ROAD MILEAGE PARTICULARS IN PR, SUB-DIVISION NAGARAM

(Thirumalagiri, Nagaram, Arvapally, 3 Mandals)

ABSTRACT

Total Lengh of

CC&BT Road
Total Gravel
Road Lengh

Road Lengh

Road Lengh

Road Lengh

Road Lengh
Name of the

Total Lengh
Total WBM
year in Km
Total No of

sanctioned
length last

otherthan
Earthern
Total CC

Total BT

Total BT
Roads in

renewal
Mandal

in KM

in KM
in KM

in KM

in KM

in KM
Roads
Sl No

Kms.

Total
CD works

1 2 3 4 5 6 7 8 9 10 11 12

1 Thirumalagiri 40 113.66 8.65 35.96 0.00 23.05 41.50 4.50 69.05 117.00

2 Nagaram 33 90.95 3.09 29.91 0.00 8.10 41.45 8.40 57.95 89.00

3 Arvapally 46 132.12 6.03 42.19 0.00 17.95 50.05 15.90 83.90 78.00

Total 119 336.73 17.77 108.06 0.00 49.10 133.00 28.80 210.90 284.00
GP CONNECTIVITY WITH BT ROADS IN PR, SUB-DIVISION NAGARAM
(Thirumalagiri, Nagaram, Arvapally, 3 Mandals)
ABSTRACT

Already
Name of the GP Yet to be
S.No Total GPs Connected by BT Remarks
Mandal connected by BT
Roads

1 2 3 4 5 6
1 Thirumalagiri 11 11 0

2 Nagaram 9 9 0

3 Arvapally 9 9 0
Total 29 29 0
HABITATIONS CONNECTIVITY WITH BT ROADS

Total No. of Habitations


Total No. of Total No. of Depopulated and
S.No Name of the Mandal
GPs Habitations
Habitations
less populated Habs
already connected by
Inclduing GP's BT Roads

1 2 3 4 5 6 7
1 Tirumalagiri 11 33 44 6 12
2 Nagaram 9 23 32 16 11
3 Arvapally 9 30 39 23 17
Total 29 86 115 45 40
ABITATIONS CONNECTIVITY WITH BT ROADS

Habitations yet to
be connected by
BT Road

21

12

13
46
GP BUILDINGS
Total No. of No. of Estd cost
Name of the Total No. of
S.No
Mandal GPs
GPs with own Buildings (in Grant
Buildings sanctioned Lakhs)
1 2 3 4 5 6 7
1 Tirumalagiri 11 7 4 13 MGNREGS

2 Nagaram
9 6 3 13 MGNREGS
3 Arvapally 9 7 2 13 MGNREGS
Total 29 20 9 39 0
GS
Expenditure
incurred (in Status of work Remarks
Lakhs)
8 9 10
0 Progress(2) Not started(2)

Machireddypalli work
to be done under
13.5 Progress(3) MGNREGS
0 Progress(1) Not started(1)
13.5 0
ZPGF
No. of
Estd cost
S.No Name of the Mandal Works Grant Status of work Remarks
(in Lakhs)
sanctioned
1 2 4 5 6 Completed Progress Not Started 8
1 Jajireddygudem 12 32 ZPGF 2 3 6
2
Total 12 32
ALL GRANTS PROGRESS REPORT OF PR DIVISION, SURYAPET
GRANT:- MGNREGS (CONVERGNCE-WORKS) - Agricultural FOR THE MONTH OF SEPTEMBER, 2016
Godowns
Expenditure Particulars
Date set
Expendit
Sub.Divisi Village / Adm.Sanction Procs Est.Cost(i Date of for Up to During
Sl.No Mandal Name of the Work ure up to
on Habitation No.& Date n laks) Agmt. completi last the
31.03.15
on month month
(From
1 2 4 5 6 7 8 9 10 11 April,15)
12 13

2 Thungatur Thirumalagi Ettor Constn.of Agricultural Produce G.O.Ms.No.16, dt. 40.00 - - 0.00 0.00 0.00
thy-II ri Storage Godown cum Drying 31.10.14 of the PR
Platform at Etoor &RD (RD-I)Dept.

3 Thungatur Thirumalagi Mamidipally Constn.of Agricultural Produce G.O.Ms.No.16, dt. 40.00 - - 0.00 0.00 0.00
thy-II ri Storage Godown cum Drying 31.10.14 of the PR
Platform at Mamidipally &RD (RD-I)Dept.

6 Thungathu Arvapally Jajireddygudem Constn.of Agricultural Produce G.O.Ms.No.16, dt. 40.00 - - 0.00 0.00 0.00
rthy-I Storage Godown cum Drying 31.10.14 of the PR
Platform at Jajireddygudem &RD (RD-I)Dept.

7 Thungathu Arvapally Wardhamankota Constn.of Agricultural Produce G.O.Ms.No.16, dt. 40.00 - - 0.00 0.00 0.00
rthy-I Storage Godown cum Drying 31.10.14 of the PR
Platform at Wardhamankota &RD (RD-I)Dept.

Total:- 160.00 0.00 0.00 0.00 0.00 0.00


SS REPORT OF PR DIVISION, SURYAPET

FOR THE MONTH OF SEPTEMBER, 2016 Rs.in lakhs

Expenditure Particulars Cum.Ex


penditu Balance
Total Remark
re amount Stage of work
During s
(Col.10 required
the
+ 13)
year
14 15 16 17 18

0.00 0.00 0.00 Administrative


sanction to be
issued

0.00 0.00 0.00 Administrative


sanction to be
issued

0.00 0.00 0.00 Administrative


sanction to be
issued

0.00 0.00 0.00 Administrative


sanction to be
issued

0.00 0.00 0.00


ZPGF
Estd cost
S.No Name of the Mandal Name of village Name of the work
(in Lakhs)
Grant
1 2 3 5 6

1 Laying of internal CC Road From D.Gopal(H) to


Jajireddygudem Jajireddygudem Malsoor(H) at Jajireddygudem 5.00 ZPGF

2 Laying of internal CC Road From R.Bakkaiah(H) to


Jajireddygudem Jajireddygudem vadderi Biksham(H) at Jajireddygudem 5.00 ZPGF
3 Laying of internal CC Road fromVenkatreddy(H) to
Jajireddygudem Thimmapuram P.Ramulu (H) in Thimmapuram (V) 5.00 ZPGF

4 Laying of internal cc road fromRentala Shantaiah (H) to


Jajireddygudem Jajireddygudem Peramandla Laxmi(H) in Jajireddy gudem village 1.00 ZPGF
5 Maintanance of Road from Arvapally Dharga to
Jajireddygudem Jajireddygudem Kummarigidda tank 5.00 ZPGF
Maintanance of Road from Kasarlapahad to PWD road
6
Jajireddygudem Kasarlapahad janagaon road 3.00 ZPGF

7
Jajireddygudem Thimmapuram Maintanance of Road from Thimmapuram to Adivemla 2.00 ZPGF

8 Maintanance of Road from Thimmapuram to PWD road


Jajireddygudem Thimmapuram janagan road 2.00 ZPGF

9 Maintenance of road from Thungathurthy road to


Jajireddygudem Nagaram Pichireddy Thanda 1.50 ZPGF

10 Maintenance of road from Thungagudem Nagaram road


Jajireddygudem Wardhamankota to Dubba Thanda Sarvegani Thanda 1.50 ZPGF

11 Laying of internal cc road from Mallepaka Ellaiah (H)


Jajireddygudem Jajireddygudem to Pagatemari veeriah(H) in Jajireddy gudem village 1.00 ZPGF
12
Status of
Remarks
work
7 8

Not Started Newely sanctioned

Not Started Newely sanctioned

Completed

Completed
Jungle cutting and
Progress collection of gravel

Progress Jungle cutting completed

Not Started Newely sanctioned

Not Started Newely sanctioned


BT Road Sanctioned
Not Started under tribel fund

Progress

Not Started
Progress Report for the Month of September, 2016
Revis
ed NS - Not Phy
Date set Adm started length length Total
Length Total
Sl.no District AC
Name of the Road ID
Name of the work Go.No & Date
Year of
sanctioned
Estimate Date of for Name of n. / P - completed complete Length C
Length
Mandal No. sanction cost Agmt. completio Agency Sanc. length
in KM Progress upto d during
complet Complt
n if / C - 31.03.201 the year ed
accor ed
Complet 5 2015-16 upto
ded ed last
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
month
1 Nagonda Thungathu Jajireddygudem 2311008 T01 Road at 9km to GO Ms No. 36, 2014 2.500 122.00 13.04.15 12.04.16 M/S Sri 0.00 2.50 2.50 0.00
rthy Loyapally Dt.30.12.2014 Raghavend
ra,
C
Hyderabad

2 Nagonda Thungathu Jajireddygudem 2311017 JS PWD Road at GO Ms No. 36, 2014 1.500 60.00 15.04.15 14.01.16 P. Ranga 0.00 1.50 1.50 0.00
rthy 65KM to Adivemula Dt.30.12.2014 Rao, R/o C
Suryapet
3 Nagonda Thungathu Jajireddygudem 2311021 R/F PWD road at GO Ms No. 36, 2014 1.500 50.00 08.04.15 07.09.15 K. Yadava 0.00 0.74 0.74 0.00
rthy Ramannagudem to Dt.30.12.2014 Reddy, R/o
Kothagudem ZP road Suryapet
C

5.500 0.000 4.740 4.740 0.000


1 Nagonda Thungathu Thirmalgiri 2307006 R/F Pwd Road To GO Ms No. 36, 2014 1.500 50.00 02.04.20 01.09.15 P.Dayaker 0.00 1.50 1.50 0.00
rthy Mamidyala Dt.30.12.2014 15 Reddy, R/o.
Mushipatla
C

