ESTIMATORS COSTING & MTO FOR SAMPLE PROJECT.

XLS

FLOORWISE AND ITEMWISE QUANTITY BREAKUP


For RCC Work:
SAMPLE PROJECT:

FLOORWISE QUANTITY Unit Total


ITEM
SRN

Description Plinth Parking 1st 2nd 3rd 4th 5th 6th 7th 8th 9th Top LMR & Qty
Work Floor Floor Floor Floor Floor Floor Floor Floor Floor Floor Terrace OHWT

RCC ITEMS
1 EARTHWORK & ANTI-TERMITE TREATMENT:
Excavation in Soils,
soft murrum for 693 M3 693
Footings
Refilling the Footing
486 M3 486
Pits
Filling in Plinth with
Murrum Brought from 92 M3 92
outside
Rubble Soling- 230mm
96 M3 96
thk.

Antitermite Treatment 743 M2 743

2 RCC Work:
PCC below Footings-
53 M3 53
1:3:6
PCC below Plinth
16 M3 16
Beams- 1:3:6
PCC under Plinth Floor-
63 M3 63
1:3:6
RCC Footing & Rafts-
135 M3 135
M25
RCC Columns- M30 19 44 39 37 - - - - - - - - - M3 140
RCC Columns- M25 - - - - 37 36 36 - - - - - - M3 109
RCC Columns- M20 - - - - - - - 34 34 32 32 9 3 M3 144
RCC Lift Pardi &
4 7 7 7 7 7 7 7 7 7 7 7 10 M3 96
OHWT- M20
RCC Plinth Beams-
20 - - - - - - - - - - - - M3 20
M20
RCC Floor Beams-
42 45 43 42 43 42 43 43 43 39 4 3 M3 433
M20

RCC Floor Slabs- M20 68 63 57 57 57 57 57 62 57 48 5 5 M3 592

RCC Staircase- M20 2 2 2 2 2 2 2 2 2 2 - - M3 24


RCC Coping for
27 M3 27
Parapet- M20
RCC Pergolas- M20 - M3 -
Reinforcement Steel 11,783 19,940 19,170 17,690 17,526 15,725 16,468 15,378 15,788 14,573 12,430 3,555 3,917 KG 183,940

FOR FINISHING ITEMS


1 Masonry (Brick) Work:
1 BBM : 4.5" thk. - - - - - - - - - - - - SFT -
2 BBM : 6" thk. 1,086 7,411 7,377 7,157 7,050 7,097 7,050 7,097 7,050 7,097 1,909 855 SFT 68,236
3 BBM : 8" thk. - - - - - - - - - - - 28 SFT 28
4 BBM : 9" thk. - - - - - - - - - - - - SFT -
5 BBM : 18" thk. - 46 49 46 49 46 49 46 49 46 8 - SFT 433
2 Plaster Work:
CEILING PLASTER
Rooms Ceiling -(flats):
1 - 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 3,530 - - SFT 31,770
POP
Toilets & Terrace
2 Ceiling -(flats): - 1,082 1,068 1,082 1,068 1,082 1,068 1,082 1,068 1,082 - - SFT 9,678
SANALA
Common Lobby &
3 101 432 432 432 432 432 432 432 432 432 506 244 SFT 4,737
Staircase: SANALA
Ceiling Plaster -Parking:
4 7,391 - - - - - - - - - - - SFT 7,391
SANALA

FLOORWISE QUANTITY BREAKUP Page 1 of 8 QUANTSOFT INDIA PVT. LTD.


ESTIMATORS COSTING & MTO FOR SAMPLE PROJECT.XLS

FLOORWISE QUANTITY Unit Total

ITEM
SRN
Description Plinth Parking 1st 2nd 3rd 4th 5th 6th 7th 8th 9th Top LMR & Qty
Work Floor Floor Floor Floor Floor Floor Floor Floor Floor Floor Terrace OHWT
INTERNAL WALL PLASTER
Internal tar plaster for
1 dado & POP walls - 1,572 1,410 1,572 1,410 1,572 1,410 1,572 1,410 1,572 - - SFT 13,498
(flats)
Internal Plaster-POP
2 - 8,538 8,533 8,538 8,533 8,538 8,533 8,538 8,533 8,538 - - SFT 76,820
walls (flats)

