ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION UNIDAD CANTIDAD UNITARIO PARCIAL

TRABAJOS PRELIMINARES

Cerco de Madera, h=2.20 m.

Rendimiento: 1.00 ml /da


Unidad: ml
CLAVOS 2" KG. 0.94 4.58 4.31
MADERA TORNILLO (LARGA) P2 5.60 2.93 16.41
CAPATAZ (E) HH 0.80 17.04 13.63
OPERARIO (E) HH 8.00 14.37 114.96
OFICIAL (E) HH 8.00 12.91 103.28
PEON (E) HH 8.00 11.40 91.20
Concreto para Sobrecimento m3 0.02 196.33 0.05
TOTAL

Oficina, Almacn, Caseta de Guardiana

Rendimiento: 7.00 m2 /da


Unidad; m2
CLAVOS 2" KG. 0.01 4.58 0.07
MADERA TORNILLO (LARGA) P2 1.70 2.93 4.98
TRIPLAY LUPUNA 4x8x12 MM PL 0.07 43.73 3.10
PLANC.CORRUG.SUPER TECHALIT 1.80M. UND 0.16 7.93 1.27
CAPATAZ (E) HH 0.11 17.04 1.95
OPERARIO (E) HH 2.29 14.37 32.85
OFICIAL (E) HH 2.29 12.91 29.51
PEON (E) HH 4.57 11.40 52.11
HERRAMIENTAS % M.O. 5.00 116.42 5.82
Concreto para Falso Piso e=4" m2 1.00 27.04 27.04
TOTAL

Cartel de obra 3,6 x 7,2 m

Rendimiento: 1.00 und/da


Unidad: und
CLAVOS 3" KG. 1.50 4.58 6.87
PIEDRA GRANDE PARA ZANJA M3 0.98 25.42 24.81
HORMIGON (PLANTA) M3 0.98 19.77 19.30
CEMENTO PORTLAND TIPO I BOL 3.65 14.29 52.16
LIJA PARA MADERA HJA 3.00 0.85 2.55
PERNO 5/8" x 10" CON TUERCA KG 15.00 4.87 73.05
ARANDELA 5/8" UND 15.00 0.62 9.30
MADERA TORNILLO (LARGA) P2 247.50 2.93 725.18
TRIPLAY LUPUNA 4x8x12 MM PL 9.00 43.73 393.57
PINTURA ESMALTE SINTETICO STANDARD GAL 1.00 26.48 26.48
CAPATAZ (E) HH 2.40 17.04 40.90
OPERARIO (E) HH 24.00 14.37 344.88
OFICIAL (E) HH 16.00 12.91 206.56
PEON (E) HH 8.00 11.40 91.20
HERRAMIENTAS % M.O. 20.00 683.54 136.71
TOTAL

LIMPIEZA DE TERRENOS

Limpieza Manual de Terreno

Rendimiento: 40.00 m2 /da


Unidad: m2
OPERARIO (E) HH 0.02 14.37 0.29
PEON (E) HH 0.20 11.40 2.28
HERRAMIENTAS % M.O. 5.00 2.57 0.13
TOTAL

Limpieza de Terreno, con Mquina

Rendimiento: 600.00 m2 /da


Unidad: m2
CAPATAZ (E) HH 0.01 17.04 0.17
PEON (E) HH 0.03 11.40 0.34
TRACTOR SOBRE ORUGAS 100 HP HM 0.01 149.11 1.49
HERRAMIENTAS % M.O. 3.00 0.32 0.01
TOTAL

TRAZO Y REPLANTEO

Trazo y Replanteo de Ejes y Niveles

Rendimiento: 500.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.01 4.58 0.05
YESO (20 KG.) BOL 0.03 6.52 0.20
WINCHA UND 0.01 30.00 0.30
MADERA TORNILLO (LARGA) P2 0.03 2.93 0.09
ESMALTE SINTET.PINTOR BLANCO Y COLO GLN 0.01 65.35 0.65
TOPOGRAFO (E) HH 0.02 13.80 0.28
CAPATAZ (E) HH 0.01 17.04 0.17
OFICIAL (E) HH 0.01 12.91 0.13
PEON (E) HH 0.05 11.40 0.57
MIRA TOPOGRAFICA Hra 0.01 0.98 0.01
JALON Hra 0.03 0.75 0.02
TEODOLITO Hra 0.02 9.62 0.19
HERRAMIENTAS % M.O. 5.00 1.01 0.05
TOTAL

Colocacin de Plantillas de Nivel

Rendimiento: 80.00 pto/da


Unidad: pto.
YESO (20 KG.) BOL 0.01 6.52 0.07
TOPOGRAFO (E) HH 0.10 13.80 1.38
CAPATAZ (E) HH 0.10 17.04 1.70
OFICIAL (E) HH 0.10 12.91 1.29
PEON (E) HH 0.30 11.40 3.42
MIRA TOPOGRAFICA Hra 0.10 0.98 0.10
NIVEL TOPOGRAFICO Hra 0.10 7.77 0.78
HERRAMIENTAS % M.O. 3.00 7.79 0.23
TOTAL

DEMOLICIONES

DEMOLICIONES DE ESTRUCTURA DE CONCRETO

Demolicin Manual de Cimientos

Rendimiento: 0.30 m3 /da


Unidad: m3
CAPATAZ (E) HH 2.67 17.04 45.44
PEON (E) HH 26.67 11.40 304.00
HERRAMIENTAS % M.O. 5.00 349.44 17.47
TOTAL

Demolicin Manual de Columnas

Rendimiento: 0.25 m3 /da


Unidad: m3
CAPATAZ (E) HH 3.20 17.04 54.53
PEON (E) HH 32.00 11.40 364.80
HERRAMIENTAS % M.O. 5.00 419.33 20.97
TOTAL

Demolicin de Est. de Concreto Armado, con Martillo Neumtico

Rendimiento: 4.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.20 17.04 3.41
OFICIAL (E) HH 4.00 12.91 51.64
PEON (E) HH 2.00 11.40 22.80
OPERADOR DE EQUIPO LIVIANO (E) HH 4.00 15.88 63.52
COMPRESORA NEUMATICA 76 HP 125-17 HM 2.00 52.45 104.90
MARTILLO MEUMATICO 21-24 KG HM 4.00 5.22 20.88
HERRAMIENTAS % M.O. 5.00 141.37 7.07
TOTAL

Demolicin de Piso de Concreto, con Martillo Neumtico

Rendimiento: 100.00 m2 /da


Unidad: m2
CAPATAZ (E) HH 0.08 17.04 1.36
OFICIAL (E) HH 0.16 12.91 2.07
PEON (E) HH 0.32 11.40 3.65
OPERADOR DE EQUIPO LIVIANO (E) HH 0.16 15.88 2.54
COMPRESORA NEUMATICA 76 HP 125-17 HM 0.08 52.45 4.20
MARTILLO MEUMATICO 21-24 KG HM 0.16 5.22 0.84
HERRAMIENTAS % M.O. 5.00 9.62 0.48
TOTAL

Demolicin de concreto simple manual

Rendimiento: 0.60 m3 /da


Unidad: m3
CAPATAZ H-H 1.33 17.04 22.72
PEON H-H 13.33 11.40 152.00
HERRAMIENTAS % M.O. 5.00 174.72 8.74
TOTAL

Picado de concreto para anclaje columnas

Rendimiento: 0.40 m3 /da


Unidad: m3
CAPATAZ H-H 2.00 17.04 34.08
PEON H-H 20.00 11.40 228.00
HERRAMIENTAS % M.O. 3.00 262.08 7.86
TOTAL

DEMOLICIONES DE ALBAILERIA

Demolicin de Muros de Lad. KK-Soga, Manual

Rendimiento: 6.00 m2 /da


Unidad: m2
CAPATAZ (E) HH 0.13 17.04 2.27
PEON (E) HH 1.33 11.40 15.20
HERRAMIENTAS % M.O. 3.00 17.47 0.52
TOTAL

Demolicion de Muros de Lad. KK-Cabeza, Manual

Rendimiento: 4.50 m2 /da


Unidad: m2
CAPATAZ (E) HH 0.18 17.04 3.03
PEON (E) HH 1.78 11.40 20.27
HERRAMIENTAS % M.O. 3.00 23.30 0.70
TOTAL

Demolicin de Muros Ladrillo KK canto, Manual

Rendimiento: 8.00 m2 /da


Unidad: m2
CAPATAZ H-H 0.10 17.04 1.70
PEON H-H 1.00 11.40 11.40
HERRAMIENTAS % M.O. 3.00 13.10 0.39
TOTAL

Demolicin de Muros de Adobe\Quincha

Rendimiento: 14.00 m2 /da


Unidad: m2
CAPATAZ H-H 0.06 17.04 0.97
PEON H-H 0.57 11.40 6.51
HERRAMIENTAS % M.O. 3.00 7.48 0.22
TOTAL

DEMOLICIONES DE PISOS

Demolicin de Piso de Loseta


Rendimiento: 12.00 m2 /da
Unidad: m2
CAPATAZ H-H 0.07 17.04 1.14
PEON H-H 0.67 11.40 7.60
HERRAMIENTAS % M.O. 3.00 8.74 0.26
TOTAL

Demolicin de Pisos de Madera

Rendimiento: 20.00 m2 /da


Unidad: m2
CAPATAZ H-H 0.04 17.04 0.68
PEON H-H 0.40 11.40 4.56
HERRAMIENTAS % M.O. 3.00 5.24 0.16
TOTAL

Demolicin de piso de parquet

Rendimiento: 40.00 m2 /da


Unidad: m2
CAPATAZ H-H 0.02 17.04 0.34
PEON H-H 0.20 11.40 2.28
HERRAMIENTAS % M.O. 5.00 2.62 0.13
TOTAL

DESMONTAJES

Desmontaje de Puertas de Madera

Rendimiento: 16.00 m2 /da


Unidad: m2
CAPATAZ H-H 0.05 17.04 0.85
OPERARIO H-H 0.50 14.37 7.19
PEON H-H 0.50 11.40 5.70
HERRAMIENTAS % M.O. 5.00 13.74 0.69
TOTAL

Desmontaje de Calaminas

Rendimiento: 60.00 m2 /da


Unidad: m2
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.13 14.37 1.92
PEON H-H 0.13 11.40 1.52
HERRAMIENTAS % M.O. 3.00 3.67 0.11
TOTAL

Retiro de Aparatos Sanitarios

Rendimiento: 10.00 und/da


Unidad: und
CAPATAZ H-H 0.08 17.04 1.36
OPERARIO H-H 0.80 14.37 11.50
PEON H-H 0.80 11.40 9.12
HERRAMIENTAS % M.O. 5.00 21.98 1.10
TOTAL

Desmontaje de Artefactos de Iluminacion

Rendimiento: 8.00 und/da


Unidad: und
CAPATAZ H-H 0.10 17.04 1.70
OPERARIO H-H 1.00 14.37 14.37
PEON H-H 2.00 11.40 22.80
HERRAMIENTAS % M.O. 3.00 38.87 1.17
TOTAL

Desmontaje de Ventanas

Rendimiento: 40.00 m2 /da


Unidad: m2
CAPATAZ H-H 0.02 17.04 0.34
OPERARIO H-H 0.20 14.37 2.87
PEON H-H 0.20 11.40 2.28
HERRAMIENTAS % M.O. 3.00 5.49 0.16
TOTAL

MOVIMIENTO DE TIERRAS

CORTE Y NIVELACION DE TERRENO

Corte Superficial Manual, e=0.20m

Rendimiento: 200.00 m2 /da


Unidad: m2
CAPATAZ (E) HH 0.00 17.04 0.07
PEON (E) HH 0.04 11.40 0.46
HERRAMIENTAS % M.O. 3.00 0.53 0.02
TOTAL

Corte Superficial Manual, e=0.40m


Rendimiento: 100.00 m2 /da
Unidad: m2
CAPATAZ (E) HH 0.01 17.04 0.14
PEON (E) HH 0.08 11.40 0.91
HERRAMIENTAS % M.O. 3.00 1.05 0.03
TOTAL

Corte Superficial con Equipo, e=0.20m

Rendimiento: 1,000.00 m2 /da


Unidad: m2
CAPATAZ (E) HH 0.001 17.04 0.01
PEON (E) HH 0.016 11.40 0.18
MOTONIVELADORA 120 HP HM 0.01 149.21 1.19
TOTAL

Corte Superficial con Equipo, e=0.40m

Rendimiento: 500.00 m2 /da


Unidad: m2
CAPATAZ (E) HH 0.00 17.04 0.03
PEON (E) HH 0.03 11.40 0.36
MOTONIVELADORA 120 HP HM 0.02 149.21 2.39
TOTAL

EXCAVACIONES

Excavacion Masiva para Stanos con Cargador Frontal

Rendimiento: 800.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.01 17.04 0.17
PEON (E) HH 0.02 11.40 0.23
CAMION VOLQUETE 300 HP x 10 M3 HM 0.06 218.43 13.11
CARGADOR F. SOBRE ORUGAS 135 HP 2.2 HM 0.01 189.18 1.89
HERRAMIENTAS % M.O. 3.00 0.25 0.01
TOTAL

Excavacin Masiva para Stanos con Retroexcavadora

Rendimiento: 450.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.01 17.04 0.17
PEON (E) HH 0.04 11.40 0.41
CAMION VOLQUETE 300 HP x 10 M3 HM 0.11 218.43 23.31
RETROEXCAVADORA S/ORUGAS 110 HP 1. HM 0.02 185.20 3.30
HERRAMIENTAS % M.O. 3.00 0.44 0.01
TOTAL

Excavacin para cimentacion de calzadura con Retroexc.

Rendimiento: 180.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.00 17.04 0.07
PEON (E) HH 0.09 11.40 1.01
RETROEXCAVADORA S/LLANTAS 58 HP 1.O HM 0.04 126.35 5.61
HERRAMIENTAS % M.O. 3.00 1.08 0.03
TOTAL

Excavacion Manual de Zanjas h=1.00m Material Suelto

Rendimiento: 4.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.20 17.04 3.41
PEON (E) HH 2.00 11.40 22.80
HERRAMIENTAS % M.O. 3.00 26.21 0.79
TOTAL

Excavacion Manual de Zanjas h=1.40m Material Suelto

Rendimiento: 3.50 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.23 17.04 3.92
PEON (E) HH 2.29 11.40 26.11
HERRAMIENTAS % M.O. 3.00 29.96 0.90
TOTAL

Excavacion Manual de Zanjas h=1.70m Material Suelto

Rendimiento: 3.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.27 17.04 4.54
PEON (E) HH 2.67 11.40 30.40
HERRAMIENTAS % M.O. 3.00 34.94 1.05
TOTAL

Excavacion de Zanjas h=1.00m Roca Fracturada

Rendimiento: 24.00 m3 /da


Unidad: m3
OPERARIO H-H 0.33 14.37 4.79
CAPATAZ (E) HH 0.03 17.04 0.57
PEON (E) HH 4.00 11.40 45.60
OPERADOR DE EQUIPO LIVIANO (E) HH 0.67 15.88 10.59
COMPRESORA NEUMATICA 76 HP 125-17 HM 0.33 52.45 17.48
MARTILLO MEUMATICO 21-24 KG HM 0.67 5.22 3.48
HERRAMIENTAS % M.O. 5.00 61.55 3.08
TOTAL

Excavacion de Zanjas h=1.00m Roca Fija

Rendimiento: 20.00 m3 /da


Unidad: m3
OPERARIO H-H 0.40 14.37 5.75
CAPATAZ (E) HH 0.04 17.04 0.68
PEON (E) HH 4.80 11.40 54.72
OPERADOR DE EQUIPO LIVIANO (E) HH 0.80 15.88 12.70
COMPRESORA NEUMATICA 76 HP 125-17 HM 0.40 52.45 20.98
MARTILLO MEUMATICO 21-24 KG HM 0.80 5.22 4.18
HERRAMIENTAS % M.O. 5.00 73.85 3.69
TOTAL

Excavacin Manual de Zapatas h=1.00m Material Suelto

Rendimiento: 3.50 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.23 17.04 3.92
PEON (E) HH 2.29 11.40 26.06
HERRAMIENTAS % M.O. 5.00 29.96 1.50
TOTAL

Excavacin Manual de Zapatas h=1.40m Material Suelto

Rendimiento: 3.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.27 17.04 4.54
PEON (E) HH 2.67 11.40 30.40
HERRAMIENTAS % M.O. 5.00 34.94 1.75
TOTAL

Excavacin Manual de Zapatas h=1.70m Material Suelto

Rendimiento: 2.50 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.32 17.04 5.45
PEON (E) HH 3.20 11.40 36.48
HERRAMIENTAS % M.O. 5.00 41.93 2.10
TOTAL

Excavacin de Zapata h=1.00m Roca Fracturada

Rendimiento: 20.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.04 17.04 0.68
PEON (E) HH 4.80 11.40 54.72
OPERADOR DE EQUIPO LIVIANO (E) HH 0.80 15.88 12.70
COMPRESORA NEUMATICA 76 HP 125-17 HM 0.40 52.45 20.98
MARTILLO MEUMATICO 21-24 KG HM 0.80 5.22 4.18
HERRAMIENTAS % M.O. 5.00 68.10 3.41
TOTAL

Excavacion de Zapata h=1.00m Roca Fija

Rendimiento: 17.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.05 17.04 0.80
PEON (E) HH 5.65 11.40 64.38
OPERADOR DE EQUIPO LIVIANO (E) HH 0.94 15.88 14.95
COMPRESORA NEUMATICA 76 HP 125-17 HM 0.47 52.45 24.68
MARTILLO MEUMATICO 21-24 KG HM 0.94 5.22 4.91
HERRAMIENTAS % M.O. 5.00 80.13 4.01
TOTAL

RHELLENO Y COMPACTACION

Relleno Compactado, Mat. Propio Pisn Manual

Rendimiento: 7.00 m3 /da


Unidad: m3
AGUA M3 0.12 9.00 1.08
CAPATAZ (E) HH 0.11 17.04 1.95
PEON (E) HH 1.14 11.40 13.03
HERRAMIENTAS % M.O. 5.00 14.98 0.75
TOTAL

Relleno Compactado, Mat. Propio Compactadora 4.0 HP

Rendimiento: 18.00 m3 /da


Unidad: m3
AGUA M3 0.12 9.00 1.08
CAPATAZ (E) HH 0.04 17.04 0.76
PEON (E) HH 0.89 11.40 10.13
OPERADOR DE EQUIPO LIVIANO (E) HH 0.44 15.88 7.06
COMPACTADOR VIB. TIPO PLANCHA 4.0 H HM 0.44 18.79 8.35
HERRAMIENTAS % M.O. 3.00 17.95 0.54
TOTAL

Relleno Compactado, Mat. Propio Compactadora 5,8 HP

Rendimiento: 30.00 m3 /da


Unidad: m3
AGUA M3 0.12 9.00 1.08
CAPATAZ (E) HH 0.03 17.04 0.45
PEON (E) HH 0.80 11.40 9.12
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
COMPACTADOR VIB. TIPO PLANCHA 5.8 H HM 0.27 20.20 5.39
HERRAMIENTAS % M.O. 3.00 13.81 0.41
TOTAL

Relleno Compactado, Mat. Propio Compactadora 7,0 HP

Rendimiento: 50.00 m3 /da


Unidad; m3
AGUA M3 0.12 9.00 1.08
CAPATAZ (E) HH 0.05 17.04 0.82
PEON (E) HH 0.48 11.40 5.47
OPERADOR DE EQUIPO LIVIANO (E) HH 0.16 15.88 2.54
COMPACTADOR VIB. TIPO PLANCHA 7.0 H HM 0.16 22.87 3.66
HERRAMIENTAS % M.O. 3.00 8.83 0.26
TOTAL

Nivelacion, Refine y Compactacion, Pisn Manual

Rendimiento: 100.00 m2 /da


Unidad: m2
AGUA M3 0.05 9.00 0.45
PISON MANUAL HM 0.08 2.00 0.16
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.08 14.37 1.15
PEON (E) HH 0.08 11.40 0.91
HERRAMIENTAS % M.O. 5.00 3.42 0.17
TOTAL

Nivelacion, Refine y Compactacion, Compactadora 5,8 HP


Rendimiento: 120.00 m2 /da
Unidad: m2
AGUA M3 0.05 9.00 0.45
CAPATAZ (E) HH 0.01 17.04 0.11
PEON (E) HH 0.07 11.40 0.76
OPERADOR DE EQUIPO LIVIANO (E) HH 0.07 15.88 1.06
COMPACTADOR VIB. TIPO PLANCHA 5.8 H HM 0.07 20.20 1.35
HERRAMIENTAS % M.O. 5.00 1.93 0.10
TOTAL

ELIMINACION DE MATERIAL EXCEDENTE

Elim. Mat. Manual, Dp=30 m.

Rendimiento: 6.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.13 17.04 2.27
PEON (E) HH 1.33 11.40 15.20
HERRAMIENTAS % M.O. 5.00 17.47 0.87
TOTAL

Elim. Mat. Carg.135HP / Volq.6 m3, D=05 Km

Rendimiento: 384.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.00 17.04 0.04
PEON (E) HH 0.04 11.40 0.48
CAMION VOLQUETE 210 HP x 6 M3 HM 0.08 151.21 12.60
CARGADOR F. SOBRE ORUGAS 135 HP 2.2 HM 0.02 189.18 3.93
HERRAMIENTAS % M.O. 3.00 0.52 0.02
TOTAL

Elim. Mat.Carg.135HP/Volq. 6m3, D=10 Km.

Rendimiento: 240.00 m3 /da


Unidad: m3
CAPATAZ (E) HH 0.00 17.04 0.06
PEON (E) HH 0.07 11.40 0.76
CAMION VOLQUETE 300 HP x 10 M3 HM 0.10 218.43 21.84
CARGADOR F. SOBRE ORUGAS 135 HP 2.2 HM 0.03 189.18 6.30
HERRAMIENTAS % M.O. 3.00 0.82 0.02
TOTAL

Elim.Mat Carg. Manual/Volq.4m3 Dm=5 Km


Rendimiento: 20.00 m3 /da
Unidad: m3
CAPATAZ H-H 0.04 17.04 0.68
PEON H-H 1.60 11.40 18.24
CAMION VOLQUETE 140 HP x 4 M3 HM 0.40 123.95 49.58
HERRAMIENTAS % M.O. 3.00 18.92 0.57
TOTAL

Elim.Mat.Carg.Manual/Volq.6m3 D=5 Km

Rendimiento: 30.00 m3 /da


Unidad: m3
CAPATAZ H-H 0.03 17.04 0.45
PEON H-H 1.60 11.40 18.24
CAMION VOLQUETE 210 HP x 6 M3 HM 0.27 151.21 40.33
HERRAMIENTAS % M.O. 5.00 18.69 0.93
TOTAL

Elim.Mat.Carg.Manual/Volq.6m3 D=10 Km

Rendimiento: 24.00 m3 /da


Unidad: m3
CAPATAZ H-H 0.03 17.04 0.57
PEON H-H 2.00 11.40 22.80
CAMION VOLQUETE 210 HP x 6 M3 HM 0.33 151.21 50.40
HERRAMIENTAS % M.O. 5.00 23.37 1.17
TOTAL

CALZADURAS

Concreto para Calzaduras Ciclpeo 1:6 (C:H) +30%PG

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
PIEDRA GRANDE PARA ZANJA M3 0.42 25.42 10.68
CEMENTO PORTLAND TIPO I BOL 3.90 14.29 55.73
GASOLINA 84 OCTANOS GLN 0.12 10.05 1.21
HORMIGON M3 0.78 22.00 17.16
AGUA M3 0.13 9.00 1.17
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ H-H 0.06 17.04 1.09
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 48.59 1.46
TOTAL

Concreto para Calzaduras Ciclpeo 1:8 (C:H) +30%PG

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
PIEDRA GRANDE PARA ZANJA M3 0.42 25.42 10.68
CEMENTO PORTLAND TIPO I BOL 3.70 14.29 52.87
GASOLINA 84 OCTANOS GLN 0.25 10.05 2.51
HORMIGON M3 0.78 22.00 17.16
AGUA M3 0.13 9.00 1.17
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.32 12.91 4.13
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 5.00 48.68 2.43
TOTAL

Concreto para Calzaduras Ciclpeo 1:10 (C:H) +30%PG

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
PIEDRA GRANDE PARA ZANJA M3 0.42 25.42 10.68
CEMENTO PORTLAND TIPO I BOL 2.90 14.29 41.44
GASOLINA 84 OCTANOS GLN 0.25 10.05 2.51
HORMIGON M3 0.89 22.00 19.58
AGUA M3 0.13 9.00 1.17
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ H-H 0.06 17.04 1.09
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.10 23.92 2.45
HERRAMIENTAS % M.O. 5.00 48.59 2.43
TOTAL
Encofrado para Calzaduras Normal

Rendimiento: 28.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.20 4.58 0.92
CLAVOS 4" KG. 0.20 4.58 0.92
MADERA TORNILLO (LARGA) P2 2.50 2.93 7.33
TRIPLAY LUPUNA 4x8x19 MM PL 0.04 69.50 2.85
CAPATAZ (E) HH 0.02 17.04 0.39
OPERARIO (E) HH 0.29 14.37 4.11
OFICIAL (E) HH 0.57 12.91 7.38
PEON (E) HH 0.57 11.40 6.51
HERRAMIENTAS % M.O. 3.00 18.49 0.55
TOTAL

FALSA ZAPATA

Concreto para Falsa Zapata Ciclpeo 1:6 +30% PG

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
PIEDRA GRANDE PARA ZANJA M3 0.52 25.42 13.22
CEMENTO PORTLAND TIPO I BOL 5.00 14.29 71.45
GASOLINA 84 OCTANOS GLN 0.12 10.05 1.21
HORMIGON (PLANTA) M3 1.30 22.00 28.60
AGUA M3 0.16 9.00 1.46
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.32 12.91 4.13
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 48.68 1.46
TOTAL

CONCRETO SIMPLE

SOLADOS

Concreto para Solados, e=0.10 m. C:H, 1:12

Rendimiento: 60.00 m2 /da


Unidad: m2
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
CEMENTO PORTLAND TIPO I BOL 0.36 14.29 5.14
GASOLINA 84 OCTANOS GLN 0.24 10.05 2.41
HORMIGON (PLANTA) M3 0.12 22.00 2.71
AGUA M3 0.01 9.00 0.11
CAPATAZ (E) HH 0.01 17.04 0.23
OPERARIO (E) HH 0.27 14.37 3.83
PEON (E) HH 0.80 11.40 9.12
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
MEZCLADORA DE CONCRETO /TAMBOR 7 HM 0.13 14.35 1.91
HERRAMIENTAS % M.O. 5.00 15.30 0.77
TOTAL

Concreto para Solados, e=0.15 m. C:H, 1:12

Rendimiento: 40.00 m2 /da


Unidad: m2
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
CEMENTO PORTLAND TIPO I BOL 0.54 14.29 7.72
GASOLINA 84 OCTANOS GLN 0.24 10.05 2.41
HORMIGON (PLANTA) M3 0.18 22.00 4.06
AGUA M3 0.02 9.00 0.16
CAPATAZ (E) HH 0.02 17.04 0.34
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 1.20 11.40 13.68
OPERADOR DE EQUIPO LIVIANO (E) HH 0.20 15.88 3.18
MEZCLADORA DE CONCRETO /TAMBOR 7 HM 0.20 14.35 2.87
HERRAMIENTAS % M.O. 5.00 22.95 1.15
TOTAL

Concreto para Solados, e=2". C:H, 1:12

Rendimiento: 100.00 m2 /da


Unidad: m2
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.05
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.16
GASOLINA 84 OCTANOS GLN 0.03 10.05 0.30
HORMIGON (PLANTA) M3 0.07 22.00 1.43
AGUA M3 0.01 9.00 0.07
GRASA MULTIPLE EP LB 0.00 5.58 0.01
OFICIAL H-H 0.08 12.61 1.01
CAPATAZ (E) HH 0.02 17.04 0.27
OPERARIO (E) HH 0.16 14.37 2.30
PEON (E) HH 0.64 11.40 7.30
OPERADOR DE EQUIPO LIVIANO (E) HH 0.08 15.88 1.27
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.08 23.92 1.91
HERRAMIENTAS % M.O. 5.00 12.15 0.61
TOTAL

Concreto para Solados, e=2". C:H, 1:10

Rendimiento: 100.00 m2 /da


Unidad: m2
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.05
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.72
GASOLINA 84 OCTANOS GLN 0.03 10.05 0.30
HORMIGON (PLANTA) M3 0.07 22.00 1.43
AGUA M3 0.01 9.00 0.07
GRASA MULTIPLE EP LB 0.00 5.58 0.01
OFICIAL H-H 0.08 12.61 1.01
CAPATAZ (E) HH 0.02 17.04 0.27
OPERARIO (E) HH 0.16 14.37 2.30
PEON (E) HH 0.64 11.40 7.30
OPERADOR DE EQUIPO LIVIANO (E) HH 0.08 15.88 1.27
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.08 23.92 1.91
HERRAMIENTAS % M.O. 5.00 12.15 0.61
TOTAL

CIMIENTOS CORRIDOS

Concreto para Cimientos Ciclpeo 1:6+30% PG

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.004 47.91 0.19
PIEDRA GRANDE PARA ZANJA M3 0.48 25.42 12.20
CEMENTO PORTLAND TIPO I BOL 4.29 14.29 61.30
GASOLINA 84 OCTANOS GLN 0.24 10.05 2.41
HORMIGON M3 0.73 22.00 16.06
AGUA M3 0.15 9.00 1.31
CAPATAZ (E) HH 0.03 17.04 0.51
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.32 12.91 4.13
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 48.14 1.44
TOTAL
Concreto para Cimientos Ciclpeo 1:8+25% PG

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.48
PIEDRA GRANDE PARA ZANJA M3 0.48 25.42 12.20
CEMENTO PORTLAND TIPO I BOL 3.48 14.29 49.67
GASOLINA 84 OCTANOS GLN 0.24 10.05 2.41
HORMIGON M3 0.79 22.00 17.31
AGUA M3 0.12 9.00 1.06
CAPATAZ (E) HH 0.03 17.04 0.55
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.32 12.91 4.13
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 48.14 1.44
TOTAL

Concreto para Cimientos Ciclpeo 1:10+30% PG

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.004 47.91 0.19
PIEDRA GRANDE PARA ZANJA M3 0.48 25.42 12.20
CEMENTO PORTLAND TIPO I BOL 2.90 14.29 41.44
GASOLINA 84 OCTANOS GLN 0.24 10.05 2.41
HORMIGON M3 0.83 22.00 18.26
AGUA M3 0.10 9.00 0.90
CAPATAZ (E) HH 0.03 17.04 0.55
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.32 12.91 4.13
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 48.14 1.44
TOTAL

SOBRECIMIENTOS

Concreto para Sobrecimento Ciclpeo 1:6+25% PM

Rendimiento: 12.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
HORMIGON (PLANTA) M3 0.38 19.77 7.51
CEMENTO PORTLAND TIPO I BOL 4.50 14.29 64.31
GASOLINA 84 OCTANOS GLN 0.25 10.05 2.51
PIEDRA MEDIANA m3 0.38 26.27 9.98
HORMIGON M3 0.90 22.00 19.80
AGUA M3 0.16 9.00 1.46
GRASA MULTIPLE EP LB 0.02 5.58 0.09
CAPATAZ (E) HH 0.13 17.04 2.27
OPERARIO (E) HH 1.33 14.37 19.16
OFICIAL (E) HH 0.67 12.91 8.61
PEON (E) HH 5.33 11.40 60.80
OPERADOR DE EQUIPO LIVIANO (E) HH 0.67 15.88 10.59
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.67 23.92 15.95
HERRAMIENTAS % M.O. 3.00 101.43 3.04
TOTAL

Concreto para Sobrecimento Ciclpeo 1:8+25% PM

Rendimiento: 12.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
HORMIGON (PLANTA) M3 0.38 19.77 7.51
CEMENTO PORTLAND TIPO I BOL 3.30 14.29 47.16
GASOLINA 84 OCTANOS GLN 0.24 10.05 2.41
HORMIGON M3 0.90 22.00 19.80
AGUA M3 0.16 9.00 1.46
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 1.33 14.37 19.16
OFICIAL (E) HH 0.67 12.91 8.61
PEON (E) HH 5.33 11.40 60.80
OPERADOR DE EQUIPO LIVIANO (E) HH 0.67 15.88 10.59
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.67 23.92 15.95
HERRAMIENTAS % M.O. 3.00 100.30 3.01
TOTAL

Encofrado y Desencofrado Normal para Sobrecimiento

Rendimiento: 16.00 m2 /da


Unidad: m2
CLAVOS 2" KG 0.13 4.58 0.60
CLAVOS 3" KG 0.26 4.58 1.19
MADERA TORNILLO (LARGA) P2 3.35 2.93 9.82
CAPATAZ (E) HH 0.05 17.04 0.85
OPERARIO (E) HH 0.50 14.37 7.19
OFICIAL (E) HH 0.50 12.91 6.46
HERRAMIENTAS % M.O. 3.00 14.50 0.44
Desencofrado de Sobrecimiento m2 1.00 5.95 5.95
TOTAL

GRADAS Y RAMPAS

Concreto 1:10(C:H) Gradas y Rampas

Rendimiento: 15.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.32
CEMENTO PORTLAND TIPO I BOL 3.80 14.29 54.30
GASOLINA 84 OCTANOS GLN 0.20 10.05 2.01
HORMIGON M3 1.30 22.00 28.60
AGUA M3 0.16 9.00 1.46
GRASA MULTIPLE EP LB 0.01 5.58 0.07
CAPATAZ H-H 0.11 17.04 1.82
OPERARIO H-H 1.07 14.37 15.33
OFICIAL H-H 0.53 12.61 6.72
PEON H-H 4.27 11.40 48.64
OPERADOR DE EQUIPO LIVIANO (E) HH 0.53 15.88 8.47
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.28 23.92 6.80
HERRAMIENTAS % M.O. 5.00 80.98 4.05
TOTAL

Concreto f'c=140 Kg/cm2

Rendimiento: 15.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.32
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 7.00 14.29 100.03
GASOLINA 84 OCTANOS GLN 0.20 10.05 2.01
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.07
CAPATAZ H-H 0.11 17.04 1.82
OPERARIO H-H 1.07 14.37 15.33
OFICIAL H-H 0.53 12.61 6.72
PEON H-H 4.27 11.40 48.64
OPERADOR DE EQUIPO LIVIANO (E) HH 1.07 15.88 16.94
VIBRADOR PARA CONCRETO 4 HP x 2.40" HM 0.53 4.89 2.61
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.53 23.92 12.76
HERRAMIENTAS % M.O. 5.00 89.45 4.47
TOTAL
Concreto f'c=175 Kg/cm2

Rendimiento: 15.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.32
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 8.40 14.29 120.04
GASOLINA 84 OCTANOS GLN 0.20 10.05 2.01
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.07
CAPATAZ H-H 0.11 17.04 1.82
OPERARIO H-H 1.07 14.37 15.33
OFICIAL H-H 0.53 12.61 6.72
PEON H-H 4.27 11.40 48.64
OPERADOR DE EQUIPO LIVIANO (E) HH 1.07 15.88 16.94
VIBRADOR PARA CONCRETO 4 HP x 2.40" HM 0.53 4.89 2.61
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.53 23.92 12.76
HERRAMIENTAS % M.O. 5.00 89.45 4.47
TOTAL

Encofrado y Desencofrado Gradas y Rampas

Rendimiento: 6.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.20 4.58 0.92
ALAMBRE NEGRO N 8 KG. 0.10 4.58 0.46
MADERA TORNILLO (LARGA) P2 2.12 2.93 6.21
CAPATAZ H-H 0.13 17.04 2.27
OPERARIO H-H 1.33 14.37 19.16
OFICIAL H-H 1.33 12.61 16.81
HERRAMIENTAS % M.O. 5.00 38.24 1.91
TOTAL

FALSO PISO

Concreto para Falso Piso e=3" Mezcla 1:6 C:H

Rendimiento: 125.00 m2 /da


Unidad: m2
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.04
CEMENTO PORTLAND TIPO I BOL 0.47 14.29 6.73
GASOLINA 84 OCTANOS GLN 0.02 10.05 0.24
HORMIGON M3 0.10 22.00 2.15
AGUA M3 0.01 9.00 0.11
REGLA DE MADERA p2 0.06 5.47 0.33
GRASA MULTIPLE EP LB 0.00 5.58 0.01
CAPATAZ (E) HH 0.01 17.04 0.22
OPERARIO (E) HH 0.13 14.37 1.84
OFICIAL (E) HH 0.06 12.91 0.83
PEON (E) HH 0.38 11.40 4.38
OPERADOR DE EQUIPO LIVIANO (E) HH 0.06 15.88 1.02
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.06 23.92 1.53
HERRAMIENTAS % M.O. 5.00 8.29 0.41
TOTAL

Concreto para Falso Piso e=3" Mezcla 1:8 C:H

Rendimiento: 125.00 m2 /da


Unidad: m2
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.04
CEMENTO PORTLAND TIPO I BOL 0.37 14.29 5.22
GASOLINA 84 OCTANOS GLN 0.02 10.05 0.24
HORMIGON M3 0.10 22.00 2.15
AGUA M3 0.01 9.00 0.11
REGLA DE MADERA p2 0.06 5.47 0.33
GRASA MULTIPLE EP LB 0.00 5.58 0.01
CAPATAZ (E) HH 0.01 17.04 0.22
OPERARIO (E) HH 0.13 14.37 1.84
OFICIAL (E) HH 0.06 12.91 0.83
PEON (E) HH 0.38 11.40 4.38
OPERADOR DE EQUIPO LIVIANO (E) HH 0.06 15.88 1.02
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.06 23.92 1.53
HERRAMIENTAS % M.O. 5.00 8.29 0.41
TOTAL

Concreto para Falso Piso e=4" Mezcla 1:6 C:H

Rendimiento: 110.00 m2 /da


Unidad: m2
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.05
CEMENTO PORTLAND TIPO I BOL 0.63 14.29 8.97
GASOLINA 84 OCTANOS GLN 0.03 10.05 0.27
HORMIGON M3 0.13 22.00 2.86
AGUA M3 0.02 9.00 0.15
CAPATAZ (E) HH 0.01 17.04 0.25
OPERARIO (E) HH 0.15 14.37 2.09
OFICIAL (E) HH 0.07 12.91 0.94
PEON (E) HH 0.44 11.40 4.97
OPERADOR DE EQUIPO LIVIANO (E) HH 0.07 15.88 1.15
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.07 23.92 1.74
HERRAMIENTAS % M.O. 5.00 9.40 0.47
TOTAL

Concreto para Falso Piso e=4" Mezcla 1:8 C:H

Rendimiento: 110.00 m2 /da


Unidad; m2
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
CEMENTO PORTLAND TIPO I BOL 0.48 14.29 6.90
GASOLINA 84 OCTANOS GLN 0.03 10.05 0.27
HORMIGON M3 0.15 22.00 3.19
AGUA M3 0.02 9.00 0.14
REGLA DE MADERA p2 0.06 5.47 0.33
GRASA MULTIPLE EP LB 0.00 5.58 0.01
CAPATAZ (E) HH 0.01 17.04 0.25
OPERARIO (E) HH 0.15 14.37 2.09
OFICIAL (E) HH 0.07 12.91 0.94
PEON (E) HH 0.44 11.40 4.97
OPERADOR DE EQUIPO LIVIANO (E) HH 0.07 15.88 1.15
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.07 23.92 1.74
HERRAMIENTAS % M.O. 5.00 9.40 0.47
TOTAL

