ANLISIS DE CARGAS EN LOSA DE AZOTEA 3er.Nivel

Impermeabilizacin
Losa Concreto
Aplanado Plafn

1.- CARGA VIVA


Carga viva 100 Kg/m2
TOTAL CARGA VIVA (WL) = 100 Kg/m2

2.- CARGA MUERTA (WD)


A.- Losa de concreto armado 200 Kg/cm2
Lado 1 Lado 2 Altura Peso Concreto kg/m3
1 1 0.1 2400 240 Kg/m2
B.- Varilla 3/8" (9.5 MM)
Lado 1 Lado 2 Cantidad ML Peso kg/ml
1 1 5 0.56 2.8 Kg/m2
C.- Impermeabilizante
Lado 1 Lado 2 Altura Peso kg/m3
1 1 0.01 2400 24 Kg/m2
TOTAL CARGA MUERTA (WD) = 266.8 Kg/m2

TOTAL CARGA VIVA + CARGA MUERTA (WT) = 366.8 Kg/m2

Factor de Seguridad K= WL 100 0.37


WD 266.8

Factor de Seguridad Fs= 1.4 + 1.7 (K) 2.04 1.48


1+K 1.37
1.4 1.7 1

Factor de Seguridad (F.S.) = 1.48


Factor de Instalaciones (F.INST.) = 1.2

Carga Ultima de Diseo


Wu = (F.S)(F.INST)(WT)
WU = 1.48 1.2 366.80 652.224
ANLISIS DE CARGAS EN LOSA DE ENTREPISO 2do. NIVEL

Losa de Concreto
Acero
Aplanado y Pintura

1.- CARGA VIVA


Carga viva 200 Kg/m2
TOTAL CARGA VIVA (WL) = 200 Kg/m2

2.- CARGA MUERTA (WD)


A.- Losa de concreto armado 200 Kg/cm2
Lado 1 Lado 2 Altura Peso Concreto kg/m3
1 1 0.1 2400 240 Kg/m2
B.- Varilla 3/8" (9.5 MM)
Lado 1 Lado 2 Cantidad ML Peso kg/ml
1 1 5 0.56 2.8 Kg/m2
C.- Aplanado
Lado 1 Lado 2 Altura Peso kg/m3
1 1 0.01 2400 24 Kg/m2
C.- Pintura
Lado 1 Lado 2 Altura Peso kg/m2
1 1 5 5 Kg/m2
TOTAL CARGA MUERTA (WD) = 271.8 Kg/m2

TOTAL CARGA VIVA + CARGA MUERTA (WT) = 471.8 Kg/m2

Factor de Seguridad K= WL 200 0.74


WD 271.8

Factor de Seguridad Fs= 1.4 + 1.7 (K) 2.65 1.53


1+K 1.74
1.4 1.7 1

Factor de Seguridad (F.S.) = 1.53


Factor de Instalaciones (F.INST.) = 1.2

Carga Ultima de Diseo


Wu = (F.S)(F.INST)(WT)
WU = 1.53 1.2 471.8 864.624
ANLISIS DE CARGAS EN LOSA DE ENTREPISO 1er. NIVEL

Losa de Concreto
Acero
Aplanado y Pintura

1.- CARGA VIVA


Carga viva 200 Kg/m2
TOTAL CARGA VIVA (WL) = 200 Kg/m2

2.- CARGA MUERTA (WD)


A.- Losa de concreto armado 200 Kg/cm2
Lado 1 Lado 2 Altura Peso Concreto kg/m3
1 1 0.1 2400 240 Kg/m2
B.- Varilla 3/8" (9.5 MM)
Lado 1 Lado 2 Cantidad ML Peso kg/ml
1 1 5 0.56 2.8 Kg/m2
C.- Aplanado
Lado 1 Lado 2 Altura Peso kg/m3
1 1 0.01 2400 24 Kg/m2
C.- Pintura
Lado 1 Lado 2 Altura Peso kg/m2
1 1 5 5 Kg/m2
TOTAL CARGA MUERTA (WD) = 271.8 Kg/m2

TOTAL CARGA VIVA + CARGA MUERTA (WT) = 471.8 Kg/m2

Factor de Seguridad K= WL 200 0.74


WD 271.8

Factor de Seguridad Fs= 1.4 + 1.7 (K) 2.65 1.53


1+K 1.74
1.4 1.7 1

Factor de Seguridad (F.S.) = 1.53


Factor de Instalaciones (F.INST.) = 1.2

Carga Ultima de Diseo


Wu = (F.S)(F.INST)(WT)
WU = 1.53 1.2 471.8 864.624
CALCULO DE REAS TRIBUTARIAS 3er. Nivel

TABLERO No. 1
Tipo Formula B b h Total
A1 Trapecio (B+b)h/2 4.25 0.356 1.947 4.48
A2 Triangulo B*h/2 2.772 2.772 3.84
A3 Trapecio (B+b)h/2 4.25 3.05 1.95 7.12
A4 Triangulo B*h/2 2.772 2.772 3.84
Total M2 19.29
TABLERO No. 2
Tipo Formula B b h Total
A5 Trapecio (B+b)h/2 4.25 1.225 1.513 4.14
A6 Triangulo B*h/2 2.139 2.139 2.29
A7 Trapecio (B+b)h/2 4.25 1.225 1.513 4.14
A8 Triangulo B*h/2 2.139 2.139 2.29
Total M2 12.86
TABLERO No. 3
Tipo Formula B b h Total
A9 Trapecio (B+b)h/2 3.894 1.084 1.405 3.50
A10 Triangulo B*h/2 1.969 1.969 1.94
A11 Trapecio (B+b)h/2 3.894 1.084 1.405 3.50
A12 Triangulo B*h/2 1.969 1.969 1.94
Total M2 10.87
TABLERO No. 4
Tipo Formula B b h Total
A13 Trapecio (B+b)h/2 3.025 0.215 1.405 2.28
A14 Triangulo B*h/2 1.987 1.987 1.97
A15 Trapecio (B+b)h/2 3.025 0.215 1.405 2.28
A16 Triangulo B*h/2 1.987 1.987 1.97
Total M2 8.50
TABLERO No. 5
Tipo Formula B b h Total
A17 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A18 Triangulo B*h/2 2.079 2.079 2.16
A19 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A20 Triangulo B*h/2 2.079 2.079 2.16
Total M2 11.45
TABLERO No. 6
Tipo Formula B b h Total
A21 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A22 Triangulo B*h/2 2.079 2.079 2.16
A23 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A24 Triangulo B*h/2 2.079 2.079 2.16
Total M2 8.89
TABLERO No. 7
Tipo Formula B b h Total
A25 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A26 Triangulo B*h/2 2.037 2.037 2.07
A27 Trapecio (B+b)h/2 3.894 3.05 1.95 6.77
A28 Triangulo B*h/2 2.037 2.037 2.07
Total M2 14.48
TABLERO No. 8
Tipo Formula B b h Total
A29 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A30 Triangulo B*h/2 2.061 2.061 2.12
A31 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A32 Triangulo B*h/2 2.061 2.061 2.12
Total M2 8.82
TABLERO No. 9
Tipo Formula B b h Total
A33 Trapecio (B+b)h/2 3.894 1.134 1.38 3.47
A34 Triangulo B*h/2 1.952 1.952 1.91
A35 Trapecio (B+b)h/2 3.894 1.134 1.38 3.47
A36 Triangulo B*h/2 1.952 1.952 1.91
Total M2 10.75
TABLERO No. 10
Tipo Formula B b h Total
A37 Trapecio (B+b)h/2 3.025 0.265 1.38 2.27
A38 Triangulo B*h/2 1.952 1.952 1.91
A39 Trapecio (B+b)h/2 3.025 0.265 1.38 2.27
A40 Triangulo B*h/2 1.952 1.952 1.91
Total M2 8.35
TABLERO No. 11
Tipo Formula B b h Total
A41 Trapecio (B+b)h/2 4.3 0.406 1.947 4.58
A42 Triangulo B*h/2 2.754 2.754 3.79
A43 Trapecio (B+b)h/2 4.3 0.406 1.947 4.58
A44 Triangulo B*h/2 2.754 2.754 3.79
Total M2 16.75
TABLERO No. 12
Tipo Formula B b h Total
A45 Trapecio (B+b)h/2 4.3 1.275 1.513 4.22
A46 Triangulo B*h/2 2.139 2.139 2.29
A47 Trapecio (B+b)h/2 4.3 1.275 1.513 4.22
A48 Triangulo B*h/2 2.139 2.139 2.29
Total M2 13.01
CALCULO DE REAS TRIBUTARIAS 2do. Nivel