Internal Plaster- Toilet


3 walls: SANALA - 485 435 485 435 485 435 485 435 485 - - SFT 4,165
(ABOVE DADO in flats)

Internal Plaster -
4 Common lobby and 275 699 708 708 708 708 708 708 708 708 913 592 SFT 8,147
staircase: SANALA
Lift Inside/Duct near lift:
5 414 414 414 414 414 414 414 414 414 414 349 - SFT 4,489
WHITE WASH
EXTERNAL WALL PLASTER
External Plaster: SAND
1 10,461 13,075 12,082 12,513 11,390 12,513 11,390 12,513 11,390 12,513 6,600 2,327 SFT 128,766
FACED
2 Patta Plaster- 6" wide - 225 66 225 255 255 255 255 255 255 - - RFT 2,048
3 Patta Plaster- 3" wide - 28 20 28 20 28 20 28 20 28 - - RFT 220
4 Groove in Plaster - - - - - - - - - - - - RFT -
Plaster Ornamental
5 - 2 2 2 2 2 2 2 2 2 - - NOS 18
Pyramid- 9"x24"
Plaster Ornamental
6 - 2 2 - - - - - - - - - NOS 4
Pyramid- 12"x12"
CHICHEN MESH FOR RCC & MASONRY JOINT
Chicken Mesh- 6"
1 91 2,532 2,532 2,499 2,499 2,499 2,499 2,499 2,499 2,499 713 253 SFT 23,613
Strip
3 Waterproofing Work:
Toilets Waterproofing-
1 0.2M SUNK- Brick bat - 377 338 377 338 377 338 377 338 377 - - SFT 3,239
type
Toilets Side
Waterproofing- 0.3m
2 - 252 226 252 226 252 252 226 252 252 - - SFT 2,191
high- Waterproofing
plaster
Terrace Waterproofing-
3 0.15M SUNK- Brick bat - 1,193 1,015 584 612 584 584 612 584 584 - - SFT 6,351
type
Top Terrace
4 Waterproofing- Brick - - - - - - - - - - 4,292 277 SFT 4,569
bat type
OHWT- Waterproofing
5 - - - - - - - - - - - 983 SFT 983
plaster
LIFT- Box type
6 318 - - - - - - - - - - - SFT 318
shahabad type
4 Flooring
LIVING / DINING/
1 KITCHEN / PASSAGE / - 2,974 2,974 2,974 2,974 2,974 2,974 2,974 2,974 2,974 - - SFT 26,763
C.BED ROOM
2 MASTER BED - 751 752 751 752 751 752 751 752 751 - - SFT 6,764
3 TOILET & BATHS - 377 338 377 338 377 338 377 338 377 - - SFT 3,239
TERRACE / DRY
4 - 1,193 1,015 584 612 584 612 584 612 584 - - SFT 6,379
BALCONY
5 COMMON LOBBY - 331 331 331 331 331 331 331 331 331 405 - SFT 3,387

6 STAIRCASE LANDING - 27 27 27 27 27 27 27 27 27 27 - SFT 270

STAIRCASE TREADS-
7 - 18 18 18 18 18 18 18 18 18 18 - NOS 180
4' X 10.5"
STAIRCASE RISERS-4'
8 - 18 18 18 18 18 18 18 18 18 18 - NOS 180
X 6.5"
9 LMR -IPS - - - - - - - - - - - 244 SFT 244
ENTRANCE LOBBY &
10 354 - - - - - - - - - - - SFT 354
STAIR ROOM
PATHWAY IN
11 515 - - - - - - - - - - - SFT 515
PARKING
12 CAR PARKING 6,876 - - - - - - - - - - - SFT 6,876

FLOORWISE QUANTITY BREAKUP Page 2 of 8 QUANTSOFT INDIA PVT. LTD.