2 Nagonda Thungathu Thirmalgiri 2307017 R/F Thirmalgiri To GO Ms No. 36, 2014 4.500 175.00 23.05.20 April, 16 M/S Sri 0.00 4.20 4.20 0.00
rthy Nellibanda thanda Dt.30.12.2014 15 Raghavend
ra,
C
Hyderabad

3 Nagonda Thungathu Thirmalgiri 2307014 R/F Velishala To GO Ms No. 36, 2014 4.000 160.00 02.04.20 01.04.16 P. Ranga 0.00 3.20 3.20 0.00
rthy Siddisamudram Dt.30.12.2014 15 Rao, R/o C
Suryapet
Revis
ed NS - Not Phy
Date set Adm started length length Total
Length Total
Name of the Road ID Year of Estimate Date of for Name of n. Length C
length Length
Sl.no District AC Name of the work Go.No & Date sanctioned / P - completed complete
Mandal No. sanction cost Agmt. completio Agency Sanc. Progress upto d during Complt
in KM complet
n if / C - 31.03.201 the year ed
accor ed
Complet 5 2015-16 upto
ded ed last
21.000 617.00 0.00 18.38 18.38 month
0.00
2016
Physical Financial Bills special
cummulati Balance pending comment
Length Actual Exp. during the Year 2016-17 ve Amount with Categary s
Length Completed during the Year 2016-17 Balance Exp. Cum. Exp. expenditur PAO for (Plain/S pertainin Type
Complete Length Completed during the Upto expenditure ( est cost -
31.03.2015 incurred upto Cum Exp. During During the
length want of CP/TSP) g to the
d during e cummulati
year (9-21)
31-03-2016 Upto last the BRO/LO work
the year (23+24+27 ve exp.)
(16+17+20) Month current (25+26) C may be
current ) (10-17)
20 21 22 23 24 25 month
26 27 28 29 30 31 32 33
month

0.00 2.50 0.00 0.00 100.18 0.00 17.37 17.37 117.55 4.45 17.36 Plain BT
Complet
ed

0.00 1.50 0.00 0.00 41.49 0.00 0.00 0.00 41.49 18.51 0.00 Plain BT
Complet
ed
0.00 0.74 0.76 0.00 32.73 0.00 0.00 0.00 32.73 17.27 0.00 Plain BT
Complet
ed

0.000 4.740 0.760 0.000 174.400


0.00 1.50 0.00 0.00 11.27 27.09 0.00 27.09 38.36 11.64 6.48 Plain BT
complet
ed,

0.00 4.20 0.30 0.00 145.44 26.89 0.00 26.89 172.33 2.67 0.00 TSP BT
complet
ed,

0.00 3.20 0.80 0.00 40.03 28.56 0.00 28.56 68.59 91.41 0.00 TSP BT
complet
ed,
Physical Financial Bills special
cummulati Balance pending comment
Length Actual Exp. during the Year 2016-17 ve Amount with Categary s
Length Completed during the Year 2016-17 Balance Exp. Cum. Exp. expenditur PAO for (Plain/S pertainin Type
Complete Length Completed during the Upto expenditure ( est cost -
31.03.2015 incurred upto Cum Exp. During During the
length want of CP/TSP) g to the
d during e cummulati
year (9-21)
31-03-2016 Upto last the BRO/LO work
the year (23+24+27 ve exp.)
(16+17+20) Month current (25+26) C may be
current ) (10-17)
month
month
0.00 18.38 2.62 0.00 545.54 82.54 17.37 99.91 471.05 145.95 23.84
PROGRESS REPORT Month Sep-16 Length in Km, Rs in Lakhs
Dist: Nalgonda

Admn Sanction Details for the works


Agmt . Details Expenditure
which are spilover for the FY 2015-16

Package No./ Name


Sl.no Actual
Road ID Year Length Date set expenditu
(8work AC Mandal Name of the work Upto
No. of sanction Estimate Date of for Name of re
s) Go.No & Date 31.03.20
sancti ed in cost Agmt. complet Agency incurred
15
on KM ion upto 31-
03-2016

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 Thungathur Jajireddy MRR GO 20(BT 2311004 Arvapally to Kommala G.O.Ms.No. 20, 2014 9.50 123.50 02.05.15 01.02.16 M/S BPSC 0.00 68.40
thy gudem Renewals) Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
2 Thungathur Jajireddy MRR GO 20(BT 2311032 R/F Pwd Road to G.O.Ms.No. 20, 2014 5.35 69.55 02.05.15 01.02.16 M/S BPSC 0.00 43.48
thy gudem Renewals) Shanthinagar via Dt.19.11.14 Infra Pvt.,
D.Kothapally Ltd., Hyd.,
3 Thungathur Jajireddy MRR GO 20(BT 2311036 JS PWD Road at 59km to G.O.Ms.No. 20, 2014 3.00 39.00 02.05.15 01.02.16 M/S BPSC 0.00 21.26
thy gudem Renewals) Parsaipally Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
4 Thungathur Thirmalg MRR GO 20(BT 2307002 R/F Pwd Road To Tatipamula G.O.Ms.No. 20, 2014 4.00 52.00 02.02.15 01.11.15 M/S Sujana 33.78 0.00
thy iri Renewals) Dt.19.11.14 Constructions

5 Thungathur Thirmalg MRR GO 20(BT 2307003 R/F Thirmalgiri To G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 11.47 0.00
thy iri Renewals) Tatipamula Via Nandapur Dt.19.11.14 Constructions

6 Thungathur Thirmalg MRR GO 20(BT 2307004 R/F Pwd Road To Gundepuri G.O.Ms.No. 20, 2014 8.10 105.30 02.02.15 01.11.15 M/S Sujana 68.83 0.00
thy iri Renewals) via Malipuram Dt.19.11.14 Constructions

Plg. Sec. O/o ENC PR Page 16 of 62


Admn Sanction Details for the works
Agmt . Details Expenditure
which are spilover for the FY 2015-16

Package No./ Name


Sl.no Actual
Road ID Year Length Date set expenditu
(8work AC Mandal Name of the work Upto
No. of sanction Estimate Date of for Name of re
s) Go.No & Date 31.03.20
sancti ed in cost Agmt. complet Agency incurred
15
on KM ion upto 31-
03-2016

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
7 Thungathur Thirmalg MRR GO 20(BT 2307015 R/F Zp Road To Rajanaik G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 11.56 0.00
thy iri Renewals) tanda via Jalalpuram Dt.19.11.14 Constructions

8 Thungathur Thungat MRR GO 20(BT 2308005 R/f NM Road at 8km to G.O.Ms.No. 20, 2014 1.30 16.90 19.11.14 18.11.15 M/S SKR 0.00 10.33
thy hurthy Renewals) Pasnoor Dt.19.11.14 Constructions,
Suryapet

313.92 4092.65 801.60 1350.34

Plg. Sec. O/o ENC PR Page 17 of 62


PROGRESS REPORT Month Sep-16 Length in Km, Rs in Lakhs
Dist: Nalgonda

Admn Sanction Details for the works Stage of


Agmt . Details
Expenditure Length i
which are spilover for the FY 2015-16 work

Package No./ Name


NS - Not
Sl.no
Road ID Cummula started Length
(8work AC Mandal Name of the work Year Length Date set comple
No. tive /P-
s) of sanction Estimate Date of for Name of ted
Go.No & Date expenditu Progress upto
sancti ed in cost Agmt. complet Agency /C-
re 31.03.2
on KM ion
(14+15) Complete 015
d

1 2 3 4 5 6 7 8 9 10 11 12 13 16 17 18

1 Thungathur Jajireddy MRR GO 20(BT 2311004 Arvapally to Kommala G.O.Ms.No. 20, 2014 9.50 123.50 02.05.15 01.02.16 M/S BPSC 68.40 C 0
thy gudem Renewals) Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
2 Thungathur Jajireddy MRR GO 20(BT 2311032 R/F Pwd Road to G.O.Ms.No. 20, 2014 5.35 69.55 02.05.15 01.02.16 M/S BPSC 43.48 C 0
thy gudem Renewals) Shanthinagar via Dt.19.11.14 Infra Pvt.,
D.Kothapally Ltd., Hyd.,
3 Thungathur Jajireddy MRR GO 20(BT 2311036 JS PWD Road at 59km to G.O.Ms.No. 20, 2014 3.00 39.00 02.05.15 01.02.16 M/S BPSC 21.26 C 0
thy gudem Renewals) Parsaipally Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
4 Thungathur Thirmalg MRR GO 20(BT 2307002 R/F Pwd Road To Tatipamula G.O.Ms.No. 20, 2014 4.00 52.00 02.02.15 01.11.15 M/S Sujana 33.78 C 3.82
thy iri Renewals) Dt.19.11.14 Constructions

5 Thungathur Thirmalg MRR GO 20(BT 2307003 R/F Thirmalgiri To G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 11.47 C 1.3
thy iri Renewals) Tatipamula Via Nandapur Dt.19.11.14 Constructions

6 Thungathur Thirmalg MRR GO 20(BT 2307004 R/F Pwd Road To Gundepuri G.O.Ms.No. 20, 2014 8.10 105.30 02.02.15 01.11.15 M/S Sujana 68.83 C 7.75
thy iri Renewals) via Malipuram Dt.19.11.14 Constructions

Plg. Sec. O/o ENC PR Page 18 of 62


Admn Sanction Details for the works Stage of
Agmt . Details
Expenditure Length i
which are spilover for the FY 2015-16 work

Package No./ Name


NS - Not
Sl.no
Road ID Cummula started Length
(8work AC Mandal Name of the work Year Length Date set comple
No. tive /P-
s) of sanction Estimate Date of for Name of ted
Go.No & Date expenditu Progress upto
sancti ed in cost Agmt. complet Agency /C-
re 31.03.2
on KM ion
(14+15) Complete 015
d

1 2 3 4 5 6 7 8 9 10 11 12 13 16 17 18
7 Thungathur Thirmalg MRR GO 20(BT 2307015 R/F Zp Road To Rajanaik G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 11.56 C 0
thy iri Renewals) tanda via Jalalpuram Dt.19.11.14 Constructions