CONCRETO ARMADO

HABILITACION Y COLOCACION DE ARMADURA

Habilitacin y colocacin de Armadura Rend. 200 kg/da

Rendimiento: 200.00 kg /da


Unidad: kg
ALAMBRE NEGRO N 16 KG. 0.02 4.58 0.09
ACERO CORRUGADO 3/4" SIDER PERU KG 1.05 2.85 2.99
DOBLADURA HM 0.01 3.48 0.03
CAPATAZ (E) HH 0.00 17.04 0.07
OPERARIO (E) HH 0.04 14.37 0.57
OFICIAL (E) HH 0.04 12.91 0.52
CIZALLAS PARA CORTAR FIERRO DE 30" UND 0.0004 4.90 0.00
HERRAMIENTAS % M.O. 5.00 1.16 0.06
TOTAL

Habilitacin y colocacin de Armadura Rend. 250 kg/da


Rendimiento: 250.00 kg /da
Unidad: kG
ALAMBRE NEGRO N 16 KG. 0.02 4.58 0.09
ACERO CORRUGADO 3/4" SIDER PERU KG 1.05 2.85 2.99
DOBLADURA HM 0.01 3.48 0.03
CAPATAZ (E) HH 0.00 17.04 0.05
OPERARIO (E) HH 0.03 14.37 0.46
OFICIAL (E) HH 0.03 12.91 0.41
CIZALLAS PARA CORTAR FIERRO DE 30" UND 0.01 4.90 0.05
HERRAMIENTAS % M.O. 5.00 0.92 0.05
TOTAL

Habilitacin y colocacin de Armadura Rend. 300 kg/da

Rendimiento: 300.00 kg /da


Unidad: kg
ALAMBRE NEGRO N 16 KG. 0.02 4.58 0.09
ACERO CORRUGADO 3/4" SIDER PERU KG 1.05 2.85 2.99
DOBLADURA HM 0.01 3.48 0.03
CAPATAZ (E) HH 0.00 17.04 0.05
OPERARIO (E) HH 0.03 14.37 0.38
OFICIAL (E) HH 0.03 12.91 0.34
CIZALLAS PARA CORTAR FIERRO DE 30" UND 0.01 4.90 0.02
HERRAMIENTAS % M.O. 5.00 0.77 0.04
TOTAL

Habilitacin y colocacin de Armadura Rend. 350 kg/da

Rendimiento: 350.00 kg /da


Unidad: kg
ALAMBRE NEGRO N 16 KG. 0.02 4.58 0.09
ACERO CORRUGADO 3/4" SIDER PERU KG 1.05 2.85 2.99
DOBLADURA HM 0.01 3.48 0.03
CAPATAZ (E) HH 0.00 17.04 0.04
OPERARIO (E) HH 0.02 14.37 0.33
OFICIAL (E) HH 0.02 12.91 0.30
CIZALLAS PARA CORTAR FIERRO DE 30" UND 0.01 4.90 0.02
HERRAMIENTAS % M.O. 5.00 0.67 0.03
TOTAL

CIMIENTOS REFORZADOS

Concreto para Cimiento Reforzado fc=140 kg/cm2

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 7.00 14.29 100.03
GASOLINA 84 OCTANOS GLN 0.12 10.05 1.21
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.32 12.91 4.13
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.64 15.88 10.16
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 5.00 53.76 2.69
TOTAL

Concreto para Cimiento Reforzado fc=175 kg/cm2

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 8.40 14.29 120.04
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.32 12.91 4.13
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.64 15.88 10.16
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 5.00 53.76 2.69
TOTAL

Concreto para Cimiento Reforzado fc=210 kg/cm2

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.48
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 9.20 14.29 131.47
GASOLINA 84 OCTANOS GLN 0.12 10.05 1.21
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.32 12.91 4.13
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.64 15.88 10.16
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 5.00 53.76 2.69
TOTAL

Encofrado/ Desencofrado Normal, Cimiento Reforzado

Rendimiento: 20.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.20 4.58 0.92
CLAVOS 4" KG. 0.10 4.58 0.46
MADERA TORNILLO (LARGA) P2 2.50 2.93 7.33
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
OFICIAL (E) HH 0.40 12.91 5.16
HERRAMIENTAS % M.O. 3.00 11.59 0.35
Desencofrado de Cimiento m2 1.00 9.20 9.20
TOTAL

ZAPATAS

Concreto para Zapatas fc=140 kg/cm2

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.48
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 7.00 14.29 100.03
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.64 12.91 8.26
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.64 15.88 10.16
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 57.89 1.74
TOTAL

Concreto para Zapatas fc=175 kg/cm2

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.48
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 8.40 14.29 120.04
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.64 12.91 8.26
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.64 15.88 10.16
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 57.89 1.74
TOTAL

Concreto para Zapatas fc=210 kg/cm2

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.48
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 9.20 14.29 131.47
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.64 12.91 8.26
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.64 15.88 10.16
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 57.89 1.74
TOTAL

Concreto para Zapatas fc=245 kg/cm2

Rendimiento: 25.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.24
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 11.50 14.29 164.34
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.04
CAPATAZ (E) HH 0.06 17.04 1.09
OPERARIO (E) HH 0.64 14.37 9.20
OFICIAL (E) HH 0.64 12.91 8.26
PEON (E) HH 2.56 11.40 29.18
OPERADOR DE EQUIPO LIVIANO (E) HH 0.64 15.88 10.16
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.32 23.92 7.65
HERRAMIENTAS % M.O. 3.00 57.89 1.74
TOTAL

Encofrado/ Desencofrado Normal, Zapata

Rendimiento: 14.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.15 4.58 0.69
MADERA TORNILLO (LARGA) P2 4.03 2.93 11.81
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
OFICIAL (E) HH 0.57 12.91 7.38
HERRAMIENTAS % M.O. 3.00 16.56 0.50
Desencofrado de Zapata m2 1.00 9.20 9.20
TOTAL

VIGAS DE CIMENTACION

Concreto para Vigas de Cimentacin fc=140 kg/cm2

Rendimiento: 20.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.24
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 7.00 14.29 100.03
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.06
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
OFICIAL (E) HH 0.80 12.91 10.33
PEON (E) HH 3.20 11.40 36.48
OPERADOR DE EQUIPO LIVIANO (E) HH 0.80 15.88 12.70
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.40 4.71 1.88
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.40 23.92 9.57
HERRAMIENTAS % M.O. 3.00 72.37 2.17
TOTAL

Concreto para Vigas de Cimentacin fc=175 kg/cm2

Rendimiento: 20.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 8.40 14.29 120.04
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.06
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
OFICIAL (E) HH 0.80 12.91 10.33
PEON (E) HH 3.20 11.40 36.48
OPERADOR DE EQUIPO LIVIANO (E) HH 0.80 15.88 12.70
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.40 4.71 1.88
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.40 23.92 9.57
HERRAMIENTAS % M.O. 3.00 72.37 2.17
TOTAL

Concreto para Vigas de Cimentacin fc=210 kg/cm2

Rendimiento: 20.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.00 47.91 0.19
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 9.20 14.29 131.47
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.01 5.58 0.06
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
OFICIAL (E) HH 0.80 12.91 10.33
PEON (E) HH 3.20 11.40 36.48
OPERADOR DE EQUIPO LIVIANO (E) HH 0.80 15.88 12.70
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.40 4.71 1.88
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.40 23.92 9.57
HERRAMIENTAS % M.O. 3.00 72.37 2.17
TOTAL

Encofrado/ Desencofrado Normal, Vigas de Cimentacin

Rendimiento: 10.00 m2 /da


Unidad: m2
CLAVOS 2" KG 0.15 4.58 0.69
CLAVOS 3" KG 0.30 4.58 1.37
MADERA TORNILLO (LARGA) P2 2.18 2.93 6.39
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
OFICIAL (E) HH 0.80 12.91 10.33
HERRAMIENTAS % M.O. 3.00 23.19 0.70
Desencofrado de Viga de Cimentacion m2 1.00 8.40 8.40
TOTAL

CIMIENTOS REFORZADOS

Concreto para Sobrecimientos Reforzados fc=140 kg/cm2

Rendimiento: 12.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.40
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 7.00 14.29 100.03
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.02 5.58 0.09
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 1.33 14.37 19.16
OFICIAL (E) HH 0.67 12.91 8.61
PEON (E) HH 5.33 11.40 60.80
OPERADOR DE EQUIPO LIVIANO (E) HH 1.33 15.88 21.17
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.67 4.71 3.14
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.67 23.92 15.95
HERRAMIENTAS % M.O. 3.00 110.88 3.33
TOTAL

Concreto para Sobrecimientos Reforzados fc=175 kg/cm2

Rendimiento: 12.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.40
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 8.40 14.29 120.04
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.02 5.58 0.09
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 1.33 14.37 19.16
OFICIAL (E) HH 0.67 12.91 8.61
PEON (E) HH 5.33 11.40 60.80
OPERADOR DE EQUIPO LIVIANO (E) HH 1.33 15.88 21.17
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.67 4.71 3.14
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.67 23.92 15.95
HERRAMIENTAS % M.O. 3.00 110.88 3.33
TOTAL

Concreto para Sobrecimientos Reforzados fc=210 kg/cm2

Rendimiento: 12.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.40
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 9.20 14.29 131.47
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.02 5.58 0.09
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 1.33 14.37 19.16
OFICIAL (E) HH 0.67 12.91 8.61
PEON (E) HH 5.33 11.40 60.80
OPERADOR DE EQUIPO LIVIANO (E) HH 1.33 15.88 21.17
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.67 4.71 3.14
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.67 23.92 15.95
HERRAMIENTAS % M.O. 3.00 110.88 3.33
TOTAL

Concreto para Sobrecimientos Reforzados fc=245 kg/cm2

Rendimiento: 12.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRAD GAL 0.01 47.91 0.40
ARENA GRUESA M3 0.50 38.14 19.07
PIEDRA CHANCADA DE 1/2" M3 0.80 49.07 39.26
CEMENTO PORTLAND TIPO I BOL 11.50 14.29 164.34
GASOLINA 84 OCTANOS GLN 0.30 10.05 3.02
AGUA M3 0.18 9.00 1.62
GRASA MULTIPLE EP LB 0.02 5.58 0.09
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 1.33 14.37 19.16
OFICIAL (E) HH 0.67 12.91 8.61
PEON (E) HH 5.33 11.40 60.80
OPERADOR DE EQUIPO LIVIANO (E) HH 1.33 15.88 21.17
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.67 4.71 3.14
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.67 23.92 15.95
HERRAMIENTAS % M.O. 3.00 110.88 3.33
TOTAL

Encofrado y Desencofrado Normal, Sobrecimientos Reforzado

Rendimiento: 16.00 m2 /da


Unidad: m2
CLAVOS 2" KG 0.13 4.58 0.60
CLAVOS 3" KG 0.26 4.58 1.19
MADERA TORNILLO (LARGA) P2 3.35 2.93 9.82
CAPATAZ (E) HH 0.05 17.04 0.85
OPERARIO (E) HH 0.50 14.37 7.19
OFICIAL (E) HH 0.50 12.91 6.46
HERRAMIENTAS % M.O. 3.00 14.50 0.44
Desencofrado de Sobrecimiento m2 1.00 5.95 5.95
TOTAL

Concreto Premezclado fc=175 kg/cm2 - Cimiento Reforzado

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/CM2 M3 1.02 202.50 206.55
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=210 kg/cm2 - Cimiento Reforzado

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/CM2 M3 1.02 208.00 212.16
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc= 245 kg/cm2 - Cimiento Reforzado

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/CM2 M3 1.02 221.50 225.93
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=280 kg/cm2 - Cimiento Reforzado

Redimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/CM2M3 1.02 229.00 233.58
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc= 315 kg/cm2 - Cimiento Reforzado

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/CM2 M3 1.02 242.00 246.84
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezacldo fc=350 kg/cm2 - Cimiento Reforzado

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/CM2 M3 1.02 255.50 260.61
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=420 kg/cm2 - Cimiento Reforzado

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/CM2 M3 1.02 278.00 283.56
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL
Concreto Premezclado fc= 175 kg/cm2 - Viga de Cimentacin

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/CM2 M3 1.02 202.50 206.55
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=210 kg/cm2 - Viga de Cimentacin

Rndimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/CM2 M3 1.02 208.00 212.16
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=245 kg/cm2 - Viga de Cimentacin

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/CM2 M3 1.02 221.50 225.93
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=280 kg/cm2 - Viga de Cimetacin

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/CM2M3 1.02 229.00 233.58
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=315 kg/cm2 - Viga de Cimenatcin

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/CM2 M3 1.02 242.00 246.84
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=350 kg/cm2 - Viga de Cimentacin

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/CM2 M3 1.02 255.50 260.61
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=420 kg/cm2 - Viga de Cimentacin

Rendimiento: 60.01 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/CM2 M3 1.02 278.00 283.56
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=175 kg/cm2 - Losa de Cimentacin

Rendimiento: 65.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/CM2 M3 1.02 202.50 206.55
CAPATAZ H-H 0.01 17.04 0.21
OPERARIO H-H 0.25 14.37 3.54
OFICIAL H-H 0.12 12.61 1.55
PEON H-H 0.49 11.40 5.61
OPERADOR DE EQUIPO LIVIANO (E) HH 0.12 15.88 1.95
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.12 4.71 0.58
HERRAMIENTAS % M.O. 3.00 12.86 0.39
TOTAL

Concreto Premezclado fc=210 kg/cm2 - Losa de Cimentacin

Rendimiento: 65.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/CM2 M3 1.02 208.00 212.16
CAPATAZ H-H 0.01 17.04 0.21
OPERARIO H-H 0.25 14.37 3.54
OFICIAL H-H 0.12 12.61 1.55
PEON H-H 0.49 11.40 5.61
OPERADOR DE EQUIPO LIVIANO (E) HH 0.12 15.88 1.95
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.12 4.71 0.58
HERRAMIENTAS % M.O. 3.00 12.86 0.39
TOTAL

Concreto Premezclado fc =245 kg/cm2 - Losa de Cimentacin

Rendimiento: 65.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/CM2 M3 1.02 221.50 225.93
CAPATAZ H-H 0.01 17.04 0.21
OPERARIO H-H 0.25 14.37 3.54
OFICIAL H-H 0.12 12.61 1.55
PEON H-H 0.49 11.40 5.61
OPERADOR DE EQUIPO LIVIANO (E) HH 0.12 15.88 1.95
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.12 4.71 0.58
HERRAMIENTAS % M.O. 3.00 12.86 0.39
TOTAL

Concreto Premezclado fc=280 kg/cm2 - Losa de Cimentacin

Rendimiento: 65.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/CM2M3 1.02 229.00 233.58
CAPATAZ H-H 0.01 17.04 0.21
OPERARIO H-H 0.25 14.37 3.54
OFICIAL H-H 0.12 12.61 1.55
PEON H-H 0.49 11.40 5.61
OPERADOR DE EQUIPO LIVIANO (E) HH 0.12 15.88 1.95
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.12 4.71 0.58
HERRAMIENTAS % M.O. 3.00 12.86 0.39
TOTAL

Concreto Premezclado fc=315 kg/cm2 - Losa de Cimentacin

Rendimiento: 65.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/CM2 M3 1.02 242.00 246.84
CAPATAZ H-H 0.01 17.04 0.21
OPERARIO H-H 0.25 14.37 3.54
OFICIAL H-H 0.12 12.61 1.55
PEON H-H 0.49 11.40 5.61
OPERADOR DE EQUIPO LIVIANO (E) HH 0.12 15.88 1.95
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.12 4.71 0.58
HERRAMIENTAS % M.O. 3.00 12.86 0.39
TOTAL

Concreto Premezclado fc=350 kg/cm2 - Losa de Cimentacin

Rendimiento: 65.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/CM2 M3 1.02 255.50 260.61
CAPATAZ H-H 0.01 17.04 0.21
OPERARIO H-H 0.25 14.37 3.54
OFICIAL H-H 0.12 12.61 1.55
PEON H-H 0.49 11.40 5.61
OPERADOR DE EQUIPO LIVIANO (E) HH 0.12 15.88 1.95
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.12 4.71 0.58
HERRAMIENTAS % M.O. 3.00 12.86 0.39
TOTAL

Concreto Premezclado fc=420 kg/cm2 - Losa de Cimentacin

Rendimiento: 65.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/CM2 M3 1.02 278.00 283.56
CAPATAZ H-H 0.01 17.04 0.21
OPERARIO H-H 0.25 14.37 3.54
OFICIAL H-H 0.12 12.61 1.55
PEON H-H 0.49 11.40 5.61
OPERADOR DE EQUIPO LIVIANO (E) HH 0.12 15.88 1.95
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.12 4.71 0.58
HERRAMIENTAS % M.O. 3.00 12.86 0.39
TOTAL

Concreto Premezclado fc= 175 kg/cm2 - Sobrecimiento Reforzado

Rendimiento: 35.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/CM2 M3 1.02 202.50 206.55
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.46 14.37 6.57
OFICIAL H-H 0.23 12.61 2.88
PEON H-H 1.14 11.40 13.03
OPERADOR DE EQUIPO LIVIANO (E) HH 0.23 15.88 3.63
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.23 4.71 1.08
HERRAMIENTAS % M.O. 3.00 26.50 0.80
TOTAL

Concreto Premezclado fc=210 kg/cm2 - Sobrecimiento Reforzado

Rendimiento: 35.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/CM2 M3 1.02 208.00 212.16
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.46 14.37 6.57
OFICIAL H-H 0.23 12.61 2.88
PEON H-H 1.14 11.40 13.03
OPERADOR DE EQUIPO LIVIANO (E) HH 0.23 15.88 3.63
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.23 4.71 1.08
HERRAMIENTAS % M.O. 3.00 26.50 0.80
TOTAL

Concreto Premezclado fc=245 kg/cm2 - Sobrecimiento Reforzado


Rendimiento: 35.00 m3 /da
Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/CM2 M3 1.02 221.50 225.93
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.46 14.37 6.57
OFICIAL H-H 0.23 12.61 2.88
PEON H-H 1.14 11.40 13.03
OPERADOR DE EQUIPO LIVIANO (E) HH 0.23 15.88 3.63
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.23 4.71 1.08
HERRAMIENTAS % M.O. 3.00 26.50 0.80
TOTAL

Concreto Premezclado fc=280 kg/cm2 - Sobrecimiento Reforzado

Rendimiento: 35.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/CM2M3 1.02 229.00 233.58
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.46 14.37 6.57
OFICIAL H-H 0.23 12.61 2.88
PEON H-H 1.14 11.40 13.03
OPERADOR DE EQUIPO LIVIANO (E) HH 0.23 15.88 3.63
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.23 4.71 1.08
HERRAMIENTAS % M.O. 3.00 26.50 0.80
TOTAL

Concreto Premezclado fc=315 kg/cm2 - Sobrecimiento Reforzado

Rendimiento: 35.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/CM2 M3 1.02 242.00 246.84
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.46 14.37 6.57
OFICIAL H-H 0.23 12.61 2.88
PEON H-H 1.14 11.40 13.03
OPERADOR DE EQUIPO LIVIANO (E) HH 0.23 15.88 3.63
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.23 4.71 1.08
HERRAMIENTAS % M.O. 3.00 26.50 0.80
TOTAL

Concreto Premezclado fc=350 kg/cm2 - Sobrecimiento Reforzado

Rendimiento: 35.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/CM2 M3 1.02 255.50 260.61
OPERARIO H-H 0.46 14.37 6.57
OFICIAL H-H 0.23 12.61 2.88
PEON H-H 1.14 11.40 13.03
OPERADOR DE EQUIPO LIVIANO (E) HH 0.23 15.88 3.63
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.23 4.71 1.08
HERRAMIENTAS % M.O. 3.00 26.11 0.78
TOTAL

Concreto Premezclado fc=420 kg/cm2 - Sobrecimiento Reforzado

Rendimiento: 35.00 m3 /da


Ulnidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/CM2 M3 1.02 278.00 283.56
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.46 14.37 6.57
OFICIAL H-H 0.23 12.61 2.88
PEON H-H 1.14 11.40 13.03
OPERADOR DE EQUIPO LIVIANO (E) HH 0.23 15.88 3.63
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.23 4.71 1.08
HERRAMIENTAS % M.O. 3.00 26.50 0.80
TOTAL

Concreto Premezclado fc=175 kg/cm2 - Muros y Tabiques

Rendimiento: 25.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/CM2 M3 1.02 202.50 206.55
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.55
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 1.28 11.40 14.59
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
HERRAMIENTAS % M.O. 3.00 33.46 1.00
TOTAL

Concreto Premezclado fc=210 kg/cm2 - Muros y Tabiques

Rendimiento: 25.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/CM2 M3 1.02 208.00 212.16
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.55
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 1.28 11.40 14.59
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
HERRAMIENTAS % M.O. 3.00 33.46 1.00
TOTAL

Concreto Premezclado fc=245 kg/cm2 - Muros y Tabiques

Rendimiento: 25.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/CM2 M3 1.02 221.50 225.93
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.55
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 1.28 11.40 14.59
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
HERRAMIENTAS % M.O. 3.00 33.46 1.00
TOTAL

Concreto Premezclado fc= 280 kg/cm2 - Muros y Tabiques

Rendimiento: 25.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/CM2M3 1.02 229.00 233.58
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.55
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 1.28 11.40 14.59
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
HERRAMIENTAS % M.O. 3.00 33.46 1.00
TOTAL

Concreto Premezclado fc= 315 kg/cm2 - Muros y Tabiques

Rendimiento: 25.00 m3/da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/CM2 M3 1.02 242.00 246.84
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.55
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 1.28 11.40 14.59
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
HERRAMIENTAS % M.O. 3.00 33.46 1.00
TOTAL

Concreto Premezclado fc=350 kg/cm2 - Muros y Tabiques

Rendimiento: 25.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/CM2 M3 1.02 255.50 260.61
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.55
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 1.28 11.40 14.59
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
HERRAMIENTAS % M.O. 3.00 33.46 1.00
TOTAL

Concreto Premezclado fc=420 kg/cm2 - Muros y Tabiques

Rendimiento: 25.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/CM2 M3 1.02 278.00 283.56
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.55
OPERARIO H-H 0.64 14.37 9.20
OFICIAL H-H 0.32 12.61 4.04
PEON H-H 1.28 11.40 14.59
OPERADOR DE EQUIPO LIVIANO (E) HH 0.32 15.88 5.08
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.32 4.71 1.51
HERRAMIENTAS % M.O. 3.00 33.46 1.00
TOTAL

Concreto Premezclado fc=175 kg/cm2 - Columnas

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/CM2 M3 1.02 202.50 206.55
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado fc=210 kg/cm2 - Columnas

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/CM2 M3 1.02 208.00 212.16
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado fc=245 kg/cm2 - Columnas

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/CM2 M3 1.02 221.50 225.93
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado fc=280 kg/cm2 - Columnas

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/CM2M3 1.02 229.00 233.58
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado fc=315 kg/cm2 - Columnas

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/CM2 M3 1.02 242.00 246.84
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado fc=350 kg/cm2 - Columnas

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/CM2 M3 1.02 255.50 260.61
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado fc= 420 kg/cm2 - Columnas

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/CM2 M3 1.02 278.00 283.56
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado fc=175 kg/cm2 - Vigas

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/CM2 M3 1.02 202.50 206.55
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc= 210 kg/cm2 - Vigas

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/CM2 M3 1.02 208.00 212.16
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=245 kg/cm2 - Vigas

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/CM2 M3 1.02 221.50 225.93
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=280 kg/cm2 - Vigas

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/CM2M3 1.02 229.00 233.58
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc= 315 kg/cm2 - Vigas

Rendimiento: 60.00 m3/da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/CM2 M3 1.02 242.00 246.84
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc=350 kg/m2 - Vigas

Rendimiento: 60.01 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/CM2 M3 1.02 255.50 260.61
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado fc= 420 kd/cm2 - Vigas

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/CM2 M3 1.02 278.00 283.56
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Loza Maciza fc=175 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/C M3 1.02 202.50 206.55
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Maciza fc=210 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/C M3 1.02 208.00 212.16
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Maciza fc=245 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/C M3 1.02 221.50 225.93
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Maciza fc=280 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/ M3 1.02 229.00 233.58
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Maciza fc=315 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/C M3 1.00 242.00 242.00
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Maciza fc=350 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/C M3 1.02 255.50 260.61
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Maciza fc=420 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/C M3 1.02 278.00 283.56
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto premezclado Losa Aligerada fc=175 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/C M3 1.02 202.50 206.55
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Aligerada fc=210 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/C M3 1.02 208.00 212.16
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Aligerada fc=245 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/C M3 1.02 221.50 225.93
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Aligerada fc=280 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/ M3 1.02 229.00 233.58
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Aligerada fc=315 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/C M3 1.02 242.00 246.84
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Aligerada fc=350 kg/cm2

Rendimiento: 60.01 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/C M3 1.02 255.50 260.61
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Losa Aligerada fc=420 kg/cm2

Rendimiento: 60.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/C M3 1.02 278.00 283.56
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
PEON H-H 0.53 11.40 6.08
OPERADOR DE EQUIPO LIVIANO (E) HH 0.13 15.88 2.12
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.13 4.71 0.63
HERRAMIENTAS % M.O. 3.00 13.94 0.42
TOTAL

Concreto Premezclado Escalera fc=175 kg/cm2

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=175 KG/C M3 1.02 202.50 206.55
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado Escalera fc=210 kg/cm2

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=210 KG/C M3 1.02 208.00 212.16
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado Escalera fc=245 kg/cm2

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=245 KG/C M3 1.02 221.50 225.93
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado Escalera fc=280 kg/cm2

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PTREMEZCLADO F'C=280 KG/ M3 1.02 229.00 233.58
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado Escalera fc=315 kg/cm2

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=315 KG/C M3 1.02 242.00 246.84
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado Escalera fc=350 kg/cm2

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=350 KG/C M3 1.02 255.50 260.61
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

Concreto Premezclado Escalera fc=420 kg/cm2

Rendimiento: 30.00 m3 /da


Unidad: m3
CONCRETO PREMEZCLADO F'C=420 KG/C M3 1.02 278.00 283.56
SERVICIO DE BOMBA DE CONCRETO M3 1.00 33.00 33.00
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.53 14.37 7.66
OFICIAL H-H 0.27 12.61 3.36
PEON H-H 1.07 11.40 12.16
OPERADOR DE EQUIPO LIVIANO (E) HH 0.27 15.88 4.24
VIBRADOR PARA CONCRETO 4 HP x 1.50" HM 0.27 4.71 1.26
HERRAMIENTAS % M.O. 3.00 27.87 0.84
TOTAL

ALBAILERIA

MUROS DE LADRILLO KING KONG DE ARCILLA

Muro de Ladrillo KK de arcilla, N-Cab. Mezcla 1:5

Rendimiento: 6.45 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.06 38.14 2.46
LADRILLO KING KONG 18H 9X13X23 MLL 0.07 557.14 38.44
CEMENTO PORTLAND TIPO I BOL 0.45 14.29 6.48
AGUA M3 0.01 9.00 0.13
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.12 17.04 2.11
OPERARIO (E) HH 1.24 14.37 17.82
PEON (E) HH 0.62 11.40 7.07
HERRAMIENTAS % M.O. 3.00 27.00 0.81
TOTAL

Muro de Ladrillo KK de arcilla, N-Sog. Mezcla 1:5


Rendimiento: 9.46 m2 /da
Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.03 38.14 1.10
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 21.73
CEMENTO PORTLAND TIPO I BOL 0.20 14.29 2.91
AGUA M3 0.01 9.00 0.07
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.08 17.04 1.44
OPERARIO (E) HH 0.85 14.37 12.15
PEON (E) HH 0.42 11.40 4.82
HERRAMIENTAS % M.O. 3.00 18.41 0.55
TOTAL

Muro de Ladrillo KK de arcilla, N-Can. Mezcla 1:5

Rendimiento: 11.00 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.02 38.14 0.63
LADRILLO KING KONG 18H 9X13X23 MLL 0.03 557.14 16.16
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.67
AGUA M3 0.00 9.00 0.04
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.07 17.04 1.24
OPERARIO (E) HH 0.73 14.37 10.45
PEON (E) HH 0.36 11.40 4.15
HERRAMIENTAS % M.O. 3.00 15.84 0.48
TOTAL

Muro de Ladrillo KK de arcilla, N-Cab. Mezcla 1:4

Rendimiento: 6.45 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.06 38.14 2.34
LADRILLO KING KONG 18H 9X13X23 MLL 0.07 557.14 38.44
CEMENTO PORTLAND TIPO I BOL 0.55 14.29 7.80
AGUA M3 0.01 9.00 0.13
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.12 17.04 2.11
OPERARIO (E) HH 1.24 14.37 17.82
PEON (E) HH 0.62 11.40 7.07
HERRAMIENTAS % M.O. 3.00 27.00 0.81
TOTAL

Muro de Ladrillo KK de arcilla, N-Sog. Mezcla 1:4

Rendimiento: 9.46 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.03 38.14 1.05
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 21.73
CEMENTO PORTLAND TIPO I BOL 0.25 14.29 3.50
AGUA M3 0.01 9.00 0.07
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.08 17.04 1.44
OPERARIO (E) HH 0.85 14.37 12.15
PEON (E) HH 0.42 11.40 4.82
HERRAMIENTAS % M.O. 3.00 18.41 0.55
TOTAL

Muro de Ladrillo KK de arcilla, N-Can. Mezcla 1:4

Rendimiento: 11.00 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.02 38.14 0.60
LADRILLO KING KONG 18H 9X13X23 MLL 0.03 557.14 16.16
CEMENTO PORTLAND TIPO I BOL 0.14 14.29 2.01
AGUA M3 0.00 9.00 0.04
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.07 17.04 1.24
OPERARIO (E) HH 0.73 14.37 10.45
PEON (E) HH 0.36 11.40 4.15
HERRAMIENTAS % M.O. 3.00 15.84 0.48
TOTAL

Muro de Ladrillo KK de arcilla, CV-Cab. Mezcla 1:5

Rendimiento: 5.00 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.06 38.14 2.46
LADRILLO KING KONG 18H 9X13X23 MLL 0.08 557.14 44.01
CEMENTO PORTLAND TIPO I BOL 0.34 14.29 4.84
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.16 17.04 2.73
OPERARIO (E) HH 1.60 14.37 22.99
PEON (E) HH 0.80 11.40 9.12
HERRAMIENTAS % M.O. 3.00 34.84 1.05
TOTAL

Muro de Ladrillo KK de arcilla, CV-Sog. Mezcla 1 :5

Rendimiento: 7.00 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.02 38.14 0.82
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 24.51
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.16
AGUA M3 0.01 9.00 0.05
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.11 17.04 1.95
OPERARIO (E) HH 1.14 14.37 16.42
PEON (E) HH 0.57 11.40 6.51
HERRAMIENTAS % M.O. 3.00 24.88 0.75
TOTAL

Muro de Ladrillo KK de arcilla, CV-Can.Mezcla 1:5

Rendimiento: 9.00 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.01 38.14 0.46
LADRILLO KING KONG 18H 9X13X23 MLL 0.03 557.14 17.83
CEMENTO PORTLAND TIPO I BOL 0.09 14.29 1.21
AGUA M3 0.00 9.00 0.02
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.09 17.04 1.51
OPERARIO (E) HH 0.89 14.37 12.77
PEON (E) HH 0.44 11.40 5.07
HERRAMIENTAS % M.O. 3.00 19.35 0.58
TOTAL

Muro de Ladrillo KK de arcilla, CV-Cab. Mezcla 1:4

Rendimiento: 5.00 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.05 38.14 1.75
LADRILLO KING KONG 18H 9X13X23 MLL 0.08 557.14 44.01
CEMENTO PORTLAND TIPO I BOL 0.41 14.29 5.82
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.16 17.04 2.73
OPERARIO (E) HH 1.60 14.37 22.99
PEON (E) HH 0.80 11.40 9.12
HERRAMIENTAS % M.O. 3.00 34.84 1.05
TOTAL

Muro de Ladrillo KK de arcilla, CV-Sog. Mezcla 1:4

Rendimiento: 7.00 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.02 38.14 0.78
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 24.51
CEMENTO PORTLAND TIPO I BOL 0.18 14.29 2.60
AGUA M3 0.01 9.00 0.05
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.11 17.04 1.95
OPERARIO (E) HH 1.14 14.37 16.42
PEON (E) HH 0.57 11.40 6.51
HERRAMIENTAS % M.O. 3.00 24.88 0.75
TOTAL

Muro de Ladrillo KK de arcilla, CV-Can. Mezcla 1:4

Rendimiento: 9.00 m2 /da


Unidad: m3
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.01 38.14 0.44
LADRILLO KING KONG 18H 9X13X23 MLL 0.03 557.14 17.83
CEMENTO PORTLAND TIPO I BOL 0.10 14.29 1.46
AGUA M3 0.00 9.00 0.02
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.09 17.04 1.51
OPERARIO (E) HH 0.89 14.37 12.77
PEON (E) HH 0.44 11.40 5.07
HERRAMIENTAS % M.O. 3.00 19.35 0.58
TOTAL

ALBAILERIA

MUROS DE LADRILLO CORRIENTE DE ARCILLA

Muro de Lad. Corriente arcilla, N-Cabeza, Mezcla 1:5


Rendimiento: 5.55 m2 /da
Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.08 38.14 3.07
LADRILLO CORRIENTE 6X12X25 MLL 0.10 678.99 70.61
CEMENTO PORTLAND TIPO I BOL 0.57 14.29 8.11
AGUA M3 0.02 9.00 0.17
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.14 17.04 2.46
OPERARIO (E) HH 1.44 14.37 20.71
PEON (E) HH 0.72 11.40 8.22
HERRAMIENTAS % M.O. 3.00 31.39 0.94
TOTAL

Muro de Lad. Corriente arcilla, N-Soga, Mezcla 1:5

Rendimiento: 6.92 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.03 38.14 1.31
LADRILLO CORRIENTE 6X12X25 MLL 0.06 678.99 37.34
CEMENTO PORTLAND TIPO I BOL 0.20 14.29 2.91
AGUA M3 0.01 9.00 0.07
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.12 17.04 1.97
OPERARIO (E) HH 1.16 14.37 16.61
PEON (E) HH 0.58 11.40 6.59
HERRAMIENTAS % M.O. 3.00 25.17 0.76
TOTAL

Muro de Lad. Corriente arcilla, N-Canto, Mezcla 1:5

Rendimiento: 8.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.01 38.14 0.44
LADRILLO CORRIENTE 6X12X25 MLL 0.03 678.99 21.05
CEMENTO PORTLAND TIPO I BOL 0.08 14.29 1.16
AGUA M3 0.00 9.00 0.02
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.10 17.04 1.70
OPERARIO (E) HH 1.00 14.37 14.37
PEON (E) HH 0.50 11.40 5.70
HERRAMIENTAS % M.O. 3.00 21.77 0.65
TOTAL

Muro de Lad. Corriente arcilla, N-Cabeza, Mecla 1:4

Rendimiento: 5.55 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.08 38.14 2.93
LADRILLO CORRIENTE 6X12X25 MLL 0.10 678.99 70.61
CEMENTO PORTLAND TIPO I BOL 0.68 14.29 9.75
AGUA M3 0.02 9.00 0.17
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.14 17.04 2.46
OPERARIO (E) HH 1.44 14.37 20.71
PEON (E) HH 0.72 11.40 8.22
HERRAMIENTAS % M.O. 3.00 31.39 0.94
TOTAL

Muro de Lad. Corriente arcilla, N-Soga, Mezcla 1:4

Rendimiento: 6.92 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.03 38.14 1.25
LADRILLO CORRIENTE 6X12X25 MLL 0.06 678.99 37.34
CEMENTO PORTLAND TIPO I BOL 0.29 14.29 4.16
AGUA M3 0.01 9.00 0.07
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.12 17.04 1.97
OPERARIO (E) HH 1.16 14.37 16.61
PEON (E) HH 0.58 11.40 6.59
HERRAMIENTAS % M.O. 3.00 25.17 0.76
TOTAL

Muro de Lad. Corriente arcilla, N-Canto, Mezcla 1:4

Rendimiento: 8.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.01 38.14 0.42
LADRILLO CORRIENTE 6X12X25 MLL 0.03 678.99 21.05
CEMENTO PORTLAND TIPO I BOL 0.10 14.29 1.40
AGUA M3 0.00 9.00 0.02
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.10 17.04 1.70
OPERARIO (E) HH 1.00 14.37 14.37
PEON (E) HH 0.50 11.40 5.70
HERRAMIENTAS % M.O. 3.00 21.77 0.65
TOTAL

Muro de Lad. Corriente arcilla, CV-Cabeza, Mezcla 1:5

Rendimiento: 4.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.06 38.14 2.32
LADRILLO CORRIENTE 6X12X25 MLL 0.12 678.99 82.16
CEMENTO PORTLAND TIPO I BOL 0.43 14.29 6.13
AGUA M3 0.01 9.00 0.12
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 1.00 11.40 11.40
HERRAMIENTAS % M.O. 3.00 43.55 1.31
TOTAL

Muro de Lad. Corriente arcilla, CV-Soga, Mezcla 1:5

Rendimiento: 5.50 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.03 38.14 0.98
LADRILLO CORRIENTE 6X12X25 MLL 0.06 678.99 42.78
CEMENTO PORTLAND TIPO I BOL 0.18 14.29 2.60
AGUA M3 0.01 9.00 0.05
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.15 17.04 2.48
OPERARIO (E) HH 1.45 14.37 20.90
PEON (E) HH 0.73 11.40 8.29
HERRAMIENTAS % M.O. 3.00 31.67 0.95
TOTAL

Muro de Lad. Corriente arcilla, CV-Canto, Mezcla1:5

Rendimiento: 7.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.01 38.14 0.32
LADRILLO CORRIENTE 6X12X25 MLL 0.03 678.99 23.09
CEMENTO PORTLAND TIPO I BOL 0.06 14.29 0.84
AGUA M3 0.00 9.00 0.02
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.11 17.04 1.95
OPERARIO (E) HH 1.14 14.37 16.42
PEON (E) HH 0.57 11.40 6.51
HERRAMIENTAS % M.O. 3.00 24.88 0.75
TOTAL

Muro de Lad. Corriente arcilla, CV-Cabeza, Mezcla 1:4

Rendimiento: 4.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.06 38.14 2.21
LADRILLO CORRIENTE 6X12X25 MLL 0.12 678.99 82.16
CEMENTO PORTLAND TIPO I BOL 0.52 14.29 7.37
AGUA M3 0.01 9.00 0.12
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 1.00 11.40 11.40
HERRAMIENTAS % M.O. 3.00 43.55 1.31
TOTAL

