Target
ADOC
Discipline Rev. Drawing Project ITP ITP Title Activit Location Applicable Checklist Report No. Remarks
TPI
TR
No. No. Inspection Inspection Inspected Status TR RFI
No. No. No. y No.
RFI-HSF-
06.00 AM TO Surface preparation,paint HD-EC-CM- ITP for Surface Preparation and 2.1,
9 Painting TARGET-TF- 0 20-Oct-17 - H W S Mubarraz - - AE 328 Painting
06.00 PM application & Final DFT check ZQXS-5001 Coating 2.2
PAINT-0024
RFI-HSF- INSPECTION AND TEST PLAN
TARGET-TF- 06.00 AM TO Final Visual Inspection of Fire HD-EC-CM- FOR SURFACE Checklist HSF-ITP-TEC-MOG-0016,
10 Fireproofing 0 20-Oct-17 - 6.1 H H W Mubarraz - - Fireproofing
FIREPROOFING- 06.00 PM Proofing ZQXS-5024 PREPARATION AND F-01
0014 FIREPROOFING
RFI-HSF- INSPECTION AND TEST PLAN
08.00 AM TO Lighting System Installaltion @ HD-EC-CM- Electrical and
11 Elect TARGET-TF- - 20-Oct-17 - FOR INSTALLATION OF 6,7,8,9 H W W Mubbaraz - Checklist
05.00 PM CKT NO.18 ZQXS-5016 Instrumentation
ELEC-0117 LIGHTING SYSTEM
DATE 19-Oct-17