ESTIMATORS COSTING & MTO FOR SAMPLE PROJECT.XLS

FLOORWISE QUANTITY Unit Total

ITEM
SRN
Description Plinth Parking 1st 2nd 3rd 4th 5th 6th 7th 8th 9th Top LMR & Qty
Work Floor Floor Floor Floor Floor Floor Floor Floor Floor Floor Terrace OHWT
5 Skirting
LIVING / DINING/
1 KITCHEN / PASSAGE / - 748 748 748 748 748 748 748 748 748 - - RFT 6,732
C.BED ROOM
2 MASTER BED - 211 211 211 211 211 211 211 211 211 - - RFT 1,901
TERRACE / DRY
3 - 453 410 307 307 307 307 307 307 307 - - RFT 3,010
BALCONY
4 COMMON LOBBY - 82 85 85 82 82 82 82 82 82 77 - RFT 817
5 STAIRCASE - 40 40 40 40 40 40 40 40 40 40 - RFT 404
ENTRANCE LOBBY &
6 45 - - - - - - - - - - - RFT 45
STAIR ROOM
6 Dado
TOILET / BATHS - 2.10
1 - 1,552 1,393 1,552 1,393 1,552 1,393 1,552 1,393 1,552 - - SFT 13,332
m ht.
Kitchen - 4'6" ht. above
2 - 284 284 284 284 284 284 284 284 284 - - SFT 2,552
counter
Passage W.H. Basin -
3 - 50 50 50 50 50 50 50 50 50 - - SFT 450
2'0" ht. above basin
7 WINDOW CILLS
Window Cills 3" (Bottom
1 6 426 444 444 444 444 444 444 444 444 18 9 RFT 4,008
only)
8 MODULAR KITCHEN OTTA WITH GRANITE PLATFORM:
1 Kitchen Otta- 2' wide - 48 48 48 48 48 48 48 48 48 - - RFT 432
9 COUNTERS FOR BASINS:
Big Counter - 5'0"x1'6"
1 - 4 4 4 4 4 4 4 4 4 - - NOS 36
size
Small Counter-2'6"x1'6"
2 - 6 6 6 6 6 6 6 6 6 - - NOS 54
size
10 Door Work:
Inside Doors
Door Type D
1 =3'6"X7'8" for Main - 4 4 4 4 4 4 4 4 4 3 1 NOS 40
Door
Door Type
2 D1=3'0"X7'8" for Bed - 10 10 10 10 10 10 10 10 10 - - NOS 90
Door

Door Type
3 - 10 10 10 10 10 10 10 10 10 - - NOS 90
D2=2'6"X7'8" for Toilets

Outside Doors for Dry Balcony


Door Type
4 - 4 4 4 4 4 4 4 4 4 - - NOS 36
D2=2'6"X7'8"
11 Window And Ventilator Work:
FD= 6'0" x 7'8"
1 - 368 368 368 368 368 368 368 368 368 - - SFT 3,313
Aluminium
W= 6'0" x 6'0"
2 - 288 288 288 288 288 288 288 288 288 - - SFT 2,592
Aluminium
W1= 6'0" x 4'6"
3 27 108 135 135 135 135 135 135 135 135 27 - SFT 1,242
Aluminium
W2= 5'0" x 3'6"
4 - 70 70 70 70 70 70 70 70 70 - - SFT 630
Aluminium
W3= 4'0" x 4'6"
5 - 72 72 72 72 72 72 72 72 72 - - SFT 648
Aluminium
W4= 2'6" x 3'6"
6 - 35 35 35 35 35 35 35 35 35 - - SFT 315
Aluminium
Wlmr= 3'6" x 4'0"
7 - - - - - - - - - - - 14 SFT 14
Aluminium
V= 2'0" x 3'0"
8 - 48 48 48 48 48 48 48 48 48 - - SFT 432
Aluminium
V1= 1'9" x 3'0"
9 - 11 11 11 11 11 11 11 11 11 - - SFT 95
Aluminium
12 MS Fabrication Work:
1 WINDOW GRILLS 27 632 659 659 659 659 659 659 659 659 27 14 SFT 5,968
2 TERRACE RAILINGS - 251 160 201 160 201 160 201 160 201 - - RFT 1,695
DRY TERRACE
3 - 38 19 38 19 38 19 38 19 38 - - RFT 264
RAILINGS

4 STAIRCASE RAILINGS - 16 16 16 16 16 16 16 16 16 16 - RFT 163

FLOORWISE QUANTITY BREAKUP Page 3 of 8 QUANTSOFT INDIA PVT. LTD.