TABLERO No. 1
Tipo Formula B b h Total
A1 Trapecio (B+b)h/2 4.25 0.356 1.947 4.48
A2 Triangulo B*h/2 2.772 2.772 3.84
A3 Trapecio (B+b)h/2 4.25 3.05 1.95 7.12
A4 Triangulo B*h/2 2.772 2.772 3.84
Total M2 19.29
TABLERO No. 2
Tipo Formula B b h Total
A5 Trapecio (B+b)h/2 4.25 1.225 1.513 4.14
A6 Triangulo B*h/2 2.139 2.139 2.29
A7 Trapecio (B+b)h/2 4.25 1.225 1.513 4.14
A8 Triangulo B*h/2 2.139 2.139 2.29
Total M2 12.86
TABLERO No. 3
Tipo Formula B b h Total
A9 Trapecio (B+b)h/2 3.894 1.084 1.405 3.50
A10 Triangulo B*h/2 1.969 1.969 1.94
A11 Trapecio (B+b)h/2 3.894 1.084 1.405 3.50
A12 Triangulo B*h/2 1.969 1.969 1.94
Total M2 10.87
TABLERO No. 4
Tipo Formula B b h Total
A13 Trapecio (B+b)h/2 3.025 0.215 1.405 2.28
A14 Triangulo B*h/2 1.987 1.987 1.97
A15 Trapecio (B+b)h/2 3.025 0.215 1.405 2.28
A16 Triangulo B*h/2 1.987 1.987 1.97
Total M2 8.50
TABLERO No. 5
Tipo Formula B b h Total
A17 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A18 Triangulo B*h/2 2.079 2.079 2.16
A19 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A20 Triangulo B*h/2 2.079 2.079 2.16
Total M2 11.45
TABLERO No. 6
Tipo Formula B b h Total
A21 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A22 Triangulo B*h/2 2.079 2.079 2.16
A23 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A24 Triangulo B*h/2 2.079 2.079 2.16
Total M2 8.89
TABLERO No. 7
Tipo Formula B b h Total
A25 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A26 Triangulo B*h/2 2.037 2.037 2.07
A27 Trapecio (B+b)h/2 3.894 3.05 1.95 6.77
A28 Triangulo B*h/2 2.037 2.037 2.07
Total M2 14.48
TABLERO No. 8
Tipo Formula B b h Total
A29 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A30 Triangulo B*h/2 2.061 2.061 2.12
A31 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A32 Triangulo B*h/2 2.061 2.061 2.12
Total M2 8.82
TABLERO No. 9
Tipo Formula B b h Total
A33 Trapecio (B+b)h/2 3.894 1.134 1.38 3.47
A34 Triangulo B*h/2 1.952 1.952 1.91
A35 Trapecio (B+b)h/2 3.894 1.134 1.38 3.47
A36 Triangulo B*h/2 1.952 1.952 1.91
Total M2 10.75
TABLERO No. 10
Tipo Formula B b h Total
A37 Trapecio (B+b)h/2 3.025 0.265 1.38 2.27
A38 Triangulo B*h/2 1.952 1.952 1.91
A39 Trapecio (B+b)h/2 3.025 0.265 1.38 2.27
A40 Triangulo B*h/2 1.952 1.952 1.91
Total M2 8.35
TABLERO No. 11
Tipo Formula B b h Total
A41 Trapecio (B+b)h/2 4.3 0.406 1.947 4.58
A42 Triangulo B*h/2 2.754 2.754 3.79
A43 Trapecio (B+b)h/2 4.3 0.406 1.947 4.58
A44 Triangulo B*h/2 2.754 2.754 3.79
Total M2 16.75
TABLERO No. 12
Tipo Formula B b h Total
A45 Trapecio (B+b)h/2 4.3 1.275 1.513 4.22
A46 Triangulo B*h/2 2.139 2.139 2.29
A47 Trapecio (B+b)h/2 4.3 1.275 1.513 4.22
A48 Triangulo B*h/2 2.139 2.139 2.29
Total M2 13.01
CALCULO DE REAS TRIBUTARIAS 1er. Nivel

