Vous êtes sur la page 1sur 136

FLUJO DE COSTOS

CONSTRUCCIN, MONTAJE Y PUESTA EN MARCHA DE LA ESTACIN DE COMPRESIN TOTOROCO

COSTO EQUIPOS, TOTAL COSTO TOTAL COSTO


Cantidad Cant. fsica COSTO MANO DE SUBTOTAL GASTOS GENERALES PROVISION GASTOS SALDO SIN GASTOS SALDO CON GASTOS
ITEM DESCRIPCIN Unidad PU MONTO CONTRATO COSTO MATERIALES MAQUINARIAS Y COSTO UNITARIO IVA CREDITO FISCAL DISPONIBLE SIN DISPONIBLE CON SUBCONTRATISTAS
Contrato Total % OBRA COSTOS UNITARIOS GENERALES GENERALES GENERALES
HERRAMIENTAS GASTOS GENERALES GASTOS GENERALES

13% 100% 10.00% 10.00% ASISTECAB


1.- LOGISTICA 8.36% 547,430.69 83,013.57 90,020.47 158,292.61 331,326.65 393,683.08 43,072.47 -43,072.47 393,683.08 33,132.67 39,368.31 433,051.39 27,239.81 - - - 172,346.38 192,305.00

1.1 Movilizacin de Equipos y Personal a Obra Global 1.00 2.04% 133,215.30 133,215.30 3,500.00 37,768.32 54,533.05 95,801.37 95,801.37 12,454.18 -12,454.18 95,801.37 9,580.14 9,580.14 105,381.51 21,959.53 73,841.84 83,421.98
1.2 Montaje de Obrador, Almacenes y Oficinas Global 1.00 0.93% 61,057.01 61,057.01 27,000.00 8,397.05 8,511.91 43,908.96 43,908.96 5,708.17 -5,708.17 43,908.96 4,390.90 4,390.90 48,299.86 2,096.04 41,812.92 46,203.82
Instalacin de Campamento (incluye comedor, sanitarios, servicios hidrosanitarios y elctricos, dormitorios,
1.3 Global 1.00 1.27% 83,259.57 83,259.57 37,500.00 14,023.17 8,352.69 59,875.86 59,875.86 7,783.86 -7,783.86 59,875.86 5,987.59 5,987.59 65,863.45 3,184.24 56,691.62 62,679.21
sala de recreacin, etc.)
1.4 Alimentacin para el personal de YPFB TRANSPORTE Racin 7,560.00 0.90% 7.77 58,764.63 5.59 - - 5.59 42,260.40 0.73 -0.73 42,260.40 0.56 4,226.04 46,486.44

1.5 Lavado de ropa y limpieza de habitaciones para el personal de YPFB TRANSPORTE Pers./da 2,520.00 0.43% 11.10 27,963.13 7.98 - - 7.98 20,109.60 1.04 -1.04 20,109.60 0.80 2,010.96 22,120.56

1.6 Limpieza y Desmovilizacin de Equipos y Personal Global 1.00 1.27% 83,259.57 83,259.57 15,000.00 11,724.14 33,151.72 59,875.86 59,875.86 7,783.86 -7,783.86 59,875.86 5,987.59 5,987.59 65,863.45
Transporte de equipos y materiales a la obra desde Almacenes de YPFB TRANSPORTE en Santa Cruz y
1.7 devolucin de equipos y materiales sobrantes y/o desmontados hasta Almacenes de YPFB TRANSPORTE en Global 1.00 1.53% 99,911.48 99,911.48 - 18,107.80 53,743.23 71,851.03 71,851.03 9,340.63 -9,340.63 71,851.03 7,185.10 7,185.10 79,036.13
Santa Cruz
2.- INGENIERIA & CALIDAD 2.37% 155,417.88 16,281.88 87,923.63 7,562.77 111,768.29 111,768.29 14,529.88 -14,529.88 111,768.29 11,176.83 11,176.83 122,945.12 16,100.00 - - - 95,668.29 106,845.12
2.1 Validacin de la Ingeniera de Detalle Global 1.00 0.42% 27,753.19 27,753.19 3,500.00 15,979.25 479.38 19,958.62 19,958.62 2,594.62 -2,594.62 19,958.62 1,995.86 1,995.86 21,954.49 2,000.00 17,958.62 19,954.49

2.2 Reingeniera Bsica y de Detalle Global 1.00 0.42% 27,753.19 27,753.19 3,500.00 15,979.25 479.38 19,958.62 19,958.62 2,594.62 -2,594.62 19,958.62 1,995.86 1,995.86 21,954.49 3,200.00 16,758.62 18,754.49
2.3 Elaboracin de Procedimientos de calidad QA / QC Global 1.00 0.25% 16,651.91 16,651.91 1,000.00 10,655.51 319.67 11,975.17 11,975.17 1,556.77 -1,556.77 11,975.17 1,197.52 1,197.52 13,172.69 2,300.00 9,675.17 10,872.69
2.4 Elaboracin de Procedimientos de Precomisionado y Comisionado Global 1.00 0.25% 16,651.91 16,651.91 1,000.00 10,655.51 319.67 11,975.17 11,975.17 1,556.77 -1,556.77 11,975.17 1,197.52 1,197.52 13,172.69 800.00 11,175.17 12,372.69

2.5 Planos Conforme a Obra Global 1.00 0.51% 33,303.83 33,303.83 1,000.00 17,500.28 5,450.07 23,950.35 23,950.35 3,113.55 -3,113.55 23,950.35 2,395.03 2,395.03 26,345.38 3,800.00 20,150.35 22,545.38
2.6 Data Books y CD Global 1.00 0.51% 33,303.83 33,303.83 6,281.88 17,153.85 FLUJO DE23,950.35
514.62 COSTOS23,950.35 3,113.55 -3,113.55 23,950.35 2,395.03 2,395.03 26,345.38 4,000.00 19,950.35 22,345.38
3.- INSTALACION Y MONTAJE ESTACION TOTOROCO 88.49% 5,791,658.82 990,295.96 1,875,567.84 1,094,279.91 3,960,143.71 4,161,444.75 514,818.68 -514,818.68 4,161,444.75 396,314.40 416,444.50 4,577,889.25 314,581.34 - - - -67,045.73 -42,071.18

3.1 OBRAS CIVILES 59.60%


CONSTRUCCIN,
3,900,599.46
MONTAJE
839,345.85 1,042,118.61
Y PUESTA EN MARCHA
722,338.54
DE LA2,805,104.04
2,603,803.00
ESTACIN DE COMPRESIN
338,494.39 -338,494.39
TOTOROCO
2,805,104.04 260,276.51 280,406.62 3,085,510.66 - - - - - -
3.1.1 Adecuacin de sitio 14.61% 956,481.47 92,487.82 248,281.63 347,081.25 687,850.69 687,850.69 89,420.59 -89,420.59 687,850.69 68,785.07 68,785.07 756,635.76 - - - - - -

3.1.1.1 Construccin de Planchadas (Trabajos de Corte y Relleno) Global 1.00 6.83% 446,717.66 446,717.66 - 100,918.08 220,337.54 321,255.62 321,255.62 41,763.23 -41,763.23 321,255.62 32,125.56 32,125.56 353,381.19
Construccin de Calles Internas Empedradas de la Estacin. Incluye losas de proteccin de tuberas en
3.1.1.2 Global 1.00 5.79% 379,152.54 379,152.54 81,902.98 98,814.16 91,949.22 272,666.37 272,666.37 35,446.63 -35,446.63 272,666.37 27,266.64 27,266.64 299,933.01
cruces, cunetas, cordones de HS, etc.
3.1.1.3 Estabilizacin de Taludes de Planchadas con zampeado de piedra. Global 1.00 1.19% 78,193.17 78,193.17 4,898.53 32,327.61 19,006.23 56,232.37 56,232.37 7,310.21 -7,310.21 56,232.37 5,623.24 5,623.24 61,855.61
Estabilizacin de Taludes de Calles internas de ms de 1m de altura con zampeado de piedra y de menos de 1
3.1.1.4 m de altura con grama y/u otra especie autctona aprobada por la fiscalizacin. Incluye zanjas de Global 1.00 0.60% 39,096.58 39,096.58 3,446.30 15,195.81 9,474.07 28,116.18 28,116.18 3,655.10 -3,655.10 28,116.18 2,811.62 2,811.62 30,927.80
coronamiento de tierra.
Restauracin de Camino de Ingreso a la Estacin, revestimiento de taludes con grama y/u otra especie
3.1.1.5 autctona aprobada por la fiscalizacin, tablestacado, conformacin de cunetas y zanjas de coronamiento de Global 1.00 0.20% 13,321.53 13,321.53 2,240.00 1,025.96 6,314.18 9,580.14 9,580.14 1,245.42 -1,245.42 9,580.14 958.01 958.01 10,538.15
tierra.
3.1.2 Construccin de Fundaciones de HA / Fabricacin Soportes / Torres 8.52% 557,775.33 160,391.79 211,798.91 28,931.69 401,122.40 401,122.40 52,145.91 -52,145.91 401,122.40 40,112.24 40,112.24 441,234.64 - - - - - -

Construccin de las Fundaciones de HA de 4 Unidades de Compresin, Aeroenfriadores, Soportes de


Silenciadores, Soporte de Escapes y Tanques de Aceite de Motor. Incluye la provisin e instalacin de pernos
3.1.2.1 Global 1.00 4.73% 309,318.10 309,318.10 94,604.26 117,591.25 10,249.64 222,445.15 222,445.15 28,917.87 -28,917.87 222,445.15 22,244.52 22,244.52 244,689.67
de anclaje, planchas de nivelacin y Sika Grout 212 (Canal de Lneas de Compresores y Tapas metlicas
separados en otro tem)
Construccin de la Fundacin de HA y Anclajes para Venteo (V-5200). Incluye el colocado de pernos de
3.1.2.2 Global 1.00 0.10% 6,261.55 6,261.55 2,068.05 2,359.24 75.68 4,502.97 4,502.97 585.39 -585.39 4,502.97 450.30 450.30 4,953.27
anclaje y planchas de nivelacin (Segn Planos)
Construccin de la Fundacin de HA y Anclajes para Pararrayos PR-01 y PR-02. Debe Incluir el colocado de
3.1.2.3 pernos de anclaje, planchas de nivelacin y la provisin e instalacin de las dos torres para los pararrayos Global 1.00 0.52% 33,718.93 33,718.93 13,927.31 9,416.97 904.58 24,248.86 24,248.86 3,152.35 -3,152.35 24,248.86 2,424.89 2,424.89 26,673.75
(Segn Planos)
Construccin de la Fundacin de HA para V-5000. Incluye el colocado de pernos de anclaje y planchas de
3.1.2.4 Global 1.00 0.03% 1,765.68 1,765.68 556.47 687.63 25.69 1,269.78 1,269.78 165.07 -165.07 1,269.78 126.98 126.98 1,396.76
nivelacin (Segn Planos)
Construccin de las Fundaciones de HA para V-5100, V-5600 & F-5700. Incluye el colocado de pernos de
3.1.2.5 Global 1.00 0.07% 4,462.99 4,462.99 1,611.42 1,546.54 51.59 3,209.55 3,209.55 417.24 -417.24 3,209.55 320.95 320.95 3,530.50
anclaje y planchas de nivelacin (Segn Planos)
Construccin de Estructura y Cubierta Metlica para Clamp On. Incluye el colocado de pernos de anclaje y
3.1.2.6 Global 1.00 0.06% 3,982.13 3,982.13 1,176.67 1,625.88 61.18 2,863.74 2,863.74 372.29 -372.29 2,863.74 286.37 286.37 3,150.11
planchas de nivelacin (Segn Planos)
Construccin de Losa y Cubierta Metlica para Medicin y Regulacin de Gas para Vivienda de Operadores
3.1.2.7 Global 1.00 0.14% 9,248.31 9,248.31 653.08 4,241.66 1,756.15 6,650.89 6,650.89 864.62 -864.62 6,650.89 665.09 665.09 7,315.98
(Segn Planos).

3.1.2.8 Construccin de Bases de HA, Soportes de Tuberas y Grampas, rea de Compresores y Rack de Lneas Global 1.00 1.39% 90,800.42 90,800.42 24,198.95 34,392.70 6,707.19 65,298.84 65,298.84 8,488.85 -8,488.85 65,298.84 6,529.88 6,529.88 71,828.72

Construccin de Bases de HA, Soportes de Tuberas y Grampas, rea de Facilidades, de Trampas de


FLUJO DE COSTOS
3.1.2.9 Global 1.00 1.43% 93,800.42 93,800.42 20,945.99 37,723.58 8,786.71 67,456.28 67,456.28 8,769.32 -8,769.32 67,456.28 6,745.63 6,745.63 74,201.91
Chancho, Flash Separador (V-5000) (Segn Planos).
Construccin de Base de H A para Antena Satelital de 700 x 700 x 800 mm con soporte de tubera
3.1.2.10
galvanizada de 3"
Pza 1.00 0.07% 4,416.81
CONSTRUCCIN,
4,416.81
MONTAJE
649.58 2,213.47
Y PUESTA 313.29
EN MARCHA DE LA ESTACIN
3,176.34 3,176.34
DE COMPRESIN
412.92 -412.92
TOTOROCO
3,176.34 317.63 317.63 3,493.97

3.1.3 Construccin de Escaleras 4.55% 297,984.46 65,181.04 71,057.22 34,676.60 170,914.86 214,294.60 22,218.93 -22,218.93 214,294.60 17,091.49 21,429.46 235,724.07 - - - - - -
3.1.3.1 Construccin de Escaleras de HA con barandas metlicas (EH-01). Pza 2.00 0.15% 4,903.40 9,806.81 1,112.82 2,009.24 404.20 3,526.27 7,052.54 458.41 -458.41 7,052.54 352.63 705.25 7,757.79
Construccin y Montaje de Escaleras Metlicas Tipo EM-01 sobre Fundaciones de HA, con barandas
3.1.3.2 Pza 2.00 0.25% 8,306.56 16,613.12 2,912.68 1,925.51 1,135.45 5,973.64 11,947.27 776.57 -776.57 11,947.27 597.36 1,194.73 13,142.00
metlicas.
FLUJO DE COSTOS
COSTO EQUIPOS, TOTAL COSTO TOTAL COSTO
Cantidad Cant. fsica COSTO MANO DE SUBTOTAL GASTOS GENERALES PROVISION GASTOS SALDO SIN GASTOS SALDO CON GASTOS
ITEM DESCRIPCIN Unidad PU MONTO CONTRATO COSTO MATERIALES MAQUINARIAS Y COSTO UNITARIO IVA CREDITO FISCAL DISPONIBLE SIN DISPONIBLE CON SUBCONTRATISTAS
Contrato Total % OBRA COSTOS UNITARIOS GENERALES GENERALES GENERALES
CONSTRUCCIN, MONTAJE Y PUESTA EN MARCHA DE LA ESTACIN DE COMPRESIN
HERRAMIENTAS
TOTOROCO
GASTOS GENERALES GASTOS GENERALES

Construccin y Montaje de Escaleras Metlicas Tipo EM-02 Y EM-03 (1 de cada tipo) sobre Fundaciones de
3.1.3.3 Pza 2.00 0.92% 30,245.04 60,490.08 13,594.30 4,817.07 3,339.25 21,750.63 43,501.26 2,827.58 -2,827.58 43,501.26 2,175.06 4,350.13 47,851.38
HA, con barandas metlicas.

3.1.3.4 Construccin y Montaje de Escalera Metlica Tipo EM-04 sobre Fundaciones de HA, con barandas metlicas. Pza 1.00 0.09% 5,827.43 5,827.43 2,267.67 1,123.10 800.01 4,190.78 4,190.78 544.80 -544.80 4,190.78 419.08 419.08 4,609.86

Construccin y Montaje de Escaleras Metlicas Tipo EM-05 sobre Fundaciones de HA, con barandas
3.1.3.5 Pza 2.00 0.17% 5,414.40 10,828.80 1,748.55 1,308.79 836.41 3,893.75 7,787.50 506.19 -506.19 7,787.50 389.37 778.75 8,566.25
metlicas.
Construccin y Montaje de Escaleras Metlicas Tipo EM-06 sobre Fundaciones de HA, con barandas
3.1.3.6 Pza 2.00 0.19% 6,310.83 12,621.67 2,111.47 1,573.13 853.81 4,538.42 9,076.83 589.99 -589.99 9,076.83 453.84 907.68 9,984.52
metlicas.
Construccin y Montaje de Escaleras Metlicas Tipo EM-07 sobre Fundaciones de HA, con barandas
3.1.3.7 Pza 2.00 0.16% 5,140.88 10,281.76 1,565.35 1,349.62 782.08 3,697.05 7,394.10 480.62 -480.62 7,394.10 369.70 739.41 8,133.51
metlicas.
Construccin para cada una de las cuatro unidades de compresin de dos plataformas metlicas con barandas
y escaleras, y una escalera marinera con plataforma para mantenimiento de acuerdo a planos conforme a obra
3.1.3.8 Global 1.00 2.62% 171,514.79 171,514.79 39,868.21 56,950.75 26,525.38 123,344.33 123,344.33 16,034.76 -16,034.76 123,344.33 12,334.43 12,334.43 135,678.77
de la Estacin de Compresin Huayacota. (Incluye bases de HA de 310x310x280 mm en el contacto de las
plataformas con la losa de la sala de compresores)

3.1.4 Construccin de Edificios y Cubiertas 22.51% 1,473,446.94 457,919.68 327,687.72 274,017.41 1,059,624.81 1,059,624.81 137,751.23 -137,751.23 1,059,624.81 105,962.48 105,962.48 1,165,587.29 - - - - - -
3.1.4.1 Construccin de Edificio de Compresores Global 1.00 13.60% 890,372.77 890,372.77 338,621.42 157,585.62 144,101.78 640,308.82 640,308.82 83,240.15 -83,240.15 640,308.82 64,030.88 64,030.88 704,339.71
3.1.4.2 Construccin de Edificio de Sala de Control Global 1.00 2.98% 195,160.42 195,160.42 35,481.64 58,388.94 46,478.43 140,349.01 140,349.01 18,245.37 -18,245.37 140,349.01 14,034.90 14,034.90 154,383.91

3.1.4.3 Construccin de Edificio de Microturbinas Global 1.00 2.20% 144,097.33 144,097.33 37,577.83 38,740.85 27,308.48 103,627.15 103,627.15 13,471.53 -13,471.53 103,627.15 10,362.71 10,362.71 113,989.86
3.1.4.4 Construccin de Edificio de Mantenimiento y Almacn Global 1.00 2.24% 146,536.83 146,536.83 27,598.17 45,871.23 31,912.10 105,381.51 105,381.51 13,699.60 -13,699.60 105,381.51 10,538.15 10,538.15 115,919.66

3.1.4.5 Construccin de Edificio de Portera Global 1.00 0.75% 48,845.61 48,845.61 11,355.24 13,053.30 10,718.63 35,127.17 35,127.17 4,566.53 -4,566.53 35,127.17 3,512.72 3,512.72 38,639.89
Construccin de Tinglado de Almacenamiento de Residuos (Cotizar de acuerdo a las modificaciones
3.1.4.6 Global 1.00 0.56% 36,634.21 36,634.21 5,547.42 10,559.75 10,238.21 26,345.38 26,345.38 3,424.90 -3,424.90 26,345.38 2,634.54 2,634.54 28,979.92
realizadas en la EC Huayacota, ver planos indicados como referencia (2))
Construccin de la Cubierta para Tanque de Agua para Compresores, fundacin y losa de HA (segn
3.1.4.7 Global 1.00 0.18% 11,799.77 11,799.77 1,737.95 3,488.03 3,259.79 8,485.77 8,485.77 1,103.15 -1,103.15 8,485.77 848.58 848.58 9,334.35
planos).
3.1.5 Sistema de Drenaje Industrial 0.88% 57,305.33 16,479.67 19,991.19 4,740.08 41,210.95 41,210.95 5,357.42 -5,357.42 41,210.95 4,121.10 4,121.10 45,332.05 - - - - - -

Construccin de Sistema de Drenaje Industrial, comprende cmaras de drenaje industrial, sumideros, tendido
de tubos de PVC de 3" E-40 y 4" SDR-35, canales perimetrales de los compresores, tapas y rejillas metlicas
3.1.5.1 Global 1.00 0.32% 21,036.42 21,036.42 7,962.85 6,689.01 476.41 15,128.27 15,128.27 1,966.68 -1,966.68 15,128.27 1,512.83 1,512.83 16,641.10
(los canales de drenaje industrial perimetrales a los compresores debern estar conforme a lo construido en la
EC Huayacota, ver planos indicados como referencia (2)).

Construccin de cmaras de tratamiento de hidrocarburos, losa y cubierta bomba P-5020 (Cotizar de acuerdo
3.1.5.2 Global 1.00 0.55% 36,268.91 36,268.91 8,516.82 13,302.18 4,263.67 26,082.68 26,082.68 3,390.75 -3,390.75 26,082.68 2,608.27 2,608.27 28,690.94
a las modificaciones realizadas en la EC Huayacota, ver planos indicados como referencia (2))

3.1.6 Construccin de Obras de Drenaje Pluvial 4.94% 323,408.97 32,428.49 135,582.74 29,004.01 197,015.24 232,578.56 25,611.98 -25,611.98 232,578.56 19,701.52 23,257.86 255,836.41 - - - - - -
3.1.6.1 Cabezales para Alcantarillas Pluviales Pza 16.00 0.61% 2,513.66 40,218.59 455.67 1,269.41 82.61 1,807.69 28,923.08 235.00 -235.00 28,923.08 180.77 2,892.31 31,815.39

3.1.6.2 Alcantarilla Pluvial de Acero 900 mm (MP-68 tipo ARMCO, de 2 mm) ml 32.00 0.11% 233.10 7,459.36 37.78 80.20 49.66 167.64 5,364.37 21.79 -21.79 5,364.37 16.76 536.44 5,900.81
Planificador Coordinador QHSE Superintendente
3.1.6.3 Alcantarilla Pluvial de Acero 700 mm (MP-68 tipo ARMCO, de 1.8 mm) ml 22.00 0.07% 215.28 4,736.19 34.40 71.04 49.38 154.82 3,406.02 20.13 -20.13 3,406.02 15.48 340.60 3,746.62

3.1.6.4 Canal Pluvial Tipo 1 Global 1.00 3.13% 204,680.03 204,680.03 21,943.94 104,374.82 20,876.24 147,195.01 147,195.01 19,135.35 -19,135.35 147,195.01 14,719.50 14,719.50 161,914.51
3.1.6.5 Canal Pluvial Tipo 2 Global 1.00 0.75% 49,401.56 49,401.56 7,755.86 21,695.26 6,075.86 35,526.98 35,526.98 4,618.51 -4,618.51 35,526.98 3,552.70 3,552.70 39,079.67

3.1.6.6 Canal Pluvial Tipo 3 Global 1.00 0.26% 16,913.24 16,913.24 2,200.83 8,092.02 1,870.26 12,163.10 12,163.10 1,581.20 -1,581.20 12,163.10 1,216.31 1,216.31 13,379.41

3.1.7 Obras Civiles Varias 3.58% 234,196.97 14,457.36 27,719.21 3,887.49 46,064.05 168,422.03 5,988.33 - 5,988.33 168,422.03 4,502.62 16,738.42 185,160.44 - - - - - -
3.1.7.1 Construccin de Losa de HA e Instalacin de Tanque de Aceite Usado. Global 1.00 0.04% 2,331.27 2,331.27 1,069.85 578.61 28.07 1,676.52 1,676.52 217.95 -217.95 1,676.52 167.65 167.65 1,844.17
Construccin de Losa de HA y Soporte Metlico Para Lavaojos. Incluye instalacin de un punto de agua de
3.1.7.2 Global 1.00 0.03% 1,831.71 1,831.71 434.60 844.85 37.82 1,317.27 1,317.27 171.24 -171.24 1,317.27 27.94 27.94 1,345.21
acuerdo al equipo que sea entregado por YPFB TRANSPORTE.
3.1.7.3 Construccin de Losas de HA y Cubiertas Metlicas para Extintores. Pza 3.00 0.02% 388.54 1,165.61 118.54 153.35 7.52 279.41 838.24 36.32 -36.32 838.24 27.94 83.82 922.07

3.1.7.4 Instalacin de Extintores en Paredes y/o Columnas de Edificios/Tinglados. Pza 10.00 0.03% 166.52 1,665.22 45.00 72.58 2.18 119.75 1,197.54 15.57 -15.57 1,197.54 11.98 119.75 1,317.29
3.1.7.5 Instalacin de Extintores en Postes de 2 empotrados en Bases de HC de 40 x 40 x 60 cm. Pza 10.00 0.06% 388.54 3,885.39 56.05 216.35 7.02 279.42 2,794.17 36.32 -36.32 2,794.17 27.94 279.42 3,073.58

3.1.7.6 Canales de Lnea con Tapas Metlicas. Pza 4.00 0.52% 8,576.22 34,304.89 2,705.89 3,280.32 181.35 6,167.56 24,670.25 801.78 -801.78 24,670.25 616.76 2,467.03 27,137.28

3.1.7.7 Cmaras Elctricas y de Instrumentacin con Tapas Metlicas. Pza 15.00 0.45% 1,966.41 29,496.21 946.27 411.78 56.09 1,414.14 21,212.11 183.84 -183.84 21,212.11 141.41 2,121.21 23,333.32
3.1.7.8 Cmaras para Trampa de Chancho, incluye drenaje pluvial (20 cm de caera galvanizada y vlvula 1"). Pza 2.00 0.01% 367.12 734.24 94.67 158.93 10.42 264.01 528.03 34.32 -34.32 528.03 26.40 52.80 580.83

3.1.7.9 Cmaras Slop (rea Venteo, Edificio de Mantenimiento y Almacn) Pza 2.00 0.08% 2,594.37 5,188.74 1,053.33 777.37 35.03 1,865.73 3,731.47 242.55 -242.55 3,731.47 186.57 373.15 4,104.61

3.1.7.10 Pozos Absorbentes (2), Cmaras Spticas (2) y Cmaras de Inspeccin (4) para Sala de Control y Portera. Global 1.00 0.56% 36,675.97 36,675.97 3,648.05 19,312.98 3,414.39 26,375.41 26,375.41 3,428.80 -3,428.80 26,375.41 2,637.54 2,637.54 29,012.95

3.1.7.11 Fundaciones de HA para Postes de Iluminacin. Pza 32.00 0.58% 1,189.36 38,059.53 358.54 477.23 19.55 855.32 27,370.39 111.19 -111.19 27,370.39 85.53 2,737.04 30,107.43
Construccin de Tanque de HA de Almacenamiento de Agua , cmara de vlvulas y medidor de agua (el
3.1.7.12 tanque deber redisearse y construirse con el doble de la capacidad indicada en la ingeniera y manteniendo Global 1.00 0.11% 6,916.09 6,916.09 3,650.00 1,244.10 79.58 4,973.68 4,973.68 646.58 -646.58 4,973.68 497.37 497.37 5,471.05
la cuanta de fierros)
COSTO EQUIPOS, TOTAL COSTO TOTAL COSTO
Cantidad Cant. fsica COSTO MANO DE SUBTOTAL GASTOS GENERALES PROVISION GASTOS SALDO SIN GASTOS SALDO CON GASTOS
ITEM DESCRIPCIN Unidad PU MONTO CONTRATO COSTO MATERIALES MAQUINARIAS Y COSTO UNITARIO IVA CREDITO FISCAL DISPONIBLE SIN DISPONIBLE CON SUBCONTRATISTAS
Contrato Total % OBRA COSTOS UNITARIOS GENERALES GENERALES GENERALES
HERRAMIENTAS GASTOS GENERALES GASTOS GENERALES

Instalacin de Letreros de Seguridad en postes de 2" empotrados en Bases de HC de 40 x 40 x 60 cm (slo


3.1.7.13 Pza 30.00 0.07% 159.86 4,795.80 56.05 54.52 4.39 114.96 3,448.89 14.95 -14.95 3,448.89 11.50 344.89 3,793.78
los letreros sern provistos por YPFB TRANSPORTE).
3.1.7.14 reas con Grava. m2 1,628.40 0.28% 11.10 18,076.23 3.60 4.26 0.13 7.98 12,999.47 1.04 -1.04 12,999.47 0.80 1,299.95 14,299.41
3.1.7.15 Construccin de Aceras Peatonales de HC. ml 362.00 0.50% 91.03 32,951.21 8.56 55.25 1.66 65.46 23,696.76 8.51 -8.51 23,696.76 6.55 2,369.68 26,066.44
Muro de Ladrillo Adobito Visto con mortero de cemento y arena (dosif.: 1:4), incluye Columnas y Viga "T"
3.1.7.16 ml 51.70 0.12% 155.42 8,035.30 79.04 31.78 0.95 111.77 5,778.56 14.53 -14.53 5,778.56 11.18 577.86 6,356.42
Invertida de HA (hormigones y morteros con Sika 1 o similar), pintado.
Pasillo de Circulacin (Incluye cimiento de HC, piso de HS, estructura metlica, planchas, pernos, cubierta,
3.1.7.17 ml 33.10 0.12% 244.22 8,083.56 129.33 44.95 1.35 175.63 5,813.27 22.83 -22.83 5,813.27 17.56 581.33 6,394.59
carpintera de aluminio y vidrio (4mm), etc.).
3.2 OBRAS MECANICAS 23.56% 1,541,833.92 106,200.12 643,151.26 359,453.72 1,108,805.09 1,108,805.09 144,144.66 -144,144.66 1,108,805.09 111,063.34 111,063.34 1,219,868.43 - - - - - -

3.2.1 Obras de construccin en la Estacin e Interconexiones 23.56% 1,541,833.92 106,200.12 643,151.26 359,453.72 1,108,805.09 1,108,805.09 144,144.66 - 144,144.66 1,108,805.09 111,063.34 111,063.34 1,219,868.43 - - - - - -
Soldadura de todos los prefabricados, lneas de proceso, lneas auxiliares y lneas de interconexin
3.2.1.1 Global 1.00 6.04% 395,205.40 395,205.40 22,500.00 173,168.31 88,542.43 284,210.74 284,210.74 36,947.40 -36,947.40 284,210.74 28,421.07 28,421.07 312,631.81
especificados en los planos mecnicos e isomtricos
rea de Trampas de Chancho: Montaje e Instalacin de dos Trampas de Chancho, prefabricados de tubera y
3.2.1.2 Global 1.00 0.64% 41,629.78 41,629.78 2,500.00 18,001.51 9,436.42 29,937.93 29,937.93 3,891.93 -3,891.93 29,937.93 2,993.79 2,993.79 32,931.72
accesorios, vlvulas, etc.
rea de Medicin y Regulacin: Montaje e instalacin de dos medidores de gas, vlvulas reguladoras,
3.2.1.3 prefabricados de tuberas y accesorios, filtros separadores V-5100 y V-5600, filtro de gas combustible F-5700, Global 1.00 2.12% 138,765.94 138,765.94 5,000.00 56,880.60 37,912.49 99,793.10 99,793.10 12,973.10 -12,973.10 99,793.10 9,979.31 9,979.31 109,772.41
vlvulas, puente de regulacin y medicin de gas combustible, etc.
rea Gas Combustible a tres Micro Turbinas: Montaje e Instalacin de lnea de gas combustible, vlvulas,
3.2.1.4 accesorios, etc. Incluye el montaje e instalacin de las microturbinas y de los kits de regulacin de cada Global 1.00 0.23% 14,986.72 14,986.72 1,500.00 6,360.43 2,917.22 10,777.65 10,777.65 1,401.09 -1,401.09 10,777.65 1,077.77 1,077.77 11,855.42
microturbina (ubicacin a definir en campo).
rea Tanque Separador: Montaje e Instalacin de lneas, vlvulas, tanque separador V-5000, tanque de aceite
3.2.1.5 usado TK-5100, bomba P-5020, accesorios, etc. La configuracin del juego de vlvulas de la bomba de Global 1.00 0.19% 12,211.40 12,211.40 1,000.00 5,805.14 1,976.65 8,781.79 8,781.79 1,141.63 -1,141.63 8,781.79 878.18 878.18 9,659.97
oxigenacin ser definida en campo.
3.2.1.6 rea de Venteo y Alivios: Montaje e Instalacin de lneas, vlvulas, venteo V-5200, accesorios, etc. Global 1.00 0.24% 15,763.81 15,763.81 1,500.00 6,599.75 3,236.74 11,336.50 11,336.50 1,473.74 -1,473.74 11,336.50 1,133.65 1,133.65 12,470.15

Interconexin del Loop del GAA 12": Excavacin y tapado de zanjas, soldadura, ensayos NDT, prueba
hidrulica, pintado, revestimiento, trabajos de adecuacin en cmara de HA (relleno con HS, puente de
3.2.1.7 Global 1.00 0.54% 35,524.08 35,524.08 1,500.00 15,484.87 8,562.16 25,547.04 25,547.04 3,321.11 -3,321.11 25,547.04 2,554.70 2,554.70 28,101.74
adherencia con Colmafix 32, pintura impermeabilizante en el rea intervenida con Sika Top 107 Seal), TIE-IN
002, TIE-IN 004, etc.
Interconexin del GAA 6": Excavacin y tapado de zanjas, curvado de tuberas, soldadura, ensayos NDT,
3.2.1.8 Global 1.00 0.42% 27,753.19 27,753.19 1,250.00 11,582.32 7,126.29 19,958.62 19,958.62 2,594.62 -2,594.62 19,958.62 1,995.86 1,995.86 21,954.48
prueba hidrulica, pintado, revestimiento, TIE-IN 001, TIE-IN 003, etc.
rea de Compresores: Montaje e Instalacin de rack de lneas, lneas de proceso & auxiliares, vlvulas de los
3.2.1.9 Global 1.00 3.99% 260,879.97 260,879.97 11,250.00 137,261.89 39,099.13 187,611.02 187,611.02 24,389.43 -24,389.43 187,611.02 18,761.10 18,761.10 206,372.13
4 Compresores, accesorios, etc.

Montaje e Instalacin de las 4 Unidades de Compresin, equipos auxiliares, escapes, silenciadores, tanques
de aceite, soportes metlicos, prefabricados de tubera, tanque de agua, mantas aislantes de los escapes,
3.2.1.10 Global 1.00 3.99% 260,879.97 260,879.97 10,000.00 141,721.82 35,889.20 187,611.02 187,611.02 24,389.43 -24,389.43 187,611.02 18,761.10 18,761.10 206,372.13
accesorios, lneas de venteos atmosfricos, etc. Incluye el soporte a los tcnicos de Fbrica y de YPFB
TRANSPORTE y el montaje e instalacin de los paneles de control (UCP) de cada unidad de compresin.

rea de Tanque de Agua Desmineralizada para Compresores: Montaje e Instalacin de lneas, tanque de agua,
3.2.1.11 vlvulas, bomba P-5010, accesorios, etc. El arreglo de vlvulas para el tanque y la bomba p-5010 podr ser Global 1.00 0.12% 7,548.87 7,548.87 500.00 3,685.47 1,243.27 5,428.75 5,428.75 705.74 -705.74 5,428.75 542.87 542.87 5,971.62
modificado a solicitud de YPFB TRANSPORTE.

Montaje e Instalacin del Sistema de Aire Comprimido al Edificio de Compresores, Edificio de Mantenimiento /
Almacn y Edificio de Micro Turbinas; instalacin de compresor de aire , lneas, vlvulas,etc. El arreglo de
3.2.1.12 Global 1.00 0.11% 7,215.83 7,215.83 - 4,630.33 558.91 5,189.24 5,189.24 674.60 -674.60 5,189.24 518.92 518.92 5,708.16
vlvulas para el compresor de aire podr ser modificado a solicitud de YPFB TRANSPORTE. Se deber
modificar el trazado de la caera para aire comprimido para el taller por reubicacin de puerta de ingreso.

