The Shard: structural engineering

Stlbyggnadsdagen 2012
Height: 3
Storeys: 72
Client: Sellar Prope
on behalf of LBQ
Architect: Renzo Piano Building Works
Adamson Assoc
Structural engineer: WSP Gr
Services engineer: A
Project manager: Turner + Town
Cost consultant: Davis Lang
Main contractor: M
Piling: Stent Foundat
Steel: Severfield R
Concrete: Byrne Brot
edom Tower 541m Eiffel Tower 324m Shard at London Bridge 306m One Canada Square
Gross internal area: 127,000 m2 1,367,000 sq
Net internal area: 85,000 m2 915,000 sq
Residential: 5,800 m2 62,000 sq
Hotel: 17,800 m2 192,000 sq
Offices: 55,200 m2 594,000 sq
Retail 5,600 m2 61,000 sq
Volume of concrete: 54,000 m3 22 Olympic swimming poo
Weight of steel: 11,000 tons
ifts: 44
Area of faade: 56,000 m2 8 football pitche
Population 8,000 Burnham-on-Crouc
Car parking spaces: 48
Spire

Viewing Gallery

Apartments

Hotel

Restaurants

Offices
Offices
L07 2,900 m2
L28 1,350m2
Restaurants
L31 1,200m2
Hotel
L37 1,000m2
L50 670m2
Apartments
L53 600m2
L65 270m2
C of G
rectilinear tower

C of G
Shard
wing wall
shard 1
winter garden

mini backpack
(to L20)
backpack (to L1

shard 18

main core

backpack core
Jubilee line

London Bridge
station arches
Southwark
Towers

Guys
hospital
Top of raft slab -9m River terrace grave
-13.4m

London clay

Secant pile wall -30m/-35m


female pile
960 dia
Lambeth group

-45m/-51m

TOE LEVEL

Secant pile wall Main bearing Thanet sand


male pile piles
1000 dia 1500-1800 dia -59m/-65m

Chalk
15 total stat
~ 900 monitoring tar
op down 1: secant piled wall
op down 2: bearing piles and plunge columns
op down 3: L00 slab; excavation to B2
op down 4: core slipform set up at B2
op down 5: core slipform started; excavation to B3
op down 6: first hold point L00 and B2 slabs connected
Faade -

op down 7: second hold point full depth excavation


op down 8: B3 slab cast; core walls completed
14.0
14.0
14.0
Steel

Concrete

Steel
L09
L23
L45
63
Efficient use of materials
GGBS in concrete (70% in B3 slab saved
700 tons of cement)
Public transport hub
Mixed use building
Combined heat, cooling and power
Faade and automatic blinds
BREEAM brown roof
Spire

Viewing Gallery

Apartments

Hotel

Restaurants

Offices

Backpack
L78
L78
L78