ESTIMATORS COSTING & MTO FOR SAMPLE PROJECT.XLS

FLOORWISE QUANTITY Unit Total

ITEM
SRN
Description Plinth Parking 1st 2nd 3rd 4th 5th 6th 7th 8th 9th Top LMR & Qty
Work Floor Floor Floor Floor Floor Floor Floor Floor Floor Floor Terrace OHWT
13 Painting Work:
1 Ceiling Paint OBD 7,492 5,043 5,030 5,043 5,030 5,043 5,030 5,043 5,030 5,043 506 244 SFT 53,576

2 Internal Wall Paint OBD 275 9,610 9,576 9,619 9,576 9,619 9,576 9,619 9,576 9,619 913 592 SFT 88,168

External Wall Paint


3 10,461 13,075 12,082 12,513 11,390 12,513 11,390 12,513 11,390 12,513 6,600 2,327 SFT 128,766
Cement Paint
White Wash for lift
4 414 414 414 414 414 414 414 414 414 414 349 - SFT 4,489
ducts
5 Wooden Oil Paint - 1,333 1,333 1,333 1,333 1,333 1,333 1,333 1,333 1,333 177 59 SFT 12,234
Metal Oil Paint to Grills
6 27 1,202 1,037 1,128 1,037 1,128 1,037 1,128 1,037 1,128 76 14 SFT 9,978
& Railings
14 LIFTS
Lift Elevators- Auto-
1 NO 1
matic type
Lift Elevators- Manually
2 NO 1
operated

FOR PLUMBING & SANITARY WORK

PART1 > INTERNAL PLUMBING WORK


1 G.I.Material
1/2" 'C' Class GI
Domestic Water Pipe - 111 111 111 111 111 111 111 111 111 - - Rmt 1,307
(20' Long)

1/2" 'C' Class GI Solar


- 19 19 19 19 19 19 19 19 19 - - Rmt 163
Water Pipe (20' Long)

1/2" 'C' Class GI


Flushing Water Pipe - 18 18 18 18 18 18 18 18 18 - - Rmt 315
(20' Long)
1/2" GI Elbow - 216 216 216 216 216 216 216 216 216 - - Nos 3,016
1.25" GI Elbow - 32 32 32 32 32 32 32 32 32 - - Nos 384

2" GI Elbow for


- - - - - - - - - - - - Nos -
Washing machine outlet

1/2" GI Tee - 36 36 36 36 36 36 36 36 36 - - Nos 446


1/2" X 2" Barrel Piece - 16 16 16 16 16 16 16 16 16 - - Nos 268
1/2" X 4" Barrel Piece - 24 24 24 24 24 24 24 24 24 - - Nos 411
1/2" X 6" Barrel Piece - 32 32 32 32 32 32 32 32 32 - - Nos 360
1/2" GI Union - 34 34 34 34 34 34 34 34 34 - - Nos 434
1/2" Patti/Get Valve - 10 10 10 10 10 10 10 10 10 - - Nos 127

1/2" Non Return Valve - 6 6 6 6 6 6 6 6 6 - - Nos 55

1/2" GI Plug - 126 126 126 126 126 126 126 126 126 - - Nos 1,529
2 PVC Material
1.25" PVC Pipe
(Schedule 40) (10'
- 25 25 25 25 25 25 25 25 25 - - Rmt 295
Long) for wash basin
outlet pipe
2" PVC Blue Pipe near
EWC & Washing - 12 12 12 12 12 12 12 12 12 - - Rmt 69
Machine
2" Antisyphone Pipe - 9 9 9 9 9 9 9 9 9 - - Rmt 101
2" PVC Pipe - 8 8 8 8 8 8 8 8 8 - - Rmt 68
3" PVC Pipe for Waste
- 46 46 46 46 46 46 46 46 46 - - Rmt 352
Line (WP)
4" PVC Pipe for Soil
- 12 12 12 12 12 12 12 12 12 - - Rmt 226
Line(SP)
2" PVC Plain Bend - 6 6 6 6 6 6 6 6 6 - - Nos 68
3" PVC Plain Bend - 24 24 24 24 24 24 24 24 24 - - Nos 264
3" PVC Plug Bend - - - - - - - - - - - - Nos 12
4" PVC Plain Bend - 16 16 16 16 16 16 16 16 16 - - Nos 140
4" PVC Plug Bend - - - - - - - - - - - - Nos 45

FLOORWISE QUANTITY BREAKUP Page 4 of 8 QUANTSOFT INDIA PVT. LTD.