Montaje e Instalacin del Sistema de Agua desde el Tanque de Agua al Edificio de Compresores, Edificio de
3.2.1.13 Mantenimiento / Almacn, Sala de Control y Portera, ducha lava ojos, etc. Incluye el tendido de caera hasta Global 1.00 0.11% 7,215.83 7,215.83 - 4,630.33 558.91 5,189.24 5,189.24 674.60 -674.60 5,189.24 518.92 518.92 5,708.16
la vivienda de operadores (las instalaciones en el interior de la vivienda a cargo de terceros).

Montaje e Instalacin de Manifold de Regulacin y Medicin de Gas para Vivienda de Operadores (incluye
3.2.1.14 tendido de tubera slo hasta el manifold, desde el manifold hasta la vivienda la tubera ser instalada por Global 1.00 0.02% 1,332.15 1,332.15 - 930.11 27.90 958.01 958.01 124.54 -124.54 958.01 95.80 95.80 1,053.81
terceros)

3.2.1.15 Revestimiento epxico 100% slidos a todas las lneas enterradas. Global 1.00 0.44% 28,863.32 28,863.32 10,056.40 6,645.81 4,054.76 20,756.97 20,756.97 2,698.41 -2,698.41 20,756.97 2,075.70 2,075.70 22,832.66

Inspeccin NDT (Radiogrfica, tintas penetrantes ) al 100% de las juntas soldadas en las lneas de proceso,
3.2.1.16 Global 1.00 1.53% 100,444.34 100,444.34 13,733.92 - 58,500.32 72,234.23 72,234.23 9,390.45 -9,390.45 72,234.23 7,223.42 7,223.42 79,457.66
lneas auxiliares y lneas de interconexin.
Prueba Hidrulica de todas las lneas de proceso, lneas auxiliares y lneas de interconexin. Incluye limpieza y
3.2.1.17 Global 1.00 0.99% 64,942.46 64,942.46 - 15,734.56 30,968.61 46,703.17 46,703.17 6,071.41 -6,071.41 46,703.17 4,670.32 4,670.32 51,373.48
secado.
Pintado de todas las tuberas areas, vlvulas, equipos, accesorios e instalaciones nuevas con pintura
3.2.1.18 Global 1.00 0.64% 42,184.85 42,184.85 23,909.80 3,210.77 3,216.54 30,337.11 30,337.11 3,943.82 -3,943.82 30,337.11 3,216.54 3,216.54 33,553.65
anticorrosiva y epxica-poliuretano.
3.2.1.19 Pruebas de cuerpo y sello de todas las vlvulas de dimetro 2 de acuerdo al API 6 D Global 1.00 1.02% 66,607.65 66,607.65 - 23,219.16 24,681.52 47,900.69 47,900.69 6,227.09 -6,227.09 47,900.69 4,790.07 4,790.07 52,690.76

3.2.1.20 Montaje de Vlvulas Actuadas (Vlvulas SDV, EBDV, PCV) Global 1.00 0.11% 6,882.79 6,882.79 - 4,110.16 839.58 4,949.74 4,949.74 643.47 -643.47 4,949.74 494.97 494.97 5,444.71
Provisin e instalacin de placas de aluminio estampadas con todos los TAGs de Ingeniera de los nuevos
3.2.1.21 equipos mecnicos, elctricos e instrumentos instalados en campo. Incluye el llenado de las correspondientes Global 1.00 0.08% 4,995.57 4,995.57 - 3,487.91 104.64 3,592.55 3,592.55 467.03 -467.03 3,592.55 359.25 359.25 3,951.80
planillas con las especificaciones tcnicas, de acuerdo al Diagrama P&ID.
COSTO EQUIPOS, TOTAL COSTO TOTAL COSTO
Cantidad Cant. fsica COSTO MANO DE SUBTOTAL GASTOS GENERALES PROVISION GASTOS SALDO SIN GASTOS SALDO CON GASTOS
ITEM DESCRIPCIN Unidad PU MONTO CONTRATO COSTO MATERIALES MAQUINARIAS Y COSTO UNITARIO IVA CREDITO FISCAL DISPONIBLE SIN DISPONIBLE CON SUBCONTRATISTAS
Contrato Total % OBRA COSTOS UNITARIOS GENERALES GENERALES GENERALES
HERRAMIENTAS GASTOS GENERALES GASTOS GENERALES

3.3 OBRAS ELECTRICAS 3.04% 199,256.32 31,100.00 101,238.80 7,346.98 139,685.78 139,685.78 18,159.15 -18,159.15 139,685.78 14,189.56 14,189.56 153,875.34 179,489.55 - - - -39,803.77 -25,614.21

3.3.1 Instalaciones Elctricas Sala de Compresores Global 1.00 0.14% 9,167.98 9,167.98 1,050.00 5,216.68 326.45 6,593.13 6,593.13 857.11 -857.11 6,593.13 659.31 659.31 7,252.44 8,258.49 -1,665.36 -1,006.05
3.3.2 Instalaciones Elctricas Sala de Generacin (Microturbinas) Global 1.00 0.11% 6,875.99 6,875.99 750.00 293.03 293.03 1,336.07 1,336.07 173.69 -173.69 1,336.07 494.48 494.48 1,830.55 6,193.87 -4,857.80 -4,363.32

3.3.3 Instalaciones Elctricas Sala de Control (incluye el tendido de un conduit de 1" x 25 m a la Antena Satelital) Global 1.00 0.05% 3,437.99 3,437.99 375.00 2,036.33 61.09 2,472.42 2,472.42 321.41 -321.41 2,472.42 247.24 247.24 2,719.66 3,096.93 -624.51 -377.27

3.3.4 Instalaciones Elctricas Taller Almacn Global 1.00 0.09% 6,188.38 6,188.38 600.00 3,683.42 166.94 4,450.36 4,450.36 578.55 -578.55 4,450.36 445.04 445.04 4,895.39 5,574.48 -1,124.12 -679.09

3.3.5 Instalaciones Elctricas Portera Global 1.00 0.04% 2,291.99 2,291.99 225.00 1,358.25 65.03 1,648.28 1,648.28 214.28 -214.28 1,648.28 164.83 164.83 1,813.10 2,064.62 -416.34 -251.52

3.3.6 Instalaciones Elctricas rea de Tratamiento de Aguas Aceitosas (Bomba P-5020, Flash Separador V-5000) Global 1.00 0.08% 5,500.78 5,500.78 600.00 3,222.99 132.88 3,955.87 3,955.87 514.26 -514.26 3,955.87 395.59 395.59 4,351.46 4,955.09 -999.22 -603.63

3.3.7 Instalaciones Elctricas e Instrumentos en rea de Trampas de Chancho y Facilidades Global 1.00 0.10% 6,417.58 6,417.58 750.00 3,726.20 138.98 4,615.18 4,615.18 599.97 -599.97 4,615.18 461.52 461.52 5,076.70 5,780.94 -1,165.76 -704.24

3.3.8 Instalaciones Elctricas Tinglado de Residuos Global 1.00 0.05% 3,208.79 3,208.79 300.00 1,916.73 90.86 2,307.59 2,307.59 299.99 -299.99 2,307.59 90.86 90.86 2,398.45 2,890.47 -582.88 -492.02
3.3.9 Instalaciones Elctricas Tinglado de Agua Desmineralizada Global 1.00 0.04% 2,750.40 2,750.40 300.00 1,600.58 77.36 1,977.94 1,977.94 257.13 -257.13 1,977.94 197.79 197.79 2,175.73 2,477.55 -499.61 -301.82

3.3.10 Provisin y Tendido de Caeros Global 1.00 0.33% 21,349.97 21,349.97 3,900.00 11,120.16 333.60 15,353.77 15,353.77 1,995.99 -1,995.99 15,353.77 1,535.38 1,535.38 16,889.14 19,232.00 -3,878.23 -2,342.86

3.3.11 Provisin y Colocado de Cajas y Tableros Global 1.00 0.21% 13,443.17 13,443.17 1,500.00 7,929.72 237.89 9,667.61 9,667.61 1,256.79 -1,256.79 9,667.61 966.76 966.76 10,634.38 12,109.57 -2,441.96 -1,475.19
3.3.12 Instalaciones Elctricas de Equipos Nuevos Provistos por YPFBT Global 1.00 0.09% 5,911.06 5,911.06 750.00 3,398.95 101.97 4,250.92 4,250.92 552.62 -552.62 4,250.92 425.09 425.09 4,676.01 5,324.67 -1,073.75 -648.66

3.3.13 Provisin y Colocado de Alimentadores Global 1.00 0.27% 17,626.61 17,626.61 2,250.00 10,122.45 303.67 12,676.12 12,676.12 1,647.90 -1,647.90 12,676.12 1,267.61 1,267.61 13,943.74 15,878.00 -3,201.88 -1,934.26

3.3.14 Iluminacin Exterior Global 1.00 0.37% 23,931.86 23,931.86 3,000.00 11,904.00 2,306.52 17,210.52 17,210.52 2,237.37 -2,237.37 17,210.52 1,721.05 1,721.05 18,931.57 21,557.76 -4,347.24 -2,626.19
3.3.15 Aterramiento de Iluminacin Exterior y de Enmallado Global 1.00 0.40% 25,974.96 25,974.96 6,000.00 12,310.49 369.31 18,679.81 18,679.81 2,428.38 -2,428.38 18,679.81 1,867.98 1,867.98 20,547.79 23,398.18 -4,718.37 -2,850.39

3.3.16 Aterramiento Sala De Compresores Global 1.00 0.10% 6,681.86 6,681.86 750.00 3,937.13 118.11 4,805.24 4,805.24 624.68 -624.68 4,805.24 480.52 480.52 5,285.77 6,019.00 -1,213.76 -733.23

3.3.17 Aterramiento Sala De Control y Microturbinas (Sistema elctrico de potencia y de control) Global 1.00 0.12% 8,081.10 8,081.10 750.00 4,914.08 147.42 5,811.50 5,811.50 755.50 -755.50 5,811.50 581.15 581.15 6,392.65 7,279.43 -1,467.93 -886.78
Aterramiento de Instalaciones Mecnicas, (rea de Tratamiento de Aguas Aceitosas, Tinglado de Residuos
3.3.18 Slidos, Cubierta de Tanque de Agua Desmineralizada, V-5200, rea de Trampas de Chancho, rea de Global 1.00 0.11% 7,215.27 7,215.27 750.00 4,309.55 129.29 5,188.84 5,188.84 674.55 -674.55 5,188.84 518.88 518.88 5,707.73 6,499.50 -1,310.66 -791.77
Facilidades), Cmaras Elctricas, Pararrayos y Tanque de Agua de Servicio

3.3.19 Aterramiento de Edificios (Taller/Almacn/Sala de Lubricantes, Tinglado de Residuos Slidos, Portera) Global 1.00 0.10% 6,437.63 6,437.63 750.00 3,766.61 113.00 4,629.60 4,629.60 601.85 -601.85 4,629.60 462.96 462.96 5,092.57 5,799.00 -1,169.40 -706.43

3.3.20 Proteccin Atmosfrica con provisin e Instalacin de los Pararrayos PR-01 y PR-02 Global 1.00 0.26% 16,762.93 16,762.93 5,750.00 4,471.44 1,833.57 12,055.01 12,055.01 1,567.15 -1,567.15 12,055.01 1,205.50 1,205.50 13,260.51 15,100.00 -3,044.99 -1,839.49

3.4 OBRAS DE INSTRUMENTACION Y CONTROL 2.29% 149,969.12 13,650.00 89,059.16 5,140.67 107,849.83 107,849.83 14,020.48 -14,020.48 107,849.83 10,784.98 10,784.98 118,634.81 135,091.79 - - - -27,241.96 -16,456.98
3.4.1 Instalacin de Sistemas de Medicin y Regulacin de Gas de Proceso y Gas Combustible Global 1.00 0.58% 38,171.94 38,171.94 3,000.00 23,235.62 1,215.62 27,451.23 27,451.23 3,568.66 -3,568.66 27,451.23 2,745.12 2,745.12 30,196.36 34,385.18 -6,933.95 -4,188.82

3.4.2 Instalacin de Instrumentacin de Proceso y F&G para Lneas y Equipos Global 1.00 0.49% 32,112.90 32,112.90 3,000.00 19,184.66 909.24 23,093.90 23,093.90 3,002.21 -3,002.21 23,093.90 2,309.39 2,309.39 25,403.29 28,927.22 -5,833.32 -3,523.93

Calibracin de todos los instrumentos, vlvulas actuadas y vlvulas de alivio instaladas, transmisores de
3.4.3 presin y temperatura, medidor clamp on y placa de orificio, detectores de fuego - gas - humo. Se debern Global 1.00 0.44% 28,788.36 28,788.36 3,000.00 16,777.20 925.86 20,703.06 20,703.06 2,691.40 -2,691.40 20,703.06 2,070.31 2,070.31 22,773.37 25,932.48 -5,229.42 -3,159.11
presentar las planillas de calibracin en los formatos establecidos por YPFB TRANSPORTE

3.4.4 Instalacin de Sistemas de Control y Seguridad (Proceso, F&G) Global 1.00 0.72% 47,260.49 47,260.49 4,500.00 27,503.20 1,984.04 33,987.24 33,987.24 4,418.34 -4,418.34 33,987.24 3,398.72 3,398.72 37,385.96 42,572.13 -8,584.89 -5,186.17

3.4.5 Instalacin de 2 alarmas audiovisuales Global 1.00 0.06% 3,635.42 3,635.42 150.00 2,358.48 105.92 2,614.40 2,614.40 339.87 -339.87 2,614.40 261.44 261.44 2,875.84 3,274.78 -660.38 -398.94
4.- OBRAS DE PROTECCION CATODICA 0.60% 39,520.54 4,850.00 22,884.54 686.54 28,421.08 28,421.08 3,694.74 -3,694.74 28,421.08 2,842.11 2,842.11 31,263.18 35,600.00 - - - - -
4.1 Instalacin del Sistema de Proteccin Catdica de lneas enterradas (segn planos) Global 1.00 0.60% 39,520.54 39,520.54 4,850.00 22,884.54 686.54 28,421.08 28,421.08 3,694.74 -3,694.74 28,421.08 2,842.11 2,842.11 31,263.18 35,600.00

5.- COMISIONADO Y PUESTA EN MARCHA 0.16% 10,768.24 - 7,518.39 225.55 7,743.94 7,743.94 1,006.71 -1,006.71 7,743.94 774.39 774.39 8,518.34 9,700.00 - - - - -
Precomisionado ( verificacin) de todos los sistemas mecnicos, elctricos, de instrumentacin y control
5.1 Global 1.00 0.06% 4,218.48 4,218.48 - 2,945.34 88.36 3,033.70 3,033.70 394.38 -394.38 3,033.70 303.37 303.37 3,337.07 3,800.00
instalados

5.2 Apoyo con personal y herramientas a las pruebas y puesta en marcha de los compresores y equipos auxiliares Global 1.00 0.05% 3,441.40 3,441.40 - 2,402.79 72.08 2,474.87 2,474.87 321.73 -321.73 2,474.87 247.49 247.49 2,722.36 3,100.00

Puesta en Marcha y Comisionado de la estacin, Apoyo con personal y herramientas a las pruebas SAT del
5.3 Global 1.00 0.05% 3,108.36 3,108.36 - 2,170.26 65.11 2,235.37 2,235.37 290.60 -290.60 2,235.37 223.54 223.54 2,458.91 2,800.00
Sistema de Control de Planta
Total 100.00% Total 6,544,796.16 1,094,441.42 2,083,914.87 1,261,047.39 4,439,403.67 4,703,061.14 577,122.48 (577,122.48) 4,703,061.14 444,240.39 470,606.14 5,173,667.28 403,221.15 - - - 200,968.95 257,078.93
(67,045.73) -
Diferencia Subcontratista Asistecab 336,175.42

16,924.08
N de RDO
1
REPORTE DIARIO DE OBRA (RDO) Pagina: 1 de 6
Fecha

CONSTRUCCIN, MONTAJE Y PUESTA EN MARCHA DE LA ESTACIN DE COMPRESIN TOTOROCO 11/21/2013

REV0

1. DATOS GENERALES 2. DATOS SSMS


Orden de Trabajo YPFB-T.: Das Condiciones Meteorolgicas Parcial Acumulado
Plazo Contractual
395 Horas Trabajadas 10 Cantidad de casi accidentes 0 0
Inicio de Obra: Das Soleado 10 Cantidad de actos Inseguros 0 0
Plazo Vencido
11/1/2013 21 Nublado 0 Cantidad de condiciones Inseguras 0 0
Final de Contrato: Das Lluvioso/Operable 0 Cantidad de accidentes Personales 0 0
Plazo Restante
11/30/2014 374 Inoperable 0 Cantidad de accidentes Vehiculares 0 0

3. DATOS DE AVANCE DE OBRA


AVANCE ACUMULADO 0.00% AVANCE DEL DIA 0.00%

4. ACTIVIDADES REALIZADAS

MONTO A Avance
Cantidad Cant. fsica MONTO ANTERIOR
ITEM DESCRIPCIN Unidad PU MONTO CONTRATO FACTURAR AL % Anterior % Avance % Acumulado Total Proyecto
Contrato Total % ACUMULADO
MOMENTO (%)

1.- LOGISTICA 8.36% 547,430.69 - - 0.00% 0.00%


1.1 Movilizacin de Equipos y Personal a Obra Global 1.00 2.04% 133,215.30 133,215.30 - - 0.00% 0.00% 0.00% 0.00%
1.2 Montaje de Obrador, Almacenes y Oficinas Global 1.00 0.93% 61,057.01 61,057.01 - - 0.00% 0.00% 0.00% 0.00%
Instalacin de Campamento (incluye comedor, sanitarios, servicios hidrosanitarios y elctricos, dormitorios,
1.3 Global 1.00 1.27% 83,259.57 83,259.57 - - 0.00% 0.00% 0.00% 0.00%
sala de recreacin, etc.)
1.4 Alimentacin para el personal de YPFB TRANSPORTE Racin 7,560.00 0.90% 7.77 58,764.63 - - 0.00% 0.00% 0.00% 0.00%
1.5 Lavado de ropa y limpieza de habitaciones para el personal de YPFB TRANSPORTE Pers./da 2,520.00 0.43% 11.10 27,963.13 - - 0.00% 0.00% 0.00% 0.00%
1.6 Limpieza y Desmovilizacin de Equipos y Personal Global 1.00 1.27% 83,259.57 83,259.57 - - 0.00% 0.00% 0.00% 0.00%
Transporte de equipos y materiales a la obra desde Almacenes de YPFB TRANSPORTE en Santa Cruz y
1.7 devolucin de equipos y materiales sobrantes y/o desmontados hasta Almacenes de YPFB TRANSPORTE en Global 1.00 1.53% 99,911.48 99,911.48 - - 0.00% 0.00% 0.00% 0.00%
Santa Cruz
2.- INGENIERIA & CALIDAD 2.37% 155,417.88 - - 0.00% 0.00%
2.1 Validacin de la Ingeniera de Detalle Global 1.00 0.42% 27,753.19 27,753.19 - - 0.00% 0.00% 0.00% 0.00%
2.2 Reingeniera Bsica y de Detalle Global 1.00 0.42% 27,753.19 27,753.19 - - 0.00% 0.00% 0.00% 0.00%

2.3 Elaboracin de Procedimientos de calidad QA / QC Global 1.00 0.25% 16,651.91 16,651.91 - - 0.00% 0.00% 0.00% 0.00%
2.4 Elaboracin de Procedimientos de Precomisionado y Comisionado Global 1.00 0.25% 16,651.91 16,651.91 - - 0.00% 0.00% 0.00% 0.00%
2.5 Planos Conforme a Obra Global 1.00 0.51% 33,303.83 33,303.83 - - 0.00% 0.00% 0.00% 0.00%
2.6 Data Books y CD Global 1.00 0.51% 33,303.83 33,303.83 - - 0.00% 0.00% 0.00% 0.00%
3.- INSTALACION Y MONTAJE ESTACION TOTOROCO 88.49% 5,791,658.82 - - 0.00% 0.00%
3.1 OBRAS CIVILES 59.60% 3,900,599.46 - - 0.00% 0.00% 0.00% 0.00%
3.1.1 Adecuacin de sitio 14.61% 956,481.47 - - 0.00% 0.00% 0.00% 0.00%

3.1.1.1 Construccin de Planchadas (Trabajos de Corte y Relleno) Global 1.00 6.83% 446,717.66 446,717.66 - - 0.00% 0.00% 0.00% 0.00%
Construccin de Calles Internas Empedradas de la Estacin. Incluye losas de proteccin de tuberas en
3.1.1.2 Global 1.00 5.79% 379,152.54 379,152.54 - - 0.00% 0.00% 0.00% 0.00%
cruces, cunetas, cordones de HS, etc.
3.1.1.3 Estabilizacin de Taludes de Planchadas con zampeado de piedra. Global 1.00 1.19% 78,193.17 78,193.17 - - 0.00% 0.00% 0.00% 0.00%
Estabilizacin de Taludes de Calles internas de ms de 1m de altura con zampeado de piedra y de menos de 1
3.1.1.4 m de altura con grama y/u otra especie autctona aprobada por la fiscalizacin. Incluye zanjas de Global 1.00 0.60% 39,096.58 39,096.58 - - 0.00% 0.00% 0.00% 0.00%
coronamiento de tierra.
Restauracin de Camino de Ingreso a la Estacin, revestimiento de taludes con grama y/u otra especie
3.1.1.5 autctona aprobada por la fiscalizacin, tablestacado, conformacin de cunetas y zanjas de coronamiento de Global 1.00 0.20% 13,321.53 13,321.53 - - 0.00% 0.00% 0.00% 0.00%
tierra.
3.1.2 Construccin de Fundaciones de HA / Fabricacin Soportes / Torres 8.52% 557,775.33 - - 0.00% 0.00% 0.00% 0.00%

Construccin de las Fundaciones de HA de 4 Unidades de Compresin, Aeroenfriadores, Soportes de


Silenciadores, Soporte de Escapes y Tanques de Aceite de Motor. Incluye la provisin e instalacin de pernos
3.1.2.1 Global 1.00 4.73% 309,318.10 309,318.10 - - 0.00% 0.00% 0.00% 0.00%
de anclaje, planchas de nivelacin y Sika Grout 212 (Canal de Lneas de Compresores y Tapas metlicas
separados en otro tem)
Construccin de la Fundacin de HA y Anclajes para Venteo (V-5200). Incluye el colocado de pernos de
3.1.2.2 Global 1.00 0.10% 6,261.55 6,261.55 - - 0.00% 0.00% 0.00% 0.00%
anclaje y planchas de nivelacin (Segn Planos)
Construccin de la Fundacin de HA y Anclajes para Pararrayos PR-01 y PR-02. Debe Incluir el colocado de
3.1.2.3 pernos de anclaje, planchas de nivelacin y la provisin e instalacin de las dos torres para los pararrayos Global 1.00 0.52% 33,718.93 33,718.93 - - 0.00% 0.00% 0.00% 0.00%
(Segn Planos)
Construccin de la Fundacin de HA para V-5000. Incluye el colocado de pernos de anclaje y planchas de
3.1.2.4 Global 1.00 0.03% 1,765.68 1,765.68 - - 0.00% 0.00% 0.00% 0.00%
nivelacin (Segn Planos)
Construccin de las Fundaciones de HA para V-5100, V-5600 & F-5700. Incluye el colocado de pernos de
3.1.2.5 Global 1.00 0.07% 4,462.99 4,462.99 - - 0.00% 0.00% 0.00% 0.00%
anclaje y planchas de nivelacin (Segn Planos)
Construccin de Estructura y Cubierta Metlica para Clamp On. Incluye el colocado de pernos de anclaje y
3.1.2.6 Global 1.00 0.06% 3,982.13 3,982.13 - - 0.00% 0.00% 0.00% 0.00%
planchas de nivelacin (Segn Planos)
Construccin de Losa y Cubierta Metlica para Medicin y Regulacin de Gas para Vivienda de Operadores
3.1.2.7 Global 1.00 0.14% 9,248.31 9,248.31 - - 0.00% 0.00% 0.00% 0.00%
(Segn Planos).

3.1.2.8 Construccin de Bases de HA, Soportes de Tuberas y Grampas, rea de Compresores y Rack de Lneas Global 1.00 1.39% 90,800.42 90,800.42 - - 0.00% 0.00% 0.00% 0.00%

Construccin de Bases de HA, Soportes de Tuberas y Grampas, rea de Facilidades, de Trampas de


3.1.2.9 Global 1.00 1.43% 93,800.42 93,800.42 - - 0.00% 0.00% 0.00% 0.00%
Chancho, Flash Separador (V-5000) (Segn Planos).
Construccin de Base de H A para Antena Satelital de 700 x 700 x 800 mm con soporte de tubera
3.1.2.10 Pza 1.00 0.07% 4,416.81 4,416.81 - - 0.00% 0.00% 0.00% 0.00%
galvanizada de 3"
3.1.3 Construccin de Escaleras 4.55% 297,984.46 - - 0.00% 0.00%
3.1.3.1 Construccin de Escaleras de HA con barandas metlicas (EH-01). Pza 2.00 0.15% 4,903.40 9,806.81 - - 0.00% 0.00% 0.00% 0.00%
Construccin y Montaje de Escaleras Metlicas Tipo EM-01 sobre Fundaciones de HA, con barandas
3.1.3.2 Pza 2.00 0.25% 8,306.56 16,613.12 - - 0.00% 0.00% 0.00% 0.00%
metlicas.
N de RDO
1
REPORTE DIARIO DE OBRA (RDO) Pagina: 2 de 6
Fecha

CONSTRUCCIN, MONTAJE Y PUESTA EN MARCHA DE LA ESTACIN DE COMPRESIN TOTOROCO 11/21/2013

REV0

1. DATOS GENERALES 2. DATOS SSMS


Orden de Trabajo YPFB-T.: Das Condiciones Meteorolgicas Parcial Acumulado
Plazo Contractual
395 Horas Trabajadas 10 Cantidad de casi accidentes 0 0
Inicio de Obra: Das Soleado 10 Cantidad de actos Inseguros 0 0
Plazo Vencido
11/1/2013 21 Nublado 0 Cantidad de condiciones Inseguras 0 0
Final de Contrato: Das Lluvioso/Operable 0 Cantidad de accidentes Personales 0 0
Plazo Restante
11/30/2014 374 Inoperable 0 Cantidad de accidentes Vehiculares 0 0

3. DATOS DE AVANCE DE OBRA


AVANCE ACUMULADO 0.00% AVANCE DEL DIA 0.00%

4. ACTIVIDADES REALIZADAS

MONTO A Avance
Cantidad Cant. fsica MONTO ANTERIOR
ITEM DESCRIPCIN Unidad PU MONTO CONTRATO FACTURAR AL % Anterior % Avance % Acumulado Total Proyecto
Contrato Total % ACUMULADO
MOMENTO (%)

Construccin y Montaje de Escaleras Metlicas Tipo EM-02 Y EM-03 (1 de cada tipo) sobre Fundaciones de
3.1.3.3 Pza 2.00 0.92% 30,245.04 60,490.08 - - 0.00% 0.00% 0.00% 0.00%
HA, con barandas metlicas.

3.1.3.4 Construccin y Montaje de Escalera Metlica Tipo EM-04 sobre Fundaciones de HA, con barandas metlicas. Pza 1.00 0.09% 5,827.43 5,827.43 - - 0.00% 0.00% 0.00% 0.00%

Construccin y Montaje de Escaleras Metlicas Tipo EM-05 sobre Fundaciones de HA, con barandas
3.1.3.5 Pza 2.00 0.17% 5,414.40 10,828.80 - - 0.00% 0.00% 0.00% 0.00%
metlicas.
Construccin y Montaje de Escaleras Metlicas Tipo EM-06 sobre Fundaciones de HA, con barandas
3.1.3.6 Pza 2.00 0.19% 6,310.83 12,621.67 - - 0.00% 0.00% 0.00% 0.00%
metlicas.
Construccin y Montaje de Escaleras Metlicas Tipo EM-07 sobre Fundaciones de HA, con barandas
3.1.3.7 Pza 2.00 0.16% 5,140.88 10,281.76 - - 0.00% 0.00% 0.00% 0.00%
metlicas.
Construccin para cada una de las cuatro unidades de compresin de dos plataformas metlicas con barandas
y escaleras, y una escalera marinera con plataforma para mantenimiento de acuerdo a planos conforme a obra
3.1.3.8 Global 1.00 2.62% 171,514.79 171,514.79 - - 0.00% 0.00% 0.00% 0.00%
de la Estacin de Compresin Huayacota. (Incluye bases de HA de 310x310x280 mm en el contacto de las
plataformas con la losa de la sala de compresores)

3.1.4 Construccin de Edificios y Cubiertas 22.51% 1,473,446.94 - - 0.00% 0.00%


3.1.4.1 Construccin de Edificio de Compresores Global 1.00 13.60% 890,372.77 890,372.77 - - 0.00% 0.00% 0.00% 0.00%
3.1.4.2 Construccin de Edificio de Sala de Control Global 1.00 2.98% 195,160.42 195,160.42 - - 0.00% 0.00% 0.00% 0.00%
3.1.4.3 Construccin de Edificio de Microturbinas Global 1.00 2.20% 144,097.33 144,097.33 - - 0.00% 0.00% 0.00% 0.00%
3.1.4.4 Construccin de Edificio de Mantenimiento y Almacn Global 1.00 2.24% 146,536.83 146,536.83 - - 0.00% 0.00% 0.00% 0.00%
3.1.4.5 Construccin de Edificio de Portera Global 1.00 0.75% 48,845.61 48,845.61 - - 0.00% 0.00% 0.00% 0.00%
Construccin de Tinglado de Almacenamiento de Residuos (Cotizar de acuerdo a las modificaciones
3.1.4.6 Global 1.00 0.56% 36,634.21 36,634.21 - - 0.00% 0.00% 0.00% 0.00%
realizadas en la EC Huayacota, ver planos indicados como referencia (2))
Construccin de la Cubierta para Tanque de Agua para Compresores, fundacin y losa de HA (segn
3.1.4.7 Global 1.00 0.18% 11,799.77 11,799.77 - - 0.00% 0.00% 0.00% 0.00%
planos).
3.1.5 Sistema de Drenaje Industrial 0.88% 57,305.33 - - 0.00% 0.00%

Construccin de Sistema de Drenaje Industrial, comprende cmaras de drenaje industrial, sumideros, tendido
de tubos de PVC de 3" E-40 y 4" SDR-35, canales perimetrales de los compresores, tapas y rejillas metlicas
3.1.5.1 Global 1.00 0.32% 21,036.42 21,036.42 - - 0.00% 0.00% 0.00% 0.00%
(los canales de drenaje industrial perimetrales a los compresores debern estar conforme a lo construido en la
EC Huayacota, ver planos indicados como referencia (2)).