Muro de Lad. Corriente arcilla, CV-Soga, Mezcla 1:4

Rendimiento: 5.50 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.02 38.14 0.94
LADRILLO CORRIENTE 6X12X25 MLL 0.06 678.99 42.78
CEMENTO PORTLAND TIPO I BOL 0.22 14.29 3.13
AGUA M3 0.01 9.00 0.05
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.15 17.04 2.48
OPERARIO (E) HH 1.45 14.37 20.90
PEON (E) HH 0.73 11.40 8.29
HERRAMIENTAS % M.O. 3.00 31.67 0.95
TOTAL

Muro de Lad. Corriente arcilla, CV-Canto, Mezcla 1:4

Rendimiento: 7.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.01 38.14 0.30
LADRILLO CORRIENTE 6X12X25 MLL 0.03 678.99 23.09
CEMENTO PORTLAND TIPO I BOL 0.07 14.29 1.01
AGUA M3 0.00 9.00 0.02
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.11 17.04 1.95
OPERARIO (E) HH 1.14 14.37 16.42
PEON (E) HH 0.57 11.40 6.51
HERRAMIENTAS % M.O. 3.00 24.88 0.75
TOTAL

MUROS DE LADRILLO PANDERETA DE ARCILLA

Muro Lad. Pand. de cabeza C:A 1:5 p/tarrajear

Rendimiento: 5.50 m2 /da


Unidad: m2
ARENA GRUESA M3 0.07 38.14 2.67
LADRILLO PANDERETA 10X12X25 MLL 0.07 445.38 31.18
CEMENTO PORTLAND TIPO I BOL 0.47 14.29 6.72
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.17
CAPATAZ H-H 0.15 17.04 2.48
OPERARIO H-H 1.45 14.37 20.90
PEON H-H 0.73 11.40 8.29
HERRAMIENTAS % M.O. 5.00 31.67 1.58
TOTAL

Muro Ladr.Pandereta de soga C:A 1:5 p/tarrajear

Rendimiento: 9.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.03 38.14 1.14
LADRILLO PANDERETA 10X12X25 MLL 0.04 445.38 17.82
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.72
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.17
CAPATAZ H-H 0.09 17.04 1.51
OPERARIO H-H 0.89 14.37 12.77
PEON H-H 0.44 11.40 5.07
HERRAMIENTAS % M.O. 5.00 19.35 0.97
TOTAL

Muro Lad. Pandereta de canto C.A.1:5 p/tarrajear


Rendimiento: 11.50 m2 /da
Unidad: m2
CLAVOS 3" KG. 0.02 4.58 0.10
ARENA GRUESA M3 0.02 38.14 0.76
LADRILLO PANDERETA 10X12X25 MLL 0.03 445.38 13.36
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.71
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.17
CAPATAZ H-H 0.07 17.04 1.19
OPERARIO H-H 0.70 14.37 10.00
PEON H-H 0.35 11.40 3.96
HERRAMIENTAS % M.O. 5.00 15.15 0.76
TOTAL

Muro Lad. Pandereta de cabeza C:A 1:4 p/tarrajear

Rendimiento: 5.50 m2 /da


Unidad: m2
ARENA GRUESA M3 0.06 38.14 2.29
LADRILLO PANDERETA 10X12X25 MLL 0.07 445.38 31.18
CEMENTO PORTLAND TIPO I BOL 0.56 14.29 8.00
AGUA M3 0.02 9.00 0.18
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.17
CAPATAZ H-H 0.15 17.04 2.48
OPERARIO H-H 1.45 14.37 20.90
PEON H-H 0.73 11.40 8.29
HERRAMIENTAS % M.O. 5.00 31.67 1.58
TOTAL

Muro Lad. Pandereta de soga C:A 1:4 p/tarrajear

Rendimiento: 9.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.03 38.14 1.14
LADRILLO PANDERETA 10X12X25 MLL 0.04 445.38 17.82
CEMENTO PORTLAND TIPO I BOL 0.23 14.29 3.29
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.17
CAPATAZ H-H 0.09 17.04 1.51
OPERARIO H-H 0.89 14.37 12.77
PEON H-H 0.44 11.40 5.07
HERRAMIENTAS % M.O. 5.00 19.35 0.97
TOTAL
Muro Lad. Pandereta de canto C:A 1:4 p/tarrajear

Rendimiento: 11.50 m2 /da


Unidad: m2
ARENA GRUESA M3 0.15 38.14 5.72
LADRILLO PANDERETA 10X12X25 MLL 0.03 445.38 13.36
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.17
CAPATAZ H-H 0.07 17.04 1.19
OPERARIO H-H 0.70 14.37 10.00
PEON H-H 0.35 11.40 3.96
HERRAMIENTAS % M.O. 5.00 15.15 0.76
TOTAL

Muro Lad Pandereta de cab. C:C:A 1:2:9 p/tarrajear

Rendimiento: 5.50 m2 /da


Unidad: m2
ARENA GRUESA M3 0.06 38.14 2.29
LADRILLO PANDERETA 10X12X25 MLL 0.07 445.38 31.18
CEMENTO PORTLAND TIPO I BOL 0.22 14.29 3.14
CAL HIDRAT. INDUSTRIAL ITINTEC (30 KG.) BOL 0.22 13.00 2.86
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.07 2.93 0.21
CAPATAZ H-H 0.15 17.04 2.48
OPERARIO H-H 1.45 14.37 20.90
PEON H-H 0.73 11.40 8.29
HERRAMIENTAS % M.O. 5.00 31.67 1.58
TOTAL

Muro Lad.Pandereta de soga C.C.A. 1:2:9 p /tarrajear

Rendimiento: 9.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.76
LADRILLO PANDERETA 10X12X25 MLL 0.04 445.38 17.82
CEMENTO PORTLAND TIPO I BOL 0.09 14.29 1.29
CAL HIDRAT. INDUSTRIAL ITINTEC (30 KG.) BOL 0.09 13.00 1.17
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.17
CAPATAZ H-H 0.09 17.04 1.51
OPERARIO H-H 0.89 14.37 12.77
PEON H-H 0.44 11.40 5.07
HERRAMIENTAS % M.O. 5.00 19.35 0.97
TOTAL

Muro Lad.Pandereta de canto C:C:A 1:2:9 p/tarrajear

Rendimiento: 11.50 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.76
LADRILLO PANDERETA 10X12X25 MLL 0.03 445.38 13.36
CEMENTO PORTLAND TIPO I BOL 0.06 14.29 0.86
CAL HIDRAT. INDUSTRIAL ITINTEC (30 KG.) BOL 0.06 13.00 0.78
AGUA M3 0.01 9.00 0.09
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.17
CAPATAZ H-H 0.07 17.04 1.19
OPERARIO H-H 0.70 14.37 10.00
PEON H-H 0.35 11.40 3.96
HERRAMIENTAS % M.O. 5.00 15.15 0.76
TOTAL

MUROS DE LADRILLO SILICO CALCAREO

Muro Lad. Sil. Calc. KK Normal 14x24x29 Soga Solaqueado

Rendimiento: 8.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.68
LADRILLO S.C. TIPO V K.K.NORMAL 14X2 MLL 0.04 567.00 23.36
CEMENTO PORTLAND TIPO I BOL 0.16 14.29 2.23
CAL HIDRAULICA (30 KG.) BOL 0.04 13.00 0.52
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.10 17.04 1.70
OPERARIO (E) HH 1.00 14.37 14.37
PEON (E) HH 0.50 11.40 5.70
HERRAMIENTAS % M.O. 3.00 21.77 0.65
TOTAL

Muro Lad. Sil. Calc. KK Modulado 14x29x9 Soga Solaqueado

Rendimiento: 10.00 m2/da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.65
LADRILLO S.C. TIPO V K.K. MOD. 14X29XX MLL 0.03 685.00 23.50
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
CAL HIDRAULICA (30 KG.) BOL 0.04 13.00 0.50
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.40 11.40 4.56
HERRAMIENTAS % M.O. 3.00 17.42 0.52
TOTAL

Muro Lad. Sil. Calc. Estandar 12x29x9 Soaga Solaqueado

Rendimiento: 10.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.01 38.14 0.56
LADRILLO S.C. TIPO V ESTANDAR 12X29X9 MLL 0.03 577.50 19.81
CEMENTO PORTLAND TIPO I BOL 0.13 14.29 1.83
CAL HIDRAULICA (30 KG.) BOL 0.03 13.00 0.43
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.40 11.40 4.56
HERRAMIENTAS % M.O. 3.00 17.42 0.52
TOTAL

Muro Lad. Sil. Calc. Corriente 12x27x6 Soga Solqueado

Rendimiento: 6.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.75
LADRILLO S.C. TIPO V CORRIENTE 12X29X MLL 0.06 550.00 31.13
CEMENTO PORTLAND TIPO I BOL 0.17 14.29 2.48
CAL HIDRAULICA (30 KG.) BOL 0.04 13.00 0.58
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.13 17.04 2.27
OPERARIO (E) HH 1.33 14.37 19.16
PEON (E) HH 0.67 11.40 7.60
HERRAMIENTAS % M.O. 3.00 29.03 0.87
TOTAL

Muro Lad. Sil. Calc. Dedalo 11.5x24x14 Soga Solaqueado

Rendimiento: 10.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.01 38.14 0.42
LADRILLO S.C. TIPO V DEDALO 11.5X24X1 MLL 0.03 755.00 20.76
CEMENTO PORTLAND TIPO I BOL 0.10 14.29 1.40
CAL HIDRAULICA (30 KG.) BOL 0.03 13.00 0.33
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.40 11.40 4.56
HERRAMIENTAS % M.O. 3.00 17.42 0.52
TOTAL

Muro Lad. Sil. Calc. Modulado 10x29x9 Soga Solaqueado

Rendimiento: 10.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.01 38.14 0.46
LADRILLO S.C. TIPO V MODULADO 10X29 MLL 0.03 555.00 19.04
CEMENTO PORTLAND TIPO I BOL 0.11 14.29 1.53
CAL HIDRAULICA (30 KG.) BOL 0.03 13.00 0.35
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.40 11.40 4.56
HERRAMIENTAS % M.O. 3.00 17.42 0.52
TOTAL

Muro Lad. Sil. Calc. Duplo 19x29x9 Soga Solaqueado

Rendimiento: 5.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.88
LADRILLO S.C. TIPO V DUPLO 19X29X9 MLL 0.03 1004.30 34.45
CEMENTO PORTLAND TIPO I BOL 0.20 14.29 2.90
CAL HIDRAULICA (30 KG.) BOL 0.05 13.00 0.67
MADERA TORNILLO (LARGA) P2 0.40 2.93 1.18
CAPATAZ (E) HH 0.16 17.04 2.73
OPERARIO (E) HH 1.60 14.37 22.99
PEON (E) HH 0.80 11.40 9.12
HERRAMIENTAS % M.O. 3.00 34.84 1.05
TOTAL

TARRAJEO DE MUROS INTERIORES

Tarrajeo Rayado de Muros Interiores, Mezcla 1:5

Rendimiento: 16.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.60
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.67
AGUA M3 0.01 9.00 0.05
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.58 2.93 1.70
CAPATAZ (E) HH 0.05 17.04 0.85
OPERARIO (E) HH 0.50 14.37 7.19
PEON (E) HH 0.25 11.40 2.85
HERRAMIENTAS % M.O. 5.00 10.89 0.54
TOTAL

Tarrajeo Frotachado, Muros Int. e=1.5cm, Mezcla 1:5

Rendimiento: 15.00 m2 /da


Unidad: m2
CLAVOS KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.68
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.70
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.05 17.04 0.91
OPERARIO (E) HH 0.53 14.37 7.66
PEON (E) HH 0.18 11.40 2.01
HERRAMIENTAS % M.O. 5.00 10.58 0.53
TOTAL

Tarrajeo Frotachado, Muros Int. e=2.0cm, Mezcla 1:5

Rendimiento: 12.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.90
CEMENTO PORTLAND TIPO I BOL 0.16 14.29 2.27
AGUA M3 0.01 9.00 0.05
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 0.67 14.37 9.58
PEON (E) HH 0.22 11.40 2.51
HERRAMIENTAS % M.O. 5.00 13.23 0.66
TOTAL

Tarrajeo Frotachado, Muros Int. e=1.5cm, Mezcla 1:4

Rendimiento: 15.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.66
CEMENTO PORTLAND TIPO I BOL 0.14 14.29 2.07
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.05 17.04 0.91
OPERARIO (E) HH 0.53 14.37 7.66
PEON (E) HH 0.18 11.40 2.01
HERRAMIENTAS % M.O. 5.00 10.58 0.53
TOTAL

Tarrajeo Frotachado, Muros Int. e=2.0cm, Mezcla 1:4

Rendimiento: 12.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.88
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.76
AGUA M3 0.01 9.00 0.05
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 0.67 14.37 9.58
PEON (E) HH 0.22 11.40 2.51
HERRAMIENTAS % M.O. 5.00 13.23 0.66
TOTAL

Tarrajeo Fino, Muros Int. e=1.5cm, Mezcla 1:4

Rendimiento: 9.50 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.68
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.70
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.08 17.04 1.43
OPERARIO (E) HH 0.84 14.37 12.10
PEON (E) HH 0.28 11.40 3.17
HERRAMIENTAS % M.O. 5.00 16.70 0.84
TOTAL

TARRAJEO DE MUROS EXTERIORES


Tarrajeo Frotachado, Muros Ext. e=1.5cm, Mezcla 1:4

Rendimiento: 12.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.68
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.70
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.02 5.47 0.13
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 0.67 14.37 9.58
PEON (E) HH 0.22 11.40 2.51
HERRAMIENTAS % M.O. 5.00 13.23 0.66
TOTAL

Tarrajeo Frotachado, Muros Ext. e=2.0cm, Mezcla 1:5

Rendimiento: 10.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.90
CEMENTO PORTLAND TIPO I BOL 0.16 14.29 2.27
AGUA M3 0.01 9.00 0.05
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.26 11.40 3.01
HERRAMIENTAS % M.O. 5.00 15.87 0.79
TOTAL

Tarrajeo Frotachado, Muros Ext. e=1.5cm, Mezcla 1:4

Rendimiento: 12.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.66
CEMENTO PORTLAND TIPO I BOL 0.14 14.29 2.07
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 0.67 14.37 9.58
PEON (E) HH 0.22 11.40 2.51
HERRAMIENTAS % M.O. 5.00 13.23 0.66
TOTAL

Tarrajeo Frotachado, Muros Ext. e=2.0cm, Mezcla 1:4

Rendimiento: 10.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.88
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.76
AGUA M3 0.01 9.00 0.05
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.26 11.40 3.01
HERRAMIENTAS % M.O. 5.00 15.87 0.79
TOTAL

Tarrajeo Fino, Muros Ext. e=1.5cm, Mezcla 1:5

Rendimiento: 7.50 m2 /da


Unidad: m2
CLAVOS 3" KG 0.02 4.58 0.10
ARENA FINA M3 0.02 37.20 0.68
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.70
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.11 17.04 1.82
OPERARIO (E) HH 1.07 14.37 15.33
PEON (E) HH 0.35 11.40 4.01
HERRAMIENTAS % M.O. 5.00 21.16 1.06
TOTAL

TARRAJEO DE COLUMNAS

Tarrajeo de Columnas e=1.5cm, Mezcla 1:5

Rendimiento: 9.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.00 4.58 0.00
ARENA FINA M3 0.02 37.20 0.68
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.70
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.09 17.04 1.51
OPERARIO (E) HH 0.89 14.37 12.77
PEON (E) HH 0.29 11.40 3.34
HERRAMIENTAS % M.O. 5.00 17.62 0.88
TOTAL

Tarrajeo de Columnas e=2.0cm, Mezcla 1:5

Rendimiento: 7.00 m2 /da


Unidad: m2
0.00 4.58 0.00
ARENA FINA M3 0.02 37.20 0.90
CEMENTO PORTLAND TIPO I BOL 0.16 14.29 2.27
AGUA M3 0.01 9.00 0.05
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.11 17.04 1.95
OPERARIO (E) HH 1.14 14.37 16.42
PEON (E) HH 0.38 11.40 4.30
HERRAMIENTAS % M.O. 5.00 22.67 1.13
TOTAL

Vestidura de Aristas, Columnas mano de obra + herramienta

Rendimiento: 20.00 ml /da


Unidad: ml
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 0.13 11.40 1.50
HERRAMIENTAS % M.O. 3.00 7.93 0.24
TOTAL

TARRAJEO DE VIGAS

Tarrajeo de Vigas e=1.5cm, Mezcla 1:5

Rendimiento: 6.50 m2 /da


Unidad: m2
CLAVOS 3" 0.00 4.58 0.00
ARENA FINA M3 0.02 37.20 0.68
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.70
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.12 17.04 2.10
OPERARIO (E) HH 1.23 14.37 17.69
PEON (E) HH 0.41 11.40 4.63
HERRAMIENTAS % M.O. 5.00 24.42 1.22
TOTAL

Tarrajeo de Vigas e=2.0cm, Mezcla 1:5

Rendimiento: 5.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.00 4.58 0.00
ARENA FINA M3 0.02 37.20 0.90
CEMENTO PORTLAND TIPO I BOL 0.16 14.29 2.27
AGUA M3 0.01 9.00 0.05
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.20 2.93 0.59
CAPATAZ (E) HH 0.16 17.04 2.73
OPERARIO (E) HH 1.60 14.37 22.99
PEON (E) HH 0.53 11.40 6.02
HERRAMIENTAS % M.O. 5.00 31.74 1.59
TOTAL

Vestidura de Aristas, Vigas mano de obra & herramienta

Rendimiento: 18.00 ml /da


Unidad: ml
CAPATAZ (E) HH 0.04 17.04 0.76
OPERARIO (E) HH 0.44 14.37 6.39
PEON (E) HH 0.15 11.40 1.67
HERRAMIENTAS % M.O. 3.00 8.82 0.26
TOTAL

TARRAJEO PARA ALBAILERIA ARMADA APILADA

Tarrajeo (e=1.0 cm)

Rendimiento: 20.00 m2 /da


Unidad: m2
MORTERO ULTRA-PEGA SUPER POR 40 KG BOL 0.46 4.90 2.23
OPERARIO H-H 0.40 14.37 5.75
PEON H-H 0.10 11.40 1.14
HERRAMIENTAS % M.O. 5.00 6.89 0.34
TOTAL
Tarrajeo (e=0.5cm)

Rendimiento: 30.00 m2 /da


Unidad: m2
MORTERO ULTRA-PEGA ESTANDAR POR40 BOL 0.23 4.90 1.12
OPERARIO H-H 0.27 14.37 3.83
PEON H-H 0.07 11.40 0.76
HERRAMIENTAS % M.O. 5.00 4.59 0.23
TOTAL

Solaqueo con Imprimante

Rendimiento: 30.00 m2 /da


Unidad: m2
IMPRIMANTE GLN 0.05 14.36 0.72
PEON H-H 0.27 11.40 3.04
HERRAMIENTAS % M.O. 5.00 3.04 0.15
TOTAL

Solaqueo con Mezcla de Cemento

Rendimiento: 30.00 m2 /da


Unidad: m2
MORTERO ULTRA-PEGA ESTANDAR POR40 BOL 0.04 4.90 0.20
OPERARIO H-H 0.27 14.37 3.83
HERRAMIENTAS % M.O. 5.00 3.83 0.19
TOTAL

DERRAMES Y BRUAS

Vestidura de Derrames, A=0.10, e=1.5cm, Mezcla 1:5

Rendimiento: 18.00 ml /da


Unidad: ml
CLAVOS 3" KG 0.01 4.58 0.03
ARENA FINA M3 0.00 37.20 0.07
CEMENTO PORTLAND TIPO I BOL 0.01 14.29 0.17
AGUA M3 0.00 9.00 0.00
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.13 2.93 0.37
CAPATAZ (E) HH 0.04 17.04 0.76
OPERARIO (E) HH 0.44 14.37 6.39
PEON (E) HH 0.15 11.40 1.67
HERRAMIENTAS % M.O. 5.00 8.82 0.44
TOTAL
Vestidura de Derrames, A=0.10, e=2.0cm, Mezcla 1:5

Rendimiento: 15.00 ml /da


Unidad: ml
CLAVOS 3" KG 0.01 4.58 0.03
ARENA FINA M3 0.00 37.20 0.07
CEMENTO PORTLAND TIPO I BOL 0.01 14.29 0.17
AGUA M3 0.00 9.00 0.00
REGLA DE MADERA p2 0.03 5.47 0.14
MADERA TORNILLO (LARGA) P2 0.13 2.93 0.37
CAPATAZ (E) HH 0.05 17.04 0.91
OPERARIO (E) HH 0.53 14.37 7.66
PEON (E) HH 0.18 11.40 2.01
HERRAMIENTAS % M.O. 5.00 10.58 0.53
TOTAL

Bruas de 1.0cm mano de obra & herramienta

Rendimiento: 20.00 ml /da


Unidad: ml
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 0.13 11.40 1.50
HERRAMIENTAS % M.O. 3.00 7.93 0.24
TOTAL

Union de Muros y Cielorasos con mezcla

Rendimiento: 30.00 ml /da


Unidad: ml
CAPATAZ (E) HH 0.03 17.04 0.45
OPERARIO (E) HH 0.27 14.37 3.83
PEON (E) HH 0.20 11.40 2.28
HERRAMIENTAS % M.O. 3.00 6.56 0.20
TOTAL

CIELORRASOS

TARRAJEO DE CIELORRASOS CON MEZCLA

Tarrajeo de Cieloraso e=1.5cm, Mezcla 1:5

Rendimiento: 8.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.00 4.58 0.02
ARENA FINA M3 0.02 37.20 0.61
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.67
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.15
MADERA TORNILLO (LARGA) P2 0.59 2.93 1.73
CAPATAZ (E) HH 0.10 17.04 1.70
OPERARIO (E) HH 1.00 14.37 14.37
PEON (E) HH 0.33 11.40 3.76
HERRAMIENTAS % M.O. 5.00 19.83 0.99
TOTAL

Tarrajeo de Cieloraso e=1.5cm, Mezcla 1:4

Rendimiento: 8.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.00 4.58 0.02
ARENA FINA M3 0.02 37.20 0.59
CEMENTO PORTLAND TIPO I BOL 0.14 14.29 2.00
AGUA M3 0.00 9.00 0.04
REGLA DE MADERA p2 0.03 5.47 0.15
MADERA TORNILLO (LARGA) P2 0.59 2.93 1.73
CAPATAZ (E) HH 0.10 17.04 1.70
OPERARIO (E) HH 1.00 14.37 14.37
PEON (E) HH 0.33 11.40 3.76
HERRAMIENTAS % M.O. 5.00 19.83 0.99
TOTAL

ENLUCIDO DE CIELORRASOS CON YESO

Enlucido de Cieloraso con Yeso e=1.0cm

Rendimiento: 8.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.00 4.58 0.02
YESO (20 KG.) BOL 0.27 6.52 1.77
AGUA M3 0.05 9.00 0.45
REGLA DE MADERA p2 0.03 5.47 0.15
MADERA TORNILLO (LARGA) P2 0.59 2.93 1.73
CAPATAZ (E) HH 0.10 17.04 1.70
OPERARIO (E) HH 1.00 14.37 14.37
PEON (E) HH 0.33 11.40 3.76
HERRAMIENTAS % M.O. 5.00 19.83 0.99
TOTAL
CONTRAPISOS

Contrapiso e=40mm, Base 3.0cm, Mez. 1:5 Pasta 1:2

Rendimiento: 100.00 m2 /da


Unidad: m2
ARENA FINA M3 0.04 37.20 1.57
CEMENTO PORTLAND TIPO I BOL 0.39 14.29 5.61
AGUA M3 0.01 9.00 0.10
CAPATAZ (E) HH 0.02 17.04 0.41
OPERARIO (E) HH 0.24 14.37 3.45
OFICIAL (E) HH 0.08 12.91 1.03
PEON (E) HH 0.48 11.40 5.47
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.08 23.92 1.91
HERRAMIENTAS % M.O. 5.00 10.36 0.52
TOTAL

Contrapiso e=48mm, Base 3.8cm, Mez 1:5 Pasta 1:2

Rendimiento: 80.00 m2 /da


Unidad: m2
ARENA FINA M3 0.05 37.20 1.89
CEMENTO PORTLAND TIPO I BOL 0.45 14.29 6.50
AGUA M3 0.01 9.00 0.12
CAPATAZ (E) HH 0.03 17.04 0.51
OPERARIO (E) HH 0.30 14.37 4.31
OFICIAL (E) HH 0.10 12.91 1.29
PEON (E) HH 0.60 11.40 6.84
MEZCLADORA DE CONCRETO /TAMBOR 12 HM 0.10 23.92 2.39
HERRAMIENTAS % M.O. 5.00 12.95 0.65
TOTAL

PISOS DE CEMENTO

Piso de Cemento Pulido e=2", Mezcla 1:4

Rendimiento: 14.00 m2 /da


Unidad: m2
ARENA FINA M3 0.01 37.20 0.33
ARENA GRUESA M3 0.06 38.14 2.14
CEMENTO PORTLAND TIPO I BOL 0.48 14.29 6.89
AGUA M3 0.01 9.00 0.10
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
OFICIAL (E) HH 0.29 12.91 3.69
PEON (E) HH 0.57 11.40 6.51
HERRAMIENTAS % M.O. 5.00 19.38 0.97
TOTAL

Piso de Frotachado e=4", Mezcla 1:4

Rendimiento: 14.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.69
CEMENTO PORTLAND TIPO I BOL 0.29 14.29 4.14
AGUA M3 0.01 9.00 0.06
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
PEON (E) HH 0.29 11.40 3.26
HERRAMIENTAS % M.O. 3.00 12.44 0.37
TOTAL

PISOS DE LOSETA

Piso Loseta Veneciana C. Claro 20x20

Rendimiento: 10.00 m2 /da


Unidad: m2
ARENA FINA M3 0.03 37.20 1.00
CEMENTO PORTLAND TIPO I BOL 0.24 14.29 3.42
AGUA M3 0.01 9.00 0.06
LOSETA VENECIANA 20X20 CLARA M2 1.05 23.15 24.31
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.40 11.40 4.56
HERRAMIENTAS % M.O. 5.00 17.42 0.87
TOTAL

Piso Loseta Veneciana C. Claro 30x30

Rendimiento: 12.00 m2 /da


Unidad: m2
ARENA FINA M3 0.03 37.20 1.00
CEMENTO PORTLAND TIPO I BOL 0.24 14.29 3.42
AGUA M3 0.01 9.00 0.06
LOSETA VENECIANA 30X30 CLARA M2 1.05 25.42 26.69
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 0.67 14.37 9.58
PEON (E) HH 0.33 11.40 3.80
HERRAMIENTAS % M.O. 5.00 14.52 0.73
TOTAL

Piso Loseta Veneciana C. Claro 40x40

Rendimiento: 14.00 m2 /da


Unidad: m2
ARENA FINA M3 0.03 37.20 1.00
CEMENTO PORTLAND TIPO I BOL 0.24 14.29 3.42
AGUA M3 0.01 9.00 0.06
LOSETA VENECIANA 40X40 CLARA M2 1.05 27.97 29.37
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
PEON (E) HH 0.29 11.40 3.26
HERRAMIENTAS % M.O. 5.00 12.44 0.62
TOTAL

Piso Loseta Veneciana C. Oscuro 30x30

Rendimiento: 12.00 m2 /da


Unidad: m2
ARENA FINA M3 0.03 37.20 1.00
CEMENTO PORTLAND TIPO I BOL 0.24 14.29 3.42
AGUA M3 0.01 9.00 0.06
LOSETA VENECIANA 30X30 OSCURA M2 1.05 18.49 19.41
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 0.67 14.37 9.58
PEON (E) HH 0.33 11.40 3.80
HERRAMIENTAS % M.O. 5.00 14.52 0.73
TOTAL

Piso Loseta Veneciana C. Oscuro 40x40

Rendimiento: 14.00 m2 /da


Unidad: m2
ARENA FINA M3 0.03 37.20 1.00
CEMENTO PORTLAND TIPO I BOL 0.24 14.29 3.42
AGUA M3 0.01 9.00 0.06
LOSETA VENECIANA 40X40 OSCURA M2 1.05 24.83 26.07
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
PEON (E) HH 0.29 11.40 3.26
HERRAMIENTAS % M.O. 5.00 12.44 0.62
TOTAL

Piso Loseta Vinlica 1.6 mm 30,5x30,5cm


Rendimiento: 40.00 m2 /da
Unidad: m2
PEGAMENTO ASFALTICO P/VINILICO GAL 0.10 22.40 2.24
LOSETA VINILICA E=1.6MM 30.5x30.5 cm m2 1.05 37.20 39.06
CAPATAZ (E) HH 0.02 17.04 0.34
OPERARIO (E) HH 0.20 14.37 2.87
PEON (E) HH 0.10 11.40 1.14
HERRAMIENTAS % M.O. 3.00 4.35 0.13
TOTAL

Piso Loseta Vinlica 2.5mm 305x30.5 cm

Rendimiento: 40.00 m2 /da


Unidad: m2
PEGAMENTO ASFALTICO P/VINILICO GAL 0.10 22.40 2.24
LOSETA VINILICA E=2.5mm 30.5x30.5 cm m2 1.05 35.00 36.75
CAPATAZ (E) HH 0.02 17.04 0.34
OPERARIO (E) HH 0.20 14.37 2.87
PEON (E) HH 0.10 11.40 1.14
HERRAMIENTAS % M.O. 3.00 4.35 0.13
TOTAL

Piso Loseta Vinlica 3.2 mm 30.5x30.5 cm

Rendimiento: 40.00 m2 /da


Unidad: m2
PEGAMENTO ASFALTICO P/VINILICO GAL 0.10 22.40 2.24
LOSETA VINILICA E=3.2 mm 30.5x30.5 cm M2 1.05 44.80 47.04
CAPATAZ (E) HH 0.02 17.04 0.34
OPERARIO (E) HH 0.20 14.37 2.87
PEON (E) HH 0.10 11.40 1.14
HERRAMIENTAS % M.O. 3.00 4.35 0.13
TOTAL

PISOS DE MAYOLICA

Piso de Mayolica 15x15 Blanca, 1ra.

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA I BLANCA 15X15 M2 1.05 16.88 17.72
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Piso de Mayolica 15x15 Blanca, 2da.

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA II BLANCA 15X15 M2 1.05 12.34 12.96
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Piso de Mayolica 15x15 Color

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA I BLANCA 15X15 M2 1.05 16.88 17.72
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

PISOS DE PARQUET

Piso de Parquet Hualtaco

Rendimiento: 8.00 m2 /da


Unidad: m2
BREA 160/220 PA KG 0.03 23.00 0.69
PARQUET HUALTACO DE SELVA M2 1.06 20.00 21.20
CERA LIQUIDA gal 0.02 21.19 0.42
CAPATAZ H-H 0.10 17.04 1.70
OPERARIO H-H 1.00 14.37 14.37
PEON H-H 0.50 11.40 5.70
CEPILLADORA ELECTRICA HM 0.10 5.76 0.58
HERRAMIENTAS % M.O. 5.00 21.77 1.09
TOTAL

Piso de Parquet Oreja Len Oscuro 6x30

Rendimiento: 8.00 m2 /da


Unidad: m2
BREA 160/220 PA KG 0.03 23.00 0.69
PARQUET OREJA DE LEON OSCURO NORT M2 1.05 22.00 23.10
CERA LIQUIDA gal 0.02 21.19 0.42
CAPATAZ H-H 0.10 17.04 1.70
OPERARIO H-H 1.00 14.37 14.37
PEON H-H 0.50 11.40 5.70
CEPILLADORA ELECTRICA HM 0.10 5.76 0.58
HERRAMIENTAS % M.O. 5.00 21.77 1.09
TOTAL

Piso de Parquet Coricaspi Veteado 30x6

Rendimiento: 8.00 m2 /da


Unidad: m2
PARQUET CORICASPI OSCURO M2 1.05 19.00 19.95
CERA LIQUIDA gal 0.03 21.19 0.64
CAPATAZ H-H 0.10 17.04 1.70
OPERARIO H-H 1.00 14.37 14.37
PEON H-H 0.50 11.40 5.70
CEPILLADORA ELECTRICA HM 0.10 5.76 0.58
HERRAMIENTAS % M.O. 5.00 21.77 1.09
TOTAL

Piso de Parquet Guayacn Veteado Norte

Rendimiento: 8.00 m2 /da


Unidad: m2
PARQUET GUAYACAN CANELO VETEADO M2 1.05 25.00 26.25
CERA LIQUIDA gal 0.02 21.19 0.42
CAPATAZ H-H 0.10 17.04 1.70
OPERARIO H-H 1.00 14.37 14.37
PEON H-H 0.50 11.40 5.70
CEPILLADORA ELECTRICA HM 0.10 5.76 0.58
HERRAMIENTAS % M.O. 5.00 21.77 1.09
TOTAL

PISOS DE ALFOMBRA

Piso de Alfombra de Nylon 6 mm alto trnsito

Rendimiento: 30.00 m2 /da


Unidad: m2
Alfombra de Nylon 6 mm alto trnsito m2 1.05 18.55 19.48
Fieltro Nacional m2 1.05 11.67 12.25
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.27 14.37 3.83
OFICIAL H-H 0.13 12.61 1.68
TOTAL

Piso de Alfombra de Nylon 9 mm alto trnsito

Rendimiento: 30.00 m2 /da


Unidad: m2
Alfombra de Nylon 9 mm alto transito m2 1.05 39.20 41.16
Fieltro Nacional m2 1.05 11.67 12.25
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.27 14.37 3.83
PEON H-H 0.13 11.40 1.52
TOTAL

ZOCALOS

ZOCALOS DE CEMENTO

Zocalo de Cemento Frotachado e=2.0cm

Rendimiento: 14.00 m2 /da


Unidad: m2
CLAVOS 3" KG 0.03 4.58 0.14
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
AGUA M3 0.01 9.00 0.05
MADERA TORNILLO (LARGA) P2 0.52 2.93 1.52
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
PEON (E) HH 0.38 11.40 4.37
HERRAMIENTAS % M.O. 3.00 13.55 0.41
TOTAL
Zocalo de Cemento Coloreado e=2.0cm

Rendimiento: 14.00 m2 /da


Unidad: m2
CLAVOS 3" KG. 0.03 4.58 0.14
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
OCRE ROJO IMPORTADO KG. 0.40 16.00 6.36
AGUA M3 0.01 9.00 0.05
MADERA TORNILLO (LARGA) P2 0.52 2.93 1.52
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
PEON (E) HH 0.38 11.40 4.37
HERRAMIENTAS % M.O. 3.00 13.55 0.41
TOTAL

Zocalo de Cemento Co. Bruado e=2.0cm

Rendimiento: 12.00 m2 /da


Unidad: m2
CLAVOS 3" JG 0.03 4.58 0.14
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
OCRE ROJO IMPORTADO KG. 0.40 16.00 6.36
AGUA M3 0.01 9.00 0.05
MADERA TORNILLO (LARGA) P2 0.52 2.93 1.52
CAPATAZ (E) HH 0.07 17.04 1.14
OPERARIO (E) HH 0.67 14.37 9.58
PEON (E) HH 0.45 11.40 5.09
HERRAMIENTAS % M.O. 3.00 15.81 0.47
TOTAL

ZOCALOS DE MAYOLICA

Zcalo de Maylica Blanca 15x15, 1ra.

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA I BLANCA 15X15 M2 1.05 16.88 17.72
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Maylica Blanca 15x15, 2da.

