CONTRACTORS DAILY REPORT

c
Owner
Consultant
Contractor

Today
no. Description
1 Plastering (on progress)
2 Electrical working (on progress)
3 Excavation for foundation of retaining wall
4 placing of blinding layer for retaining wall
5 formwork of foundation for retaining wall
6
7
8
9
10
Next Day Sunday Date:
no. Description
1 Plastering (on progress)
2 Electrical working (on progress)
3 stripping of formwork for blinding layer of retaining wall
4
5
6
7
8
9
10
Accident
no. Describtion
1
2

Signature :
Site Engineer :

Project Manager :
PORT

Report No.: 74
Day: Wednesday
Date: 13 7 2016
Time: 4 pm
weather: Sunny
MAN POWER EQUIPMENT
project manager 1 Tower Crane **
Site Engineer 1 Excavator 1
Foreman 1 Loader **
Surveyor ** Tipper **
Lab. Tech ** Concrete Pump 1
Driver 2 Concrete Mixer **
Store keeper 1 Concrete Vibrator **
Guard 1 Compactor **
Operator ** Water Tank **
Carpenter 7 Car 1
Carp. Helper 4 Elec. Generator **
Steel Fixer 2 water Pump 2
Pipe Fitter ** Total Station **
Mason ** Level 1
Plumber **
Mechanic **
Electrician **
Welder **
Painter **
Plaster worker 5
Material Delivered to Site
No. Description QTY.
1-
2-
3-
4-
5-