A PURPOSE:-
This document is prepared to guide the operating personnel for managing the turbine side drains during a unit startup ,
shutdown & normal operating condition in stage- II of NTPC /TSTPS .
B SCOPE: :-
This shall be applicable to all the 4 units of stage - II , TSTPS ( 4 X 500 MW Units ) .
C INTRODUCTION : -
Drains play an important role in any system charged with steam . This is basically provided to drain out
the condensate before charging steam in a pipeline & subsequently allows sufficient flow in the line for initial warm
up . Also this allows to drain the condensate during cooling of any pipeline .Normally the big headers like MS
/CRH / HRH are provided with drain pots where the condensate is expected to collect & subsequently they are
drained by operation of these drain valves . To avoid human interventions some of the drains depending on their
location & importance severity they are interlocked with certain logics or instruments like level switches & so on .
If the condensate is not properly drained & steam is charged into a line , then it will lead to severe
hammering in the line causing major damages & sometime forced outage of the units due to failure of the
support system . Hence due care is to be taken while operating these drains .
Each Motor Operated drain is provided with a manual isolating valve for isolation of the drain valve
depending on requirement . But in case of MAW 11 drain valve no isolation valve is provided . However a bypass
line with 6-10 mm orifice is provided for continuous bleeding .Some systems are provided with orifice operated
continuous drains for continuous bleeding of steam /condensate .At some places drains are provided with steam drain
traps which should always be kept in service .
Manual Isolation
Down Stream Temp
Sl No Valve Tag Description of Valve Valve Open
Point Provided
provided
ATMOSPHERIC DRAINS
01. MS LINE Drain at TG 0 Mtr Yes No
02. CRH LINE Drain at TG 0 Mtr Yes No
03. HRH LINE Drain at TG 0 Mtr Yes No
04. CRH Drain Before NRV at TG 0 Mtr Yes No
05. LPBP line 1& 2 Drain at TG 0 Mtr Yes No
06. UFT vent line drain at TG 0 Mtr Yes No
IBD TANK ( 02 nos )
07. MS 401 MS line L Drain before MSSV ( Left ) Yes No
08. MS402 MS line R Drain before MSSV ( Right ) Yes No
UNIT FLASH TANK ( 08 nos )
09. BP 101 HPBP Drain ( Left ) Yes No
Sheet 1 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
Sheet 2 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
D OPERATING INSTRUCTIONS :
The following instructions are to be followed during the Unit normal operation , Unit Hot & Cold start-up &
Unit shutdown conditions .
Sheet 3 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
D-2.1.3. Open MS/HRH Strainers drains to SDFT MS 105/106 & HRH 105/106 ( Operated from BHEL CRT ) immediately
after turbine tip out . On auto these drains open at SGC Shutdown programme at step 53 .
D-2.1.4. Open CRH Hdr Drain CRH 501 to SDFT . This drain actually operates on auto based on the Drain Pot Level
Switch actuation .
D-2.1.5. Ensure all the manual valves ( if anyone was closed ) of drains connected to the SDFT /FB-1& FB -2 / LP & HP FT
are opened as per the list attached as soon the unit has tripped .
D-2.1.6. Now ensure the temperatures are picking up down stream of the drain as soon as soon as steam flow established
( where ever on line measurement provided)
D-2.1.7. Now as the turbine rolling started the MS/HRH Strainers drains MS 105/106 & HRH 105/106 gets closed at step
13 .
D-2.1.8. After Unit is synchronisation & Load pick up is > 100 MW ensure all the following drains are closed on auto
MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2
MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV
MAL 31 Drain After IV - 1
MAL 32 Drain After IV - 2
D-2.1.9. Ensure the Extraction line drains are closed after the respective Extractions are charged .
D-2.1.10. Check all the TDBFP drains are closed after TDBFPs are loaded .
Sheet 4 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
D-2.2.9. The temp points provided for the major drains are functioning indicated by the rise in temp when ever steam
flows in those drain .
D-2.2.10. For Charging HP/LP Bypass the HPBP Warm up Line Drains
D-2.2.11. Normally the drains are kept closed as soon as sufficient steam flow is established in the system . Such as
Close MS Line drains to IBD ( MS401/402) once the Main MS SV are full open .
