Vous êtes sur la page 1sur 3

10/17/2017 New Capitol done next year The Bohol Chronicle | Latest News from Tagbilaran City and

from Tagbilaran City and Around Bohol, Philippines

Tuesday, October 17, 2017

Headlines News

New Capitol done next year


January 16, 2017 Bohol Chronicle Daily 0 Comment

NEWS EDITORIAL OPINION FEATURES NATION LIFESTYLE ARCHIVES

NEW CAPITOL. Fast work continues at the new Capitol near CPG Park which is a 3-story building with a
basement parking.

The new provincial Capitol will be completed during the rst quarter of next year.

Gov. Edgar Chatto issued marching orders to double time the construction to beat its
completion by February 2018. The new Capitol sprawls on a 3.2 hectare lot near the Carlos
P. Garcia Park, in front of Bohol Wisdom School along CPG North Ave., this city.

The P700 million new Capitol will be an


ADVERTISEMENT
imposing three-storey building with a
basement parking. The future home of the
provincial governance is constructed on an
elevated area which back exit leads to JA Clarin
st.

The governor said the expected tra c


congestion in the area is being addressed with Recent Popular
the widening of the existing road that leads to
the Bohol Medical Care Institute (BMCI) in Dao Yaps party shift shakes political
district, this city. It will be widened to a four- cauldron
October 17, 2017
lane highway. The nearby roads like the
Calceta st. will likewise be widened, he said.
Make-up classes in Bohol
The construction of the new Capitol was pushed through despite objection from the schools due to transport strike,
business sector due to the expected tra c congestion. says...
October 17, 2017
The other proposed area for the Capitol wasin Mt. Banat-i in barangay Bool where a lot
already owned by the provincial government is available for such edi ce. However,
http://www.boholchronicle.com.ph/2017/01/16/new-capitol-done-next-year/ 1/3
10/17/2017 New Capitol done next year The Bohol Chronicle | Latest News from Tagbilaran City and Around Bohol, Philippines

engineers said the area requires a lot of engineering works due to the slope of the hill. NGCP completes tapping power
from barge in Ubay
The area which was earlier proposed by then Gov. Rene Relampagos could have made the October 17, 2017
Capitol to a tourist destination by itself as it will be located on a hill overlooking Tagbilaran
and Dauis. PDEA unfazed over lead role in
drug war
The on-going construction of the new Capitol is perceived to cause tra c congestion
October 17, 2017
especially along CPG North Ave. which goes on heavy tra c fronting Bohol Wisdom
School.
Andas bet is Miss Silka Bohol
2017
It may be recalled that this site was proposed for the new Capitol wayback in the late 60s
October 16, 2017
when this area was not yet congested as it is today.
Next
Urban developers could have objected to the construction but the provincial government
was already decided to construct the new Capitol in the area which used to the Provincial
Jail.

However, Gov. Chatto said to make the new Capitol spacious, the Hall of Justice and the
DPWH-1 o ces will be transferred to other sites. He told theChroniclethat City Mayor
Baba Yap committed to provide the area where the Hall of Justice will be relocated.

WHY WAS First mini-mall opens Shoemart eyeing to Bohols danger


TAGBILARAN in Panglao lease HNU main bldg. ahead
DELISTED AS 'NEW...

Alturas Mall opens College student, 18, China funding eyed 3rd Tag-Panglao link
Supermarket gang raped in Cogon in Bohol-Cebu bridge to be named Iconic
extension market Bridge

Leave a Reply
Your email address will not be published. Required elds are marked *

Comment

Name *

http://www.boholchronicle.com.ph/2017/01/16/new-capitol-done-next-year/ 2/3
10/17/2017 New Capitol done next year The Bohol Chronicle | Latest News from Tagbilaran City and Around Bohol, Philippines

Email *

Website

Post Comment

Recent Posts Comments Categories

Yaps party shift shakes political cauldron October 17, 2017 James on Waterfalls you News
must see in Bohol Headlines
Make-up classes in Bohol schools due to transport strike, says
DepEd October 17, 2017 roger on Alleged pusher Front Page
killed in Tagbilaran buy-
NGCP completes tapping power from barge in Ubay October Major Events
bust shootout
17, 2017
Billboard
Cahayag on 1 killed, 44
PDEA unfazed over lead role in drug war October 17, 2017
arrested
Editorial
Andas bet is Miss Silka Bohol 2017 October 16, 2017
david on Alleged pusher
Opinion
Loboc loses P19M from van drivers commission October 16, shot dead in Carmen buy-
2017 bust shootout Features

pedroalinsud on Where in Nation


Bohol should you take Miss
Lifestyle
Universe 2016 bets?
Archives
Victor Gaw on Pres.
Rodrigo Duterte: An Avatar

Enrico on Anda LGU moves


to put town under state of
calamity

k.b. bub on New NGCP


facility to improve Bohol
power capacity

Copyright 2017 The Bohol Chronicle. All rights reserved.


http://www.boholchronicle.com.ph/2017/01/16/new-capitol-done-next-year/ 3/3

Vous aimerez peut-être aussi