8 Thungathur Thungat MRR GO 20(BT 2308005 R/f NM Road at 8km to G.O.Ms.No. 20, 2014 1.30 16.90 19.11.14 18.11.15 M/S SKR 10.33 C 0
thy hurthy Renewals) Pasnoor Dt.19.11.14 Constructions,
Suryapet

313.92 4092.65 2151.94

Plg. Sec. O/o ENC PR Page 19 of 62


PROGRESS REPORT Month Sep-16 Length in Km, Rs in Lakhs
Dist: Nalgonda
Spillover
Admn Sanction Details for the works Programme fo
Agmt . Details Length in KM
which are spilover for the FY 2015-16 2016-17

Package No./ Name


(10-17)

Sl.no Length Total Balanc


Road ID Year Length Date set
(8work AC Mandal Name of the work complete length
No. of sanction Estimate Date of for Name of e
s) Go.No & Date d during complete
sancti ed in cost Agmt. complet Agency the year d (Col. length
on KM ion 2015-16 19+20) (9-21)

1 2 3 4 5 6 7 8 9 10 11 12 13 19 20 21

1 Thungathur Jajireddy MRR GO 20(BT 2311004 Arvapally to Kommala G.O.Ms.No. 20, 2014 9.50 123.50 02.05.15 01.02.16 M/S BPSC 9.50 9.50 0.00
thy gudem Renewals) Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
2 Thungathur Jajireddy MRR GO 20(BT 2311032 R/F Pwd Road to G.O.Ms.No. 20, 2014 5.35 69.55 02.05.15 01.02.16 M/S BPSC 5.35 5.35 0.00
thy gudem Renewals) Shanthinagar via Dt.19.11.14 Infra Pvt.,
D.Kothapally Ltd., Hyd.,
3 Thungathur Jajireddy MRR GO 20(BT 2311036 JS PWD Road at 59km to G.O.Ms.No. 20, 2014 3.00 39.00 02.05.15 01.02.16 M/S BPSC 3.00 3.00 0.00
thy gudem Renewals) Parsaipally Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
4 Thungathur Thirmalg MRR GO 20(BT 2307002 R/F Pwd Road To Tatipamula G.O.Ms.No. 20, 2014 4.00 52.00 02.02.15 01.11.15 M/S Sujana 0.18 4.00 0.00
thy iri Renewals) Dt.19.11.14 Constructions

5 Thungathur Thirmalg MRR GO 20(BT 2307003 R/F Thirmalgiri To G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 0.00 1.30 0.00
thy iri Renewals) Tatipamula Via Nandapur Dt.19.11.14 Constructions

6 Thungathur Thirmalg MRR GO 20(BT 2307004 R/F Pwd Road To Gundepuri G.O.Ms.No. 20, 2014 8.10 105.30 02.02.15 01.11.15 M/S Sujana 0.35 8.10 0.00
thy iri Renewals) via Malipuram Dt.19.11.14 Constructions

Plg. Sec. O/o ENC PR Page 20 of 62


Spillover
Admn Sanction Details for the works Programme fo
Agmt . Details Length in KM
which are spilover for the FY 2015-16 2016-17

Package No./ Name


(10-17)

Sl.no Length Total Balanc


Road ID Year Length Date set
(8work AC Mandal Name of the work complete length
No. of sanction Estimate Date of for Name of e
s) Go.No & Date d during complete
sancti ed in cost Agmt. complet Agency the year d (Col. length
on KM ion 2015-16 19+20) (9-21)

1 2 3 4 5 6 7 8 9 10 11 12 13 19 20 21
7 Thungathur Thirmalg MRR GO 20(BT 2307015 R/F Zp Road To Rajanaik G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 1.30 1.30 0.00
thy iri Renewals) tanda via Jalalpuram Dt.19.11.14 Constructions

8 Thungathur Thungat MRR GO 20(BT 2308005 R/f NM Road at 8km to G.O.Ms.No. 20, 2014 1.30 16.90 19.11.14 18.11.15 M/S SKR 1.16 1.16 0.14
thy hurthy Renewals) Pasnoor Dt.19.11.14 Constructions,
Suryapet

313.92 4092.65 25.63

Plg. Sec. O/o ENC PR Page 21 of 62


PROGRESS REPORT Month Sep-16 Length in Km, Rs in Lakhs
Dist: Nalgonda
Spillover
Admn Sanction Details for the works Programme for Length completed
Agmt . Details during the year 2016-
which are spilover for the FY 2015-16 2016-17

Package No./ Name


(10-17) 17

Sl.no Balance
Road ID Year Length Date set Amount
(8work AC Mandal Name of the work Up to Durin
No. of sanction Estimate Date of for Name of ( est cost -
s) Go.No & Date Last g the
sancti ed in cost Agmt. complet Agency cummulati
Month Month
on KM ion ve exp.)
(10-17)

1 2 3 4 5 6 7 8 9 10 11 12 13 22 23 24

1 Thungathur Jajireddy MRR GO 20(BT 2311004 Arvapally to Kommala G.O.Ms.No. 20, 2014 9.50 123.50 02.05.15 01.02.16 M/S BPSC 55.10 0.00 0.00
thy gudem Renewals) Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
2 Thungathur Jajireddy MRR GO 20(BT 2311032 R/F Pwd Road to G.O.Ms.No. 20, 2014 5.35 69.55 02.05.15 01.02.16 M/S BPSC 26.07 0.00 0.00
thy gudem Renewals) Shanthinagar via Dt.19.11.14 Infra Pvt.,
D.Kothapally Ltd., Hyd.,
3 Thungathur Jajireddy MRR GO 20(BT 2311036 JS PWD Road at 59km to G.O.Ms.No. 20, 2014 3.00 39.00 02.05.15 01.02.16 M/S BPSC 17.74 0.00 0.00
thy gudem Renewals) Parsaipally Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
4 Thungathur Thirmalg MRR GO 20(BT 2307002 R/F Pwd Road To Tatipamula G.O.Ms.No. 20, 2014 4.00 52.00 02.02.15 01.11.15 M/S Sujana 18.22 0.00 0.00
thy iri Renewals) Dt.19.11.14 Constructions

5 Thungathur Thirmalg MRR GO 20(BT 2307003 R/F Thirmalgiri To G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 5.43 0.00 0.00
thy iri Renewals) Tatipamula Via Nandapur Dt.19.11.14 Constructions

6 Thungathur Thirmalg MRR GO 20(BT 2307004 R/F Pwd Road To Gundepuri G.O.Ms.No. 20, 2014 8.10 105.30 02.02.15 01.11.15 M/S Sujana 36.47 0.00 0.00
thy iri Renewals) via Malipuram Dt.19.11.14 Constructions

Plg. Sec. O/o ENC PR Page 22 of 62


Spillover
Admn Sanction Details for the works Programme for Length completed
Agmt . Details during the year 2016-
which are spilover for the FY 2015-16 2016-17

Package No./ Name


(10-17) 17

Sl.no Balance
Road ID Year Length Date set Amount
(8work AC Mandal Name of the work Up to Durin
No. of sanction Estimate Date of for Name of ( est cost -
s) Go.No & Date Last g the
sancti ed in cost Agmt. complet Agency cummulati
Month Month
on KM ion ve exp.)
(10-17)

1 2 3 4 5 6 7 8 9 10 11 12 13 22 23 24
7 Thungathur Thirmalg MRR GO 20(BT 2307015 R/F Zp Road To Rajanaik G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 5.34 0.00 0.00
thy iri Renewals) tanda via Jalalpuram Dt.19.11.14 Constructions

8 Thungathur Thungat MRR GO 20(BT 2308005 R/f NM Road at 8km to G.O.Ms.No. 20, 2014 1.30 16.90 19.11.14 18.11.15 M/S SKR 6.57 0.00 0.00
thy hurthy Renewals) Pasnoor Dt.19.11.14 Constructions,
Suryapet

313.92 4092.65 1949.92 0.00 0.00

Plg. Sec. O/o ENC PR Page 23 of 62


PROGRESS REPORT Month Sep-16 Length in Km, Rs in Lakhs
Dist: Nalgonda

Admn Sanction Details for the works Length completed Expenditure during the
Agmt . Details
during the year 2016- year 2016-17
which are spilover for the FY 2015-16

Package No./ Name


17

Sl.no
Road ID Year Length Date set
(8work AC Mandal Name of the work Durin Up to During
No. of sanction Estimate Date of for Name of
s) Go.No & Date g the Last the
sancti ed in cost Agmt. complet Agency
year Month Month
on KM ion

1 2 3 4 5 6 7 8 9 10 11 12 13 25 26 27

1 Thungathur Jajireddy MRR GO 20(BT 2311004 Arvapally to Kommala G.O.Ms.No. 20, 2014 9.50 123.50 02.05.15 01.02.16 M/S BPSC 0.00 0.00 0.00
thy gudem Renewals) Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
2 Thungathur Jajireddy MRR GO 20(BT 2311032 R/F Pwd Road to G.O.Ms.No. 20, 2014 5.35 69.55 02.05.15 01.02.16 M/S BPSC 0.00 0.00 0.00
thy gudem Renewals) Shanthinagar via Dt.19.11.14 Infra Pvt.,
D.Kothapally Ltd., Hyd.,
3 Thungathur Jajireddy MRR GO 20(BT 2311036 JS PWD Road at 59km to G.O.Ms.No. 20, 2014 3.00 39.00 02.05.15 01.02.16 M/S BPSC 0.00 0.00 0.00
thy gudem Renewals) Parsaipally Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
4 Thungathur Thirmalg MRR GO 20(BT 2307002 R/F Pwd Road To Tatipamula G.O.Ms.No. 20, 2014 4.00 52.00 02.02.15 01.11.15 M/S Sujana 0.00 0.00 0.00
thy iri Renewals) Dt.19.11.14 Constructions