Construccin de cmaras de tratamiento de hidrocarburos, losa y cubierta bomba P-5020 (Cotizar de acuerdo
3.1.5.2 Global 1.00 0.55% 36,268.91 36,268.91 - - 0.00% 0.00% 0.00% 0.00%
a las modificaciones realizadas en la EC Huayacota, ver planos indicados como referencia (2))

3.1.6 Construccin de Obras de Drenaje Pluvial 4.94% 323,408.97 - - 0.00% 0.00%


3.1.6.1 Cabezales para Alcantarillas Pluviales Pza 16.00 0.61% 2,513.66 40,218.59 - - 0.00% 0.00% 0.00% 0.00%

3.1.6.2 Alcantarilla Pluvial de Acero 900 mm (MP-68 tipo ARMCO, de 2 mm) ml 32.00 0.11% 233.10 7,459.36 - - 0.00% 0.00% 0.00% 0.00%
3.1.6.3 Alcantarilla Pluvial de Acero 700 mm (MP-68 tipo ARMCO, de 1.8 mm) ml 22.00 0.07% 215.28 4,736.19 - - 0.00% 0.00% 0.00% 0.00%
3.1.6.4 Canal Pluvial Tipo 1 Global 1.00 3.13% 204,680.03 204,680.03 - - 0.00% 0.00% 0.00% 0.00%
3.1.6.5 Canal Pluvial Tipo 2 Global 1.00 0.75% 49,401.56 49,401.56 - - 0.00% 0.00% 0.00% 0.00%
3.1.6.6 Canal Pluvial Tipo 3 Global 1.00 0.26% 16,913.24 16,913.24 - - 0.00% 0.00% 0.00% 0.00%
3.1.7 Obras Civiles Varias 3.58% 234,196.97 - - 0.00% 0.00%
3.1.7.1 Construccin de Losa de HA e Instalacin de Tanque de Aceite Usado. Global 1.00 0.04% 2,331.27 2,331.27 - - 0.00% 0.00% 0.00% 0.00%
Construccin de Losa de HA y Soporte Metlico Para Lavaojos. Incluye instalacin de un punto de agua de
3.1.7.2 Global 1.00 0.03% 1,831.71 1,831.71 - - 0.00% 0.00% 0.00% 0.00%
acuerdo al equipo que sea entregado por YPFB TRANSPORTE.
3.1.7.3 Construccin de Losas de HA y Cubiertas Metlicas para Extintores. Pza 3.00 0.02% 388.54 1,165.61 - - 0.00% 0.00% 0.00% 0.00%
3.1.7.4 Instalacin de Extintores en Paredes y/o Columnas de Edificios/Tinglados. Pza 10.00 0.03% 166.52 1,665.22 - - 0.00% 0.00% 0.00% 0.00%
3.1.7.5 Instalacin de Extintores en Postes de 2 empotrados en Bases de HC de 40 x 40 x 60 cm. Pza 10.00 0.06% 388.54 3,885.39 - - 0.00% 0.00% 0.00% 0.00%

3.1.7.6 Canales de Lnea con Tapas Metlicas. Pza 4.00 0.52% 8,576.22 34,304.89 - - 0.00% 0.00% 0.00% 0.00%
3.1.7.7 Cmaras Elctricas y de Instrumentacin con Tapas Metlicas. Pza 15.00 0.45% 1,966.41 29,496.21 - - 0.00% 0.00% 0.00% 0.00%
3.1.7.8 Cmaras para Trampa de Chancho, incluye drenaje pluvial (20 cm de caera galvanizada y vlvula 1"). Pza 2.00 0.01% 367.12 734.24 - - 0.00% 0.00% 0.00% 0.00%
3.1.7.9 Cmaras Slop (rea Venteo, Edificio de Mantenimiento y Almacn) Pza 2.00 0.08% 2,594.37 5,188.74 - - 0.00% 0.00% 0.00% 0.00%

3.1.7.10 Pozos Absorbentes (2), Cmaras Spticas (2) y Cmaras de Inspeccin (4) para Sala de Control y Portera. Global 1.00 0.56% 36,675.97 36,675.97 - - 0.00% 0.00% 0.00% 0.00%

3.1.7.11 Fundaciones de HA para Postes de Iluminacin. Pza 32.00 0.58% 1,189.36 38,059.53 - - 0.00% 0.00% 0.00% 0.00%
Construccin de Tanque de HA de Almacenamiento de Agua , cmara de vlvulas y medidor de agua (el
3.1.7.12 tanque deber redisearse y construirse con el doble de la capacidad indicada en la ingeniera y manteniendo Global 1.00 0.11% 6,916.09 6,916.09 - - 0.00% 0.00% 0.00% 0.00%
la cuanta de fierros)
N de RDO
1
REPORTE DIARIO DE OBRA (RDO) Pagina: 3 de 6
Fecha

CONSTRUCCIN, MONTAJE Y PUESTA EN MARCHA DE LA ESTACIN DE COMPRESIN TOTOROCO 11/21/2013

REV0

1. DATOS GENERALES 2. DATOS SSMS


Orden de Trabajo YPFB-T.: Das Condiciones Meteorolgicas Parcial Acumulado
Plazo Contractual
395 Horas Trabajadas 10 Cantidad de casi accidentes 0 0
Inicio de Obra: Das Soleado 10 Cantidad de actos Inseguros 0 0
Plazo Vencido
11/1/2013 21 Nublado 0 Cantidad de condiciones Inseguras 0 0
Final de Contrato: Das Lluvioso/Operable 0 Cantidad de accidentes Personales 0 0
Plazo Restante
11/30/2014 374 Inoperable 0 Cantidad de accidentes Vehiculares 0 0

3. DATOS DE AVANCE DE OBRA


AVANCE ACUMULADO 0.00% AVANCE DEL DIA 0.00%

4. ACTIVIDADES REALIZADAS

MONTO A Avance
Cantidad Cant. fsica MONTO ANTERIOR
ITEM DESCRIPCIN Unidad PU MONTO CONTRATO FACTURAR AL % Anterior % Avance % Acumulado Total Proyecto
Contrato Total % ACUMULADO
MOMENTO (%)

Instalacin de Letreros de Seguridad en postes de 2" empotrados en Bases de HC de 40 x 40 x 60 cm (slo


3.1.7.13 Pza 30.00 0.07% 159.86 4,795.80 - - 0.00% 0.00% 0.00% 0.00%
los letreros sern provistos por YPFB TRANSPORTE).
3.1.7.14 reas con Grava. m2 1,628.40 0.28% 11.10 18,076.23 - - 0.00% 0.00% 0.00% 0.00%
3.1.7.15 Construccin de Aceras Peatonales de HC. ml 362.00 0.50% 91.03 32,951.21 - - 0.00% 0.00% 0.00% 0.00%
Muro de Ladrillo Adobito Visto con mortero de cemento y arena (dosif.: 1:4), incluye Columnas y Viga "T"
3.1.7.16 ml 51.70 0.12% 155.42 8,035.30 - - 0.00% 0.00% 0.00% 0.00%
Invertida de HA (hormigones y morteros con Sika 1 o similar), pintado.
Pasillo de Circulacin (Incluye cimiento de HC, piso de HS, estructura metlica, planchas, pernos, cubierta,
3.1.7.17 ml 33.10 0.12% 244.22 8,083.56 - - 0.00% 0.00% 0.00% 0.00%
carpintera de aluminio y vidrio (4mm), etc.).
3.2 OBRAS MECANICAS 23.56% 1,541,833.92 - - 0.00% 0.00%
3.2.1 Obras de construccin en la Estacin e Interconexiones 23.56% 1,541,833.92 - - 0.00% 0.00%
Soldadura de todos los prefabricados, lneas de proceso, lneas auxiliares y lneas de interconexin
3.2.1.1 Global 1.00 6.04% 395,205.40 395,205.40 - - 0.00% 0.00% 0.00% 0.00%
especificados en los planos mecnicos e isomtricos
rea de Trampas de Chancho: Montaje e Instalacin de dos Trampas de Chancho, prefabricados de tubera y
3.2.1.2 Global 1.00 0.64% 41,629.78 41,629.78 - - 0.00% 0.00% 0.00% 0.00%
accesorios, vlvulas, etc.
rea de Medicin y Regulacin: Montaje e instalacin de dos medidores de gas, vlvulas reguladoras,
3.2.1.3 prefabricados de tuberas y accesorios, filtros separadores V-5100 y V-5600, filtro de gas combustible F-5700, Global 1.00 2.12% 138,765.94 138,765.94 - - 0.00% 0.00% 0.00% 0.00%
vlvulas, puente de regulacin y medicin de gas combustible, etc.
rea Gas Combustible a tres Micro Turbinas: Montaje e Instalacin de lnea de gas combustible, vlvulas,
3.2.1.4 accesorios, etc. Incluye el montaje e instalacin de las microturbinas y de los kits de regulacin de cada Global 1.00 0.23% 14,986.72 14,986.72 - - 0.00% 0.00% 0.00% 0.00%
microturbina (ubicacin a definir en campo).
rea Tanque Separador: Montaje e Instalacin de lneas, vlvulas, tanque separador V-5000, tanque de aceite
3.2.1.5 usado TK-5100, bomba P-5020, accesorios, etc. La configuracin del juego de vlvulas de la bomba de Global 1.00 0.19% 12,211.40 12,211.40 - - 0.00% 0.00% 0.00% 0.00%
oxigenacin ser definida en campo.
3.2.1.6 rea de Venteo y Alivios: Montaje e Instalacin de lneas, vlvulas, venteo V-5200, accesorios, etc. Global 1.00 0.24% 15,763.81 15,763.81 - - 0.00% 0.00% 0.00% 0.00%

Interconexin del Loop del GAA 12": Excavacin y tapado de zanjas, soldadura, ensayos NDT, prueba
hidrulica, pintado, revestimiento, trabajos de adecuacin en cmara de HA (relleno con HS, puente de
3.2.1.7 Global 1.00 0.54% 35,524.08 35,524.08 - - 0.00% 0.00% 0.00% 0.00%
adherencia con Colmafix 32, pintura impermeabilizante en el rea intervenida con Sika Top 107 Seal), TIE-IN
002, TIE-IN 004, etc.
Interconexin del GAA 6": Excavacin y tapado de zanjas, curvado de tuberas, soldadura, ensayos NDT,
3.2.1.8 Global 1.00 0.42% 27,753.19 27,753.19 - - 0.00% 0.00% 0.00% 0.00%
prueba hidrulica, pintado, revestimiento, TIE-IN 001, TIE-IN 003, etc.
rea de Compresores: Montaje e Instalacin de rack de lneas, lneas de proceso & auxiliares, vlvulas de los
3.2.1.9 Global 1.00 3.99% 260,879.97 260,879.97 - - 0.00% 0.00% 0.00% 0.00%
4 Compresores, accesorios, etc.

Montaje e Instalacin de las 4 Unidades de Compresin, equipos auxiliares, escapes, silenciadores, tanques
de aceite, soportes metlicos, prefabricados de tubera, tanque de agua, mantas aislantes de los escapes,
3.2.1.10 Global 1.00 3.99% 260,879.97 260,879.97 - - 0.00% 0.00% 0.00% 0.00%
accesorios, lneas de venteos atmosfricos, etc. Incluye el soporte a los tcnicos de Fbrica y de YPFB
TRANSPORTE y el montaje e instalacin de los paneles de control (UCP) de cada unidad de compresin.

rea de Tanque de Agua Desmineralizada para Compresores: Montaje e Instalacin de lneas, tanque de agua,
3.2.1.11 vlvulas, bomba P-5010, accesorios, etc. El arreglo de vlvulas para el tanque y la bomba p-5010 podr ser Global 1.00 0.12% 7,548.87 7,548.87 - - 0.00% 0.00% 0.00% 0.00%
modificado a solicitud de YPFB TRANSPORTE.

Montaje e Instalacin del Sistema de Aire Comprimido al Edificio de Compresores, Edificio de Mantenimiento /
Almacn y Edificio de Micro Turbinas; instalacin de compresor de aire , lneas, vlvulas,etc. El arreglo de
3.2.1.12 Global 1.00 0.11% 7,215.83 7,215.83 - - 0.00% 0.00% 0.00% 0.00%
vlvulas para el compresor de aire podr ser modificado a solicitud de YPFB TRANSPORTE. Se deber
modificar el trazado de la caera para aire comprimido para el taller por reubicacin de puerta de ingreso.

Montaje e Instalacin del Sistema de Agua desde el Tanque de Agua al Edificio de Compresores, Edificio de
3.2.1.13 Mantenimiento / Almacn, Sala de Control y Portera, ducha lava ojos, etc. Incluye el tendido de caera hasta Global 1.00 0.11% 7,215.83 7,215.83 - - 0.00% 0.00% 0.00% 0.00%
la vivienda de operadores (las instalaciones en el interior de la vivienda a cargo de terceros).

Montaje e Instalacin de Manifold de Regulacin y Medicin de Gas para Vivienda de Operadores (incluye
3.2.1.14 tendido de tubera slo hasta el manifold, desde el manifold hasta la vivienda la tubera ser instalada por Global 1.00 0.02% 1,332.15 1,332.15 - - 0.00% 0.00% 0.00% 0.00%
terceros)

3.2.1.15 Revestimiento epxico 100% slidos a todas las lneas enterradas. Global 1.00 0.44% 28,863.32 28,863.32 - - 0.00% 0.00% 0.00% 0.00%

Inspeccin NDT (Radiogrfica, tintas penetrantes ) al 100% de las juntas soldadas en las lneas de proceso,
3.2.1.16 Global 1.00 1.53% 100,444.34 100,444.34 - - 0.00% 0.00% 0.00% 0.00%
lneas auxiliares y lneas de interconexin.
Prueba Hidrulica de todas las lneas de proceso, lneas auxiliares y lneas de interconexin. Incluye limpieza y
3.2.1.17 Global 1.00 0.99% 64,942.46 64,942.46 - - 0.00% 0.00% 0.00% 0.00%
secado.
Pintado de todas las tuberas areas, vlvulas, equipos, accesorios e instalaciones nuevas con pintura
3.2.1.18 Global 1.00 0.64% 42,184.85 42,184.85 - - 0.00% 0.00% 0.00% 0.00%
anticorrosiva y epxica-poliuretano.
3.2.1.19 Pruebas de cuerpo y sello de todas las vlvulas de dimetro 2 de acuerdo al API 6 D Global 1.00 1.02% 66,607.65 66,607.65 - - 0.00% 0.00% 0.00% 0.00%
3.2.1.20 Montaje de Vlvulas Actuadas (Vlvulas SDV, EBDV, PCV) Global 1.00 0.11% 6,882.79 6,882.79 - - 0.00% 0.00% 0.00% 0.00%
Provisin e instalacin de placas de aluminio estampadas con todos los TAGs de Ingeniera de los nuevos
3.2.1.21 equipos mecnicos, elctricos e instrumentos instalados en campo. Incluye el llenado de las correspondientes Global 1.00 0.08% 4,995.57 4,995.57 - - 0.00% 0.00% 0.00% 0.00%
planillas con las especificaciones tcnicas, de acuerdo al Diagrama P&ID.
N de RDO
1
REPORTE DIARIO DE OBRA (RDO) Pagina: 4 de 6
Fecha

CONSTRUCCIN, MONTAJE Y PUESTA EN MARCHA DE LA ESTACIN DE COMPRESIN TOTOROCO 11/21/2013

REV0

1. DATOS GENERALES 2. DATOS SSMS


Orden de Trabajo YPFB-T.: Das Condiciones Meteorolgicas Parcial Acumulado
Plazo Contractual
395 Horas Trabajadas 10 Cantidad de casi accidentes 0 0
Inicio de Obra: Das Soleado 10 Cantidad de actos Inseguros 0 0
Plazo Vencido
11/1/2013 21 Nublado 0 Cantidad de condiciones Inseguras 0 0
Final de Contrato: Das Lluvioso/Operable 0 Cantidad de accidentes Personales 0 0
Plazo Restante
11/30/2014 374 Inoperable 0 Cantidad de accidentes Vehiculares 0 0

3. DATOS DE AVANCE DE OBRA


AVANCE ACUMULADO 0.00% AVANCE DEL DIA 0.00%

brom: Ingresar 4. ACTIVIDADES REALIZADAS


P.U de cada
tem

MONTO A Avance
Cantidad Cant. fsica MONTO ANTERIOR
ITEM DESCRIPCIN Unidad PU MONTO CONTRATO FACTURAR AL % Anterior % Avance % Acumulado Total Proyecto
Contrato Total % ACUMULADO
MOMENTO (%)

3.3 OBRAS ELECTRICAS 3.04% 199,256.32 - - 0.00% 0.00%


3.3.1 Instalaciones Elctricas Sala de Compresores Global 1.00 0.14% 9,167.98 9,167.98 - - 0.00% 0.00% 0.00% 0.00%
3.3.2 Instalaciones Elctricas Sala de Generacin (Microturbinas) Global 1.00 0.11% 6,875.99 6,875.99 - - 0.00% 0.00% 0.00% 0.00%

3.3.3 Instalaciones Elctricas Sala de Control (incluye el tendido de un conduit de 1" x 25 m a la Antena Satelital) Global 1.00 0.05% 3,437.99 3,437.99 - - 0.00% 0.00% 0.00% 0.00%

3.3.4 Instalaciones Elctricas Taller Almacn Global 1.00 0.09% 6,188.38 6,188.38 - - 0.00% 0.00% 0.00% 0.00%
3.3.5 Instalaciones Elctricas Portera Global 1.00 0.04% 2,291.99 2,291.99 - - 0.00% 0.00% 0.00% 0.00%

3.3.6 Instalaciones Elctricas rea de Tratamiento de Aguas Aceitosas (Bomba P-5020, Flash Separador V-5000) Global 1.00 0.08% 5,500.78 5,500.78 - - 0.00% 0.00% 0.00% 0.00%

3.3.7 Instalaciones Elctricas e Instrumentos en rea de Trampas de Chancho y Facilidades Global 1.00 0.10% 6,417.58 6,417.58 - - 0.00% 0.00% 0.00% 0.00%
3.3.8 Instalaciones Elctricas Tinglado de Residuos Global 1.00 0.05% 3,208.79 3,208.79 - - 0.00% 0.00% 0.00% 0.00%
3.3.9 Instalaciones Elctricas Tinglado de Agua Desmineralizada Global 1.00 0.04% 2,750.40 2,750.40 - - 0.00% 0.00% 0.00% 0.00%
3.3.10 Provisin y Tendido de Caeros Global 1.00 0.33% 21,349.97 21,349.97 - - 0.00% 0.00% 0.00% 0.00%
3.3.11 Provisin y Colocado de Cajas y Tableros Global 1.00 0.21% 13,443.17 13,443.17 - - 0.00% 0.00% 0.00% 0.00%
3.3.12 Instalaciones Elctricas de Equipos Nuevos Provistos por YPFBT Global 1.00 0.09% 5,911.06 5,911.06 - - 0.00% 0.00% 0.00% 0.00%
3.3.13 Provisin y Colocado de Alimentadores Global 1.00 0.27% 17,626.61 17,626.61 - - 0.00% 0.00% 0.00% 0.00%
3.3.14 Iluminacin Exterior Global 1.00 0.37% 23,931.86 23,931.86 - - 0.00% 0.00% 0.00% 0.00%
3.3.15 Aterramiento de Iluminacin Exterior y de Enmallado Global 1.00 0.40% 25,974.96 25,974.96 - - 0.00% 0.00% 0.00% 0.00%
3.3.16 Aterramiento Sala De Compresores Global 1.00 0.10% 6,681.86 6,681.86 - - 0.00% 0.00% 0.00% 0.00%
3.3.17 Aterramiento Sala De Control y Microturbinas (Sistema elctrico de potencia y de control) Global 1.00 0.12% 8,081.10 8,081.10 - - 0.00% 0.00% 0.00% 0.00%
Aterramiento de Instalaciones Mecnicas, (rea de Tratamiento de Aguas Aceitosas, Tinglado de Residuos
3.3.18 Slidos, Cubierta de Tanque de Agua Desmineralizada, V-5200, rea de Trampas de Chancho, rea de Global 1.00 0.11% 7,215.27 7,215.27 - - 0.00% 0.00% 0.00% 0.00%
Facilidades), Cmaras Elctricas, Pararrayos y Tanque de Agua de Servicio

3.3.19 Aterramiento de Edificios (Taller/Almacn/Sala de Lubricantes, Tinglado de Residuos Slidos, Portera) Global 1.00 0.10% 6,437.63 6,437.63 - - 0.00% 0.00% 0.00% 0.00%

3.3.20 Proteccin Atmosfrica con provisin e Instalacin de los Pararrayos PR-01 y PR-02 Global 1.00 0.26% 16,762.93 16,762.93 - - 0.00% 0.00% 0.00% 0.00%
3.4 OBRAS DE INSTRUMENTACION Y CONTROL 2.29% 149,969.12 - - 0.00% 0.00%
3.4.1 Instalacin de Sistemas de Medicin y Regulacin de Gas de Proceso y Gas Combustible Global 1.00 0.58% 38,171.94 38,171.94 - - 0.00% 0.00% 0.00% 0.00%
3.4.2 Instalacin de Instrumentacin de Proceso y F&G para Lneas y Equipos Global 1.00 0.49% 32,112.90 32,112.90 - - 0.00% 0.00% 0.00% 0.00%

Calibracin de todos los instrumentos, vlvulas actuadas y vlvulas de alivio instaladas, transmisores de
3.4.3 presin y temperatura, medidor clamp on y placa de orificio, detectores de fuego - gas - humo. Se debern Global 1.00 0.44% 28,788.36 28,788.36 - - 0.00% 0.00% 0.00% 0.00%
presentar las planillas de calibracin en los formatos establecidos por YPFB TRANSPORTE

3.4.4 Instalacin de Sistemas de Control y Seguridad (Proceso, F&G) Global 1.00 0.72% 47,260.49 47,260.49 - - 0.00% 0.00% 0.00% 0.00%
3.4.5 Instalacin de 2 alarmas audiovisuales Global 1.00 0.06% 3,635.42 3,635.42 - - 0.00% 0.00% 0.00% 0.00%
4.- OBRAS DE PROTECCION CATODICA 0.60% 39,520.54 - - 0.00% 0.00%

4.1 Instalacin del Sistema de Proteccin Catdica de lneas enterradas (segn planos) Global 1.00 0.60% 39,520.54 39,520.54 - - 0.00% 0.00% 0.00% 0.00%
5.- COMISIONADO Y PUESTA EN MARCHA 0.16% 10,768.24 - - 0.00% 0.00%
Precomisionado ( verificacin) de todos los sistemas mecnicos, elctricos, de instrumentacin y control
5.1 Global 1.00 0.06% 4,218.48 4,218.48 - - 0.00% 0.00% 0.00% 0.00%
instalados

5.2 Apoyo con personal y herramientas a las pruebas y puesta en marcha de los compresores y equipos auxiliares Global 1.00 0.05% 3,441.40 3,441.40 - - 0.00% 0.00% 0.00% 0.00%

Puesta en Marcha y Comisionado de la estacin, Apoyo con personal y herramientas a las pruebas SAT del
5.3 Global 1.00 0.05% 3,108.36 3,108.36 - - 0.00% 0.00% 0.00% 0.00%
Sistema de Control de Planta
Total 100.00% Total 6,544,796.16 - - 0.00%
Monto Avance Total Proyecto $u$ -
Monto Faltante del Proyecto $u$ 6,544,796.16

Avance Total Proyecto (%) 0.00%

16,924.08
N de RDO
1
REPORTE DIARIO DE OBRA (RDO) Pagina: 5 de 6
Fecha

CONSTRUCCIN, MONTAJE Y PUESTA EN MARCHA DE LA ESTACIN DE COMPRESIN TOTOROCO 11/21/2013

REV0

1. DATOS GENERALES 2. DATOS SSMS


Orden de Trabajo YPFB-T.: Das Condiciones Meteorolgicas Parcial Acumulado
Plazo Contractual
395 Horas Trabajadas 10 Cantidad de casi accidentes 0 0
Inicio de Obra: Das Soleado 10 Cantidad de actos Inseguros 0 0
Plazo Vencido
11/1/2013 21 Nublado 0 Cantidad de condiciones Inseguras 0 0
Final de Contrato: Das Lluvioso/Operable 0 Cantidad de accidentes Personales 0 0
Plazo Restante
11/30/2014 374 Inoperable 0 Cantidad de accidentes Vehiculares 0 0

3. DATOS DE AVANCE DE OBRA


AVANCE ACUMULADO 0.00% AVANCE DEL DIA 0.00%

PERSONAL EQUIPO EN OBRA


No DETALLE CANT. No DETALLE CANT.
1 STAFF #REF! 1 STAFF #REF!

2 ARMADO DE CAMPAMENTO, OBRADOR Y OFICINAS #REF! 2 ARMADO DE CAMPAMENTO, OBRADOR Y OFICINAS #REF!

3 CONSTRUCCIONES CIVILES #REF! 3 CONSTRUCCIONES CIVILES #REF!

4 CONSTRUCCIONES MECNICAS #REF! 4 CONSTRUCCIONES MECNICAS #REF!

5 REVESTIMIENTO #REF! 5 REVESTIMIENTO #REF!

6 MEDIO AMBIENTE #REF! 6 MEDIO AMBIENTE #REF!

7 SOLDADURA #REF! 7 SOLDADURA #REF!

8 CAMPAMENTO Y APOYO #REF! 8 CAMPAMENTO Y APOYO #REF!

9 ALMACN Y OBRADOR #REF! 9 ALMACN Y OBRADOR #REF!

10 RADIOGRAFA #REF! 10 RADIOGRAFA #REF!

11 0 11 0

12 0 12 0

16 CAMPAMENTO Y APOYO 16 #REF!

TOTAL TOTAL #REF!

TOTAL DE PERSONAL #REF! TOTAL DE EQUIPO #REF!

COMENTARIOS SVP COMENTARIOS YPFBT S.A.

ACTIVIDADES SVP COMENTARIOS YPFBT S.A.

SUPERINTENDENTE DE OBRA SERVIPETROL LTDA FISCALIZACION YPFB TRANSPORTE


ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Movilizacin de Equipos y Personal a Obra Cdigo: 1.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
Material e insumos para movilizacin Da 70.00 50.00 3,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
PP00105O Personal Hr 2,692.45 9.05 24,366.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 24,366.66
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 13,401.66
Sub Total Costo Mano de Obra: 37,768.32
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Viaje 2.00 1,200.00 2,400.00
EQ00014Q Camioneta 4 x 4 Viaje 8.00 350.00 2,800.00
EQ00012Q Camin tracto con low boy Viaje 10.00 2,400.00 24,000.00
EQ00013Q Camin trailler con chata plana Viaje 9.00 2,400.00 21,600.00
EQ00015Q Cisterna Aguatero Viaje 1.00 1,200.00 1,200.00
EQ00042Q Micro para 21 personas Viaje 4.00 350.00 1,400.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1,133.05
Sub Total Costo Equipo: 54,533.05

4. GASTOS GENERALES 10.00% 9,580.14


5. UTILIDAD 10.00% 10,538.15
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 13,599.51
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 3,696.13
8. TOTAL PRECIO UNITARIO ADOPTADO 133,215.30
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Montaje de Obrador, Almacenes y Oficinas Cdigo: 1.2

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
Material e insumos para montaje de obrador Da 15.00 1,800.00 27,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 27,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
PP00105O Personal Hr 598.61 9.05 5,417.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 5,417.45
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 2,979.60
Sub Total Costo Mano de Obra: 8,397.05
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Da 15.00 168.00 2,520.00
EQ00014Q Camioneta 4 x 4 Da 15.00 84.00 1,260.00
EQ00062Q Grua de 30 ton Da 5.00 696.00 3,480.00
EQ00020Q Contenedor de almacn Da 10.00 50.00 500.00
EQ00021Q Contenedor de oficinas de 20 pies Da 10.00 50.00 500.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 251.91
Sub Total Costo Equipo: 8,511.91

4. GASTOS GENERALES 10.00% 4,390.90


5. UTILIDAD 10.00% 4,829.99
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 6,233.11
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,694.06
8. TOTAL PRECIO UNITARIO ADOPTADO 61,057.01
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Instalacin de Campamento (incluye comedor, sanitarios, servicios hidrosanitarios y elctricos,


ITEM: Cdigo: 1.3
dormitorios, sala de recreacin, etc.)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
Material e insumos para montaje campamento Da 15.00 2,500.00 37,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 37,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
PP00105O Personal Hr 999.69 9.05 9,047.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 9,047.20
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 4,975.96
Sub Total Costo Mano de Obra: 14,023.17
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Da 20.00 168.00 3,360.00
EQ00014Q Camioneta 4 x 4 Da 13.00 84.00 1,092.00
EQ00062Q Grua de 30 ton Da 5.00 696.00 3,480.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 420.69
Sub Total Costo Equipo: 8,352.69

4. GASTOS GENERALES 10.00% 5,987.59


5. UTILIDAD 10.00% 6,586.34
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 8,499.70
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 2,310.08
8. TOTAL PRECIO UNITARIO ADOPTADO 83,259.57
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Alimentacin para el personal de YPFB TRANSPORTE Cdigo: 1.4

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
Alimentacin Racin 1.00 5.59 5.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 5.59
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 0.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 0.00
Sub Total Costo Mano de Obra: 0.00
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 0.00
Sub Total Costo Equipo: 0.00

4. GASTOS GENERALES 10.00% 0.56


5. UTILIDAD 10.00% 0.61
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 0.79
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 0.22
8. TOTAL PRECIO UNITARIO ADOPTADO 7.77
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Lavado de ropa y limpieza de habitaciones para el personal de YPFB TRANSPORTE Cdigo: 1.5

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
Lavado de ropa Pers./da 1.00 7.98 7.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 7.98
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 0.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 0.00
Sub Total Costo Mano de Obra: 0.00
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 0.00
Sub Total Costo Equipo: 0.00

4. GASTOS GENERALES 10.00% 0.80


5. UTILIDAD 10.00% 0.88
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1.13
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 0.31
8. TOTAL PRECIO UNITARIO ADOPTADO 11.10
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Limpieza y Desmovilizacin de Equipos y Personal Cdigo: 1.6

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
Material para limpieza y desmovilizacin Da 15.00 1,000.00 15,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 15,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
PP00105O Personal Hr 835.80 9.05 7,563.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 7,563.96
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 4,160.18
Sub Total Costo Mano de Obra: 11,724.14
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Viaje 2.00 1,200.00 2,400.00
EQ00014Q Camioneta 4 x 4 Viaje 6.00 350.00 2,100.00
EQ00012Q Camin tracto con low boy Viaje 7.00 2,400.00 16,800.00
EQ00013Q Camin trailler con chata plana Viaje 4.00 2,400.00 9,600.00
EQ00015Q Cisterna Aguatero Viaje 1.00 1,200.00 1,200.00
EQ00042Q Micro para 21 personas Viaje 2.00 350.00 700.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 351.72
Sub Total Costo Equipo: 33,151.72

4. GASTOS GENERALES 10.00% 5,987.59


5. UTILIDAD 10.00% 6,586.34
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 8,499.70
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 2,310.08
8. TOTAL PRECIO UNITARIO ADOPTADO 83,259.57
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Transporte de equipos y materiales a la obra desde Almacenes de YPFB TRANSPORTE en Santa


ITEM: Cruz y devolucin de equipos y materiales sobrantes y/o desmontados hasta Almacenes de YPFB Cdigo: 1.7
TRANSPORTE en Santa Cruz

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
PP00105O Personal Hr 679.44 9.05 6,148.95
HR-0104O Inspector de Calidad Mecnico Hr 150.00 10.08 1,512.00
HR-0105O Inspector de Calidad Civil Hr 150.00 10.08 1,512.00
HR-0091O Coordinador de Calidad Hr 150.00 16.73 2,509.50
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 11,682.45
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 6,425.35
Sub Total Costo Mano de Obra: 18,107.80
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Viaje 2.00 1,200.00 2,400.00
EQ00014Q Camioneta 4 x 4 Viaje 8.00 350.00 2,800.00
EQ00013Q Camin trailler con chata plana Viaje 20.00 2,400.00 48,000.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 543.23
Sub Total Costo Equipo: 53,743.23

4. GASTOS GENERALES 10.00% 7,185.10


5. UTILIDAD 10.00% 7,903.61
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 10,199.64
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 2,772.10
8. TOTAL PRECIO UNITARIO ADOPTADO 99,911.48
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Validacin de la Ingeniera de Detalle Cdigo: 2.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0643M Material de escritorio diario Da 70.00 50.00 3,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0103O Ingeniero de Procesos Hr 70.00 31.49 2,204.30
PP00040O Ingeniero de proyecto ( Responsible de ingenieria) Hr 80.00 31.49 2,519.20
HR-0101O Ingeniero Elctrico Hr 70.00 16.73 1,171.10
HR-0102O Ingeniero Instrumental Hr 70.00 16.73 1,171.10
HR-0100O Ingeniero Mecnico Hr 70.00 16.73 1,171.10
HR-0099O Ingeniero Civil Hr 70.00 16.73 1,171.10
HR-0086O Cadista Mecnico Hr 69.12 13.04 901.29
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 10,309.19
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 5,670.05
Sub Total Costo Mano de Obra: 15,979.25
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 479.38
Sub Total Costo Equipo: 479.38

4. GASTOS GENERALES 10.00% 1,995.86


5. UTILIDAD 10.00% 2,195.45
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,833.23
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 770.03
8. TOTAL PRECIO UNITARIO ADOPTADO 27,753.19
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Reingeniera Bsica y de Detalle Cdigo: 2.2

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0643M Material de escritorio diario Da 70.00 50.00 3,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0103O Ingeniero de Procesos Hr 70.00 31.49 2,204.30
PP00040O Ingeniero de proyecto ( Responsible de ingenieria) Hr 80.00 31.49 2,519.20
HR-0101O Ingeniero Elctrico Hr 70.00 16.73 1,171.10
HR-0102O Ingeniero Instrumental Hr 70.00 16.73 1,171.10
HR-0100O Ingeniero Mecnico Hr 70.00 16.73 1,171.10
HR-0099O Ingeniero Civil Hr 70.00 16.73 1,171.10
HR-0086O Cadista Mecnico Hr 69.12 13.04 901.29
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 10,309.19
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 5,670.05
Sub Total Costo Mano de Obra: 15,979.25
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 479.38
Sub Total Costo Equipo: 479.38

4. GASTOS GENERALES 10.00% 1,995.86


5. UTILIDAD 10.00% 2,195.45
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,833.23
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 770.03
8. TOTAL PRECIO UNITARIO ADOPTADO 27,753.19
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Elaboracin de Procedimientos de Calidad QA/QC Cdigo: 2.3

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0643M Material de escritorio diario Da 20.00 50.00 1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0104O Inspector de Calidad Mecnico Hr 180.00 10.08 1,814.40
HR-0105O Inspector de Calidad Civil Hr 180.00 10.08 1,814.40
HR-0091O Coordinador de Calidad Hr 194.01 16.73 3,245.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 6,874.52
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 3,780.99
Sub Total Costo Mano de Obra: 10,655.51
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 319.67
Sub Total Costo Equipo: 319.67

4. GASTOS GENERALES 10.00% 1,197.52


5. UTILIDAD 10.00% 1,317.27
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,699.94
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 462.02
8. TOTAL PRECIO UNITARIO ADOPTADO 16,651.91
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Elaboracin de Procedimientos de Precomisionado y Comisionado Cdigo: 2.4

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0643M Material de escritorio diario Da 20.00 50.00 1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0104O Inspector de Calidad Mecnico Hr 180.00 10.08 1,814.40
HR-0105O Inspector de Calidad Civil Hr 180.00 10.08 1,814.40
HR-0091O Coordinador de Calidad Hr 194.01 16.73 3,245.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 6,874.52
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 3,780.99
Sub Total Costo Mano de Obra: 10,655.51
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 319.67
Sub Total Costo Equipo: 319.67

4. GASTOS GENERALES 10.00% 1,197.52


5. UTILIDAD 10.00% 1,317.27
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,699.94
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 462.02
8. TOTAL PRECIO UNITARIO ADOPTADO 16,651.91
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Planos conforme a obra Cdigo: 2.5

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0643M Material de escritorio diario Da 20.00 50.00 1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
PP00040O Ingeniero de proyecto ( Responsible de ingenieria) Hr 100.00 31.49 3,149.00
HR-0105O Inspector de Calidad Civil Hr 300.00 10.08 3,024.00
HR-0091O Coordinador de Calidad Hr 150.00 16.73 2,509.50
HR-0086O Cadista Mecnico Hr 200.00 13.04 2,608.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 11,290.50
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 6,209.78
Sub Total Costo Mano de Obra: 17,500.28
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00049Q Plotter da 16.42 300.00 4,925.06
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 525.01
Sub Total Costo Equipo: 5,450.07

4. GASTOS GENERALES 10.00% 2,395.03


5. UTILIDAD 10.00% 2,634.54
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,399.88
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 924.03
8. TOTAL PRECIO UNITARIO ADOPTADO 33,303.83
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Data Books y CD Cdigo: 2.6

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0643M Material de escritorio diario Da 17.95 350.00 6,281.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 6,281.88
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0104O Inspector de Calidad Mecnico Hr 300.00 10.08 3,024.00
HR-0105O Inspector de Calidad Civil Hr 300.00 10.08 3,024.00
HR-0091O Coordinador de Calidad Hr 300.00 16.73 5,019.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 11,067.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 6,086.85
Sub Total Costo Mano de Obra: 17,153.85
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 514.62
Sub Total Costo Equipo: 514.62

4. GASTOS GENERALES 10.00% 2,395.03


5. UTILIDAD 10.00% 2,634.54
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,399.88
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 924.03
8. TOTAL PRECIO UNITARIO ADOPTADO 33,303.83
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Planchadas (Trabajos de Corte y Relleno) Cdigo: 3.1.1.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 4,420.38 4.83 21,350.44
HR-0105O Inspector de Calidad Civil Hr 600.00 10.08 6,048.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 600.00 10.88 6,528.00
HR-0149O Topografo Hr 600.00 11.24 6,744.00
HR-0077O Alarifes Hr 1,200.00 5.48 6,576.00
HR-0089O Chofer camioneta Hr 600.00 6.33 3,798.00
HR-0090O Chofer equipo pesado Hr 1,600.00 8.79 14,064.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 65,108.44
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 35,809.64
Sub Total Costo Mano de Obra: 100,918.08
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00044Q Motoniveladora Hr. 300.00 84.00 25,200.00
EQ00074Q Volquete de 10 m3 Hr. 1000.00 16.70 16,700.00
EQ00056Q Tractor oruga D-6 Hr. 300.00 72.95 21,885.00
EQ00050Q Retroexcavadora Hr. 300.00 49.00 14,700.00
EQ00001Q Aguatero 15000 lts Hr. 600.00 32.75 19,650.00
EQ00060Q Vibrocompactador a rodillo Hr. 300.00 26.25 7,875.00
EQ00031Q Excavadora Tipo CAT-320/balde para roca Hr. 750.00 126.00 94,500.00
EQ00029Q Estacin Total Calibrada Hr. 600.00 17.50 10,500.00
EQ00014Q Camioneta 4 x 4 Hr. 600.00 10.50 6,300.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 3,027.54
Sub Total Costo Equipo: 220,337.54

4. GASTOS GENERALES 10.00% 32,125.56


5. UTILIDAD 10.00% 35,338.12
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 45,603.94
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 12,394.41
8. TOTAL PRECIO UNITARIO ADOPTADO 446,717.66
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Calles Internas Empedradas de la Estacin. Incluye losas de proteccin de


ITEM: Cdigo: 3.1.1.2
tuberas en cruces, cunetas, cordones de HS, etc.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0392M Ripio bruto m3 6.24 24.00 149.76
MAT0008M Agua potable lt 1,404.00 0.01 16.85
MAT0001M Acero de alta resistencia kg 507.00 1.22 618.54
MAT0134M Clavos de 2 1/2 pulg kg 15.60 3.80 59.28
MAT-099M Cordon de cemento m 2,504.20 21.55 53,965.51
MAT0349M Piedra manzana m3 610.88 38.00 23,213.44
MAT0050M Arenilla m3 4.68 15.32 71.70
MAT0665M Tierra para asiento de piedra o adoqun m3 114.54 25.00 2,863.50
MAT0118M Cemento portland Kg 2,730.00 0.19 509.96
MAT0664M Ripio de 1 pulg m3 16.80 25.86 434.45
Sub Total Costo Materiales: 81,902.98
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0081O Ayudante albanil Hr 3,806.93 4.80 18,285.93
HR-0078O Albail Hr 1,211.90 6.48 7,853.11
HR-0034O Inspector de Seguridad con SSMS-40 Hr 450.00 10.89 4,899.91
HR-0105O Inspector de Calidad Civil Hr 450.00 10.09 4,539.59
HR-0083O Ayudante general Hr 5,826.35 4.84 28,172.53
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 63,751.07
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 35,063.09
Sub Total Costo Mano de Obra: 98,814.16
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00044Q Motoniveladora Hr. 200.00 84.00 16,800.00
EQ00001Q Aguatero 15000 lts Hr. 450.00 32.76 14,742.00
EQ00056Q Tractor oruga D-6 Hr. 100.00 72.96 7,296.00
EQ00060Q Vibrocompactador a rodillo Hr. 200.00 26.25 5,250.00
EQ00074Q Volquete de 10 m3 Hr. 450.00 16.70 7,516.80
EQ00050Q Retroexcavadora Hr. 300.00 49.00 14,700.00
EQ00031Q Excavadora Tipo CAT-320 Hr. 180.00 126.00 22,680.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 2,964.42
Sub Total Costo Equipo: 91,949.22