TABLERO No. 1
Tipo Formula B b h Total
A1 Trapecio (B+b)h/2 4.25 0.356 1.947 4.48
A2 Triangulo B*h/2 2.772 2.772 3.84
A3 Trapecio (B+b)h/2 4.25 3.05 1.95 7.12
A4 Triangulo B*h/2 2.772 2.772 3.84
Total M2 19.29
TABLERO No. 2
Tipo Formula B b h Total
A5 Trapecio (B+b)h/2 4.25 1.225 1.513 4.14
A6 Triangulo B*h/2 2.139 2.139 2.29
A7 Trapecio (B+b)h/2 4.25 1.225 1.513 4.14
A8 Triangulo B*h/2 2.139 2.139 2.29
Total M2 12.86
TABLERO No. 3
Tipo Formula B b h Total
A9 Trapecio (B+b)h/2 3.894 1.084 1.405 3.50
A10 Triangulo B*h/2 1.969 1.969 1.94
A11 Trapecio (B+b)h/2 3.894 1.084 1.405 3.50
A12 Triangulo B*h/2 1.969 1.969 1.94
Total M2 10.87
TABLERO No. 4
Tipo Formula B b h Total
A13 Trapecio (B+b)h/2 3.025 0.215 1.405 2.28
A14 Triangulo B*h/2 1.987 1.987 1.97
A15 Trapecio (B+b)h/2 3.025 0.215 1.405 2.28
A16 Triangulo B*h/2 1.987 1.987 1.97
Total M2 8.50
TABLERO No. 5
Tipo Formula B b h Total
A17 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A18 Triangulo B*h/2 2.079 2.079 2.16
A19 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A20 Triangulo B*h/2 2.079 2.079 2.16
Total M2 11.45
TABLERO No. 6
Tipo Formula B b h Total
A21 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A22 Triangulo B*h/2 2.079 2.079 2.16
A23 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A24 Triangulo B*h/2 2.079 2.079 2.16
Total M2 8.89
TABLERO No. 7
Tipo Formula B b h Total
A25 Trapecio (B+b)h/2 3.894 0.954 1.47 3.56
A26 Triangulo B*h/2 2.037 2.037 2.07
A27 Trapecio (B+b)h/2 3.894 3.05 1.95 6.77
A28 Triangulo B*h/2 2.037 2.037 2.07
Total M2 14.48
TABLERO No. 8
Tipo Formula B b h Total
A29 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A30 Triangulo B*h/2 2.061 2.061 2.12
A31 Trapecio (B+b)h/2 3.025 0.085 1.47 2.29
A32 Triangulo B*h/2 2.061 2.061 2.12
Total M2 8.82
TABLERO No. 9
Tipo Formula B b h Total
A33 Trapecio (B+b)h/2 3.894 1.134 1.38 3.47
A34 Triangulo B*h/2 1.952 1.952 1.91
A35 Trapecio (B+b)h/2 3.894 1.134 1.38 3.47
A36 Triangulo B*h/2 1.952 1.952 1.91
Total M2 10.75
TABLERO No. 10
Tipo Formula B b h Total
A37 Trapecio (B+b)h/2 3.025 0.265 1.38 2.27
A38 Triangulo B*h/2 1.952 1.952 1.91
A39 Trapecio (B+b)h/2 3.025 0.265 1.38 2.27
A40 Triangulo B*h/2 1.952 1.952 1.91
Total M2 8.35
TABLERO No. 11
Tipo Formula B b h Total
A41 Trapecio (B+b)h/2 4.3 0.406 1.947 4.58
A42 Triangulo B*h/2 2.754 2.754 3.79
A43 Trapecio (B+b)h/2 4.3 0.406 1.947 4.58
A44 Triangulo B*h/2 2.754 2.754 3.79
Total M2 16.75
TABLERO No. 12
Tipo Formula B b h Total
A45 Trapecio (B+b)h/2 4.3 1.275 1.513 4.22
A46 Triangulo B*h/2 2.139 2.139 2.29
A47 Trapecio (B+b)h/2 4.3 1.275 1.513 4.22
A48 Triangulo B*h/2 2.139 2.139 2.29
Total M2 13.01
CALCULO DE CARGAS TRIBUTARIAS 3er. Nivel
W = M2 652.224
TABLERO No. 1
Total PESO TOTAL
A1 4.48 652.224 2924.53393
A2 3.84 652.224 2505.84
A3 7.12 652.224 4642.20432
A4 3.84 652.224 2505.84
19.29 12578.42
TABLERO No. 2
Total PESO TOTAL
A5 4.14 652.224 2701.41
A6 2.29 652.224 1492.07
A7 4.14 652.224 2701.41
A8 2.29 652.224 1492.07
12.86 8386.95
TABLERO No. 3
Total PESO TOTAL
A9 3.50 652.224 2280.86
A10 1.94 652.224 1264.32
A11 3.50 652.224 2280.86
A12 1.94 652.224 1264.32
10.87
TABLERO No. 4
Total PESO TOTAL
A13 2.28 652.224 1484.53
A14 1.97 652.224 1287.55
A15 2.28 652.224 1484.53
A16 1.97 652.224 1287.55
8.50
TABLERO No. 5
Total PESO TOTAL
A17 3.56 652.224 2324.06
A18 2.16 652.224 1409.53
A19 3.56 652.224 2324.06
A20 2.16 652.224 1409.53
11.45
TABLERO No. 6
Total PESO TOTAL
A21 2.29 652.224 1490.89
A22 2.16 652.224 1409.53
A23 2.29 652.224 1490.89
A24 2.16 652.224 1409.53
8.89
TABLERO No. 7
Total PESO TOTAL
A25 3.56 652.224 2324.06
A26 2.07 652.224 1353.16
A27 6.77 652.224 4415.82
A28 2.07 652.224 1353.16
14.48
TABLERO No. 8
Total PESO TOTAL
A29 2.29 652.224 1490.89
A30 2.12 652.224 1385.23
A31 2.29 652.224 1490.89
A32 2.12 652.224 1385.23
8.82
TABLERO No. 9
Total PESO TOTAL
A33 3.47 652.224 2262.77
A34 1.91 652.224 1242.59
A35 3.47 652.224 2262.77
A36 1.91 652.224 1242.59
10.75
TABLERO No. 10
Total PESO TOTAL
A37 2.27 652.224 1480.61
A38 1.91 652.224 1242.59
A39 2.27 652.224 1480.61
A40 1.91 652.224 1242.59
8.35
TABLERO No. 11
Total PESO TOTAL
A41 4.58 652.224 2988.03
A42 3.79 652.224 2473.40
A43 4.58 652.224 2988.03
A44 3.79 652.224 2473.40
16.75
TABLERO No. 12
Total PESO TOTAL
A45 4.22 652.224 2750.75
A46 2.29 652.224 1492.07
A47 4.22 652.224 2750.75
A48 2.29 652.224 1492.07
13.01
CALCULO DE CARGAS TRIBUTARIAS 2do. Nivel
W = M2 864.624
TABLERO No. 1
Total PESO TOTAL
A1 4.48 864.624 3876.923
A2 3.84 864.624 3321.88
A3 7.12 864.624 6153.96132
A4 3.84 864.624 3321.88
19.29 16674.6413
TABLERO No. 2
Total PESO TOTAL
A5 4.14 864.624 3581.13
A6 2.29 864.624 1977.97
A7 4.14 864.624 3581.13
A8 2.29 864.624 1977.97
12.86
TABLERO No. 3
Total PESO TOTAL
A9 3.50 864.624 3023.63
A10 1.94 864.624 1676.06
A11 3.50 864.624 3023.63
A12 1.94 864.624 1676.06
10.87
TABLERO No. 4
Total PESO TOTAL
A13 2.28 864.624 1967.97
A14 1.97 864.624 1706.84
A15 2.28 864.624 1967.97
A16 1.97 864.624 1706.84
8.50
TABLERO No. 5
Total PESO TOTAL
A17 3.56 864.624 3080.90
A18 2.16 864.624 1868.56
A19 3.56 864.624 3080.90
A20 2.16 864.624 1868.56
11.45
TABLERO No. 6
Total PESO TOTAL
A21 2.29 864.624 1976.40
A22 2.16 864.624 1868.56
A23 2.29 864.624 1976.40
A24 2.16 864.624 1868.56
8.89
TABLERO No. 7
Total PESO TOTAL
A25 3.56 864.624 3080.90
A26 2.07 864.624 1793.82
A27 6.77 864.624 5853.85
A28 2.07 864.624 1793.82
14.48
TABLERO No. 8
Total PESO TOTAL
A29 2.29 864.624 1976.40
A30 2.12 864.624 1836.34
A31 2.29 864.624 1976.40
A32 2.12 864.624 1836.34
8.82
TABLERO No. 9
Total PESO TOTAL
A33 3.47 864.624 2999.66
A34 1.91 864.624 1647.24
A35 3.47 864.624 2999.66
A36 1.91 864.624 1647.24
10.75
TABLERO No. 10
Total PESO TOTAL
A37 2.27 864.624 1962.78
A38 1.91 864.624 1647.24
A39 2.27 864.624 1962.78
A40 1.91 864.624 1647.24
8.35
TABLERO No. 11
Total PESO TOTAL
A41 4.58 864.624 3961.09
A42 3.79 864.624 3278.88
A43 4.58 864.624 3961.09
A44 3.79 864.624 3278.88
16.75
TABLERO No. 12
Total PESO TOTAL
A45 4.22 864.624 3646.54
A46 2.29 864.624 1977.97
A47 4.22 864.624 3646.54
A48 2.29 864.624 1977.97
13.01
CALCULO DE CARGAS TRIBUTARIAS 1er. Nivel
W = M2 864.624
TABLERO No. 1
Total PESO TOTAL
A1 4.48 864.624 3876.923
A2 3.84 864.624 3321.88
A3 7.12 864.624 6153.96132
A4 3.84 864.624 3321.88
19.29 16674.6413
TABLERO No. 2
Total PESO TOTAL
A5 4.14 864.624 3581.13
A6 2.29 864.624 1977.97
A7 4.14 864.624 3581.13
A8 2.29 864.624 1977.97
12.86
TABLERO No. 3
Total PESO TOTAL
A9 3.50 864.624 3023.63
A10 1.94 864.624 1676.06
A11 3.50 864.624 3023.63
A12 1.94 864.624 1676.06
10.87
TABLERO No. 4
Total PESO TOTAL
A13 2.28 864.624 1967.97
A14 1.97 864.624 1706.84
A15 2.28 864.624 1967.97
A16 1.97 864.624 1706.84
8.50
TABLERO No. 5
Total PESO TOTAL
A17 3.56 864.624 3080.90
A18 2.16 864.624 1868.56
A19 3.56 864.624 3080.90
A20 2.16 864.624 1868.56
11.45
TABLERO No. 6
Total PESO TOTAL
A21 2.29 864.624 1976.40
A22 2.16 864.624 1868.56
A23 2.29 864.624 1976.40
A24 2.16 864.624 1868.56
8.89
TABLERO No. 7
Total PESO TOTAL
A25 3.56 864.624 3080.90
A26 2.07 864.624 1793.82
A27 6.77 864.624 5853.85
A28 2.07 864.624 1793.82
14.48
TABLERO No. 8
Total PESO TOTAL
A29 2.29 864.624 1976.40
A30 2.12 864.624 1836.34
A31 2.29 864.624 1976.40
A32 2.12 864.624 1836.34
8.82
TABLERO No. 9
Total PESO TOTAL
A33 3.47 864.624 2999.66
A34 1.91 864.624 1647.24
A35 3.47 864.624 2999.66
A36 1.91 864.624 1647.24
10.75
TABLERO No. 10
Total PESO TOTAL
A37 2.27 864.624 1962.78
A38 1.91 864.624 1647.24
A39 2.27 864.624 1962.78
A40 1.91 864.624 1647.24
8.35
TABLERO No. 11
Total PESO TOTAL
A41 4.58 864.624 3961.09
A42 3.79 864.624 3278.88
A43 4.58 864.624 3961.09
A44 3.79 864.624 3278.88
16.75
TABLERO No. 12
Total PESO TOTAL
A45 4.22 864.624 3646.54
A46 2.29 864.624 1977.97
A47 4.22 864.624 3646.54
A48 2.29 864.624 1977.97
13.01
SUMATORIA DE CALCULO DE CARGAS TRIBUTARIAS 3er, 2do y 1er. Nivel