5 Thungathur Thirmalg MRR GO 20(BT 2307003 R/F Thirmalgiri To G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 0.00 0.00 0.00
thy iri Renewals) Tatipamula Via Nandapur Dt.19.11.14 Constructions

6 Thungathur Thirmalg MRR GO 20(BT 2307004 R/F Pwd Road To Gundepuri G.O.Ms.No. 20, 2014 8.10 105.30 02.02.15 01.11.15 M/S Sujana 0.00 0.00 0.00
thy iri Renewals) via Malipuram Dt.19.11.14 Constructions

Plg. Sec. O/o ENC PR Page 24 of 62


Admn Sanction Details for the works Length completed Expenditure during the
Agmt . Details
during the year 2016- year 2016-17
which are spilover for the FY 2015-16

Package No./ Name


17

Sl.no
Road ID Year Length Date set
(8work AC Mandal Name of the work Durin Up to During
No. of sanction Estimate Date of for Name of
s) Go.No & Date g the Last the
sancti ed in cost Agmt. complet Agency
year Month Month
on KM ion

1 2 3 4 5 6 7 8 9 10 11 12 13 25 26 27
7 Thungathur Thirmalg MRR GO 20(BT 2307015 R/F Zp Road To Rajanaik G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 0.00 0.00 0.00
thy iri Renewals) tanda via Jalalpuram Dt.19.11.14 Constructions

8 Thungathur Thungat MRR GO 20(BT 2308005 R/f NM Road at 8km to G.O.Ms.No. 20, 2014 1.30 16.90 19.11.14 18.11.15 M/S SKR 0.00 0.00 0.00
thy hurthy Renewals) Pasnoor Dt.19.11.14 Constructions,
Suryapet

313.92 4092.65 0.00 129.39 207.95

Plg. Sec. O/o ENC PR Page 25 of 62


PROGRESS REPORT Month Sep-16 Length in Km, Rs in Lakhs
Dist: Nalgonda

Admn Sanction Details for the works Expenditure during the

Cumulative length completed


Agmt . Details
year 2016-17
which are spilover for the FY 2015-16

Package No./ Name


Sl.no
Road ID Year Length Date set
(8work AC Mandal Name of the work
No. of sanction Estimate Date of for Name of During
s) Go.No & Date
sancti ed in cost Agmt. complet Agency the year
on KM ion

1 2 3 4 5 6 7 8 9 10 11 12 13 28 29

1 Thungathur Jajireddy MRR GO 20(BT 2311004 Arvapally to Kommala G.O.Ms.No. 20, 2014 9.50 123.50 02.05.15 01.02.16 M/S BPSC 0.00 9.50
thy gudem Renewals) Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
2 Thungathur Jajireddy MRR GO 20(BT 2311032 R/F Pwd Road to G.O.Ms.No. 20, 2014 5.35 69.55 02.05.15 01.02.16 M/S BPSC 0.00 5.35
thy gudem Renewals) Shanthinagar via Dt.19.11.14 Infra Pvt.,
D.Kothapally Ltd., Hyd.,
3 Thungathur Jajireddy MRR GO 20(BT 2311036 JS PWD Road at 59km to G.O.Ms.No. 20, 2014 3.00 39.00 02.05.15 01.02.16 M/S BPSC 0.00 3.00
thy gudem Renewals) Parsaipally Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
4 Thungathur Thirmalg MRR GO 20(BT 2307002 R/F Pwd Road To Tatipamula G.O.Ms.No. 20, 2014 4.00 52.00 02.02.15 01.11.15 M/S Sujana 0.00 4.00
thy iri Renewals) Dt.19.11.14 Constructions

5 Thungathur Thirmalg MRR GO 20(BT 2307003 R/F Thirmalgiri To G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 0.00 1.30
thy iri Renewals) Tatipamula Via Nandapur Dt.19.11.14 Constructions

6 Thungathur Thirmalg MRR GO 20(BT 2307004 R/F Pwd Road To Gundepuri G.O.Ms.No. 20, 2014 8.10 105.30 02.02.15 01.11.15 M/S Sujana 0.00 8.10
thy iri Renewals) via Malipuram Dt.19.11.14 Constructions

Plg. Sec. O/o ENC PR Page 26 of 62


Admn Sanction Details for the works Expenditure during the

Cumulative length completed


Agmt . Details
year 2016-17
which are spilover for the FY 2015-16

Package No./ Name


Sl.no
Road ID Year Length Date set
(8work AC Mandal Name of the work
No. of sanction Estimate Date of for Name of During
s) Go.No & Date
sancti ed in cost Agmt. complet Agency the year
on KM ion

1 2 3 4 5 6 7 8 9 10 11 12 13 28 29
7 Thungathur Thirmalg MRR GO 20(BT 2307015 R/F Zp Road To Rajanaik G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 0.00 1.30
thy iri Renewals) tanda via Jalalpuram Dt.19.11.14 Constructions

8 Thungathur Thungat MRR GO 20(BT 2308005 R/f NM Road at 8km to G.O.Ms.No. 20, 2014 1.30 16.90 19.11.14 18.11.15 M/S SKR 0.00 1.16
thy hurthy Renewals) Pasnoor Dt.19.11.14 Constructions,
Suryapet

313.92 4092.65 337.34 290.42

Plg. Sec. O/o ENC PR Page 27 of 62


PROGRESS REPORT Month Sep-16 Length in Km, Rs in Lakhs Length in Km, Rs in Lakhs
Dist: Nalgonda

Admn Sanction Details for the works Bills


Agmt . Details pending
which are spilover for the FY 2015-16

Cumulative expenditure
Package No./ Name
with
PAO for
Sl.no want of
Road ID Year Length Date set
(8work AC Mandal Name of the work BRO/L
No. of sanction Estimate Date of for Name of
s) Go.No & Date OC
sancti ed in cost Agmt. complet Agency
on KM ion

1 2 3 4 5 6 7 8 9 10 11 12 13 30 31

1 Thungathur Jajireddy MRR GO 20(BT 2311004 Arvapally to Kommala G.O.Ms.No. 20, 2014 9.50 123.50 02.05.15 01.02.16 M/S BPSC 68.40
thy gudem Renewals) Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
2 Thungathur Jajireddy MRR GO 20(BT 2311032 R/F Pwd Road to G.O.Ms.No. 20, 2014 5.35 69.55 02.05.15 01.02.16 M/S BPSC 43.48
thy gudem Renewals) Shanthinagar via Dt.19.11.14 Infra Pvt.,
D.Kothapally Ltd., Hyd.,
3 Thungathur Jajireddy MRR GO 20(BT 2311036 JS PWD Road at 59km to G.O.Ms.No. 20, 2014 3.00 39.00 02.05.15 01.02.16 M/S BPSC 21.26
thy gudem Renewals) Parsaipally Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
4 Thungathur Thirmalg MRR GO 20(BT 2307002 R/F Pwd Road To Tatipamula G.O.Ms.No. 20, 2014 4.00 52.00 02.02.15 01.11.15 M/S Sujana 33.78
thy iri Renewals) Dt.19.11.14 Constructions

5 Thungathur Thirmalg MRR GO 20(BT 2307003 R/F Thirmalgiri To G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 11.47
thy iri Renewals) Tatipamula Via Nandapur Dt.19.11.14 Constructions

6 Thungathur Thirmalg MRR GO 20(BT 2307004 R/F Pwd Road To Gundepuri G.O.Ms.No. 20, 2014 8.10 105.30 02.02.15 01.11.15 M/S Sujana 68.83
thy iri Renewals) via Malipuram Dt.19.11.14 Constructions

Plg. Sec. O/o ENC PR Page 28 of 62


Admn Sanction Details for the works Bills
Agmt . Details pending
which are spilover for the FY 2015-16

Cumulative expenditure
Package No./ Name
with
PAO for
Sl.no want of
Road ID Year Length Date set
(8work AC Mandal Name of the work BRO/L
No. of sanction Estimate Date of for Name of
s) Go.No & Date OC
sancti ed in cost Agmt. complet Agency
on KM ion

1 2 3 4 5 6 7 8 9 10 11 12 13 30 31
7 Thungathur Thirmalg MRR GO 20(BT 2307015 R/F Zp Road To Rajanaik G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 11.56
thy iri Renewals) tanda via Jalalpuram Dt.19.11.14 Constructions

8 Thungathur Thungat MRR GO 20(BT 2308005 R/f NM Road at 8km to G.O.Ms.No. 20, 2014 1.30 16.90 19.11.14 18.11.15 M/S SKR 10.33
thy hurthy Renewals) Pasnoor Dt.19.11.14 Constructions,
Suryapet

313.92 4092.65 2489.28

Plg. Sec. O/o ENC PR Page 29 of 62


PROGRESS REPORT Month Sep-16 Length in Km, Rs in Lakhs Length in Km, Rs in Lakhs
Dist: Nalgonda

Admn Sanction Details for the works Remarks


Agmt . Details any special
which are spilover for the FY 2015-16
comments

Package No./ Name


pertaining
Sl.no to the work
Road ID Year Length Date set may be
(8work AC Mandal Name of the work
No. of sanction Estimate Date of for Name of mentioned
s) Go.No & Date
sancti ed in cost Agmt. complet Agency
on KM ion

1 2 3 4 5 6 7 8 9 10 11 12 13 32

1 Thungathur Jajireddy MRR GO 20(BT 2311004 Arvapally to Kommala G.O.Ms.No. 20, 2014 9.50 123.50 02.05.15 01.02.16 M/S BPSC 1
thy gudem Renewals) Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
2 Thungathur Jajireddy MRR GO 20(BT 2311032 R/F Pwd Road to G.O.Ms.No. 20, 2014 5.35 69.55 02.05.15 01.02.16 M/S BPSC 1
thy gudem Renewals) Shanthinagar via Dt.19.11.14 Infra Pvt.,
D.Kothapally Ltd., Hyd.,
3 Thungathur Jajireddy MRR GO 20(BT 2311036 JS PWD Road at 59km to G.O.Ms.No. 20, 2014 3.00 39.00 02.05.15 01.02.16 M/S BPSC
thy gudem Renewals) Parsaipally Dt.19.11.14 Infra Pvt.,
Ltd., Hyd.,
4 Thungathur Thirmalg MRR GO 20(BT 2307002 R/F Pwd Road To Tatipamula G.O.Ms.No. 20, 2014 4.00 52.00 02.02.15 01.11.15 M/S Sujana 1
thy iri Renewals) Dt.19.11.14 Constructions