4. GASTOS GENERALES 10.00% 27,266.64


5. UTILIDAD 10.00% 29,993.30
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 38,706.44
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 10,519.78
8. TOTAL PRECIO UNITARIO ADOPTADO 379,152.54
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Estabilizacin de Taludes de Planchadas con zampeado de piedra. Cdigo: 3.1.1.3

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0349M Piedra manzana m3 64.50 38.00 2,451.00
MAT0050M Arenilla m3 32.50 15.32 497.90
MAT0118M Cemento portland Kg 6,240.00 0.19 1,165.63
MAT0394M Ripio rodado m3 28.00 28.00 784.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 4,898.53
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0081O Ayudante albanil Hr 2,114.47 4.80 10,156.52
HR-0078O Albail Hr 500.00 6.48 3,240.00
HR-0149O Topografo Hr 100.00 11.24 1,124.00
HR-0077O Alarifes Hr 200.00 5.48 1,096.00
HR-0105O Inspector de Calidad Civil Hr 250.00 10.08 2,520.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 250.00 10.88 2,720.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 20,856.52
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 11,471.09
Sub Total Costo Mano de Obra: 32,327.61
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00031Q Excavadora Tipo CAT-320 Hr. 90.00 126.00 11,340.00
EQ00074Q Volquete de 10 m3 Hr. 100.00 16.70 1,670.40
EQ00001Q Aguatero 15000 lts Hr. 100.00 32.76 3,276.00
EQ00029Q Estacin Total Calibrada Hr. 100.00 17.50 1,750.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 969.83
Sub Total Costo Equipo: 19,006.23

4. GASTOS GENERALES 10.00% 5,623.24


5. UTILIDAD 10.00% 6,185.56
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 7,982.48
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 2,169.51
8. TOTAL PRECIO UNITARIO ADOPTADO 78,193.17
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Estabilizacin de Taludes de Calles internas de ms de 1m de altura con zampeado de piedra y de


ITEM: menos de 1 m de altura con grama y/u otra especie autctona aprobada por la fiscalizacin. Cdigo: 3.1.1.4
Incluye zanjas de coronamiento de tierra.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0349M Piedra manzana m3 43.60 38.00 1,656.80
MAT0050M Arenilla m3 26.00 15.32 398.32
MAT0118M Cemento portland Kg 3,850.00 0.19 719.18
MAT0394M Ripio rodado m3 24.00 28.00 672.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,446.30
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0081O Ayudante albanil Hr 946.29 4.80 4,545.35
HR-0078O Albail Hr 200.00 6.48 1,296.00
HR-0149O Topografo Hr 80.00 11.24 899.20
HR-0077O Alarifes Hr 100.00 5.48 548.00
HR-0105O Inspector de Calidad Civil Hr 120.00 10.08 1,209.60
HR-0034O Inspector de Seguridad con SSMS-40 Hr 120.00 10.88 1,305.60
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 9,803.75
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 5,392.06
Sub Total Costo Mano de Obra: 15,195.81
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00031Q Excavadora Tipo CAT-320 Hr. 45.00 126.00 5,670.00
EQ00074Q Volquete de 10 m3 Hr. 50.00 16.70 835.20
EQ00001Q Aguatero 15000 lts Hr. 50.00 32.76 1,638.00
EQ00029Q Estacin Total Calibrada Hr. 50.00 17.50 875.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 455.87
Sub Total Costo Equipo: 9,474.07

4. GASTOS GENERALES 10.00% 2,811.62


5. UTILIDAD 10.00% 3,092.78
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,991.24
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,084.75
8. TOTAL PRECIO UNITARIO ADOPTADO 39,096.58
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Restauracin de Camino de Ingreso a la Estacin, revestimiento de taludes con grama y/u otra
ITEM: especie autctona aprobada por la fiscalizacin, tablestacado, conformacin de cunetas y zanjas Cdigo: 3.1.1.5
de coronamiento de tierra.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0394M Ripio rodado m3 80.00 28.00 2,240.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 2,240.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0149O Topografo Hr 29.81 11.24 335.03
HR-0077O Alarifes Hr 59.65 5.48 326.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 661.91
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 364.05
Sub Total Costo Mano de Obra: 1,025.96
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00044Q Motoniveladora Hr. 40.00 84.00 3,360.00
EQ00001Q Aguatero 15000 lts Hr. 40.00 32.76 1,310.40
EQ00029Q Estacin Total Calibrada Hr. 30.00 17.50 525.00
EQ00074Q Volquete de 10 m3 Hr. 40.00 16.70 668.00
EQ00014Q Camioneta 4 x 4 Hr. 40.00 10.50 420.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 30.78
Sub Total Costo Equipo: 6,314.18

4. GASTOS GENERALES 10.00% 958.01


5. UTILIDAD 10.00% 1,053.82
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,359.95
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 369.61
8. TOTAL PRECIO UNITARIO ADOPTADO 13,321.53
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de las Fundaciones de HA de 4 Unidades de Compresin, Aeroenfriadores,


Soportes de Silenciadores, Soporte de Escapes y Tanques de Aceite de Motor. Incluye la provisin
ITEM: Cdigo: 3.1.2.1
e instalacin de pernos de anclaje, planchas de nivelacin y Sika Grout 212 (Canal de Lneas de
Compresores y Tapas metlicas separados en otro tem)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0271M Liso 3/8 plg. (10 mm.) Bar 12m. brra 1.50 12.33 18.50
MAT0667M Perno de Anclaje de 3/4 pulg x 0.533 m Pza 16.00 36.00 576.00
MAT0669M Jackscrew 1 1/2" Pza 56.00 38.00 2,128.00
MAT0293M Madera para encofrado p2 20,992.96 1.40 29,390.14
MAT0001M Acero de alta resistencia kg 19,104.00 1.22 23,306.88
MAT0269M Liso 1/4 plg. (6 mm.) Bar 12m. brra 1.50 2.82 4.22
MAT0273M Liso 5/8 plg. (16 mm.) Bar 12m. brra 1.50 19.76 29.64
MAT-103M Perno de Anclaje de 1 pulg x 0.850 m pza 40.00 45.00 1,800.00
MAT0646M Perno de Anclaje de 3/4 pulg x 0.635 m pza 16.00 40.00 640.00
MAT0050M Arenilla m3 185.23 15.32 2,837.75
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 0.32 70.65 22.25
MAT0008M Agua potable lt 55,569.60 0.01 666.84
MAT0134M Clavos de 2 1/2 pulg kg 617.44 3.80 2,346.27
MAT0392M Ripio bruto m3 246.98 24.00 5,927.42
MAT0118M Cemento portland Kg 101,990.10 0.19 19,051.75
MAT0668M Perno de Anclaje de 3/4 pulg x 0.831 m Pza 16.00 45.00 720.00
MAT0339M PERNO PRIS. 1 1/8pulg X 7 1/2pulg ASTM A 193.GR B7 A 1 Pza 56.00 24.08 1,348.48
MAT-027M Perno de anclaje de 1/2pulg x 356 mm Pza 16.00 6.90 110.40
MAT0666M Perno de anclaje de 5/8 pulg x 0.356 m Pza 80.00 24.00 1,920.00
MAT0024M Alambre de amarre kg 463.08 3.80 1,759.70
Sub Total Costo Materiales: 94,604.26
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 6,580.00 6.48 42,638.40
HR-0081O Ayudante albanil Hr 6,174.00 4.80 29,655.78
HR-0105O Inspector de Calidad Civil Hr 354.00 10.09 3,571.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 75,865.32
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 41,725.93
Sub Total Costo Mano de Obra: 117,591.25
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00031Q Excavadora Tipo CAT-320 Hr 39.91 126.00 5,028.09
EQ00001Q Aguatero 15000 lts Hr 20.04 32.76 656.51
EQ00059Q Vibradora de inmersion Hr 216.10 4.20 907.64
EQ00041Q Mezcladora de Hormign 360 lts Hr 24.70 5.25 129.66
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 3,527.74
Sub Total Costo Equipo: 10,249.64

4. GASTOS GENERALES 10.00% 22,244.52


5. UTILIDAD 10.00% 24,468.97
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 31,577.27
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 8,582.19
8. TOTAL PRECIO UNITARIO ADOPTADO 309,318.10
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de la Fundacin de HA y Anclajes para Venteo (V-5200). Incluye el colocado de


ITEM: Cdigo: 3.1.2.2
pernos de anclaje y planchas de nivelacin (Segn Planos)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0050M Arenilla m3 3.35 15.32 51.32
MAT0008M Agua potable lt 1,162.80 0.01 13.95
MAT0134M Clavos de 2 1/2 pulg kg 6.50 3.80 24.70
MAT0668M Perno de Anclaje de 3/4 pulg x 0.831 m Pza 12.00 45.00 540.00
MAT0118M Cemento portland Kg 1,965.20 0.19 367.10
MAT0001M Acero de alta resistencia kg 618.45 1.22 754.51
MAT0392M Ripio bruto m3 4.65 24.00 111.60
MAT0293M Madera para encofrado p2 125.36 1.40 175.50
MAT0268M Liso 1/2 plg. (12 mm.) Bar 12m. m 0.50 0.97 0.48
MAT0024M Alambre de amarre kg 7.60 3.80 28.88
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 2,068.05
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 163.58 6.48 1,060.00
HR-0081O Ayudante albanil Hr 96.20 4.80 462.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,522.09
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 837.15
Sub Total Costo Mano de Obra: 2,359.24
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 0.52 4.20 2.18
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.52 5.25 2.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 70.78
Sub Total Costo Equipo: 75.68

4. GASTOS GENERALES 10.00% 450.30


5. UTILIDAD 10.00% 495.33
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 639.22
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 173.73
8. TOTAL PRECIO UNITARIO ADOPTADO 6,261.55
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de la Fundacin de HA y Anclajes para Pararrayos PR-01 y PR-02. Debe Incluir el


ITEM: colocado de pernos de anclaje, planchas de nivelacin y la provisin e instalacin de las dos Cdigo: 3.1.2.3
torres para los pararrayos (Segn Planos)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0670M Grampas para cable de 3/16" PZa 180.00 8.50 1,530.00
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 12.00 35.00 420.00
MAT0134M Clavos de 2 1/2 pulg kg 20.32 3.80 77.22
MAT-003M Tubera 2pulg Sch-40 m 23.34 22.00 513.48
MAT0293M Madera para encofrado p2 690.88 1.40 967.23
MAT0271M Liso 3/8 plg. (10 mm.) Bar 12m. brra 257.04 12.33 3,170.33
MAT0024M Alambre de amarre kg 15.24 3.80 57.91
MAT0672M Tesador para cable de 3/16" PZa 30.00 25.00 750.00
MAT0050M Arenilla m3 6.10 15.32 93.39
MAT0001M Acero de alta resistencia kg 1,159.20 1.22 1,414.22
MAT0008M Agua potable lt 1,828.80 0.01 21.95
MAT-007M Angular 2pulg x 1/4pulg m 13.32 6.25 83.25
MAT0392M Ripio bruto m3 8.13 24.00 195.07
MAT0118M Cemento portland Kg 3,383.00 0.19 631.94
MAT-004M Tubera 3pulg Sch-40 m 23.34 38.00 886.92
MAT-027M Perno de anclaje de 1/2pulg x 356 mm Pza 18.00 6.90 124.20
MAT0273M Liso 5/8 plg. (16 mm.) Bar 12m. brra 114.90 19.76 2,270.19
MAT0671M Guarda Cabo para cable de 3/16" Pza 60.00 12.00 720.00
0.00
0.00
Sub Total Costo Materiales: 13,927.31
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
PP00091O Pintor Hr 30.00 5.50 165.00
HR-0083O Ayudante general Hr 22.24 4.84 107.54
HR-0034O Inspector de Seguridad con SSMS-40 Hr 60.00 10.89 653.32
HR-0104O Inspector de Calidad Mecnico Hr 30.00 10.89 326.66
HR-0131O Soldador de Estructura Calificado Hr 60.00 11.29 677.34
HR-0081O Ayudante albanil Hr 200.68 4.80 963.91
HR-0080O Amolador Hr 60.00 7.06 423.68
PP00047O Inspector de Soldadura Nivel I Hr 30.00 20.42 612.48
HR-0078O Albail Hr 331.10 6.48 2,145.53
0.00
SUBTOTAL MANO DE OBRA 6,075.47
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 3,341.51
Sub Total Costo Mano de Obra: 9,416.97
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00045Q Motosoldadora 250 D Hr 60.00 7.81 468.75
EQ00059Q Vibradora de inmersion Hr 0.81 4.20 3.40
EQ00056Q Tractor oruga D-6 Hr 0.56 72.96 40.57
EQ00031Q Excavadora Tipo CAT-320/balde para roca Hr 0.83 126.00 105.08
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.81 5.25 4.27
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 282.51
Sub Total Costo Equipo: 904.58

4. GASTOS GENERALES 10.00% 2,424.89


5. UTILIDAD 10.00% 2,667.37
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,442.25
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 935.55
8. TOTAL PRECIO UNITARIO ADOPTADO 33,718.93
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de la Fundacin de HA para V-5000. Incluye el colocado de pernos de anclaje y


ITEM: Cdigo: 3.1.2.4
planchas de nivelacin (Segn Planos)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0008M Agua potable lt 288.00 0.01 3.46
MAT0392M Ripio bruto m3 1.28 24.00 30.72
MAT0667M Perno de Anclaje de 3/4 pulg x 0.533 m Pza 4.00 36.00 144.00
MAT0293M Madera para encofrado p2 50.00 1.40 70.00
MAT0050M Arenilla m3 0.96 15.32 14.71
MAT0024M Alambre de amarre kg 2.40 3.80 9.12
MAT0134M Clavos de 2 1/2 pulg kg 3.20 3.80 12.16
MAT0118M Cemento portland Kg 465.00 0.19 86.86
MAT0001M Acero de alta resistencia kg 152.00 1.22 185.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 556.47
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 44.00 6.48 285.12
HR-0081O Ayudante albanil Hr 33.00 4.80 158.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 443.63
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 244.00
Sub Total Costo Mano de Obra: 687.63
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.54 5.25 2.84
EQ00059Q Vibradora de inmersion Hr 0.53 4.20 2.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 20.63
Sub Total Costo Equipo: 25.69

4. GASTOS GENERALES 10.00% 126.98


5. UTILIDAD 10.00% 139.68
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 180.25
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 48.99
8. TOTAL PRECIO UNITARIO ADOPTADO 1,765.68
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de las Fundaciones de HA para V-5100, V-5600 & F-5700. Incluye el colocado de
ITEM: Cdigo: 3.1.2.5
pernos de anclaje y planchas de nivelacin (Segn Planos)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0293M Madera para encofrado p2 237.60 1.40 332.64
MAT0050M Arenilla m3 3.02 15.32 46.33
MAT0646M Perno de Anclaje de 3/4 pulg x 0.635 m pza 12.00 40.00 480.00
MAT0118M Cemento portland Kg 1,512.00 0.19 282.44
MAT0001M Acero de alta resistencia kg 280.80 1.22 342.58
MAT0134M Clavos de 2 1/2 pulg kg 3.50 3.80 13.30
MAT0392M Ripio bruto m3 3.48 24.00 83.52
MAT0024M Alambre de amarre kg 5.60 3.80 21.28
MAT0008M Agua potable lt 777.60 0.01 9.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,611.42
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 98.85 6.48 640.55
HR-0081O Ayudante albanil Hr 74.37 4.80 357.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 997.76
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 548.77
Sub Total Costo Mano de Obra: 1,546.54
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.55 5.25 2.89
EQ00059Q Vibradora de inmersion Hr 0.55 4.20 2.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 46.40
Sub Total Costo Equipo: 51.59

4. GASTOS GENERALES 10.00% 320.95


5. UTILIDAD 10.00% 353.05
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 455.61
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 123.83
8. TOTAL PRECIO UNITARIO ADOPTADO 4,462.99
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Estructura y Cubierta Metlica para Clamp On. Incluye el colocado de pernos de
ITEM: Cdigo: 3.1.2.6
anclaje y planchas de nivelacin (Segn Planos)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-013M Cumbrera para cubierta con pernos de fijacin m 3.00 8.00 24.00
MAT0001M Acero de alta resistencia kg 44.40 1.22 54.17
MAT-017M Plancha metlica de 3/8pulg (10 mm) 2x1 m2 0.09 95.20 8.76
MAT0050M Arenilla m3 0.26 15.32 3.95
MAT-014M Calamina Trapezoidal # 28 con pernos de fijacin m2 8.76 12.00 105.12
MAT0392M Ripio bruto m3 0.34 24.00 8.26
MAT0008M Agua potable lt 77.40 0.01 0.93
MAT0024M Alambre de amarre kg 0.65 3.80 2.45
MAT-004M Tubera 3pulg Sch-40 m 23.70 38.00 900.60
MAT0134M Clavos de 2 1/2 pulg kg 0.86 3.80 3.27
MAT0118M Cemento portland Kg 129.74 0.19 24.24
MAT0293M Madera para encofrado p2 29.24 1.40 40.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,176.67
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 45.00 6.48 291.60
HR-0081O Ayudante albanil Hr 45.00 4.80 216.15
PP00091O Pintor Hr 25.00 5.50 137.50
HR-0131O Soldador de Estructura Calificado Hr 22.00 11.29 248.36
HR-0080O Amolador Hr 22.00 7.06 155.35
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,048.96
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 576.93
Sub Total Costo Mano de Obra: 1,625.88
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 1.32 4.20 5.52
EQ00041Q Mezcladora de Hormign 360 lts Hr 1.31 5.25 6.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 48.78
Sub Total Costo Equipo: 61.18

4. GASTOS GENERALES 10.00% 286.37


5. UTILIDAD 10.00% 315.01
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 406.52
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 110.49
8. TOTAL PRECIO UNITARIO ADOPTADO 3,982.13
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Losa y Cubierta Metlica para Medicin y Regulacin de Gas para Vivienda de
ITEM: Cdigo: 3.1.2.7
Operadores (Segn Planos).

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0001M Acero de alta resistencia kg 75.60 1.22 92.23
MAT0024M Alambre de amarre kg 1.25 3.80 4.73
MAT-013M Cumbrera para cubierta con pernos de fijacin m 1.80 8.00 14.40
MAT0118M Cemento portland Kg 221.30 0.19 41.34
MAT0293M Madera para encofrado p2 56.44 1.40 79.02
MAT-003M Tubera 2pulg Sch-40 m 11.12 22.00 244.64
MAT0050M Arenilla m3 0.50 15.32 7.63
MAT-014M Calamina Trapezoidal # 28 con pernos de fijacin m2 1.88 12.00 22.56
MAT0392M Ripio bruto m3 0.66 24.00 15.94
MAT0008M Agua potable lt 149.40 0.01 1.79
MAT0134M Clavos de 2 1/2 pulg kg 1.66 3.80 6.31
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 3.50 35.00 122.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 653.08
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 54.00 6.48 349.92
HR-0081O Ayudante albanil Hr 78.21 4.80 375.67
PP00091O Pintor Hr 25.00 5.50 137.50
HR-0131O Soldador de Estructura Calificado Hr 40.00 11.29 451.56
HR-0080O Amolador Hr 80.00 7.06 564.90
HR-0105O Inspector de Calidad Civil Hr 25.00 10.08 252.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 25.00 10.88 272.00
HR-0149O Topografo Hr 15.00 11.24 168.60
HR-0077O Alarifes Hr 30.00 5.48 164.40
0.00
SUBTOTAL MANO DE OBRA 2,736.56
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,505.11
Sub Total Costo Mano de Obra: 4,241.66
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00045Q Motosoldadora 250 D Hr 40.00 7.81 312.50
EQ00059Q Vibradora de inmersion Hr 2.00 4.20 8.40
EQ00041Q Mezcladora de Hormign 360 lts Hr 2.00 5.25 10.50
EQ00017Q Compresor 180 cfm - 85 psi Hr 25.00 28.00 700.00
EQ00087Q Equipo de pintura tipo air less Hr 25.00 5.00 125.00
EQ00029Q Estacin Total Calibrada Hr. 15.00 17.50 262.50
EQ00014Q Camioneta 4 x 4 Hr. 20.00 10.50 210.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 127.25
Sub Total Costo Equipo: 1,756.15

4. GASTOS GENERALES 10.00% 665.09


5. UTILIDAD 10.00% 731.60
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 944.13
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 256.60
8. TOTAL PRECIO UNITARIO ADOPTADO 9,248.31
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Bases de HA, Soportes de Tuberas y Grampas, rea de Compresores y Rack


ITEM: Cdigo: 3.1.2.8
de Lneas

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0118M Cemento portland Kg 13,205.00 0.19 2,466.69
MAT-106M Grampa Tipo GT1 para 16 pulg Pza 5.00 45.00 225.00
MAT0392M Ripio bruto m3 33.54 24.00 805.06
MAT-074M U Bolt para 4pulg Pza 8.00 10.00 80.00
MAT-043M Perfil C (0.12x0.070x0.006) m 4.24 18.38 77.93
MAT-053M Grampa Tipo GT1 para 6pulg Pza 8.00 20.00 160.00
MAT-018M Plancha metlica de 1/2pulg (12 mm) 2x1 m2 0.44 116.16 51.11
MAT-067M Grampa Tipo GT4 para 6pulg Pza 4.00 35.00 140.00
MAT-060M Grampa Tipo GT2 para 6pulg Pza 6.00 25.00 150.00
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 1.96 70.65 138.47
MAT0134M Clavos de 2 1/2 pulg kg 83.86 3.80 318.67
MAT-061M Grampa Tipo GT2 para 8pulg Pza 4.00 30.00 120.00
MAT-072M U Bolt para 2pulg Pza 51.00 6.00 306.00
MAT0001M Acero de alta resistencia kg 4,521.60 1.22 5,516.35
MAT-068M Grampa Tipo GT4 para 8pulg Pza 4.00 40.00 160.00
MAT-028M Perno de anclaje de 5/8pulg x 432 mm Pza 204.00 7.50 1,530.00
MAT-056M Grampa Tipo GT1 para 12pulg Pza 16.00 40.00 640.00
MAT0293M Madera para encofrado p2 2,851.24 1.40 3,991.74
MAT-050M Grampa Tipo GT1 para 2pulg Pza 62.00 10.00 620.00
MAT0024M Alambre de amarre kg 62.90 3.80 239.00
MAT-007M Angular 2pulg x 1/4pulg m 0.25 6.25 1.56
MAT0050M Arenilla m3 25.16 15.32 385.42
MAT-078M U Bolt para 12pulg Pza 6.00 25.00 150.00
MAT-051M Grampa Tipo GT1 para 3pulg Pza 37.00 12.00 444.00
MAT-107M U Bolt para 1/2 pulg Pza 18.00 2.50 45.00
MAT0644M Grouting Cementicio - 25 kg Kg 22.53 2.32 52.27
MAT-071M U Bolt para 1pulg Pza 4.00 5.00 20.00
MAT-108M U Bolt para 3/4 pulg Pza 48.00 3.80 182.40
MAT-041M Perfil I (6pulg x 6pulg x 1/4pulg) m 62.30 35.00 2,180.50
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 45.00 35.00 1,575.00
MAT-104M Grampa tipo GT1 para 3/4" Pza 12.00 6.50 78.00
MAT-105M Grampa Tipo GT1 para 1 pulg Pza 24.00 8.00 192.00
MAT0008M Agua potable lt 7,547.40 0.01 90.57
MAT0213M Fierro redondo de 1/2 ml 3.20 1.92 6.14
MAT-052M Grampa Tipo GT1 para 4pulg Pza 17.00 15.00 255.00
MAT-042M Perfil C (0.20x0.15x0.006) m 10.05 35.33 355.07
MAT-054M Grampa Tipo GT1 para 8pulg Pza 18.00 25.00 450.00
Sub Total Costo Materiales: 24,198.95
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 1,382.97 6.48 8,961.65
HR-0081O Ayudante albanil Hr 838.60 4.80 4,028.08
PP00091O Pintor Hr 100.00 5.50 550.00
HR-0131O Soldador de Estructura Calificado Hr 300.00 11.29 3,386.72
HR-0080O Amolador Hr 300.00 7.06 2,118.39
HR-0105O Inspector de Calidad Civil Hr 150.00 10.08 1,512.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 150.00 10.88 1,632.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 22,188.84
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 12,203.86
Sub Total Costo Mano de Obra: 34,392.70
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00045Q Motosoldadora 250 D Hr 300.00 7.81 2,343.75
EQ00059Q Vibradora de inmersion Hr 3.35 4.20 14.07
EQ00041Q Mezcladora de Hormign 360 lts Hr 3.35 5.25 17.59
EQ00017Q Compresor 180 cfm - 85 psi Hr 100.00 28.00 2,800.00
EQ00087Q Equipo de pintura tipo air less Hr 100.00 5.00 500.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1,031.78
Sub Total Costo Equipo: 6,707.19

4. GASTOS GENERALES 10.00% 6,529.88


5. UTILIDAD 10.00% 7,182.87
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 9,269.52
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 2,519.30
8. TOTAL PRECIO UNITARIO ADOPTADO 90,800.42
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Bases de HA, Soportes de Tuberas y Grampas, rea de Facilidades, de


ITEM: Cdigo: 3.1.2.9
Trampas de Chancho, Flash Separador (V-5000) (Segn Planos).

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-074M U Bolt para 4pulg Pza 4.00 10.00 40.00
MAT-041M Perfil I (6pulg x 6pulg x 1/4pulg) m 119.84 35.00 4,194.40
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 9.77 70.65 690.25
MAT0392M Ripio bruto m3 33.83 24.00 811.97
MAT0001M Acero de alta resistencia kg 4,520.40 1.22 5,514.89
MAT-042M Perfil C (0.20x0.15x0.006) m 4.91 35.33 173.47
MAT-007M Angular 2pulg x 1/4pulg m 1.25 6.25 7.81
MAT-071M U Bolt para 1pulg Pza 24.00 5.00 120.00
MAT0134M Clavos de 2 1/2 pulg kg 84.58 3.80 321.40
MAT-072M U Bolt para 2pulg Pza 48.00 6.00 288.00
MAT-109M U Bolt para 2 1/2 pulg Pza 16.00 7.00 112.00
MAT-009M Angular 1 1/2pulg x 1/4pulg m 9.60 6.25 60.00
MAT0008M Agua potable lt 7,612.20 0.01 91.35
MAT0644M Grouting Cementicio - 25 kg Kg 21.11 2.32 48.98
MAT0118M Cemento portland Kg 13,202.98 0.19 2,466.32
MAT-018M Plancha metlica de 1/2pulg (12 mm) 2x1 m2 3.66 116.16 425.15
MAT0293M Madera para encofrado p2 2,875.72 1.40 4,026.01
MAT0024M Alambre de amarre kg 63.44 3.80 241.05
MAT-110M Angular de 4 pulg x 1/4 pulg m 12.96 42.00 544.32
MAT0050M Arenilla m3 25.37 15.32 388.73
MAT-006M Angular 3pulg x 1/4pulg m 13.18 9.27 122.18
MAT0213M Fierro redondo de 1/2 ml 113.40 1.92 217.73
MAT-073M U Bolt para 3pulg Pza 5.00 8.00 40.00
0.00
0.00
Sub Total Costo Materiales: 20,945.99
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 1,395.57 6.48 9,043.29
HR-0081O Ayudante albanil Hr 1,395.57 4.80 6,703.39
PP00091O Pintor Hr 180.00 5.50 990.00
HR-0131O Soldador de Estructura Calificado Hr 300.00 11.29 3,386.72
HR-0080O Amolador Hr 300.00 7.06 2,118.39
HR-0105O Inspector de Calidad Civil Hr 100.00 10.08 1,008.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 100.00 10.88 1,088.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 24,337.79
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 13,385.78
Sub Total Costo Mano de Obra: 37,723.58
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00045Q Motosoldadora 250 D Hr 300.00 7.81 2,343.75
EQ00059Q Vibradora de inmersion Hr 22.36 4.20 93.91
EQ00041Q Mezcladora de Hormign 360 lts Hr 22.35 5.25 117.34
EQ00017Q Compresor 180 cfm - 85 psi Hr 150.00 28.00 4,200.00
EQ00087Q Equipo de pintura tipo air less Hr 180.00 5.00 900.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1,131.71
Sub Total Costo Equipo: 8,786.71

4. GASTOS GENERALES 10.00% 6,745.63


5. UTILIDAD 10.00% 7,420.19
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 9,575.78
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 2,602.54
8. TOTAL PRECIO UNITARIO ADOPTADO 93,800.42
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Base de H A para Antena Satelital de 700 x 700 x 800 mm con soporte de
ITEM: Cdigo: 3.1.2.10
tubera galvanizada de 3"

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0293M Madera para encofrado p2 120.36 1.40 168.50
MAT0644M Grouting Cementicio - 25 kg Kg 0.49 2.32 1.14
MAT0024M Alambre de amarre kg 2.66 3.80 10.09
MAT0118M Cemento portland Kg 508.78 0.19 95.04
MAT0001M Acero de alta resistencia kg 174.00 1.22 212.28
MAT0134M Clavos de 2 1/2 pulg kg 3.54 3.80 13.45
MAT0050M Arenilla m3 1.06 15.32 16.27
MAT0008M Agua potable lt 318.60 0.01 3.82
MAT0392M Ripio bruto m3 1.42 24.00 33.98
MAT-004M Tubera 3pulg Sch-40 m 2.50 38.00 95.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 649.58
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 89.41 6.48 579.38
HR-0081O Ayudante albanil Hr 89.41 4.80 429.47
HR-0105O Inspector de Calidad Civil Hr 20.00 10.08 201.60
HR-0034O Inspector de Seguridad con SSMS-40 Hr 20.00 10.88 217.60
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,428.04
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 785.42
Sub Total Costo Mano de Obra: 2,213.47
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 3.91 4.20 16.40
EQ00041Q Mezcladora de Hormign 360 lts Hr 3.90 5.25 20.49
EQ00014Q Camioneta 4 x 4 Hr 20.00 10.50 210.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 66.40
Sub Total Costo Equipo: 313.29

4. GASTOS GENERALES 10.00% 317.63


5. UTILIDAD 10.00% 349.40
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 450.90
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 122.55
8. TOTAL PRECIO UNITARIO ADOPTADO 4,416.81
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Escaleras de HA con barandas metlicas (EH-01). Cdigo: 3.1.3.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 5.00 35.00 175.00
MAT0001M Acero de alta resistencia kg 100.80 1.22 122.98
MAT0293M Madera para encofrado p2 57.12 1.40 79.97
MAT-002M Tubera 1 1/2pulg SCH-40 m 34.19 12.00 410.28
MAT0050M Arenilla m3 0.50 15.32 7.72
MAT-081M Perno de 1/2pulg para sujecin Pza 20.00 2.01 40.20
MAT-003M Tubera 2pulg Sch-40 m 2.20 22.00 48.40
MAT0008M Agua potable lt 151.20 0.01 1.81
MAT0024M Alambre de amarre kg 1.26 3.80 4.79
MAT-016M Plancha metlica de 5/16pulg (8 mm) 2x1 m2 1.00 74.24 74.24
MAT0392M Ripio bruto m3 0.67 24.00 16.13
MAT0134M Clavos de 2 1/2 pulg kg 1.68 3.80 6.38
MAT0240M Insumos diarios para soldadura da 1.00 70.00 70.00
MAT0118M Cemento portland Kg 294.00 0.19 54.92
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,112.82
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 42.60 6.48 276.05
HR-0081O Ayudante albanil Hr 88.56 4.80 425.38
HR-0105O Inspector de Calidad Civil Hr 10.00 10.08 100.80
HR-0034O Inspector de Seguridad con SSMS-40 Hr 10.00 10.88 108.80
PP00091O Pintor Hr 20.00 5.50 110.00
HR-0131O Soldador de Estructura Calificado Hr 15.00 11.29 169.34
HR-0080O Amolador Hr 15.00 7.06 105.92
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,296.29
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 712.96
Sub Total Costo Mano de Obra: 2,009.24
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 3.89 4.20 16.32
EQ00041Q Mezcladora de Hormign 360 lts Hr 3.89 5.25 20.42
EQ00045Q Motosoldadora 250 D Hr 15.00 7.81 117.19
EQ00017Q Compresor 180 cfm - 85 psi Hr 5.00 28.00 140.00
EQ00087Q Equipo de pintura tipo air less Hr 10.00 5.00 50.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 60.28
Sub Total Costo Equipo: 404.20

4. GASTOS GENERALES 10.00% 352.63


5. UTILIDAD 10.00% 387.89
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 500.57
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 136.05
8. TOTAL PRECIO UNITARIO ADOPTADO 4,903.40
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin y Montaje de Escaleras Metlicas Tipo EM-01 sobre Fundaciones de HA, con
ITEM: Cdigo: 3.1.3.2
barandas metlicas.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0293M Madera para encofrado p2 57.12 1.40 79.97
MAT0240M Insumos diarios para soldadura da 6.00 70.00 420.00
MAT-003M Tubera 2pulg Sch-40 m 2.20 22.00 48.40
MAT0008M Agua potable lt 151.20 0.01 1.81
MAT-079M Grating (1 1/4pulg x 3/16pulg) m2 4.97 120.00 596.40
MAT0118M Cemento portland Kg 294.00 0.19 54.92
MAT0024M Alambre de amarre kg 1.26 3.80 4.79
MAT0050M Arenilla m3 0.50 15.32 7.72
MAT0134M Clavos de 2 1/2 pulg kg 1.68 3.80 6.38
MAT-016M Plancha metlica de 5/16pulg (8 mm) 2x1 m2 1.00 74.24 74.24
MAT-111M Perfil "C" prefabricado (6"x3"x1/4") m 14.93 22.00 328.46
MAT-081M Perno de 1/2pulg para sujecin Pza 20.00 2.01 40.20
MAT0392M Ripio bruto m3 0.67 24.00 16.13
MAT0001M Acero de alta resistencia kg 100.80 1.22 122.98
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 20.00 35.00 700.00
MAT-002M Tubera 1 1/2pulg SCH-40 m 34.19 12.00 410.28
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 2,912.68
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 28.67 6.48 185.78
HR-0081O Ayudante albanil Hr 38.80 4.80 186.37
HR-0105O Inspector de Calidad Civil Hr 10.00 10.08 100.80
HR-0034O Inspector de Seguridad con SSMS-40 Hr 10.00 10.88 108.80
PP00091O Pintor Hr 20.00 5.50 110.00
HR-0131O Soldador de Estructura Calificado Hr 30.00 11.29 338.67
HR-0080O Amolador Hr 30.00 7.06 211.84
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,242.26
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 683.24
Sub Total Costo Mano de Obra: 1,925.51
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 4.16 4.20 17.47
EQ00041Q Mezcladora de Hormign 360 lts Hr 4.16 5.25 21.84
EQ00014Q Camioneta 4 x 4 Hr 30.00 10.50 315.00
EQ00045Q Motosoldadora 250 D Hr 30.00 7.81 234.38
EQ00017Q Compresor 180 cfm - 85 psi Hr 10.00 28.00 280.00
EQ00087Q Equipo de pintura tipo air less Hr 25.00 5.00 125.00
EQ00009Q Camin Hidrogra 3 ton Hr 2.00 21.00 42.00
EQ00013Q Camin trailler con chata plana Hr 2.00 21.00 42.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 57.77
Sub Total Costo Equipo: 1,135.45