Close the CRH hdr atmospheric drain after HP/LP bypass is charged & sufficient steam coming .
Close the MS /HRH Hdr Drains MS 417/419 , HRH 606/604 once HP /LP bypass is charged
D-2.2.12. Check the following turbine drains are opened as per SLC logic after the Unit Has tripped out .
D-2.2.13. The MS /HRH strainer drains MS 105/106 & HRH 105/106 are automatically closed once TG set Rolling started at
step 13 .
D-2.2.14. After Unit is synchronisation & Load pick up is > 100 MW ensure all the following drains are closed on auto
MAL 11 Drain Before HPCV - 1 MAL 12 Drain Before HPCV - 2
MAL 26 Drain Before IV - 1 MAL 27 Drain Before IV - 2
MAL 65 Drain Before CRH NRV
MAL 31 Drain After IV - 1
MAL 32 Drain After IV - 2
D-2.2.15. Ensure the Extraction line drains are closed after the respective extractions are charged .
D-2.2.16. Check all the TDBFP drains are closed after TDBFPs are loaded .
D-2.2.17. Ensure the turbine casing drain MAL22 is closed after HPT casing temp attained > 320 0 C on auto .
Sheet 5 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
D-3.1.3. Open MS/HRH Strainers drains to SDFT MS 105/106 & HRH 105/106 ( Operated from BHEL CRT ) immediately
after turbine tip out . On auto these drains open at SGC Shutdown programme at step 53 .
D-3.1.4. Open CRH Hdr Drain CRH 501 to SDFT . This drain actually operates on auto based on the Drain Pot Level
Switch actuation .
D-3.1.5. Ensure all the manual valves ( if anyone was closed ) of drains connected to the SDFT /FB-1& FB -2 / LP & HP FT
are opened as per the list attached as soon the unit has tripped .
D-3.1.6. Now ensure the temperatures are picking up down stream of the drain as soon as soon as steam flow established (
Where ever on line measurement provided)
D-3.1.7. As Boiler is Boxed up by closing the MS stop Valves Ensure the opening of following drains
MS 105 MS Strainer Drain ( Left ) HRH 606 HRH Line Drain Before Strainer
MS 106 MS Strainer Drain ( Right ) LP 625 LPBP Line Drain ( Left )
MS 417 MS Line Drain Before Strainer LP 624 LPBP Line Drain ( Right )
CRH 101 CRH NRV Drain HRH 109 LPBP Warm up Line Drain ( Left )
CRH 501 CRH Line Drain HRH 110 LPBP Warm up Line Drain ( Right )
HRH 105 HRH Strainer Drain ( Left )
HRH 106 HRH Strainer Drain ( Right )
D-3.1.8. Ensure that the HPC drain MAL 22 has opened after HPC temp drops below 300 0 C .
D-3.1.9. Ensure TDBFP drains are opened after TDBFP Tripping .
D-3.2.6. Check HPT casing drain MAL 22 is opened after temp drops < 300 0 C .