5 Thungathur Thirmalg MRR GO 20(BT 2307003 R/F Thirmalgiri To G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 1
thy iri Renewals) Tatipamula Via Nandapur Dt.19.11.14 Constructions

6 Thungathur Thirmalg MRR GO 20(BT 2307004 R/F Pwd Road To Gundepuri G.O.Ms.No. 20, 2014 8.10 105.30 02.02.15 01.11.15 M/S Sujana 1
thy iri Renewals) via Malipuram Dt.19.11.14 Constructions

Plg. Sec. O/o ENC PR Page 30 of 62


Admn Sanction Details for the works Remarks
Agmt . Details any special
which are spilover for the FY 2015-16
comments

Package No./ Name


pertaining
Sl.no to the work
Road ID Year Length Date set may be
(8work AC Mandal Name of the work
No. of sanction Estimate Date of for Name of mentioned
s) Go.No & Date
sancti ed in cost Agmt. complet Agency
on KM ion

1 2 3 4 5 6 7 8 9 10 11 12 13 32
7 Thungathur Thirmalg MRR GO 20(BT 2307015 R/F Zp Road To Rajanaik G.O.Ms.No. 20, 2014 1.30 16.90 02.02.15 01.11.15 M/S Sujana 1
thy iri Renewals) tanda via Jalalpuram Dt.19.11.14 Constructions

8 Thungathur Thungat MRR GO 20(BT 2308005 R/f NM Road at 8km to G.O.Ms.No. 20, 2014 1.30 16.90 19.11.14 18.11.15 M/S SKR 1
thy hurthy Renewals) Pasnoor Dt.19.11.14 Constructions,
Suryapet

313.92 4092.65

Plg. Sec. O/o ENC PR Page 31 of 62


Annexure-I
ROAD MILEAGE WORK WISE DETAILS as on 01.04.2017

Total Lengh of Kms.


Surfa

Nomeniclature of
Length in KM

Starting Milage

Ending Milage
Constituency

the Road
Road ID

Mandal
Sl No

CC

BT
Total
MDR
ODR

VR
1 2 3 4 5 6 7 8 9 10 11 12 13 14
41 Thungathurthy 3001001 Nagaram R/F AnantharamTo Etoor 0.00 0.00 6.50 6.50 0.00 6.50 6.50 0.000 6.500
42 Thungathurthy 3001002 Nagaram R/F Malipuram to Mamidipally 0.00 0.00 1.50 1.50 0.00 1.50 1.50 0.00 0.00
43 Thungathurthy 3001003 Nagaram R/F Etoor To Nagaram 0.00 0.00 2.50 2.50 0.00 2.50 2.50 0.00 0.00
44 Thungathurthy 3001004 Nagaram R/F PWD(V-T) road to Etoor alugu 0.00 0.00 2.50 2.50 0.00 2.50 2.50 0.00 0.00
45 Thungathurthy 3001005 Nagaram R/F Etoor to Malipuram 0.00 0.00 4.00 4.00 0.00 4.00 4.00 0.00 0.00
46 Thungathurthy 3001006 Nagaram R/F Pragathi Nagar to Lingalagadda(H) Etoor 0.00 0.00 2.00 2.00 0.00 2.00 2.00 0.00 0.00
47 Thungathurthy 3001007 Nagaram R/F Mamidipally to Harichandru thanda 0.00 0.00 3.00 3.00 0.00 3.00 3.00 0.00 0.00
48 Thungathurthy 3001008 Nagaram R/F Harichandru Thanda to Malipuram 0.00 0.00 2.50 2.50 0.00 2.50 2.50 0.00 0.00
49 Thungathurthy 3001009 Nagaram R/F Phanigiri to Mamidipally 0.00 0.00 2.60 2.60 0.00 2.60 2.60 0.140 2.460
50 Thungathurthy 3001010 Nagaram R/f Phanigiri to Laxmidevigudem 0.00 0.00 3.00 3.00 0.00 3.00 3.00 0.000 0.000
51 Thungathurthy 3001011 Nagaram R/F phanigiri to Buddist temple 0.00 0.00 1.05 1.05 0.00 1.05 1.05 0.000 0.000
52 Thungathurthy 3001012 Nagaram R/F Mamidipally to bandlapalli 0.00 0.00 4.00 4.00 0.00 4.00 4.00 0.000 0.000
53 Thungathurthy 3001013 Nagaram CC road from Ponna Narayana (H) to Rice mill at Etoor (V) 0.00 0.00 0.20 0.20 0.00 0.20 0.20 0.200 0.000
54 Thungathurthy 3001014 Nagaram Rice Mill to Ravula Venkateshwarlu (H) at Etoor (V) 0.00 0.00 0.20 0.20 0.20 0.40 0.20 0.200 0.000
55 Thungathurthy 3001015 Nagaram R/f NM Road at 8km to Pasnoor 0.00 0.00 1.30 1.30 0.00 1.30 1.30 0.00 1.300
56 Thungathurthy 3001016 Nagaram R/f Kasithanda to Pastala 0.00 0.00 7.00 7.00 0.00 7.00 7.00 1.000 6.000
57 Thungathurthy 3001017 Nagaram R/F Pasnoor to Pasthala 0.00 0.00 1.50 1.50 0.00 1.50 1.50 0.00 0.00
58 Thungathurthy 3001018 Nagaram R/F Pasnoor to Laxmapur 0.00 0.00 1.50 1.50 0.00 1.50 1.50 0.00 0.00
59 Thungathurthy 3001019 Nagaram R/F Dauda thanda to Shanthinagar- Kothapally road 0.00 0.00 0.50 0.50 0.00 0.50 0.50 0.000 0.000
60 Thungathurthy 3001020 Nagaram R/F ZP road to Hussain tanda via Medibhavi tanda 0.00 0.00 2.00 2.00 0.00 2.00 2.00 0.000 0.000
61 Thungathurthy 3001021 Nagaram R/F Pwd Road to Shanthinagar via D.Kothapally 0.00 0.00 6.30 6.30 0.00 6.30 6.30 0.950 5.350
62 Thungathurthy 3001022 Nagaram Approach road to Narsimla gudem 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.000 1.000
63 Thungathurthy 3001023 Nagaram R/F PWD road to D.Kothapally 0.00 0.00 3.00 3.00 0.00 3.00 3.00 0.000 3.000
64 Thungathurthy 3001024 Nagaram R/F PWD road to Pichireddy tanda 0.00 0.00 2.00 2.00 0.00 2.00 2.00 0.000 0.000
65 Thungathurthy 3001025 Nagaram R/F PWD road at Nagaram bunglow to Musi river via Peraboinagudem 0.00 0.00 6.00 6.00 0.00 6.00 6.00 0.000 4.300
66 Thungathurthy 3001026 Nagaram R/F PWD road to Bheemla Thanda 0.00 0.00 1.80 1.80 0.00 1.80 1.80 0.000 0.000
67 Thungathurthy 3001027 Nagaram R/F Wardhamankota to Kotamarthibata 0.00 0.00 2.00 2.00 0.00 2.00 2.00 0.000 0.000
68 Thungathurthy 3001028 Nagaram R/F Nagarambangla-Peraboinagudem road to Dubbatanda 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.000 0.000
69 Thungathurthy 3001029 Nagaram R/F Wardhamankota to Panigiri 0.00 0.00 2.00 2.00 0.00 2.00 2.00 0.000 0.000
70 Thungathurthy 3001030 Nagaram R/FD.Kothapally to Jajireddygudem 0.00 0.00 4.00 4.00 0.00 4.00 4.00 0.000 0.000
R/F Suryapet Janagaon road (vijayanagar colony) to phanigiri via
71 Thungathurthy 3001031 Nagaram Nagaram Village 0.00 0.00 5.00 5.00 0.00 5.00 5.00 0.600 0.000
72 Thungathurthy 3001032 Nagaram R/F Panigiri to Nagaram Village 0.00 0.00 3.00 3.00 0.00 3.00 3.00 0.000 0.000
73 Thungathurthy 3001033 Nagaram R/F Wardhamankota to Sarvam thanda 0.00 0.00 4.50 4.50 0.00 4.50 4.50 0.000 0.000
Bridges
and
Surface Details CD works