4. GASTOS GENERALES 10.00% 597.36


5. UTILIDAD 10.00% 657.10
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 847.99
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 230.47
8. TOTAL PRECIO UNITARIO ADOPTADO 8,306.56
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin y Montaje de Escaleras Metlicas Tipo EM-02 Y EM-03 (1 de cada tipo) sobre
ITEM: Cdigo: 3.1.3.3
Fundaciones de HA, con barandas metlicas.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 76.00 35.00 2,660.00
MAT-079M Grating (1 1/4pulg x 3/16pulg) m2 36.00 120.00 4,320.00
MAT0134M Clavos de 2 1/2 pulg kg 6.72 3.80 25.54
MAT-002M Tubera 1 1/2pulg SCH-40 m 196.70 12.00 2,360.40
MAT0392M Ripio bruto m3 2.69 24.00 64.51
MAT-081M Perno de 1/2pulg para sujecin Pza 20.00 2.01 40.20
MAT0118M Cemento portland Kg 1,176.00 0.19 219.68
MAT0293M Madera para encofrado p2 228.48 1.40 319.87
MAT0050M Arenilla m3 2.02 15.32 30.89
MAT-111M Perfil "C" prefabricado (6"x3"x1/4") m 72.41 22.00 1,593.06
MAT0024M Alambre de amarre kg 5.04 3.80 19.15
MAT0240M Insumos diarios para soldadura da 15.00 70.00 1,050.00
MAT-003M Tubera 2pulg Sch-40 m 7.92 22.00 174.24
MAT0001M Acero de alta resistencia kg 403.20 1.22 491.90
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 3.08 70.65 217.60
MAT0008M Agua potable lt 604.80 0.01 7.26
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 13,594.30
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 52.80 6.48 342.14
HR-0081O Ayudante albanil Hr 38.85 4.80 186.61
HR-0105O Inspector de Calidad Civil Hr 25.00 10.08 252.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 25.00 10.88 272.00
PP00091O Pintor Hr 40.00 5.50 220.00
HR-0131O Soldador de Estructura Calificado Hr 100.00 11.29 1,128.91
HR-0080O Amolador Hr 100.00 7.06 706.13
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 3,107.79
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,709.28
Sub Total Costo Mano de Obra: 4,817.07
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 4.60 4.20 19.32
EQ00041Q Mezcladora de Hormign 360 lts Hr 4.60 5.25 24.17
EQ00014Q Camioneta 4 x 4 Hr 20.00 10.50 210.00
EQ00045Q Motosoldadora 250 D Hr 100.00 7.81 781.25
EQ00017Q Compresor 180 cfm - 85 psi Hr 40.00 28.00 1,120.00
EQ00087Q Equipo de pintura tipo air less Hr 40.00 5.00 200.00
EQ00009Q Camin Hidrogra 3 ton Hr 20.00 21.00 420.00
EQ00013Q Camin trailler con chata plana Hr 20.00 21.00 420.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 144.51
Sub Total Costo Equipo: 3,339.25

4. GASTOS GENERALES 10.00% 2,175.06


5. UTILIDAD 10.00% 2,392.57
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,087.62
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 839.16
8. TOTAL PRECIO UNITARIO ADOPTADO 30,245.04
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin y Montaje de Escalera Metlica Tipo EM-04 sobre Fundaciones de HA, con
ITEM: Cdigo: 3.1.3.4
barandas metlicas.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-003M Tubera 2pulg Sch-40 m 2.20 22.00 48.40
MAT0001M Acero de alta resistencia kg 67.20 1.22 81.98
MAT0392M Ripio bruto m3 0.45 24.00 10.75
MAT-079M Grating (1 1/4pulg x 3/16pulg) m2 3.96 120.00 475.20
MAT0050M Arenilla m3 0.34 15.32 5.15
MAT-002M Tubera 1 1/2pulg SCH-40 m 32.03 12.00 384.36
MAT0008M Agua potable lt 100.80 0.01 1.21
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 3.08 70.65 217.60
MAT0293M Madera para encofrado p2 38.08 1.40 53.31
MAT-081M Perno de 1/2pulg para sujecin Pza 12.00 2.01 24.12
MAT-111M Perfil "C" prefabricado (6"x3"x1/4") m 8.16 22.00 179.52
MAT0240M Insumos diarios para soldadura da 4.00 70.00 280.00
MAT0134M Clavos de 2 1/2 pulg kg 1.12 3.80 4.26
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 13.20 35.00 462.00
MAT0024M Alambre de amarre kg 0.84 3.80 3.19
MAT0118M Cemento portland Kg 196.00 0.19 36.61
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 2,267.67
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 18.50 6.48 119.88
HR-0081O Ayudante albanil Hr 13.50 4.80 64.85
HR-0105O Inspector de Calidad Civil Hr 10.00 10.08 100.80
HR-0034O Inspector de Seguridad con SSMS-40 Hr 10.00 10.88 108.80
PP00091O Pintor Hr 10.00 5.50 55.00
HR-0131O Soldador de Estructura Calificado Hr 15.00 11.29 169.34
HR-0080O Amolador Hr 15.00 7.06 105.92
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 724.58
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 398.52
Sub Total Costo Mano de Obra: 1,123.10
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 3.28 4.20 13.78
EQ00041Q Mezcladora de Hormign 360 lts Hr 3.28 5.25 17.23
EQ00014Q Camioneta 4 x 4 Hr 10.00 10.50 105.00
EQ00045Q Motosoldadora 250 D Hr 25.00 7.81 195.31
EQ00017Q Compresor 180 cfm - 85 psi Hr 10.00 28.00 280.00
EQ00087Q Equipo de pintura tipo air less Hr 10.00 5.00 50.00
EQ00009Q Camin Hidrogra 3 ton Hr 5.00 21.00 105.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 33.69
Sub Total Costo Equipo: 800.01

4. GASTOS GENERALES 10.00% 419.08


5. UTILIDAD 10.00% 460.99
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 594.90
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 161.69
8. TOTAL PRECIO UNITARIO ADOPTADO 5,827.43
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin y Montaje de Escaleras Metlicas Tipo EM-05 sobre Fundaciones de HA, con
ITEM: Cdigo: 3.1.3.5
barandas metlicas.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 11.00 35.00 385.00
MAT-079M Grating (1 1/4pulg x 3/16pulg) m2 2.50 120.00 300.00
MAT0240M Insumos diarios para soldadura da 4.00 70.00 280.00
MAT0008M Agua potable lt 100.80 0.01 1.21
MAT0001M Acero de alta resistencia kg 67.20 1.22 81.98
MAT0293M Madera para encofrado p2 38.08 1.40 53.31
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 0.65 70.65 45.92
MAT0392M Ripio bruto m3 0.45 24.00 10.75
MAT-081M Perno de 1/2pulg para sujecin Pza 12.00 2.01 24.12
MAT-111M Perfil "C" prefabricado (6"x3"x1/4") m 8.16 22.00 179.52
MAT0050M Arenilla m3 0.34 15.32 5.15
MAT-002M Tubera 1 1/2pulg SCH-40 m 24.90 12.00 298.80
MAT-003M Tubera 2pulg Sch-40 m 1.76 22.00 38.72
MAT0134M Clavos de 2 1/2 pulg kg 1.12 3.80 4.26
MAT0118M Cemento portland Kg 196.00 0.19 36.61
MAT0024M Alambre de amarre kg 0.84 3.80 3.19
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,748.55
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 28.50 6.48 184.68
HR-0081O Ayudante albanil Hr 13.50 4.80 64.85
HR-0105O Inspector de Calidad Civil Hr 10.00 10.08 100.80
HR-0034O Inspector de Seguridad con SSMS-40 Hr 10.00 10.88 108.80
PP00091O Pintor Hr 20.00 5.50 110.00
HR-0131O Soldador de Estructura Calificado Hr 15.00 11.29 169.34
HR-0080O Amolador Hr 15.00 7.06 105.92
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 844.38
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 464.41
Sub Total Costo Mano de Obra: 1,308.79
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 2.37 4.20 9.93
EQ00041Q Mezcladora de Hormign 360 lts Hr 2.36 5.25 12.40
EQ00014Q Camioneta 4 x 4 Hr 10.00 10.50 105.00
EQ00045Q Motosoldadora 250 D Hr 25.00 7.81 195.31
EQ00017Q Compresor 180 cfm - 85 psi Hr 10.00 28.00 280.00
EQ00087Q Equipo de pintura tipo air less Hr 20.00 5.00 100.00
EQ00009Q Camin Hidrogra 3 ton Hr 4.50 21.00 94.50
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 39.26
Sub Total Costo Equipo: 836.41

4. GASTOS GENERALES 10.00% 389.37


5. UTILIDAD 10.00% 428.31
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 552.74
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 150.23
8. TOTAL PRECIO UNITARIO ADOPTADO 5,414.40
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin y Montaje de Escaleras Metlicas Tipo EM-06 sobre Fundaciones de HA, con
ITEM: Cdigo: 3.1.3.6
barandas metlicas.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0050M Arenilla m3 0.34 15.32 5.15
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 0.75 70.65 52.99
MAT0008M Agua potable lt 100.80 0.01 1.21
MAT0024M Alambre de amarre kg 0.84 3.80 3.19
MAT-003M Tubera 2pulg Sch-40 m 2.20 22.00 48.40
MAT0293M Madera para encofrado p2 38.08 1.40 53.31
MAT-079M Grating (1 1/4pulg x 3/16pulg) m2 3.40 120.00 408.00
MAT-111M Perfil "C" prefabricado (6"x3"x1/4") m 10.55 22.00 232.10
MAT0392M Ripio bruto m3 0.45 24.00 10.75
MAT0134M Clavos de 2 1/2 pulg kg 1.12 3.80 4.26
MAT-081M Perno de 1/2pulg para sujecin Pza 12.00 2.01 24.12
MAT0001M Acero de alta resistencia kg 67.20 1.22 81.98
MAT0240M Insumos diarios para soldadura da 5.00 70.00 350.00
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 13.00 35.00 455.00
MAT-002M Tubera 1 1/2pulg SCH-40 m 28.70 12.00 344.40
MAT0118M Cemento portland Kg 196.00 0.19 36.61
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 2,111.47
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 26.50 6.48 171.72
HR-0081O Ayudante albanil Hr 13.50 4.80 64.85
HR-0105O Inspector de Calidad Civil Hr 10.00 10.08 100.80
HR-0034O Inspector de Seguridad con SSMS-40 Hr 10.00 10.88 108.80
PP00091O Pintor Hr 20.00 5.50 110.00
HR-0131O Soldador de Estructura Calificado Hr 25.00 11.29 282.23
HR-0080O Amolador Hr 25.00 7.06 176.53
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,014.92
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 558.21
Sub Total Costo Mano de Obra: 1,573.13
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 2.26 4.20 9.49
EQ00041Q Mezcladora de Hormign 360 lts Hr 2.25 5.25 11.81
EQ00014Q Camioneta 4 x 4 Hr 10.00 10.50 105.00
EQ00045Q Motosoldadora 250 D Hr 25.00 7.81 195.31
EQ00017Q Compresor 180 cfm - 85 psi Hr 10.00 28.00 280.00
EQ00087Q Equipo de pintura tipo air less Hr 20.00 5.00 100.00
EQ00009Q Camin Hidrogra 3 ton Hr 5.00 21.00 105.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 47.19
Sub Total Costo Equipo: 853.81

4. GASTOS GENERALES 10.00% 453.84


5. UTILIDAD 10.00% 499.23
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 644.25
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 175.10
8. TOTAL PRECIO UNITARIO ADOPTADO 6,310.83
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin y Montaje de Escaleras Metlicas Tipo EM-07 sobre Fundaciones de HA, con
ITEM: Cdigo: 3.1.3.7
barandas metlicas.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0293M Madera para encofrado p2 38.08 1.40 53.31
MAT-111M Perfil "C" prefabricado (6"x3"x1/4") m 8.00 22.00 176.00
MAT-079M Grating (1 1/4pulg x 3/16pulg) m2 2.50 120.00 300.00
MAT0050M Arenilla m3 0.34 15.32 5.15
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 8.00 35.00 280.00
MAT-002M Tubera 1 1/2pulg SCH-40 m 17.87 12.00 214.44
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 0.65 70.65 45.92
MAT0134M Clavos de 2 1/2 pulg kg 1.12 3.80 4.26
MAT0024M Alambre de amarre kg 0.84 3.80 3.19
MAT0118M Cemento portland Kg 196.00 0.19 36.61
MAT-081M Perno de 1/2pulg para sujecin Pza 12.00 2.01 24.12
MAT0392M Ripio bruto m3 0.45 24.00 10.75
MAT-003M Tubera 2pulg Sch-40 m 2.20 22.00 48.40
MAT0008M Agua potable lt 100.80 0.01 1.21
MAT0001M Acero de alta resistencia kg 67.20 1.22 81.98
MAT0240M Insumos diarios para soldadura da 4.00 70.00 280.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,565.35
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 22.65 6.48 146.77
HR-0081O Ayudante albanil Hr 13.50 4.80 64.85
HR-0105O Inspector de Calidad Civil Hr 10.00 10.08 100.80
HR-0034O Inspector de Seguridad con SSMS-40 Hr 10.00 10.88 108.80
PP00091O Pintor Hr 15.00 5.50 82.50
HR-0131O Soldador de Estructura Calificado Hr 20.00 11.29 225.78
HR-0080O Amolador Hr 20.00 7.06 141.23
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 870.72
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 478.90
Sub Total Costo Mano de Obra: 1,349.62
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 2.15 4.20 9.03
EQ00041Q Mezcladora de Hormign 360 lts Hr 2.15 5.25 11.31
EQ00014Q Camioneta 4 x 4 Hr 10.00 10.50 105.00
EQ00045Q Motosoldadora 250 D Hr 20.00 7.81 156.25
EQ00017Q Compresor 180 cfm - 85 psi Hr 10.00 28.00 280.00
EQ00087Q Equipo de pintura tipo air less Hr 15.00 5.00 75.00
EQ00009Q Camin Hidrogra 3 ton Hr 5.00 21.00 105.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 40.49
Sub Total Costo Equipo: 782.08

4. GASTOS GENERALES 10.00% 369.70


5. UTILIDAD 10.00% 406.68
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 524.82
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 142.64
8. TOTAL PRECIO UNITARIO ADOPTADO 5,140.88
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin para cada una de las cuatro unidades de compresin de dos plataformas metlicas
con barandas y escaleras, y una escalera marinera con plataforma para mantenimiento de
ITEM: acuerdo a plaos conforme a obra de la Estacin de Compresin Huayacota. (Incluye bases de Cdigo: 3.1.3.8
HA de 310x310x280 mm en el contacto de las plataformas con la losa de la sala de
compresores)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0293M Madera para encofrado p2 1,188.64 1.40 1,664.10
MAT0134M Clavos de 2 1/2 pulg kg 34.96 3.80 132.85
MAT0024M Alambre de amarre kg 26.22 3.80 99.64
MAT0008M Agua potable lt 3,146.40 0.01 37.76
MAT0240M Insumos diarios para soldadura da 40.00 70.00 2,800.00
MAT0118M Cemento portland Kg 4,803.20 0.19 897.24
MAT-079M Grating (1 1/4pulg x 3/16pulg) m2 48.96 120.00 5,875.20
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 28.72 70.65 2,029.07
MAT-111M Perfil "C" prefabricado (6"x3"x1/4") m 232.96 22.00 5,125.12
MAT-002M Tubera 1 1/2pulg SCH-40 m 178.04 12.00 2,136.48
MAT-008M Angular 2pulg x 3/4pulg m 77.20 18.76 1,448.27
MAT0001M Acero de alta resistencia kg 1,641.60 1.22 2,002.75
MAT0050M Arenilla m3 10.49 15.32 160.68
MAT-003M Tubera 2pulg Sch-40 m 15.20 22.00 334.40
MAT-007M Angular 2pulg x 1/4pulg m 140.00 6.25 875.00
MAT-081M Perno de 1/2pulg para sujecin Pza 236.00 2.01 474.36
MAT-006M Angular 3pulg x 1/4pulg m 275.56 9.27 2,554.44
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 200.00 35.00 7,000.00
MAT-080M Malla tipo rombo 1/4pulg m2 52.04 70.00 3,642.80
MAT0392M Ripio bruto m3 13.98 24.00 335.62
MAT-010M Pletina de 1pulg x 1/4pulg m 80.28 3.02 242.45
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 39,868.21
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 700.23 6.48 4,537.49
HR-0081O Ayudante albanil Hr 590.60 4.80 2,836.85
HR-0105O Inspector de Calidad Civil Hr 280.00 10.08 2,822.40
HR-0034O Inspector de Seguridad con SSMS-40 Hr 280.00 10.88 3,046.40
PP00091O Pintor Hr 600.00 5.50 3,300.00
HR-0131O Soldador de Estructura Calificado Hr 600.00 11.29 6,773.44
HR-0080O Amolador Hr 600.00 7.06 4,236.78
HR-0149O Topografo Hr 120.00 11.24 1,348.92
HR-0088O Caista armador Hr 400.00 19.60 7,840.14
0.00
SUBTOTAL MANO DE OBRA 36,742.42
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 20,208.33
Sub Total Costo Mano de Obra: 56,950.75
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 7.86 4.20 33.01
EQ00041Q Mezcladora de Hormign 360 lts Hr 7.88 5.25 41.34
EQ00014Q Camioneta 4 x 4 Hr 200.00 10.50 2,100.00
EQ00045Q Motosoldadora 250 D Hr 600.00 7.81 4,687.50
EQ00017Q Compresor 180 cfm - 85 psi Hr 280.00 28.00 7,840.00
EQ00087Q Equipo de pintura tipo air less Hr 280.00 5.00 1,400.00
EQ00009Q Camin Hidrogra 3 ton Hr 280.00 21.00 5,880.00
EQ00013Q Camin trailler con chata plana Hr 135.00 21.00 2,835.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1,708.52
Sub Total Costo Equipo: 26,525.38

4. GASTOS GENERALES 10.00% 12,334.43


5. UTILIDAD 10.00% 13,567.88
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 17,509.38
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 4,758.77
8. TOTAL PRECIO UNITARIO ADOPTADO 171,514.79
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Edifico de Compresores Cdigo: 3.1.4.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-087M Perfil C (2pulgx17pulgx1/4pulg) m 340.21 27.95 9,508.87
MAT0293M Madera para encofrado p2 1,286.56 1.40 1,801.18
MAT-081M Perno de 1/2pulg para sujecin Pza 1,000.00 2.01 2,010.00
MAT-005M Insumos de Soldadura Estructural Diario Da 97.00 70.40 6,828.80
MAT-093M Revestimiento acstico Barrier PAB 011 m2 1,442.55 10.06 14,512.05
MAT-092M Tecle de desplazamiento mecnico 5 ton Pza 1.00 15,000.00 15,000.00
MAT0050M Arenilla m3 11.35 15.32 173.91
MAT-095M Drenaje industrial mediante rejillas m 100.00 80.46 8,046.00
MAT0392M Ripio bruto m3 15.14 24.00 363.26
MAT-083M Perfil I (8pulgx8pulgx3/8pulg) m 220.98 105.27 23,262.56
MAT-049M Rueda con rodamiento Pza 12.00 35.92 431.04
MAT-013M Cumbrera para cubierta con pernos de fijacin m 44.33 8.00 354.64
MAT0134M Clavos de 2 1/2 pulg kg 37.84 3.80 143.79
MAT0024M Alambre de amarre kg 28.38 3.80 107.84
MAT0008M Agua potable lt 3,405.60 0.01 40.87
MAT-048M Carro D-150 Pza 12.00 402.30 4,827.60
MAT-019M Plancha metlica de 3/4pulg (19 mm) 2x1 m2 4.47 328.16 1,466.88
MAT-007M Angular 2pulg x 1/4pulg m 52.00 6.25 325.00
MAT-029M Perno de anclaje de 7/8pulg x 661 mm Pza 64.00 30.00 1,920.00
MAT0118M Cemento portland Kg 6,089.16 0.19 1,137.46
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 2,885.10 35.00 100,978.50
MAT0001M Acero de alta resistencia kg 2,085.60 1.22 2,544.43
MAT-090M Calamina Trapezoidal Galv. # 26 (esp 0.5mm) m2 1,472.55 6.90 10,160.60
MAT-089M Fierro Macizo cuadrado 1.5pulgx1.5pulg m 92.82 25.07 2,327.00
MAT-018M Plancha metlica de 1/2pulg (12 mm) 2x1 m2 12.54 116.16 1,456.65
MAT-096M Sumideros de drenaje incluye cmara y tubera Pza 6.00 502.87 3,017.22
MAT-094M Tubo cuadrado (50x50x3) m 172.20 13.65 2,350.53
MAT-082M Perfil I (16pulgx8pulgx1/2pulg) m 414.38 178.27 73,871.52
MAT-084M Perfil I (8pulgx4pulgx1/4pulg) m 99.35 40.95 4,068.38
MAT-028M Perno de anclaje de 5/8pulg x 432 mm Pza 64.00 7.50 480.00
MAT-085M Perfil I (6.5pulgx14pulgx1/2pulg) m 12.00 150.42 1,805.04
MAT-086M Perfil I W 18x97 m 10.73 316.80 3,399.26
MAT-088M Perfil C (3pulgx8pulgx3/8pulg) m 649.74 61.41 39,900.53
0.00
0.00
0.00
Sub Total Costo Materiales: 338,621.42
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 900.00 6.48 5,832.00
HR-0081O Ayudante albanil Hr 4,800.00 4.80 23,056.00
HR-0105O Inspector de Calidad Civil Hr 600.00 10.08 6,048.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 600.00 10.88 6,528.00
PP00091O Pintor Hr 600.00 5.50 3,300.00
HR-0131O Soldador de Estructura Calificado Hr 1,800.00 11.29 20,320.31
HR-0080O Amolador Hr 2,400.00 7.06 16,947.12
HR-0149O Topografo Hr 180.00 11.24 2,023.38
HR-0088O Caista armador Hr 400.00 19.60 7,840.14
HR-0140O Supervisor obras mecanicas Hr 300.00 14.09 4,227.45
HR-0107O Inspector de Soldadura Nivel I Hr 300.00 18.49 5,545.73
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 101,668.14
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 55,917.48
Sub Total Costo Mano de Obra: 157,585.62
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 46.68 4.20 196.06
EQ00041Q Mezcladora de Hormign 360 lts Hr 46.69 5.25 245.10
EQ00014Q Camioneta 4 x 4 Hr 600.00 10.50 6,300.00
EQ00045Q Motosoldadora 250 D Hr 2,400.00 7.81 18,750.00
EQ00017Q Compresor 180 cfm - 85 psi Hr 300.00 28.00 8,400.00
EQ00087Q Equipo de pintura tipo air less Hr 300.00 5.00 1,500.00
EQ00009Q Camin Hidrogra 3 ton Hr 600.00 21.00 12,600.00
EQ00013Q Camin trailler con chata plana Hr 300.00 21.00 6,300.00
EQ00015Q Cisterna Aguatero Hr 200.00 26.25 5,250.00
EQ00042Q Micro para 21 personas Hr 600.00 13.42 8,050.05
EQ00024Q Equipo de Arenado Hr 300.00 8.75 2,625.00
EQ00062Q Grua de 30 ton hr 200.00 120.00 24,000.00
EQ00025Q Equipo de Radiografiado Industrial Hr 300.00 65.00 19,500.00
EQ00030Q Excavadora Tipo CAT-320 Hr. 100.00 78.08 7,808.00
EQ00050Q Retroexcavadora Hr. 300.00 49.00 14,700.00
EQ00029Q Estacin Total Calibrada Hr. 180.00 17.50 3,150.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 4,727.57
Sub Total Costo Equipo: 144,101.78

4. GASTOS GENERALES 10.00% 64,030.88


5. UTILIDAD 10.00% 70,433.97
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 90,895.24
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 24,703.86
8. TOTAL PRECIO UNITARIO ADOPTADO 890,372.77
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Edificio de Sala de Control Cdigo: 3.1.4.2

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0395M Rodillo pza 4.64 4.00 18.56
MAT0293M Madera para encofrado p2 1,948.88 1.40 2,728.43
MAT-007M Angular 2pulg x 1/4pulg m 5.05 6.25 31.56
MAT0008M Agua potable lt 5,158.80 0.01 61.91
MAT0319M Mesn de granito negro 0.60 m ml 1.00 140.00 140.00
MAT0650M Plancha antideslizante m2 20.87 60.72 1,267.23
MAT-013M Cumbrera para cubierta con pernos de fijacin m 15.65 8.00 125.20
MAT0431M Tefln 3/4 pulg pza 0.30 0.60 0.18
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 220.00 35.00 7,700.00
MAT0306M Masa corrida lt 69.60 3.20 222.72
MAT0675M Cielo Falso Armstrong m2 17.85 24.00 428.40
MAT0133M Clavos de 1 1/2 pulg kg 3.12 3.80 11.86
MAT0264M Lija ml 92.80 1.00 92.80
MAT0355M Pintura latex para interior lt 139.20 5.20 723.84
MAT-113M Perfil C (100x60 mm e=1/8"(3.2 mm)) m 78.05 17.60 1,373.68
MAT0117M Cemento cola Kg 624.00 0.20 124.80
MAT-090M Calamina Trapezoidal Galv. # 26 (esp 0.5mm) m2 170.00 6.90 1,173.00
MAT0320M Mezclador monocomando para cocina FV pza 1.00 140.00 140.00
MAT0674M Puerta metlica reforzada m2 10.50 80.00 840.00
MAT0213M Fierro redondo de 1/2 ml 15.00 1.92 28.80
MAT-116M Tubo de Concreto 150 mm interior e=10 cm 1 m de largo. m 3.20 200.00 640.00
MAT-009M Angular 1 1/2pulg x 1/4pulg m 67.20 6.25 420.00
MAT0134M Clavos de 2 1/2 pulg kg 57.32 3.80 217.82
MAT0394M Ripio rodado m3 0.85 28.00 23.80
MAT-005M Insumos de Soldadura Estructural Diario Da 6.00 70.40 422.40
MAT0392M Ripio bruto m3 23.81 24.00 571.39
MAT0235M Inodoro Ferrum T/bajo blanco normal pza 1.00 280.00 280.00
MAT0049M Arena Fina m3 6.50 19.00 123.50
MAT0389M Reduccin de Fe 3/4x1/2 pulg pza 2.00 0.80 1.60
MAT0260M Lavamano de embutir Ferrum pza 1.00 55.76 55.76
MAT0050M Arenilla m3 18.22 15.32 279.07
MAT-115M Ventana de Aluminio m2 14.63 65.00 950.95
MAT0001M Acero de alta resistencia kg 2,511.75 1.22 3,064.34
MAT0398M Sellador para paredes lt 69.60 3.00 208.80
MAT0349M Piedra manzana m3 1.70 38.00 64.60
MAT-114M Correa C (100x50 mm e=1/8"(3.2mm)) m 186.60 16.33 3,047.18
MAT0673M Vidrio doble de 4 mm m2 25.13 30.00 753.90
MAT0118M Cemento portland Kg 9,022.55 0.19 1,685.41
MAT0252M Ladrillo adobito pza 7,800.00 0.12 936.00
MAT0121M Cermica Esmaltada Gladymar (41x41) m2 168.48 15.00 2,527.20
MAT0127M Chicotillo metlico pza 2.00 12.00 24.00
MAT-112M Perfil C (120x60 mm e=1/8"(3.2 mm)) m 97.20 18.20 1,769.04
MAT0069M Brocha de 2 pulg pza 4.64 4.00 18.56
MAT0024M Alambre de amarre kg 42.99 3.80 163.36
0.00
0.00
Sub Total Costo Materiales: 35,481.64
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 1,800.00 6.48 11,664.00
HR-0081O Ayudante albanil Hr 1,450.00 4.80 6,964.83
HR-0105O Inspector de Calidad Civil Hr 500.00 10.08 5,040.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 500.00 10.88 5,440.00
PP00091O Pintor Hr 250.00 5.50 1,375.00
HR-0131O Soldador de Estructura Calificado Hr 200.00 11.29 2,257.81
HR-0080O Amolador Hr 300.00 7.06 2,118.39
HR-0149O Topografo Hr 250.00 11.24 2,810.25
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 37,670.28
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 20,718.66
Sub Total Costo Mano de Obra: 58,388.94
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 12.53 4.20 52.63
EQ00041Q Mezcladora de Hormign 360 lts Hr 12.53 5.25 65.79
EQ00014Q Camioneta 4 x 4 Hr 300.00 10.50 3,150.00
EQ00045Q Motosoldadora 250 D Hr 200.00 7.81 1,562.50
EQ00017Q Compresor 180 cfm - 85 psi Hr 250.00 28.00 7,000.00
EQ00087Q Equipo de pintura tipo air less Hr 250.00 5.00 1,250.00
EQ00009Q Camin Hidrogra 3 ton Hr 200.00 21.00 4,200.00
EQ00013Q Camin trailler con chata plana Hr 150.00 21.00 3,150.00
EQ00015Q Cisterna Aguatero Hr 200.00 26.25 5,250.00
EQ00042Q Micro para 21 personas Hr 200.00 13.42 2,683.35
EQ00024Q Equipo de Arenado Hr 250.00 8.75 2,187.50
EQ00050Q Retroexcavadora Hr. 200.00 49.00 9,800.00
EQ00029Q Estacin Total Calibrada Hr. 250.00 17.50 4,375.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1,751.67
Sub Total Costo Equipo: 46,478.43

4. GASTOS GENERALES 10.00% 14,034.90


5. UTILIDAD 10.00% 15,438.39
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 19,923.29
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 5,414.83
8. TOTAL PRECIO UNITARIO ADOPTADO 195,160.42
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Edificio de Microturbinas Cdigo: 3.1.4.3

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0118M Cemento portland Kg 8,157.32 0.19 1,523.79
MAT0293M Madera para encofrado p2 1,623.84 1.40 2,273.38
MAT0134M Clavos de 2 1/2 pulg kg 47.76 3.80 181.49
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 218.00 35.00 7,630.00
MAT0008M Agua potable lt 4,298.40 0.01 51.58
MAT0392M Ripio bruto m3 19.10 24.00 458.50
MAT-005M Insumos de Soldadura Estructural Diario Da 20.00 70.40 1,408.00
MAT0050M Arenilla m3 14.33 15.32 219.50
MAT-013M Cumbrera para cubierta con pernos de fijacin m 14.30 8.00 114.40
MAT-117M Perfil W 8x10 (200x100x22.3) para correa m 60.92 78.40 4,776.13
MAT-119M Perfil C 120mmx50mmx3/16"(4.7mm) m 326.00 34.80 11,344.80
MAT-009M Angular 1 1/2pulg x 1/4pulg m 28.00 6.25 175.00
MAT0001M Acero de alta resistencia kg 1,048.50 1.22 1,279.17
MAT0213M Fierro redondo de 1/2 ml 4.80 1.92 9.22
MAT-090M Calamina Trapezoidal Galv. # 26 (esp 0.5mm) m2 109.00 6.90 752.10
MAT0024M Alambre de amarre kg 35.82 3.80 136.12
MAT0650M Plancha antideslizante m2 8.25 60.72 500.94
MAT-118M Perfil W 8x10 (200x100x28.2) para columna m 47.96 98.91 4,743.72
0.00
0.00
0.00
Sub Total Costo Materiales: 37,577.83
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 988.04 6.48 6,402.50
HR-0081O Ayudante albanil Hr 1,020.00 4.80 4,899.40
HR-0105O Inspector de Calidad Civil Hr 250.00 10.08 2,520.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 250.00 10.88 2,720.00
PP00091O Pintor Hr 100.00 5.50 550.00
HR-0131O Soldador de Estructura Calificado Hr 400.00 11.29 4,515.62
HR-0080O Amolador Hr 400.00 7.06 2,824.52
HR-0149O Topografo Hr 50.00 11.24 562.05
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 24,994.09
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 13,746.75
Sub Total Costo Mano de Obra: 38,740.85
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 15.57 4.20 65.37
EQ00041Q Mezcladora de Hormign 360 lts Hr 15.56 5.25 81.69
EQ00014Q Camioneta 4 x 4 Hr 250.00 10.50 2,625.00
EQ00045Q Motosoldadora 250 D Hr 400.00 7.81 3,125.00
EQ00017Q Compresor 180 cfm - 85 psi Hr 100.00 28.00 2,800.00
EQ00087Q Equipo de pintura tipo air less Hr 100.00 5.00 500.00
EQ00009Q Camin Hidrogra 3 ton Hr 60.00 21.00 1,260.00
EQ00013Q Camin trailler con chata plana Hr 60.00 21.00 1,260.00
EQ00015Q Cisterna Aguatero Hr 20.00 26.25 525.00
EQ00042Q Micro para 21 personas Hr 250.00 13.42 3,354.19
EQ00024Q Equipo de Arenado Hr 100.00 8.75 875.00
EQ00025Q Equipo de Radiografiado Industrial Hr 60.00 65.00 3,900.00
EQ00050Q Retroexcavadora Hr. 100.00 49.00 4,900.00
EQ00029Q Estacin Total Calibrada Hr. 50.00 17.50 875.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1,162.23
Sub Total Costo Equipo: 27,308.48

4. GASTOS GENERALES 10.00% 10,362.71


5. UTILIDAD 10.00% 11,398.99
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 14,710.42
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 3,998.06
8. TOTAL PRECIO UNITARIO ADOPTADO 144,097.33
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Edificio de Mantenimiento y Almacn Cdigo: 3.1.4.4