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA II BLANCA 15X15 M2 1.05 12.34 12.96
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Maylica Color 15x15

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA I BLANCA 15X15 M2 1.05 16.88 17.72
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Maylica Decorada 15x15

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA 15X15 DECORADAS SERIE PER M2 1.05 17.16 18.02
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Maylica Travertino 20x20

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA TRAVERTINO I 20X20 M2 1.05 28.29 29.70
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Maylica Roma 20x20

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA ROMA I 20X20 M2 1.05 28.29 29.70
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Maylica Extra 20x30

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA 20X30 (AIRE,LUZ,OTROS) EXTR M2 1.05 29.83 31.32
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Maylica Estandar 20x30

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA FINA M3 0.02 37.20 0.78
CEMENTO PORTLAND TIPO I BOL 0.19 14.29 2.67
MAYOLICA 20X30 (AIRE, LUZ,OTROS) STA M2 1.05 25.35 26.62
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.20 1.77 0.35
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

ZOCALOS DE BALDOSAS CERAMICAS

Zcalo de Baldosas Cermicas 20x20 Serie Piedra

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.80
BALDOSA I 20X20 SERIE COLOR M2 1.05 55.33 58.10
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.25 1.77 0.44
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zocalo de Baldosas Cermicas 20x20 Serie Promocin

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.80
BALDOSA I 20X20 SERIE PROMOCION M2 1.05 52.86 55.50
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.25 1.77 0.44
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Baldosas Cermicas 30x30 Serie Parquet

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.80
BALDOSA I 30X30 SERIE PARQUET M2 1.05 72.47 76.09
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.25 1.77 0.44
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Baldosas Cermicas 30x30 Serie Amrica

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.80
BALDOSA I 30X30 SERIE AMERICA M2 1.05 49.90 52.40
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.25 1.77 0.44
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zocalo de Baldosas Ceramicas 30x30 Serie Nrdica

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.80
BALDOSA I 30X30 NORDICA M2 1.05 67.41 70.78
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.25 1.77 0.44
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Baldosas Cermicas 30x30 Serie Color

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.80
BALDOSA I 30X30 SERIE COLOR M2 1.05 52.09 54.69
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.25 1.77 0.44
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

Zcalo de Baldosas Cermicas 30x30 Seire Piedra Agata

Rendimiento: 4.00 m2 /da


Unidad: m2
ARENA GRUESA M3 0.02 38.14 0.80
BALDOSA I 30X30 AGATA PIEDRA M2 1.05 69.84 73.33
CEMENTO PORTLAND TIPO I BOL 0.15 14.29 2.14
FRAGUA BLANCA (BOLSA 1KG.) BOL 0.25 1.77 0.44
AGUA M3 0.01 9.00 0.05
CAPATAZ (E) HH 0.20 17.04 3.41
OPERARIO (E) HH 2.00 14.37 28.74
PEON (E) HH 0.66 11.40 7.52
HERRAMIENTAS % M.O. 3.00 39.67 1.19
TOTAL

CONTRAZOCALOS

CONTRAZOCALOS DE CEMENTO

Contrazcalo Cem. Pulido s/Color 10 cm

Rendimiento: 24.00 ml /da


Unidad: ml
ARENA FINA M3 0.00 37.20 0.08
CEMENTO PORTLAND TIPO I BOL 0.02 14.29 0.22
AGUA M3 0.00 9.00 0.01
CAPATAZ (E) HH 0.03 17.04 0.57
OPERARIO (E) HH 0.33 14.37 4.79
PEON (E) HH 0.17 11.40 1.90
HERRAMIENTAS % M.O. 3.00 7.26 0.22
TOTAL

Contrazcalo Cem. Pulido s/Color 20 cm

Rendimiento: 20.00 ml /da


Unidad: ml
ARENA FINA M3 0.00 37.20 0.16
CEMENTO PORTLAND TIPO I BOL 0.03 14.29 0.44
AGUA M3 0.00 9.00 0.01
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 0.20 11.40 2.28
HERRAMIENTAS % M.O. 3.00 8.71 0.26
TOTAL

Contrazcalo Cem. Pulido s/Color 25 cm

Rendimiento: 18.50 ml /da


Unidad: ml
ARENA FINA M3 0.01 37.20 0.20
CEMENTO PORTLAND TIPO I BOL 0.04 14.29 0.53
AGUA M3 0.00 9.00 0.01
CAPATAZ (E) HH 0.04 17.04 0.74
OPERARIO (E) HH 0.43 14.37 6.21
PEON (E) HH 0.22 11.40 2.46
HERRAMIENTAS % M.O. 3.00 9.41 0.28
TOTAL

Contrazcalo Cem. Pulido s/Color 30 cm

Rendimiento: 17.00 ml /da


Unidad: ml
ARENA FINA M3 0.01 37.20 0.25
CEMENTO PORTLAND TIPO I BOL 0.05 14.29 0.67
AGUA M3 0.00 9.00 0.02
CAPATAZ (E) HH 0.05 17.04 0.80
OPERARIO (E) HH 0.47 14.37 6.76
PEON (E) HH 0.24 11.40 2.68
HERRAMIENTAS % M.O. 3.00 10.24 0.31
TOTAL

Contrazcalo Cem. Pulido Color 10 cm

Rendimiento: 24.00 ml /da


Unidad: ml
ARENA FINA M3 0.00 37.20 0.08
CEMENTO PORTLAND TIPO I BOL 0.02 14.29 0.22
OCRE NEGRO IMPORTADO KG. 0.03 10.00 0.33
AGUA M3 0.00 9.00 0.01
CAPATAZ (E) HH 0.03 17.04 0.57
OPERARIO (E) HH 0.33 14.37 4.79
PEON (E) HH 0.17 11.40 1.90
HERRAMIENTAS % M.O. 3.00 7.26 0.22
TOTAL

Contrazcalo Cem. Pulido Color 15 cm

Rendimiento: 22.00 ml /da


Unidad: ml
ARENA FINA M3 0.00 37.20 0.12
CEMENTO PORTLAND TIPO I BOL 0.02 14.29 0.32
OCRE NEGRO IMPORTADO KG. 0.05 10.00 0.47
AGUA M3 0.00 9.00 0.01
CAPATAZ (E) HH 0.04 17.04 0.62
OPERARIO (E) HH 0.36 14.37 5.22
PEON (E) HH 0.18 11.40 2.07
HERRAMIENTAS % M.O. 3.00 7.91 0.24
TOTAL

Contrazcalo Cem. Pulido Color 20 cm

Rendimiento: 20.00 ml /da


Unidad: ml
ARENA FINA M3 0.00 37.20 0.16
CEMENTO PORTLAND TIPO I BOL 0.03 14.29 0.44
OCRE NEGRO IMPORTADO KG. 0.07 10.00 0.66
AGUA M3 0.00 9.00 0.01
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 0.20 11.40 2.28
HERRAMIENTAS % M.O. 3.00 8.71 0.26
TOTAL
Contrazcalo Cem. Pulido Color 25 cm

Rendimiento: 18.50 ml /da


Unidad: ml
ARENA FINA M3 0.01 37.20 0.20
CEMENTO PORTLAND TIPO I BOL 0.04 14.29 0.53
OCRE NEGRO IMPORTADO KG. 0.08 10.00 0.79
AGUA M3 0.00 9.00 0.01
CAPATAZ (E) HH 0.04 17.04 0.74
OPERARIO (E) HH 0.43 14.37 6.21
PEON (E) HH 0.22 11.40 2.46
HERRAMIENTAS % M.O. 3.00 9.41 0.28
TOTAL

Contrazcalo Cem. Pulido Color 30 cm

Rendimiento: 17.00 ml /da


Unidad: ml
ARENA FINA M3 0.01 37.20 0.25
CEMENTO PORTLAND TIPO I BOL 0.05 14.29 0.67
OCRE NEGRO IMPORTADO KG. 0.10 10.00 0.99
AGUA M3 0.00 9.00 0.02
CAPATAZ (E) HH 0.05 17.04 0.80
OPERARIO (E) HH 0.47 14.37 6.76
PEON (E) HH 0.24 11.40 2.68
HERRAMIENTAS % M.O. 3.00 10.24 0.31
TOTAL

CONTRAZOCALOS VENECIANOS

Contrazcalo Veneciano C. Claro 10x30

Rendimiento: 18.00 ml /da


Unidad: ml
ARENA FINA M3 0.00 37.20 0.04
CEMENTO PORTLAND TIPO I BOL 0.01 14.29 0.19
AGUA M3 0.00 9.00 0.00
CONTRAZOCALO LOSETA VENECIANA 10X3 ML. 1.05 10.50 11.03
CAPATAZ (E) HH 0.04 17.04 0.76
OPERARIO (E) HH 0.44 14.37 6.39
PEON (E) HH 0.15 11.40 1.67
HERRAMIENTAS % M.O. 3.00 8.82 0.26
TOTAL

Contrazcalo Veneciano C. Oscuro 10x30


Rendimiento: 18.00 ml /da
Unidad: ml
ARENA FINA M3 0.00 37.20 0.04
CEMENTO PORTLAND TIPO I BOL 0.01 14.29 0.19
AGUA M3 0.00 9.00 0.00
CONTRAZOCALO LOSETA VENECIANA 10X ML. 1.05 9.50 9.98
CAPATAZ (E) HH 0.04 17.04 0.76
OPERARIO (E) HH 0.44 14.37 6.39
PEON (E) HH 0.15 11.40 1.67
HERRAMIENTAS % M.O. 3.00 8.82 0.26
TOTAL

CONTRAZOCALOS VINILICOS

Contrazcalo Vinlico de 1,6 mmm h=3"

Rendimiento: 150.00 ml /da


Unidad: ml
PEGAMENTO ASFALTICO LINEA 45 0.25 GL UND 0.01 22.40 0.22
ZOCALO VINILICO LINEA 60 DE 3" M2 1.05 3.78 3.97
CAPATAZ H-H 0.00 17.04 0.01
OPERARIO H-H 0.05 14.37 0.77
HERRAMIENTAS % M.O. 3.00 0.78 0.02
TOTAL

Contrazcalo Vinlico de 1.6 mm h=6"

Rendimiento: 150.19 ml /da


Unidad: ml
PEGAMENTO ASFALTICO LINEA 45 0.25 GL UND 0.01 22.40 0.22
ZOCALO VINILICO LINEA 60 DE 6" M2 1.05 12.60 13.23
CAPATAZ H-H 0.00 17.04 0.01
OPERARIO H-H 0.05 14.37 0.77
HERRAMIENTAS % M.O. 3.00 0.78 0.02
TOTAL

CONTRAZOCALOS DE MADERA

Contrazcalo de 3/4"x3"Rodon 3/4" cedro

Rendimiento: 40.00 ml /da


Unidad: ml
CLAVOS 2" KG. 0.05 4.58 0.23
ZOCALO MAD. 3/4x3 C/RODON CEDRO P2 1.03 5.40 5.56
CAPATAZ H-H 0.02 17.04 0.34
OPERARIO H-H 0.20 14.37 2.87
PEON H-H 0.10 11.40 1.14
HERRAMIENTAS % M.O. 3.00 4.35 0.13
TOTAL

Contrazcalo de 3/4"x3" Rodon 3/4" caoba

Rendimiento: 40.00 ml /da


Unidad: ml
CLAVOS 2" KG. 0.05 4.58 0.23
ZOCALO MAD. 3/4x3 C/RODON CAOBA P2 1.03 7.16 7.37
CAPATAZ H-H 0.02 17.04 0.34
OPERARIO H-H 0.20 14.37 2.87
PEON H-H 0.10 11.40 1.14
HERRAMIENTAS % M.O. 3.00 4.35 0.13
TOTAL

Contrazcalo de 3/4"x4" Rodon 3/4 cedro

Rendimiento: 40.00 ml /da


Unidad: ml
CLAVOS 2" KG. 0.05 4.58 0.23
ZOCALO MAD. 3/4x4 C/RODON CEDRO P2 1.03 6.72 6.92
CAPATAZ H-H 0.02 17.04 0.34
OPERARIO H-H 0.20 14.37 2.87
PEON H-H 0.10 11.40 1.14
HERRAMIENTAS % M.O. 3.00 4.35 0.13
TOTAL

Contrazcalo 3/4"x4" Rodon 3/4" caoba

Rendimiento: 40.00 ml /da


Unidad: ml
CLAVOS 2" KG. 1.03 4.58 4.72
ZOCALO MAD. 3/4x4 C/RODON CAOBA P2 1.03 8.95 9.22
CAPATAZ H-H 0.02 17.04 0.34
OPERARIO H-H 0.20 14.37 2.87
PEON H-H 0.10 11.40 1.14
HERRAMIENTAS % M.O. 3.00 4.35 0.13
TOTAL

RVESTIMIENTO DE ESCALERAS

Revestimiento de Gradas de Escalera


Rendimiento: 10.00 ml /da
Unidad: ml
ARENA FINA M3 0.01 37.20 0.52
CEMENTO PORTLAND TIPO I BOL 0.12 14.29 1.74
REGLA DE MADERA p2 0.15 5.47 0.82
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.14 11.40 1.55
HERRAMIENTAS % M.O. 5.00 14.41 0.72
TOTAL

OTROS REVESTIMIENTOS

Revestimiento con papel decorativo

Rendimiento: 20.00 m2 /da


Unidad: m2
PEGAMENTO PARA PAPEL DECORATIVO GAL 0.08 50.00 4.00
PAPEL DECORATIVO RLL 0.22 40.08 8.82
CAPATAZ H-H 0.04 17.04 0.68
OFICIAL H-H 0.40 12.61 5.04
PEON H-H 0.12 11.40 1.37
HERRAMIENTAS % M.O. 5.00 7.09 0.35
TOTAL

CUBIERTAS

CUBIERTA CON TORTA DE BARRO

Cubierta con Torta de Barro 2"

Rendimiento: 20.00 m2 /da


Unidad: m2
ARENA FINA M3 0.00 37.20 0.11
TIERRA DE CHACRA M3 0.07 26.27 1.84
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 0.80 11.40 9.12
HERRAMIENTAS % M.O. 3.00 15.55 0.47
TOTAL

CUBIERTAS CON LADRILLO PASTELERO DE ARCILLA

Cubierta con Ladrillo Pastelero 25x25 Asentado con Barro


Rendimiento: 20.00 m2 /da
Unidad: m2
ARENA FINA M3 0.00 37.20 0.18
TIERRA DE CHACRA M3 0.04 26.27 1.10
LADRILLO PASTELERO 25X25 CON HUECO MLL 0.02 839.50 13.43
CEMENTO PORTLAND TIPO I BOL 0.10 14.29 1.43
AGUA M3 0.00 9.00 0.02
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 0.80 11.40 9.12
HERRAMIENTAS % M.O. 3.00 15.55 0.47
TOTAL

Cubierta con Ladrillo Pastelero 25x25 Asentado con Barro

Rendimiento: 20.00 m2 /da


Unidad: m2
ARENA FINA M3 0.01 37.20 0.39
LADRILLO PASTELERO 25X25 CON HUECO MLL 0.02 839.50 13.43
CEMENTO PORTLAND TIPO I BOL 0.23 14.29 3.29
AGUA M3 0.01 9.00 0.08
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 0.80 11.40 9.12
HERRAMIENTAS % M.O. 5.00 15.55 0.78
TOTAL

CUBIERTAS FIBRABLOCK

Cubierta Fibrablock(2x0,50) e=2"/A=0,5 m2

Rendimiento: 20.00 m2 /da


Unidad: m2
ALAMBRE NEGRO No. 8 KG. 0.05 4.58 0.23
FIBRABLOCK 2"x2.00x0.50 m. (22.00 KG. ) UND 1.00 23.50 23.50
CLAVO C/CABEZA P/MADERA 1"x15 KG 0.01 5.68 0.06
CLAVO C/CABEZ A P/MADERA 4"x8 KG 0.12 3.68 0.44
CAPATAZ H-H 0.04 17.04 0.68
OPERARIO H-H 0.40 14.37 5.75
PEON H-H 0.40 11.40 4.56
HERRAMIENTAS % M.O. 5.00 10.99 0.55
TOTAL

Cubierta Fibrablock(2.10x0.60)e=2" A=0.6 m2


Rendimiento: 20.00 m2 /da
Unidad: m2
ALAMBRE NEGRO No. 8 KG. 0.05 4.58 0.23
FIBRABLOCK 2"x2.40x0.60 m.(30.00KG.) UND 0.69 31.50 21.74
CLAVO C/CABEZA P/MADERA 1"x15 KG 0.01 5.68 0.06
CLAVO C/CABEZ A P/MADERA 4"x8 KG 0.10 3.68 0.37
CAPATAZ H-H 0.04 17.04 0.68
OPERARIO H-H 0.40 14.37 5.75
PEON H-H 0.40 11.40 4.56
HERRAMIENTAS % M.O. 5.00 10.99 0.55
TOTAL

Cubierta Fibrablock(2.10x0.60)e=2"/A=0.8 m2

Rendimiento: 20.00 m2 /da


Unidad: m2
ALAMBRE NEGRO No. 8 KG. 0.18 4.58 0.82
FIBRABLOCK 2"x2.40x0.60 m.(30.00KG.) UND 0.69 31.50 21.74
CLAVO C/CABEZA P/MADERA 1"x15 KG 0.04 5.68 0.23
CLAVO C/CABEZ A P/MADERA 4"x8 KG 0.12 3.68 0.44
CAPATAZ H-H 0.04 17.04 0.68
OPERARIO H-H 0.40 14.37 5.75
PEON H-H 0.40 11.40 4.56
HERRAMIENTAS % M.O. 5.00 10.99 0.55
TOTAL

CUBIERTAS DE TEJA

Cubierta de Teja Pizarra

Rendimiento: 20.00 m2 /da


Unidad: m2
ARENA FINA M3 0.03 37.20 1.12
CEMENTO PORTLAND TIPO I BOL 0.35 14.29 5.00
AGUA M3 0.01 9.00 0.09
PLANCHA FIBROCEMENTO TEJA PIZARRA m2 1.44 36.06 51.93
REGLA DE MADERA p2 0.01 5.47 0.05
CAPATAZ H-H 0.04 17.04 0.68
OPERARIO H-H 0.40 14.37 5.75
PEON H-H 0.80 11.40 9.12
HERRAMIENTAS % M.O. 3.00 15.55 0.47
TOTAL

Cubierta de Teja Arcilla 36x16 cm


Rendimiento: 7.00 m2 /da
Unidad: m2
ARENA FINA M3 0.06 37.20 2.23
CEMENTO PORTLAND TIPO I BOL 0.50 14.29 7.15
AGUA M3 0.08 9.00 0.72
TEJA ARCILLA 36x16 CM MLL 0.03 760.00 22.80
CAPATAZ H-H 0.11 17.04 1.95
OPERARIO H-H 1.14 14.37 16.42
PEON H-H 0.57 11.40 6.51
HERRAMIENTAS % M.O. 5.00 24.88 1.24
TOTAL

Cubierta Teja Andina Eternit 1.18x 0.745

Rendimiento: 21.05 m2 /da


Unidad: m2
CLAVO GALVANIZADO CON ARANDELA DE UND 3.05 1.43 4.36
PLANCHA TEJA ANDINA ETERNIT 1.16x0.7 UND 1.42 26.75 37.99
CAPATAZ (E) HH 0.04 17.04 0.65
OPERARIO (E) HH 0.38 14.37 5.47
OFICIAL (E) HH 0.38 12.91 4.92
PEON (E) HH 0.76 11.40 8.69
HERRAMIENTAS % M.O. 3.00 19.73 0.59
TOTAL

CARPINTERIA DE MADERA

PUERTAS DE MADERA

Puerta Contraplacada e=35mm Triplay, Lupuna 4 mm

Rendimiento: 3.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.05 4.58 0.24
LIJA PARA MADERA HJA 1.00 0.85 0.85
COLA SINTETICA GLN 0.08 13.56 1.08
MADERA CEDRO (LARGA) P2 8.00 4.60 36.80
TRIPLAY LUPUNA 4x8x4 MM PL 1.00 16.27 16.27
CAPATAZ (E) HH 0.67 17.04 11.36
OPERARIO (E) HH 2.67 14.37 38.32
OFICIAL (E) HH 2.67 12.91 34.43
SIERRA CIRCULAR HM 1.33 5.25 7.00
CEPILLADORA HM 1.33 4.40 5.87
HERRAMIENTAS % M.O. 3.00 84.11 2.52
TOTAL

Puerta Contraplacada e=35mm Triplay, Lupuna 4 mm

Rendimiento: 3.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.05 4.58 0.24
LIJA PARA MADERA HJA 1.00 0.85 0.85
COLA SINTETICA GLN 0.08 13.56 1.08
MADERA CEDRO (LARGA) P2 8.00 4.60 36.80
TRIPLAY LUPUNA 4x8x6 MM PL 1.00 22.46 22.46
CAPATAZ (E) HH 0.67 17.04 11.36
OPERARIO (E) HH 2.67 14.37 38.32
OFICIAL (E) HH 2.67 12.91 34.43
SIERRA CIRCULAR HM 1.33 5.25 7.00
CEPILLADORA HM 1.33 4.40 5.87
HERRAMIENTAS % M.O. 3.00 84.11 2.52
TOTAL

Puerta Contraplacada e=45mm Triplay Lupuna 4 mmm

Rendimiento: 3.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.07 4.58 0.31
LIJA PARA MADERA HJA 1.10 0.85 0.94
COLA SINTETICA GLN 0.10 13.56 1.39
MADERA CEDRO (LARGA) P2 10.29 4.60 47.33
TRIPLAY LUPUNA 4x8x4 MM PL 1.00 16.27 16.27
CAPATAZ (E) HH 0.67 17.04 11.36
OPERARIO (E) HH 2.67 14.37 38.32
OFICIAL (E) HH 2.67 12.91 34.43
SIERRA CIRCULAR HM 0.53 5.25 2.80
CEPILLADORA ELECTRICA HM 0.53 5.76 3.07
HERRAMIENTAS % M.O. 3.00 84.11 2.52
TOTAL

PUERTAS PANELADAS

Puerta Contraplacada e=45mm Lupuna 6 mm

Rendimiento: 3.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.07 4.58 0.31
LIJA PARA MADERA HJA 1.10 0.85 0.94
COLA SINTETICA GLN 0.10 13.56 1.39
MADERA CEDRO (LARGA) P2 10.29 4.60 47.33
TRIPLAY LUPUNA 4x8x6 MM PL 1.00 22.46 22.46
CAPATAZ (E) HH 0.67 17.04 11.36
OPERARIO (E) HH 2.67 14.37 38.32
OFICIAL (E) HH 2.67 12.91 34.43
SIERRA CIRCULAR HM 0.53 5.25 2.80
CEPILLADORA ELECTRICA HM 0.53 5.76 3.07
HERRAMIENTAS % M.O. 3.00 84.11 2.52
TOTAL

Puerta de Tableros Rebajados 45mm Cedro

Rendimiento: 2.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.08 4.58 0.34
LIJA PARA MADERA HJA 1.10 0.85 0.94
COLA SINTETICA GLN 0.12 13.56 1.63
MADERA CEDRO (LARGA) P2 17.00 4.60 78.20
CAPATAZ (E) HH 0.40 17.04 6.82
OPERARIO (E) HH 4.00 14.37 57.48
OFICIAL (E) HH 4.00 12.91 51.64
SIERRA CIRCULAR HM 0.80 5.25 4.20
CEPILLADORA ELECTRICA HM 0.80 5.76 4.61
HERRAMIENTAS % M.O. 5.00 115.94 5.80
TOTAL

Puerta de Garaje en Cedro

Rendimiento: 2.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.08 4.58 0.34
LIJA PARA MADERA HJA 1.10 0.85 0.94
COLA SINTETICA GLN 0.12 13.56 1.63
MADERA CEDRO (LARGA) P2 25.40 4.60 116.84
CAPATAZ (E) HH 0.80 17.04 13.63
OPERARIO (E) HH 4.00 14.37 57.48
OFICIAL (E) HH 2.00 12.91 25.82
SIERRA CIRCULAR HM 0.80 5.25 4.20
CEPILLADORA ELECTRICA HM 0.80 5.76 4.61
HERRAMIENTAS % M.O. 3.00 96.93 2.91
TOTAL

MARCOS DE MADERA

Marcos de Madera Puerta de Cedro 1 1/2"x3"


Rendimiento: 35.00 ml /da
Unidad: ml
COLA SINTETICA GLN 0.01 13.56 0.14
TORNILLO ACERO SAE 1020 2.1/2"x3/4"1. CTO 0.01 21.20 0.21
TALADRO HM 0.07 3.00 0.21
REBAJO PARA MARCO DE PUERTAS M 1.00 1.50 1.50
MADERA CEDRO (LARGA) P2 1.36 4.60 6.26
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.23 14.37 3.28
PEON H-H 0.11 11.40 1.30
HERRAMIENTAS % M.O. 3.00 4.97 0.15
TOTAL

Marcos de Madera Puerta Cedro 1 1/2"x4"

Rendimiento: 35.00 ml /da


Unidad: ml
COLA SINTETICA GLN 0.01 13.56 0.14
TORNILLO ACERO SAE 1020 2.1/2"x3/4"1. CTO 0.01 21.20 0.21
TALADRO HM 0.07 3.00 0.21
REBAJO PARA MARCO DE PUERTAS M 1.00 1.50 1.50
MADERA CEDRO (LARGA) P2 1.81 4.60 8.33
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.23 14.37 3.28
PEON H-H 0.11 11.40 1.30
HERRAMIENTAS % M.O. 3.00 4.97 0.15
TOTAL

Marcos de Madera Puerta Cedro 1 1/2"x6"

Rendimiento: 30.00 ml /da


Unidad: ml
COLA SINTETICA GLN 0.01 13.56 0.14
TORNILLO ACERO SAE 1020 2.1/2"x3/4"1. CTO 0.01 21.20 0.21
TALADRO HM 0.08 3.00 0.24
REBAJO PARA MARCO DE PUERTAS M 1.00 1.50 1.50
MADERA CEDRO (LARGA) P2 2.72 4.60 12.51
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.27 14.37 3.83
PEON H-H 0.13 11.40 1.52
HERRAMIENTAS % M.O. 3.00 5.80 0.17
TOTAL

Marcos de Maderas Puerta Cedro 1 1/2"X8"


Rendmiento: 30.00 ml /da
Unidad: ml
COLA SINTETICA GLN 0.01 13.56 0.14
TORNILLO ACERO SAE 1020 2.1/2"x3/4"1. CTO 0.02 21.20 0.42
TALADRO HM 0.08 3.00 0.24
REBAJO PARA MARCO DE PUERTAS M 1.00 1.50 1.50
MADERA CEDRO (LARGA) P2 3.63 4.60 16.70
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.27 14.37 3.83
PEON H-H 0.13 11.40 1.52
HERRAMIENTAS % M.O. 3.00 5.80 0.17
TOTAL

Marcos de Madera Puerta Cedro 2"x4"

Rendimiento: 34.99 ml/da


Unidad: ml
COLA SINTETICA GLN 0.01 13.56 0.14
TORNILLO ACERO SAE 1020 2.1/2"x3/4"1. CTO 0.01 21.20 0.21
TALADRO HM 0.07 3.00 0.21
REBAJO PARA MARCO DE PUERTAS M 1.00 1.50 1.50
MADERA CEDRO (LARGA) P2 2.42 4.60 11.13
CAPATAZ H-H 0.02 17.04 0.39
OPERARIO H-H 0.23 14.37 3.28
PEON H-H 0.11 11.40 1.30
HERRAMIENTAS % M.O. 3.00 4.97 0.15
TOTAL

Marcos de Madera Puerta Cedro 2"x6"

Rendimiento: 30.00 ml/da


Unidad: ml
COLA SINTETICA GLN 0.01 13.56 0.14
TORNILLO ACERO SAE 1020 2.1/2"x3/4"1. CTO 0.01 21.20 0.21
TALADRO HM 0.08 3.00 0.24
REBAJO PARA MARCO DE PUERTAS M 1.00 1.50 1.50
MADERA CEDRO (LARGA) P2 3.63 4.60 16.70
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.27 14.37 3.83
PEON H-H 0.13 11.40 1.52
HERRAMIENTAS % M.O. 3.00 5.80 0.17
TOTAL

Marcos de Madera p. Puertas Cedro 2"x8"


Rendimiento: 30.00 ml/da
Unidad: ml
COLA SINTETICA GLN 0.01 13.56 0.14
TORNILLO ACERO SAE 1020 2.1/2"x3/4"1. CTO 0.02 21.20 0.42
TALADRO HM 0.08 3.00 0.24
REBAJO PARA MARCO DE PUERTAS M 1.00 1.50 1.50
MADERA CEDRO (LARGA) P2 4.84 4.60 22.26
CAPATAZ H-H 0.03 17.04 0.45
OPERARIO H-H 0.27 14.37 3.83
PEON H-H 0.13 11.40 1.52
HERRAMIENTAS % M.O. 3.00 5.80 0.17
TOTAL

VENTANAS DE MADERA

Ventana de Madera con Hojas, Cedro

Rendimiento: 4.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.05 4.58 0.23
LIJA PARA MADERA HJA 0.60 0.85 0.51
COLA SINTETICA GLN 0.12 13.56 1.63
MADERA CEDRO (LARGA) P2 8.50 4.60 39.10
CAPATAZ H-H 0.20 17.04 3.41
OPERARIO H-H 2.00 14.37 28.74
PEON H-H 1.00 11.40 11.40
CEPILLADORA HM 0.20 4.40 0.88
HERRAMIENTAS % M.O. 3.00 43.55 1.31
TOTAL

PASAMANOS DE MADERA

Pasamanos de Madera 2"x3", Cedro

Rendimiento: 6.00 ml /da


Unidad: ml
CLAVOS 2" KG. 0.04 4.58 0.18
COLA SINTETICA GLN 0.11 13.56 1.49
MADERA CEDRO (LARGA) P2 1.75 4.60 8.05
CAPATAZ (E) HH 0.13 17.04 2.27
OPERARIO (E) HH 1.33 14.37 19.16
PEON (E) HH 0.67 11.40 7.60
HERRAMIENTAS % M.O. 3.00 29.03 0.87
TOTAL
Pasamanos de Madera 2"x4", Cedro

Rendimiento: 6.00 ml /da


Unidad: ml
CLAVOS 2" KG. 0.04 4.58 0.18
COLA SINTETICA GLN 0.11 13.56 1.49
MADERA CEDRO (LARGA) P2 2.31 4.60 10.63
CAPATAZ (E) HH 0.13 17.04 2.27
OPERARIO (E) HH 1.33 14.37 19.16
PEON (E) HH 0.67 11.40 7.60
HERRAMIENTAS % M.O. 3.00 29.03 0.87
TOTAL

Pasamanos de Madera 2"x3", Caoba

Rendimiento: 6.00 ml /da


Unidad: ml
CLAVOS 2" KG. 0.04 4.58 0.18
COLA SINTETICA GLN 0.11 13.56 1.49
MADERA CAOBA (LARGA) P2 1.73 7.66 13.25
CAPATAZ (E) HH 0.13 17.04 2.27
OPERARIO (E) HH 1.33 14.37 19.16
PEON (E) HH 0.67 11.40 7.60
HERRAMIENTAS % M.O. 3.00 29.03 0.87
TOTAL

Pasamanos de Madera 2"x4", Caoba

Rendimiento: 6.00 ml /da


Unidad: ml
CLAVOS 2" KG. 0.04 4.58 0.18
COLA SINTETICA GLN 0.11 13.56 1.49
MADERA CAOBA (LARGA) P2 2.31 7.66 17.69
CAPATAZ (E) HH 0.13 17.04 2.27
OPERARIO (E) HH 1.33 14.37 19.16
PEON (E) HH 0.67 11.40 7.60
HERRAMIENTAS % M.O. 3.00 29.03 0.87
TOTAL

ENCHAPES DE MADERA

Enchape de Madera Machimbrada 1/2"x4"Cedro+A715

Rendimiento: 16.00 m2 /da


Unidad: m2
CLAVOS 2" KG. 0.30 4.58 1.37
BREA 160/220 PA KG 0.03 23.00 0.69
CINTA PARA MACHIMBRADO M 3.00 18.09 54.27
REBAJO PARA MACHIMBRADO M 8.00 1.20 9.60
MADERA CEDRO (LARGA) P2 13.18 4.60 60.63
CAPATAZ H-H 0.05 17.04 0.85
OPERARIO H-H 0.50 14.37 7.19
PEON H-H 0.25 11.40 2.85
HERRAMIENTAS % M.O. 3.00 10.89 0.33
TOTAL

Enchape de Madera Machimbrada 1/2"x4"Diablo Fuerte

Rendimiento: 16.00 m2 /da


Unidad: m2
BREA 160/220 PA KG 0.03 23.00 0.69
CINTA PARA MACHIMBRADO M 3.00 18.09 54.27
CLAVO S/CABEZA P/MADERA PROMEDIO KG 0.30 4.24 1.27
REBAJO PARA MACHIMBRADO M 8.00 1.20 9.60
MADERA DIABLO FUERTE (LARGA) P2 13.18 2.69 35.45
CAPATAZ H-H 0.05 17.04 0.85
OPERARIO H-H 0.50 14.37 7.19
PEON H-H 0.25 11.40 2.85
HERRAMIENTAS % M.O. 3.00 10.89 0.33
TOTAL

Enchape de Madera Machimbrada 1/2"x4"Caoba

Rendimiento: 16.00 m2 /da


Unidad: m2
BREA 160/220 PA KG 0.03 23.00 0.69
CINTA PARA MACHIMBRADO M 3.00 18.09 54.27
CLAVO S/CABEZA P/MADERA PROMEDIO KG 0.30 4.24 1.27
REBAJO PARA MACHIMBRADO M 8.00 1.20 9.60
MADERA CAOBA (LARGA) P2 13.18 7.66 100.96
CAPATAZ H-H 0.05 17.04 0.85
OPERARIO H-H 0.50 14.37 7.19
PEON H-H 0.25 11.40 2.85
HERRAMIENTAS % M.O. 3.00 10.89 0.33
TOTAL

Enchape de Madera Machimbrada 1/2"x4"Ishpingo

Rendimiento: 16.00 m2 /da


Unidad: m2
BREA 160/220 PA KG 0.03 23.00 0.69
CINTA PARA MACHIMBRADO M 3.00 18.09 54.27
CLAVO S/CABEZA P/MADERA PROMEDIO KG 0.30 4.24 1.27
REBAJO PARA MACHIMBRADO M 8.00 1.20 9.60
MADERA ISHPINGO PUCALLPA P2 13.18 3.40 44.81
CAPATAZ H-H 0.05 17.04 0.85
OPERARIO H-H 0.50 14.37 7.19
PEON H-H 0.25 11.40 2.85
HERRAMIENTAS % M.O. 3.00 10.89 0.33
TOTAL

CORREAS DE MADERA

Correas de Madera 3" x 5"

Rendimiento: 1.00 p2 /da


Unidad: p2
MADERA TORNILLO (LARGA) P2 1.05 2.93 0.03
TOTAL

CARPINTERIA METALICA

PUERTAS DE FIERRO

Puerta de fierro

Rendimiento: 2.00 m2/da


Unidad: m2
SOLDADURA CELLOCORD 1/8 KG 0.08 6.48 0.53
TUBO ACERO NEGRO ELECTRS.RECTA.2"x PZA 2.16 29.96 64.71
BARRA CUAD. F. N. LISO 5/8 ML 5.82 2.82 16.41
PLANCH. NEGRA LAF 0.9x1200x2400 mm und 0.06 61.38 3.87
OPERARIO (E) HH 4.00 14.37 57.48
PEON (E) HH 4.00 11.40 45.60
EQUIPO DE SOLDAR HM 4.00 8.40 33.60
HERRAMIENTAS % M.O. 3.00 103.08 3.09
TOTAL

Puerta de fierro y malla metlica 2"x 2" # 10

Rendimiento: 2.00 m2 /da


Unidad: m2
SOLDADURA CELLOCORD 1/8 KG 0.04 6.48 0.25
TUBO ACERO NEGRO ELECTROS. REDOND PZA 0.31 64.47 19.99
MALLA ELELECT. CICLON BWG#10 M2 0.02 791.01 15.42
ANGULO 1/8" x 3/4 "x 6 M. FIERRO NEGR PZA 0.31 2.89 0.91
OPERARIO (E) HH 4.00 14.37 57.48
PEON (E) HH 4.00 11.40 45.60
EQUIPO DE SOLDAR HM 4.00 8.40 33.60
HERRAMIENTAS % M.O. 3.00 103.08 3.09
TOTAL

VENTANAS DE FIERRO

Ventana de fierro con reja de seguridad

Rendimiento: 1.50 m2 /da


Unidad: m2
SOLDADURA CELLOCORD 1/8 KG 0.21 6.48 1.36
ANGULO ACERO NEGRO 1"x1"x1/4"x6m KG 1.65 33.69 55.59
BARRA CUAD. F. N. LISO 5/8 ML 7.98 2.82 22.50
OPERARIO (E) HH 5.33 14.37 76.64
PEON (E) HH 5.33 11.40 60.80
EQUIPO DE SOLDAR HM 5.33 8.40 44.80
HERRAMIENTAS % M.O. 5.00 137.44 6.87
TOTAL

Ventana de fierro sin seguridad

Rendimiento: 2.50 m2 /da


Unidad: m2
SOLDADURA CELLOCORD 1/8 KG 0.12 6.48 0.81
ANGULO ACERO NEGRO 1"x1"x1/4"x6m KG 1.65 33.69 55.59
OPERARIO (E) HH 3.20 14.37 45.98
PEON (E) HH 3.20 11.40 36.48
EQUIPO DE SOLDAR HM 3.20 8.40 26.88
HERRAMIENTAS % M.O. 5.00 82.46 4.12
TOTAL

Cerco Metlico con Malla 2"x2"No.8

Rendimiento: 8.00 m2 /da


Unidad: m2
SOLDADURA CELLOCORD 1/8 KG 0.50 6.48 3.24
TUBO ACERO NEGRO ELECTROS. REDOND PZA 0.33 64.47 21.28
ANGULO ACERO NEGRO 1"x1"x1/4"x6m KG 0.33 33.69 11.12
MALLA ELECTROSOLDADA CICLON BWG#8 PZA 0.02 1219.33 24.39
CAPATAZ H-H 0.10 17.04 1.70
OPERARIO H-H 1.00 14.37 14.37
PEON H-H 1.00 11.40 11.40
EQUIPO DE SOLDAR HM 0.50 8.40 4.20
HERRAMIENTAS % M.O. 3.00 27.47 0.82
TOTAL

Cerco Metlico con Malla 2x2 #10

Rendimiento: 8.00 m2 /da


Unidad: m2
SOLDADURA CELLOCORD 1/8 KG 0.50 6.48 3.24
TUBO ACERO NEGRO ELECTROS. REDOND PZA 0.33 64.47 21.28
ANGULO ACERO NEGRO 1"x1"x1/4"x6m KG 0.33 33.69 11.12
MALLA ELELECT. CICLON BWG#10 M2 0.02 791.01 15.82
CAPATAZ H-H 0.10 17.04 1.70
OPERARIO (E) HH 1.00 14.37 14.37
PEON (E) HH 1.00 11.40 11.40
EQUIPO DE SOLDAR HM 0.50 8.40 4.20
HERRAMIENTAS % M.O. 3.00 27.47 0.82
TOTAL

PASAMANOS METALICO

Pasamanos de tubo galvanizado de 2"

Rendimiento: 6.00 ml /da


Unidad: ml
TUBO ACERO GALV.STANDAR ISO I 6.40M TUB 1.20 18.52 22.22
CODO DEACERO GALV.ISO I 2x90 pza 1.50 7.13 10.70
CAPATAZ (E) HH 0.13 17.04 2.27
OPERARIO (E) HH 1.33 14.37 19.16
PEON (E) HH 1.33 11.40 15.20
HERRAMIENTAS % M.O. 10.00 36.63 3.66
TOTAL

Pasamanos de tubo galvanizado de 1"

Rendimiento: 6.00 ml /da


Unidad: ml
TUBO ACERO GALV.STANDAR ISO I 6.40M TUB 1.20 8.58 10.30
CODO DE ACERO GALV.ISO I 1 x 90 PZA 1.50 2.23 3.35
CAPATAZ (E) HH 0.13 17.04 2.27
OPERARIO (E) HH 1.33 14.37 19.16
PEON (E) HH 1.33 11.40 15.20
HERRAMIENTAS % M.O. 10.00 36.63 3.66
TOTAL
Psamanos de tubo galvanizado de 3"

Rendimiento: 5.00 ml /da


Unidad: ml
TUBO ACERO GALV.STANDAR ISO I 6.40M TUB 1.20 32.11 38.53
CODO GALVANIZADO 90 3" UND 1.50 17.15 25.73
CAPATAZ H-H 0.16 17.04 2.73
OPERARIO H-H 1.60 14.37 22.99
PEON H-H 1.60 11.40 18.24
HERRAMIENTAS % M.O. 10.00 43.96 4.40
TOTAL

OTROS

Escalera de gato, Tubo FoGo 1 1/2" y 3/4"

Rendimiento: 5.00 und/da


Unidad: und
SOLDADURA CELLOCORD 1/8 KG 0.80 6.48 5.18
LIJA PARA FIERRO UND 0.50 1.23 0.62
TUBERIA F.G. 3/4" ML 1.20 4.89 5.87
TUBERIA F.G. 1 1/2" ML 2.10 11.43 24.00
ELECTRODO TIPO 6012 UND 0.30 6.72 2.02
CAPATAZ (E) HH 0.16 17.04 2.73
OPERARIO (E) HH 1.60 14.37 22.99
PEON (E) HH 0.80 11.40 9.12
HERRAMIENTAS % M.O. 15.00 34.84 5.23
TOTAL

CERRAJERIAS

BISAGRAS

Bisagra Tipo Capuchina Aluminizada 3"

Rendimiento: 12.00 pza/da


Unidad: pza.
BISAGRA CAPUCHINO ALUMINIO 3"x3" PZA 1.00 2.26 2.26
CAPATAZ H-H 0.07 17.04 1.14
OPERARIO H-H 0.33 14.37 4.79
HERRAMIENTAS % M.O. 3.00 5.93 0.18
TOTAL

Bisagra Tipo Capuchina Aluminizada 3 1/2"


Rendimiento: 12.00 pza/da
Seguridad: pza
BISAGRA CAPUCHINO ALUMINIO 3 1/2"x 3 PZA 1.00 2.68 2.68
CAPATAZ H-H 0.07 17.04 1.14
OPERARIO H-H 0.33 14.37 4.79
HERRAMIENTAS % M.O. 3.00 5.93 0.18
TOTAL

Bisagra Tipo Capuchina Aluminzada 4"

Rendimiento: 12.00 pza/da


Unidad: pza
BISAGRA CAPUCHINA ALUMINIZADA 4" PZA 1.00 4.19 4.19
CAPATAZ H-H 0.07 17.04 1.14
OPERARIO H-H 0.33 14.37 4.79
HERRAMIENTAS % M.O. 3.00 5.93 0.18
TOTAL

