CONSTRUCCION DE DIRECCION
PARADA DE COLUMNAS EN CIMIENTO CORRIDO, ENCOFRADO
10 Y VACIADO; PARA CONFINAMIENTO DE MURO UND 4
COSTO
DESCRIPCCION UNID. CANT.
S/.
1 CEMENTO UND 35 21
2 ARENA FINA M3 1 30
4 ARENA GRUESA M3 4 30
5 GRAVILLA DE 1/2" M3 1 35
6 GRAVILLA DE 3/4" M3 2 25
9 FIERRO DE 1/4" VAR. 6 8
8 FIERRO DE 12 MM VAR. 8 20
10 ALAMBRE N 16 KG 6 5
11 LADRILLO KK KING KONG MILL. 1 380
12 TUBERIA DE 2 UNID 4 9
13 VIGAS PARA TECHO UNID 3 60
=
METRADO COSTO TOTAL
LONG. ANCHO ALTO PARCIAL S/. PARCIAL
4 250 1000
17 20 340
17 15 255
950 350 350
64 15 960
1 400 400
1 250 250
7 7 49
1 200 200
= 7813.1
TOTAL 7813.1
TOTAL
PARCIAL
735
30
120
35 = 9617.1
50
48
160
30
380
36
180
1804
MANO DE OBRA
METRADO
DESCRIPCCION UNID. CANT.
LONG. ANCHO ALTO
COSTO TOTAL
DESCRIPCCION UNID. CANT. S/. PARCIAL
1 350 350
4 75 300
1 150 150
6.5 20 130
= 930
TOTAL 930
1902