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0001M Acero de alta resistencia kg 1,465.95 1.22 1,788.46
MAT0049M Arena Fina m3 4.59 19.00 87.21
MAT-043M Perfil C (0.12x0.070x0.006) m 22.00 18.38 404.36
MAT0133M Clavos de 1 1/2 pulg kg 1.21 3.80 4.59
MAT0117M Cemento cola Kg 241.72 0.20 48.34
MAT0293M Madera para encofrado p2 1,020.68 1.40 1,428.95
MAT0069M Brocha de 2 pulg pza 3.06 4.00 12.24
MAT0118M Cemento portland Kg 7,976.12 0.19 1,489.94
MAT-115M Ventana de Aluminio m2 10.56 65.00 686.40
MAT0134M Clavos de 2 1/2 pulg kg 30.02 3.80 114.08
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 0.14 70.65 9.89
MAT0394M Ripio rodado m3 5.29 28.00 148.06
MAT-013M Cumbrera para cubierta con pernos de fijacin m 11.50 8.00 92.00
MAT0264M Lija ml 61.20 1.00 61.20
MAT0355M Pintura latex para interior lt 91.80 5.20 477.36
MAT0673M Vidrio doble de 4 mm m2 20.01 30.00 600.30
MAT0269M Liso 1/4 plg. (6 mm.) Bar 12m. brra 4.00 2.82 11.26
MAT-112M Perfil C (120x60 mm e=1/8"(3.2 mm)) m 338.00 18.20 6,151.60
MAT0050M Arenilla m3 15.35 15.32 235.19
MAT0121M Cermica Esmaltada Gladymar (41x41) m2 65.26 15.00 978.97
MAT-090M Calamina Trapezoidal Galv. # 26 (esp 0.5mm) m2 125.50 6.90 865.95
MAT0349M Piedra manzana m3 10.58 38.00 401.89
MAT0024M Alambre de amarre kg 22.52 3.80 85.56
MAT0252M Ladrillo adobito pza 10,174.50 0.12 1,220.94
MAT0008M Agua potable lt 2,701.80 0.01 32.42
MAT0395M Rodillo pza 3.06 4.00 12.24
MAT0392M Ripio bruto m3 12.01 24.00 288.19
MAT0306M Masa corrida lt 45.90 3.20 146.88
MAT0674M Puerta metlica reforzada m2 9.45 80.00 756.00
MAT0398M Sellador para paredes lt 45.90 3.00 137.70
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 252.00 35.00 8,820.00
0.00
0.00
0.00
Sub Total Costo Materiales: 27,598.17
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 1,120.00 6.48 7,257.60
HR-0081O Ayudante albanil Hr 1,350.00 4.80 6,484.50
HR-0105O Inspector de Calidad Civil Hr 300.00 10.08 3,024.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 300.00 10.88 3,264.00
PP00091O Pintor Hr 200.00 5.50 1,100.00
HR-0131O Soldador de Estructura Calificado Hr 400.00 11.29 4,515.62
HR-0080O Amolador Hr 400.00 7.06 2,824.52
HR-0149O Topografo Hr 100.00 11.24 1,124.10
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 29,594.34
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 16,276.89
Sub Total Costo Mano de Obra: 45,871.23
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 9.31 4.20 39.10
EQ00041Q Mezcladora de Hormign 360 lts Hr 9.32 5.25 48.92
EQ00014Q Camioneta 4 x 4 Hr 250.00 10.50 2,625.00
EQ00045Q Motosoldadora 250 D Hr 400.00 7.81 3,125.00
EQ00017Q Compresor 180 cfm - 85 psi Hr 200.00 28.00 5,600.00
EQ00087Q Equipo de pintura tipo air less Hr 200.00 5.00 1,000.00
EQ00009Q Camin Hidrogra 3 ton Hr 200.00 21.00 4,200.00
EQ00013Q Camin trailler con chata plana Hr 100.00 21.00 2,100.00
EQ00015Q Cisterna Aguatero Hr 35.00 26.25 918.75
EQ00042Q Micro para 21 personas Hr 250.00 13.42 3,354.19
EQ00024Q Equipo de Arenado Hr 100.00 8.75 875.00
EQ00050Q Retroexcavadora Hr. 100.00 49.00 4,900.00
EQ00029Q Estacin Total Calibrada Hr. 100.00 17.50 1,750.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1,376.14
Sub Total Costo Equipo: 31,912.10

4. GASTOS GENERALES 10.00% 10,538.15


5. UTILIDAD 10.00% 11,591.97
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 14,959.46
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 4,065.74
8. TOTAL PRECIO UNITARIO ADOPTADO 146,536.83
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Edificio de Portera Cdigo: 3.1.4.5

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0673M Vidrio doble de 4 mm m2 10.11 30.00 303.30
MAT0133M Clavos de 1 1/2 pulg kg 0.69 3.80 2.62
MAT0049M Arena Fina m3 1.57 19.00 29.81
MAT0320M Mezclador monocomando para cocina FV pza 1.00 140.00 140.00
MAT0127M Chicotillo metlico pza 2.00 12.00 24.00
MAT0398M Sellador para paredes lt 15.69 3.00 47.07
MAT0117M Cemento cola Kg 138.00 0.20 27.60
MAT0252M Ladrillo adobito pza 3,477.95 0.12 417.35
MAT0395M Rodillo pza 1.05 4.00 4.18
MAT-120M Perfil C (100x50 mm e=1/8"(3.2 mm)) m 49.20 16.30 801.96
MAT0392M Ripio bruto m3 8.39 24.00 201.41
MAT-115M Ventana de Aluminio m2 6.54 65.00 425.10
MAT0677M Plancha plegada I para techo de portera item 3.1.4.5 m 28.50 37.90 1,080.15
MAT0674M Puerta metlica reforzada m2 3.57 80.00 285.60
MAT0001M Acero de alta resistencia kg 819.60 1.22 999.91
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 68.00 35.00 2,380.00
MAT0260M Lavamano de embutir Ferrum pza 1.00 55.76 55.76
MAT0008M Agua potable lt 1,690.20 0.01 20.28
MAT0134M Clavos de 2 1/2 pulg kg 18.78 3.80 71.36
MAT0069M Brocha de 2 pulg pza 1.05 4.00 4.18
MAT0389M Reduccin de Fe 3/4x1/2 pulg pza 2.00 0.80 1.60
MAT0264M Lija ml 20.92 1.00 20.92
MAT0675M Cielo Falso Armstrong m2 32.84 24.00 788.16
MAT0431M Tefln 3/4 pulg pza 0.30 0.60 0.18
MAT0319M Mesn de granito negro 0.60 m ml 1.00 140.00 140.00
MAT0355M Pintura latex para interior lt 31.38 5.20 163.18
MAT-090M Calamina Trapezoidal Galv. # 26 (esp 0.5mm) m2 34.89 6.90 240.74
MAT0121M Cermica Esmaltada Gladymar (41x41) m2 37.26 15.00 558.90
MAT0306M Masa corrida lt 15.69 3.20 50.21
MAT0235M Inodoro Ferrum T/bajo blanco normal pza 1.00 280.00 280.00
MAT0118M Cemento portland Kg 3,783.35 0.19 706.73
MAT-013M Cumbrera para cubierta con pernos de fijacin m 6.15 8.00 49.20
MAT0293M Madera para encofrado p2 638.52 1.40 893.93
MAT0050M Arenilla m3 5.63 15.32 86.31
MAT0024M Alambre de amarre kg 14.09 3.80 53.52
0.00
0.00
0.00
Sub Total Costo Materiales: 11,355.24
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 531.84 6.48 3,446.32
HR-0081O Ayudante albanil Hr 282.52 4.80 1,357.04
HR-0105O Inspector de Calidad Civil Hr 120.00 10.08 1,209.60
HR-0034O Inspector de Seguridad con SSMS-40 Hr 120.00 10.88 1,305.60
PP00091O Pintor Hr 80.00 5.50 440.00
HR-0149O Topografo Hr 10.00 11.24 112.41
HR-0131O Soldador de Estructura Calificado Hr 30.00 11.29 338.67
HR-0080O Amolador Hr 30.00 7.06 211.84
0.00
SUBTOTAL MANO DE OBRA 8,421.48
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 4,631.81
Sub Total Costo Mano de Obra: 13,053.30
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 12.70 4.20 53.34
EQ00041Q Mezcladora de Hormign 360 lts Hr 12.73 5.25 66.81
EQ00014Q Camioneta 4 x 4 Hr 50.00 10.50 525.00
EQ00045Q Motosoldadora 250 D Hr 30.00 7.81 234.38
EQ00017Q Compresor 180 cfm - 85 psi Hr 80.00 28.00 2,240.00
EQ00087Q Equipo de pintura tipo air less Hr 80.00 5.00 400.00
EQ00009Q Camin Hidrogra 3 ton Hr 50.00 21.00 1,050.00
EQ00013Q Camin trailler con chata plana Hr 20.00 21.00 420.00
EQ00015Q Cisterna Aguatero Hr 20.00 26.25 525.00
EQ00042Q Micro para 21 personas Hr 150.00 13.42 2,012.51
EQ00024Q Equipo de Arenado Hr 20.00 8.75 175.00
EQ00050Q Retroexcavadora Hr. 50.00 49.00 2,450.00
EQ00029Q Estacin Total Calibrada Hr. 10.00 17.50 175.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 391.60
Sub Total Costo Equipo: 10,718.63

4. GASTOS GENERALES 10.00% 3,512.72


5. UTILIDAD 10.00% 3,863.99
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 4,986.49
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,355.25
8. TOTAL PRECIO UNITARIO ADOPTADO 48,845.61
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Tinglado de Almacenamiento de Residuos (Cotizar de acuerdo a las


ITEM: Cdigo: 3.1.4.6
modificaciones realizadas en la EC Huayacota, ver planos indicados como referencia (2))

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-013M Cumbrera para cubierta con pernos de fijacin m 4.71 8.00 37.68
MAT0134M Clavos de 2 1/2 pulg kg 3.26 3.80 12.39
MAT0118M Cemento portland Kg 536.94 0.19 100.30
MAT0298M Malla olmpica #14 3/4 pulg m2 24.00 12.60 302.40
MAT0293M Madera para encofrado p2 110.84 1.40 155.18
MAT0349M Piedra manzana m3 0.30 38.00 11.29
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 0.05 70.65 3.53
MAT-002M Tubera 1 1/2pulg SCH-40 m 67.54 12.00 810.48
MAT-003M Tubera 2pulg Sch-40 m 52.77 22.00 1,160.94
MAT-121M Tubera 1pulg Sch-40 m 125.00 19.00 2,375.00
MAT0024M Alambre de amarre kg 2.45 3.80 9.29
MAT-027M Perno de anclaje de 1/2pulg x 356 mm Pza 16.00 6.90 110.40
MAT0008M Agua potable lt 293.40 0.01 3.52
MAT0050M Arenilla m3 1.16 15.32 17.71
MAT-090M Calamina Trapezoidal Galv. # 26 (esp 0.5mm) m2 27.90 6.90 192.51
MAT0001M Acero de alta resistencia kg 171.60 1.22 209.35
MAT0394M Ripio rodado m3 0.15 28.00 4.16
MAT0392M Ripio bruto m3 1.30 24.00 31.30
0.00
0.00
0.00
Sub Total Costo Materiales: 5,547.42
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 225.60 6.48 1,461.89
HR-0081O Ayudante albanil Hr 230.65 4.80 1,107.89
HR-0105O Inspector de Calidad Civil Hr 50.00 10.08 504.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 50.00 10.88 544.00
PP00091O Pintor Hr 60.00 5.50 330.00
HR-0149O Topografo Hr 10.00 11.24 112.41
HR-0131O Soldador de Estructura Calificado Hr 150.00 11.29 1,693.36
HR-0080O Amolador Hr 150.00 7.06 1,059.20
0.00
SUBTOTAL MANO DE OBRA 6,812.74
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 3,747.01
Sub Total Costo Mano de Obra: 10,559.75
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 10.80 4.20 45.36
EQ00041Q Mezcladora de Hormign 360 lts Hr 10.79 5.25 56.67
EQ00014Q Camioneta 4 x 4 Hr 50.00 10.50 525.00
EQ00045Q Motosoldadora 250 D Hr 150.00 7.81 1,171.88
EQ00017Q Compresor 180 cfm - 85 psi Hr 60.00 28.00 1,680.00
EQ00087Q Equipo de pintura tipo air less Hr 60.00 5.00 300.00
EQ00009Q Camin Hidrogra 3 ton Hr 45.00 21.00 945.00
EQ00013Q Camin trailler con chata plana Hr 20.00 21.00 420.00
EQ00015Q Cisterna Aguatero Hr 20.00 26.25 525.00
EQ00042Q Micro para 21 personas Hr 120.00 13.42 1,610.01
EQ00024Q Equipo de Arenado Hr 30.00 8.75 262.50
EQ00050Q Retroexcavadora Hr. 45.00 49.00 2,205.00
EQ00029Q Estacin Total Calibrada Hr. 10.00 17.50 175.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 316.79
Sub Total Costo Equipo: 10,238.21

4. GASTOS GENERALES 10.00% 2,634.54


5. UTILIDAD 10.00% 2,897.99
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,739.87
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,016.44
8. TOTAL PRECIO UNITARIO ADOPTADO 36,634.21
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccion de la Cubierta para Tanque de Agua para Compresores, fundacin y losa de HA


ITEM: Cdigo: 3.1.4.7
(segn planos).

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-003M Tubera 2pulg Sch-40 m 5.00 22.00 110.00
MAT0118M Cemento portland Kg 410.82 0.19 76.74
MAT-007M Angular 2pulg x 1/4pulg m 8.00 6.25 50.00
MAT-005M Insumos de Soldadura Estructural Diario Da 6.00 70.40 422.40
MAT0008M Agua potable lt 270.00 0.01 3.24
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 20.00 35.00 700.00
MAT0050M Arenilla m3 0.90 15.32 13.79
MAT-014M Calamina Trapezoidal # 28 con pernos de fijacin m2 6.70 12.00 80.40
MAT-013M Cumbrera para cubierta con pernos de fijacin m 3.20 8.00 25.60
MAT0001M Acero de alta resistencia kg 52.65 1.22 64.23
MAT0392M Ripio bruto m3 1.20 24.00 28.80
MAT0293M Madera para encofrado p2 102.00 1.40 142.80
MAT0024M Alambre de amarre kg 2.25 3.80 8.55
MAT0134M Clavos de 2 1/2 pulg kg 3.00 3.80 11.40
0.00
0.00
0.00
Sub Total Costo Materiales: 1,737.95
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 145.20 6.48 940.90
HR-0081O Ayudante albanil Hr 120.50 4.80 578.80
PP00091O Pintor Hr 20.00 5.50 110.00
HR-0149O Topografo Hr 10.00 11.24 112.41
HR-0131O Soldador de Estructura Calificado Hr 20.00 11.29 225.78
HR-0080O Amolador Hr 40.00 7.06 282.45
0.00
SUBTOTAL MANO DE OBRA 2,250.34
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,237.69
Sub Total Costo Mano de Obra: 3,488.03
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 1.80 4.20 7.56
EQ00041Q Mezcladora de Hormign 360 lts Hr 1.81 5.25 9.50
EQ00014Q Camioneta 4 x 4 Hr 60.00 10.50 630.00
EQ00045Q Motosoldadora 250 D Hr 20.00 7.81 156.25
EQ00017Q Compresor 180 cfm - 85 psi Hr 10.00 28.00 280.00
EQ00087Q Equipo de pintura tipo air less Hr 10.00 5.00 50.00
EQ00009Q Camin Hidrogra 3 ton Hr 10.00 21.00 210.00
EQ00013Q Camin trailler con chata plana Hr 6.00 21.00 126.00
EQ00015Q Cisterna Aguatero Hr 10.00 26.25 262.50
EQ00042Q Micro para 21 personas Hr 50.00 13.42 670.84
EQ00024Q Equipo de Arenado Hr 10.00 8.75 87.50
EQ00050Q Retroexcavadora Hr. 10.00 49.00 490.00
EQ00029Q Estacin Total Calibrada Hr. 10.00 17.50 175.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 104.64
Sub Total Costo Equipo: 3,259.79

4. GASTOS GENERALES 10.00% 848.58


5. UTILIDAD 10.00% 933.43
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,204.60
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 327.39
8. TOTAL PRECIO UNITARIO ADOPTADO 11,799.77
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Sistema de Drenaje Industrial, comprende cmaras de drenaje industrial,


sumideros, tendido de tubos de PVC de 3" E-40 y 4" SDR-35, canales perimetrales de los
ITEM: compresores, tapas y rejillas metlicas (los canales de drenaje industrial perimetrales a los Cdigo: 3.1.5.1
compresores debern estar conforme a lo construido en la EC Huayacota, ver planos indicados
como referencia (2)).

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-010M Pletina de 1pulg x 1/4pulg m 684.60 3.02 2,067.49
MAT0050M Arenilla m3 4.50 15.32 68.94
MAT0392M Ripio bruto m3 6.00 24.00 144.00
MAT0001M Acero de alta resistencia kg 1,200.00 1.22 1,464.00
MAT0679M Tubo PVC 4 Pulg SDR-35 para hidrocarburos L=6.00 m 197.04 8.33 1,642.00
MAT-009M Angular 1 1/2pulg x 1/4pulg m 361.12 6.25 2,257.00
MAT0678M Tubo PVC 3 Pulg SDR-35 para hidrocarburos L=6.00 m 43.14 6.67 287.60
MAT0118M Cemento portland Kg 170.34 0.19 31.82
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 7,962.85
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 339.00 6.48 2,196.72
HR-0081O Ayudante albanil Hr 380.00 4.80 1,825.27
PP00091O Pintor Hr 20.00 5.50 110.00
HR-0131O Soldador de Estructura Calificado Hr 10.00 11.29 112.89
HR-0080O Amolador Hr 10.00 7.06 70.61
0.00
SUBTOTAL MANO DE OBRA 4,315.49
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 2,373.52
Sub Total Costo Mano de Obra: 6,689.01
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 0.80 4.20 3.36
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.81 5.25 4.26
EQ00045Q Motosoldadora 250 D Hr 10.00 7.81 78.13
EQ00017Q Compresor 180 cfm - 85 psi Hr 5.00 28.00 140.00
EQ00087Q Equipo de pintura tipo air less Hr 10.00 5.00 50.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 200.67
Sub Total Costo Equipo: 476.41

4. GASTOS GENERALES 10.00% 1,512.83


5. UTILIDAD 10.00% 1,664.11
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,147.54
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 583.67
8. TOTAL PRECIO UNITARIO ADOPTADO 21,036.42
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de cmaras de tratamiento de hidrocarburos, losa y cubierta bomba P-5020 (Cotizar


ITEM: de acuerdo a las modificaciones realizadas en la EC Huayacota, ver planos indicados como Cdigo: 3.1.5.2
referencia (2))

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0001M Acero de alta resistencia kg 1,370.40 1.22 1,671.89
MAT0050M Arenilla m3 7.73 15.32 118.39
MAT0268M Liso 1/2 plg. (12 mm.) Bar 12m. m 18.00 0.97 17.39
MAT0118M Cemento portland Kg 91.49 0.19 17.09
MAT0008M Agua potable lt 2,318.40 0.01 27.82
MAT0680M Plancha Antideslizante de 1/4" (6mm) m2 16.04 164.85 2,644.19
MAT0293M Madera para encofrado p2 875.84 1.40 1,226.18
MAT-094M Tubo cuadrado (50x50x3) m 20.45 13.65 279.14
MAT-080M Malla tipo rombo 1/4pulg m2 0.76 70.00 53.20
MAT-007M Angular 2pulg x 1/4pulg m 38.00 6.25 237.50
MAT0024M Alambre de amarre kg 19.32 3.80 73.42
MAT0134M Clavos de 2 1/2 pulg kg 25.76 3.80 97.89
MAT-015M Plancha metlica de 1/4pulg (6 mm) 2x1 m2 6.80 70.65 480.42
MAT-123M Perfil C (180x60 mm e=1/8"(3.2 mm)) m 4.40 22.00 96.80
MAT0392M Ripio bruto m3 10.30 24.00 247.30
MAT-122M Tubera 3/4 pulg Sch-40 m 6.80 17.00 115.60
MAT-009M Angular 1 1/2pulg x 1/4pulg m 101.00 6.25 631.25
MAT0682M Plancha Antideslizante de 3/32" (2 mm) m2 8.76 54.95 481.36
0.00
Sub Total Costo Materiales: 8,516.82
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 445.00 6.48 2,883.60
HR-0081O Ayudante albanil Hr 420.56 4.80 2,020.09
PP00091O Pintor Hr 100.00 5.50 550.00
HR-0131O Soldador de Estructura Calificado Hr 70.00 11.29 790.23
HR-0080O Amolador Hr 100.00 7.06 706.13
HR-0034O Inspector de Seguridad con SSMS-40 Hr 150.00 10.88 1,632.00
SUBTOTAL MANO DE OBRA 8,582.05
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 4,720.13
Sub Total Costo Mano de Obra: 13,302.18
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 6.10 4.20 25.62
EQ00041Q Mezcladora de Hormign 360 lts Hr 6.12 5.25 32.11
EQ00045Q Motosoldadora 250 D Hr 150.00 7.81 1,171.88
EQ00017Q Compresor 180 cfm - 85 psi Hr 70.00 28.00 1,960.00
EQ00087Q Equipo de pintura tipo air less Hr 100.00 5.00 500.00
EQ00024Q Equipo de Arenado Hr 20.00 8.75 175.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 399.07
Sub Total Costo Equipo: 4,263.67

4. GASTOS GENERALES 10.00% 2,608.27


5. UTILIDAD 10.00% 2,869.09
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,702.57
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,006.30
8. TOTAL PRECIO UNITARIO ADOPTADO 36,268.91
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Cabezales para Alcantarillas Pluviales Cdigo: 3.1.6.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0293M Madera para encofrado p2 145.00 1.40 203.00
MAT0050M Arenilla m3 0.95 15.32 14.55
MAT0024M Alambre de amarre kg 2.30 3.80 8.72
MAT0118M Cemento portland Kg 465.00 0.19 86.86
MAT0349M Piedra manzana m3 2.56 38.00 97.28
MAT0134M Clavos de 2 1/2 pulg kg 2.42 3.80 9.20
MAT0008M Agua potable lt 45.00 0.01 0.54
MAT0392M Ripio bruto m3 1.48 24.00 35.52

0.00
Sub Total Costo Materiales: 455.67
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 38.00 6.48 246.24
HR-0081O Ayudante albanil Hr 75.60 4.80 363.13
HR-0105O Inspector de Calidad Civil Hr 10.00 10.08 100.80
HR-0034O Inspector de Seguridad con SSMS-40 Hr 10.00 10.88 108.80
0.00
0.00
SUBTOTAL MANO DE OBRA 818.97
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 450.43
Sub Total Costo Mano de Obra: 1,269.41
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 4.71 4.20 19.78
EQ00041Q Mezcladora de Hormign 360 lts Hr 4.71 5.25 24.75
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 38.08
Sub Total Costo Equipo: 82.61

4. GASTOS GENERALES 10.00% 180.77


5. UTILIDAD 10.00% 198.85
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 256.61
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 69.74
8. TOTAL PRECIO UNITARIO ADOPTADO 2,513.66
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Alcantarilla Pluvial de Acero 900 mm (MP-68 tipo ARMCO, de 2 mm) Cdigo: 3.1.6.2

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0392M Ripio bruto m3 0.12 24.00 2.78
MAT0683M Alcantarilla Pluvial de Acero 900 mm (MP-68 tipo ARMCO, de 2 m 1.00 35.00 35.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 37.78
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 2.50 6.48 16.20
HR-0081O Ayudante albanil Hr 7.40 4.80 35.54
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 51.74
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 28.46
Sub Total Costo Mano de Obra: 80.20
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 1.00 21.00 21.00
EQ00060Q Vibrocompactador a rodillo Hr 1.00 26.25 26.25
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 2.41
Sub Total Costo Equipo: 49.66

4. GASTOS GENERALES 10.00% 16.76


5. UTILIDAD 10.00% 18.44
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 23.80
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 6.47
8. TOTAL PRECIO UNITARIO ADOPTADO 233.10
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Alcantarilla Pluvial de Acero 700 mm (MP-68 tipo ARMCO, de 1.8 mm) Cdigo: 3.1.6.3

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0392M Ripio bruto m3 0.10 24.00 2.40
MAT0684M Alcantarilla Pluvial de Acero 700 mm (MP-68 tipo ARMCO, de 1. m 1.00 32.00 32.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 34.40
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 2.25 6.48 14.61
HR-0081O Ayudante albanil Hr 6.50 4.80 31.22
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 45.83
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 25.21
Sub Total Costo Mano de Obra: 71.04
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 1.00 21.00 21.00
EQ00060Q Vibrocompactador a rodillo Hr 1.00 26.25 26.25
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 2.13
Sub Total Costo Equipo: 49.38

4. GASTOS GENERALES 10.00% 15.48


5. UTILIDAD 10.00% 17.03
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 21.98
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 5.97
8. TOTAL PRECIO UNITARIO ADOPTADO 215.28
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Canal Pluvial Tipo 1 Cdigo: 3.1.6.4

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0394M Ripio rodado m3 109.00 28.00 3,052.00
MAT0050M Arenilla m3 95.00 15.32 1,455.40
MAT0049M Arena Fina m3 88.69 19.00 1,685.11
MAT0118M Cemento portland Kg 39,772.10 0.19 7,429.43
MAT0349M Piedra manzana m3 219.00 38.00 8,322.00
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 21,943.94
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 4,850.00 6.48 31,428.00
HR-0081O Ayudante albanil Hr 4,858.00 4.80 23,334.60
HR-0105O Inspector de Calidad Civil Hr 600.00 10.08 6,048.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 600.00 10.88 6,528.00
0.00
0.00
SUBTOTAL MANO DE OBRA 67,338.60
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 37,036.23
Sub Total Costo Mano de Obra: 104,374.82
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00050Q Retroexcavadora Hr. 330.00 49.00 16,170.00
EQ00041Q Mezcladora de Hormign 360 lts Hr 300.00 5.25 1,575.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 3,131.24
Sub Total Costo Equipo: 20,876.24

4. GASTOS GENERALES 10.00% 14,719.50


5. UTILIDAD 10.00% 16,191.45
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 20,895.11
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 5,678.95
8. TOTAL PRECIO UNITARIO ADOPTADO 204,680.03
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Canal Pluvial Tipo 2 Cdigo: 3.1.6.5

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0349M Piedra manzana m3 56.00 38.00 2,128.00
MAT0049M Arena Fina m3 22.00 19.00 418.00
MAT0394M Ripio rodado m3 109.00 28.00 3,052.00
MAT0050M Arenilla m3 21.00 15.32 321.72
MAT0118M Cemento portland Kg 9,829.45 0.19 1,836.14
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 7,755.86
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 867.00 4.84 4,192.26
HR-0034O Inspector de Seguridad con SSMS-40 Hr 200.00 10.89 2,177.74
HR-0078O Albail Hr 865.00 6.48 5,609.35
HR-0105O Inspector de Calidad Civil Hr 200.00 10.09 2,017.59
0.00
0.00
SUBTOTAL MANO DE OBRA 13,996.94
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 7,698.32
Sub Total Costo Mano de Obra: 21,695.26
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00050Q Retroexcavadora Hr. 100.00 49.00 4,900.00
EQ00041Q Mezcladora de Hormign 360 lts Hr 100.00 5.25 525.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 650.86
Sub Total Costo Equipo: 6,075.86

4. GASTOS GENERALES 10.00% 3,552.70


5. UTILIDAD 10.00% 3,907.97
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 5,043.24
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,370.67
8. TOTAL PRECIO UNITARIO ADOPTADO 49,401.56
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Canal Pluvial Tipo 3 Cdigo: 3.1.6.6

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0118M Cemento portland Kg 3,800.57 0.19 709.95
MAT0394M Ripio rodado m3 11.00 28.00 308.00
MAT0349M Piedra manzana m3 22.00 38.00 836.00
MAT0050M Arenilla m3 9.00 15.32 137.88
MAT0049M Arena Fina m3 11.00 19.00 209.00
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 2,200.83
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 350.00 6.48 2,269.68
HR-0105O Inspector de Calidad Civil Hr 60.00 10.09 605.28
HR-0083O Ayudante general Hr 350.00 4.84 1,692.38
HR-0034O Inspector de Seguridad con SSMS-40 Hr 60.00 10.89 653.32
0.00
0.00
SUBTOTAL MANO DE OBRA 5,220.66
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 2,871.36
Sub Total Costo Mano de Obra: 8,092.02
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 30.00 5.25 157.50
EQ00050Q Retroexcavadora Hr. 30.00 49.00 1,470.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 242.76
Sub Total Costo Equipo: 1,870.26

4. GASTOS GENERALES 10.00% 1,216.31


5. UTILIDAD 10.00% 1,337.94
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,726.62
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 469.27
8. TOTAL PRECIO UNITARIO ADOPTADO 16,913.24
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Losa de HA e Instalacin de Tanque de Aceite Usado. Cdigo: 3.1.7.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0118M Cemento portland Kg 525.00 0.19 98.07
MAT0293M Madera para encofrado p2 510.00 1.40 714.00
MAT0001M Acero de alta resistencia kg 120.00 1.22 146.40
MAT0134M Clavos de 2 1/2 pulg kg 15.00 3.80 57.00
MAT0050M Arenilla m3 0.90 15.32 13.79
MAT0392M Ripio bruto m3 1.20 24.00 28.80
MAT0008M Agua potable lt 270.00 0.01 3.24
MAT0024M Alambre de amarre kg 2.25 3.80 8.55

0.00
Sub Total Costo Materiales: 1,069.85
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 26.02 6.48 168.73
HR-0083O Ayudante general Hr 42.31 4.84 204.56
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 373.29
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 205.31
Sub Total Costo Mano de Obra: 578.61
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion hr 1.05 4.20 4.41
EQ00041Q Mezcladora de Hormign 360 lts Hr 1.20 5.25 6.30
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 17.36
Sub Total Costo Equipo: 28.07

4. GASTOS GENERALES 10.00% 167.65


5. UTILIDAD 10.00% 184.42
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 237.99
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 64.68
8. TOTAL PRECIO UNITARIO ADOPTADO 2,331.27
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Losa de HA y Soporte Metlico Para Lavaojos. Incluye instalacin de un punto


ITEM: Cdigo: 3.1.7.2
de agua de acuerdo al equipo que sea entregado por YPFB TRANSPORTE.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0134M Clavos de 2 1/2 pulg kg 3.77 3.80 14.32
MAT-002M Tubera 1 1/2pulg SCH-40 m 14.00 12.00 168.00
MAT0001M Acero de alta resistencia kg 30.14 1.22 36.78
MAT0392M Ripio bruto m3 0.30 24.00 7.23
MAT0118M Cemento portland Kg 131.88 0.19 24.64
MAT0293M Madera para encofrado p2 128.11 1.40 179.36
MAT0050M Arenilla m3 0.23 15.32 3.46
MAT0008M Agua potable lt 67.82 0.01 0.81
MAT0024M Alambre de amarre kg 0.57 3.80

0.00
Sub Total Costo Materiales: 434.60
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 38.65 6.48 250.64
HR-0083O Ayudante general Hr 60.89 4.84 294.43
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 545.06
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 299.78
Sub Total Costo Mano de Obra: 844.85
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 1.35 4.20 5.68
EQ00041Q Mezcladora de Hormign 360 lts Hr 1.30 5.25 6.80
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 25.35
Sub Total Costo Equipo: 37.82

4. GASTOS GENERALES 10.00% 131.73


5. UTILIDAD 10.00% 144.90
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 186.99
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 50.82
8. TOTAL PRECIO UNITARIO ADOPTADO 1,831.71
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Losas de HA y Cubiertas Metlicas para Extintores. Cdigo: 3.1.7.3

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0008M Agua potable lt 67.82 0.01 0.81
MAT0001M Acero de alta resistencia kg 22.00 1.22 26.84
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 1.02 35.00 35.70
MAT0392M Ripio bruto m3 0.30 24.00 7.23
MAT-003M Tubera 2pulg Sch-40 m 1.50 22.00 33.00
MAT0024M Alambre de amarre kg 0.57 3.80 2.15
MAT0050M Arenilla m3 0.23 15.32 3.46
MAT0118M Cemento portland Kg 50.00 0.19 9.34

0.00
Sub Total Costo Materiales: 118.54
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 10.20 6.48 66.14
HR-0083O Ayudante general Hr 6.78 4.84 32.79
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 98.94
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 54.42
Sub Total Costo Mano de Obra: 153.35
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00059Q Vibradora de inmersion Hr 0.32 4.20 1.34
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.30 5.25 1.58
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 4.60
Sub Total Costo Equipo: 7.52

4. GASTOS GENERALES 10.00% 27.94


5. UTILIDAD 10.00% 30.74
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 39.66
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 10.78
8. TOTAL PRECIO UNITARIO ADOPTADO 388.54
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalacin de Extintores en Paredes y/o Columnas de Edificios/Tinglados. Cdigo: 3.1.7.4

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0635M Letrero para poste de sealizacin pza 1.00 10.00 10.00
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 1.00 35.00 35.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 45.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 2.19 6.48 14.18
HR-0083O Ayudante general Hr 4.50 4.84 21.76
HR-0034O Inspector de Seguridad con SSMS-40 Hr 1.00 10.89 10.89
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 46.82
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 25.75
Sub Total Costo Mano de Obra: 72.58
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 2.18
Sub Total Costo Equipo: 2.18

4. GASTOS GENERALES 10.00% 11.98


5. UTILIDAD 10.00% 13.17
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 17.00
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 4.62
8. TOTAL PRECIO UNITARIO ADOPTADO 166.52
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalacin de Extintores en Postes de 2 empotrados en Bases de HC de 40 x 40 x 60 cm. Cdigo: 3.1.7.5

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0392M Ripio bruto m3 0.04 24.00 0.96
MAT0134M Clavos de 2 1/2 pulg kg 0.06 3.80 0.23
MAT0635M Letrero para poste de sealizacin pza 1.00 10.00 10.00
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 1.00 35.00 35.00
MAT0293M Madera para encofrado p2 2.50 1.40 3.50
MAT0024M Alambre de amarre kg 0.06 3.80 0.23
MAT0050M Arenilla m3 0.03 15.32 0.38
MAT0349M Piedra manzana m3 0.08 38.00 3.04
MAT0118M Cemento portland Kg 14.50 0.19 2.71

0.00
Sub Total Costo Materiales: 56.05
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 8.20 6.48 53.18
HR-0083O Ayudante general Hr 12.58 4.84 60.82
HR-0034O Inspector de Seguridad con SSMS-40 Hr 2.35 10.89 25.59
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 139.58
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 76.77
Sub Total Costo Mano de Obra: 216.35
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.10 5.25 0.53
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 6.49
Sub Total Costo Equipo: 7.02

4. GASTOS GENERALES 10.00% 27.94


5. UTILIDAD 10.00% 30.74
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 39.66
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 10.78
8. TOTAL PRECIO UNITARIO ADOPTADO 388.54
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Canales de Lnea con Tapas Metlicas. Cdigo: 3.1.7.6

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-007M Angular 2pulg x 1/4pulg m 26.00 6.25 162.50
MAT0024M Alambre de amarre kg 7.10 3.80 27.00
MAT0008M Agua potable lt 852.48 0.01 10.23
MAT0392M Ripio bruto m3 3.79 24.00 90.93
MAT0267M LINTERNA T/FAROL RECARGABLE Pza 0.45 33.00 14.85
MAT0118M Cemento portland Kg 1,312.50 0.19 245.18
MAT0134M Clavos de 2 1/2 pulg kg 9.47 3.80 35.99
MAT0293M Madera para encofrado p2 322.05 1.40 450.87
MAT0050M Arenilla m3 2.84 15.32 43.53
MAT0001M Acero de alta resistencia kg 449.52 1.22 548.41
MAT-079M Grating (1 1/4pulg x 3/16pulg) m2 8.97 120.00 1,076.40
Sub Total Costo Materiales: 2,705.89
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 156.29 6.48 1,013.50
HR-0083O Ayudante general Hr 126.00 4.84 609.26
HR-0034O Inspector de Seguridad con SSMS-40 Hr 15.00 10.89 163.33
HR-0131O Soldador de Estructura Calificado Hr 15.00 11.29 169.34
HR-0080O Amolador Hr 15.00 7.06 105.92
PP00091O Pintor Hr 10.00 5.50 55.00
SUBTOTAL MANO DE OBRA 2,116.34
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,163.99
Sub Total Costo Mano de Obra: 3,280.32
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 2.20 5.25 11.55
EQ00087Q Equipo de pintura tipo air less Hr 10.00 6.25 62.50
EQ00059Q Vibradora de inmersion hr 2.12 4.20 8.89
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 98.41
Sub Total Costo Equipo: 181.35

4. GASTOS GENERALES 10.00% 616.76


5. UTILIDAD 10.00% 678.43
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 875.52
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 237.95
8. TOTAL PRECIO UNITARIO ADOPTADO 8,576.22
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Cmaras Electricas y de Instrumentacin con Tapas Metlicas. Cdigo: 3.1.7.7

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0681M Plancha Antideslizante de 1/8" (3.2 mm) m2 0.28 87.92 24.97
MAT0118M Cemento portland Kg 326.02 0.19 60.90
MAT0008M Agua potable lt 190.80 0.01 2.29
MAT-009M Angular 1 1/2pulg x 1/4pulg m 1.08 6.25 6.75
MAT0001M Acero de alta resistencia kg 111.60 1.22 136.15
MAT0050M Arenilla m3 0.64 15.32 9.74
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 5.20 35.00 182.00
MAT0293M Madera para encofrado p2 72.08 1.40 100.91
MAT0134M Clavos de 2 1/2 pulg kg 2.12 3.80 8.06
MAT0680M Plancha Antideslizante de 1/4" (6mm) m2 2.31 164.85 380.80
MAT0268M Liso 1/2 plg. (12 mm.) Bar 12m. m 0.27 0.97 0.26
MAT0392M Ripio bruto m3 0.85 24.00 20.35
MAT0024M Alambre de amarre kg 1.59 3.80 6.04
MAT-005M Insumos de Soldadura Estructural Diario Da 0.10 70.40 7.04
0.00
0.00
Sub Total Costo Materiales: 946.27
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 18.60 6.48 120.62
HR-0083O Ayudante general Hr 15.20 4.84 73.50
HR-0131O Soldador de Estructura Calificado Hr 3.00 11.29 33.87
HR-0080O Amolador Hr 3.00 7.06 21.18
PP00091O Pintor Hr 3.00 5.50 16.50
SUBTOTAL MANO DE OBRA 265.67
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 146.12
Sub Total Costo Mano de Obra: 411.78
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00045Q Motosoldadora 250 D Hr 3.00 7.81 23.44
EQ00041Q Mezcladora de Hormign 360 lts Hr 2.15 5.25 11.29
EQ00059Q Vibradora de inmersion hr 2.15 4.20 9.01
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 12.35
Sub Total Costo Equipo: 56.09

4. GASTOS GENERALES 10.00% 141.41


5. UTILIDAD 10.00% 155.56
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 200.74
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 54.56
8. TOTAL PRECIO UNITARIO ADOPTADO 1,966.41
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Cmaras para Trampa de Chancho, incluye drenaje pluvial (20 cm de caera galvanizada y
ITEM: Cdigo: 3.1.7.8
vlvula 1").