CERRADURAS

Cerradura Puerta Principal Pesada

Rendimiento: 4.00 pza/da


Unidad: pza
CERRADURA PERILLA P/PUERTA PPAL BRO PZA 1.00 27.81 27.81
CAPATAZ H-H 0.20 17.04 3.41
OPERARIO H-H 2.00 14.37 28.74
HERRAMIENTAS % M.O. 3.00 32.15 0.96
TOTAL

Cerradura para Bao Bronce Antiguo

Rendimiento: 4.00 pza/da


Unidad: pza
CERRADURA PERILLA /BAO BRONCE AN PZA 1.00 23.44 23.44
CAPATAZ H-H 0.20 17.04 3.41
OPERARIO H-H 2.00 14.37 28.74
HERRAMIENTAS % M.O. 3.00 32.15 0.96
TOTAL

Cerradura para Puerta Interior Bronce Antiguo

Rendimiento: 4.00 pza/da


Unidad: pza
CERRADURA PERILLA P/DORMITORIO BR PZA 1.00 25.63 25.63
CAPATAZ H-H 0.20 17.04 3.41
OPERARIO H-H 2.00 14.37 28.74
HERRAMIENTAS % M.O. 3.00 32.15 0.96
TOTAL

PICAPORTE

Rendimiento: 8.00 pza/da


Unidad: pza
PICAPORTE DE SUPERFICE DE 6" PZA 1.00 31.01 31.01
CAPATAZ H-H 0.10 17.04 1.70
OPERARIO H-H 0.50 14.37 7.19
HERRAMIENTAS % M.O. 5.00 8.89 0.44
TOTAL

VIDRIOS Y CRISTALES

Vidrio Incoloro Simple

Rendimiento: 70.00 p2 /da


Unidad: p2
VIDRIO SIMPLE P2 1.05 2.00 2.10
CAPATAZ (E) HH 0.01 17.04 0.19
OPERARIO (E) HH 0.11 14.37 1.64
PEON (E) HH 0.03 11.40 0.39
HERRAMIENTAS % M.O. 3.00 2.22 0.07
TOTAL

Vidrio Incoloro Semidoble

Rendimiento: 60.00 p2 /da


Unidad: p2
VIDRIO MEDIO DOBLE P2 1.05 2.50 2.63
CAPATAZ (E) HH 0.01 17.04 0.23
OPERARIO (E) HH 0.13 14.37 1.92
PEON (E) HH 0.03 11.40 0.30
HERRAMIENTAS % M.O. 3.00 2.45 0.07
TOTAL

Vidrio Incoloro Doble

Rendimiento: 50.00 p2 /da


Unidad: p2
VIDRIO DOBLE P2 1.05 3.00 3.15
CAPATAZ (E) HH 0.02 17.04 0.27
OPERARIO (E) HH 0.16 14.37 2.30
PEON (E) HH 0.16 11.40 1.82
HERRAMIENTAS % M.O. 3.00 4.39 0.13
TOTAL

Vidrio Incoloro Triple

Rendimiento: 40.00 p2 /da


Unidad: p2
VIDRIO TRIPLE P2 1.05 5.00 5.25
CAPATAZ (E) HH 0.02 17.04 0.34
OPERARIO (E) HH 0.20 14.37 2.87
PEON (E) HH 0.20 11.40 2.28
HERRAMIENTAS % M.O. 3.00 5.49 0.16
TOTAL

PINTURA

PINTURA DE CIELORRASOS

Pintura Cielorasos a la Cal

Rendimiento: 40.00 m2 /da


Unidad: m2
CAL HIDRAT. INDUSTRIAL ITINTEC (30 KG.) BOL 0.03 13.00 0.39
LIJA PARA MADERA HJA 0.10 0.85 0.09
CAPATAZ H-H 0.02 17.04 0.34
OPERARIO H-H 0.20 14.37 2.87
HERRAMIENTAS % M.O. 3.00 3.21 0.10
TOTAL

Pintura de Cielorasos al Temple

Rendimiento: 25.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.10 0.85 0.09
IMPRIMANTE GLN 0.10 14.36 1.44
PINTURA TEMPLE BLS 0.10 11.86 1.19
CAPATAZ (E) HH 0.03 17.04 0.55
OPERARIO (E) HH 0.32 14.37 4.60
HERRAMIENTAS % M.O. 3.00 5.15 0.15
TOTAL

Pintura de Cielorasos,Vinlica 2 manos


Rendimiento: 25.00 m2 /da
Unidad: m2
CLAVOS 2" KG. 0.00 4.58 0.00
LIJA PARA MADERA HJA 0.10 0.85 0.09
MADERA PARA ANDAMIOS P2 0.20 2.62 0.52
SELLADOR PARA MUROS BLANCO GLN 0.13 24.56 3.27
LATEX PATO BLANCO/COLORES GL 0.04 19.66 0.79
CAPATAZ (E) HH 0.03 17.04 0.55
OPERARIO (E) HH 0.32 14.37 4.60
HERRAMIENTAS % M.O. 3.00 5.15 0.15
TOTAL

Pintura de Cielorasos, Esmalte 2 manos

Rendimiento: 14.00 m2 /da


Unidad: m2
MADERA PARA ANDAMIOS P2 0.58 2.62 1.52
IMPRIMANTE PARA MUROS GLN 0.04 42.13 1.69
ESMALTE SINTET.PINTOR BLANCO Y COLO GLN 0.04 65.35 2.61
AGUARRAS MINERAL GLN 0.01 13.10 0.08
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
HERRAMIENTAS % M.O. 3.00 9.18 0.28
TOTAL

Pintura de Cielorasos al Oleo 2 manos

Rendimiento: 14.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.10 0.85 0.09
SOLVENTE AGUARRAS GLN 0.01 25.80 0.15
IMPRIMANTE PARA MUROS GLN 0.13 42.13 5.48
OLEO MATE SINT.BLANCO Y COLORES GLN 0.04 52.42 2.10
CAPATAZ (E) HH 0.06 17.04 0.97
OPERARIO (E) HH 0.57 14.37 8.21
PEON (E) HH 0.29 11.40 3.26
HERRAMIENTAS % M.O. 3.00 12.44 0.37
TOTAL

PINTURA DE MUROS INTERIORES

Pintura de Muros Interiores a la Cal

Rendimiento: 25.00 m2 /da


Unidad: m2
CAL HIDRAT. INDUSTRIAL ITINTEC (30 KG.) BOL 0.03 13.00 0.39
LIJA PARA MADERA HJA 0.10 0.85 0.09
CAPATAZ (E) HH 0.03 17.04 0.55
OPERARIO (E) HH 0.32 14.37 4.60
HERRAMIENTAS % M.O. 3.00 5.15 0.15
TOTAL

Pintura de Muros Interiores al Temple

Rendimiento: 30.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.10 0.85 0.09
IMPRIMANTE GLN 0.10 14.36 1.44
PINTURA TEMPLE BLS 0.10 11.86 1.19
CAPATAZ (E) HH 0.03 17.04 0.45
OPERARIO (E) HH 0.27 14.37 3.83
HERRAMIENTAS % M.O. 5.00 4.28 0.21
TOTAL

Pintura de Muros, Vinlica 2 manos

Rendimiento: 30.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.10 0.85 0.09
PINTURA LATEX SUPERMATE GLN 0.04 35.97 1.44
IMPRIMANTE GLN 0.20 14.36 2.87
CAPATAZ (E) HH 0.03 17.04 0.45
OPERARIO (E) HH 0.27 14.37 3.83
HERRAMIENTAS % M.O. 3.00 4.28 0.13
TOTAL

PINTURA DE CONTRAZOCALOS

Pintura de Contrazcalos, Esmalte - 2 manos

Rendimiento: 60.00 ml /da


Unidad: ml
LIJA PARA MADERA HJA 0.01 0.85 0.01
ESMALTE SINTET.PINTOR BLANCO Y COLO GLN 0.01 65.35 0.65
AGUARRAS MINERAL GLN 0.01 13.10 0.08
CAPATAZ (E) HH 0.01 17.04 0.23
OPERARIO (E) HH 0.13 14.37 1.92
PEON (E) HH 0.07 11.40 0.76
HERRAMIENTAS % M.O. 3.00 2.91 0.09
TOTAL

Pintura en contrazcalos con barniz - 2 manos

Rendimiento: 60.00 ml /da


Unidad: ml
LIJA PARA MADERA HJA 0.01 0.85 0.01
BARNIZ V-1 GLN 0.01 36.09 0.36
CAPATAZ (E) HH 0.01 17.04 0.23
OPERARIO (E) HH 0.13 14.37 1.92
PEON (E) HH 0.07 11.40 0.76
HERRAMIENTAS % M.O. 3.00 2.91 0.09
TOTAL

Pintura en contrazcalos al leo - 2 manos

Rendimiento: 60.00 ml /da


Unidad: ml
LIJA PARA MADERA HJA 0.01 0.85 0.01
PINTURA AL OLEO MATE GAL 0.01 26.48 0.26
CAPATAZ H-H 0.01 17.04 0.23
OPERARIO H-H 0.13 14.37 1.92
PEON H-H 0.07 11.40 0.76
HERRAMIENTAS % M.O. 3.00 2.91 0.09
TOTAL

PINTURA EN CARPINTERIA DE MADERA

Pintura en Puertas de Madera, Barniz - 2 manos

Rendimiento: 18.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.20 0.85 0.17
TARAPOROS DE MADERA ACABADA C/BAR KG 0.15 3.91 0.59
BARNIZ V-1 GLN 0.05 36.09 1.80
SELLADOR 150 GLN 0.02 15.94 0.32
CAPATAZ (E) HH 0.04 17.04 0.76
OPERARIO (E) HH 0.44 14.37 6.39
PEON (E) HH 0.22 11.40 2.53
HERRAMIENTAS % M.O. 3.00 9.68 0.29
TOTAL

Pintura en Puertas de Madera con Laca - 2 manos

Rendimiento: 4.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.20 0.85 0.17
LACA SELLADORA OPEX GLN 0.06 49.72 2.98
LACA MATE OPEX GLN 0.06 54.47 3.27
AGUARRAS MINERAL GLN 0.04 13.10 0.52
CAPATAZ H-H 0.20 17.04 3.41
OPERARIO H-H 2.00 14.37 28.74
PEON H-H 1.00 11.40 11.40
HERRAMIENTAS % M.O. 3.00 43.55 1.31
TOTAL

Pintura en Puertas de Madera al Oleo - 2 manos

Rendimiento: 10.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.20 0.85 0.17
TARAPOROS DE MADERA ACABADA C/BAR KG 0.06 3.91 0.23
PINTURA AL OLEO MATE GAL 0.06 26.48 1.59
CAPATAZ H-H 0.08 17.04 1.36
OPERARIO H-H 0.80 14.37 11.50
PEON H-H 0.40 11.40 4.56
HERRAMIENTAS % M.O. 3.00 17.42 0.52
TOTAL

Pintura en Mamparas de Madera c/Barniz-2 manos

Rendimiento: 20.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.20 0.85 0.17
TARAPOROS DE MADERA ACABADA C/BAR KG 0.04 3.91 0.16
BARNIZ V-1 GLN 0.03 36.09 1.08
CAPATAZ H-H 0.04 17.04 0.68
OPERARIO H-H 0.40 14.37 5.75
PEON H-H 0.20 11.40 2.28
HERRAMIENTAS % M.O. 3.00 8.71 0.26
TOTAL

Pintura en Ventanas de Madera, Barniz - 2manos

Rendimiento: 20.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.15 0.85 0.13
TARAPOROS DE MADERA ACABADA C/BAR KG 0.04 3.91 0.16
BARNIZ V-1 GLN 0.03 36.09 1.08
CAPATAZ (E) HH 0.04 17.04 0.68
OPERARIO (E) HH 0.40 14.37 5.75
PEON (E) HH 0.20 11.40 2.28
HERRAMIENTAS % M.O. 3.00 8.71 0.26
TOTAL

Pintura de Fondo de Escaleras Vinilica - 2 manos

Rendimiento: 20.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.10 0.85 0.09
PINTURA LATEX SUPERMATE 5GLN UND 0.04 37.25 1.49
IMPRIMANTE FONDO BLANCO PARA MAD GLN 0.13 22.49 2.92
CAPATAZ H-H 0.04 17.04 0.68
OPERARIO H-H 0.40 14.37 5.75
PEON H-H 0.20 11.40 2.28
HERRAMIENTAS % M.O. 3.00 8.71 0.26
TOTAL

Pintura de Pasamanos de Madera / Barniz-2 manos

Rendimiento: 20.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.02 0.85 0.02
BARNIZ V-1 GLN 0.02 36.09 0.72
CAPATAZ H-H 0.04 17.04 0.68
OPERARIO H-H 0.40 14.37 5.75
HERRAMIENTAS % M.O. 3.00 6.43 0.19
TOTAL

Pintura de Pasamanos de Madera al Oleo-2 manos

Rendimiento: 20.00 m2 /da


Unidad: m2
LIJA PARA MADERA HJA 0.02 0.85 0.02
PINTURA AL OLEO MATE GAL 0.01 26.48 0.26
CAPATAZ H-H 0.04 17.04 0.68
OPERARIO H-H 0.40 14.37 5.75
HERRAMIENTAS % M.O. 3.00 6.43 0.19
TOTAL

APARATOS Y ACCESORIOS SANITARIOS

INODORO SIFON JET BLANCO COMERCIAL

Rendimiento: 1.00 pza/da


Unidad: pza
INODORO SIFON JET (TAZA) BLANCO STD UND 1.00 91.79 91.79
ESTANQUE C/TAPA SIFON JET BLANCO ST UND 1.00 45.93 45.93
MANIJA METALICA P/INODORO MOD.PES PZA 1.00 11.62 11.62
VALV.ENTRAD.DESCARG.P/T.BAJO STAND.( PZA 1.00 26.93 26.93
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 1.00 5.69 5.69
PERNO DE ANCLAJE P/INODORO PZA 2.00 2.12 4.24
PERNO DE SUJECION O/INODORO PZA 2.00 2.97 5.94
ASIENTO P/INODORO MOPLEN BLANCO N PZA 1.00 9.05 9.05
TOTAL

INODORO TOP PIECE BLANCO COMERCIAL

Rendimiento: 1.00 pza/da


Unidad: pza
INODORO TOP PIECE (TAZA) BLANCO STD UND 1.00 214.67 214.67
ESTANQUE C/TAPA TOP PIECE BLANCO ST UND 1.00 99.28 99.28
MANIJA METALICA P/INODORO MOD.PES PZA 1.00 11.62 11.62
VALV.ENTRAD.DESCARG.P/T.BAJO STAND.( PZA 1.00 26.93 26.93
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 1.00 5.69 5.69
PERNO DE ANCLAJE P/INODORO PZA 2.00 2.12 4.24
PERNO DE SUJECION O/INODORO PZA 2.00 2.97 5.94
ASIENTO P/INODORO MOPLEN BLANCO N PZA 1.00 9.05 9.05
TOTAL

LAVATORIO SONET BLANCO STANDARD

Rendimiento: 1.00 pza/da


Unidad: pza
LAVATORIO SONET BLANCO STD UND 1.00 73.55 73.55
MEZC.P/LAVAT.4"CROMO-CROMO AVANT PZA 1.00 84.41 84.41
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 2.00 5.69 11.38
TRAMPA TIPO BRONCE CROMADA DE 1 1/ PZA 1.00 20.24 20.24
TUBO PROLONG. DESAGUE BRONCE 1 1/4x PZA 1.00 6.12 6.12
TOTAL

OVALIN TREBOL 20"x17" BLANCO STANDARD

Rendimiento: 1.00 pza/da


Unidad: pza
LAVATORIO OVALIN GRANDE BLANCO STD UND 1.00 110.34 110.34
MEZC.P/LAVAT.4"CROMO-CROMO AVANT PZA 1.00 84.41 84.41
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 2.00 5.69 11.38
TRAMPA TIPO BRONCE CROMADA DE 1 1/ PZA 1.00 20.24 20.24
TUBO PROLONG. DESAGUE BRONCE 1 1/4x PZA 1.00 6.12 6.12
TOTAL

BIDET TOP PIECE BLANCO COMERCIAL

Rendimiento: 1.00 pza/da


Unidad: pza
BIDET TOP PIECE BLANCO STD UND 1.00 214.67 214.67
MEZC.P/BIDET(2LLAVES) CR.-CR. AVANTE PZA 1.00 157.13 157.13
DESAG.AUTOM.P/BIDET.PESADO CROMO PZA 1.00 80.29 80.29
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 2.00 5.69 11.38
TOTAL

URINARIO CADET BLANCO STANDARD TREBOL

Rendimiento: 1.00 pza/da


Unidad: pza
URINARIO BAMBY BLANCO STD UND 1.00 60.92 60.92
PERNO DE ANCLAJE P/URINARIO PZA 1.00 2.12 2.12
DESAGUE MULTIPLE CROMO C/TAPON-C PZA 1.00 17.25 17.25
VALVULA ANGULAR P/URINARIO FUTURA PZA 1.00 49.08 49.08
TRAMPA TIPO P BRONCE CROMADA DE 1 PZA 1.00 20.24 20.24
TOTAL

INODORO SIFON JET COLOR ESPECIAL COMERCIAL

Rendimiento: 1.00 pza/da


Unidad: pza
INODORO SIFON JET COLOR ESPECIAL CO PZA 1.00 131.44 131.44
ESTANQUE C/TAPA SOFON JET COLOR ESP PZA 1.00 65.95 65.95
MANIJA METALICA P/INODORO MOD.PES PZA 1.00 11.62 11.62
VALV.ENTRAD.DESCARG.P/T.BAJO STAND.( PZA 1.00 26.93 26.93
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 1.00 5.69 5.69
PERNO DE ANCLAJE P/INODORO PZA 2.00 2.12 4.24
PERNO DE SUJECION O/INODORO PZA 2.00 2.97 5.94
ASIENTO P/INODORO MOPLEN BLANCO N PZA 1.00 9.05 9.05
TOTAL

INODORO TOP PIECE COLOR ESPECIAL COM.

Rendimiento: 1.00 pza/da


Unidad: pza
INODORO TOP PIECE COLOR ESPECIAL ST PZA 1.00 150.91 150.91
ESTANQUE C/TAPA TOP PIECE COLOR ESPE PZA 1.00 109.20 109.20
MANIJA METALICA P/INODORO MOD.PES PZA 1.00 11.62 11.62
VALV.ENTRAD.DESCARG.P/T.BAJO STAND.( PZA 1.00 26.93 26.93
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 1.00 5.69 5.69
PERNO DE ANCLAJE P/INODORO PZA 2.00 2.12 4.24
PERNO DE SUJECION O/INODORO PZA 2.00 2.97 5.94
ASIENTO P/INODORO MOPLEN BLANCO N PZA 1.00 9.05 9.05
TOTAL

LAVATORIO SONNET COLOR ESPECIAL COMER

Rendimiento: 1.00 pza/da


Unidad: pza
LAVATORIO SONNET COLOR ESPECIAL CO PZA 1.00 192.25 192.25
MEZC.P/LAVAT.4"CROMO-CROMO AVANT PZA 1.00 84.41 84.41
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 2.00 5.69 11.38
TUBO PROLONG. DESAGUE BRONCE 1 1/4x PZA 1.00 6.12 6.12
TRAMPA TIPO P BRONCE CROMADA DE 1 PZA 1.00 20.24 20.24
TOTAL

OVALIN GRANDE COLOR PREMIUM

Rendimiento: 1.00 pza/da


Unidad: pza
LAVATORIO OVALIN GRANDE PREMIUM S PZA 1.00 118.92 118.92
MEZC.P/LAVAT.4"CROMO-CROMO AVANT PZA 1.00 84.41 84.41
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 2.00 5.69 11.38
TUBO PROLONG. DESAGUE BRONCE 1 1/4x PZA 1.00 6.12 6.12
TRAMPA TIPO P BRONCE CROMADA DE 1 PZA 1.00 20.24 20.24
TOTAL

BIDET TOP PIECE COLOR ESPECIAL COMERCIAL

Rendimiento: 1.00 pza/da


Unidad: pza
BIDET TOP PIECE COLOR ESPECIAL COMER PZA 1.00 260.11 260.11
MEZC.P/BIDET(2LLAVES) CR.-CR. AVANTE PZA 1.00 157.13 157.13
DESAG.AUTOM.P/BIDET.PESADO CROMO PZA 1.00 80.29 80.29
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 2.00 5.69 11.38
TOTAL

LAVATORIO FONTANA BLANCO STANDARD

Rendimiento: 1.00 pza/da


Unidad: pza
LAVATORIO FONTANA BLANCO STD UND 1.00 103.60 103.60
MEZC.P/LAVAT.4"CROMO-CROMO AVANT PZA 1.00 84.41 84.41
TUBO ABASTO ALUMINIO TRENZADO 1/2" PZA 2.00 5.69 11.38
TUBO PROLONG. DESAGUE BRONCE 1 1/4x PZA 1.00 6.12 6.12
TRAMPA TIPO P BRONCE CROMADA DE 1 PZA 1.00 20.24 20.24
TOTAL

ACCESORIOS SANITARIOS

JABONERAS SIMPLE 15x 15 DE LOSA BLANCA

Rendimiento: 1.00 pza/da


Unidad: pza
JABONERA SIN ASA BLANCO STD UND 1.00 5.01 5.01
TOTAL

JABONERA CON ASA 15x15 DE LOSA BLANCA

Rendimiento: 1.00 pza/da


Unidad: pza
JABONERA CON ASA BLANCO STD UND 1.00 6.90 6.90
TOTAL

JABONERAS SIMPLE 15x15 LOSA DE COLOR

Rendimiento: 1.00 pza/da


Unidad: pza
JABONERA LOSA C/ASA 15 cm COLOR STA PZA 1.00 8.73 8.73
TOTAL

JABONERAS CON ASA 15x15 LOSA DE COLOR

Rendimiento: 1.00 pza/da


Unidad: pza
JABONERA CON ASA 15cm COLOR CAL ST PZA 1.00 8.99 8.99
TOTAL

TOALLERA DE LOSA BLANCA

Rendimiento: 1.00 pza/da


Unidad: pza
TOALLERO PAR SIN BARRA BLANCO STD UND 1.00 6.09 6.09
TOTAL

TOALLERA DE LOSA BLANCA BARRA PLASTICA

Rendimiento: 1.00 pza/da


Unidad: pza
PAR TOALLERO C/BARRA LOSA BLANCA S PZA 1.00 6.09 6.09
TOTAL

TOALLERA DE LOSA DE COLOR BARRA PLASTICA

Rendimiento: 1.00 pza/da


Unidad: pza
PAR TOALLERO C/BARRA LOSA COLOR ST PZA 1.00 7.38 7.38
TOTAL

PAPELERA DE LOSA BLANCA

Rendimiento: 1.00 pza/da


Unidad: pza
PAPELERA DE EMPOTRAR LOSA C/EJE 15x PZA 1.00 7.80 7.80
TOTAL

PAPELERA DE LOSA DE COLOR

Rendimiento: 1.00 pza/da


Unidad: pza
PAPELERA DE EMPOTRAR LOSA C/EJE 15x PZA 1.00 9.88 9.88
TOTAL

INSTALACIONES DE APARATOS SANITARIOS

Instalacin de Aparatos Sanitarios

Rendimiento: 2.00 und/da


Unidad: und
CAPATAZ (E) HH 0.40 17.04 6.82
OPERARIO (E) HH 4.00 14.37 57.48
PEON (E) HH 2.00 11.40 22.80
HERRAMIENTAS % M.O. 3.00 87.10 2.61
TOTAL

Instalacin de Accesorios Sanitarios

Rendimiento: 10.00 und/da


Unidad: und
CAPATAZ (E) HH 0.08 17.04 1.36
OPERARIO (E) HH 0.80 14.37 11.50
PEON (E) HH 0.40 11.40 4.56
HERRAMIENTAS % M.O. 3.00 17.42 0.52
TOTAL
SISTEMA DE DESAGE Y VENTILACION

SALIDAS DE DESAGE

Salida de Desague PVC-SAL 4"

Rendimiento: 4.00 pto/da


Unidad: pto.
PEGAMENTO PVC LT. 0.03 156.96 4.71
TUBO PVC C/CAMPANA SAL 3M. 4" UND 0.35 24.15 8.45
CODOS PVC 90 SAL 4" UND 1.03 7.36 7.58
TRAMPA "P" (SAL) 4" UND 1.03 27.58 28.41
YEE PVC DESAGUE SAL 4" UND 1.03 11.35 11.69
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

SALIDA DE VENTILACION

Salida de Ventilacion PVC-SAL 2"

Rendimiento: 4.00 pto/da


Unidad: pto.
PEGAMENTO PVC LT. 0.03 156.96 4.71
TUBO PVC C/CAMPANA SAL 3M. 2" UND 1.00 9.34 9.34
CODOS PVC 90 SAL 2" UND 1.00 1.80 1.80
CODOS PVC 90 SAL 4" A 2" (VENTILAC.)UND 1.00 6.45 6.45
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

REDES DE DERIVACION

Tubera de PVC - SAL 2"

Rendimiento: 20.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.01 156.96 1.88
TUBO PVC C/CAMPANA SAL 3M. 2" UND 0.35 9.34 3.27
CAPATAZ (E) HH 0.04 17.89 0.72
OPERARIO (E) HH 0.40 15.22 6.09
PEON (E) HH 0.80 11.93 9.54
HERRAMIENTAS % M.O. 3.00 16.35 0.49
TOTAL

Tubera de PVC - SAL 3"

Rendimiento: 20.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.01 156.96 1.57
TUBO PVC C/CAMPANA SAL 3M. 3" UND 0.35 15.64 5.47
CAPATAZ (E) HH 0.04 17.89 0.72
OPERARIO (E) HH 0.40 15.22 6.09
PEON (E) HH 0.80 11.93 9.54
HERRAMIENTAS % M.O. 3.00 16.35 0.49
TOTAL

Tubera de PVC - SAL 4"

Rendimiento: 20.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.01 156.96 1.57
TUBO PVC C/CAMPANA SAL 3M. 4" UND 0.35 24.15 8.45
CAPATAZ (E) HH 0.04 17.89 0.72
OPERARIO (E) HH 0.40 15.22 6.09
PEON (E) HH 0.80 11.93 9.54
HERRAMIENTAS % M.O. 3.00 16.35 0.49
TOTAL

Tubera de PVC - SAL 6"

Rendimiento: 18.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.01 156.96 1.57
TUBO PVC DESAGUE SAL 6"x 5M UND 0.21 95.00 19.95
CAPATAZ H-H 0.04 17.89 0.79
OPERARIO H-H 0.44 15.22 6.76
PEON H-H 0.89 11.93 10.60
HERRAMIENTAS % M.O. 3.00 18.15 0.54
TOTAL

REDES COLECTORAS

Tuberia C.S.N. 6", Union Flexible


Rendimiento: 15.00 ml /da
Unidad: ml
TUBERIA C.S.N. 6" x 1, 00 m 50 Kg ML 1.05 14.81 15.55
CAPATAZ (E) HH 0.05 17.89 0.95
OPERARIO (E) HH 0.53 15.22 8.12
PEON (E) HH 1.07 11.93 12.73
HERRAMIENTAS % M.O. 3.00 21.80 0.65
TOTAL

Tuberia C.S.N. 8", Union Flexible

Rendimiento: 12.00 ml /da


Unidad: ml
TECLE DE 1 TON HM 1.33 4.00 5.32
TUBERIA C.S.N. 8" x 1,50 m 100 Kg ML 1.05 19.22 20.18
CAPATAZ (E) HH 0.07 17.89 1.19
OPERARIO (E) HH 0.67 15.22 10.15
PEON (E) HH 1.33 11.93 15.91
HERRAMIENTAS % M.O. 3.00 27.25 0.82
TOTAL

Tuberia C.S.N. 10", Union Flexible

Rendimiento: 10.00 ml /da


Unidad: ml
TECLE DE 1 TON HM 1.60 4.00 6.40
TUBERIA C.S.N. 10" x 1,50 m 145 Kg ML 1.05 27.83 29.22
CAPATAZ (E) HH 0.08 17.89 1.43
OPERARIO (E) HH 0.80 15.22 12.18
PEON (E) HH 1.60 11.93 19.09
HERRAMIENTAS % M.O. 3.00 32.70 0.98
TOTAL

ACCESORIOS DE DESAGE

Codo PVC Sal2" x 45

Rendimiento: 0.01 und/da


Unidad: und
PEGAMENTO PVC LT. 0.00 156.96 0.46
CODOS PVC 45 SAL 2" UND 1.05 1.80 1.89
TOTAL

Codo PVC Sal 4" x 90


Rendimiento: 8.00 und/da
Unidad: und
PEGAMENTO PVC LT. 0.00 156.96 0.46
CODOS PVC 90 SAL 2" UND 1.05 1.80 1.89
TOTAL

Codo PVC Sal 4" x 45

Rendimiento: 0.01 und/da


Unidad: und
PEGAMENTO PVC LT. 0.00 156.96 0.46
CODOS PVC 45 SAL 4" UND 1.05 6.47 6.79
TOTAL

Codo PVC Sal 4" x 90

Rendimiento: 0.01 und/da


Unidad: und
PEGAMENTO PVC LT. 0.00 156.96 0.46
CODOS PVC 90 SAL 4" UND 1.05 7.36 7.73
TOTAL

Codo PVC SAL 3" x 90

Rendimiento: 0.01 und/da


Unidad: und
PEGAMENTO PVC LT. 0.00 156.96 0.46
CODOS PVC 90 SAL 3" UND 1.00 4.17 4.17
TOTAL

Tee PVC SAL 2"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.00 156.96 0.46
TEE SANITARIA PVC DESAGUE SAL 2" UND 1.00 3.34 3.34
TOTAL

Tee PVC SAL 3"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.00 156.96 0.46
TEE SANITARIA PVC DESAGUE SAL 3" UND 1.00 5.23 5.23
TOTAL
Tee PVC SAL 4"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.00 156.96 0.46
TEE SANITARIA PVC DESAGUE SAL 4" UND 1.05 11.35 11.92
TOTAL

ADITAMIENTOS VARIOS

Sumidero de Bronce 2"

Rendimiento: 6.00 und/da


Unidad: und
TRAMPA "P" (SAL) 2" UND 1.00 6.71 6.71
SUMIDERO DE BRONCE DE 2 UND 1.00 5.93 5.93
CAPATAZ (E) HH 0.13 17.89 2.38
OPERARIO (E) HH 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL

Sumidero de Bronce 3"

Rendimiento: 6.00 und/da


Unidad: und
SUMIDERO BRONCE 3" UND 1.05 12.71 13.35
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL 0.00
0.00
Sumidero de Bronce 4" 0.00
0.00
Rendimiento: 6.00 und/da 0.00
Unidad: und 0.00
SUMIDERO DE BRONCE DE 4 UND 1.05 15.25 16.01
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL 0.00
0.00
Sumidero de Bronce Cromado 2" 0.00
0.00
Rendimiento: 6.00 und/da 0.00
Unidad: und 0.00
SUMIDERO BRONCE 2" CROMADO UND 1.05 7.63 8.01
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL 0.00
0.00
Sumidero de Bronce Cromado 3" 0.00
0.00
Rendimiento: 6.00 und/da 0.00
Unidad: und 0.00
SUMIDERO BRONCE 3" CROMADO UND 1.05 15.25 16.01
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL 0.00
0.00
Registro de Bronce Cromado 2" 0.00
0.00
Rendimiento: 6.00 und/da 0.00
Unidad: und 0.00
CINTA TEFLON UND 0.06 1.60 0.10
REGISTRO DE BRONCE CROMADO DE 2 UND 1.00 4.24 4.24
CAPATAZ (E) HH 0.13 17.89 2.38
OPERARIO (E) HH 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL 0.00
0.00
Registro de Bronce Cromado 3" 0.00
0.00
Rendimiento: 6.00 und/da 0.00
Unidad: und 0.00
REGISTRO ROSCADO DE BRONCE CROMADUND 1.05 6.78 7.12
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL 0.00
0.00
Registro de Bronce Cromado 4" 0.00
0.00
Rendimiento: 6.00 und/da 0.00
Unidad: und 0.00
REGISTRO ROSCADO DE BRONCE CROMADUND 1.05 10.17 10.68
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL 0.00
0.00
Registro de Bronce Roscado 2" 0.00
0.00
Rendimiento: 8.00 und/da 0.00
Unidad: und 0.00
CINTA TEFLON UND 0.06 1.60 0.10
TEE PVC CLASE 10(150) SP 2" UND 1.00 12.60 12.60
CODOS PVC 90 SAL 2" UND 1.00 1.80 1.80
REGISTRO DE BRONCE ROSCADO DE 2 UND 1.00 4.24 4.24
CAPATAZ (E) HH 0.10 17.89 1.79
OPERARIO (E) HH 1.00 15.22 15.22
HERRAMIENTAS % M.O. 3.00 17.01 0.51
TOTAL 0.00
0.00
Registro de Bronce Roscado de piso 3" 0.00
0.00
Rendimiento: 6.00 und/da 0.00
Unidad: und 0.00
REGISTRO ROSCADO DE BRONCE 3" UND 1.00 5.08 5.08
CODOS PVC 90SAL 3" UND 1.00 4.17 4.17
TEE SANITARIA PVC DESAGUE SAL 3" UND 1.00 5.23 5.23
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL 0.00
0.00
Registro de Bronce Roscado de piso 4" 0.00
0.00
Rendimiento: 6.00 und/da 0.00
Unidad: und 0.00
REGISTRO ROSCADO DE BRONCE 4" UND 1.00 8.47 8.47
CODOS PVC 90 SAL 4" UND 1.00 7.36 7.36
TEE SANITARIA PVC DESAGUE SAL 4" UND 1.00 11.35 11.35
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
PEON H-H 0.67 11.93 7.95
HERRAMIENTAS % M.O. 3.00 30.62 0.92
TOTAL 0.00
0.00
Sombrero de Ventilacin 2" PVC 0.00
0.00
Rendimiento: 25.00 und/da 0.00
Unidad: und 0.00
CABEZA VENTILACION PVC DESAGUE SAL UND 1.05 4.88 5.12
PEGAMENTO PVC LT. 0.01 156.96 1.57
CAPATAZ H-H 0.03 17.89 0.57
OPERARIO H-H 0.32 15.22 4.87
OFICIAL H-H 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL 0.00
0.00
Sombrero de Ventilacin 3" PVC 0.00
0.00
Rendimiento: 25.00 und/da 0.00
Unidad: und 0.00
CABEZA VENTILACION PVC DESAGUE SAL UND 1.05 7.69 8.07
PEGAMENTO PVC LT. 0.01 156.96 1.57
CAPATAZ H-H 0.03 17.89 0.57
OPERARIO H-H 0.32 15.22 4.87
OFICIAL H-H 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL

Sombrero de Ventilacin 4" PVC

Rendimiento: 25.00 und/da


Unidad: und
CABEZA VENTILACION PVC DESAGUE SAL UND 1.05 13.39 14.06
PEGAMENTO PVC LT. 0.01 156.96 1.57
CAPATAZ H-H 0.03 17.89 0.57
OPERARIO H-H 0.32 15.22 4.87
OFICIAL H-H 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL

CAJAS Y BUZONES DE REGISTRO

Caja de Registro 10"x20", Albailera, Tapa de Concreto

Rendimiento: 4.00 und/da


Unidad: und
CLAVOS 2" KG. 0.86 4.58 3.94
ARENA FINA M3 0.03 37.20 1.12
ARENA GRUESA M3 0.06 38.14 2.29
PIEDRA CHANCADA DE 1/2" M3 0.25 49.07 12.27
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 19.50
CEMENTO PORTLAND TIPO I BOL 1.50 14.29 21.44
AGUA M3 0.01 9.00 0.09
ACERO A-60 KG 10.00 3.62 36.20
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Caja de Registro 12"x24", Albailera, Tapa de Concreto

Rendimiento: 4.00 und/da


Unidad: und
CLAVOS 2" KG. 0.86 4.58 3.94
ARENA FINA M3 0.03 37.20 1.12
ARENA GRUESA M3 0.06 38.14 2.29
PIEDRA CHANCADA DE 1/2" M3 0.25 49.07 12.27
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 22.29
CEMENTO PORTLAND TIPO I BOL 1.50 14.29 21.44
AGUA M3 0.01 9.00 0.09
ACERO A-60 KG 10.00 3.62 36.20
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Caja de Registro 24"x24", Albailera, Tapa de Concreto

Rendimiento: 3.00 und/da


Unidad: und
CLAVOS 2" KG. 0.86 4.58 3.94
ARENA FINA M3 0.03 37.20 1.12
ARENA GRUESA M3 0.06 38.14 2.29
PIEDRA CHANCADA DE 1/2" M3 0.25 49.07 12.27
LADRILLO KING KONG 18H 9X13X23 MLL 0.05 557.14 27.86
CEMENTO PORTLAND TIPO I BOL 1.50 14.29 21.44
AGUA M3 0.01 9.00 0.09
ACERO A-60 KG 10.00 3.62 36.20
CAPATAZ (E) HH 0.27 17.89 4.77
OPERARIO (E) HH 2.67 15.22 40.59
PEON (E) HH 2.67 11.93 31.81
HERRAMIENTAS % M.O. 3.00 77.17 2.32
TOTAL

Caja de Registro 10"x20", Tapa de Fo. Fdo.


Rendimiento: 5.00 und/da
Unidad: und
CLAVOS 2" KG. 0.50 4.58 2.29
ARENA GRUESA M3 0.04 38.14 1.63
PIEDRA CHANCADA DE 1/2" M3 0.25 49.07 12.27
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 19.50
CEMENTO PORTLAND TIPO I BOL 1.50 14.29 21.44
AGUA M3 0.01 9.00 0.07
MARCO Y TAPA DE FIERRO FUNDIDO 10"xUND 1.00 20.45 20.45
CAPATAZ (E) HH 0.32 17.89 5.72
OPERARIO (E) HH 3.20 15.22 48.70
PEON (E) HH 1.20 11.93 14.32
HERRAMIENTAS % M.O. 3.00 68.74 2.06
TOTAL

Caja de Registro 12"x24",Tapa de Fo. Fdo.