TABLERO No. 1
PESO TOTAL
A1 10678.38
A2 9149.60
A3 16950.13
A4 9149.60

TABLERO No. 2
PESO TOTAL
A5 9863.67
A6 5448.00
A7 9863.67
A8 5448.00

TABLERO No. 3
PESO TOTAL
A9 8328.11
A10 4616.44
A11 8328.11
A12 4616.44

TABLERO No. 4
PESO TOTAL
A13 5420.47
A14 4701.23
A15 5420.47
A16 4701.23

TABLERO No. 5
PESO TOTAL
A17 8485.85
A18 5146.65
A19 8485.85
A20 5146.65

TABLERO No. 6
PESO TOTAL
A21 5443.69
A22 5146.65
A23 5443.69
A24 5146.65

TABLERO No. 7
PESO TOTAL
A25 8485.85
A26 4940.80
A27 16123.52
A28 4940.80

TABLERO No. 8
PESO TOTAL
A29 5443.69
A30 5057.91
A31 5443.69
A32 5057.91

TABLERO No. 9
PESO TOTAL
A33 8262.09
A34 4537.07
A35 8262.09
A36 4537.07

TABLERO No. 10
PESO TOTAL
A37 5406.18
A38 4537.07
A39 5406.18
A40 4537.07

TABLERO No. 11
PESO TOTAL
A41 10910.22
A42 9031.16
A43 10910.22
A44 9031.16

TABLERO No. 12
PESO TOTAL
A45 10043.83
A46 5448.00
A47 10043.83
A48 5448.00
ANLISIS DE CARGA DE COLUMNA 3er Nivel

Concepto kg/m3 B b h Total


Concreto 2400 0.15 0.15 1 54.00
Concepto kg/ml Cantidad b h Total
Varilla (3/8") 0.557 4 1 2.23
Concepto kg/ml ml b h Total
Estribos (1/4") 0.25 4 1.00
Total Kg/ml 57.23