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0050M Arenilla m3 0.20 15.32 3.03
MAT0392M Ripio bruto m3 0.26 24.00 6.34
MAT0008M Agua potable lt 59.40 0.01 0.71
MAT0001M Acero de alta resistencia kg 27.60 1.22 33.67
MAT0134M Clavos de 2 1/2 pulg kg 0.66 3.80 2.51
MAT0118M Cemento portland Kg 80.90 0.19 15.11
MAT0024M Alambre de amarre kg 0.50 3.80 1.88
MAT0293M Madera para encofrado p2 22.44 1.40 31.42
0.00

0.00
Sub Total Costo Materiales: 94.67
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 10.89 6.48 70.62
HR-0083O Ayudante general Hr 6.60 4.84 31.91
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 102.53
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 56.39
Sub Total Costo Mano de Obra: 158.93
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 1.08 5.25 5.65
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 4.77
Sub Total Costo Equipo: 10.42

4. GASTOS GENERALES 10.00% 26.40


5. UTILIDAD 10.00% 29.04
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 37.48
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 10.19
8. TOTAL PRECIO UNITARIO ADOPTADO 367.12
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Cmaras Slop (rea Venteo, Edificio de Mantenimiento y Almacn) Cdigo: 3.1.7.9

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0293M Madera para encofrado p2 133.28 1.40 186.59
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 3.70 35.00 129.50
MAT-009M Angular 1 1/2pulg x 1/4pulg m 1.08 6.25 6.75
MAT0681M Plancha Antideslizante de 1/8" (3.2 mm) m2 0.06 87.92 5.54
MAT0050M Arenilla m3 1.18 15.32 18.02
MAT0024M Alambre de amarre kg 2.94 3.80 11.17
MAT0392M Ripio bruto m3 1.57 24.00 37.63
MAT0118M Cemento portland Kg 616.80 0.19 115.22
MAT0001M Acero de alta resistencia kg 211.20 1.22 257.66
MAT0680M Plancha Antideslizante de 1/4" (6mm) m2 1.57 164.85 258.81
MAT0008M Agua potable lt 352.80 0.01 4.23
MAT0134M Clavos de 2 1/2 pulg kg 3.92 3.80 14.90
MAT-005M Insumos de Soldadura Estructural Diario Da 0.10 70.40 7.04
MAT0268M Liso 1/2 plg. (12 mm.) Bar 12m. m 0.27 0.97 0.26

0.00
Sub Total Costo Materiales: 1,053.33
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 46.00 6.48 298.30
HR-0083O Ayudante general Hr 34.50 4.84 166.82
PP00091O Pintor Hr 2.00 5.50 11.00
HR-0131O Soldador de Estructura Calificado Hr 1.00 11.29 11.29
HR-0080O Amolador Hr 2.00 7.06 14.12
0.00
SUBTOTAL MANO DE OBRA 501.53
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 275.84
Sub Total Costo Mano de Obra: 777.37
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.41 5.25 2.15
EQ00045Q Motosoldadora 250 D Hr 1.00 7.81 7.81
EQ00059Q Vibradora de inmersion hr 0.42 4.20 1.74
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 23.32
Sub Total Costo Equipo: 35.03

4. GASTOS GENERALES 10.00% 186.57


5. UTILIDAD 10.00% 205.23
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 264.85
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 71.98
8. TOTAL PRECIO UNITARIO ADOPTADO 2,594.37
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Pozos Absorbentes (2), Cmaras Spticas (2) y Cmaras de Inspeccin (4) para Sala de Control y
ITEM: Cdigo: 3.1.7.10
Portera.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0392M Ripio bruto m3 7.40 24.00 177.56
MAT0024M Alambre de amarre kg 11.70 3.80 44.46
MAT0293M Madera para encofrado p2 530.40 1.40 742.56
MAT-116M Tubo de Concreto 150 mm interior e=10 cm 1 m de largo. m 6.40 200.00 1,280.00
MAT0049M Arena Fina m3 1.05 19.00 19.91
MAT0134M Clavos de 2 1/2 pulg kg 15.60 3.80 59.28
MAT0252M Ladrillo adobito pza 535.99 0.12 64.32
MAT0118M Cemento portland Kg 2,959.71 0.19 552.87
MAT0050M Arenilla m3 4.68 15.32 71.70
MAT0008M Agua potable lt 1,404.00 0.01 16.85
MAT0001M Acero de alta resistencia kg 507.00 1.22 618.54
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 3,648.05
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 300.00 6.48 1,945.44
HR-0083O Ayudante general Hr 600.00 4.84 2,901.22
HR-0139O Supervisor obras Civiles Hr 300.00 11.29 3,386.72
PP00013O Ayudante de Albail hr 600.00 1.60 960.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 300.00 10.89 3,266.61
0.00
SUBTOTAL MANO DE OBRA 12,459.98
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 6,852.99
Sub Total Costo Mano de Obra: 19,312.98
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00031Q Excavadora Tipo CAT-320 Hr. 15.00 126.00 1,890.00
EQ00041Q Mezcladora de Hormign 360 lts Hr 100.00 5.25 525.00
EQ00059Q Vibradora de inmersion hr 100.00 4.20 420.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 579.39
Sub Total Costo Equipo: 3,414.39

4. GASTOS GENERALES 10.00% 2,637.54


5. UTILIDAD 10.00% 2,901.30
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,744.13
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,017.59
8. TOTAL PRECIO UNITARIO ADOPTADO 36,675.97
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Fundaciones de HA para Postes de Iluminacin. Cdigo: 3.1.7.11

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0293M Madera para encofrado p2 48.28 1.40 67.59
MAT0134M Clavos de 2 1/2 pulg kg 1.42 3.80 5.40
MAT0392M Ripio bruto m3 0.57 24.00 13.63
MAT0008M Agua potable lt 127.80 0.01 1.53
MAT-029M Perno de anclaje de 7/8pulg x 661 mm Pza 4.00 30.00 120.00
MAT0050M Arenilla m3 0.43 15.32 6.53
MAT0001M Acero de alta resistencia kg 79.20 1.22 96.62
MAT0118M Cemento portland Kg 231.20 0.19 43.19
MAT0024M Alambre de amarre kg 1.07 3.80 4.05
0.00
0.00
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 358.54
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 22.50 6.48 145.91
HR-0083O Ayudante general Hr 33.50 4.84 161.98
0.00

0.00
SUBTOTAL MANO DE OBRA 307.89
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 169.34
Sub Total Costo Mano de Obra: 477.23
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.55 5.25 2.89
EQ00059Q Vibradora de inmersion hr 0.56 4.20 2.35
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 14.32
Sub Total Costo Equipo: 19.55

4. GASTOS GENERALES 10.00% 85.53


5. UTILIDAD 10.00% 94.09
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 121.42
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 33.00
8. TOTAL PRECIO UNITARIO ADOPTADO 1,189.36
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Construccin de Tanque de HA de Almacenamiento de Agua , cmara de vlvulas y medidor de


ITEM: agua (el tanque deber redisearse y construirse con el doble de la capacidad indicada en la Cdigo: 3.1.7.12
ingeniera y manteniendo la cuanta de fierros)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-007M Angular 2pulg x 1/4pulg m 8.40 6.25 52.50
MAT0134M Clavos de 2 1/2 pulg kg 18.63 3.80 70.78
MAT0164M Corrugado 5/8 plg. (16 mm.) Bar 12m. brra 3.00 31.70 95.10
MAT-009M Angular 1 1/2pulg x 1/4pulg m 17.00 6.25 106.25
MAT0050M Arenilla m3 5.92 15.32 90.76
MAT0268M Liso 1/2 plg. (12 mm.) Bar 12m. m 2.00 0.97 1.93
MAT0001M Acero de alta resistencia kg 878.40 1.22 1,071.65
MAT0118M Cemento portland Kg 3,261.65 0.19 609.28
MAT0008M Agua potable lt 1,416.60 0.01 17.00
MAT0392M Ripio bruto m3 8.22 24.00 197.28
MAT0293M Madera para encofrado p2 320.00 1.40 448.00
MAT0024M Alambre de amarre kg 14.69 3.80 55.83
MAT0349M Piedra manzana m3 3.85 38.00 146.22
MAT0680M Plancha Antideslizante de 1/4" (6mm) m2 4.17 164.85 687.42
MAT-111M Perfil "C" prefabricado (6"x3"x1/4") m 4.00 22.00
0.00
Sub Total Costo Materiales: 3,650.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 85.00 6.48 551.21
HR-0083O Ayudante general Hr 52.00 4.84 251.44
0.00

0.00
SUBTOTAL MANO DE OBRA 802.65
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 441.46
Sub Total Costo Mano de Obra: 1,244.10
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 4.45 5.25 23.36
EQ00059Q Vibradora de inmersion hr 4.50 4.20 18.90
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 37.32
Sub Total Costo Equipo: 79.58

4. GASTOS GENERALES 10.00% 497.37


5. UTILIDAD 10.00% 547.11
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 706.04
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 191.89
8. TOTAL PRECIO UNITARIO ADOPTADO 6,916.09
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Instalacin de Letreros de Seguridad en postes de 2" empotrados en Bases de HC de 40 x 40 x


ITEM: Cdigo: 3.1.7.13
60 cm (slo los letreros sern provistos por YPFB TRANSPORTE).

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT-026M Pintura estructural(tinglado, soportes,etc) m2 1.00 35.00 35.00
MAT0349M Piedra manzana m3 0.08 38.00 3.04
MAT0392M Ripio bruto m3 0.04 24.00 0.96
MAT0134M Clavos de 2 1/2 pulg kg 0.06 3.80 0.23
MAT0118M Cemento portland Kg 14.50 0.19 2.71
MAT0024M Alambre de amarre kg 0.06 3.80 0.23
MAT0293M Madera para encofrado p2 2.50 1.40 3.50
MAT0635M Letrero para poste de sealizacin pza 1.00 10.00 10.00
MAT0050M Arenilla m3 0.03 15.32 0.38
0.00
0.00
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 56.05
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 1.92 6.48 12.45
HR-0083O Ayudante general Hr 4.70 4.84 22.73
0.00

0.00
SUBTOTAL MANO DE OBRA 35.18
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 19.35
Sub Total Costo Mano de Obra: 54.52
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00041Q Mezcladora de Hormign 360 lts Hr 0.30 5.25 1.58
EQ00059Q Vibradora de inmersion hr 0.28 4.20 1.18
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1.64
Sub Total Costo Equipo: 4.39

4. GASTOS GENERALES 10.00% 11.50


5. UTILIDAD 10.00% 12.65
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 16.32
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 4.44
8. TOTAL PRECIO UNITARIO ADOPTADO 159.86
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Areas con Grava. Cdigo: 3.1.7.14

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0392M Ripio bruto m3 0.15 24.00 3.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 3.60
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0081O Ayudante albanil Hr 0.50 4.80 2.40
HR-0078O Albail Hr 0.05 6.48 0.34
0.00

0.00
SUBTOTAL MANO DE OBRA 2.75
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1.51
Sub Total Costo Mano de Obra: 4.26
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 0.13
Sub Total Costo Equipo: 0.13

4. GASTOS GENERALES 10.00% 0.80


5. UTILIDAD 10.00% 0.88
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1.13
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 0.31
8. TOTAL PRECIO UNITARIO ADOPTADO 11.10
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Construccin de Aceras Peatonales de HC. Cdigo: 3.1.7.15

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0050M Arenilla m3 0.03 15.32 0.46
MAT0118M Cemento portland Kg 23.00 0.19 4.30
MAT0349M Piedra manzana m3 0.10 38.00 3.80
0.00
0.00
0.00

0.00
Sub Total Costo Materiales: 8.56
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0081O Ayudante albanil Hr 4.05 4.80 19.43
HR-0078O Albail Hr 2.50 6.48 16.21
0.00

0.00
SUBTOTAL MANO DE OBRA 35.64
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 19.60
Sub Total Costo Mano de Obra: 55.25
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1.66
Sub Total Costo Equipo: 1.66

4. GASTOS GENERALES 10.00% 6.55


5. UTILIDAD 10.00% 7.20
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 9.29
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 2.53
8. TOTAL PRECIO UNITARIO ADOPTADO 91.03
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Muro de Ladrillo Adobito Visto con mortero de cemento y arena (dosif.: 1:4), incluye Columnas y
ITEM: Cdigo: 3.1.7.16
Viga "T" Invertida de HA (hormigones y morteros con Sika 1 o similar), pintado.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0050M Arenilla m3 0.13 15.32 2.02
MAT0024M Alambre de amarre kg 0.33 3.80 1.25
MAT0355M Pintura latex para interior lt 1.80 5.20 9.36
MAT0293M Madera para encofrado p2 14.96 1.40 20.94
MAT0264M Lija ml 1.20 1.00 1.20
MAT0069M Brocha de 2 pulg pza 0.06 4.00 0.24
MAT0392M Ripio bruto m3 0.18 24.00 4.22
MAT0395M Rodillo pza 0.06 4.00 0.24
MAT0398M Sellador para paredes lt 0.90 3.00 2.70
MAT0134M Clavos de 2 1/2 pulg kg 0.44 3.80 1.67
MAT0008M Agua potable lt 39.60 0.01 0.48
MAT0118M Cemento portland Kg 77.00 0.19 14.38
MAT0001M Acero de alta resistencia kg 14.30 1.22 17.45
MAT0306M Masa corrida lt 0.90 3.20 2.88
0.00
Sub Total Costo Materiales: 79.04
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0081O Ayudante albanil Hr 2.24 4.80 10.77
HR-0078O Albail Hr 1.50 6.48 9.73
0.00

0.00
SUBTOTAL MANO DE OBRA 20.50
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 11.28
Sub Total Costo Mano de Obra: 31.78
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 0.95
Sub Total Costo Equipo: 0.95

4. GASTOS GENERALES 10.00% 11.18


5. UTILIDAD 10.00% 12.29
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 15.87
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 4.31
8. TOTAL PRECIO UNITARIO ADOPTADO 155.42
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Pasillo de Circulacin (Incluye cimiento de HC, piso de HS, estructura metlica, planchas,
ITEM: Cdigo: 3.1.7.17
pernos, cubierta, carpintera de aluminio y vidrio (4mm), etc.).

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0024M Alambre de amarre kg 1.20 3.80 4.56
MAT-115M Ventana de Aluminio m2 1.20 65.00 78.00
MAT0293M Madera para encofrado p2 6.00 1.40 8.40
MAT0349M Piedra manzana m3 0.10 38.00 3.80
MAT0118M Cemento portland Kg 42.00 0.19 7.85
MAT0392M Ripio bruto m3 0.10 24.00 2.40
MAT0049M Arena Fina m3 0.10 19.00 1.90
MAT0134M Clavos de 2 1/2 pulg kg 1.50 3.80 5.70
MAT0252M Ladrillo adobito pza 133.00 0.12 15.96
MAT0050M Arenilla m3 0.05 15.32 0.77

0.00
Sub Total Costo Materiales: 129.33
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0081O Ayudante albanil Hr 3.34 4.80 16.03
HR-0078O Albail Hr 2.00 6.48 12.97
0.00

0.00
SUBTOTAL MANO DE OBRA 29.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 15.95
Sub Total Costo Mano de Obra: 44.95
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1.35
Sub Total Costo Equipo: 1.35

4. GASTOS GENERALES 10.00% 17.56


5. UTILIDAD 10.00% 19.32
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 24.93
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 6.78
8. TOTAL PRECIO UNITARIO ADOPTADO 244.22
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Soldadura de todos los prefabricados, lneas de proceso, lneas auxiliares y lneas de


ITEM: Cdigo: 3.2.1.1
interconexin especificados en los planos mecnicos e isometricos

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 90.00 250.00 22,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 22,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0140O Supervisor obras mecanicas Hr 300.00 14.09 4,227.45
HR-0089O Chofer camioneta Hr 450.00 6.33 2,848.50
HR-0090O Chofer equipo pesado Hr 300.00 8.79 2,635.66
HR-0129O Soldador calificado API 1104 Hr 2,400.00 16.89 40,545.62
HR-0080O Amolador Hr 2,400.00 7.06 16,947.12
HR-0122O Operador grua de 20 a 50 tn Hr 300.00 8.09 2,425.86
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 300.00 5.12 1,537.08
HR-0088O Caista armador Hr 600.00 19.60 11,760.22
HR-0111O Inspector de Lquipos Penetrantes Hr 200.00 22.39 4,477.36
HR-0083O Ayudante general Hr 2,100.00 4.84 10,154.27
HR-0104O Inspector de Calidad Mecnico Hr 300.00 10.89 3,266.61
HR-0108O Inspector de Soldadura Nivel II Hr 300.00 36.32 10,895.74
0.00
0.00
SUBTOTAL MANO DE OBRA 111,721.49
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 61,446.82
Sub Total Costo Mano de Obra: 173,168.31
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00062Q Grua de 30 ton hr 250.00 120.00 30,000.00
EQ00045Q Motosoldadora 250 D Hr 2406.06 7.81 18,797.36
EQ00042Q Micro para 21 personas Hr 300.00 13.42 4,025.03
EQ00009Q Camin Hidrogra 3 ton Hr 300.00 21.00 6,300.00
EQ00014Q Camioneta 4 x 4 Hr 450.00 10.50 4,725.00
EQ00025Q Equipo de Radiografiado Industrial Hr 300.00 65.00 19,500.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 5,195.05
Sub Total Costo Equipo: 88,542.43

4. GASTOS GENERALES 10.00% 28,421.07


5. UTILIDAD 10.00% 31,263.18
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 40,345.22
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 10,965.18
8. TOTAL PRECIO UNITARIO ADOPTADO 395,205.40
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

rea de Trampas de Chancho: Montaje e Instalacin de dos Trampas de Chancho, prefabricados


ITEM: Cdigo: 3.2.1.2
de tubera y accesorios, vlvulas, etc.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 10.00 250.00 2,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 2,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0090O Chofer equipo pesado Hr 70.00 8.79 614.99
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 70.00 5.12 358.65
HR-0089O Chofer camioneta Hr 70.00 6.33 443.10
HR-0140O Supervisor obras mecanicas Hr 70.00 14.09 986.41
HR-0088O Caista armador Hr 70.00 19.60 1,372.03
HR-0080O Amolador Hr 150.00 7.06 1,059.20
HR-0083O Ayudante general Hr 150.00 4.84 725.30
HR-0104O Inspector de Calidad Mecnico Hr 70.00 10.89 762.21
HR-0111O Inspector de Lquipos Penetrantes Hr 70.00 22.39 1,567.08
HR-0108O Inspector de Soldadura Nivel II Hr 70.00 36.32 2,542.34
HR-0129O Soldador calificado API 1104 Hr 70.00 16.89 1,182.58
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 11,613.87
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 6,387.63
Sub Total Costo Mano de Obra: 18,001.51
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00025Q Equipo de Radiografiado Industrial Hr 70.00 65.00 4,550.00
EQ00014Q Camioneta 4 x 4 Hr 70.00 10.50 735.00
EQ00009Q Camin Hidrogra 3 ton Hr 70.00 21.00 1,470.00
EQ00045Q Motosoldadora 250 D Hr 153.88 7.81 1,202.20
EQ00042Q Micro para 21 personas Hr 70.00 13.42 939.17
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 540.05
Sub Total Costo Equipo: 9,436.42

4. GASTOS GENERALES 10.00% 2,993.79


5. UTILIDAD 10.00% 3,293.17
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 4,249.85
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,155.04
8. TOTAL PRECIO UNITARIO ADOPTADO 41,629.78
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

rea de Medicin y Regulacin: Montaje e instalacin de dos medidores de gas, vlvulas


ITEM: reguladoras, prefabricados de tuberas y accesorios, filtros separadores V-5100 y V-5600, filtro de Cdigo: 3.2.1.3
gas combustible F-5700, vlvulas, puente de regulacin y medicin de gas combustible, etc.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 20.00 250.00 5,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 5,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0104O Inspector de Calidad Mecnico Hr 200.00 10.89 2,177.74
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 175.00 5.12 896.63
HR-0108O Inspector de Soldadura Nivel II Hr 200.00 36.32 7,263.82
HR-0129O Soldador calificado API 1104 Hr 400.00 16.89 6,757.60
HR-0080O Amolador Hr 400.00 7.06 2,824.52
HR-0122O Operador grua de 20 a 50 tn Hr 150.00 8.09 1,212.93
HR-0089O Chofer camioneta Hr 200.00 6.33 1,266.00
HR-0090O Chofer equipo pesado Hr 200.00 8.79 1,757.10
HR-0140O Supervisor obras mecanicas Hr 200.00 14.09 2,818.30
HR-0083O Ayudante general Hr 1,200.00 4.84 5,802.44
HR-0088O Caista armador Hr 200.00 19.60 3,920.07
0.00
0.00
SUBTOTAL MANO DE OBRA 36,697.16
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 20,183.44
Sub Total Costo Mano de Obra: 56,880.60
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00042Q Micro para 21 personas Hr 200.00 13.42 2,683.35
EQ00014Q Camioneta 4 x 4 Hr 200.00 10.50 2,100.00
EQ00009Q Camin Hidrogra 3 ton Hr 175.00 21.00 3,675.00
EQ00062Q Grua de 30 ton hr 150.00 120.00 18,000.00
EQ00045Q Motosoldadora 250 D Hr 415.71 7.81 3,247.73
EQ00025Q Equipo de Radiografiado Industrial Hr 100.00 65.00 6,500.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 1,706.42
Sub Total Costo Equipo: 37,912.49

4. GASTOS GENERALES 10.00% 9,979.31


5. UTILIDAD 10.00% 10,977.24
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 14,166.16
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 3,850.13
8. TOTAL PRECIO UNITARIO ADOPTADO 138,765.94
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

rea Gas Combustible a tres Micro Turbinas: Montaje e Instalacin de lnea de gas combustible,
ITEM: vlvulas, accesorios, etc. Incluye el montaje e instalacin de las microturbinas y de los kits de Cdigo: 3.2.1.4
regulacin de cada microturbina (ubicacin a definir en campo).

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 6.00 250.00 1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0104O Inspector de Calidad Mecnico Hr 60.00 10.89 653.32
HR-0129O Soldador calificado API 1104 Hr 60.00 16.89 1,013.64
HR-0111O Inspector de Lquipos Penetrantes Hr 10.00 22.39 223.87
HR-0088O Caista armador Hr 20.00 19.60 392.01
HR-0108O Inspector de Soldadura Nivel II Hr 30.00 36.32 1,089.57
HR-0080O Amolador Hr 60.00 7.06 423.68
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 60.00 5.12 307.42
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 4,103.51
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 2,256.93
Sub Total Costo Mano de Obra: 6,360.43
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00045Q Motosoldadora 250 D Hr 70.15 7.81 548.07
EQ00009Q Camin Hidrogra 3 ton Hr 60.00 21.00 1,260.00
EQ00025Q Equipo de Radiografiado Industrial Hr 10.00 65.00 650.00
EQ00042Q Micro para 21 personas Hr 20.00 13.42 268.34
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 190.81
Sub Total Costo Equipo: 2,917.22

4. GASTOS GENERALES 10.00% 1,077.77


5. UTILIDAD 10.00% 1,185.54
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,529.94
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 415.81
8. TOTAL PRECIO UNITARIO ADOPTADO 14,986.72
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

rea Tanque Separador: Montaje e Instalacin de lneas, vlvulas, tanque separador V-5000,
ITEM: tanque de aceite usado TK-5100, bomba P-5020, accesorios, etc. La configuracin del juego de Cdigo: 3.2.1.5
vlvulas de la bomba de oxigenacin ser definida en campo.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 4.00 250.00 1,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0108O Inspector de Soldadura Nivel II Hr 40.00 36.32 1,452.76
HR-0129O Soldador calificado API 1104 Hr 40.00 16.89 675.76
HR-0080O Amolador Hr 40.00 7.06 282.45
HR-0104O Inspector de Calidad Mecnico Hr 40.00 10.89 435.55
HR-0088O Caista armador Hr 25.00 19.60 490.01
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 40.00 5.12 204.94
HR-0111O Inspector de Lquipos Penetrantes Hr 9.10 22.39 203.77
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 3,745.25
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 2,059.89
Sub Total Costo Mano de Obra: 5,805.14
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00045Q Motosoldadora 250 D Hr 40.00 7.81 312.50
EQ00009Q Camin Hidrogra 3 ton Hr 40.00 21.00 840.00
EQ00025Q Equipo de Radiografiado Industrial Hr 10.00 65.00 650.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 174.15
Sub Total Costo Equipo: 1,976.65

4. GASTOS GENERALES 10.00% 878.18


5. UTILIDAD 10.00% 966.00
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,246.62
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 338.81
8. TOTAL PRECIO UNITARIO ADOPTADO 12,211.40
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: rea de Venteo y Alivios: Montaje e Instalacin de lneas, vlvulas, venteo V-5200, accesorios, etc Cdigo: 3.2.1.6

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 6.00 250.00 1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0129O Soldador calificado API 1104 Hr 60.00 16.89 1,013.64
HR-0111O Inspector de Lquipos Penetrantes Hr 11.06 22.39 247.58
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 60.00 5.12 307.42
HR-0108O Inspector de Soldadura Nivel II Hr 30.00 36.32 1,089.57
HR-0088O Caista armador Hr 60.00 19.60 1,176.02
HR-0080O Amolador Hr 60.00 7.06 423.68
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 4,257.91
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 2,341.85
Sub Total Costo Mano de Obra: 6,599.75
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 60.00 21.00 1,260.00
EQ00062Q Grua de 30 ton hr 5.50 120.00 660.00
EQ00025Q Equipo de Radiografiado Industrial Hr 10.00 65.00 650.00
EQ00045Q Motosoldadora 250 D Hr 60.00 7.81 468.75
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 197.99
Sub Total Costo Equipo: 3,236.74

4. GASTOS GENERALES 10.00% 1,133.65


5. UTILIDAD 10.00% 1,247.01
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,609.28
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 437.38
8. TOTAL PRECIO UNITARIO ADOPTADO 15,763.81
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Interconexin del Loop del GAA 12": Excavacin y tapado de zanjas, soldadura, ensayos NDT,
prueba hidraulica, pintado, revestimiento, trabajos de adecuacin en cmara de HA (relleno con
ITEM: Cdigo: 3.2.1.7
HS, puente de adherencia con Colmafix 32, pintura impermeabilizante en el rea intervenida con
Sika Top 107 Seal), TIE-IN 002, TIE-IN 004, etc.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 6.00 250.00 1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0078O Albail Hr 60.00 6.48 389.09
HR-0140O Supervisor obras mecanicas Hr 60.00 14.09 845.49
HR-0104O Inspector de Calidad Mecnico Hr 60.00 10.89 653.32
HR-0081O Ayudante albanil Hr 140.00 4.80 672.47
HR-0129O Soldador calificado API 1104 Hr 80.00 16.89 1,351.52
HR-0108O Inspector de Soldadura Nivel II Hr 50.00 36.32 1,815.96
HR-0088O Caista armador Hr 60.00 19.60 1,176.02
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 60.00 5.12 307.42
HR-0080O Amolador Hr 120.00 7.06 847.36
HR-0111O Inspector de Lquipos Penetrantes Hr 30.00 22.39 671.60
PP00092O Instrumentista hr 36.00 35.00 1,260.00
SUBTOTAL MANO DE OBRA 9,990.24
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 5,494.63
Sub Total Costo Mano de Obra: 15,484.87
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 60.00 21.00 1,260.00
EQ00023Q Curvadora 10-12pulg Hr 20.00 10.94 218.75
EQ00042Q Micro para 21 personas Hr 20.00 13.42 268.34
EQ00045Q Motosoldadora 250 D Hr 80.00 7.81 625.00
EQ00041Q Mezcladora de Hormign 360 lts Hr 40.00 5.25 210.00
EQ00025Q Equipo de Radiografiado Industrial Hr 10.00 65.00 650.00
EQ00014Q Camioneta 4 x 4 Hr 40.00 10.50 420.00
EQ00030Q Excavadora Tipo CAT-320 Hr. 40.00 78.08 3,123.20
EQ00002Q Ambulancia SVP Hr 40.00 21.88 875.00
EQ00081Q Registrador de Presin da 2.50 100.00 250.00
EQ00060Q Vibrocompactador a rodillo Hr 7.52 26.25 197.33
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 464.55
Sub Total Costo Equipo: 8,562.16

4. GASTOS GENERALES 10.00% 2,554.70


5. UTILIDAD 10.00% 2,810.17
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,626.54
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 985.63
8. TOTAL PRECIO UNITARIO ADOPTADO 35,524.08
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Interconexin del GAA 6": Excavacin y tapado de zanjas, curvado de tuberas, soldadura,
ITEM: Cdigo: 3.2.1.8
ensayos NDT, prueba hidraulica, pintado, revestimiento, TIE-IN 001, TIE-IN 003, etc.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 5.00 250.00 1,250.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,250.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0111O Inspector de Lquipos Penetrantes Hr 29.84 22.39 668.02
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 50.00 5.12 256.18
HR-0140O Supervisor obras mecanicas Hr 50.00 14.09 704.58
HR-0081O Ayudante albanil Hr 60.00 4.80 288.20
HR-0104O Inspector de Calidad Mecnico Hr 50.00 10.89 544.44
HR-0078O Albail Hr 50.00 6.48 324.24
HR-0129O Soldador calificado API 1104 Hr 80.00 16.89 1,351.52
HR-0088O Caista armador Hr 40.00 19.60 784.01
PP00092O Instrumentista hr 36.00 35.00 1,260.00
HR-0108O Inspector de Soldadura Nivel II Hr 20.00 36.32 726.38
HR-0080O Amolador Hr 80.00 7.06 564.90
SUBTOTAL MANO DE OBRA 7,472.47
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 4,109.86
Sub Total Costo Mano de Obra: 11,582.32
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00014Q Camioneta 4 x 4 Hr 50.00 10.50 525.00
EQ00030Q Excavadora Tipo CAT-320 Hr. 40.00 78.08 3,123.20
EQ00009Q Camin Hidrogra 3 ton Hr 40.00 21.00 840.00
EQ00002Q Ambulancia SVP Hr 30.00 21.88 656.25
EQ00045Q Motosoldadora 250 D Hr 80.00 7.81 625.00
EQ00081Q Registrador de Presin da 2.50 100.00 250.00
EQ00023Q Curvadora 10-12pulg Hr 10.00 10.94 109.38
EQ00025Q Equipo de Radiografiado Industrial Hr 10.00 65.00 650.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 347.47
Sub Total Costo Equipo: 7,126.29

4. GASTOS GENERALES 10.00% 1,995.86


5. UTILIDAD 10.00% 2,195.45
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,833.23
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 770.03
8. TOTAL PRECIO UNITARIO ADOPTADO 27,753.19
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

rea de Compresores: Montaje e Instalacin de rack de lneas, lneas de proceso & auxiliares,
ITEM: Cdigo: 3.2.1.9
vlvulas de los 4 Compresores, accesorios, etc.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 45.00 250.00 11,250.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 11,250.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0090O Chofer equipo pesado Hr 900.00 8.79 7,906.97
HR-0083O Ayudante general Hr 2,700.00 4.84 13,055.49
HR-0080O Amolador Hr 900.00 7.06 6,355.17
HR-0122O Operador grua de 20 a 50 tn Hr 150.00 8.09 1,212.93
HR-0129O Soldador calificado API 1104 Hr 900.00 16.89 15,204.61
HR-0140O Supervisor obras mecanicas Hr 450.00 14.09 6,341.18
HR-0089O Chofer camioneta Hr 450.00 6.33 2,848.50
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 450.00 5.12 2,305.62
HR-0108O Inspector de Soldadura Nivel II Hr 450.00 36.32 16,343.60
HR-0104O Inspector de Calidad Mecnico Hr 450.00 10.89 4,899.92
HR-0111O Inspector de Lquipos Penetrantes Hr 145.71 22.39 3,261.92
HR-0088O Caista armador Hr 450.00 19.60 8,820.16
SUBTOTAL MANO DE OBRA 88,556.06
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 48,705.83
Sub Total Costo Mano de Obra: 137,261.89
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 450.00 21.00 9,450.00
EQ00045Q Motosoldadora 250 D Hr 900.00 7.81 7,031.25
EQ00025Q Equipo de Radiografiado Industrial Hr 150.00 65.00 9,750.00
EQ00014Q Camioneta 4 x 4 Hr 450.00 10.50 4,725.00
EQ00042Q Micro para 21 personas Hr 300.00 13.42 4,025.03
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 4,117.86
Sub Total Costo Equipo: 39,099.13

4. GASTOS GENERALES 10.00% 18,761.10


5. UTILIDAD 10.00% 20,637.21
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 26,632.38
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 7,238.25
8. TOTAL PRECIO UNITARIO ADOPTADO 260,879.97
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Montaje e Instalacin de las 4 Unidades de Compresin, equipos auxiliares, escapes,


silenciadores, tanques de aceite, soportes metlicos, prefabricados de tubera, tanque de agua,
ITEM: mantas aislantes de los escapes, accesorios, lneas de venteos atmosfricos, etc. Incluye el Cdigo: 3.2.1.10
soporte a los tcnicos de Fbrica y de YPFB TRANSPORTE y el montaje e instalacin de los
paneles de control (UCP) de cada unidad de compresin.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 40.00 250.00 10,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 10,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0140O Supervisor obras mecanicas Hr 600.00 14.09 8,454.91
HR-0108O Inspector de Soldadura Nivel II Hr 600.00 36.32 21,791.47
HR-0089O Chofer camioneta Hr 600.00 6.33 3,798.00
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 600.00 5.12 3,074.16
HR-0083O Ayudante general Hr 1,800.00 4.84 8,703.66
HR-0104O Inspector de Calidad Mecnico Hr 600.00 10.89 6,533.22
HR-0111O Inspector de Lquipos Penetrantes Hr 280.61 22.39 6,281.98
HR-0080O Amolador Hr 1,200.00 7.06 8,473.56
HR-0122O Operador grua de 20 a 50 tn Hr 300.00 8.09 2,425.86
HR-0088O Caista armador Hr 600.00 19.60 11,760.22
HR-0129O Soldador calificado API 1104 Hr 600.00 16.89 10,136.41
0.00
SUBTOTAL MANO DE OBRA 91,433.43
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 50,288.39
Sub Total Costo Mano de Obra: 141,721.82
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00042Q Micro para 21 personas Hr 600.00 13.42 8,050.05
EQ00045Q Motosoldadora 250 D Hr 600.00 7.81 4,687.50
EQ00009Q Camin Hidrogra 3 ton Hr 600.00 21.00 12,600.00
EQ00014Q Camioneta 4 x 4 Hr 600.00 10.50 6,300.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 4,251.65
Sub Total Costo Equipo: 35,889.20

4. GASTOS GENERALES 10.00% 18,761.10


5. UTILIDAD 10.00% 20,637.21
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 26,632.38
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 7,238.25
8. TOTAL PRECIO UNITARIO ADOPTADO 260,879.97
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

rea de Tanque de Agua Desmineralizada para Compresores: Montaje e Instalacin de lneas,


ITEM: tanque de agua, vlvulas, bomba P-5010, accesorios, etc. El arreglo de vlvulas para el tanque y Cdigo: 3.2.1.11
la bomba p-5010 podr ser modificado a solicitud de YPFB TRANSPORTE.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0240M Insumos diarios para soldadura da 2.00 250.00 500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0111O Inspector de Lquipos Penetrantes Hr 8.92 22.39 199.61
HR-0080O Amolador Hr 30.00 7.06 211.84
HR-0104O Inspector de Calidad Mecnico Hr 30.00 10.89 326.66
HR-0129O Soldador calificado API 1104 Hr 30.00 16.89 506.82
HR-0088O Caista armador Hr 30.00 19.60 588.01
HR-0108O Inspector de Soldadura Nivel II Hr 15.00 36.32 544.79
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,377.72
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,307.75
Sub Total Costo Mano de Obra: 3,685.47
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00042Q Micro para 21 personas Hr 20.00 13.42 268.34
EQ00045Q Motosoldadora 250 D Hr 30.00 7.81 234.38
EQ00009Q Camin Hidrogra 3 ton Hr 30.00 21.00 630.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 110.56
Sub Total Costo Equipo: 1,243.27

4. GASTOS GENERALES 10.00% 542.87


5. UTILIDAD 10.00% 597.16
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 770.64
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 209.45
8. TOTAL PRECIO UNITARIO ADOPTADO 7,548.87
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Montaje e Instalacin del Sistema de Aire Comprimido al Edificio de Compresores, Edificio de


Mantenimiento / Almacn y Edificio de Micro Turbinas; instalacin de compresor de aire , lneas,
ITEM: vlvulas,etc. El arreglo de vlvulas para el compresor de aire podr ser modificado a solicitud de Cdigo: 3.2.1.12
YPFB TRANSPORTE. Se deber modificar el trazado de la caera para aire comprimido para el
taller por reubicacin de puerta de ingreso.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0104O Inspector de Calidad Mecnico Hr 50.00 10.89 544.44
HR-0147O Tecnico instrumentista Hr 37.22 6.48 241.33
HR-0083O Ayudante general Hr 100.00 4.84 483.54
HR-0123O Operador hidrogrua de 2 a 5 tn Hr 20.00 5.12 102.47
HR-0082O Ayudante Caista Hr 90.00 7.06 635.52
HR-0088O Caista armador Hr 50.00 19.60 980.02
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,987.31
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,643.02
Sub Total Costo Mano de Obra: 4,630.33
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 20.00 21.00 420.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 138.91
Sub Total Costo Equipo: 558.91

4. GASTOS GENERALES 10.00% 518.92


5. UTILIDAD 10.00% 570.82
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 736.64
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 200.21
8. TOTAL PRECIO UNITARIO ADOPTADO 7,215.83
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Montaje e Instalacin del Sistema de Agua desde el Tanque de Agua al Edificio de Compresores,
Edificio de Mantenimiento / Almacen, Sala de Control y Portera, ducha lava ojos, etc. Incluye el
ITEM: Cdigo: 3.2.1.13
tendido de caera hasta la vivienda de operadores (las instalaciones en el interior de la vivienda a
cargo de terceros).