Rendimiento: 5.00 und/da


Unidad: und
CLAVOS 2" KG. 0.50 4.58 2.29
ARENA GRUESA M3 0.04 38.14 1.63
PIEDRA CHANCADA DE 1/2" M3 0.25 49.07 12.27
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 22.29
CEMENTO PORTLAND TIPO I BOL 1.50 14.29 21.44
AGUA M3 0.01 9.00 0.07
MARCO Y TAPA DE FIERRO FUNDIDO 12"xUND 1.00 24.20 24.20
CAPATAZ (E) HH 0.32 17.89 5.72
OPERARIO (E) HH 3.20 15.22 48.70
PEON (E) HH 1.20 11.93 14.32
HERRAMIENTAS % M.O. 3.00 68.74 2.06
TOTAL

Caja Ciega de 10"x20"

Rendimiento: 4.00 und/da


Unidad: und
CLAVOS 2" KG. 0.86 4.58 3.94
ARENA FINA M3 0.03 37.20 1.12
ARENA GRUESA M3 0.06 38.14 2.29
PIEDRA CHANCADA DE 1/2" M3 0.25 49.07 12.27
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 22.29
CEMENTO PORTLAND TIPO I BOL 1.50 14.29 21.44
AGUA M3 0.01 9.00 0.09
ACERO A-60 KG 10.00 3.62 36.20
CAPATAZ H-H 0.20 17.89 3.58
OPERARIO H-H 2.00 15.22 30.44
PEON H-H 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Caja Ciega de 12"x 24"

Rendimiento: 4.00 und/da


Unidad: und
CLAVOS 2" KG. 0.86 4.58 3.94
ARENA FINA M3 0.03 37.20 1.12
ARENA GRUESA M3 0.06 38.14 2.29
PIEDRA CHANCADA DE 1/2" M3 0.25 49.07 12.27
LADRILLO KING KONG 18H 9X13X23 MLL 0.04 557.14 22.84
CEMENTO PORTLAND TIPO I BOL 1.50 14.29 21.44
AGUA M3 0.01 9.00 0.09
ACERO A-60 KG 10.00 3.62 36.20
CAPATAZ H-H 0.20 17.89 3.58
OPERARIO H-H 2.00 15.22 30.44
PEON H-H 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Caja Ciega de 24"x24"

Rendimiento: 3.00 und/da


Unidad: und
CLAVOS 2" KG. 0.86 4.58 3.94
ARENA FINA M3 0.03 37.20 1.12
ARENA GRUESA M3 0.06 38.14 2.29
PIEDRA CHANCADA DE 1/2" M3 0.25 49.07 12.27
LADRILLO KING KONG 18H 9X13X23 MLL 0.05 557.14 27.86
CEMENTO PORTLAND TIPO I BOL 1.50 14.29 21.44
AGUA M3 0.01 9.00 0.09
ACERO A-60 KG 10.00 3.62 36.20
CAPATAZ H-H 0.27 17.89 4.77
OPERARIO H-H 2.67 15.22 40.59
PEON H-H 2.67 11.93 31.81
HERRAMIENTAS % M.O. 3.00 77.17 2.32
TOTAL

Buzones de Desage Std.

Rendimiento: 0.50 und/da


Unidad: und
ACEITE MOTOR GASOLINERO MULTIGRADGAL 0.00 47.91 0.05
CLAVOS 2" KG. 2.69 4.58 12.32
ALAMBRE NEGRO N 8 KG. 1.75 4.58 8.02
ALAMBRE NEGRO N 16 KG. 0.63 4.58 2.89
ARENA GRUESA M3 1.05 38.14 40.05
PIEDRA CHANCADA DE 1/2" M3 1.57 49.07 77.04
CEMENTO PORTLAND TIPO I BOL 18.25 14.29 260.79
GASOLINA 84 OCTANOS GLN 0.04 10.05 0.40
ENCOFRADO METALICO P/BUZON UND 0.01 2.50 0.03
GRASA MULTIPLE EP LB 0.01 5.58 0.06
MADERA TORNILLO (LARGA) P2 14.70 2.93 43.07
TAPA DE C.R. P/BUZON 650 mm UND 1.00 119.70 119.70
ACERO A-60 KG 19.00 3.62 68.78
CAPATAZ H-H 1.60 17.89 28.62
OPERARIO H-H 16.00 15.22 243.52
OFICIAL H-H 5.28 13.23 69.85
PEON H-H 32.00 11.93 381.76
OPERADOR DE EQUIPO LIVIANO (E) HH 1.60 16.67 26.67
MEZCLADORA DE CONCRETO /TAMBOR 12HM 1.60 23.92 38.27
HERRAMIENTAS % M.O. 3.00 750.42 22.51
TOTAL

SISTEMA DE AGUA FRIA Y CONTAR INCENDIO

SALIDAS DE AGUA FRIA

Salida de Agua Fria PVC 1/2"

Rendimiento: 2.00 pto/da


Unidad: pto.
PEGAMENTO PVC LT. 0.02 156.96 3.14
TUBO PVC 5M. CLASE 10 TIPO R 1/2" UND 0.70 7.39 5.17
CODOS 90 PVC CLASE 10(150) RI 1/2" UND 3.00 1.21 3.63
TEE PVC CLASE 10(150) RI 1/2" UND 1.00 1.56 1.56
PEON H-H 2.00 11.93 23.86
CAPATAZ (E) HH 0.40 17.89 7.16
OPERARIO (E) HH 4.00 15.22 60.88
HERRAMIENTAS % M.O. 3.00 91.90 2.76
TOTAL

Salida de Agua Fria, Fo.Go. 1/2"

Rendimiento: 2.00 pto/da


Unidad: pto.
CINTA TEFLON UND 0.02 1.60 0.03
TUBO ACERO GALV.STANDAR ISO I 6.40M TUB 0.16 23.05 3.78
CODO DE ACERO GALV.ISO I 1/2x90 UND 2.00 1.03 2.06
TEE DE ACERO GALV. ISO I 1/2 UND 1.00 1.27 1.27
UNION SIMPLE ACERO GALV.TIPO ISO I 1/ UND 2.00 0.85 1.70
CAPATAZ (E) HH 0.40 17.89 7.16
OPERARIO (E) HH 4.00 15.22 60.88
HERRAMIENTAS % M.O. 3.00 68.04 2.04
TOTAL

REDES DE DISTRIBUCION

Tubera de PVC Clase 10 SP 1/2"

Rendimiento: 25.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.01 156.96 2.20
TUBO PVC 5M. CLASE 10 TIPO SP 1/2" UND 0.21 8.21 1.72
CAPATAZ (E) HH 0.03 17.89 0.57
OPERARIO (E) HH 0.32 15.22 4.87
OFICIAL (E) HH 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL

Tubera de PVC Clase 10 SP 3/4"

Rendimiento: 25.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.01 156.96 2.20
TUBO PVC 5M. CLASE 10 TIPO SP 3/4" UND 0.21 9.51 2.00
CAPATAZ (E) HH 0.03 17.89 0.57
OPERARIO (E) HH 0.32 15.22 4.87
OFICIAL (E) HH 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL

Tubera de PVC Clase 10 SP 1"

Rendimiento: 25.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.01 156.96 2.20
TUBO PVC 5M. CLASE 10 TIPO SP 1" UND 0.21 11.93 2.51
CAPATAZ (E) HH 0.03 17.89 0.57
OPERARIO (E) HH 0.32 15.22 4.87
OFICIAL (E) HH 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL

Tubera de PVC Clase 10 SP 1.1/2"

Rendimiento: 25.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.02 156.96 2.51
TUBO PVC 5M. CLASE 10 TIPO SP 1.1/2" UND 0.21 22.45 4.71
CAPATAZ (E) HH 0.03 17.89 0.57
OPERARIO (E) HH 0.32 15.22 4.87
OFICIAL (E) HH 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL

Tubera de PVC Clase 10 SP 2"

Rendimiento: 25.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.02 156.96 2.51
TUBO PVC 5M. CLASE 10 TIPO SP 2" UND 0.21 35.37 7.43
CAPATAZ (E) HH 0.03 17.89 0.57
OPERARIO (E) HH 0.32 15.22 4.87
OFICIAL (E) HH 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL

Tubera de PVC Clase 10 SP 2 1/2"

Rendimiento: 25.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.02 156.96 2.51
TUBO PVC 5M. CLASE 10 TIPO SP 2.1/2" UND 0.21 51.94 10.91
CAPATAZ (E) HH 0.03 17.89 0.57
OPERARIO (E) HH 0.32 15.22 4.87
OFICIAL (E) HH 0.32 13.23 4.23
HERRAMIENTAS % M.O. 3.00 9.67 0.29
TOTAL

Tubera de PVC Clase 10 SP 3"

Rendimiento: 22.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.02 156.96 2.83
TUBO PVC 5M. CLASE 10 TIPO SP 3" UND 0.21 83.93 17.63
CAPATAZ (E) HH 0.04 17.89 0.65
OPERARIO (E) HH 0.36 15.22 5.53
OFICIAL (E) HH 0.36 13.23 4.81
HERRAMIENTAS % M.O. 3.00 10.99 0.33
TOTAL

REDES DE ALIMENTACION

Tuberia de Asbesto-Cemento 4"

Rendimiento: 20.00 ml /da


Unidad: ml
TUB. ASB.CEM.C.A-10(10KG/CM2)4M.1 UND 0.26 75.31 19.77
CAPATAZ (E) HH 0.04 17.89 0.72
OPERARIO (E) HH 0.40 15.22 6.09
PEON (E) HH 0.80 11.93 9.54
HERRAMIENTAS % M.O. 3.00 16.35 0.49
TOTAL

Tuberia de Asbesto-Cemento 6"

Rendimiento: 20.00 ml /da


Unidad: ml
TUB. ASB.CEM.C.A-10(10KG/CM2)4M.1 UND 0.26 127.66 33.51
CAPATAZ (E) HH 0.04 17.89 0.72
OPERARIO (E) HH 0.40 15.22 6.09
PEON (E) HH 0.80 11.93 9.54
HERRAMIENTAS % M.O. 3.00 16.35 0.49
TOTAL

Tubera de PVC Clase 10 SP 4"

Rendimiento: 22.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.02 156.96 2.83
TUBO PVC 5M. CLASE 10 TIPO SP 4" UND 0.21 137.65 28.91
CAPATAZ (E) HH 0.04 17.89 0.65
OPERARIO (E) HH 0.36 15.22 5.53
OFICIAL (E) HH 0.36 13.23 4.81
HERRAMIENTAS % M.O. 3.00 10.99 0.33
TOTAL

Tubera de PVC Clase 10 SP 6"

Rendimiento: 20.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.02 156.96 2.83
TUBO PVC 5M. CLASE 10 TIPO SP 6" UND 0.21 303.32 63.70
CAPATAZ (E) HH 0.04 17.89 0.72
OPERARIO (E) HH 0.40 15.22 6.09
OFICIAL (E) HH 0.40 13.23 5.29
HERRAMIENTAS % M.O. 3.00 12.10 0.36
TOTAL

Tubera de PVC Clase 10 SP 8"

Rendimiento: 18.00 ml /da


Unidad: ml
PEGAMENTO PVC LT. 0.02 156.96 2.83
TUBO PVC 5M. CLASE 10 TIPO SP 8" UND 0.21 513.34 107.80
CAPATAZ (E) HH 0.04 17.89 0.79
OPERARIO (E) HH 0.44 15.22 6.76
OFICIAL (E) HH 0.44 13.23 5.88
HERRAMIENTAS % M.O. 3.00 13.43 0.40
TOTAL

SISTEMA DE DESAGE Y VENTILACION

ACCESORIOS DE REDES

Unin Universal de Fo.Galv. 1/2"

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
UNION UNIVERSAL ACERO GALV. 1/2" UND 1.00 3.39 3.39
TOTAL

Unin Universal de Fo. Galv. 3/4"

Rendimiento: 10.00 UND/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
UNION UNIVERSAL ACERO GALV. 3/4" UND 1.00 5.08 5.08
TOTAL

Unin Universal de Fo.Galv. 1"

Rendimiento: 10.00 und/da


Unidad; und
CINTA TEFLON UND 0.02 1.60 0.03
UNION UNIVERSAL ACERO GALV. 1" UND 1.00 7.20 7.20
TOTAL

Unin Universal Acero Galv. 1 1/2"

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
UNION UNIVERSAL ACERO GALV. 1 1/2" UND 1.00 14.41 14.41
TOTAL

Unin Universal de Fo. Galv. 2"

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
UNION UNIVERSAL ACERO GALV. 2" UND 1.00 20.34 20.34
TOTAL

Unin Universal PVC P/Agua Fra D=1/2"

Rendimiento: 10.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION UNIVERSAL PVC AGUA S.P. 1/2" UND 1.00 4.24 4.24
TOTAL

Unin Universal PVC P/Agua Fra D=3/4"

Rendimiento: 10.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION UNIVERSAL PVC P/AGUA FRIA D=3 UND 1.00 5.08 5.08
TOTAL

Unin Universal PVC P/Agua Fra D=1"

Rendimiento: 10.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION UNIVERSAL PVC P/AGUA FRIA D=1 UND 1.00 7.63 7.63
TOTAL

Unin Simple Roscada PVC P/Agua D=1/2"


Rendimiento: 20.00 und/da
Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
UNION UNIVERSAL PVCINYECTADA ROSCA UND 1.00 0.83 0.83
TOTAL

Unin Simple Roscada PVC P/Agua D=3/4"

Rendimiento: 20.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
UNION PVC AGUA INYECTADA ROSCADO 3 UND 1.00 0.80 0.80
TOTAL

Unin Simple Roscada PVC P/Agua D=1"

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
UNION PVC AGUA INYECTADA ROSCADO 1 UND 1.00 0.90 0.90
TOTAL

Unin Simple Roscada PVC P/Agua D=1 1/2"

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
UNION PVC AGUA INYECTADA ROSCADO 1 UND 1.00 3.46 3.46
TOTAL

Unin Simple Presin 1/2" para Agua

Rendimiento: 20.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION PVC AGUA DOBLE CAMPANA S.P. 1 UND 1.00 0.83 0.83
TOTAL

Unin Simple Presin 3/4" PVC para Agua

Rendimiento: 15.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION PVC AGUA DOBLE CAMPANA S.P.3/ UND 1.00 1.21 1.21
TOTAL
Unin Simple Presin 1" PVC para Agua

Rendimiento: 10.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION PVC AGUA DOBLE CAMPANA S.P.1 UND 1.00 1.62 1.62
TOTAL

Unin Simple Presin 1/2" PVC para Agua

Rendimiento: 10.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION PVC AGUA DOBLE CAMPANA S.P.1/ UND 1.00 3.83 3.83
TOTAL

Unin Simple Presin 2" PVC para Agua

Rendimiento: 10.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION PVC AGUA DOBLE CAMPANA S.P.2 UND 1.00 6.22 6.22
TOTAL

Unin Simple Presin 2 1/2" PVC para Agua

Rendimiento: 10.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
UNION PVC AGUA DOBLE CAMPANA S.P.2 UND 1.00 12.89 12.89
TOTAL

Codo Fo.Galv. 1/2" x 45

Rencimiento: 20.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV.TIPO ISO I 1/2" 45 UND 1.00 1.27 1.27
TOTAL

Codo Fo. Galv. 1/2" x d =90

Rendimiento: 20.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV. TIPO ISO I 1/2 x90 UND 1.00 0.85 0.85
TOTAL

Codo Fo.Galv. 3/4" x d=45

Rendimiento: 15.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV. TIPO I 3/4" x45 UND 1.00 2.12 2.12
TOTAL

Codo Fo.Galv 3/4 x d=90

Rendimiento: 15.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV.TIPO ISO I 3/4" x 90 UND 1.00 1.69 1.69
TOTAL

Codo Fo. Galv. 1" x d=45

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV. TIPO ISO I 1"x 45 UND 1.00 2.97 2.97
TOTAL

Codo Fo. Galv. 1" x d=90

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV. TIPO I 1"x 90 UND 1.00 2.54 2.54
TOTAL

Codo Fo. Galv. 1 1/2" x 45

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV.TIPO ISO I 1 1/2" x45 UND 1.00 6.78 6.78
TOTAL

Codo Fo.Galv. 1 1/2" x 90


Rendimiento: 10.00 und/da
Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV. TIPO ISO I 1/2" x 90 UND 1.00 5.51 5.51
TOTAL

Codoo Fo. Galv. 2" x 45

Rendimiento: 10.00 und /da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV.TIPO ISO I 2" x 45 UND 1.00 9.32 9.32
TOTAL

Codo Fo. Galv. 2" x 90

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV. TIPOP ISO I 2" x 90 UND 1.00 8.05 8.05
TOTAL

Codo Fo. Galv. 2 1/2" x 45

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV. TIPO ISO I 2" x 90 UND 1.00 8.22 8.22
TOTAL

Codo Fo. Galv. 2 1/2" x 90

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
CODO ACERO GALV.TIPO ISO I 2 1/2" x 90 UND 1.00 8.00 8.00
TOTAL

Codo PVC Agua C-10 1/2"

Rendimiento: 20.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
CODO PVC AGUA DOBLE CAMPANA S.P.1/2 UND 1.00 1.21 1.21
TOTAL

Codo PVC Agua C-10 3/4"

Rendimiento: 15.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
CODO PVC AGUA DOBLE CAMPANA S.P.3/4 UND 1.00 2.12 2.12
TOTAL

Codo PVC Agua C-10 1"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
CODO PVC AGUA DOBLE CAMP. S.P.1 1/2" UND 1.00 3.13 3.13
TOTAL

Codo PVC Agua C-10 1 1/2"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
CODO PVC AGUA DOBLE CAMPANA S.P.1" UND 1.00 4.81 4.81
TOTAL

Codo PVC Agua Doble Campana S.P.2"x90

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.01 156.96 1.57
CODO PVC AGUA DOBLE CAMPANA S.P.2" UND 1.00 8.85 8.85
TOTAL

Tee Fo. Galv. 1/2" Unin Roscada

Rendimiento: 20.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
TEE ACERO GALV. TIPO ISO I 1/2" UND 1.00 1.27 1.27
TOTAL

Tee Fo. Galv. 3/4" Unin Roscada

Rendimiento: 15.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
TEE ACERO GALV. TIPO ISO I 3/4" UND 1.00 2.12 2.12
TOTAL

Tee Fo.Galv.1" Unin Roscada

Rendimiento: 8.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
TEE ACERO GALV. TIPO ISO I 1" UND 1.00 2.97 2.97
TOTAL

Tee Fo.Galv. 1 1/4" Unin Roscada

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
TEE ACERO GALV. TIPO ISO I 1 1 /4" UND 1.00 5.51 5.51
TOTAL

Tee Fo. Galv. 1 1/2" Unin Roscada

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
TEE ACERO GALV. TIPO ISO I 1 1/2" UND 1.00 6.78 6.78
TOTAL

Tee Fo. Galv. 2" Unin Roscada

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
TEE ACERO GALV. TIPO ISO I 2" UND 1.00 10.17 10.17
TOTAL

Tee Fo. Galv. 2" Unin Roscada

Rendimiento: 10.00 und/da


Unidad: und
CINTA TEFLON UND 0.02 1.60 0.03
TEE ACERO GALV. TIPO ISO I 2" UND 1.00 10.17 10.17
TOTAL
Tee PVC Agua C-10 1/2"

Rendimiento: 20.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.02 156.96 3.14
TEE PVC AGUA S.P. 1/2" UND 1.00 1.51 1.51
TOTAL

Tee PVC Agua C--10 3/4"

Rendimiento: 15.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.02 156.96 3.14
TEE PVC AGUA S.P. 3/4" UND 1.00 2.74 2.74
TOTAL

Tee PVC Agua C-100 1"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.02 156.96 3.14
TEE PVC AGUA S.P. 1" UND 1.00 4.19 4.19
TOTAL

Tee PVC Agua C-100 1 1/4"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.02 156.96 3.14
TEE PVC AGUA S.P. 1 1/4" UND 1.00 5.75 5.75
TOTAL

Tee PVC Agua C-10 1 1/2"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.02 156.96 3.14
TEE PVC AGUA S.P. 1 1/2" UND 1.00 6.46 6.46
TOTAL

Tee PVC Agua C-10 2"

Rendimiento: 8.00 und/da


Unidad: und
PEGAMENTO PVC LT. 0.02 156.96 3.14
TEE PVC AGUA S.P. 2" UND 1.00 12.18 12.18
TOTAL

LLAVES, VALVULAS

Vlvula de Compuerta Pesada Bronce 1/2"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
UNION UNIVERSAL ACERO GALV. 1/2" UND 2.00 3.39 6.78
NIPLE ACERO GALV. ISO I 1/2" x 1 1/4" UND 2.00 0.68 1.36
VALVULA COMP. BRONCE 1/2" UND 1.00 11.87 11.87
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula de Compuerta Pesada Bronce 1"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
UNION UNIVERSAL ACERO GALV. 3/4" UND 2.00 5.08 10.16
NIPLE ACERO GALV.ISO-I 3/4"x 1 1/4" UND 2.00 0.68 1.36
VALVULA COMP. BRONCE 3/4 UND 1.00 16.12 16.12
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula de Compuerta Pesada Bronce 1"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
UNION UNIVERSAL ACERO GALV. 1" UND 2.00 7.20 14.40
NIPLE ACERO GALV.ISO-I 1"x 1 1/2" UND 2.00 1.02 2.04
VALVULA COMPUERTA PESADA BRONCE 25 UND 1.00 20.54 20.54
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula de Compuerta Bronce 1 1/4"

Rendimiento: 5.00 und/da


Unidad: und
CINTA TEFLON UND 2.00 1.60 3.20
UNION UNIVERSAL ACERO GALV. 1 1/4" UND 2.00 10.17 20.34
NIPLE ACERO GALV.ISO-I 1 1/4" x 1 1/2" UND 2.00 1.27 2.54
VALVULA COMP. PESADA BRONCE 250LB 1 UND 1.00 30.87 30.87
CAPATAZ H-H 0.16 17.89 2.86
OPERARIO H-H 1.60 15.22 24.35
OFICIAL H-H 0.80 13.23 10.58
HERRAMIENTAS % M.O. 3.00 37.79 1.13
TOTAL

Vlvula de Compuerta Pes. Bronce 1 1/2"

Rendimiento: 5.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
UNION UNIVERSAL ACERO GALV. 1 1/2" UND 2.00 14.41 28.82
NIPLE ACERO GALV. ISO-I 1 1/2" x 2" UND 2.00 1.95 3.90
VALVULA COM. PESADA BRONCE 250LB 1 UND 1.00 39.50 39.50
CAPATAZ H-H 0.16 17.89 2.86
OPERARIO H-H 1.60 15.22 24.35
OFICIAL H-H 0.80 13.23 10.58
HERRAMIENTAS % M.O. 3.00 37.79 1.13
TOTAL

Vlvula de Compuerta Pesada Bronce 2"

Rendimiento: 5.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
UNION UNIVERSAL ACERO GALV. 2" UND 2.00 20.34 40.68
NIPLE ACERO GALV.ISO-I 2" x 2 1/2" UND 2.00 2.58 5.16
VALVULA COM.PESADA BRONCE 250LB 2" UND 1.00 55.98 55.98
CAPATAZ H-H 0.16 17.89 2.86
OPERARIO H-H 1.60 15.22 24.35
OFICIAL H-H 0.80 13.23 10.58
HERRAMIENTAS % M.O. 3.00 37.79 1.13
TOTAL

Vlvula de Compuerta Pes. Bronce 2 1/2"


Rendimiento: 4.00 und/da
Unidad: und
CINTA TEFLON UND 0.25 1.60 0.40
UNION UNIVERSAL ACERO GALV.2 1/2" UND 3.01 38.14 114.80
NIPLE ACERO GALV.ISO-I 2 1/2" x 3" UND 2.00 4.52 9.04
VALVULA COMP.PESADA BRONCE 250LB 2 UND 1.00 100.65 100.65
CAPATAZ H-H 0.20 17.89 3.58
OPERARIO H-H 2.00 15.22 30.44
OFICIAL H-H 1.00 13.23 13.23
HERRAMIENTAS % M.O. 3.00 47.25 1.42
TOTAL

Vlvula Check de Bronce de 1/2"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
TARRAJA MANUAL HM 1.33 4.01 5.33
UNION UNIVERSAL ACERO GALV. 1/2" UND 1.00 3.39 3.39
NIPLE ACERO GALV. ISO I 1/2" x 1 1/4" UND 1.00 0.68 0.68
VALVULA CHECK HORIZONTAL BRONCE 1/ UND 1.00 17.33 17.33
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 1.33 13.23 17.64
HERRAMIENTAS % M.O. 3.00 40.31 1.21
TOTAL

Vlvula Check de Bronce de 3/4"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
TARRAJA MANUAL HM 1.33 4.01 5.33
UNION UNIVERSAL ACERO GALV. 3/4" UND 1.00 5.08 5.08
NIPLE ACERO GALV.ISO-I 3/4"x 1 1/4" UND 1.00 0.68 0.68
VALVULA CHECK HORIZONTAL BRONCE 3/ UND 1.00 25.31 25.31
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Check de Bronce de 1"


Rendimiento: 6.00 und/da
Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
TARRAJA MANUAL HM 1.33 4.01 5.33
UNION UNIVERSAL ACERO GALV. 1" UND 1.00 7.20 7.20
NIPLE ACERO GALV.ISO-I 1"x 1 1/2" UND 1.00 1.02 1.02
VALVULA CHECK HORIZONTAL BRONCE 1" UND 1.00 28.68 28.68
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Check de Bronce de 1 1/4"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
TARRAJA MANUAL HM 1.33 4.01 5.33
UNION UNIVERSAL ACERO GALV. 1 1/4" UND 1.00 10.17 10.17
NIPLE ACERO GALV.ISO-I 1 1/4" x 1 1/2" UND 1.00 1.27 1.27
VALVULA CHECK HORIZONTAL BRONCE 1" UND 1.00 52.16 52.16
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Check de Bronce 1 1/2"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
TARRAJA MANUAL HM 1.33 4.01 5.33
UNION UNIVERSAL ACERO GALV. 1 1/2" UND 1.00 14.41 14.41
NIPLE ACERO GALV. ISO-I 1 1/2" x 2" UND 1.00 1.95 1.95
VALVULA CHECK HORIZONTAL BRONCE 1 1 UND 1.00 61.77 61.77
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Check de Bronce de 2"


Rendimiento: 6.00 und/da
Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
TARRAJA MANUAL HM 1.33 4.01 5.33
UNION UNIVERSAL ACERO GALV. 2" UND 1.00 20.34 20.34
NIPLE ACERO GALV.ISO-I 2" x 2 1/2" UND 1.00 2.58 2.58
VALVULA CHECK HORIZONTAL BRONCE 2" UND 1.00 101.30 101.30
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Check Horizontal Bronce 2 1/2"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
TARRAJA MANUAL HM 1.33 4.01 5.33
UNION UNIVERSAL ACERO GALV.2 1/2" UND 1.00 38.14 38.14
NIPLE ACERO GALV.ISO-I 2 1/2" x 3" UND 1.00 4.52 4.52
VALVULA CHECK HORIZONTAL BRONCE 2 1 UND 1.00 221.65 221.65
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Flotador 1/2"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
VALVULA FLOTADOR C/BOLLA COBR 150LB UND 1.00 18.60 18.60
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Flotador 3/4"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
VALVULA FLOTADOR C/BOLLA COBRE150LB UND 1.00 29.10 29.10
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Flotador 1"

Rendimiento: 6.00 und/da


Unidada: und
CINTA TEFLON UND 0.10 1.60 0.16
VALVULA FLOTADOR C/BOLLA COBRE150LB UND 1.00 44.15 44.15
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Flotador 1 1/4"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
VALV. FLOTADOR C/BOLLA COBRE150LB 1 UND 1.00 94.83 94.83
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Flotador 2"

Rendimiento: 6.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
VALV. .FLOTADOR C/BOLLA COBRE 150LB 2 UND 1.00 166.77 166.77
CAPATAZ H-H 0.13 17.89 2.38
OPERARIO H-H 1.33 15.22 20.29
OFICIAL H-H 0.67 13.23 8.82
HERRAMIENTAS % M.O. 3.00 31.49 0.94
TOTAL

Vlvula Angular de 1 1/2" Bronce 300 PSI U


Rendimiento: 4.00 und/da
Unidad: und
CINTA TEFLON UND 0.25 1.60 0.40
UNION UNIVERSAL ACERO GALV.2 1/2" UND 3.01 38.14 114.80
NIPLE ACERO GALV.ISO-I 2 1/2" x 3" UND 2.00 4.52 9.04
VALVULA ANGULAR BRONCE UL/FM 1 1/2" UND 1.00 139.32 139.32
CAPATAZ H-H 0.20 17.89 3.58
OPERARIO H-H 2.00 15.22 30.44
OFICIAL H-H 1.00 13.23 13.23
HERRAMIENTAS % M.O. 3.00 47.25 1.42
TOTAL

Vlvula Angular de 2 1/2"Bronce 300PSI UL/F

Rendimiento: 4.00 und/da


Unidad: und
CINTA TEFLON UND 0.25 1.60 0.40
UNION UNIVERSAL ACERO GALV.2 1/2" UND 3.01 38.14 114.80
NIPLE ACERO GALV.ISO-I 2 1/2" x 3" UND 2.00 4.52 9.04
VALV. ANGULAR BRONCE UL/FM 2 1/2" 30 UND 1.00 278.64 278.64
CAPATAZ H-H 0.20 17.89 3.58
OPERARIO H-H 2.00 15.22 30.44
OFICIAL H-H 1.00 13.23 13.23
HERRAMIENTAS % M.O. 3.00 47.25 1.42
TOTAL

Vlvula Siamesa 4"x 2 1/2"x 2 1/2" T Poste

Rendimiento: 1.00 und/da


Unidad: und
VALV.SIAMESA BRONCE 42x2 1 /2"x 2 1/2" UND 1.00 731.43 731.43
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 8.00 11.93 95.44
HERRAMIENTAS % M.O. 5.00 231.51 11.58
TOTAL

Vlvula Siamesa 4"x2 1/2"x 2 1/2" T Pared

Rendimiento: 2.00 und/da


Unidad: und
VALV.SIAMESA BRONCE 4"x2 1/2"x 2 1/2" UND 1.00 661.77 661.77
CAPATAZ H-H 0.40 17.89 7.16
OPERARIO H-H 4.00 15.22 60.88
PEON H-H 2.00 11.93 23.86
HERRAMIENTAS % M.O. 5.00 91.90 4.60
TOTAL

Llave de Riego con Grifo de 1/2"

Rendimiento: 4.00 und/da


Unidad: und
CINTA TEFLON UND 0.10 1.60 0.16
LLAVE P/JARDIN ESFERICA CROMADA 1/2" UND 1.00 14.91 14.91
CAPATAZ H-H 0.20 17.89 3.58
OPERARIO H-H 2.00 15.22 30.44
HERRAMIENTAS % M.O. 5.00 34.02 1.70
TOTAL

PIEZAS VARIAS

Caja Prefabricada

Rendimiento: 4.00 und/da


Unidad: und
CAJA CONCRETO P/MEDIDOR DE AGUA 1/2 UND 1.00 17.22 17.22
CAPATAZ H-H 0.20 17.89 3.58
OPERARIO H-H 2.00 15.22 30.44
PEON H-H 1.00 11.93 11.93
HERRAMIENTAS % M.O. 3.00 45.95 1.38
TOTAL

Gabinete 80x60x18cm c/manguera poly. 1 1/2" x 30 m

Rendimiento: 1.00 und/da


Unidad: und
Pitn Policarbonato1 1/2" UL/FM und 1.00 69.66 69.66
Manguera Polyester con acoples 1 1/2" 3 und 1.00 348.30 348.30
Portamanguera met,circ.p/manguera c in und 1.00 139.22 139.22
Gabinete met.agua c/incendio 80x60x18 und 1.00 208.98 208.98
VALVULA ANGULAR BRONCE UL/FM 1 1/2" UND 1.00 139.32 139.32
NIPLE DE ENSAMBLAJE BRONCE 1 1/2" R UND 1.00 52.25 52.25
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
OFICIAL H-H 4.00 13.23 52.92
HERRAMIENTAS % M.O. 5.00 188.99 9.45
TOTAL

Gabinete 80x60x18cm c/mang. Nitrilo 1 1/2" x 30 m


Rendimiento: 1.00 und/da
Unidad: und
Pitn Policarbonato1 1/2" UL/FM und 1.00 69.66 69.66
Portamanguera met,circ.p/manguera c in und 1.00 139.22 139.22
Manguera Nitrilo con Acoples 1 1/2" 30 und 1.00 661.77 661.77
Gabinete met.agua c/incendio 80x60x18 und 1.00 208.98 208.98
VALVULA ANGULAR BRONCE UL/FM 1 1/2" UND 1.00 139.32 139.32
NIPLE DE ENSAMBLAJE BRONCE 1 1/2" R UND 1.00 52.25 52.25
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
OFICIAL H-H 4.00 13.23 52.92
HERRAMIENTAS % M.O. 5.00 188.99 9.45
TOTAL

ALMACENAMIENTO DE AGUA Y OTRAS INSTALACIONES

Cisternas - Accesorios 1"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC 5M. CLASE 10 TIPO SP 1" UND 2.00 11.93 23.86
VALVULA COMPUERTA PESADA BRONCE 25 UND 2.00 20.54 41.08
VALVULA CHECK HORIZONTAL BRONCE 1" UND 1.00 52.16 52.16
VALVULA FLOTADOR C/BOLLA COBRE150LB UND 1.00 44.15 44.15
VALVULA DE PIE BRONCE 1" UND 1.00 23.73 23.73
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

Cisternas - Accesorios 1 1/4"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC AGUA SP CLASE 10 1 1/4"x5m UND 2.00 18.39 36.78
VALVULA COMP. PESADA BRONCE 250LB 1 UND 2.00 30.87 61.74
VALV. FLOTADOR C/BOLLA COBRE150LB 1 UND 1.00 94.83 94.83
VALVULA DE PIE BRONCE 1 1/4" UND 1.00 38.14 38.14
VALVULA CHECK HORIZONTAL BRONCE 1 1 UND 1.00 52.16 52.16
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

Cisternas - Accesorios 1 1/2"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC 5M. CLASE 10 TIPO R 1.1/2" UND 2.00 24.93 49.86
VALVULA COM. PESADA BRONCE 250LB 1 UND 2.00 39.50 79.00
VALVULA CHECK HORIZONTAL BRONCE 1 1 UND 1.00 61.77 61.77
VALVULA DE PIE BRONCE 1 1/2" UND 1.00 46.61 46.61
VALVULA FLOT. C/BOLLA COBRE 150LB 1 1 UND 1.00 137.28 137.28
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

Cisternas - Accesorios 2"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC 5M. CLASE 10 TIPO SP 2" UND 2.00 35.37 70.74
VALVULA COM.PESADA BRONCE 250LB 2" UND 2.00 55.98 111.96
VALVULA CHECK HORIZONTAL BRONCE 2" UND 1.00 101.30 101.30
VALV. .FLOTADOR C/BOLLA COBRE 150LB 2 UND 1.00 166.77 166.77
VALVULA DE PUE BRONCE 2" UND 1.00 67.80 67.80
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 2.00 183.79 3.68
TOTAL

Tanques Eternit 1,0 m3

Rendimiento: 4.00 und/da


Unidad: und
TANQUE POLIETILENO PERDURIT C/ACCE1 UND 1.00 248.07 248.07
TAPA P/TANQUE POLIETILENO PERDURIT UND 1.00 90.21 90.21
CAPATAZ H-H 0.20 17.89 3.58
OPERARIO H-H 2.00 15.22 30.44
PEON H-H 1.00 11.93 11.93
HERRAMIENTAS % M.O. 3.00 45.95 1.38
TOTAL

Tanques -Accesorios 1/2"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC 5M. CLASE 10 TIPO SP 1/2" UND 2.00 8.21 16.42
UNION PVC CLASE 10(150) SP 1/2" UND 1.00 4.24 4.24
VALVULA COMP. BRONCE 1/2" UND 2.00 11.87 23.74
VALVULA CHECK HORIZONTAL BRONCE 1/ UND 1.00 17.33 17.33
VALVULA FLOTADOR C/BOLLA COBR 150LB UND 1.00 18.60 18.60
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

Tanques- Accesorios 3/4"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC 5M. CLASE 10 TIPO SP 3/4" UND 2.00 9.51 19.02
UNION PVC CLASE 10(150) SP 3/4" UND 1.00 5.08 5.08
VALVULA COMP. BRONCE 3/4 UND 2.00 16.12 32.24
VALVULA CHECK HORIZONTAL BRONCE 3/ UND 1.00 25.31 25.31
VALVULA FLOTADOR C/BOLLA COBRE150LB UND 1.00 29.10 29.10
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

Tanques-accesorios 1"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC 5M. CLASE 10 TIPO SP 1" UND 2.00 11.93 23.86
UNION PVC CLASE 10(150) SP 1" UND 1.00 7.63 7.63
VALVULA COMPUERTA PESADA BRONCE 25 UND 2.00 20.54 41.08
VALVULA CHECK HORIZONTAL BRONCE 1" UND 1.00 28.68 28.68
VALVULA FLOTADOR C/BOLLA COBRE150LB UND 1.00 44.15 44.15
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

Tanques - Accesorios 1 1/4"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC AGUA SP CLASE 10 1 1/4"x 5M UND 2.00 19.01 38.02
UNION UNIVERSAL PVC AGUA ROSCADO 1 UND 1.00 7.75 7.75
VALVULA COMP. PESADA BRONCE 250LB 1 UND 2.00 30.87 61.74
VALV. FLOTADOR C/BOLLA COBRE150LB 1 UND 1.00 94.83 94.83
VALVULA CHECK HORIZONTAL BRONCE 1 1 UND 1.00 52.16 52.16
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

Tanques - Accesorios 1 1/2"

Rendimiento: 1.00 und/da


Unidad: und 0.00
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC 5M. CLASE 10 TIPO SP 1.1/2" UND 2.00 22.45 44.90
UNION UNIVERSAL PVC AGUA ROSCADO 1 UND 1.00 13.15 13.15
VALVULA COM. PESADA BRONCE 250LB 1 UND 2.00 39.50 79.00
VALVULA CHECK HORIZONTAL BRONCE 1 1 UND 1.00 61.77 61.77
VALVULA FLOT. C/BOLLA COBRE 150LB 1 1 UND 1.00 137.28 137.28
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

Tanques - Accesorios 2"

Rendimiento: 1.00 und/da


Unidad: und
PEGAMENTO PARA TUBO PVC GAL 0.01 156.96 1.57
TUBO PVC 5M. CLASE 10 TIPO SP 2" UND 2.00 35.37 70.74
UNION UNIVERSAL PVC AGUA ROSCADO 2 UND 1.00 30.97 30.97
VALVULA COM.PESADA BRONCE 250LB 2" UND 2.00 55.98 111.96
VALVULA CHECK HORIZONTAL BRONCE 2" UND 1.00 101.30 101.30
VALV. .FLOTADOR C/BOLLA COBRE 150LB 2 UND 1.00 166.77 166.77
CAPATAZ H-H 0.80 17.89 14.31
OPERARIO H-H 8.00 15.22 121.76
PEON H-H 4.00 11.93 47.72
HERRAMIENTAS % M.O. 3.00 183.79 5.51
TOTAL

SISTEMA DE AGUA CALIENTE

SALIDAS DE AGUA CALIENTE

Salida de Agua Caliente, CPVC 1/2"

Rendimiento: 2.00 pto/da


Unidad: pto.
PEGAMENTO P/TUBO CPVC GAL 0.04 286.67 11.47
CODO DE ACERO GALV.ISO I 1/2x90 UND 1.00 1.03 1.03
TUBO CPVC S/CAMP. 5M x 1/2" TUB 0.50 25.75 12.88
TEE CPVC CAMPANA S/P 1/2" UND 1.00 1.21 1.21
CODO CPVC 90 CAMPANA S/P 1/2" UND 2.00 0.77 1.54
CAPATAZ (E) HH 0.40 17.89 7.16
OPERARIO (E) HH 4.00 15.22 60.88
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 91.90 2.76
TOTAL