ESTIMATORS COSTING & MTO FOR SAMPLE PROJECT.XLS

FLOORWISE QUANTITY Unit Total

ITEM
SRN
Description Plinth Parking 1st 2nd 3rd 4th 5th 6th 7th 8th 9th Top LMR & Qty
Work Floor Floor Floor Floor Floor Floor Floor Floor Floor Floor Terrace OHWT
3 C.P.Fittings

Hot & Cold Mixer with


- 4 4 4 4 4 4 4 4 4 - - Nos 127
Overhead shower

Single Lever Mixer unit


- 2 2 2 2 2 2 2 2 2 - - Nos 127
with Overhead Shower

Decorative shower
panel with mixer and - 4 4 4 4 4 4 4 4 4 - - Nos 127
tele. shower
Bib Tap - 8 8 8 8 8 8 8 8 8 - - Nos 55

Concealed Stop Cock - 6 6 6 6 6 6 6 6 6 - - Nos 60

Angle Cock - 30 30 30 30 30 30 30 30 30 - - Nos 55


Long Body wall
- 14 14 14 14 14 14 14 14 14 - - Nos 347
mounted Bib Tap
2 IN 1 Bib Cock +
- 10 10 10 10 10 10 10 10 10 - - Nos 237
Health Faucet
Bottle Trap - 14 14 14 14 14 14 14 14 14 - - Nos 182
4 Sanitary Fitting

Wall Hung Commode


- 6 6 6 6 6 6 6 6 6 - - Nos 127
With Accessories

Orrisa pan - 4 4 4 4 4 4 4 4 4 - - Nos 127


Dual Flush Tank - 10 10 10 10 10 10 10 10 10 - - Nos 55
Star White LARA W/B - 4 4 4 4 4 4 4 4 4 - - Nos 55
Under counter ovel
- 2 2 2 2 2 2 2 2 2 - - Nos 55
W/B 50 broad
Over Counter Wash
- 4 4 4 4 4 4 4 4 4 - - Nos 55
Basin(Bowl type)
Mirror- 1200x600 - 8 8 8 8 8 8 8 8 8 - - Nos 72
Mirrir- 600x450 - 2 2 2 2 2 2 2 2 2 - - Nos -
S.S. Sink - 4 4 4 4 4 4 4 4 4 - - Nos 55
5 Other Material
Multi-floor Trap with
- 4 4 4 4 4 4 4 4 4 - - Nos 234
Cleaning eye
Nahani Trap - 10 10 10 10 10 10 10 10 10 - - Nos 47
2" Jali - 10 10 10 10 10 10 10 10 10 - - Nos 182
Waste Coupling - 14 14 14 14 14 14 14 14 14 - - Nos 127

Connector (2'0") Outlet


- 14 14 14 14 14 14 14 14 14 - - Nos 127
for WHB & Kitchen

Inlet Pipe betn angle


Cock to long body bib - 14 14 14 14 14 14 14 14 14 - - Nos 127
cock
Boiler - 10 10 10 10 10 10 10 10 10 - - Nos 55
Aquaguard - 4 4 4 4 4 4 4 4 4 - - Nos 86

PART :2 > EXTERNAL WATER SUPPLY WORK


WATER LINES
3" GI Pipe (80mm) Rmt 24
3" GI Elbow NOS -
3" Dia GI Material

3" GI Tee NOS -


3" X2" Reducing Tee NOS -

3" X1.5" Reducing Tee NOS -

3" X2.5" Reducer NOS 4


3" Get Valve NOS 4

FLOORWISE QUANTITY BREAKUP Page 5 of 8 QUANTSOFT INDIA PVT. LTD.