Bus Plying Length


Causewa

(13+14+15+18)
Unmetalled ys

Slab Culvert

Road dam &


Pipe Culvert

Remarks
in Kms.
UnMotorable

causeway
Total
Motorable
WBM

Minor

Mjaor
Total

15 16 17 18 19 20 21 22 23 24 25 26
0.000 0.000 0.000 0.00 6.50 4.00 10 0 0 0 0
0.00 1.500 0.00 1.50 1.50 0.00 3 0 0 0 0
0.00 2.500 0.00 2.50 2.50 0.00 3 0 0 0 0
1.100 1.400 0.00 1.40 2.50 0.00 4 0 0 0 0
0.00 0.00 4.000 4.00 4.00 0.00 3 0 0 0 0
0.00 2.000 0.00 2.00 2.00 0.00 2 0 0 0 0
0.00 3.000 0.00 3.00 3.00 0.00 3 0 0 0 0
0.00 2.500 0.00 2.50 2.50 0.00 2 0 0 0 0
0.000 0.000 0.000 0.00 2.60 0.00 7 0 2 0 0
1.500 1.500 0.000 0.00 3 0.00 3 0 0 0 0
0.000 1.050 0.000 1.05 1.05 0 0 0 1 0 0
0.000 4.000 0.00 0.00 4 0.00 0 0 0 0 0
0.000 0.000 0.00 0.00 0.2 0.00 0 0 0 0 0
0.000 0.000 0.00 0.00 0.2 0.00 0 0 0 0 0
0.00 0.00 0.00 0.00 1.3 0 4 0 0 0 0
0.00 0.00 0.00 0 7 4 14 0 0 0 0
1.500 0.00 0.00 0 1.5 0 4 0 0 0 0
1.500 0.00 0.00 0 1.5 0 3 0 0 0 0
0.000 0.500 0.000 0.5 0.5 0 0 0 0 0 0
0.000 2.000 0.000 2 2 0 0.00 0 0 0 0
0.000 0.000 0.000 0 6.3 6.3 9 0 2 0 0
0.000 0.000 0.000 0 1 1 0 0 0 0
0.000 0.000 0.000 0 3 3 1 0 1 0 0
1.400 0.600 0.000 0.6 2 1.4 1 0 1 0 0
0.000 0.000 1.700 1.7 6 4.3 10 2 2 0 0
0.000 1.800 0.000 1.8 1.8 0 1 0 1 0 0
0.400 0.600 1.000 1.6 2 0.4 0 0 0 0 0
0.300 0.000 0.700 0.7 1 0.3 0 0 0 0 0
0.400 0.600 1.000 1.6 2 0.4 0 0 0 0 0
0.000 4.000 0.000 4 4 0 0 0 0 0 0

0.000 4.400 0.000 5 5 0 0 0 1 0 0


0.000 3.000 0.000 3 3 0 0 0 0 0 0
0.000 4.500 0.000 4.5 4.5 0 0 0 0 0 0
ANGANWADI BUILDINGS

No. of Estd cost


Name of the Total No. Total No. of Status of
S.No
Mandal of GPs Habitations
Buildings (in Grant
sanctioned Lakhs) work

1 2 3 4 5 6 7 8
1 Tirumalagiri 11 33 7 6.5 APIP Progress
2 Nagaram 9 23 2 6.5 APIP Progress
3 Arvapally 9 30 0
Total 29 86 9 13
Remarks

9
balance work sanctioned under mgnregs
balance work sanctioned under mgnregs
Name of District Nalgonda

Name of the grant


Re-Structured & Strengthened ICDS
Work wise Progress Report
Adm. Sacntion Expenditure
Est. Cost for Whether
New works (or) Cumulativ
the work Upto last Expenditure
Habitataion/ Name of Balance Exp. Upto During e
SI No Mandal Sector Code Estimate cost Spillover month during the
the work 31.03.16 the Expenditu
for Spillover or New (From Year ( Col
month 8+9) re
works work April,16)

1 2 3 4 5 6 7 8 9 10 11
1 Nagaram Pastala-II Plain Procs.No.105/c/2014, dt.11.02.14 of 6.50 4.50 0.00 0.00 0.00 4.50
District Collector, Nalgonda

2 Nagaram pasunoor-II Plain Procs.No.105/c/2014, dt.11.02.14 of 6.50 4.50 0.00 0.00 0.00 4.50
District Collector, Nalgonda

Total:- 13.00 0.00 9.00 0.00 0.00 0.00 9.00


4 Thirumalagiri Gundlabanda thanda apip Procs.No.105/c/2014, dt.11.02.14 of 6.50 4.50 0.00 0.00 0.00 4.50
H/O Jalalpuram District Collector, Nalgonda

5 Thirumalagiri jethya thanda H/O apip 6.50 4.50 0.00 0.00 0.00 4.50
Jalalpuram
6 Thirumalagiri kotya thanda H/O apip 6.50 4.50 0.00 0.00 0.00 4.50
Jalalpuram
7 Thirumalagiri velishala-2 apip 6.50 4.50 0.00 0.00 0.00 4.50

8 Thirumalagiri Bolla thanda apip 6.50 6.00 0.00 0.00 0.00 4.50

9 Thirumalagiri Hemla thanda apip 6.50 6.00 0.00 0.00 0.00 6.00
10 Thirumalagiri Lakya thanda H/O apip 6.50 6.00 0.00 0.00 0.00 6.00
Mamidyala
Total:- 45.50 0.00 36.00 0.00 0.00 0.00 34.50

AEE, PRSD THUNGATHURTHY-1 DEE, PRSD , THUNGATHURTHY-1


T.T.Y. SD Total:- 58.50 0.00 45.00 0.00 0.00 0.00 43.50

AEE, PRSD THUNGATHURTHY-1 DEE, PRSD , THUNGATHURTHY-1


Jun 17

Value of
Balance
work
amount Present stage Remarks
required done but
not paid

12 13 14 15
0.00 Brickwork in progress additional sanctioned in
mgnregs
0.00 Slab Completed additional sanctioned in
mgnregs
0.00
0.00 plastering completed Work takenup in NREGS Grant

0.00 plastering completed

0.00 plastering completed

0.00 plastering completed

0.00 plastering completed

0.00 floor laid


0.00 floor laid

0.00

AEE, PRSD THUNGATHURTHY-1 DEE, PRSD , THUNGATHURTHY-1


0.00

AEE, PRSD THUNGATHURTHY-1 DEE, PRSD , THUNGATHURTHY-1


DETAILS OF MAJOR ONGOING WORKS
Stage of wor
No of works Estd cost (in Expenditure
S.No Name of the Grant No of works
sanctioned Lakhs) incurred
completed
1 2 3 5 4 6
APIP-ANGANWADI
1 9 58.5 43.55 0
BUILDINGS
ANGANWADI BUILDINGS-
2 2 8.25 8.05 0
ZPGF
3 GOPALAMITHRA 0 0 0 0
4 MRR 2014-15 7 423.15 258.78 7
5 CRR 6 617 471.05 6

6 GP BUILDINGS 9 114 13.5 0

7 RIDF
8 PMGSY 1 532.68 178.07 1
9 MGNREGS CC Roads 49 420 254.85 46

BRIDGES/MAJOR CD WORKS
Stage of wor
No of works Estd cost (in Expenditure
S.No Name of the Grant No of works
sanctioned Lakhs) incurred
completed
1 2 3 5 4 6
1 Tirumalagiri 0 0 0 0
2 Nagaram 0 0 0 0
3 Arvapally 1 193 0 0
NG WORKS
Stage of work
No of works No of works Remarks
progress not started
7 8

9 0

2 0
0 0
0 0
0 0

3 GP Buildings newly
6 3 sanctioned & finalizing
location

0 0
0 3

WORKS
Stage of work
No of works No of works Remarks
progress not started
7 8
0 0
0 0
1 0 Monitered by TTY-I
GOPALAMITHRA BUILDINGS
No. of Estd cost
Name of the Total No. Total No. of Status of
S.No Buildings (in Grant
Mandal of GPs Habitations
sanctioned Lakhs) work

1 2 3 4 5 6 7 8
1 Tirumalagiri 11 33 0
2 Nagaram 9 23 0
3 Arvapally 9 30 0
Total 29 0 0 0 0
Remarks

9
FISHERIES BUILDINGS
No. of
Name of Estd cost
S.No Name of the Mandal Buildings Grant Status of work
village (in Lakhs)
sanctioned
1 2 3 4 5 6 7
1 Tirumalagiri
2 Nagaram Etoor 1 10 Fisheries Slab completed
3 Arvapally
Total 1
Remarks

8
SHRISHAKTI BUILDINGS
No. of
Buildings Estd cost Status of
S.No Name of the Mandal Name of village
sanctione (in Lakhs)
Grant
work
d

1 2 3 4 5 6 7
1 Tirumalagiri
2 Nagaram
3 Arvapally Arvapally 1 25 MGNREGS Completed
4 Arvapally Arvapally 1 5 Progress
Total 1
Remarks

Balance work to be done


SDF
Name of the Estd cost (in
S.No Name of WORK Grant Status of work
Mandal Lakhs)
1 2 3 5 6 7
1 Jajireddygudem 15
2 Nagaram 37
3 Arvapally 12
Total
Remarks

8
ANNEXURE - I
CONDITION OF BT ROADS COMPLETED UNDER CRR / PMGSY GRANT WHICH ARE IN 5 YEARS MAITENANCE PERIOD

Present
Grant in Name of the
End date of Condit Amount Required for Mai
Reach of the which Date of Name of the Engineer in-charge
Sl Length (5) Years on of agreement cond
Name of Name of the road taken up the road Completio Maitenanc Agency / of the work for
. Name of the Road ID Taken the (Rs. in Lakh
the Assembly Name of the road was n e period road Contractor who maintenance
N Mandal No. up in
District Constituency taken up (DD/MM/ DD/MM/ (Good / executed the
o Km
(CRR / YYYY) YYYY Fair / work
PMGSY) Poor)
From To AEE/AE DEE 1st Year 2nd Year 3rd Year

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
M/S Sri
T01 Road at 9km to
1 Suryapet Thungathurthy Jajireddygudem 2311008 2.50 0/000 2/500 CRR 06.03.16 06.03.21 Good Raghavendra, T.Srinivas K. Prabhu 0.70 0.92 1.11
Loyapally
Hyderabad

JS PWD Road at 65KM P. Ranga Rao,


2 Suryapet Thungathurthy Jajireddygudem 2311017 1.50 0/000 1/500 CRR 15.11.15 15.11.20 Good T.Srinivas K. Prabhu 0.47 0.63 0.76
to Adivemula to Arvapally R/o Suryapet

R/F PWD road at


K. Yadava Reddy,
3 Suryapet Thungathurthy Jajireddygudem 2311021 Ramannagudem to 1.50 0/000 1/500 CRR 20.09.15 20.09.20 Good T.Srinivas K. Prabhu 1.04 1.11 1.16
R/o Suryapet
Kothagudem ZP road
MRL21-Thirumalagiri
M/s Srujana
4 Suryapet Thungathurthy Thirmalgiri 2307026 -Thatipamula road to 8.60 0/000 8/600 PMGSY 30.06.15 30.06.20 Good T.Srinivas K. Prabhu 2.84 3.66 4.56
Constructions
Etur via Nandapuram