Tubo CPVC p/Agua Caliente D=1/2"

Rendimiento: 25.00 ml/da


Unidad: ml
PEGAMENTO P/TUBO CPVC GAL 0.04 286.67 11.47
TUBO CPVC S/CAMP. 5M x 1/2" TUB 0.21 25.75 5.41
UNION CPVC UNIVERSAL 1/2" UND 0.21 0.80 0.17
CAPATAZ H-H 0.03 17.89 0.57
OPERARIO H-H 0.32 15.22 4.87
PEON H-H 0.16 11.93 1.91
HERRAMIENTAS % M.O. 3.00 7.35 0.22
TOTAL

Tubo CPVC p/Agua Caliente D=3/4"

Rendimiento: 25.00 m /da


Unidad: ml
PEGAMENTO P/TUBO CPVC GAL 0.04 286.67 11.47
TUBO CPVC S/CAMP. 5M x 3/4" TUB 0.21 46.66 9.80
UNION CPVC UNIVERSAL 3/4" UND 0.21 1.00 0.21
CAPATAZ H-H 0.03 17.89 0.57
OPERARIO H-H 0.32 15.22 4.87
PEON H-H 0.16 11.93 1.91
HERRAMIENTAS % M.O. 3.00 7.35 0.22
TOTAL

INSTALACIONES ELECTRICAS

Tablero de Distribucin Caja Metlica 18

Rendimiento: 1.50 und/da


Unidad: und
TABLERO ELECTRICO GABINETE METAL BA UND 1.00 241.24 241.24
CAPATAZ H-H 0.53 17.89 9.54
OPERARIO H-H 5.33 15.22 81.17
PEON H-H 2.67 11.93 31.81
HERRAMIENTAS % M.O. 3.00 122.52 3.68
TOTAL

SALIDAS DE TECHO (CENTROS)

Salida de Techo, PVC-SEL Cable TW 12

Rendimiento: 5.00 pto/da


Unidad: pto.
CABLE TW 12 AWG ml 9.00 3.33 29.97
INTERRUPTOR SIMPLE PZA 1.05 7.81 8.20
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
CINTA AISLANTE ELECTRICA UND 0.10 2.54 0.25
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.16 17.89 2.86
OPERARIO (E) HH 1.60 15.22 24.35
PEON (E) HH 1.60 11.93 19.09
HERRAMIENTAS % M.O. 3.00 46.30 1.39
TOTAL

Salida de Techo, PVC-SEL Cable TW 14

Rendimiento: 5.00 pto/da


Unidad: pto.
CABLE TW 14 AWG ml 9.00 2.02 18.18
INTERRUPTOR SIMPLE PZA 1.05 7.81 8.20
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.16 17.89 2.86
OPERARIO (E) HH 1.60 15.22 24.35
PEON (E) HH 1.60 11.93 19.09
HERRAMIENTAS % M.O. 3.00 46.30 1.39
TOTAL

SALIDAS DE PARED (BRAQUETES)

Salida de Pared, PVC-SEL Cable TW 12

Rendimiento: 5.00 pto/da


Unidad: pto.
CABLE TW 12 AWG ml 9.00 3.33 29.97
INTERRUPTOR SIMPLE PZA 1.05 7.81 8.20
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.16 17.89 2.86
OPERARIO (E) HH 1.60 15.22 24.35
PEON (E) HH 1.60 11.93 19.09
HERRAMIENTAS % M.O. 3.00 46.30 1.39
TOTAL

Salida de Pared, PVC-SEL Cable TW 14

Rendimiento: 5.00 pto/da


Unidad: pto.
CABLE TW 14 AWG ml 9.00 2.02 18.18
INTERRUPTOR SIMPLE PZA 1.05 7.81 8.20
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.16 17.89 2.86
OPERARIO (E) HH 1.60 15.22 24.35
PEON (E) HH 1.60 11.93 19.09
HERRAMIENTAS % M.O. 3.00 46.30 1.39
TOTAL

SALIDAS PARA SPOT-LIGHT

Salida para Spot Light, PVC-SEL Cable TW 12

Rendimiento: 5.00 pto/da


Unidad: pto.
CABLE TW 12 AWG ml 9.00 3.33 29.97
INTERRUPTOR SIMPLE PZA 1.05 7.81 8.20
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.16 17.89 2.86
OPERARIO (E) HH 1.60 15.22 24.35
PEON (E) HH 1.60 11.93 19.09
HERRAMIENTAS % M.O. 3.00 46.30 1.39
TOTAL

Salida para Spot Light, PVC-SEL Cable TW 14

Rendimiento: 5.00 pto/da


Unidad: pto.
CABLE TW 14 AWG ml 9.00 2.02 18.18
INTERRUPTOR SIMPLE PZA 1.05 7.81 8.20
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.16 17.89 2.86
OPERARIO (E) HH 1.60 15.22 24.35
PEON (E) HH 1.60 11.93 19.09
HERRAMIENTAS % M.O. 3.00 46.30 1.39
TOTAL

SALIDAS DE CONMUTACION

Salida p/Luz de Conmutacin, PVC-SEL

Rendimiento: 4.00 pto/da


Unidad: pto.
CABLE TW 12 AWG ml 16.00 3.33 53.28
INTERRUPTOR CONMUTABLE SIMPLE PZA 2.10 4.40 9.24
CAJA DE PASE RECTANGULAR 58X93MM PZA 2.10 0.82 1.72
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Salida p/Luz de Conmutacin, PVC-SEL

Rendimiento: 4.00 pto/da


Unidad: pto.
CABLE TW 14 AWG ml 16.00 2.02 32.32
INTERRUPTOR CONMUTABLE SIMPLE PZA 2.10 4.40 9.24
CAJA DE PASE RECTANGULAR 58X93MM PZA 2.10 0.82 1.72
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

SALIDAS PARA TOMACORRIENTE

Salida Tomacorriente Simple, PVC-SEL Cable TW 12

Rendimiento: 4.00 pto/da


Unidad: pto.
CABLE TW 12 AWG ml 9.00 3.33 29.97
TOMACORRIENTE SIMPLE UNIVERSAL 2 P PZA 1.05 4.65 4.88
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Salida Tomacorriente Simple, PVC-SEL Cable TW 14

Rendimiento: 4.00 pto/da


Unidad: pto.
CABLE TW 14 AWG ml 9.00 2.02 18.18
TOMACORRIENTE SIMPLE UNIVERSAL 2 P PZA 1.05 4.65 4.88
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Salida Tomacorriente Doble, PVC-SEL Cable TW 12

Rendimiento: 4.00 pto/da


Unidad: pto.
CABLE TW 12 AWG ml 16.00 3.33 53.28
TOMACORRIENTE DOBLE UNIVERSAL 2 PO PZA 1.05 6.27 6.58
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Salida Tomacorriente Doble, PVC-SEL Cable TW 14

Rendimiento: 4.00 pto/da


Unidad: pto.
CABLE TW 14 AWG ml 16.00 2.02 32.32
TOMACORRIENTE DOBLE UNIVERSAL 2 PO PZA 1.05 6.27 6.58
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 3.00 0.82 2.46
UNIONES PVC SEL 3/4" UND 1.00 0.55 0.55
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

SALIDAS PARA CALENTADOR

Salida para calentador, PVC-SEL Cable TW 12

Rendimiento: 4.00 pto/da


Unidad: pto.
CABLE TW 12 AWG ml 9.00 3.33 29.97
INTERRUPTOR C/FUSIBLE LAMINA2PX30A PZA 1.05 27.56 28.94
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 2.50 2.75 6.88
CURVA PVC SEL 3/4" UND 1.00 0.82 0.82
UNIONES PVC SEL 3/4" UND 2.00 0.55 1.10
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Salida para calentador, PVC-SAP Cable TW 12

Rendimiento: 4.00 pto/da


Unidad: pto.
CABLE TW 12 AWG ml 9.00 3.33 29.97
INTERRUPTOR C/FUSIBLE LAMINA2PX30A PZA 1.05 27.56 28.94
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SAP 3/4" UND 2.50 6.32 15.80
CURVA PVC SAP 3/4" UND 1.00 2.99 2.99
UNIONES PVC SAP 3/4" UND 2.00 1.25 2.50
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

SALIDAS DE FUERZA

Salida para Cocina, PVC-SEL

Rendimiento: 6.00 pto/da


Unidad: pto.
CABLE TW 10 AWG ml 27.00 5.01 135.27
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.00 0.82 0.82
TUBO PVC 3M. SEL 1" UND 3.00 4.36 13.08
CURVA PVC SEL 1" UND 1.00 1.13 1.13
UNIONES PVC SEL 1" UND 2.00 0.73 1.46
CONEXION A CAJA SEL 1" UND 2.00 0.73 1.46
CAPATAZ (E) HH 0.13 17.89 2.38
OPERARIO (E) HH 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL

Salida para Cocina, PVC-SAP

Rendimiento: 6.00 pto/da


Unidad: pto.
CABLE TW 10 AWG ml 27.00 5.01 135.27
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.00 0.82 0.82
TUBO PVC 3M. SAP 1" UND 3.00 7.96 23.88
CURVA PVC SAP 1" UND 1.00 4.36 4.36
UNIONES PVC SAP 1" UND 2.00 1.68 3.36
CONEXION A CAJA SAP 1" UND 2.00 1.13 2.26
CAPATAZ (E) HH 0.13 17.89 2.38
OPERARIO (E) HH 1.33 15.22 20.29
HERRAMIENTAS % M.O. 3.00 22.67 0.68
TOTAL

Salida de Fuerza hasta 5 hp, PVC-SAP

Rendimiento: 1.50 pto/da


Unidad: pto.
CABLE TW 2.5 MM2 ml 10.50 2.48 26.04
CABLE TW 4.0 MM2 ml 21.01 3.90 81.94
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.00 0.82 0.82
TUBO PVC 3M. SAP 1" UND 3.30 7.96 26.27
CURVA PVC SAP 1" UND 2.00 4.36 8.72
UNIONES PVC SAP 1" UND 2.00 1.68 3.36
CONEXION A CAJA SAP 1" UND 2.00 1.13 2.26
CAPATAZ (E) HH 0.53 17.89 9.54
OPERARIO (E) HH 5.33 15.22 81.17
PEON (E) HH 2.67 11.93 31.81
HERRAMIENTAS % M.O. 3.00 122.52 3.68
TOTAL

Salida de Fuerza hasta 105 hp, PVC-SAP

Rendimiento: 1.50 pto/da


Unidad: pto.
CABLE TW 10 AWG ml 38.00 5.01 190.38
CABLE TW 4.0 MM2 ml 12.50 3.90 48.75
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.00 0.82 0.82
TUBO PVC 3M. SAP 1" UND 3.30 7.96 26.27
CURVA PVC SAP 1" UND 2.00 4.36 8.72
UNIONES PVC SAP 1" UND 2.00 1.68 3.36
CONEXION A CAJA SAP 1" UND 2.00 1.13 2.26
CAPATAZ (E) HH 0.53 17.89 9.54
OPERARIO (E) HH 5.33 15.22 81.17
PEON (E) HH 2.67 11.93 31.81
HERRAMIENTAS % M.O. 3.00 122.52 3.68
TOTAL

COMUNICACIONES Y SEALES

Salida para Telfono Directo, PVC-SAP

Rendimiento: 3.00 pto/da


Unidad: pto.
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SAP 3/4" UND 2.00 6.32 12.64
CURVA PVC SAP 3/4" UND 1.00 2.99 2.99
UNIONES PVC SAP 3/4" UND 2.00 1.25 2.50
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.27 17.89 4.77
OPERARIO (E) HH 2.67 15.22 40.59
PEON (E) HH 2.67 11.93 31.81
HERRAMIENTAS % M.O. 3.00 77.17 2.32
TOTAL

Salida para Telfono Interno, PVC-SAP

Rendimiento: 3.00 pto/da


Unidad: pto.
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SAP 3/4" UND 2.00 6.32 12.64
CURVA PVC SAP 3/4" UND 1.00 2.99 2.99
UNIONES PVC SAP 3/4" UND 2.00 1.25 2.50
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.27 17.89 4.77
OPERARIO (E) HH 2.67 15.22 40.59
PEON (E) HH 2.67 11.93 31.81
HERRAMIENTAS % M.O. 3.00 77.17 2.32
TOTAL

Salida para Antenas de Radio, PVC-SEL

Rendimiento: 3.00 pto/da


Unidad: pto.
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
CURVA PVC SEL 3/4" UND 1.00 0.82 0.82
UNIONES PVC SEL 3/4" UND 2.00 0.55 1.10
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.27 17.89 4.77
OPERARIO (E) HH 2.67 15.22 40.59
PEON (E) HH 2.67 11.93 31.81
HERRAMIENTAS % M.O. 3.00 77.17 2.32
TOTAL

Salida para Antenas de TV, PVC-SEL

Rendimiento: 4.00 pto/da


Unidad: pto.
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SEL 3/4" UND 1.50 2.75 4.13
CURVA PVC SEL 3/4" UND 1.00 0.82 0.82
UNIONES PVC SEL 3/4" UND 2.00 0.55 1.10
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.20 17.89 3.58
OPERARIO (E) HH 2.00 15.22 30.44
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 57.88 1.74
TOTAL

Salida para Timbre, PVC-SAP No incluye Cable

Rendimiento: 2.00 pto/da


Unidad: pto.
CAJA DE PASE RECTANGULAR 58X93MM PZA 1.05 0.82 0.86
TUBO PVC 3M. SAP 3/4" UND 6.00 6.32 37.92
CURVA PVC SAP 3/4" UND 2.00 2.99 5.98
UNIONES PVC SAP 3/4" UND 2.00 1.25 2.50
CONEXION A CAJA SEL 3/4" UND 2.00 0.55 1.10
CAPATAZ (E) HH 0.40 17.89 7.16
OPERARIO (E) HH 4.00 15.22 60.88
PEON (E) HH 2.00 11.93 23.86
HERRAMIENTAS % M.O. 3.00 91.90 2.76
TOTAL

Pozo Conexin a Tierra

Rendimiento: 0.60 pto/da


Unidad: pto.
ARENA GRUESA M3 0.04 38.14 1.53
TIERRA DE CHACRA M3 1.40 26.27 36.78
PIEDRA CHANCADA DE 3/4 M3 0.06 33.50 2.10
GRAPAS KG 0.50 7.00 3.50
CEMENTO PORTLAND TIPO I BOL 0.51 14.29 7.32
TUBO PVC 3M. SAP 1" UND 5.00 7.96 39.80
CURVA PVC SAP 1" UND 2.00 4.36 8.72
CABLE DE COBRE DESNUDO DURO 6 AWG ml 10.00 0.78 7.80
MARCO Y TAPA DE CPNCRETO REFORZAD UND 1.00 33.40 33.40
VARILLA DE COBRE d=5/8" de 2.5 CM UND 1.00 102.21 102.21
CAPATAZ H-H 1.33 17.89 23.85
OPERARIO H-H 13.33 15.22 202.93
OFICIAL H-H 13.33 13.23 176.40
HERRAMIENTAS % M.O. 3.00 403.18 12.10
TOTAL
S

SUBTOTAL

20.71

323.07
0.05
343.83

9.42

116.42
5.82
27.04
158.70
1333.26

683.54
136.71
2153.50

2.57
0.13
2.70

0.51

1.50
2.01
1.28

1.15

0.28
2.70

0.07

7.80

1.11
8.97

349.44
17.47
366.91
419.33
20.97
440.30

141.37

132.85
274.22

9.62

5.51
15.13

174.72
8.74
183.46

262.08
7.86
269.94

17.47
0.52
17.99

23.30
0.70
24.00

13.10
0.39
13.49

7.49
0.22
7.71
8.74
0.26
9.00

5.24
0.16
5.40

2.62
0.13
2.75

13.74
0.69
14.43

3.66
0.11
3.77

21.98
1.10
23.08

38.87
1.17
40.04

5.49
0.16
5.66

0.52
0.02
0.54
1.05
0.03
1.08

0.20
1.19
1.39

0.39
2.39
2.78

0.40

15.01
15.40

0.58
26.62
27.19

1.08

5.64
6.72

26.21
0.79
26.99

30.03
0.90
30.93

34.94
1.05
35.99
61.54

24.04
85.58

73.85

28.85
102.71

29.98
1.50
31.48

34.94
1.75
36.69
41.93
2.10
44.03

68.11

28.56
96.67

80.13

33.60
113.73

1.08

14.98
0.75
16.81
1.08

17.95

8.89
27.92

1.08

13.81

5.80
20.69

1.08

8.83

3.92
13.83

0.61

3.42
0.17
4.20
0.45

1.93

1.45
3.83

17.47
0.87
18.34

0.51

16.55
17.06

0.82

28.17
28.98
18.92

50.15
69.07

18.69

41.26
59.96

23.37

51.57
74.94

86.18
48.59

9.11
143.88

84.63

48.68

10.09
143.40

75.62

48.59

4.88
129.08
12.01

18.39
0.55
30.95

116.17

48.68

9.11
173.97
10.56

15.30

2.68
28.54

14.54

22.94

4.02
41.50

4.03
12.15

2.52
18.70

4.58

12.15

2.52
19.25

93.48

48.14

9.09
150.71
83.14

48.14

9.10
140.38

75.41

48.14

9.10
132.63
105.86

101.42

18.99
226.27

78.53

100.29

18.96
197.78

11.60

14.49
0.44
5.95
32.48

86.77

80.98

10.85
178.60

162.38

89.45

19.84
271.67
182.39

89.45

19.84
291.68

7.59

38.24
1.91
47.74
9.60

8.28

1.94
19.82

8.09

8.28

1.95
18.31

12.30
9.41

2.21
23.92

11.04

9.41

2.21
22.66

3.12

1.16

0.06
4.32
3.12

0.93

0.10
4.14

3.12

0.77

0.04
3.93

3.12

0.66

0.03
3.81
161.42

53.77

11.85
227.03

183.23

53.77

11.85
248.85
193.14

53.77

11.85
258.76

8.70

11.59
0.35
9.20
29.84

163.51
57.90

10.90
232.31

183.52

57.90

10.90
252.32

194.95

57.90
10.90
263.75

227.58

57.90

10.90
296.38

12.49

16.56
0.50
9.20
38.76
163.29

72.37

13.62
233.93

183.24

72.37

13.62
269.24
194.68

72.37

13.62
280.67

8.45

23.19
0.70
8.40
40.74

163.48

110.88
22.41
296.77

183.49

110.88

22.41
316.78

194.92

110.88

22.41
328.21

227.79

110.88

22.41
361.08

11.60

14.49
0.44
5.95
32.48

206.55
13.94

1.05
221.53

212.16

13.93

1.05
227.14

225.93

13.94

1.05
240.91

233.58

13.94
1.05
248.56

246.84

13.93

1.05
261.82

260.61

13.94

1.05
275.59

283.56

13.93

1.05
298.54
206.55

13.94

1.05
221.53

212.16

13.94

1.05
227.14

225.93

13.93

1.05
240.91
233.58

13.93

1.05
248.56

246.84

13.94

1.05
261.82

260.61

13.93

1.05
275.59

283.56
13.93

1.05
298.54

206.55

12.87

0.97
220.38

212.16

12.87

0.97
225.99

225.93
12.87

0.97
239.76

233.58

12.87

0.97
247.41

246.84

12.87

0.97
260.67

260.61

12.87

0.97
274.44

283.56

12.87

0.97
297.39

206.55

26.51

1.87
234.93

212.16

26.50

1.87
240.53
225.93

26.50

1.87
254.30

233.58

26.50

1.87
261.95

246.84

26.50

1.87
275.21
260.61

26.11

1.86
288.58

283.56

26.50

1.87
311.93

239.55

33.45

2.51
275.51

245.16
33.45

2.51
281.12

258.93

33.45

2.51
294.89

266.58

33.45

2.51
302.54

279.84
33.45

2.51
315.80

293.61

33.45

2.51
329.57

316.56

33.45

2.51
352.52

239.55
27.88

2.09
269.52

245.16

27.88

2.09
275.13

258.93

27.88

2.09
288.90

266.58
27.88

2.09
296.55

279.84

27.88

2.09
309.81

293.61

27.88

2.09
323.58

316.56
27.88

2.09
346.53

239.55

13.93

1.05
254.53

245.16

13.94

1.05
260.14

258.93
13.93

1.05
273.91

266.58

13.93

1.05
281.56

279.84

13.93

1.05
294.82

293.61
13.93

1.05
308.59

316.56

13.94

1.05
331.54

239.55

13.94

1.05
254.53

245.16
13.93

1.05
260.14

258.93

13.94

1.05
273.91

266.58

13.93

1.05
281.56

275.00
13.93

1.05
289.98

293.61

13.93

1.05
308.59

316.56

13.93

1.05
331.54

239.55
13.94

1.05
254.53

245.16

13.93

1.05
260.14

258.93

13.93

1.05
273.91

266.58
13.93

1.05
281.56

279.84

13.93

1.05
294.82

293.61

13.93

1.05
308.59

316.56
13.93

1.05
331.54

239.55

27.88

2.09
269.52

245.16

27.88

2.09
275.13

258.93
27.88

2.09
288.90

266.58

27.88

2.09
296.55

279.84

27.88

2.09
309.81

293.61
27.88

2.09
323.58

316.56

27.88

2.09
346.53

48.79

27.01
0.81
76.61
27.09

18.41
0.55
46.06

19.78

15.84
0.48
36.09

49.99

27.01
0.81
77.80

27.63

18.41
0.55
46.60

20.09

15.84
0.48
36.40

52.68
34.84
1.05
88.57

28.82

24.89
0.75
54.45

20.81

19.35
0.58
40.74
52.96

34.84
1.05
88.84

29.22

24.89
0.75
54.85

21.03

19.35
0.58
40.97
83.24

31.38
0.94
115.57

42.92

25.17
0.76
68.85

23.95

21.77
0.65
46.38

84.74

31.38
0.94
117.06

44.11

25.17
0.76
70.04

24.17
21.77
0.65
46.60

92.00

43.55
1.31
136.86

47.70

31.67
0.95
80.32
25.54

24.89
0.75
51.17

93.14

43.55
1.31
137.99

48.18

31.67
0.95
80.80
25.69

24.89
0.75
51.32

41.82

31.67
1.58
75.08

23.04

19.35
0.97
43.36
17.20

15.15
0.76
33.11

42.82

31.67
1.58
76.07

23.51

19.35
0.97
43.83
22.49

15.15
0.76
38.39

39.76

31.67
1.58
73.02

22.30

19.35
0.97
42.62

17.02

15.15
0.76
32.93

27.97

21.77
0.65
50.40

27.96
17.42
0.52
45.90

23.81

17.42
0.52
41.75

36.12

29.03
0.87
66.02

24.09
17.42
0.52
42.03

22.56

17.42
0.52
40.50

40.09

34.84
1.05
75.97
4.25

10.89
0.54
15.69

3.24

10.58
0.53
14.35

4.05

13.23
0.66
17.94
3.59

10.58
0.53
14.70

4.51

13.23
0.66
18.40

3.24

16.70
0.84
20.78
3.24

13.23
0.66
17.12

4.05

15.87
0.79
20.71

3.59

13.23
0.66
17.48

4.51

15.87
0.79
21.17

3.24

21.16
1.06
25.46
3.15

17.63
0.88
21.66

3.96

22.67
1.13
27.76

7.93
0.24
8.17
3.15

24.41
1.22
28.78

3.96

31.74
1.59
37.28

8.81
0.26
9.08

2.23

6.89
0.34
1.12

4.59
0.23
5.94

0.72
3.04
0.15
3.91

0.20
3.83
0.19
4.22

0.78

8.81
0.44
10.03
0.78

10.58
0.53
11.88

7.93
0.24
8.17

6.57
0.20
6.76
4.21

19.84
0.99
25.04

4.52

19.84
0.99
25.35

4.11

19.84
0.99
24.94
7.28

10.36

2.43
20.07

8.52

12.95

3.04
24.51

9.46
19.39
0.97
29.82

4.89

12.44
0.37
17.71

28.79

17.42
0.87
47.08

31.17

14.52
0.73
46.42

33.85

12.44
0.62
46.92

23.90

14.52
0.73
39.14

30.56

12.44
0.62
43.62
41.30

4.35
0.13
45.79

38.99

4.35
0.13
43.48

49.28

4.35
0.13
53.77
21.57

39.67
1.19
62.43

16.80

39.67
1.19
57.67

21.57

39.67
1.19
62.43
22.31

21.77

1.66
45.75

24.21

21.77

1.66
47.65

20.59

21.77

1.66
44.02

26.67

21.77
1.66
50.11

31.73

5.97
37.70

53.41

5.81
59.22

5.16

13.55
0.41
19.12
11.52

13.55
0.41
25.47

11.52

15.81
0.47
27.80

21.57
39.67
1.19
62.43

16.80

39.67
1.19
57.67

21.57

39.67
1.19
62.43

21.87
39.67
1.19
62.73

33.55

39.67
1.19
74.41

33.55

39.67
1.19
74.41

35.17
39.67
1.19
76.03

30.47

39.67
1.19
71.33

61.53

39.67
1.19
102.40
58.94

39.67
1.19
99.80

79.53

39.67
1.19
120.39

55.83

39.67
1.19
96.69
74.22

39.67
1.19
115.08

58.13

39.67
1.19
98.99

76.77

39.67
1.19
117.63
0.31

7.26
0.22
7.78

0.62

8.71
0.26
9.59

0.74

9.41
0.28
10.43

0.93

10.25
0.31
11.48

0.64

7.26
0.22
8.11

0.92

7.92
0.24
9.07

1.28

8.71
0.26
10.25
1.52

9.41
0.28
11.22

1.92

10.25
0.31
12.47

11.26

8.81
0.26
20.34
10.21

8.81
0.26
19.29

4.19

0.77
0.02
4.99

13.45

0.77
0.02
14.25

5.79
4.35
0.13
10.28

7.60

4.35
0.13
12.09

7.15

4.35
0.13
11.64

13.94

4.35
0.13
18.42
3.08

14.41
0.72
18.21

12.82

7.09
0.35
20.27

1.95

15.55
0.47
17.97
16.16

15.55
0.47
32.18

17.19

15.55
0.78
33.51

24.23

10.99
0.55
35.77
22.39

10.99
0.55
33.93

23.23

10.99
0.55
34.77

58.19

15.55
0.47
74.20
32.90

24.89
1.24
59.03

42.35

19.73
0.59
62.67

55.24

84.11

15.39
154.74

61.43

84.11

15.39
160.93

66.24

84.11

8.39
158.74
72.43

84.11

8.39
164.93

81.11

115.94

14.61
211.65

119.75

96.93

11.72
228.39
8.31

4.98
0.15
13.44

10.38

4.98
0.15
15.51

14.60

5.81
0.17
20.58
19.00

5.81
0.17
24.98

13.19

4.98
0.15
18.32

18.79

5.81
0.17
24.77
24.56

5.81
0.17
30.54

41.47

43.55

2.19
87.20

9.72

29.03
0.87
39.63
12.30

29.03
0.87
42.20

14.93

29.03
0.87
44.83

19.37

29.03
0.87
49.27
126.56

10.89
0.33
137.78

101.29

10.89
0.33
112.50

166.79

10.89
0.33
178.00
110.64

10.89
0.33
121.86

0.03
3.08

85.53

103.08

36.69
225.31
36.57

103.08

36.69
176.34

79.45

137.44

51.67
268.56

56.39

82.46

31.00
169.86

60.02
27.47

5.02
92.52

51.45

27.47

5.02
83.95

32.92

36.63
3.66
73.21

13.64

36.63
3.66
53.93
64.26

43.96
4.40
112.61

37.69

34.84
5.23
77.75

2.26

5.93
0.18
8.36
2.68

5.93
0.18
8.78

4.19

5.93
0.18
10.29

27.81

32.15
0.96
60.92

23.44

32.15
0.96
56.55
25.63

32.15
0.96
58.74

31.01

8.89
0.44
40.34

2.10

2.23
0.07
4.39

2.63

2.45
0.07
5.15

3.15
4.40
0.13
7.68

5.25

5.49
0.16
10.91

0.48

3.21
0.10
3.79

2.71

5.14
0.15
8.01
4.67

5.14
0.15
9.97

5.90

9.18
0.28
15.36

7.81

12.44
0.37
20.63
0.48

5.14
0.15
5.77

2.71

4.29
0.21
7.21

4.40

4.29
0.13
8.81

0.74

2.90
0.09
3.73

0.37

2.90
0.09
3.36

0.27

2.90
0.09
3.26

2.88

9.68
0.29
12.85
6.95

43.55
1.31
51.80

1.99

17.42
0.52
19.94

1.41

8.71
0.26
10.38

1.37
8.71
0.26
10.34

4.50

8.71
0.26
13.47

0.74

6.43
0.19
7.36

0.28

6.43
0.19
6.90
201.19
201.19

377.42
377.42

195.70
195.70

232.49
232.49

463.47
463.47

149.61
149.61

260.86
260.86
323.58
323.58

314.40
314.40

241.07
241.07

508.91
508.91
225.75
225.75

5.01
5.01

6.90
6.90

8.73
8.73

8.99
8.99

6.09
6.09
6.09
6.09

7.38
7.38

7.80
7.80

9.88
9.88

87.10
2.61
89.71

17.42
0.52
17.94
60.84

57.88
1.74
120.45

22.30

57.88
1.74
81.91

5.15
16.35
0.49
21.99

7.04

16.35
0.49
23.88

10.02

16.35
0.49
26.86

21.52

18.16
0.54
40.23
15.55

21.80
0.65
38.00

25.50

27.25
0.82
53.57

35.62

32.70
0.98
69.30

2.35
2.35
2.35
2.35

7.25
7.25

8.18
8.18

4.63
4.63

3.80
3.80

5.69
5.69
12.37
12.37

12.64

22.68
0.68
36.00

13.35

22.68
0.68
36.70

16.01

22.68
0.68
39.37
8.01

22.68
0.68
31.37

16.01

22.68
0.68
39.37

4.34

22.68
0.68
27.69

7.12

22.68
0.68
30.48

10.68

22.68
0.68
34.04

18.74

17.01
0.51
36.26

14.48

22.68
0.68
37.84

27.18

30.63
0.92
58.73
6.69

9.68
0.29
16.66

9.64

9.68
0.29
19.61

15.63

9.68
0.29
25.60
96.84

57.88
1.74
156.45

99.62

57.88
1.74
159.24

105.19

77.17
2.32
184.68
77.64

68.74
2.06
148.45

84.18

68.74
2.06
154.98

99.62
57.88
1.74
159.24

100.18

57.88
1.74
159.79

105.19

77.17
2.32
184.68
633.18

750.43

60.78
1444.40

13.50

91.90
2.76
108.16
8.84

68.04
2.04
78.92

3.92

9.68
0.29
13.89

4.19

9.68
0.29
14.16

4.70

9.68
0.29
14.67

7.23

9.68
0.29
17.19

9.94

9.68
0.29
19.91

13.42

9.68
0.29
23.39

20.45
11.00
0.33
31.78

19.77

16.35
0.49
36.61

33.51

16.35
0.49
50.35

31.73

11.00
0.33
43.06
66.52

12.10
0.36
78.98

110.63

13.44
0.40
124.47

3.42
3.42

5.11
5.11
7.23
7.23

14.44
14.44

20.37
20.37

5.81
5.81

6.65
6.65

9.20
9.20
0.86
0.86

0.83
0.83

0.93
0.93

3.49
3.49

2.40
2.40

2.78
2.78
3.19
3.19

5.40
5.40

7.79
7.79

14.46
14.46

1.30
1.30
0.88
0.88

2.15
2.15

1.72
1.72

3.00
3.00

2.57
2.57

6.81
6.81
5.54
5.54

9.35
9.35

8.08
8.08

8.25
8.25

8.03
8.03

2.78
2.78

3.69
3.69

4.70
4.70

6.38
6.38

10.42
10.42

1.30
1.30
2.15
2.15

3.00
3.00

5.54
5.54

6.81
6.81

10.20
10.20

10.20
10.20
4.65
4.65

5.88
5.88

7.33
7.33

8.89
8.89

9.60
9.60
15.32
15.32

20.17

31.50
0.94
52.61

27.80

31.50
0.94
60.24

37.14

31.50
0.94
69.58

56.95

37.80
1.13
95.88

72.38

37.80
1.13
111.31

101.98

37.80
1.13
140.91
224.89

47.25
1.42
273.56

26.89

40.32
1.21
68.42

36.56

31.50
0.94
69.01
42.39

31.50
0.94
74.84

69.09

31.50
0.94
101.54

83.62

31.50
0.94
116.07
129.71

31.50
0.94
162.16

269.80

31.50
0.94
302.25

18.76

31.50
0.94
51.20
29.26

31.50
0.94
61.70

44.31

31.50
0.94
76.75

94.99

31.50
0.94
127.43

166.93

31.50
0.94
199.37
263.56

47.25
1.42
312.23

402.88

47.25
1.42
451.55

731.43

231.51
11.58
974.52

661.77

91.90
4.60
758.26

15.07

34.02
1.70
50.79

17.22

45.95
1.38
64.55

957.73

188.99
9.45
1156.17
1271.20

188.99
9.45
1469.64

186.55

183.79
5.51
375.86

285.22

183.79
5.51
474.53

376.09

183.79
5.51
565.40

520.14

183.79
3.68
707.61

338.28

45.95
1.38
385.61

81.90

183.79
5.51
271.21

112.32

183.79
5.51
301.63

146.97
183.79
5.51
336.28

256.07

183.79
5.51
445.38

337.67

183.79
5.51
526.98
483.31

183.79
5.51
672.62

28.12

91.90
2.76
122.77

17.04

7.35
0.22
24.61
21.48

7.35
0.22
29.05

241.24

122.53
3.68
367.44

47.52

46.30
1.39
95.21
35.48

46.30
1.39
83.17

47.27

46.30
1.39
94.96

35.48
46.30
1.39
83.17

47.27

46.30
1.39
94.96

35.48

46.30
1.39
83.17
72.48

57.88
1.74
132.09

51.52

57.88
1.74
111.13

43.95
57.88
1.74
103.56

32.16

57.88
1.74
91.77

68.96

57.88
1.74
128.57
48.00

57.88
1.74
107.61

69.66

57.88
1.74
129.28

82.16

57.88
1.74
141.77

153.22

22.68
0.68
176.58

169.95

22.68
0.68
193.31

149.41
122.53
3.68
275.61

280.56

122.53
3.68
406.76

20.09

77.17
2.32
99.58
20.09

77.17
2.32
99.58

3.88

77.17
2.32
83.37

8.01

57.88
1.74
67.62
48.36

91.90
2.76
143.01

243.15

403.19
12.10
658.43
ANALISIS DE PRECIOS UNITARIOS EN CARRETER
DESCRIPCION HOMBRES UNIDAD

OBRAS PRELIMINARES

Trazo, Replanteo y Control Topogrfico durante la obra

Rendimiento: 0.04 km /da


Unidad: km
CLAVOS 3" KG.
YESO (25 KG.) BOL
MADERA TORNILLO (LARGA) P2
ESMALTE SINTET.PINTOR BLANCO Y COLORES GLN
CAPATAZ 0.100 H-H
OFICIAL 1.000 H-H
PEON 3.000 H-H
TOPOGRAFO (E) 1.000 HH
MIRA TOPOGRAFICA 1.000 Hra
JALON 2.000 Hra
TEODOLITO 1.000 Hra
HERRAMIENTAS % M.O.
TOTAL

Demolicin de Estructuras (no incl. eliminacin)

Rendimiento: 60.00 m3 /da


Unidad: m3
PUNTA DE ACERO HEXAGONAL UND
CAPATAZ 0.500 H-H
OPERARIO 1.000 H-H
OFICIAL 2.000 H-H
PEON 4.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
COMPRESORA NEUMATICA 87 HP 250-330 PCM 2.000 HM
MARTILLO MEUMATICO 21-24 KG 4.000 HM
RETROEXCAVADORA S/LLANTAS 58 HP 1.O Y3 1.000 HM
CIZALLA A PALANCA P/VARILLA DE ACERO 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Desbroce y Limpieza
Rendimiento: 0.64 ha/da
Unidad: ha
CAPATAZ 1.000 H-H
PEON 8.000 H-H
OPERADOR DE EQUIPO PESADO (C) 1.500 HH
CARGADOR FRONTAL SOBRE LLANTAS 125-155 HP 3.0 Y3 0.500 HM
TRACTOR DE ORUGAS 105-135 HP 1.000 HM
MOTOSIERRA 2.000 HM
HERRAMIENTAS % M.O.
TOTAL

EXPLANACIONES

Corte en Material Suelto (masivo)

Rendimiento: 960.00 m3 /da


Unidad: m3
CAPATAZ 0.500 H-H
PEON 1.000 H-H
OPERADOR DE EQUIPO PESADO (C) 1.000 HH
TRACTOR DE LLANTAS 300-350 HP 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Corte en Material Suelro (para ensanches)

Rendimiento: 1,088.00 m3 /da


Unidad: m3
CAPATAZ 1.000 H-H
PEON 2.000 H-H
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
TRACTOR DE ORUGAS 105-135 HP 1.000 HM
TRACTOR DE ORUGAS 270-295 HP 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Corte en Roca Suelta (masivo)

Rendimiento: 680.00 m3 /da


Unidad: m3
ACERO DE PERFORACION ML
DINAMITA EXADIT TIPO 60 1 1/2"X6" KG.
FULMINANTE SIMPLE PZA
MECHA RAPIDA MTR
BARRENO 5'x1/8" und
CAPATAZ 1.000 H-H
OPERARIO 1.000 H-H
OFICIAL 2.000 H-H
PEON 2.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
OPERADOR DE EQUIPO PESADO (C) 1.000 HH
COMPRESORA NEUMATICA 196 HP 600-690 PCM 0.500 HM
TRACTOR DE ORUGAS 270-295 HP 1.000 HM
PERFORADORA MANUAL LIGERA 2.000 HM
HERRAMIENTAS % M.O.
Refine de taludes en roca fija m2
TOTAL

Corte en Roca Suelta (para ensanches)

Rendimiento: 720.00 m3 /da


Unidad: m3
ACERO DE PERFORACION ML
DINAMITA EXADIT TIPO 60 1 1/2"X6" KG.
FULMINANTE SIMPLE PZA
MECHA RAPIDA MTR
BARRENO 5'x1/8" und
CAPATAZ 1.000 H-H
OPERARIO 1.000 H-H
OFICIAL 4.000 H-H
PEON 2.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
COMPRESORA NEUMATICA 196 HP 600-690 PCM 1.000 HM
TRACTOR DE ORUGAS 105-135 HP 1.000 HM
TRACTOR DE ORUGAS 270-295 HP 1.000 HM
PERFORADORA MANUAL LIGERA 4.000 HM
HERRAMIENTAS % M.O.
Refine de taludes en roca fija m2
TOTAL

Corte en Roca Fija (masivo)