ESTIMATORS COSTING & MTO FOR SAMPLE PROJECT.XLS

FLOORWISE QUANTITY Unit Total

ITEM
SRN
Description Plinth Parking 1st 2nd 3rd 4th 5th 6th 7th 8th 9th Top LMR & Qty
Work Floor Floor Floor Floor Floor Floor Floor Floor Floor Floor Terrace OHWT
2.5" GI Pipe (65
Rmt 18
mm)
2.5" GI Elbow NOS 4
2.5" GI Tee NOS -
2.5" Dia GI Material

2.5" x 2" Reducing Tee NOS -

2.5" x 1.5" Reducing


NOS -
Tee
2.5" x 2" GI Reducer NOS 4

2.5" x 1.5" GI Reducer NOS -

2.5" Get Valve NOS -


2" GI Pipe (50 mm) Rmt 60
2" Dia GI Material

2" GI Elbow NOS 8


2" GI Tee NOS -
2"x 1.5" Reducer NOS 8
2" x 1.25" Reducer NOS -
2" GI Socket NOS 8
2" Patti Valve NOS -
1.5" GI Pipe (40
Rmt 498
mm)
1.5" GI Elbow NOS 48
1.5" GI Tee NOS -
1.5" X 1.25"Reducing
NOS 14
1.5" Dia GI Material

Tee
1.5" X 0.5" Reducing
NOS 90
Tee
1.5" GI Socket NOS 62
1.5" X 1.25" Reducer NOS 90
1.5" X 0.5" Reducer NOS -
1.5" Crosses NOS -
1.5" Patti Valve NOS 90
1.5" Gate Valve NO 2
1.5" Ball Valve NO 2
1.25" GI Pipe (32
Rmt 315
mm)
1.25" GI Elbow NOS 10
1.25" GI Tee NOS -
1.25" X 1" Reducing
NOS -
Tee
1.25" Dia GI Material

1.25" X 0.5" Reducing


NOS 90
Tee
1.25" GI Socket NOS 15
1.25" X 1" Reducer NOS 90
1.25" X 0.5" Reducer NOS -
1.25" Crosses NOS -
1.25" Patti Valve NOS 90
1.25" Gate Valve NOS 1
1.25" Ball Valve NOS 1
1.25" PRV NOS -

1.25" Pressure Gauge NOS -

1" GI Pipe (25


Rmt 270
mm)
1" GI Elbow NOS -
1" X 0.5" Reducing
NOS -
Elbow
1" Dia GI Material

1" GI Tee NOS -

1" X 0.5" Reducing Tee NOS 90

1" X 0.5" Reducer NOS -


1" GI Socket NOS -
1" GI Crosses NOS -
1" Gate Valve NOS 90
1" Ball Valve NOS -
1" PRV NOS 30
1" Pressure Gauge NOS 30

FLOORWISE QUANTITY BREAKUP Page 6 of 8 QUANTSOFT INDIA PVT. LTD.


ESTIMATORS COSTING & MTO FOR SAMPLE PROJECT.XLS

FLOORWISE QUANTITY Unit Total

ITEM
SRN
Description Plinth Parking 1st 2nd 3rd 4th 5th 6th 7th 8th 9th Top LMR & Qty
Work Floor Floor Floor Floor Floor Floor Floor Floor Floor Floor Terrace OHWT
PART :3 > EXTERNAL DRAINAGE WORK
1 PVC DOWNTAKES
4" PVC Single Socket
NOS 100
Pipe (10')
4" Dia PVC Material

4" PVC Single Y NOS -


4" PVC Single Plug
NOS 90
Tee
4" PVC Plug Bend NOS -
4" PVC Plain Bend NOS -
4" PVC Socket NOS 10
4" PVC Cowl NOS 10
3" PVC Single Socket
NOS 240
Pipe (10')
3" PVC Single Y NOS -
3" Dia PVC Material

3" PVC Single Plug


NOS 20
Tee
3" PVC Plug Bend NOS 180
3" PVC Plain Bend NOS 16
3" PVC Socket NOS 104
3" PVC Cowl NOS 14
PVC Reducer 3" X
NOS 16
1.50"
Other Misc. Material 2" Dia PVC Material

2" PVC Antisyphone


NOS 100
Pipe (10')
2" PVC Plain Bend NOS 180
2" PVC Tee NOS 90
2" PVC Socket NOS 10
2" PVC Cowl NOS 10
4" CI Shoe NOS -
3" CI Shoe NOS 12
4" GI Clips NOS 108
3" GI Clips NOS 264
2" GI Clips NOS 108
Plumbing Nails NOS 14
2 EXTERNAL UNDER GROUND DRAINAGE WORK
Gully Traps with
Nos 14
chamber
External Drainage under Ground