D-3.2.7. Ensure all the SDFT / LPFT/ HPFT drains are open
Sheet 6 Of 7
Prepared By Reviewed By Approved By
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG REV 0.00
Operating Instruction For Management of Turbine Drains
UNIT - 3/4/5/6 Date : 25/ 02/2009
SL DRAIN VALVE KKS LOCATI MAN MAN AUTO AUTO PROT PROT
NO. DESCRIPTION CODE ON CLOSE OPEN CLOSE OPEN CLOSE OPEN
DRAIN HP HP OUTER CASING TOP
1 MAL22AA011 0 M TG Y Y HP OUTER CASING TOP >320 DEG .C
CASING <300 DEG .C
AND AND
HP
HP OUTER CASING
HP OUTER CASING BOT >320 DEG .C EVACUATION
BOT<300DEG .C ON
OR OR
HP OUTER CASING TOP
HP OUTER CASING TOP >320 DEG .C
<300DEG .C
OR OR
HP OUTER CASING BOT
HP OUTER CASING BOT >320 DEG .C
<300 DEG .C
AND AND
GEN LOAD > 10 % GEN LOAD <2 %
DRAIN BEFORE
2 MAL11AA011 0 M TG Y Y SGC TURBINE STEP-3
HPCV-1
SGC TURBINE SHUTDOWN
OR
STEP- 55
SGC TURBINE STEP-16
OR
SGC TURBINE STEP -19
DRAIN BEFORE
3 MAL12AA011 0 M TG Y Y SGC TURBINE STEP-3
HPCV-2
SGC TURBINE SHUTDOWN
OR
STEP- 55
SGC TURBINE STEP-16
OR
SGC TURBINE STEP -19
HRH STRAINER
4 LCM20AA202 0 M TG Y Y SGC TURBINE STEP -14 SGC TURBINE STEP- 2 CONDENSER
DRAIN -1(L)
HRH STRAINER VACCUM >0.3
5 LCM20AA203 0 M TG Y Y OR
DRAIN -2( R) KSC
6 MS STRAINER LCM20AA206 0 M TG Y Y SGC TURBINE SHUTDOWN
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG REV 0.00
Operating Instruction For Management of Turbine Drains
UNIT - 3/4/5/6 Date : 25/ 02/2009
SL DRAIN VALVE KKS LOCATI MAN MAN AUTO AUTO PROT PROT
NO. DESCRIPTION CODE ON CLOSE OPEN CLOSE OPEN CLOSE OPEN
DRAIN -1(L) STEP -53
MS STRAINER
7 LCM20AA207 0 M TG Y Y
DRAIN -2( R)
DRAIN BEFORE
8 MAL26AA011 0 M TG Y Y DT(IV1 -CRH) >50 DEG .K DT(IV1 -CRH) <20 DEG .K
IV-1
DRAIN BEFORE
9 MAL27AA011 0 M TG Y Y AND AND
IV-2
DRAIN AFTER IV-
10 MAL31AA011 0 M TG Y Y T BEHIND ICV-2 >300 DEG.C T BEHIND ICV-2 <270 DEG.C
1
DRAIN AFTER IV-
11 MAL32AA011 0 M TG Y Y OR OR
2
DT(IV1 -CRH) >50 DEG .K DT(IV1 -CRH) <20 DEG .K
OR OR
T BEHIND ICV-2 >300 DEG.C T BEHIND ICV-2 <270 DEG.C
AND AND
IPCV-2 NOT CLOSED IPCV-2 CLOSED
& &
IPCV-1 NOT CLOSED IPCV -1 CLOSED
GLAND STEAM GLAND STEAM TEM -1<120
12 MAL81AA011 0 M TG Y Y GLAND STEAM TEM -1 >150 DEG.C
DRAIN DEG.C
AND OR
GLAND STEAM TEM -2<120
GLAND STEAM TEM -2 >150 DEG.C
DEG.C
DRAIN
13 EXTRACTION V/V MAL47AA011 0 M TG Y Y EXTRACTION V/V A-5 > 15% EXTRACTION V/V A-5 < 5%
A-5
AND OR
GEN LOAD >10% GEN LOAD <2%
DRAIN
14 EXTRACTION V/V MAL51AA011 0 M TG Y Y EXTRACTION V/V A-4.1 > 15% EXTRACTION V/V A-4.1 <5%
A-4.1
AND OR
DP EXTRACTIONV/V A-4.1 >300mmwc DP EXTRACTIONV/V A-4.1
"
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG REV 0.00
Operating Instruction For Management of Turbine Drains
UNIT - 3/4/5/6 Date : 25/ 02/2009
SL DRAIN VALVE KKS LOCATI MAN MAN AUTO AUTO PROT PROT
NO. DESCRIPTION CODE ON CLOSE OPEN CLOSE OPEN CLOSE OPEN
<100mmwc
DRAIN