ANLISIS DE CARGA DE COLUMNA 2do Nivel y 3er. Nivel

Concepto kg/m3 B b h Total


Concreto 2400 0.30 0.30 1 216.00
Concepto kg/ml Cantidad b h Total
Varilla 0.996 8 1 7.97
Concepto kg/ml ml b h Total
Estribos 0.25 5.56 1.39
Total Kg/ml 225.36
CALCULO DE CARGAS COLUMNAS 3er. Nivel
W = ML 57.23
No. EJE ALTURA KG/ML TOTAL (W)
C1 1 A 2.40 57.23 137.35
C2 1 B 2.40 57.23 137.35
C3 1 C 2.40 57.23 137.35
C4 3 A 2.40 57.23 137.35
C5 3 B 2.40 57.23 137.35
C6 3 C 2.40 57.23 137.35
C7 4 A 2.40 57.23 137.35
C8 4 B 2.40 57.23 137.35
C9 4 C 2.40 57.23 137.35
C10 5 A 2.40 57.23 137.35
C11 5 B 2.40 57.23 137.35
C12 5 C 2.40 57.23 137.35
C13 6 A 2.40 57.23 137.35
C14 6 B 2.40 57.23 137.35
C15 6 C 2.40 57.23 137.35
C16 7 A 2.40 57.23 137.35
C17 7 B 2.40 57.23 137.35
C18 7 C 2.40 57.23 137.35
C19 9 A 2.40 57.23 137.35
C20 9 B 2.40 57.23 137.35
C21 9 C 2.40 57.23 137.35
Total Kg 2884.29
CALCULO DE CARGAS COLUMNAS 2do. Nivel
W = ML 57.23
No. EJE ALTURA KG/ML TOTAL (W)
C1 1 A 2.40 57.23 137.35
C2 1 B 2.40 57.23 137.35
C3 1 C 2.40 57.23 137.35
C4 3 A 2.40 57.23 137.35
C5 3 B 2.40 57.23 137.35
C6 3 C 2.40 57.23 137.35
C7 4 A 2.40 57.23 137.35
C8 4 B 2.40 57.23 137.35
C9 4 C 2.40 57.23 137.35
C10 5 A 2.40 57.23 137.35
C11 5 B 2.40 57.23 137.35
C12 5 C 2.40 57.23 137.35
C13 6 A 2.40 57.23 137.35
C14 6 B 2.40 57.23 137.35
C15 6 C 2.40 57.23 137.35
C16 7 A 2.40 57.23 137.35
C17 7 B 2.40 57.23 137.35
C18 7 C 2.40 57.23 137.35
C19 9 A 2.40 57.23 137.35
C20 9 B 2.40 57.23 137.35
C21 9 C 2.40 57.23 137.35
Total Kg 2884.29
CALCULO DE CARGAS COLUMNAS 1er. Nivel
W = ML 57.23
No. EJE ALTURA KG/ML TOTAL (W)
C1 1 A 2.40 57.23 137.35
C2 1 B 2.40 57.23 137.35
C3 1 C 2.40 57.23 137.35
C4 3 A 2.40 57.23 137.35
C5 3 B 2.40 57.23 137.35
C6 3 C 2.40 57.23 137.35
C7 4 A 2.40 57.23 137.35
C8 4 B 2.40 57.23 137.35
C9 4 C 2.40 57.23 137.35
C10 5 A 2.40 57.23 137.35
C11 5 B 2.40 57.23 137.35
C12 5 C 2.40 57.23 137.35
C13 6 A 2.40 57.23 137.35
C14 6 B 2.40 57.23 137.35
C15 6 C 2.40 57.23 137.35
C16 7 A 2.40 57.23 137.35
C17 7 B 2.40 57.23 137.35
C18 7 C 2.40 57.23 137.35
C19 9 A 2.40 57.23 137.35
C20 9 B 2.40 57.23 137.35
C21 9 C 2.40 57.23 137.35
Total Kg 2884.29
SUMATORIA DE CARGAS DE COLUMNAS A ZAPATA DE CIMENTACIN NIVEL 1, 2 Y 3

No. EJE TOTAL (W)


C1 1 A 412.04
C2 1 B 412.04
C3 1 C 412.04
C4 3 A 412.04
C5 3 B 412.04
C6 3 C 412.04
C7 4 A 412.04
C8 4 B 412.04
C9 4 C 412.04
C10 5 A 412.04
C11 5 B 412.04
C12 5 C 412.04
C13 6 A 412.04
C14 6 B 412.04
C15 6 C 412.04
C16 7 A 412.04
C17 7 B 412.04
C18 7 C 412.04
C19 9 A 412.04
C20 9 B 412.04
C21 9 C 412.04
Total Kg 8652.87
ANALISIS DE CARGA DE TRABES DE CONCRETO 3er. Nivel

Concepto kg/m3 Base Altura Longitud Total


Concreto 2400 0.15 0.30 1 108.00
Concepto kg/ml Cantidad b h Total
Varilla (3/8") 0.996 5 1 4.98
Concepto kg/ml ml b h Total
Estribos (1/4") 0.557 6.66 3.71
Total Kg/ml 116.69