R/F Pwd Road To P.Dayaker Reddy,


5 Suryapet Thungathurthy Thirmalgiri 2307006 1.50 0/000 1/500 CRR 02.12.15 02.12.20 Good T.Srinivas K. Prabhu 0.63 0.78 0.91
Mamidyala R/o. Mushipatla

M/S Sri
R/F Thirmalgiri To
6 Suryapet Thungathurthy Thirmalgiri 2307017 4.50 0/000 4/500 CRR 05.02.16 05.02.21 Good Raghavendra, T.Srinivas K. Prabhu 1.35 1.82 2.24
Nellibanda thanda
Hyderabad
R/F Velishala To P. Ranga Rao,
7 Suryapet Thungathurthy Thirmalgiri 2307014 4.00 0/000 4/000 CRR 11.05.15 11.05.20 Good T.Srinivas K. Prabhu 1.17 1.58 1.94
Siddisamudram R/o Suryapet
NEXURE - I
PMGSY GRANT WHICH ARE IN 5 YEARS MAITENANCE PERIOD

Amount Required for Maitenance as per


agreement conditions
(Rs. in Lakhs) Remarks

4th Year 5th Year

20 21 22

1.33 1.51

0.92 1.05

1.22 1.27

5.41 6.26

1.06 1.18

2.72 3.11

2.36 2.69
ANNEXURE - II

CONDITION OF BT ROADS COMPLETED UNDER OTHER THAN CRR/PMGSY WHICH ARE IN TWO YEARS DEFECT LIABILITY PERIOD

Grant in which
End date of Name of the
Reach of the road the road was Present
Length Date of Dfect Name of the Engineer in-charge
Liability Conditon
Name of Name of the taken up taken up of for maintenance
Sl. Name of the Road ID Taken Completion the road Agency /
the Assembly Name of the road NABARD/SDF/ period
No Mandal No. up in (DD/MM/ (Good / Contractor who
District Constituency RDF/MRR (Spl DD/MM/ Fair
Km YYYY) / Poor) executed the work
Repairs & BT YYYY
From To Renewal) etc., AEE/AE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
M/S BPSC Infra
1 Suryapet Thungathurthy Jajireddygudem 2311004 Arvapally to Kommala 9.50 0/000 9/500 MRR GO 20 11.01.16 11.01.18 Good T.Srinivas
Pvt., Ltd., Hyd.,
R/F Pwd Road to Shanthinagar M/S BPSC Infra
2 Suryapet Thungathurthy Jajireddygudem 2311032 5.35 0/000 5/350 MRR GO 20 11.01.16 11.01.18 Good T.Srinivas
via D.Kothapally Pvt., Ltd., Hyd.,
JS PWD Road at 59km to M/S BPSC Infra
3 Suryapet Thungathurthy Jajireddygudem 2311036 3.00 0/000 3/000 MRR GO 20 11.01.16 11.01.18 Good T.Srinivas
Parsaipally Pvt., Ltd., Hyd.,
M/S Sujana
4 Suryapet Thungathurthy Jajireddygudem 2311006 R/F Thimmapur to Kodur 9.20 0/000 9/200 MRR Spill WW 19.08.16 19.08.18 Good Constructions T.Srinivas

M/S Sujana
5 Suryapet Thungathurthy Thirumalagiri 2307002 R/F Pwd Road To Tatipamula 4.00 0/000 4/000 MRR GO 20 05.10.15 05.10.17 Fair T.Srinivas
Constructions
R/F Thirmalgiri To Tatipamula M/S Sujana
6 Suryapet Thungathurthy Thirumalagiri 2307003 1.30 0/000 1/300 MRR GO 20 22.10.15 22.10.17 Good T.Srinivas
Via Nandapur Constructions
R/F Pwd Road To Gundepuri via M/S Sujana
7 Suryapet Thungathurthy Thirumalagiri 2307004 8.10 0/000 8/100 MRR GO 20 22.10.15 22.10.17 Good T.Srinivas
Malipuram Constructions
R/F Zp Road To Rajanaik tanda M/S Sujana
8 Suryapet Thungathurthy Thirumalagiri 2307015 1.30 0/000 1/300 MRR GO 20 05.10.15 05.10.17 Good T.Srinivas
via Jalalpuram Constructions
M/S SKR
9 Suryapet Thungathurthy Nagaram 2308005 R/f NM Road at 8km to Pasnoor 1.30 0/000 1/300 MRR GO 20 16.03.16 16.03.18 Good Constructions, B.Naveen
Suryapet
M/S Sujana
10 Suryapet Thungathurthy Thirmalgiri 2307055 R/F Phanigiri to Mamillapally 2.60 0/000 2/600 MRR Spill WW 22.08.16 22.08.18 Good B.Naveen
Constructions
ANNEXURE - II

HAN CRR/PMGSY WHICH ARE IN TWO YEARS DEFECT LIABILITY PERIOD

Name of the
Engineer in-charge
for maintenance
Remarks

DEE

16 17
K.Prabhu

K.Prabhu

K.Prabhu

K.Prabhu

K.Prabhu

K.Prabhu

K.Prabhu

K.Prabhu

K.Prabhu

K.Prabhu
ANNEXURE - III
BT ROADS WHICH COMPLETED (5) YEARS PERIOD AND ELIGIBLE FOR BT RENEWALS

Grant in which
Present Name of the Engineer Amount
Length the road was
Name of Name of the Reach of the Year of Conditon in-charge for Required for
Sl. Name of the Road ID Taken taken up
the Assembly Name of the road road taken up Completio of the road maintenance BT Renewals Remarks
No Mandal No. up in CRR/PMGSY/RD (Good /
District Constituency n (Rs. in
Km F/SDF or any Fair / Poor) Lakhs)
other grant
From To AEE/AE DEE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BT Renewal on R/f Velishala to
1 Suryapet Thungathurthy Thirumalagiri 2345018 2.8 0/000 2/800 13th FC 24.07.14 Poor T.Srinivas K.Prabhu 28
Bandlapally
BT Renewal on R/f Jajireddygudem
2 Suryapet Thungathurthy Jajireddygudem 2329005 2.8 0/000 2/800 13th FC 24.07.14 Fair B.Naveen K.Prabhu 28
to Thungagudem
BT Renewal on R/f Nagarambangla
3 Suryapet Thungathurthy Jajireddygudem 2328004 4.4 0/000 4/400 13th FC 24.07.14 Fair B.Naveen K.Prabhu 44
to Peraboinagudem
4 Suryapet Thungathurthy Thirumalagiri 2345018 R/F Gundepuri to Bandaramaram 3.6 0/000 3/600 NABARD 2012 Poor T.Srinivas K.Prabhu 36
R/F Zp Road to Salegudem H/O
5 Suryapet Thungathurthy Thirumalagiri 3002006 4.2 0/000 4/200 PMGSY 2012 Fair T.Srinivas K.Prabhu 42
Gundepuri
6 Suryapet Thungathurthy Nagaram 2308006 R/f Kasithanda to Pastala 7.0 0/000 7/000 PMGSY 2011 Poor B.Naveen K.Prabhu 70
ANNEXURE IV
Roads for GPs and Habitations (Which Do not Have BT Connectivity) Required Repairs
Present
Conditio
Existing Amount
n Of
Name of the surface / Name Of The Engineer Nature of the Required
SI. Name of Name of the Road ID Length Reach Of The Remark
Assembly Name Of The Road Gravel/W Incharge Of Work For Repairs For
No the District mandal No in KM Road road . s
Constituency BM/Earth Maintanance Proposed Repairs in
Good
en lakhs
/fair/Poo
r
StartingEnding AEE/AE DEE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Pot holes and
1 Suryapet Thungathurthy Nagaram 3001002 R/F Malipuram to Mamidipally 1.50 0.00 1.50 Gravel Poor B.Naveen K.Prabhu
Blindage
2.3

Pot holes and


2 Suryapet Thungathurthy Nagaram 3001007 R/F Mamidipally to Harichandru thanda 3.00 0.00 3.00 Gravel Poor B.Naveen K.Prabhu 4.5
Blindage
Pot holes and
3 Suryapet Thungathurthy Nagaram 3001008 R/F Harichandru Thanda to Malipuram 2.50 0.00 2.50 Gravel Poor B.Naveen K.Prabhu 3.8
Blindage
Pot holes and
4 Suryapet Thungathurthy Nagaram 3001010 R/f Phanigiri to Laxmidevigudem 3.00 0.00 3.00 WBM Fair B.Naveen K.Prabhu
Blindage
3.0

Pot holes and


5 Suryapet Thungathurthy Nagaram 3001011 R/F phanigiri to Buddist temple 2.30 0.00 2.30 Gravel Poor B.Naveen K.Prabhu 3.5
Blindage
Pot holes and
6 Suryapet Thungathurthy Nagaram 3001012 R/F Mamidipally to bandlapalli 4.00 0.00 4.00 Gravel Poor B.Naveen K.Prabhu 6.0
Blindage
Pot holes and
7 Suryapet Thungathurthy Nagaram 3001017 R/F Pasnoor to Pasthala 1.50 0.00 1.50 WBM Poor B.Naveen K.Prabhu
Blindage
1.5

Pot holes and


8 Suryapet Thungathurthy Nagaram 3001018 R/F Pasnoor to Laxmapur 1.50 0.00 1.50 WBM Poor B.Naveen K.Prabhu
Blindage
1.5

Pot holes and


9 Suryapet Thungathurthy Nagaram 3001024 R/F PWD road to Pichireddy tanda 2.00 0.00 2.00 WBM Poor B.Naveen K.Prabhu
Blindage
2.0

