DATOS
ALTURA DE ZAPATA CIMENTACION (m) d = 0.60
TIPO DE TERRENO (Kg/cm2) d = 2.00
ANCHO DE PUENTE (m) A = 11.60
LUZ DEL PUENTE (m) L = 4.50
ALTURA DEL ESTRIBO (m) H = 1.90
ANGULO DE FRICCION INTERNA (grado) f = 25.50
ALTURA EQUIV, DE SOBRE CARGA (m) h' = 0.30
PESO ESPECIF, RELLENO (Tn/m3) g1 = 1.60
PESO ESPECIF, CONCRETO (Tn/m3) f2 = 2.40
TALON ANTERIOR (m) M = 0.35
TALON POSTERIOR (m) N = 0.20
ESPESOR DE BASE DE PANTALLA 1 (m) E = 0.30
ESPESOR DE BASE DE PANTALLA 2 (m) G = 0.75
ALTURA DE CAJUELA (m) a = 0.330
ESPESOR DE CORONA (m) b = 0.35
BASE DE APOYO DE VIGAS (m) c = 0.40
BASE (m) B = 1.60
CONCRETO ESTRIBOS (Kg/cm2) f'c = 175
fc =0.4f'c=70 Kg/cm2
1-Empuje de terreno,
h= 0.33
h'= 0.30
C= fff f(ff-f/f) 0.40
E= 0,5*W*h (h+2h")*C 0.098 TN
Xv=Mt/Pi 0.188 m
Z=Eh*Dh/Pi 0.046 m
e=b/2-(Xv-Z) 0.034 m
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.62 m
Z=Eh*Dh/Pi 0.26 m
e=b/2-(Xv-Z) 0.16 m
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.558 m
Yh=Mi/Pi 0.902
Z= 0.166
e= 0.133
VERIFICACIONES
Chequeo al volteo
Xv=Mt/Pi 0.991 m
Z=Eh*Dh/Pi 0.319 m
e=b/2-(Xv-Z) 0.128 m >b/6 b/6= 0.26666667
e<b/6, CONFORME
VERIFICACIONES
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.935 m
FUERZAS HORIZONTALES ESTABILIZADORAS
Yh=Mi/Pi 1.05
Z= 0.23
e= -0.03 <b/6 CONFORME
VERIFICACIONES
Chequeo al volteo
Chequeo al Deslizamiento
DATOS
ALTURA DE ZAPATA CIMENTACION (m) d = 0.60
TIPO DE TERRENO (Kg/cm2) d = 2.00
ANCHO DE PUENTE (m) A = 8.00
LUZ DEL PUENTE (m) L = 5.00
ALTURA DEL ESTRIBO (m) H = 1.90
ANGULO DE FRICCION INTERNA (grado) f = 25.50
ALTURA EQUIV, DE SOBRE CARGA (m) h' = 0.30
PESO ESPECIF, RELLENO (Tn/m3) f1 = 1.60
PESO ESPECIF, CONCRETO (Tn/m3) f2 = 2.40
TALON ANTERIOR (m) M = 0.35
TALON POSTERIOR (m) N = 0.20
ESPESOR DE BASE DE PANTALLA 1 (m) E = 0.30
ESPESOR DE BASE DE PANTALLA 2 (m) G = 0.75
ALTURA DE CAJUELA (m) a = 0.380
ESPESOR DE CORONA (m) b = 0.35
BASE DE APOYO DE VIGAS (m) c = 0.40
BASE (m) B = 1.60
CONCRETO ESTRIBOS (Kg/cm2) f'c = 175
fc =0.4f'c=70 Kg/cm2
1-Empuje de terreno,
h= 0.38
h'= 0.30
C= fff f(ff-f/f) 0.40
E= 0,5*W*h (h+2h")*C 0.119 TN
Xv=Mt/Pi 0.188 m
Z=Eh*Dh/Pi 0.055 m
e=b/2-(Xv-Z) 0.042 m
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.63 m
Z=Eh*Dh/Pi 0.27 m
e=b/2-(Xv-Z) 0.16 m
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.551 m
Yh=Mi/Pi 0.981
Z= 0.160
e= 0.135
VERIFICACIONES
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.993 m
Z=Eh*Dh/Pi 0.322 m
e=b/2-(Xv-Z) 0.129 m >b/6 b/6= 0.26666667
e<b/6, CONFORME
VERIFICACIONES
Chequeo al volteo
Chequeo al Deslizamiento
Xv=Mt/Pi 0.926 m
Yh=Mi/Pi 1.11
Z= 0.22
e= -0.03 <b/6 CONFORME
VERIFICACIONES
Chequeo al volteo
Chequeo al Deslizamiento