Vous êtes sur la page 1sur 7

AI-PS Element Guide

Element 2: Compliance with Standards

Doc. Reference: GU-XXX-02


Version: Issue 1.0
Date: 10 August 2011
Doc. Owner: Head of Technical Safety Engineering (MSE4)
Element Owner: EOIM Manager (UEPI)
AI-PS Element Background There are 20 elements in total within the PDO AI-PS Management
System as follows:
AI-PS in PDO
Elements list:
Assuring the safety of our people, our assets, the environment and
the companys reputation is a core value of PDO and providing Element 1: Process Safety Culture
assurance that we are managing our major process safety risks is a Element 2: Compliance with Standards
critical aspect of our corporate governance. Asset Integrity Process Element 3: Corporate Process Safety Competency
Safety (AI-PS) describes the way we manage our assets so that the
process risk is As Low As Reasonably Practicable (ALARP). Element 4: Workplace Involvement
Element 5: Stakeholder Outreach
What it is Element 6: Process Knowledge Management
Element 7: HEMP
Asset Integrity Process Safety (AI-PS) is the means of ensuring that
the people, systems, processes and resources, which deliver Element 8: Plant Operating Manuals
integrity, are in place, in use and fit for purpose throughout the Element 9: PTW
whole lifecycle of the asset. The aim is to be able to confidently Element 10: Technical Integrity
state that our assets are safe and we know it. Element 11: Contractor Management
Element 12: Training and Performance Assurance
Asset Integrity Process Safety Management is a complex area of
expertise covering a wide range of components, all of which are Element 13: Management of Change
essential to ensuring systems, processes and equipment perform as Element 14: Readiness for Start Up
required. There are a number of Elements which make up the Asset Element 15: Conduct of Operations
Integrity Process Safety management system. Element 16: Emergency Management
Structure of AI-PS Assurance in PDO Element 17: Incident Management
Element 18: Measurements and Metrics
PDO has a three-tiered approach to AI-PS assurance: Element 19: Audit and Verification of Level 2 Process
Level 1: Includes audits conducted on behalf of PDO's Internal Audit Element 20: Management Review and Continuous Improvement
Committee (IAC) as part of the Integrated Audit Plan. This includes
independent audits carried out by external bodies, such as Shell. Element 2: Compliance with Standards
Level 2: Includes audits carried out on behalf of Asset Managers as
Background to Element
part of their own Asset level assurance processes.
Level 3: Includes task verification and assurance activities that The Compliance to Standards Element aims to ensure there is a
supplement the formal audit process. suitable system in place that can be used to identify, develop,
acquire, evaluate, disseminate, and provide access to applicable
standards, codes, regulations, and laws that affect process safety.
Aims and Objectives of Element Responsibilities and Accountabilities for AI-PS Element Guide
Implementation
The standards system addresses both internal and external
standards for design and engineering; national and international The Operations Manager is accountable for the Level 2 Assurance
codes and standards; and local, state regulations and laws. The process at the asset.
system allows this information to be easily and quickly accessible to
potential users, e.g. designers, engineers, vendors, etc. Completion of the Level 2 Self Assessment and Level 3 Verification
Checklists, as provided in this element guide, is the responsibility of
Knowledge of and conformance to standards helps PDO to operate the Element Champions and AIPSALT. The Delivery Team Leader
and maintain a safe facility, consistently implement process safety (DTL) is accountable for the AIPSALT.
practices, and minimise legal liability. Changes in standards may
occur at irregular intervals or on a fixed schedule, and the standards AI-PS Assurance Leadership Team (AIPSALT)
system must keep up with such changes so the company can adjust
its compliance activities. The AIPSALT is comprised of the asset DTL and Process Safety
Element Champions (PSEC).
Scope of Element
The DTL and PSEC roles include: reporting the status of the Level 3
The scope of this Element applies to all PDO assets during all phases Verification activities for the relevant Element at the AIPSALT
of the facility lifecycle, including: design, commissioning, start up, meeting; maintaining Key Performance Indicators (KPIs) for the
shutdown, operations and decommissioning. Element; monitoring the effectiveness of the Level 3 Verification
activities in assuring AI-PS, and recommending changes to improve
AI-PS Element Guide Implementation effectiveness and efficiency as appropriate; monitoring the progress
of corrective actions and improvement plans associated with that
Aims and Objectives of AI-PS Element Guide Element; and leading Level 2 Self-Assessment of compliance with
the requirements of that Element.
The aim of this AI-PS Element Guide is to provide background to AI-
PS and a structured and consistent approach to carrying out Level 2 Level 2 Assurance
Self Assessments and Level 3 Verification for all AI-PS Elements
within PDO. Level 2 Self Assessment and Audit

The intended audience for the guide are the members of the Level 2 assurance is provided by a series of AI-PS audits carried out
AIPSALT although this can be used as a basis for training and on behalf of Asset Directors and Operations Managers as part of
awareness for all staff at the asset. their own Directorate-Level assurance processes.