ANALISIS DE CARGA DE TRABES DE CONCRETO 2do. y 3er. Nivel

Concepto kg/m3 Base Altura Longitud Total


Concreto 2400 0.20 0.40 1 192.00
Concepto kg/ml Cantidad b h Total
Varilla (1/2) 0.996 7 1 6.97
Concepto kg/ml ml b h Total
Estribos (3/8) 0.557 6.66 3.71
Total Kg/ml 202.68
ANALISIS DE CARGA DE TRABES DE CONCRETO (3er Nivel)
W = ML 116.69
No. EJE DISTANCIA KG/ML TOTAL (W)
TB - 1 1 A-B 3.894 116.69 454.39
TB - 2 1 B-C 3.025 116.69 352.99
TB - 3 A 1-3 4.250 116.69 495.93
TB - 4 B 1-3 4.250 116.69 495.93
TB - 5 C 1-3 4.250 116.69 495.93
TB - 6 3 A-B 3.894 116.69 454.39
TB - 7 3 B-C 3.025 116.69 352.99
TB - 8 A 3-4 2.810 116.69 327.90
TB - 9 B 3-4 2.810 116.69 327.90
TB - 10 C 3-4 2.810 116.69 327.90
TB - 11 4 A-B 3.894 116.69 454.39
TB - 12 4 B-C 3.025 116.69 352.99
TB - 13 A 4 -5 2.940 116.69 343.07
TB - 14 B 4 -5 2.940 116.69 343.07
TB - 15 C 4 -5 2.940 116.69 343.07
TB - 16 5 A-B 3.894 116.69 454.39
TB - 17 5 B-C 3.025 116.69 352.99
TB - 18 A 5-6 2.940 116.69 343.07
TB - 19 B 5-6 2.940 116.69 343.07
TB - 20 C 5-6 2.940 116.69 343.07
TB - 21 6 A-B 3.894 116.69 454.39
TB - 22 6 B-C 3.025 116.69 352.99
TB - 23 A 6-7 2.760 116.69 322.06
TB - 24 B 6-7 2.760 116.69 322.06
TB - 25 C 6-7 2.760 116.69 322.06
TB - 26 7 A-B 3.894 116.69 454.39
TB - 27 7 B-C 3.025 116.69 352.99
TB - 28 A 7-9 4.300 116.69 501.77
TB - 29 B 7-9 4.300 116.69 501.77
TB - 30 C 7-9 4.300 116.69 501.77
TB - 31 9 A-B 3.894 116.69 454.39
TB - 32 9 B-C 3.025 116.69 352.99
Total Kg 12,653.01
ANALISIS DE CARGA DE TRABES DE CONCRETO (2do Nivel)
W = ML 202.68
No. EJE DISTANCIA KG/ML TOTAL (W)
TB - 1 1 A-B 3.894 202.68 789.24
TB - 2 1 B-C 3.025 202.68 613.11
TB - 3 A 1-3 4.250 202.68 861.40
TB - 4 B 1-3 4.250 202.68 861.40
TB - 5 C 1-3 4.250 202.68 861.40
TB - 6 3 A-B 3.894 202.68 789.24
TB - 7 3 B-C 3.025 202.68 613.11
TB - 8 A 3-4 2.810 202.68 569.54
TB - 9 B 3-4 2.810 202.68 569.54
TB - 10 C 3-4 2.810 202.68 569.54
TB - 11 4 A-B 3.894 202.68 789.24
TB - 12 4 B-C 3.025 202.68 613.11
TB - 13 A 4 -5 2.940 202.68 595.88
TB - 14 B 4 -5 2.940 202.68 595.88
TB - 15 C 4 -5 2.940 202.68 595.88
TB - 16 5 A-B 3.894 202.68 789.24
TB - 17 5 B-C 3.025 202.68 613.11
TB - 18 A 5-6 2.940 202.68 595.88
TB - 19 B 5-6 2.940 202.68 595.88
TB - 20 C 5-6 2.940 202.68 595.88
TB - 21 6 A-B 3.894 202.68 789.24
TB - 22 6 B-C 3.025 202.68 613.11
TB - 23 A 6-7 2.760 202.68 559.40
TB - 24 B 6-7 2.760 202.68 559.40
TB - 25 C 6-7 2.760 202.68 559.40
TB - 26 7 A-B 3.894 202.68 789.24
TB - 27 7 B-C 3.025 202.68 613.11
TB - 28 A 7-9 4.300 202.68 871.53
TB - 29 B 7-9 4.300 202.68 871.53
TB - 30 C 7-9 4.300 202.68 871.53
TB - 31 9 A-B 3.894 202.68 789.24
TB - 32 9 B-C 3.025 202.68 613.11
Total Kg 21,977.38
ANALISIS DE CARGA DE TRABES DE CONCRETO (1er Nivel)
W = ML 202.68
No. EJE DISTANCIA KG/ML TOTAL (W)
TB - 1 1 A-B 3.894 202.68 789.24
TB - 2 1 B-C 3.025 202.68 613.11
TB - 3 A 1-3 4.250 202.68 861.40
TB - 4 B 1-3 4.250 202.68 861.40
TB - 5 C 1-3 4.250 202.68 861.40
TB - 6 3 A-B 3.894 202.68 789.24
TB - 7 3 B-C 3.025 202.68 613.11
TB - 8 A 3-4 2.810 202.68 569.54
TB - 9 B 3-4 2.810 202.68 569.54
TB - 10 C 3-4 2.810 202.68 569.54
TB - 11 4 A-B 3.894 202.68 789.24
TB - 12 4 B-C 3.025 202.68 613.11
TB - 13 A 4 -5 2.940 202.68 595.88
TB - 14 B 4 -5 2.940 202.68 595.88
TB - 15 C 4 -5 2.940 202.68 595.88
TB - 16 5 A-B 3.894 202.68 789.24
TB - 17 5 B-C 3.025 202.68 613.11
TB - 18 A 5-6 2.940 202.68 595.88
TB - 19 B 5-6 2.940 202.68 595.88
TB - 20 C 5-6 2.940 202.68 595.88
TB - 21 6 A-B 3.894 202.68 789.24
TB - 22 6 B-C 3.025 202.68 613.11
TB - 23 A 6-7 2.760 202.68 559.40
TB - 24 B 6-7 2.760 202.68 559.40
TB - 25 C 6-7 2.760 202.68 559.40
TB - 26 7 A-B 3.894 202.68 789.24
TB - 27 7 B-C 3.025 202.68 613.11
TB - 28 A 7-9 4.300 202.68 871.53
TB - 29 B 7-9 4.300 202.68 871.53
TB - 30 C 7-9 4.300 202.68 871.53
TB - 31 9 A-B 3.894 202.68 789.24
TB - 32 9 B-C 3.025 202.68 613.11
Total Kg 21,977.38
SUMATORIAS DE ANALISIS DE CARGA DE TRABES A ZAPATA DE CONCRETO 3er, 2do y 1er Nivel.

No. EJE DISTANCIA KG/ML TOTAL (W)


TB - 1 1 A-B 3.894 2,032.87
TB - 2 1 B-C 3.025 1,579.21
TB - 3 A 1-3 4.250 2,218.72
TB - 4 B 1-3 4.250 2,218.72
TB - 5 C 1-3 4.250 2,218.72
TB - 6 3 A-B 3.894 2,032.87
TB - 7 3 B-C 3.025 1,579.21
TB - 8 A 3-4 2.810 1,466.97
TB - 9 B 3-4 2.810 1,466.97
TB - 10 C 3-4 2.810 1,466.97
TB - 11 4 A-B 3.894 2,032.87
TB - 12 4 B-C 3.025 1,579.21
TB - 13 A 4 -5 2.940 1,534.84
TB - 14 B 4 -5 2.940 1,534.84
TB - 15 C 4 -5 2.940 1,534.84
TB - 16 5 A-B 3.894 2,032.87
TB - 17 5 B-C 3.025 1,579.21
TB - 18 A 5-6 2.940 1,534.84
TB - 19 B 5-6 2.940 1,534.84
TB - 20 C 5-6 2.940 1,534.84
TB - 21 6 A-B 3.894 2,032.87
TB - 22 6 B-C 3.025 1,579.21
TB - 23 A 6-7 2.760 1,440.87
TB - 24 B 6-7 2.760 1,440.87
TB - 25 C 6-7 2.760 1,440.87
TB - 26 7 A-B 3.894 2,032.87
TB - 27 7 B-C 3.025 1,579.21
TB - 28 A 7-9 4.300 2,244.83
TB - 29 B 7-9 4.300 2,244.83
TB - 30 C 7-9 4.300 2,244.83
TB - 31 9 A-B 3.894 2,032.87
TB - 32 9 B-C 3.025 1,579.21
Total Kg 56,607.76
ANALISIS DE CARGA DE MURO DE BLOCK

Concepto Pieza kg/Pza Total


Block de concreto 12.5 9.8 122.50
Total Kg/m2 122.50
Concepto kg/m3 Lado Lado Altura Total
Celdas 2400 0.11 0.11 0.2 5.81
Total Kg/m2 5.81
Concepto kg/m3 Largo Lado Altura Total
Dala 2400 1 0.11 0.2 52.80
Total Kg/m2 52.80