15 EXTRACTION V/V MAL52AA011 0 M TG Y Y EXTRACTION V/V A-4.2 > 15% EXTRACTION V/V A-4.2 <5%
A-4.2
AND OR
DP EXTRACTIONV/V A-4.2
DP EXTRACTIONV/V A-4.2 >300mmwc
<100mmwc
DRAIN
16 EXTRACTION V/V MAL54AA011 0 M TG Y Y EXTRACTION V/V A-3 > 15% EXTRACTION V/V A-3 < 5%
A-3
AND OR
GEN LOAD >10% GEN LOAD <2%
DRAIN
17 EXTRACTION V/V MAL55AA011 0 M TG Y Y EXTRACTION V/V A-2 > 15% EXTRACTION V/V A-2 < 5%
A-2
AND OR
GEN LOAD >10% GEN LOAD <2%
WARMING UP GLAND STEAM TEM BEFV/V GLAND STEAM TEM
18 MAW11AA011 0 M TG Y Y
DRAIN >270(DEG.C) BEFV/V<250(DEG.C)
DRAIN BEF CRH
19 MAL65AA011 0 M TG Y Y CRH NRV >100% CRH NRV 0%
NRV
AND OR
GEN LOAD >10% CRH NRV <100%
OR
GEN LOAD <2%
#
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
Sl Protection
Valve Tag Description of Valve Auto open Auto close
No open
IBD TANK ( 02 nos )
MS line L Drain before MSSV ( OPEN Command from
01. MS 401
Left ) GC
CLOSE Command from GC NIL
MS line R Drain before MSSV ( OPEN Command from
02. MS402
Right ) GC
CLOSE Command from GC NIL
22. HRH 109 LPBP Warm up Line Drain ( Left ) NIL BLI>10% NIL
$
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
Sl Protection
Valve Tag Description of Valve Auto open Auto close
No open
23. HRH 110 LPBP Warm up Line Drain ( Right ) NIL BLI>10% NIL
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
Sl Protection
Valve Tag Description of Valve Auto open Auto close
No open
OPEN COMMAND CLOSE COMMAND FROM
FROM SCM SCM
31. CRH 147 Steam to BFPT B Line Drain
OR AND
NIL
BFP-B TRIPPED SUCT. FLOW>30%
32. CRH 109 CRH to DEA Pegging Line Drain NIL NIL NIL
OPEN COMMAND
FROM SCM
OR
BFPT-A TIPPED CRH TEMP>290 DEG.C
OR AND
33. CRH 116 CRH to BFPT A Line Drain
BFP-A WORKING &CRH AUX STM BLOCK VALVE
NIL
TEM<250 DEG.C OPEN
OR
CRH BLOK VALVE
CLOSE
OPEN COMMAND
FROM SCM
OR
BFPT-B TIPPED CRH TEMP>290 DEG.C
OR AND
34. CRH 123 CRH to BFPT B Line Drain
BFP-B WORKING &CRH AUX STM BLOCK VALVE
NIL
TEM<250 DEG.C OPEN
OR
CRH BLOK VALVE
CLOSE
HPH
OPEN COMMAND 5A/5B/6A
CLOSE COMMAND FROM
FROM SCM LVL VERY
SCM
35. EX 101 Extraction to HPH 6 A Line Drain OR
AND
HIGH
HPH-6A EXT. VALVE OR
HPH-6A EXT VALVE OPEN
CLOSED TURBINE
TRIPPED
HPH
OPEN COMMAND 5A/5B/6B
CLOSE COMMAND FROM
FROM SCM LVL VERY
SCM
36. EX 102 Extraction to HPH 6 B Line Drain OR
AND
HIGH
HPH-6B EXT. VALVE OR
HPH-6B EXT VALVE OPEN
CLOSED TURBINE
TRIPPED
LP DRAIN FLASH TANK ( 07
nos)
CRH to DEA Pegging DS of CV
37. CRH 153
Line Drain
NIL NIL NIL
%
!
NTPC/TSTPP OPERATION DEPARTMENT TS-II/OPN/OI /TG/ / 041
AREA TG Operating Instruction For REV 0.00
UNIT - 3/4/5/6 Management of Turbine Drains Date : 25/ 02/2009
Sl Protection
Valve Tag Description of Valve Auto open Auto close
No open
OPEN COMMAND
FROM BFP-A SCM
BFP-A SUCT FLOW >30%
OR
&STM PRESS>3.5KSC
OPEN COMMAND
Extraction to BFPT A & B Line AND
38. EX 109
Drain
FROM BFP-B SCM
BFP-B SUCT FLOW >30%
NIL
OR
&STM PRESS>3.5KSC
BFP-A/B NOT
WORKING