Pot holes and


10 Suryapet Thungathurthy Nagaram 3001026 R/F PWD road to Bheemla Thanda 1.80 0.00 1.80 Gravel Poor B.Naveen K.Prabhu
Blindage
2.7

R/F Nagarambangla-Peraboinagudem Pot holes and


11 Suryapet Thungathurthy Nagaram 3001028 1.00 0.00 1.00 Track Poor B.Naveen K.Prabhu 2.0
road to Dubbatanda Blindage

Pot holes and


12 Suryapet Thungathurthy Nagaram 3001029 R/F Wardhamankota to Panigiri 2.00 0.00 2.00 Track Poor B.Naveen K.Prabhu 4.0
Blindage
Pot holes and
13 Suryapet Thungathurthy Nagaram 3001030 R/F Medibavithanda to Marribavithanda 2.00 0.00 2.00 Gravel Poor B.Naveen K.Prabhu 3.0
Blindage
Pot holes and
14 Suryapet Thungathurthy Nagaram 3001031 R/FD.Kothapally to Jajireddygudem 4.00 0.00 4.00 Gravel Poor B.Naveen K.Prabhu 6.0
Blindage

R/F Nagarmvillage Kajjamkistamurthy(H) Pot holes and


15 Suryapet Thungathurthy Nagaram 3001032 3.00 0.00 3.00 Gravel Poor B.Naveen K.Prabhu 4.5
to janagamX-Road Blindage

Pot holes and


16 Suryapet Thungathurthy Nagaram 3001033 R/F Panigiri to Nagaram Village 3.00 0.00 3.00 Gravel Poor B.Naveen K.Prabhu 4.5
Blindage
Pot holes and
17 Suryapet Thungathurthy Nagaram 3001034 R/F Wardhamankota to Sarvam thanda 4.50 0.00 4.50 Gravel Poor B.Naveen K.Prabhu 6.8
Blindage
R/F Velisala to mondichinthala thanda via Pot holes and
18 Suryapet Thungathurthy Thirumalagiri 3002008 4.20 3.10 1.10 Gravel Poor P.Ravikumar K.Prabhu 6.3
siddi samudram Blindage
Pot holes and
19 Suryapet Thungathurthy Thirumalagiri 3002010 R/F Jalalpuram to Gullabanda thanda 1.50 0.00 1.50 Gravel Poor P.Ravikumar K.Prabhu 2.3
Blindage
Pot holes and
20 Suryapet Thungathurthy Thirumalagiri 3002011 R/F Gundepuri to Chowlla thanda 1.70 0.00 1.70 Gravel Poor P.Ravikumar K.Prabhu 2.6
Blindage
R/F VT PWD Road 18km to Marrikunta Pot holes and
21 Suryapet Thungathurthy Thirumalagiri 3002014 3.50 0.00 3.50 Gravel Poor P.Ravikumar K.Prabhu 5.3
thanda Blindage
Pot holes and
22 Suryapet Thungathurthy Thirumalagiri 3002015 R/F Nandapuram to Edula parrethanda 1.80 0.00 1.80 Gravel Poor P.Ravikumar K.Prabhu 2.7
Blindage
R/F ZP road to Choulla Thanda via Rupla Pot holes and
23 Suryapet Thungathurthy Thirumalagiri 3002020 2.00 0.00 2.00 Gravel poor P.Ravikumar K.Prabhu 3.0
Thanda Blindage
Pot holes and
24 Suryapet Thungathurthy Thirumalagiri 3002024 R/F Velishala to Marri kunta (T) 2.50 0.00 2.50 Gravel poor P.Ravikumar K.Prabhu 3.8
Blindage
Pot holes and
25 Suryapet Thungathurthy Thirumalagiri 3002026 R/F Gundepuri to Choulla thanda 1.70 0.00 1.70 Gravel poor P.Ravikumar K.Prabhu 2.6
Blindage
R/F Bukyathanda to Kotyanaik thanda (H) Pot holes and
26 Suryapet Thungathurthy Thirumalagiri 3002030 4.00 0.00 4.00 Gravel Poor P.Ravikumar K.Prabhu 6.0
Jalalpuram via M.C thanda Blindage
Pot holes and
27 Suryapet Thungathurthy Thirumalagiri 3002032 R/F Banda mida thanda to Rupla thanda 2.00 0.00 2.00 Gravel Poor P.Ravikumar K.Prabhu 3.0
Blindage
Pot holes and
28 Suryapet Thungathurthy Thirumalagiri 3002039 R/F Velishala to SRSP canal 2.50 0.00 2.50 Gravel Poor P.Ravikumar K.Prabhu 3.8
Blindage
Pot holes and
29 Suryapet Thungathurthy Thirumalagiri 3002041 R/F Gundepuri To Velishala 2.60 0.00 2.60 Gravel Fair P.Ravikumar K.Prabhu 3.9
Blindage

R/F Rajanaik Thanda to Thummalakunta Pot holes and


30 Suryapet Thungathurthy Thirumalagiri 3002042 1.50 0.00 1.50 Gravel Poor P.Ravikumar K.Prabhu 2.3
thanda H/O Jalalpuram Blindage

Pot holes and


31 Suryapet Thungathurthy Jajireddygudem 3006002 R/F Kommala to Gannegani thanda 2.00 0.00 2.00 Gravel Fair S.Ashok K.Prabhu 3.0
Blindage
Pot holes and
32 Suryapet Thungathurthy Jajireddygudem 3006007 R/F ZP Road to Bollampally 1.50 0.00 1.50 WBM Fair S.Ashok K.Prabhu 1.5
Blindage
Pot holes and
33 Suryapet Thungathurthy Jajireddygudem 3006013 R/F pwd road to Velupucharla 1.70 0.00 1.70 Gravel Fair S.Ashok K.Prabhu 2.6
Blindage
Pot holes and
34 Suryapet Thungathurthy Jajireddygudem 3006020 R/F Kasarlapahad to Thurputhanda 2.70 0.00 2.70 WBM Fair S.Ashok K.Prabhu 2.7
Blindage
Pot holes and
35 Suryapet Thungathurthy Jajireddygudem 3006029 R/F Bollampally to Parsaipally 1.30 0.00 1.30 Gravel Fair S.Ashok K.Prabhu 2.0
Blindage
ANNEXURE - III (b)

BT ROADS WHICH COMPLETED (2) YEARS PERIOD AND REQUIRES POT HOLE REPAIRS

Reach of the road to be taken up


(IN Km)

Grant in which the road was taken Present


up Condition of the
Sl. No Name of the D
Name of the AssembName of the MandaRoad ID No.Name of the road Length to be Tak From To CRR/PMGSY/RDF/SDF Year
or any
of Compl
other(Good
grant / Fair / Poor)
1 2 3 4 5 6 7 8 9 10 11 12
1 Suryapet Thungathurthy Jajireddygudem 3006004 BT Renewal on R/f Jajireddygudem to Thungagud 2.80 0.00 2.80 13th FC 2014 Fair
2 Suryapet Thungathurthy Jajireddygudem 3006019 R/F PWD road Arvapally to Chakaligudem 2.00 0.00 2.00 PMGSY 2011 Poor
3 Suryapet Thungathurthy Jajireddygudem 3006045 R/f Chakaligudem to Kothagudem 4.00 0.60 4.60 PMGSY 2011 Poor
4 Suryapet Thungathurthy Jajireddygudem 3001022 Approach road to Narsimla gudem 1.00 0.00 1.00 other 2012 Poor
5 Suryapet Thungathurthy Tirumalagiri 3002006 R/F Zp Road To Salegudem H/O Gundepuri 4.20 0.00 4.20 PMGSY 2012 Poor
6 Suryapet Thungathurthy Tirumalagiri 3002025 R/F Gundepuri to Bandaramaram 3.02 0.28 3.30 NABARD 2012 Poor

Note :1. Length to be taken up and the reach of the road to be taken up shall be of same length
2. The above roads shall not be included in Annexure III(A)
3. Reach to be mentioned in Kms eg. 2/4 kM shall be mentioned as 2.4 KM
Name of the Engineer in

Amount Required for Pot Hole repairs


AEE/AE DEE (Rs. in Lakhs) Remarks
13 14 15 16
B.Naveen K.Prabhu 2.8
T.Srinivas K.Prabhu 2
T.Srinivas K.Prabhu 4
B.Naveen K.Prabhu 1
T.Srinivas K.Prabhu 4.2
T.Srinivas K.Prabhu 3
Monthly Review Meeting
Mandal: Nagaram Date: 03/04/2017

Esst. Cost
S.No Work Name GP Name Status
(in Lakhs)

I. MGNREGS
1 GP Building D.Kothapally 13.00 Mark-out Given
2 GP Building Pastala 13.00 Brickwork in Progress
Machireddypall
3 GP Building 10.00 Plastering in Progress
y
II. APIP
1 Anganwadi Building Pasthala-2 6.50 Brickwork in progress
2 Anganwadi Building Pasnoor-2 6.50 Slab completed
III. CRR

IV. CDP
4 Providing of platform with bath rooms for burial ground in Phanigiri Phanigiri 3.00 Slab completed
V. ZP General Fund

3 Maintenance of Road from Thungathurthy Road to Pichireddy Thanda Nagaram 1.50 Not started

Maintenance of Road from Thungagudem Nagaram road to Dubba


4 Vardhamankota 1.50 Not started
Thanda Sarvegani Thanda

VI. FDP
1 Fisheries Community Hall Etoor Etoor 10.00 Slab completed

Asst. Executive Engineer


PR SD Nagaram
S.No Name of the G.P Status

1 Wardhamankota (9) -

2 D.Kothapally (4) Earthwork Excavation Done

3 Nagaram (3) -

4 Machireddypally (2) Plastering in Progress

5 Etoor (3) -

6 Phanigiri (2) -

7 Mamidipally (3) -

8 Pastala (1) Brickwork Completed

9 Pasnoor (5) -