Peso Total del Muro de Block 181.11

DETALLE UNION MUROS-COLUMNAS


CALCULO DE MUROS DE BLOCK DE 15X20X40 3er. Nivel
W = ML 181.11
No. EJE BASE ALTURA KG/M2 TOTAL (W)
M-1 1 A-B 3.894 2.40 181.11 1,692.56
M-2 1 B-C 3.025 2.40 181.11 1,314.84
M-3 A 1-3 4.250 2.40 181.11 1,847.30
M-4 B 1-3 4.250 2.40 181.11 1,847.30
M-5 C 1-3 4.250 2.40 181.11 1,847.30
M-6 3 A-B 3.894 2.40 181.11 1,692.56
M-7 3 B-C 3.025 2.40 181.11 1,314.84
M-8 A 3-4 2.810 2.40 181.11 1,221.39
M-9 C 3-4 2.810 2.40 181.11 1,221.39
M-10 4 A-B 3.894 2.40 181.11 1,692.56
M-11 A 4-5 2.940 2.40 181.11 1,277.90
M-12 B 4-5 2.940 2.40 181.11 1,277.90
M-13 C 4-5 2.940 2.40 181.11 1,277.90
M-14 A 5.6 2.940 2.40 181.11 1,277.90
M-15 B 5.6 2.940 2.40 181.11 1,277.90
M-16 C 5.6 2.940 2.40 181.11 1,277.90
M-17 6 A-B 3.894 2.40 181.11 1,692.56
M-18 6 B-C 3.025 2.40 181.11 1,314.84
M-19 A 6 -7 2.760 2.40 181.11 1,199.66
M-20 C 6 -7 2.760 2.40 181.11 1,199.66
M-21 7 A-B 3.894 2.40 181.11 1,692.56
M-22 7 B-C 3.025 2.40 181.11 1,314.84
M-23 A 7-9 4.300 2.40 181.11 1,869.03
M-24 B 7-9 4.300 2.40 181.11 1,869.03
M-25 C 7-9 4.300 2.40 181.11 1,869.03
M-26 9 A-B 3.895 2.40 181.11 1,693.00
M-27 9 B-C 3.025 2.40 181.11 1,314.84
Total Kg 40,388.53
CALCULO DE MUROS DE BLOCK DE 15X20X40 2DO. Nivel
W = ML 181.11
No. EJE BASE ALTURA KG/M2 TOTAL (W)
M-1 1 A-B 3.894 2.40 181.11 1,692.56
M-2 1 B-C 3.025 2.40 181.11 1,314.84
M-3 A 1-3 4.250 2.40 181.11 1,847.30
M-4 B 1-3 4.250 2.40 181.11 1,847.30
M-5 C 1-3 4.250 2.40 181.11 1,847.30
M-6 3 A-B 3.894 2.40 181.11 1,692.56
M-7 3 B-C 3.025 2.40 181.11 1,314.84
M-8 A 3-4 2.810 2.40 181.11 1,221.39
M-9 C 3-4 2.810 2.40 181.11 1,221.39
M-10 4 A-B 3.894 2.40 181.11 1,692.56
M-11 A 4-5 2.940 2.40 181.11 1,277.90
M-12 B 4-5 2.940 2.40 181.11 1,277.90
M-13 C 4-5 2.940 2.40 181.11 1,277.90
M-14 A 5.6 2.940 2.40 181.11 1,277.90
M-15 B 5.6 2.940 2.40 181.11 1,277.90
M-16 C 5.6 2.940 2.40 181.11 1,277.90
M-17 6 A-B 3.894 2.40 181.11 1,692.56
M-18 6 B-C 3.025 2.40 181.11 1,314.84
M-19 A 6 -7 2.760 2.40 181.11 1,199.66
M-20 C 6 -7 2.760 2.40 181.11 1,199.66
M-21 7 A-B 3.894 2.40 181.11 1,692.56
M-22 7 B-C 3.025 2.40 181.11 1,314.84
M-23 A 7-9 4.300 2.40 181.11 1,869.03
M-24 B 7-9 4.300 2.40 181.11 1,869.03
M-25 C 7-9 4.300 2.40 181.11 1,869.03
M-26 9 A-B 3.895 2.40 181.11 1,693.00
M-27 9 B-C 3.025 2.40 181.11 1,314.84
Total Kg 40,388.53
CALCULO DE MUROS DE BLOCK DE 15X20X40 1er. Nivel
W = ML 181.11
No. EJE BASE ALTURA KG/M2 TOTAL (W)
M-1 1 A-B 3.894 2.40 181.11 1,692.56
M-2 1 B-C 3.025 2.40 181.11 1,314.84
M-3 A 1-3 4.250 2.40 181.11 1,847.30
M-4 B 1-3 4.250 2.40 181.11 1,847.30
M-5 C 1-3 4.250 2.40 181.11 1,847.30
M-6 3 A-B 3.894 2.40 181.11 1,692.56
M-7 3 B-C 3.025 2.40 181.11 1,314.84
M-8 A 3-4 2.810 2.40 181.11 1,221.39
M-9 C 3-4 2.810 2.40 181.11 1,221.39
M-10 4 A-B 3.894 2.40 181.11 1,692.56
M-11 A 4-5 2.940 2.40 181.11 1,277.90
M-12 B 4-5 2.940 2.40 181.11 1,277.90
M-13 C 4-5 2.940 2.40 181.11 1,277.90
M-14 A 5.6 2.940 2.40 181.11 1,277.90
M-15 B 5.6 2.940 2.40 181.11 1,277.90
M-16 C 5.6 2.940 2.40 181.11 1,277.90
M-17 6 A-B 3.894 2.40 181.11 1,692.56
M-18 6 B-C 3.025 2.40 181.11 1,314.84
M-19 A 6 -7 2.760 2.40 181.11 1,199.66
M-20 C 6 -7 2.760 2.40 181.11 1,199.66
M-21 7 A-B 3.894 2.40 181.11 1,692.56
M-22 7 B-C 3.025 2.40 181.11 1,314.84
M-23 A 7-9 4.300 2.40 181.11 1,869.03
M-24 B 7-9 4.300 2.40 181.11 1,869.03
M-25 C 7-9 4.300 2.40 181.11 1,869.03
M-26 9 A-B 3.895 2.40 181.11 1,693.00
M-27 9 B-C 3.025 2.40 181.11 1,314.84
Total Kg 40,388.53
DISTRIBUCIN DE CARGAS A COLUMNA PARA CALCULO DE ZAPATA

