TECHNICAL MANAGEMENT
The Arena Construction Industry
Type of Game
Players
Mechanics
PLAYERS
INDIRECT
Funding Institutions
PLAYERS
Owner
DIRECT
PLAYERS
Designer Constructor
Government Agencies
Architect
Civil/Structural
PLAYERS
Electrical
Funding Institution
Sanitary/Plumbing
Electronics/IT Owner
Plans
The Specs The Doer
Interpreter
Designer Constructor
Consultant General
Project Manager
Contractor
Construction Government
Agencies
Foreman/ Sub-contractor
Management Lead Man
Specialty
Works Engineers Trade Workers Contractor
Underlying Concepts
Visible (intangible to tangible)
Complex made Simple (understood by all trades)
Interdisciplinary
Formal (protection)
Fair (incentives, penalties)
Precise exact, analytical, heuristic
Hazard and danger free (to all players and
stakeholders)
PROJECT MANAGEMENT
Defined goal or objective
PROJECT
SUB-TASKS
ACTIVITY
COST
SCOPE OF WORK
RESOURCES (4Ms)
WORK ELEMENTS PROJECT MATERIALS
MANPOWER
MACHINE
MONEY
PLANS SPECIFICATIONS
TYPE OF
METHODOLOGY
MATERIALS
PROJECT MANAGEMENT
PLANNING
SCHEDULING
MONITORING
CONTROLLING
PROJECT MANAGEMENT
Owner
Feasibility
Stage
Owner
Evaluation Design Designer
Stage Stage
Owner
Construction Designer
Stage Constructor
PROJECT METAMORPHOSIS
IS THE PROJECT FEASIBLE?
Evaluation Design
Stage Stage
COMMISIONING
PRE-BID
PRECONSTRUCTION PHASE
CONCEPTUAL DESIGN
SCHEMATIC DESIGN
Feasibility DESIGN DEVELOPMENT
Stage CONTRACT DOCUMENTS
Construction
Stage CONSTRUCTION PHASE
LEGAL REQUIREMENTS
Valid PCAB license for the type and cost of the contract to be
bid
Valid joint venture agreement
Letter authorization to verify documents submitted for
eligibility screening
Statement that firm is not included in the "blacklist" issued by
ClAP
TECHNICAL REQUIREMENTS
PROCUREMENT Statement of all government and private construction contracts,
completed in
PHASE at least the last three(3) years
Statement of all ongoing government and private construction
contracts,
including contracts awarded but not yet started
Statement that the contractor has key personnel
Statement that the contractor owns, and/or has under lease,
and/or has under purchase agreements, equipment s
FINANCIAL REQUIREMENTS
Audited financial statements for past 3 calendar years
Net Financial Contracting Capacity (NFCC)
Credit limit commitment from the contractor's bank
PROJECT DELIVERY SYSTEM
TRADITIONAL APPROACH
- SEPARATE PARTIES FOR DESIGN AND BUILD
DIRECT LABOR
DESIGN AND BUILD
- single organization is responsible for performing both design and
construction
TURNKEY
- payment is then made at the completion
BUILY-OPERATE-TRANSFER
- design, construction, financing, operation, and maintenance
Fast-track
overlapping design and construction; project phasing
TIME AND MATERIAL (T&M) CONTRACTS
- Hybrid
TYPES OF CONTRACT
LUMP-SUM (Single amount)
UNIT-COST (Per item of work)
COST-PLUS (Percentage method)
W
O
R
KB
QUALITY
O N
KM O
Ss
(Q
)
W )
B
S
)
COST
TIME
PLANS & SPECIFICATIONS
PLANS - Drawn SPECIFICATIONS - Written
WORK BREAKDWON STRUCTURE
(WBS)
BILL OF QUANTITIES & BILL OF MATERIALS
BOQ BOM
ITEM OF UNIT TOTAL UNIT TOTAL
WORK QUANTITY UNIT COST COST MATERIALS QUANTITY UNIT COST COST
ITEM QUAN UNIT MATERI LABOR EQUIP DIRECT INDIRE TOTAL UNIT
OF TITY ALS MENT COST CT COST COST
WORK COST
4 CHB 100 SQ.M. 23,290 6,250 29,540 5,460 35,000 350
LAYING
NETWORK DIAGRAM
CPM - CRITICAL PATH METHOD
Activities oriented
Represented by arrows
PERT PROGRAM EVALUATION AND REVIEW
TECHNIQUES
Events oriented
Represented by circles
NETWORK DIAGRAM
AOA AON