Level 2 Audits (and Level 2 Self Assessments) are conducted at each


Directorate using standard protocols and templates described in
this series of AI-PS Element Guides.
The Level 2 Self Assessment Checklist (provided in this AI-PS Level 3 Verification is carried out by the AIPSALT, and may be
Element Guide) can be viewed as a health check of asset completed as per an agreed schedule or as required by ongoing
performance again the element. Completing the Level 2 Self work. Typically it will be completed on a quarterly basis.
Assessment will help the asset to identify areas for improvement
ahead of the Level 2 Audit. Verification Checklists

Frequency of Level 2 Assurance Level 3 Verification checklists have been developed for each AI-PS
Element within PDO in order to provide a structured and consistent
Level 2 Audits are conducted annually at each Directorate but the approach to Level 3 Verification across all assets. The Level 3
frequency and duration may be adjusted to reflect either positive or Verification checklists are structured as a sample check or specific
negative trends, recent audit findings, emerging risks and alignment and localised audit of the Element in question.
with other audit activities. The schedule of Level 2 audits is set in
the Directorate HSE Plan. By successfully verifying that the Level 3 Verification activities are
being completed correctly it provides a strong indication that the
The frequency of Level 2 Self Assessment should also reflect how element is being implemented at the system level (assessed via the
well the asset is performing against all AI-PS Elements and be Level 2 Self Assessment and Level 2 Audits).
performed no less than on an annual basis (ahead of the Level 2
Audit).
The Level 2 Self Assessment and Level 3 verification checklists for
Level 3 Verification Checklist this element are provided below.

Level 3 Verification Description

Level 3 Verification demonstrates compliance with the asset HSE


Case barriers, HSE Critical Tasks, operational procedures and other
requirements defined in the HSE Management System. These
activities provide an ongoing check that the procedures, tests and
inspections necessary to maintaining the functionality of Safety
Critical Elements and systems are completed as required so that
process risk is managed to a level that is As Low As Reasonably
Practicable (ALARP).

In summary, the Level 3 Checklists are an operational level sample


check or mini audit, completed by the asset against PDO and asset
based procedures. The effectiveness of the Level 3 Verification
process is assessed during the Level 2 Self Assessment process and
ultimately via the Level 2 Audit programme.
Level 2 Self Assessment
SN Protocol Y / N / NA & Evidence Possible approach
2.1 Have the relevant internal and external The engineering manager(s), or persons in
codes and standards for the facility been similar positions are the most likely
identified and documented? Specifically: interviewees for this protocol.
Those that define equipment
design, construction, and operations
requirements for a project or
modification;
Those that define training
requirements;
Those that identify special or unique
hazards applicable to the facility,
e.g. Hydrogen Sulphide.
2.2 Are the relevant codes and standards easily
available to those who need them?
2.3 Have the relevant internal and external The engineering manager(s), or persons in
codes and standards been properly similar positions are the most likely
interpreted for the facility, its chemicals / interviewees for this protocol.
materials, and its operations, and For a project or modification, has a list of
interpretations have been documented? DCAF deliverables been identified?
Has the list been approved or reviewed by
relevant discipline TA-2s?
2.4 Are variances to codes, standards and Review Project Change Log.
project specifications controlled in
accordance with PR-1247?
2.5 Is the facility using the current version of For a project or modification, review the list
codes and standards? of selected codes and standards. Compare
against the version of GU-611 in force at the
time that the codes and standards were
selected. Are approved variances available,
when standards have not been selected?
2.6 Have facility Technical Authorities (TA-2s) For a project, review the Project Controls &
been trained in the codes and standards Assurance Plan (PCAP) to identify the TA-
requirements and are competent to execute 2s assigned to the project. There TA
the requirements? competency assessments should be held by
the Company DCAF manager.
Interview the TAs. Are they aware of the
latest version of codes and standards
relevant to their engineering discipline.
SN Protocol Y / N / NA & Evidence Possible approach
2.7 Are facility Company Site Representatives Check awareness of a sample of codes and
aware of current codes and standards standards. Particularly those relevant to
applied by PDO? achieving Integrity in construction.
2.8 Are contractors familiar with the codes and Particularly the EMC/ODC contractors.
standards that govern their work? Review the documentation submitted by the
contractor during pre-qualification to
determine if the contractor understands the
codes and standards that govern the work.
Interview contractor personnel working at
the facility, particularly supervisors and
engineers, to determine if they understand
the codes and standards that govern their
work. Confirm that the codes and standards
are aligned to PDO standards and are the
latest revision.
AI-PS Level 3 Compliance with Standards Verification Checklist

There is no Operate phase Level 3 Verification checklist for Compliance with Standards.