8" RCC Drainage line Rmt 260

6" RCC Drainage line Rmt 36

Inspection Chambers
Nos 10
45x60cm
Inspection Chambers
Nos 4
60x90cm

Inspection Chambers-
Nos 1
Conical Shape

1 BUILDING ELECRICAL WORK- PART I ( POINT WIRING WORK)

Foot Lights - - - - - - - - - - - - Nos -


Wall light - 74 74 74 74 74 74 74 74 74 - - Nos 666
Wall light TW - 4 4 4 4 4 4 4 4 4 - - Nos 36
Ceiling light 22 2 2 2 2 2 2 2 2 2 6 2 Nos 48
Ceiling fan - 26 26 26 26 26 26 26 26 26 - - Nos 234
Ceiling fan TW - 4 4 4 4 4 4 4 4 4 - - Nos 36
Exhaust fans - 14 14 14 14 14 14 14 14 14 - - Nos 126
6A plug half - 8 8 8 8 8 8 8 8 8 - - Nos 72
6A plug 1 51 51 51 51 51 51 51 51 51 1 - Nos 461
16A plug + Socket - 26 26 26 26 26 26 26 26 26 - - Nos 234
16A plug - 8 8 8 8 8 8 8 8 8 - - Nos 72
16A Switch - 10 10 10 10 10 10 10 10 10 - - Nos 90
20A Switch - - - - - - - - - - - - Nos -
RJ 11 / Telephone
- 8 8 8 8 8 8 8 8 8 - - Nos 72
Point
TV Point - 8 8 8 8 8 8 8 8 8 - - Nos 72

FLOORWISE QUANTITY BREAKUP Page 7 of 8 QUANTSOFT INDIA PVT. LTD.


ESTIMATORS COSTING & MTO FOR SAMPLE PROJECT.XLS

FLOORWISE QUANTITY Unit Total

ITEM
SRN
Description Plinth Parking 1st 2nd 3rd 4th 5th 6th 7th 8th 9th Top LMR & Qty
Work Floor Floor Floor Floor Floor Floor Floor Floor Floor Floor Terrace OHWT
Bell Point - - - - - - - - - - - - Nos -
Bulkhead Light Point 1 1 1 1 1 1 1 1 1 1 1 - Nos 11
Vedio Door Phone - 4 4 4 4 4 4 4 4 4 - - Nos 36
Panic Switch - 4 4 4 4 4 4 4 4 4 - - Nos 36

DB- 4 Way TPN MCB - 2 2 2 2 2 2 2 2 2 - - Nos 18

DB- 4 Way SPN MCB - 2 2 2 2 2 2 2 2 2 - - Nos 18


1 Phase Meter - 4 4 4 4 4 4 4 4 4 - - Nos 36

2 BUILDING ELECRICAL WORK- PART II

Electrical Mains >

2 C x 1.5 Sq.mm Wire 17 108 148 188 228 268 308 348 388 428 117 127 RFT 2,673

2 C x 6 Sq.mm Wire 9 54 74 94 114 134 154 174 194 214 59 64 RFT 1,337
4 C x 6 Sq.mm Wire 9 54 74 94 114 134 154 174 194 214 59 64 RFT 1,337
Other mains Wiring >
Telephone Mains
17 108 148 188 228 268 308 348 388 428 117 127 RFT 2,673
Wiring
T.V Mains Wiring 17 108 148 188 228 268 308 348 388 428 117 127 RFT 2,673
Mains Conduiting >
25mm Dia Conduite
45 300 420 540 660 780 900 1,020 1,140 1,260 105 115 RFT 7,285
Piping for Mains
Misc. Electrical items >
3 Phase meter 1 - - - - - - - - - - - Nos 1
Lift DB Panel - - - - - - - - - - - 1 Nos 1
Main Control Panel 1 - - - - - - - - - - - Nos 1
Earthing 1 - - - - - - - - - - - Nos 1
Wiring From
25 - - - - - - - - - - - RFT 25
Transformer to MCB
RCC Hume Pipe with
25 - - - - - - - - - - - RFT 25
Cable Trench

FLOORWISE QUANTITY BREAKUP Page 8 of 8 QUANTSOFT INDIA PVT. LTD.