4733
Easy installation
structure
Ground re-charging
1964
207
1111
Concrete structure
Anchoring
Anchorage:
Dams are secured to the
concrete foundations using a
single or dual core clamping
plates
Plates are clamped to the
membrane using anchor bolts
Dam bag /Membrane:
Straight section
Smooth Flow
Riverbed and Bank slopes are stable.
Geological
Hydrologic
Meteorological
hydraulic conditions
Rubber dams with different deflation modes: New types can deflate in both
the upstream and downstream directions according to the direction of flow
or deflate directly onto the foundation.
S.NO. Productivity(t/ha)
Before After
Installation installation of
of Rubber Rubber Dam
Dam(2009) (2010 )
1. 2.873 4.67
HYDRO POWER Project: Rainbow Dam WATER SUPPLY Project :Gubeng Dam
Country: USA Size: 3.66Hx67.7L Country : Indonesia Size : 2.85Hx12.0L