SUMA DE CARGAS DE LOSAS, MUROS Y COLUMNAS A ZAPATA


SUMA DE CARGAS DE LOSAS SUMA DE CARGAS DE TRABES SUMA DE CARGAS DE MUROS
COLUMNAS SUMA SUMA DE CARGAS /
No. EJE SUMA DE CARGAS / 2 LOSAS TRABES SUMA DE CARGAS / 2 MUROS TOTAL (W)
P.B Y P.A. 2
C1 1 A A1,A4 9,913.99 412.04 TB1, TB3 2,125.80 M1, M3 5,309.80 17,761.63
C2 1 B A3, A4, A5, A8 20,705.70 412.04 TB1, TB2, TB4 2,915.40 M1, M2, M4 7,282.06 31,315.21
C3 1 C A7, A8 7,655.83 412.04 TB2, TB5 1,898.97 M2, M5 4,743.22 14,710.06
C4 3 A A1, A2, A9, A10 16,386.26 412.04 TB3, TB6, TB8 2,859.28 M3, M6, M8 7,141.89 26,799.47
C5 3 B A2, A3, A5, A6, A9, A13, A14 29,930.60 412.04 TB4, TB6, TB7, TB9 3,648.89 M4, M6, M7 7,282.06 41,273.59
C6 3 C A6, A7, A13, A16 12,716.68 412.04 TB5, TB7, TB10 2,632.45 M5, M7, M9 6,575.31 22,336.48
C7 4 A A10, A11, A17, A18 13,288.53 412.04 TB8, TB11, TB13 2,517.34 M8, M10, M11 6,287.78 22,505.69
A11, A12, A14, A15, A17, A20,
C8 4 B 23,644.54 412.04 TB9, TB11, TB12, TB14 3,306.94 M10, M11 8,911.38 36,274.91
A21, A22
C9 4 C A15, A16, A21, A24 10,356.02 412.04 TB10, TB12, TB15 2,290.51 M9, M12 3,748.94 16,807.50
C10 5 A A18, A19, A25, A26 13,529.58 412.04 B13, TB16, TB18 2,551.27 M11, M14 3,833.69 20,326.59
A19, A20, A22, A23, A25, A28,
C11 5 B 24,075.55 412.04 TB14, TB16, TB17, TB19 3,340.88 M12, M15 3,833.69 31,662.16
A29, A30
C12 5 C A23, A24, A29, A32 10,545.97 412.04 TB15, TB17, TB20 2,324.44 M13, M16 3,833.69 17,116.15
C13 6 A A26, A27, A33, A34 16,931.74 412.04 TB18, TB21, TB23 2,504.29 M14, M17, M19 6,255.18 26,103.25
A27, A28, A30, A31, A33, A36,
C14 6 B 27,154.16 412.04 TB19, TB21, TB22,TB24 6,587.79 M15, M17, M18 6,427.96 40,581.95
A37, A38
C15 6 C A31, A32, A37, A40 10,222.42 412.04 TB20, TB22, TB25 2,277.46 M16, M18, M20 5,688.60 18,600.52
C16 7 A A34. A35, A41, A44 16,370.26 412.04 TB23, TB26, TB28 2,859.28 M19, M21, M23 7,141.89 26,783.47
A35, A36, A38, A39, A43, A44,
C17 7 B 29,087.80 412.04 TB24, TB26, TB27, TB29 3,648.89 M21, M22, M24 7,314.66 40,463.39
A45, A48
C18 7 C A39, A40, A47, A48 12,717.54 412.04 TB25, TB27, TB30 2,632.45 M20, M22, M25 6,575.31 22,337.34
C19 9 A A41, A42 9,970.69 412.04 TB28, TB31 2,138.85 M23, M26 5,343.05 17,864.63
C20 9 B A42, A43, A45, A46 17,716.60 412.04 TB29, TB31, TB32 2,928.46 M24, M26, M27 7,315.31 28,372.41
C21 9 C A46, A47 7,745.91 412.04 TB30, TB32 1,912.02 M25, M27 4,775.82 14,845.79
TOTAL KG 534,842.18
Se calcula Cimentacin Corrida de Tramos
DIMENSIONAMIENTO DE ZAPATA CORRIDA

26.8 41.28
P1 P2

L = Longitud

3.89 Mts.

SE PROPONE EL CALCULO DEL TRAMO 3 A-B DE LAS COLUMNAS C4 Y C5

DATOS: P1= 26.80 TON Calculo de ancho de Zapata = 1.01 Mts.


P2= 41.28 TON Propuesta = 1.20 Mts.
= 20 Ton/m2
L= 3.89
Fs= 1.7 Factor se seguridad
p= P1+P2= 68.08 Ton.

X= P1(P2) = 1106.3 = 16.25 = 1.625 Mts.


p 68.08

PESO PROPIO DEL CIMIENTO


P.P. = 0.15(P)
P.P = 0.15 * 68.08 = 10.21 Ton

PESO TOTAL DEL TERRENO


Pt = P + P.P.
Pt = 68.08 + 10.21 = 78.29 Ton.

REA NECESARIA DEL DESPLANTE


A= Pt = 78.29 = 3.91 M2
20.00
ANCHO DE ZAPATA
B= A = 3.91 = 1.01 M2
L 3.89

Se dejara de: 1.20 Mts y L= 3.89

REACCIN NETA DEL TERRENO


n= p = 68.08 = 17.50 Ton/m2
L 3.89

REACCIN NECESARIA FACTORIZADA


u= (Fs)n = 1.7 * 17.50 29.75 Ton/m2

la carga debida a la presin (factorizada) que ejerce el terreno sobre la contra trabe estar
en funcin del ancho de la zapata Wu = B x u

Wu = B x u = 1.20 * 29.75 = 35.70 Ton/ml

Contratrabe

Wu
DIMENSIONAMIENTO DE ZAPATA CORRIDA

22.5 36.27
P1 P2

L = Longitud

3.025 Mts.

SE PROPONE EL CALCULO DEL TRAMO 4 A-B DE LAS COLUMNAS C7 Y C8

DATOS: P1= 22.50 TON Calculo de ancho de Zapata = 1.12 Mts.


P2= 36.27 TON Propuesta = 1.20 Mts.
= 20 Ton/m2
L= 3.025
Fs= 1.7 Factor se seguridad
p= P1+P2= 58.77 Ton.

X= P1(P2) = 816.08 = 13.886 = 1.3886 Mts.


p 58.77

PESO PROPIO DEL CIMIENTO


P.P. = 0.15(P)
P.P = 0.15 * 58.77 = 8.82 Ton

PESO TOTAL DEL TERRENO


Pt = P + P.P.
Pt = 58.77 + 8.82 = 67.59 Ton.

REA NECESARIA DEL DESPLANTE


A= Pt = 67.59 = 3.38 M2
20.00
ANCHO DE ZAPATA
B= A = 3.38 = 1.12 M2
L 3.03

Se dejara de: 1.20 Mts y L= 3.025

REACCIN NETA DEL TERRENO


n= p = 58.77 = 19.43 Ton/m2
L 3.025

REACCIN NECESARIA FACTORIZADA


u= (Fs)n = 1.7 * 19.43 33.03 Ton/m2

la carga debida a la presin (factorizada) que ejerce el terreno sobre la contra trabe estar
en funcin del ancho de la zapata Wu = B x u

Wu = B x u = 1.20 * 33.03 = 39.63 Ton/ml

Contratrabe

Wu
DIMENSIONAMIENTO DE ZAPATA CORRIDA

26.78 40.46
P1 P2

L = Longitud

3.894 Mts.

SE PROPONE EL CALCULO DEL TRAMO 7 A-B DE LAS COLUMNAS C16 Y C17

DATOS: P1= 26.78 TON Calculo de ancho de Zapata = 0.99 Mts.


P2= 40.46 TON Propuesta = 1.20 Mts.
= 20 Ton/m2
L= 3.894
Fs= 1.7 Factor se seguridad
p= P1+P2= 67.24 Ton.

X= P1(P2) = 1083.5 = 16.114 = 1.6114 Mts.


p 67.24

PESO PROPIO DEL CIMIENTO


P.P. = 0.15(P)
P.P = 0.15 * 67.24 = 10.09 Ton

PESO TOTAL DEL TERRENO


Pt = P + P.P.
Pt = 67.24 + 10.09 = 77.33 Ton.

REA NECESARIA DEL DESPLANTE


A= Pt = 77.33 = 3.87 M2
20.00
ANCHO DE ZAPATA
B= A = 3.87 = 0.99 M2
L 3.89

Se dejara de: 1.20 Mts y L= 3.894

REACCIN NETA DEL TERRENO


n= p = 67.24 = 17.27 Ton/m2
L 3.894

REACCIN NECESARIA FACTORIZADA


u= (Fs)n = 1.7 * 17.27 29.35 Ton/m2

la carga debida a la presin (factorizada) que ejerce el terreno sobre la contra trabe estar
en funcin del ancho de la zapata Wu = B x u

Wu = B x u = 1.20 * 29.35 = 35.23 Ton/ml

Contratrabe

Wu