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0147O Tecnico instrumentista Hr 41.03 6.48 266.08
HR-0082O Ayudante Caista Hr 40.00 7.06 282.45
HR-0083O Ayudante general Hr 80.00 4.84 386.83
HR-0104O Inspector de Calidad Mecnico Hr 40.00 10.89 435.55
HR-0088O Caista armador Hr 56.00 19.60 1,097.62
HR-0078O Albail Hr 80.00 6.48 518.78
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,987.31
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,643.02
Sub Total Costo Mano de Obra: 4,630.33
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 20.00 21.00 420.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 138.91
Sub Total Costo Equipo: 558.91

4. GASTOS GENERALES 10.00% 518.92


5. UTILIDAD 10.00% 570.82
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 736.64
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 200.21
8. TOTAL PRECIO UNITARIO ADOPTADO 7,215.83
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Montaje e Instalacin de Manifold de Regulacin y Medicin de Gas para Vivienda de Operadores


ITEM: (incluye tendido de tubera slo hasta el manifold, desde el manifold hasta la vivienda la tubera Cdigo: 3.2.1.14
ser instalada por terceros)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0147O Tecnico instrumentista Hr 10.00 6.48 64.85
HR-0088O Caista armador Hr 15.17 19.60 297.29
HR-0082O Ayudante Caista Hr 20.00 7.06 141.23
HR-0083O Ayudante general Hr 20.00 4.84 96.71
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 600.07
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 330.04
Sub Total Costo Mano de Obra: 930.11
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 27.90
Sub Total Costo Equipo: 27.90

4. GASTOS GENERALES 10.00% 95.80


5. UTILIDAD 10.00% 105.38
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 135.99
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 36.96
8. TOTAL PRECIO UNITARIO ADOPTADO 1,332.15
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Revestimiento epxico 100% slidos a todas las lneas enterradas. Cdigo: 3.2.1.15

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0685M Pintura 100% slidos para lneas enterradas m2 150.00 65.00 9,750.00
MAT0050M Arenilla m3 20.00 15.32 306.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 10,056.40
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0034O Inspector de Seguridad con SSMS-40 Hr 60.00 10.89 653.32
PP00091O Pintor Hr 120.00 5.50 660.00
HR-0104O Inspector de Calidad Mecnico Hr 60.00 10.89 653.32
HR-0083O Ayudante general Hr 480.00 4.84 2,320.98
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 4,287.62
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 2,358.19
Sub Total Costo Mano de Obra: 6,645.81
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00017Q Compresor 180 cfm - 85 psi Hr 60.00 28.00 1,680.00
EQ00009Q Camin Hidrogra 3 ton Hr 60.00 21.00 1,260.00
EQ00024Q Equipo de Arenado Hr 61.76 8.75 540.38
EQ00087Q Equipo de pintura tipo air less Hr 60.00 6.25 375.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 199.37
Sub Total Costo Equipo: 4,054.76

4. GASTOS GENERALES 10.00% 2,075.70


5. UTILIDAD 10.00% 2,283.27
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,946.56
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 800.83
8. TOTAL PRECIO UNITARIO ADOPTADO 28,863.32
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Inspeccin NDT (Radiogrfica, tintas penetrantes ) al 100% de las juntas soldadas en las lneas de
ITEM: Cdigo: 3.2.1.16
proceso, lneas auxiliares y lneas de interconexion.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0382M Pulgada Tinta Penetrante pulg 11,002.00 0.59 6,469.18
MAT0381M Pulgada radiografiada pulg 10,590.00 0.69 7,264.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 13,733.92
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 0.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 0.00
Sub Total Costo Mano de Obra: 0.00
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00025Q Equipo de Radiografiado Industrial Hr 900.00 65.00 58,500.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 0.00
Sub Total Costo Equipo: 58,500.32

4. GASTOS GENERALES 10.00% 7,223.42


5. UTILIDAD 10.00% 7,945.77
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 10,254.03
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 2,786.88
8. TOTAL PRECIO UNITARIO ADOPTADO 100,444.34
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Prueba Hidrulica de todas las lineas de proceso, lneas auxiliares y lneas de interconexin.
ITEM: Cdigo: 3.2.1.17
Incluye limpieza y secado.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0104O Inspector de Calidad Mecnico Hr 300.00 10.89 3,266.61
HR-0034O Inspector de Seguridad con SSMS-40 Hr 300.00 10.89 3,266.61
HR-0143O Supervisor Prueba hidrostatica Mes 1.00 2,167.50 2,167.50
HR-0083O Ayudante general Hr 300.00 4.84 1,450.61
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 10,151.33
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 5,583.23
Sub Total Costo Mano de Obra: 15,734.56
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00001Q Aguatero 15000 lts hr 99.10 32.76 3,246.57
EQ00017Q Compresor 180 cfm - 85 psi Hr 100.00 28.00 2,800.00
EQ00005Q Bomba de llenado de 400 psi da 25.00 420.00 10,500.00
EQ00033Q Generador de 65 kwa da 30.00 140.00 4,200.00
EQ00088Q Balanza de peso muerto da 30.00 120.00 3,600.00
EQ00014Q Camioneta 4 x 4 Hr 300.00 10.50 3,150.00
EQ00081Q Registrador de Presin da 30.00 100.00 3,000.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 472.04
Sub Total Costo Equipo: 30,968.61

4. GASTOS GENERALES 10.00% 4,670.32


5. UTILIDAD 10.00% 5,137.35
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 6,629.76
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,801.86
8. TOTAL PRECIO UNITARIO ADOPTADO 64,942.46
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Pintado de todas las tuberas areas, vlvulas, equipos, accesorios e instalaciones nuevas con
ITEM: Cdigo: 3.2.1.18
pintura anticorrosiva y epxica-poliuretano.

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0050M Arenilla m3 15.00 15.32 229.80
MAT0686M Pintura para piping(segn esquema del cliente) m2 740.00 32.00 23,680.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 23,909.80
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 180.00 4.84 870.37
HR-0104O Inspector de Calidad Mecnico Hr 30.00 10.89 326.66
HR-0034O Inspector de Seguridad con SSMS-40 Hr 50.00 10.89 544.44
PP00091O Pintor Hr 60.00 5.50 330.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,071.46
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,139.30
Sub Total Costo Mano de Obra: 3,210.77
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 40.01 21.00 840.22
EQ00024Q Equipo de Arenado Hr 40.00 8.75 350.00
EQ00017Q Compresor 180 cfm - 85 psi Hr 60.00 28.00 1,680.00
EQ00087Q Equipo de pintura tipo air less Hr 40.00 6.25 250.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 96.32
Sub Total Costo Equipo: 3,216.54

4. GASTOS GENERALES 10.00% 3,033.71


5. UTILIDAD 10.00% 3,337.08
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 4,306.51
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,170.44
8. TOTAL PRECIO UNITARIO ADOPTADO 42,184.85
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Pruebas de cuerpo y sello de todas las vlvulas de dimetro 2 de acuerdo al API 6 D Cdigo: 3.2.1.19

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 400.00 4.84 1,934.15
HR-0143O Supervisor Prueba hidrostatica Mes 2.00 2,167.50 4,335.00
HR-0034O Inspector de Seguridad con SSMS-40 Hr 400.00 10.89 4,355.48
HR-0104O Inspector de Calidad Mecnico Hr 400.00 10.89 4,355.48
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 14,980.11
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 8,239.06
Sub Total Costo Mano de Obra: 23,219.16
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00014Q Camioneta 4 x 4 Hr 400.00 10.50 4,200.00
EQ00033Q Generador de 65 kwa da 47.04 140.00 6,584.95
EQ00088Q Balanza de peso muerto da 60.00 120.00 7,200.00
EQ00081Q Registrador de Presin da 60.00 100.00 6,000.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 696.57
Sub Total Costo Equipo: 24,681.52

4. GASTOS GENERALES 10.00% 4,790.07


5. UTILIDAD 10.00% 5,269.08
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 6,799.76
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,848.06
8. TOTAL PRECIO UNITARIO ADOPTADO 66,607.65
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Montaje de Vlvulas Actuadas (Vlvulas SDV, EBDV, PCV) Cdigo: 3.2.1.20

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0088O Caista armador Hr 80.00 19.60 1,568.03
HR-0147O Tecnico instrumentista Hr 80.00 6.48 518.78
HR-0082O Ayudante Caista Hr 80.00 7.06 564.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,651.72
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,458.44
Sub Total Costo Mano de Obra: 4,110.16
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 34.11 21.00 716.27
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 123.30
Sub Total Costo Equipo: 839.58

4. GASTOS GENERALES 10.00% 494.97


5. UTILIDAD 10.00% 544.47
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 702.64
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 190.97
8. TOTAL PRECIO UNITARIO ADOPTADO 6,882.79
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Provisin e instalacin de placas de aluminio estampadas con todos los TAGs de Ingeniera de
ITEM: los nuevos equipos mecnicos, elctricos e instrumentos instalados en campo. Incluye el llenado Cdigo: 3.2.1.21
de las correspondientes planillas con las especificaciones tcnicas, de acuerdo al Diagrama P&ID

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0082O Ayudante Caista Hr 200.00 7.06 1,412.26
HR-0104O Inspector de Calidad Mecnico Hr 76.96 10.89 838.01
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,250.27
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,237.65
Sub Total Costo Mano de Obra: 3,487.91
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 104.64
Sub Total Costo Equipo: 104.64

4. GASTOS GENERALES 10.00% 359.25


5. UTILIDAD 10.00% 395.18
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 509.98
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 138.60
8. TOTAL PRECIO UNITARIO ADOPTADO 4,995.57
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalaciones Elctricas Sala de Compresores Cdigo: 3.3.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 7.00 150.00 1,050.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,050.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 210.00 4.84 1,016.40
HR-0137O Supervisor Elctrico Hr 70.00 14.09 986.30
HR-0145O Tecnico electricista Hr 210.00 6.49 1,362.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 3,365.60
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,851.08
Sub Total Costo Mano de Obra: 5,216.68
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 7.00 24.28 169.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 156.50
Sub Total Costo Equipo: 326.45

4. GASTOS GENERALES 10.00% 659.31


5. UTILIDAD 10.00% 725.24
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 935.93
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 254.37
8. TOTAL PRECIO UNITARIO ADOPTADO 9,167.98
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalaciones Elctricas Sala de Generacin (Microturbinas) Cdigo: 3.3.2

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 5.00 150.00 750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 750.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 160.00 4.84 774.40
HR-0137O Supervisor Elctrico Hr 50.00 14.09 704.50
HR-0145O Tecnico electricista Hr 160.00 6.49 1,038.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,517.30
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,384.52
Sub Total Costo Mano de Obra: 3,901.82
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 7.25 24.28 175.98
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 117.05
Sub Total Costo Equipo: 293.03

4. GASTOS GENERALES 10.00% 494.48


5. UTILIDAD 10.00% 543.93
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 701.95
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 190.78
8. TOTAL PRECIO UNITARIO ADOPTADO 6,875.99
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Instalaciones Elctricas Sala de Control (incluye el tendido de un conduit de 1" x 25 m a la Antena


ITEM: Cdigo: 3.3.3
Satelital)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 2.50 150.00 375.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 375.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 100.00 4.84 484.00
HR-0137O Supervisor Elctrico Hr 10.00 14.09 140.90
HR-0145O Tecnico electricista Hr 106.14 6.49 688.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,313.76
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 722.57
Sub Total Costo Mano de Obra: 2,036.33
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 61.09
Sub Total Costo Equipo: 61.09

4. GASTOS GENERALES 10.00% 247.24


5. UTILIDAD 10.00% 271.97
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 350.97
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 95.39
8. TOTAL PRECIO UNITARIO ADOPTADO 3,437.99
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalaciones Elctricas Taller Almacn Cdigo: 3.3.4

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 4.00 150.00 600.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 600.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 160.00 4.84 774.40
HR-0137O Supervisor Elctrico Hr 40.00 14.09 563.60
HR-0145O Tecnico electricista Hr 160.00 6.49 1,038.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,376.40
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,307.02
Sub Total Costo Mano de Obra: 3,683.42
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 2.32 24.28 56.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 110.50
Sub Total Costo Equipo: 166.94

4. GASTOS GENERALES 10.00% 445.04


5. UTILIDAD 10.00% 489.54
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 631.75
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 171.70
8. TOTAL PRECIO UNITARIO ADOPTADO 6,188.38
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalaciones Elctricas Portera Cdigo: 3.3.5

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 1.50 150.00 225.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 225.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 60.00 4.84 290.40
HR-0137O Supervisor Elctrico Hr 13.95 14.09 196.49
HR-0145O Tecnico electricista Hr 60.00 6.49 389.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 876.29
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 481.96
Sub Total Costo Mano de Obra: 1,358.25
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 1.00 24.28 24.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 40.75
Sub Total Costo Equipo: 65.03

4. GASTOS GENERALES 10.00% 164.83


5. UTILIDAD 10.00% 181.31
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 233.98
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 63.59
8. TOTAL PRECIO UNITARIO ADOPTADO 2,291.99
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Instalaciones Elctricas rea de Tratamiento de Aguas Aceitosas (Bomba P-5020, Flash


ITEM: Cdigo: 3.3.6
Separador V-5000)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 4.00 150.00 600.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 600.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 140.00 4.84 677.60
HR-0137O Supervisor Elctrico Hr 35.00 14.09 493.15
HR-0145O Tecnico electricista Hr 140.00 6.49 908.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,079.35
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,143.64
Sub Total Costo Mano de Obra: 3,222.99
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 1.49 24.28 36.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 96.69
Sub Total Costo Equipo: 132.88

4. GASTOS GENERALES 10.00% 395.59


5. UTILIDAD 10.00% 435.15
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 561.56
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 152.62
8. TOTAL PRECIO UNITARIO ADOPTADO 5,500.78
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalaciones Elctricas e Instrumentos en rea de Trampas de Chancho y Facilidades Cdigo: 3.3.7

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 5.00 150.00 750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 750.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 150.00 4.84 726.00
HR-0137O Supervisor Elctrico Hr 50.00 14.09 704.50
HR-0145O Tecnico electricista Hr 150.00 6.49 973.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,404.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,322.20
Sub Total Costo Mano de Obra: 3,726.20
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 1.12 24.28 27.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 111.79
Sub Total Costo Equipo: 138.98

4. GASTOS GENERALES 10.00% 461.52


5. UTILIDAD 10.00% 507.67
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 655.15
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 178.06
8. TOTAL PRECIO UNITARIO ADOPTADO 6,417.58
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalaciones Elctricas Tinglado de Residuos Cdigo: 3.3.8

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 2.00 150.00 300.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 300.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 90.00 4.84 435.60
HR-0137O Supervisor Elctrico Hr 20.00 14.09 281.80
HR-0145O Tecnico electricista Hr 80.00 6.49 519.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,236.60
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 680.13
Sub Total Costo Mano de Obra: 1,916.73
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 1.37 24.28 33.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 57.50
Sub Total Costo Equipo: 90.86

4. GASTOS GENERALES 10.00% 230.76


5. UTILIDAD 10.00% 253.83
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 327.57
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 89.03
8. TOTAL PRECIO UNITARIO ADOPTADO 3,208.79
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalaciones Elctricas Tinglado de Agua Desmineralizada Cdigo: 3.3.9

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 2.00 150.00 300.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 300.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 70.00 4.84 338.80
HR-0137O Supervisor Elctrico Hr 17.00 14.09 239.53
HR-0145O Tecnico electricista Hr 70.00 6.49 454.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,032.63
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 567.95
Sub Total Costo Mano de Obra: 1,600.58
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 1.21 24.28 29.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 48.02
Sub Total Costo Equipo: 77.36

4. GASTOS GENERALES 10.00% 197.79


5. UTILIDAD 10.00% 217.57
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 280.78
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 76.31
8. TOTAL PRECIO UNITARIO ADOPTADO 2,750.40
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Provisin y Tendido de Caeros Cdigo: 3.3.10

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 26.00 150.00 3,900.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,900.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 700.00 4.84 3,388.00
HR-0137O Supervisor Elctrico Hr 150.00 14.09 2,113.50
HR-0145O Tecnico electricista Hr 257.75 6.49 1,672.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 7,174.30
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 3,945.86
Sub Total Costo Mano de Obra: 11,120.16
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 333.60
Sub Total Costo Equipo: 333.60

4. GASTOS GENERALES 10.00% 1,535.38


5. UTILIDAD 10.00% 1,688.91
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,179.55
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 592.37
8. TOTAL PRECIO UNITARIO ADOPTADO 21,349.97
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Provisin y Colocado de Cajas y Tableros Cdigo: 3.3.11

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 10.00 150.00 1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 1,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 200.00 4.84 968.00
HR-0137O Supervisor Elctrico Hr 110.15 14.09 1,551.95
HR-0145O Tecnico electricista Hr 400.00 6.49 2,596.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 5,115.95
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 2,813.77
Sub Total Costo Mano de Obra: 7,929.72
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 237.89
Sub Total Costo Equipo: 237.89

4. GASTOS GENERALES 10.00% 966.76


5. UTILIDAD 10.00% 1,063.44
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,372.37
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 372.99
8. TOTAL PRECIO UNITARIO ADOPTADO 13,443.17
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalaciones Electricas de Equipos Nuevos Provistos por YPFBT Cdigo: 3.3.12

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 5.00 150.00 750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 750.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 100.00 4.84 484.00
HR-0137O Supervisor Elctrico Hr 50.00 14.09 704.50
HR-0145O Tecnico electricista Hr 154.76 6.49 1,004.37
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,192.87
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,206.08
Sub Total Costo Mano de Obra: 3,398.95
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 101.97
Sub Total Costo Equipo: 101.97

4. GASTOS GENERALES 10.00% 425.09


5. UTILIDAD 10.00% 467.60
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 603.44
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 164.01
8. TOTAL PRECIO UNITARIO ADOPTADO 5,911.06
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Provisin y Colocado de Alimentadores Cdigo: 3.3.13

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 15.00 150.00 2,250.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 2,250.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 150.00 4.84 726.00
HR-0137O Supervisor Elctrico Hr 150.00 14.09 2,113.50
HR-0145O Tecnico electricista Hr 568.74 6.49 3,691.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 6,530.61
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 3,591.84
Sub Total Costo Mano de Obra: 10,122.45
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 303.67
Sub Total Costo Equipo: 303.67

4. GASTOS GENERALES 10.00% 1,267.61


5. UTILIDAD 10.00% 1,394.37
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,799.44
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 489.06
8. TOTAL PRECIO UNITARIO ADOPTADO 17,626.61
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Iluminacin Exterior Cdigo: 3.3.14

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 20.00 150.00 3,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 200.00 4.84 968.00
HR-0137O Supervisor Elctrico Hr 200.00 14.09 2,818.00
HR-0145O Tecnico electricista Hr 600.00 6.49 3,894.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 7,680.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 4,224.00
Sub Total Costo Mano de Obra: 11,904.00
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 69.62 28.00 1,949.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 357.12
Sub Total Costo Equipo: 2,306.52

4. GASTOS GENERALES 10.00% 1,721.05


5. UTILIDAD 10.00% 1,893.16
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,443.12
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 664.00
8. TOTAL PRECIO UNITARIO ADOPTADO 23,931.86
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Aterramiento de Iluminacin Exterior y de Enmallado Cdigo: 3.3.15

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 40.00 150.00 6,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 6,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 200.00 4.84 968.00
HR-0137O Supervisor Elctrico Hr 200.00 14.09 2,818.00
HR-0145O Tecnico electricista Hr 640.41 6.49 4,156.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 7,942.25
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 4,368.24
Sub Total Costo Mano de Obra: 12,310.49
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 369.31
Sub Total Costo Equipo: 369.31

4. GASTOS GENERALES 10.00% 1,867.98


5. UTILIDAD 10.00% 2,054.78
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,651.70
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 720.69
8. TOTAL PRECIO UNITARIO ADOPTADO 25,974.96
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Aterramiento Sala de Compresores Cdigo: 3.3.16

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 5.00 150.00 750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 750.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 150.00 4.84 726.00
HR-0137O Supervisor Elctrico Hr 50.00 14.09 704.50
HR-0145O Tecnico electricista Hr 170.97 6.49 1,109.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,540.08
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,397.05
Sub Total Costo Mano de Obra: 3,937.13
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 118.11
Sub Total Costo Equipo: 118.11

4. GASTOS GENERALES 10.00% 480.52


5. UTILIDAD 10.00% 528.58
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 682.13
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 185.39
8. TOTAL PRECIO UNITARIO ADOPTADO 6,681.86
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Aterramiento Sala De Control y Microturbinas (Sistema elctrico de potencia y de control) Cdigo: 3.3.17

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 5.00 150.00 750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 750.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 200.00 4.84 968.00
HR-0137O Supervisor Elctrico Hr 64.19 14.09 904.37
HR-0145O Tecnico electricista Hr 200.00 6.49 1,298.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 3,170.37
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,743.71
Sub Total Costo Mano de Obra: 4,914.08
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 147.42
Sub Total Costo Equipo: 147.42

4. GASTOS GENERALES 10.00% 581.15


5. UTILIDAD 10.00% 639.27
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 824.97
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 224.21
8. TOTAL PRECIO UNITARIO ADOPTADO 8,081.10
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Aterramiento de Instalaciones Mecnicas, (rea de Tratamiento de Aguas Aceitosas, Tinglado de


ITEM: Residuos Slidos, Cubierta de Tanque de Agua Desmineralizada, V-5200, rea de Trampas de Cdigo: 3.3.18
Chancho, rea de Facilidades), Cmaras Elctricas, Pararrayos y Tanque de Agua de Servicio

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 5.00 150.00 750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 750.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 200.00 4.84 968.00
HR-0137O Supervisor Elctrico Hr 59.54 14.09 838.86
HR-0145O Tecnico electricista Hr 150.00 6.49 973.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,780.36
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,529.20
Sub Total Costo Mano de Obra: 4,309.55
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 129.29
Sub Total Costo Equipo: 129.29

4. GASTOS GENERALES 10.00% 518.88


5. UTILIDAD 10.00% 570.77
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 736.58
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 200.19
8. TOTAL PRECIO UNITARIO ADOPTADO 7,215.27
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Aterramiento de Edificios (Taller/Almacn/Sala de Lubricantes, Tinglado de Residuos Slidos,


ITEM: Cdigo: 3.3.19
Portera)

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 5.00 150.00 750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 750.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 160.00 4.84 774.40
HR-0137O Supervisor Elctrico Hr 43.81 14.09 617.27
HR-0145O Tecnico electricista Hr 160.00 6.49 1,038.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,430.07
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,336.54
Sub Total Costo Mano de Obra: 3,766.61
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 113.00
Sub Total Costo Equipo: 113.00

4. GASTOS GENERALES 10.00% 462.96


5. UTILIDAD 10.00% 509.26
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 657.20
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 178.62
8. TOTAL PRECIO UNITARIO ADOPTADO 6,437.63
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Proteccin Atmosfrica con provisin e Instalacin de los Pararrayos PR-01 y PR-02 Cdigo: 3.3.20

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Elctricos Da 5.00 150.00 750.00
Pararrayo Pza 2.00 2,500.00 5,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 5,750.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 180.00 4.84 871.20
HR-0137O Supervisor Elctrico Hr 60.00 14.09 845.40
HR-0145O Tecnico electricista Hr 180.00 6.49 1,168.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 2,884.80
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,586.64
Sub Total Costo Mano de Obra: 4,471.44
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00009Q Camin Hidrogra 3 ton Hr 60.69 28.00 1,699.43
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 134.14
Sub Total Costo Equipo: 1,833.57

4. GASTOS GENERALES 10.00% 1,205.50


5. UTILIDAD 10.00% 1,326.05
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 1,711.27
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 465.10
8. TOTAL PRECIO UNITARIO ADOPTADO 16,762.93
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalacin de Sistemas de Medicin y Regulacin de Gas de Proceso y Gas Combustible Cdigo: 3.4.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Instrumental Da 20.00 150.00 3,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 400.00 4.84 1,936.00
HR-0137O Supervisor Instrumentacin y Control Hr 242.00 28.16 6,814.72
HR-0145O Tecnico instrumentista Hr 400.00 15.60 6,240.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 14,990.72
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 8,244.90
Sub Total Costo Mano de Obra: 23,235.62
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 21.36 24.28 518.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 697.07
Sub Total Costo Equipo: 1,215.62

4. GASTOS GENERALES 10.00% 2,745.12


5. UTILIDAD 10.00% 3,019.64
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,896.85
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,059.10
8. TOTAL PRECIO UNITARIO ADOPTADO 38,171.94
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalacin de Instrumentacin de Proceso y F&G para Lneas y Equipos Cdigo: 3.4.2

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Instrumental Da 20.00 150.00 3,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 330.00 4.84 1,597.20
HR-0137O Supervisor Instrumentacin y Control Hr 200.00 28.16 5,632.00
HR-0145O Tecnico instrumentista Hr 330.00 15.60 5,148.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 12,377.20
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 6,807.46
Sub Total Costo Mano de Obra: 19,184.66
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 13.74 24.28 333.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 575.54
Sub Total Costo Equipo: 909.24

4. GASTOS GENERALES 10.00% 2,309.39


5. UTILIDAD 10.00% 2,540.33
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 3,278.30
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 890.99
8. TOTAL PRECIO UNITARIO ADOPTADO 32,112.90
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Calibracin de todos los instrumentos, vlvulas actuadas y vlvulas de alivio instaladas,


transmisores de presin y temperatura, medidor clamp on y placa de orificio, detectores de fuego -
ITEM: Cdigo: 3.4.3
gas - humo. Se debern presentar las planillas de calibracin en los formatos establecidos por
YPFB TRANSPORTE

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Instrumental Da 20.00 150.00 3,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 3,000.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 300.00 4.84 1,452.00
HR-0137O Supervisor Instrumentacin y Control Hr 150.00 28.16 4,224.00
HR-0145O Tecnico instrumentista Hr 330.00 15.60 5,148.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 10,824.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 5,953.20
Sub Total Costo Mano de Obra: 16,777.20
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 17.40 24.28 422.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 503.32
Sub Total Costo Equipo: 925.86

4. GASTOS GENERALES 10.00% 2,070.31


5. UTILIDAD 10.00% 2,277.34
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 2,938.91
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 798.75
8. TOTAL PRECIO UNITARIO ADOPTADO 28,788.36
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalacin de Sistemas de Control y Seguridad (Proceso, F&G) Cdigo: 3.4.4

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Instrumental Da 30.00 150.00 4,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 4,500.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 600.00 4.84 2,904.00
HR-0137O Supervisor Instrumentacin y Control Hr 250.00 28.16 7,040.00
HR-0145O Tecnico instrumentista Hr 500.00 15.60 7,800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 17,744.00
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 9,759.20
Sub Total Costo Mano de Obra: 27,503.20
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 47.74 24.28 1,158.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 825.10
Sub Total Costo Equipo: 1,984.04

4. GASTOS GENERALES 10.00% 3,398.72


5. UTILIDAD 10.00% 3,738.60
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 4,824.67
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,311.27
8. TOTAL PRECIO UNITARIO ADOPTADO 47,260.49
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalacin de 2 alarmas audiovisuales Cdigo: 3.4.5

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
MAT0687M Set de Consumibles Instrumental Da 1.00 150.00 150.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 150.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 40.00 4.84 193.60
HR-0137O Supervisor Instrumentacin y Control Hr 25.00 28.16 704.00
HR-0145O Tecnico instrumentista Hr 40.00 15.60 624.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,521.60
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 836.88
Sub Total Costo Mano de Obra: 2,358.48
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
EQ00003Q Andamio metlico (2 mdulos) dia 1.45 24.28 35.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 70.75
Sub Total Costo Equipo: 105.92

4. GASTOS GENERALES 10.00% 261.44


5. UTILIDAD 10.00% 287.58
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 371.13
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 100.87
8. TOTAL PRECIO UNITARIO ADOPTADO 3,635.42
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

ITEM: Instalacin del Sistema de Proteccin Catdica de lneas enterradas (segn planos) Cdigo: 4.1

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
Set de Consumibles Proteccin Catdica Gbl 1.00 4,850.00 4,850.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 4,850.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 800.00 4.84 3,872.00
HR-0137O Supervisor de Proteccin Catdica Hr 150.00 28.16 4,224.00
HR-0145O Tecnico Proteccin Catdica Hr 427.45 15.60 6,668.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 14,764.22
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 8,120.32
Sub Total Costo Mano de Obra: 22,884.54
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 686.54
Sub Total Costo Equipo: 686.54

4. GASTOS GENERALES 10.00% 2,842.11


5. UTILIDAD 10.00% 3,126.32
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 4,034.52
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 1,096.52
8. TOTAL PRECIO UNITARIO ADOPTADO 39,520.54
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Precomisionado ( verificacin) de todos los sistemas mecnicos, elctricos, de instrumentacin y


ITEM: Cdigo: 5.1
control instalados

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 115.65 4.84 559.72
HR-0104O Inspector de Calidad Mecnico Hr 50.00 10.08 504.00
HR-0091O Coordinador de Calidad Hr 50.00 16.73 836.50
0.00 0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,900.22
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 1,045.12
Sub Total Costo Mano de Obra: 2,945.34
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 88.36
Sub Total Costo Equipo: 88.36

4. GASTOS GENERALES 10.00% 303.37


5. UTILIDAD 10.00% 333.71
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 430.65
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 117.04
8. TOTAL PRECIO UNITARIO ADOPTADO 4,218.48
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Apoyo con personal y herramientas a las pruebas y puesta en marcha de los compresores y
ITEM: Cdigo: 5.2
equipos auxiliares

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 216.15 4.84 1,046.19
HR-0104O Inspector de Calidad Mecnico Hr 50.00 10.08 504.00
0.00 0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,550.19
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 852.60
Sub Total Costo Mano de Obra: 2,402.79
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 72.08
Sub Total Costo Equipo: 72.08

4. GASTOS GENERALES 10.00% 247.49


5. UTILIDAD 10.00% 272.24
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 351.32
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 95.48
8. TOTAL PRECIO UNITARIO ADOPTADO 3,441.40
ANALISIS DE PRECIOS UNITARIOS

Cliente: YPFB TRANSPORTE S.A. Rev: 00


Proyecto: ESTACIN DE COMPRESIN TOTOROCO Fecha: 01-oct-13
Invitacin: 130523-T-108 Moneda: Dlares Americanos
Ubicacin: Oruro - Bolivia Unidad: Global

Puesta en Marcha y Comisionado de la estacin, Apoyo con personal y herramientas a las


ITEM: Cdigo: 5.3
pruebas SAT del Sistema de Control de Planta

1. MATERIALES
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sub Total Costo Materiales: 0.00
2. MANO DE OBRA
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
HR-0083O Ayudante general Hr 178.51 4.84 863.97
HR-0104O Inspector de Calidad Mecnico Hr 20.00 10.08 201.60
HR-0091O Coordinador de Calidad Hr 20.00 16.73 334.60
0.00 0.00
0.00
0.00
0.00
SUBTOTAL MANO DE OBRA 1,400.17
CARGAS SOCIALES = (% DEL SUBTOTAL DE MANO DE OBRA)( 55% AL 71.18%) 55.00% 770.09
Sub Total Costo Mano de Obra: 2,170.26
3. EQUIPO, MAQUINARIA Y HERRAMIENTAS
PRECIO
Cdigo DESCRIPCION UNIDAD CANTIDAD COSTO TOTAL
PRODUCTIVO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
HERRAMIENTAS = (% DEL TOTAL DE MANO DE OBRA) 3.00% 65.11
Sub Total Costo Equipo: 65.11

4. GASTOS GENERALES 10.00% 223.54


5. UTILIDAD 10.00% 245.89
6. IMPUESTO AL VALOR AGREGADO (IVA) 10.50% 317.32
7. IMPUESTO A LAS TRANSACCIONES(IT) 3.09% 86.24
8. TOTAL PRECIO UNITARIO ADOPTADO 3,108.36

Vous aimerez peut-être aussi