Rendimiento: 520.00 m3 /da


Unidad: m3
ACERO DE PERFORACION ML
DINAMITA EXADIT TIPO 60 1 1/2"X6" KG.
CORDON DETONANTE, 3N MTR
MECHA RAPIDA MTR
RETARDOS UND
CAPATAZ 1.000 H-H
OPERARIO 2.000 H-H
PEON 4.000 H-H
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
PERFORADORA ORUGA 660-690 PCM 1.000 HM
TRACTOR DE ORUGAS 270-295 HP 1.000 HM
HERRAMIENTAS % M.O.
Refine de taludes en roca fija m2
TOTAL

Corte en Roca Fija (para ensanches)

Rendimiento: 439.97 m3 /da


Unidad: m3
DINAMITA EXADIT TIPO 60 1 1/2"X6" KG.
FULMINANTE SIMPLE PZA
CORDON DETONANTE, 3N MTR
MECHA RAPIDA MTR
BARRENO 5'x1/8" und
RETARDOS UND
CAPATAZ 1.000 H-H
OPERARIO 2.000 H-H
OFICIAL 10.000 H-H
PEON 5.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 2.000 HH
OPERADOR DE EQUIPO PESADO (C) 0.750 HH
COMPRESORA NEUMATICA 196 HP 600-690 PCM 2.000 HM
TRACTOR DE ORUGAS 270-295 HP 0.750 HM
PERFORADORA MANUAL LIGERA 10.000 HM
HERRAMIENTAS % M.O.
Refine de taludes en roca fija m2
TOTAL

Perfilado y Compactacin de Subrasante en zona de corte

Rendimiento: 2,400.00 m3 /da


Unidad: m3
CAPATAZ 0.500 H-H
PEON 1.000 H-H
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
MOTONIVELADORA 150 HP 1.000 HM
RODILLO LISO VIBRATORIO AUTOPROP. 101-135 HP 10-12 T 1.000 HM
HERRAMIENTAS % M.O.
TRANSPORTE DE AGUA m3
TOTAL

Remocin de Derrumbes (no incl. transporte)

Rendimiento: 500.00 m3 /da


Unida: m3
CAPATAZ 1.000 H-H
PEON 2.000 H-H
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
CARGADOR FRONTAL SOBRE LLANTAS 125-155 HP 3.0 Y3 1.000 HM
TRACTOR DE ORUGAS 105-135 HP 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Sub Anlisis

TRANSPORTE DE AGUA

Rendimiento: 68.00 m3 /da


Unidad: m3
PEON 1.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
MOTOBOMBA 12 HP 4" 0.250 HM
CAMION CISTERNA DE AGUA 4000-5000 GAL 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Refine de taludes en roca fija

Rendimiento: 2,400.00 m2 /da


Unidad: m2
CAPATAZ 0.500 H-H
OFICIAL 2.000 H-H
PEON 2.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
OPERADOR DE EQUIPO PESADO (C) 1.000 HH
COMPRESORA NEUMATICA 87 HP 250-330 PCM 1.000 HM
MARTILLO MEUMATICO 25-29 KG 1.000 HM
RETROEXCAVADORA S/ORUGAS 110 HP 1.3 Y3 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

PAVIMENTO

Sub Base Granular (no incluye transporte ni lavado)


Rendimiento: 202.50 m3 /da
Unidad: m3
AFIRMADO M3
AGUA M3
CAPATAZ 1.000 H-H
OFICIAL 1.000 H-H
PEON 6.000 H-H
CAMION CISTERNA 4x2, CAP. 2000 GL (AGUA) 1.000 HM
MOTONIVELADORA 125 HP 1.000 HM
RODILLO LISO VIBRATORIO AUTOPROP. 101-135 HP 10-12 T 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Base granular (no incluye transporte ni lavado)

Rendimiento: 120.00 m3 /da


Unidad: m3
AFIRMADO M3
AGUA M3
CAPATAZ 1.000 H-H
OFICIAL 1.000 H-H
PEON 6.000 H-H
CAMION CISTERNA 4x2, CAP. 2000 GL (AGUA) 1.000 HM
MOTONIVELADORA 125 HP 1.000 HM
RODILLO LISO VIBRATORIO AUTOPROP. 70-100 HP 7-9 T 1.000 HM
RODILLO NEUMAT. AUTOPROP. 100 HP 20 T 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Imprimacin Bituminosa (no incluye asfalto)

Rendimiento: 5,440.00 m2 /da


Unidad: m2
ARENA GRUESA M3
KEROSENE GLN
CAPATAZ 0.500 H-H
OPERARIO 1.000 H-H
PEON 4.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 2.000 HH
OPERADOR DE EQUIPO PESADO (C) 1.000 HH
COMPRESORA NEUMATICA 87 HP 250-330 PCM 1.000 HM
BARREDORA MECANICA 20 HP x 7" 1.000 HM
CAMION IMPRIMADOR 2000 GL 1.000 HM
TRACTOR DE TIRO 80 HP 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Riego de Liga (no incluye asfalto)

Rendimiento: 3,600.00 m2 /da


Unidad: m2
CAPATAZ 0.500 H-H
PEON 4.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
RODILLO NEUMAT. AUTOPROP. 135 HP 26 T 1.000 HM
BARREDORA MECANICA 20 HP x 7" 1.000 HM
CAMION IMPRIMADOR 2000 GL 1.000 HM
TRACTOR DE TIRO 80 HP 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Carpeta Asfltica (no incluye asfalto ni transporte)

Rendimiento: 1.00 m3 /da


Unidad: m3
Barrido y soplado de la superficie m2
Colocacio de Mezcla Asfltica Caliente 3" m3
Preparacin de Mezcla Asfltica en Caliente m3
TOTAL

Asfalto Lquido RC-250

Rendimiento: 6,960.00 gln/da


Unidad: gln
ASFALTO LIQUIDO DE PAVIMENTACION RC-250L GLN
PEON 4.000 H-H
TERMOTANQUE PARA ASFALTO LIQUI.8000-1000 4.000 GLN
HERRAMIENTAS % M.O.
TOTAL

Relleno Mineral (Filler)

Rendimiento: 9,600.00 kg /da


Unidad: kg
CEMENTO PORTLAND TIPO I BOL
PEON 5.000 H-H
TOTAL
Aditivo Mejorador de Adherencia

Rendimiento: 1.00 kg /da


Unidad: kg
MEJORADOR DE ADHERENCIA KG
TOTAL

Cemento Asfltico PEN 60/70

Rendimiento: 6,956.52 gln/da


Unidad: gln
CEMENTO ASFALTICO 60/70 GLN
PEON 4.000 H-H
TERMOTANQUE PARA ASFALTO LIQUI.8000-1000 4.000 GLN
HERRAMIENTAS % M.O.
TOTAL

Sub Anlisis

Barrido y soplado de la superficie

Rendimiento: 3,200.00 m2 /da


Unidad: m2
OPERARIO 1.000 H-H
PEON 1.000 H-H
COMPRESORA NEUMATICA 87 HP 250-330 PCM 0.500 HM
BARREDORA MECANICA 20 HP x 7" 0.500 HM
TRACTOR DE TIRO 80 HP 0.500 HM
HERRAMIENTAS % M.O.
TOTAL

Colocacin de Mezcla Asfltica Caliente 3"

Rendimiento: 220.00 m3 /da


Unidad: m3
CAPATAZ 1.000 H-H
OPERARIO 2.000 H-H
OFICIAL 2.000 H-H
PEON 6.000 H-H
OPERADOR DE EQUIPO PESADO (C) 4.500 HH
RODILLO NEUMAT. AUTOPROP. 127 HP 23 T 1.500 HM
ROD. TANDEM VIB. AUTOPROP. 130 HP 11 T 1.000 HM
PAVIMENTADORA 69 HP 1.000 HM
TOTAL
Preparacin de Mezcla Asfltica en Caliente

Rendimiento: 264.00 m3 /da


Unidad: m3
AGREGADO PARA ASFALTO (NO INCL.LAVADO M3
Instalcin de Planta de Asfalto m3
DIESEL 2 GLN
CAPATAZ 1.000 H-H
PEON 7.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
CARGADOR FRONTAL SOBRE LLANTAS 100-125 HP 2.5 Y3 1.000 HM
Planta de Asfalto 100t/h 1.000 HM
GRUPO ELECTROGENO 380HP 250KW 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

TRANSPORTE

Eliminacin de Material Excedente D<1 km (incl. carguo)

Rendimiento: 1,235.00 m3 /da


Unidad: m3
OFICIAL (E) 1.000 HH
OPERADOR DE EQUIPO LIVIANO (E) 4.000 HH
OPERADOR DE EQUIPO PESADO (C) 1.000 HH
CARGADOR FRONTAL SOBRE LLANTAS 125-155 HP 3.0 Y3 1.000 HM
CAMION VOLQUETE 6X4 330 HP 15 M3 4.000 M3
HERRAMIENTAS % M.O.
TOTAL

Eliminacin de Mat. Excedente D>1 km (incl. carguo)

Rendimiento: 1,000.00 m3 /da


Unidad: m3
OPERADOR DE EQUIPO LIVIANO (E) 1.000 HH
CAMION VOLQUETE 6X4 330 HP 15 M3 1.000 M3
HERRAMIENTAS % M.O.
TOTAL

Transporte de Material Granular D<1 km (incl. carguo)

Rendimiento: 1,123.00 m3 /da


Unidad: m3
OFICIAL 1.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 2.000 HH
OPERADOR DE EQUIPO PESADO (C) 1.000 HH
CARGADOR FRONTAL SOBRE LLANTAS 125-155 HP 3.0 Y3 1.000 HM
CAMION VOLQUETE 6X4 330 HP 15 M3 2.000 M3
HERRAMIENTAS % M.O.
TOTAL

Transporte Material Granular > 1 km (incl. carguo)

Rendimiento: 1,000.00 m3 /da


Unidad: m3
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
CAMION VOLQUETE 6X4 330 HP 15 M3 1.000 M3
HERRAMIENTAS % M.O.
TOTAL

Transporte Mezcla Asfltica D<1 km (incl. carguo)

Rendimiento: 104.00 m3 /da


Unidad: m3
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
CAMION VOLQUETE 6X4 330 HP 15 M3 1.000 M3
HERRAMIENTAS % M.O.
TOTAL

Transporte Mezcla Asfltica D>1 km (incl. carguo)

Rendimiento: 964.00 m3 /da


Unidad: m3
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
CAMION VOLQUETE 6X4 330 HP 15 M3 1.000 M3
HERRAMIENTAS % M.O.
TOTAL

OBRAS DE ARTE

Excavacin clasificada para estructuras

Rendimiento: 30.00 m3 /da


Unidad: m3
CAPATAZ 0.100 H-H
PEON 10.000 H-H
HERRAMIENTAS % M.O.
TOTAL
Relleno de Estructuras (incl 30% mat prstamo, no incl. transporte)

Rendimiento: 30.00 m3 /da


Unidad: m3
GRAVA CANTO RODADO SELECCIONADO M3
AGUA M3
CAPATAZ 0.500 H-H
PEON 4.000 H-H
OPERADOR DE EQUIPO LIVIANO (E) 1.000 HH
COMPACTADOR VIBRATORIO TIPO PLANCHA 7.0 HP 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Concreto de 140 kg/cm2

Rendimiento: 15.00 m3 /da


Unidad: m3
ARENA GRUESA M3
CEMENTO PORTLAND TIPO I BOL
PLASTIMENT VZ (RETARDADOR-RED.DE AGUA) KG
AGUA M3
CAPATAZ 1.000 H-H
OPERARIO 2.000 H-H
OFICIAL 1.000 H-H
PEON 7.000 H-H
OPERADOR DE EQUIPO LIVIANO (E) 0.500 HH
CAMION VOLQUETE 6X4 330 HP 15 M3 0.500 M3
VIBRADOR PARA CONCRETO 4 HP x 2.40" 1.000 HM
MEZCLADORA DE CONCRETO /TAMBOR 12 P3 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Concreto de 210 Kg/cm2

Rendimiento: 16.00 m3 /da


Unidad: m3
ACEITE MOTOR GASOLINERO MULTIGRADO GAL
ARENA GRUESA M3
PIEDRA CHANCADA DE 1/2" M3
CEMENTO PORTLAND TIPO I BOL
GASOLINA 84 OCTANOS GLN
AGUA M3
CAPATAZ 0.100 H-H
OPERARIO 2.000 H-H
OFICIAL 2.000 H-H
PEON 10.000 H-H
OPERADOR DE EQUIPO LIVIANO (E) 4.000 HH
WINCHE ELECTRICO, DOS BALDES 1.000 HM
VIBRADOR PARA CONCRETO 4 HP x 1.50" 2.000 HM
MEZCLADORA DE CONCRETO /TAMBOR 12 P3 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Concreto de f'c=140 kg/cm2 +30% PM

Rendimiento: 18.00 m3 /da


Unidad: m3
PIEDRA GRANDE PARA ZANJA M3
ANDAMIOS GLB
PEON 4.000 H-H
Concreto de 140 kg/cm2 m3
TRANSPORTE DE PIEDRA GRANDE m3
Extraccin y Seleccin de piedra m3
TOTAL

Habilitacin y colocacin de Armadura

Rendimiento: 200.00 kg /da


Unidad: kg
ALAMBRE NEGRO No. 16 KG.
ACERO CORRUGADO 3/4" SIDER PERU KG
CIZALLA ELECTRICA HM
DOBLADURA HM
CAPATAZ (E) 0.100 HH
OPERARIO (E) 1.000 HH
OFICIAL (E) 1.000 HH
HERRAMIENTAS % M.O.
TOTAL

Zanja de Coronacin

Rendimiento: 60.00 ml /da


Unidad: ml
CAPATAZ 0.500 H-H
PEON 5.000 H-H
OPERADOR DE EQUIPO PESADO (C) 0.250 HH
RETROCARGADOR 75.87 HP 0.250 HM
HERRAMIENTAS % M.O.
TOTAL
Encofrado y Desencofrado

Rendimiento: 8.00 m2 /da


Unidad: m2
CLAVOS 3" KG.
ALAMBRE NEGRO No. 8 KG.
DESMOLDANTE GLN
MADERA TORNILLO (LARGA) P2
ENCOFRADO METALICO PARA CIMENTACIONES m2
CAPATAZ 0.100 H-H
OPERARIO 1.000 H-H
OFICIAL 1.000 H-H
PEON 0.330 H-H
OPERADOR DE EQUIPO PESADO (C) 0.010 HH
CAMION GRUA 5 TON. 0.015 HH
EQUIPO DE CARPINTERIA 0.020 HM
HERRAMIENTAS % M.O.
TOTAL

Enrocado de Proteccin

Rendimiento: 160.00 m3 /da


Unidad: m3
ROCA T. MAX=0.90 M M3
CAPATAZ 1.000 H-H
PEON 6.000 H-H
OPERADOR DE EQUIPO PESADO (C) 2.000 HH
RETROEXCAVADORA S/ORUGAS 250 HP 2.7 Y3 1.000 HM
TRACTOR DE LLANTAS 200-250 HP 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Cuneta Triangular revestida (concreto fc=175 kg/cm2)

Rendimiento: 45.00 ml /da


Unidad: ml
JUNTA ASFALTICA ML
CAPATAZ 0.100 H-H
OPERARIO 1.000 H-H
PEON 5.000 H-H
Concreto para Zapatas m3
Encofrado/ Desencofrado Normal m2
TOTAL

Alcantarilla TMC d=36", E=1,5 mm


Rendimiento: 13.00 ml /da
Unidad: ml
ALCANT.AC.GALV.CIRC. MULTIP.36"x2.0MM ML.
MATERIALES VARIOS GLB
CAPATAZ 1.000 H-H
PEON 10.000 H-H
OPERADOR DE EQUIPO PESADO (C) 0.200 HH
CAMION GRUA 5 TON. 0.200 HH
HERRAMIENTAS % M.O.
Cama de Arena Selecta e=0.10m ml
TOTAL

Alcantarilla TMC, D=24"

Rendimiento: 14.00 ml /da


Unidad: ml
ALCANT. AC. GALV.CIRC. MULTIP. 24"x1.5MM ML.
MATERIALES VARIOS GLB
CAPATAZ 1.000 H-H
PEON 10.000 H-H
OPERADOR DE EQUIPO PESADO (C) 0.200 HH
CAMION GRUA 5 TON. 0.200 HH
HERRAMIENTAS % M.O.
Cama de Arena Selecta e=0.10m ml
TOTAL

Alcantarilla TMC d=48", E=2,5 mm

Rendimiento: 9.00 ml /da


Unidad: ml
ALCANT.ACE.GALV.CIRC. MULTIP.48"x2.5MM ML.
MATERIALES VARIOS GLB
CAPATAZ 1.000 H-H
PEON 10.000 H-H
OPERADOR DE EQUIPO PESADO (C) 0.200 HH
CAMION GRUA 5 TON. 0.200 HH
HERRAMIENTAS % M.O.
Cama de Arena Selecta e=0.10m ml
TOTAL

Alcantarilla TMC d=60", E = 3.00 mm

Rendimiento: 8.00 ml /da


Unidad: ml
ALCANT.ACE.GALV.CIRC. MULTIP.60"x3.0MM ML.
MATERIALES VARIOS GLB
CAPATAZ 1.000 H-H
PEON 10.000 H-H
OPERADOR DE EQUIPO PESADO (C) 0.200 HH
CAMION GRUA 5 TON. 0.200 HH
HERRAMIENTAS % M.O.
Cama de Arena Selecta e=0.10m ml
TOTAL

Junta de Dilatacin Water Stop

Rendimiento: 48.00 ml /da


Unidad: ml
ACERO CORRUGADO 3/8" SIDER PERU KG
ARENA FINA M3
ASFALTO LIQUIDO DE PAVIMENTACION RC-250L GLN
TECKNOPOR (4"x8"x1/2)" PL
WATER STOP DE 6" ML
CAPATAZ 0.100 H-H
OPERARIO 1.000 H-H
PEON 1.000 H-H
OPERADOR DE EQUIPO LIVIANO (E) 0.500 HH
COMPRESORA NEUMATICA 87 HP 250-330 PCM 0.050 HM
TUBERIA DE ACERO D=1" 0.700 ML
HERRAMIENTAS % M.O.
TOTAL

Aliviaderos y Emboquillado de Piedra

Rendimiento: 10.00 m2 /da


Unidad: m2
ARENA GRUESA M3
PIEDRA GRANDE PARA ZANJA M3
CEMENTO PORTLAND TIPO I BOL
CAPATAZ 0.350 H-H
OPERARIO 4.000 H-H
PEON 4.000 H-H
OPERADOR DE EQUIPO LIVIANO (E) 0.500 HH
OPERADOR DE EQUIPO PESADO (C) 0.100 HH
MEZCLADORA DE CONCRETO /TAMBOR 12 P3 0.500 HM
RETROCARGADOR 75.87 HP 0.100 HM
HERRAMIENTAS % M.O.
Concreto para Zapatas m3
TOTAL
Limpieza de Alcantarillas

Rendimiento: 0.80 und/da


Unidad: und
CAPATAZ 0.200 H-H
PEON 2.000 H-H
HERRAMIENTAS % M.O.
TOTAL

Limpieza de Cauces

Rendimiento: 112.00 ml /da


Unidad: ml
CAPATAZ 0.500 H-H
PEON 3.000 H-H
OPERADOR DE EQUIPO PESADO (C) 1.000 HH
RETROEXCAVADORA S/ORUGAS 110 HP 1.3 Y3 0.500 HM
TRACTOR DE ORUGAS 105-135 HP 0.500 HM
HERRAMIENTAS % M.O.
TOTAL

Barandas Metlicas en Puentes

Rendimiento: 24.00 ml /da


Unidad: ml
MATERIALES VARIOS GLB
Baranda ml
CAPATAZ 0.200 H-H
OPERARIO 1.000 H-H
PEON 2.000 H-H
OPERADOR DE EQUIPO PESADO (C) 0.100 HH
CAMION GRUA 5 TON. 0.100 HH
TOTAL

Drenaje de Muros (incl. slo tubera e instalacin)

Rendimiento: 64.00 ml /da


Unidad: ml
MATERIALES VARIOS GLB
TUBERIA PVC -SAL DE 6" PERFORADA ML
CAPATAZ 0.100 H-H
OPERARIO 1.000 H-H
PEON 2.000 H-H
HERRAMIENTAS % M.O.
TOTAL

Tubos de Subdrenaje

Rendimiento: 58.00 ml /da


Unidad: ml
MATERIALES VARIOS GLB
TUBERIA HDPE CORRUGADA,PERFOARADA D=6" ML
CAPATAZ 0.100 H-H
OPERARIO 1.000 H-H
PEON 2.000 H-H
HERRAMIENTAS % M.O.
TOTAL

Junta de Dilatacin - Tapajunta Metlica

Rendimiento: 16.00 ml /da


Unidad: ml
TAPAJUNTAS METALICAS ML
CAPATAZ 0.100 H-H
OPERARIO 1.000 H-H
PEON 1.000 H-H
HERRAMIENTAS % M.O.
TOTAL

SEALIZACION

Seales Preventivas

Rendimiento: 1.00 und/da


Unidad: und
Seal en fibra de vidrio de 60x60 cm und
TOTAL

Seales Reglamentarias

Rendimiento: 1.00 und/da


Unidad: und
Seal reglamentaria und
TOTAL

SEALES INFORMATIVAS

Rendimiento: 1.00 m2 /da


Unidad: m2
Seal Informativa m2
TOTAL

Demarcacin en el Pavimento

Rendimiento: 580.00 m2 /da


Unidad: m2
PINTURA TRAFICO BLANCO GLN
THINNNER (STANDARD) GLN
OPERARIO 2.000 H-H
OFICIAL 0.500 H-H
PEON 5.000 H-H
HERRAMIENTAS % M.O.
TOTAL

Tachas Bidireccionales

Rendimiento: 1.00 und/da


Unidad: und
Tachas Bidireccionales und
TOTAL

Guardavas nuevos (Incluye Terminal)

Rendimiento: 50.00 ml /da


Unidad: ml
GUARDAVIAS UND
PINTURA ESMALTE EPOXI NEGRO GLN
OFICIAL 1.000 H-H
PEON 1.000 H-H
HERRAMIENTAS % M.O.
TOTAL

Postes Delineadores

Rendimiento: 1.00 und/da


Unidad: und
Postes Delineadores und
TOTAL

Postes de Kilometraje

Rendimiento: 1.00 und/da


Unidad: und
Postes de Kilometraje und
TOTAL

07 IMPACTO AMBIENTAL

Restauracin de Canteras (acomodo, no incl. Reforestar)

Rendimiento: 4,800.00 m3 /da


Unidad: m3
CAPATAZ 0.500 H-H
PEON 2.000 H-H
OPERADOR DE EQUIPO PESADO (C) 1.200 HH
TRACTOR DE LLANTAS 300-350 HP 1.000 HM
HERRAMIENTAS % M.O.
TOTAL

Restauracin de botaderos

Rendimiento: 4,800.00 m3 /da


Unidad: m3
CAPATAZ 0.500 H-H
PEON 3.000 H-H
OPERADOR DE EQUIPO PESADO (C) 1.200 HH
TRACTOR DE LLANTAS 300-350 HP 1.000 HM
HERRAMIENTAS % M.O.
Reforestacin (Siembra) m2
TOTAL

Reacondicionamiento de Area de Campamento (Incl. Reforestacin)

Rendimiento: 8,000.00 m2 /da


Unidad: m2
CAPATAZ 1.000 H-H
OFICIAL 2.000 H-H
PEON 10.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 4.000 HH
OPERADOR DE EQUIPO PESADO (C) 1.500 HH
COMPRESORA NEUMATICA 87 HP 250-330 PCM 2.000 HM
MARTILLO MEUMATICO 21-24 KG 4.000 HM
TRACTOR DE ORUGAS 270-295 HP 1.000 HM
CAMION VOLQUETE 6X4 330 HP 15 M3 4.000 M3
MOTONIVELADORA 150 HP 0.500 HM
HERRAMIENTAS % M.O.
Reforestacin (Siembra) m2
TOTAL
Sub Anlisis

Reforestacin (Siembra)

Rendimiento: 400.00 m2 /da


Unidad: m2
ABONO INORGANICO KG
CESPED m2
CAPATAZ 0.500 H-H
PEON 10.000 H-H
OPERADOR DE EQUIPO LIVIANO (C) 1.000 HH
OPERADOR DE EQUIPO PESADO (C) 0.500 HH
CAMION VOLQUETE 330 HP 15 M3 0.500 M3
CAMION VOLQUETE 6X4 330 HP 15 M3 0.500 GAL
MOTOBOMBA 17 HP 6" 0.250 HM
RETROCARGADOR 75.87 HP 0.500 HM
HERRAMIENTAS % M.O.
TOTAL

(*) Precios Unitarios vlidos para la costa


OS EN CARRETERA (*)
CANTIDAD UNITARIO PARCIAL SUBTOTAL

0.00 3.96 0.01


0.02 18.75 0.46
0.03 3.00 0.08
0.00 65.35 0.13 0.69
20.00 19.46 389.20
200.00 13.23 2646.00
600.00 11.93 7158.00
200.00 13.95 2790.00 12983.20
200.00 0.98 196.00
400.00 0.75 300.00
200.00 9.80 1960.00
5.00 11987.60 599.38 3055.38
16039.27

0.01 297.13 1.49 1.49


0.07 19.46 1.30
0.13 15.22 2.03
0.27 13.23 3.53
0.53 11.93 6.36
0.13 15.22 2.03
0.27 15.22 4.06 19.31
0.27 77.03 20.54
0.53 4.62 2.46
0.13 112.81 15.04
0.13 60.00 8.00
3.00 17.12 0.51 46.56
67.35
12.50 19.46 243.25
100.00 11.93 1193.00
18.75 15.22 285.38 1721.63
6.25 176.20 1101.25
12.50 223.92 2799.00
25.00 58.18 1454.50
3.00 1533.13 45.99 5400.74
7122.37

0.00 19.46 0.08


0.01 11.93 0.10
0.01 15.22 0.13 0.31
0.01 440.92 3.66
3.00 0.26 0.01 3.67
3.97

0.01 19.46 0.14


0.01 11.93 0.18
0.01 15.22 0.22 0.54
0.01 223.92 1.66
0.01 408.80 3.03
3.00 0.46 0.01 4.70
5.24

0.18 1.50 0.27


0.05 6.49 0.32
0.10 0.34 0.03
0.10 0.97 0.10
0.00 322.09 0.32 1.05
0.01 19.46 0.23
0.01 15.22 0.18
0.02 13.23 0.31
0.02 15.22 0.36
0.01 15.22 0.18
0.01 14.88 0.18 1.43
0.01 170.90 1.01
0.01 408.80 4.82
0.02 12.12 0.28
3.00 1.20 0.04 6.15
0.15 0.98 0.15 0.15
8.78

0.18 1.50 0.27


0.05 6.49 0.32
0.10 0.34 0.03
0.10 0.97 0.10
0.00 322.09 0.32 1.05
0.01 19.46 0.22
0.01 15.22 0.17
0.04 13.23 0.59
0.02 11.93 0.26
0.01 15.22 0.17
0.02 15.22 0.34 1.74
0.01 170.90 1.90
0.01 223.92 2.49
0.01 408.80 4.54
0.04 12.12 0.54
3.00 1.53 0.05 9.50
0.15 0.98 0.15 0.15
12.44

0.18 1.50 0.27


0.35 6.49 2.27
1.00 0.44 0.44
0.03 0.97 0.03
0.01 4.38 0.04 3.05
0.02 19.46 0.30
0.03 15.22 0.47
0.06 11.93 0.73
0.03 15.22 0.47 1.97
0.02 79.20 1.22
0.02 408.80 6.30
3.00 1.73 0.05 7.57
0.15 0.98 0.15 0.15
12.74

0.35 6.49 2.27


0.10 0.34 0.03
1.10 0.44 0.48
0.10 0.97 0.10
0.00 322.09 0.81
0.03 4.38 0.13 3.82
0.02 19.46 0.35
0.04 15.22 0.55
0.18 13.23 2.41
0.09 11.93 1.08
0.04 15.22 0.55
0.01 15.22 0.21 5.16
0.04 170.90 6.22
0.01 408.80 5.56
0.18 12.12 2.20
3.00 4.68 0.14 14.12
0.15 0.98 0.15 0.15
23.25

0.00 19.46 0.03


0.00 11.93 0.04
0.01 15.22 0.10 0.17
0.00 206.12 0.68
0.00 150.20 0.50
3.00 0.15 0.00 1.18
0.04 23.12 0.83 0.79
2.14

0.02 19.46 0.31


0.03 11.93 0.38
0.03 15.22 0.49 1.18
0.02 176.20 2.82
0.02 223.92 3.58
3.00 1.00 0.03 6.43
7.61

0.12 11.93 1.40


0.12 15.22 1.79 3.19
0.03 22.12 0.65
0.12 154.82 18.21
3.00 2.91 0.09 18.94
22.14

0.00 19.46 0.03


0.01 13.23 0.09
0.01 11.93 0.08
0.00 15.22 0.05
0.00 15.22 0.05 0.30
0.00 77.03 0.25
0.00 3.90 0.01
0.00 153.60 0.51
3.00 0.27 0.01 0.78
1.08
0.18 22.46 4.04
0.02 9.00 0.14 4.18
0.04 19.46 0.77
0.04 13.23 0.52
0.24 11.93 2.83 4.12
0.04 128.96 5.09
0.04 161.42 6.38
0.04 150.20 5.93
3.00 3.74 0.11 17.52
25.81

0.24 22.46 5.39


0.02 9.00 0.18 5.57
0.07 19.46 1.30
0.07 13.23 0.88
0.40 11.93 4.77 6.95
0.07 128.96 8.60
0.07 161.42 10.77
0.07 97.20 6.48
0.07 115.38 7.70
3.00 6.30 0.19 33.74
46.26

0.01 38.14 0.19


0.06 8.56 0.51 0.70
0.00 19.46 0.01
0.00 15.22 0.02
0.01 11.93 0.07
0.00 15.22 0.04
0.00 15.22 0.02 0.17
0.00 77.03 0.12
0.00 46.75 0.07
0.00 134.15 0.20
0.00 74.60 0.11
3.00 0.15 0.00 0.50
1.38

0.00 19.46 0.02


0.01 11.93 0.11
0.00 15.22 0.03
0.00 15.22 0.07 0.23
0.00 130.10 0.29
0.00 46.75 0.10
0.00 134.15 0.30
0.00 74.60 0.16
3.00 0.20 0.01 0.85
1.08

1.00 0.27 0.27


1.00 22.84 22.84
1.00 78.05 78.05 101.16
101.16

1.02 4.62 4.71 4.71


0.00 11.98 0.06 0.06
0.00 15.00 0.07
3.00 0.05 0.00 0.07
4.84

0.02 14.29 0.34 0.34


0.00 11.00 0.05 0.05
0.39
1.02 14.60 14.89 14.89
14.89

1.02 4.80 4.90 4.90


0.00 11.98 0.06 0.06
0.00 15.00 0.07
3.00 0.05 0.00 0.07
5.02

0.00 15.22 0.04


0.00 11.93 0.03 0.07
0.00 77.03 0.10
0.00 46.75 0.06
0.00 74.60 0.10
3.00 0.06 0.00 0.26
0.33

0.04 19.46 0.71


0.07 15.22 1.11
0.07 13.23 0.96
0.22 11.93 2.60
0.16 15.22 2.49 7.87
0.05 126.79 6.91
0.04 133.12 4.85
0.04 132.21 4.81 16.57
24.44
1.00 29.20 29.20
1.00 2.24 2.24
3.00 8.01 24.03 55.47
0.03 19.46 0.59
0.21 11.93 2.53
0.03 15.22 0.46
0.06 15.22 0.92 4.50
0.03 150.60 4.56
0.03 326.10 9.88
0.03 150.47 4.56
3.00 3.99 0.12 19.12
79.10

0.01 13.23 0.09


0.03 15.22 0.39
0.01 15.22 0.10 0.58
0.01 176.20 1.15
0.03 223.20 5.78
3.00 0.52 0.02 6.94
7.52

0.01 15.22 0.12 0.12


0.01 223.20 1.79
3.00 0.11 0.00 1.79
1.91

0.01 13.23 0.09


0.01 15.22 0.22
0.01 15.22 0.11 0.42
0.01 176.20 1.25
0.01 223.20 3.17
3.00 0.38 0.01 4.43
4.85

0.01 15.22 0.12 0.12


0.01 223.20 1.79
3.00 0.11 0.00 1.79
1.91

0.08 15.22 1.17 1.12


0.08 223.20 17.16
3.00 1.06 0.03 17.20
18.32

0.01 15.22 0.13 0.12


0.01 223.20 1.85
3.00 0.11 0.00 1.86
1.98

0.03 19.46 0.52


2.67 11.93 31.81 32.33
3.00 29.77 0.89 0.89
33.23
1.20 7.35 8.82
0.12 9.00 1.08 9.90
0.13 19.46 2.59
1.07 11.93 12.73
0.27 15.22 4.06 19.38
0.27 26.14 6.97
3.00 17.58 0.53 7.50
36.78

0.59 38.14 22.50


6.85 14.29 97.89
1.16 2.39 2.77
0.19 9.00 1.71 124.87
0.53 19.46 10.38
1.07 15.22 16.24
0.53 13.23 7.06
3.73 11.93 44.54
0.27 15.22 4.06 82.27
0.27 223.20 59.53
0.53 5.50 2.93
0.53 10.67 5.69
3.00 74.65 2.24 70.39
277.53

0.00 47.91 0.19


0.50 38.14 19.07
0.80 36.44 29.15
9.20 14.29 131.47
0.60 9.96 5.98
0.18 9.00 1.62 187.48
0.05 19.46 0.97
1.00 15.22 15.22
1.00 13.23 13.23
5.00 11.93 59.65
2.00 15.22 30.44 119.51
0.50 19.39 9.70
1.00 5.40 5.40
0.50 10.67 5.34
3.00 109.25 3.28 23.02
330.01

0.39 34.20 13.34


0.60 3.47 2.08 15.42
1.78 11.93 21.21 21.30
0.70 222.38 155.67
0.30 26.43 7.93
0.30 40.44 12.13 175.73
212.45

0.02 3.96 0.08


1.05 2.85 2.99
0.01 20.36 0.20
0.01 3.48 0.03 3.31
0.00 19.46 0.08
0.04 15.22 0.61
0.04 13.23 0.53 1.22
5.00 1.11 0.06 0.06
4.58

0.07 17.52 1.17


0.67 11.93 7.95
0.03 15.22 0.51 9.63
0.03 101.00 3.36
3.00 8.83 0.26 3.63
13.26
0.05 3.96 0.20
0.05 3.96 0.20
0.05 14.44 0.72
0.30 3.00 0.90
2.00 2.09 4.18 6.20
0.10 19.46 1.95
1.00 15.22 15.22
1.00 13.23 13.23
0.33 11.93 3.94
0.01 15.22 0.15 34.49
0.02 132.10 1.98
0.02 220.00 4.40
3.00 31.32 0.94 7.32
48.00

1.00 48.37 48.37 48.37


0.05 19.46 0.97
0.30 11.93 3.58
0.10 15.22 1.52 6.07
0.05 311.20 15.56
0.05 298.00 14.90
3.00 5.34 0.16 30.62
85.06

0.04 1.19 0.04 0.04


0.02 19.46 0.35
0.18 15.22 2.71
0.89 11.93 10.60 13.66
0.30 204.43 61.33
0.68 37.34 25.39 86.72
100.42
1.03 211.90 218.26
2.00 3.25 6.50 224.76
0.62 19.46 11.98
6.15 11.93 73.41
0.12 15.22 1.87 87.26
0.12 132.10 16.26
3.00 79.27 2.38 18.64
0.18 4.75 0.86 0.86
331.53

1.03 116.00 119.48


1.00 3.25 3.25 122.73
0.57 19.46 11.12
5.71 11.93 68.17
0.11 15.22 1.74 81.03
0.11 132.10 15.10
3.00 73.61 2.21 17.31
0.21 4.75 1.00 1.00
222.07

1.03 339.04 349.21


3.00 3.25 9.75 358.96
0.89 19.46 17.30
8.89 11.93 106.04
0.18 15.22 2.71 126.05
0.18 132.10 23.49
3.00 114.51 3.44 26.92
0.18 4.75 0.86 0.86
512.80
1.03 521.60 537.25
4.00 3.25 13.00 550.25
1.00 19.46 19.46
10.00 11.93 119.30
0.20 15.22 3.04 141.80
0.20 132.10 26.42
3.00 128.82 3.86 30.28
0.18 4.75 0.86 0.86
723.20

3.72 2.85 10.60


0.01 18.77 0.09
0.15 4.62 0.69
0.04 10.73 0.38
1.06 9.82 10.41 22.17
0.02 19.46 0.32
0.17 15.22 2.54
0.17 11.93 1.99
0.08 15.22 1.27 6.12
0.01 77.03 0.64
0.12 1.55 0.18
3.00 5.54 0.17 0.99
29.28

0.50 38.14 19.07


1.00 34.20 34.20
4.00 14.29 57.16 110.43
0.28 19.46 5.45
3.20 15.22 48.70
3.20 11.93 38.18
0.40 15.22 6.09
0.08 15.22 1.22 99.63
0.40 10.67 4.27
0.08 101.00 8.08
3.00 90.26 2.71 15.06
0.40 204.43 81.77 81.77
306.89
2.00 19.46 38.92
20.00 11.98 239.60 278.52
3.00 252.76 7.58 7.58
286.10

0.04 19.46 0.69


0.21 11.93 2.56
0.07 15.22 1.09 4.34
0.04 153.60 5.48
0.04 223.92 7.99
3.00 3.81 0.11 13.59
17.93

1.10 3.25 3.58


1.00 104.40 104.40 107.98
0.07 19.46 1.30
0.33 15.22 5.07
0.67 11.93 7.95
0.03 15.22 0.51 14.83
0.03 132.10 4.40 4.22
127.02

0.20 3.25 0.65


1.03 28.45 29.30 29.95
0.01 19.46 0.24
0.13 15.22 1.90
0.25 11.93 2.98 5.13
3.00 4.67 0.14 0.14
35.22

0.20 3.25 0.65


1.03 20.22 20.83 21.48
0.01 19.46 0.27
0.14 15.22 2.10
0.28 11.93 3.29 5.66
3.00 5.16 0.15 0.15
27.29

1.05 41.76 43.85 43.85


0.05 19.46 0.97
0.50 15.22 7.61
0.50 11.93 5.97 14.55
3.00 13.20 0.40 0.40
58.79

1.00 341.04 341.04 341.04


341.04

1.00 400.20 400.20 400.20


400.20
1.00 1305.00 1305.00 1305.00
1305.00

0.13 79.30 10.29


0.00 50.04 0.20 10.49
0.03 15.22 0.42
0.01 13.28 0.09
0.07 11.93 0.82 1.33
5.00 1.22 0.06 0.06
11.89

1.00 9.74 9.74 9.74


9.74

1.00 132.00 132.00


0.05 137.35 6.87 138.87
0.16 13.23 2.12
0.16 11.93 1.91 4.03
3.00 3.71 0.11 11.13
154.02

1.00 99.47 99.47 99.47


99.47

1.00 97.72 97.72 97.72


97.72

0.00 19.46 0.02


0.00 11.93 0.04
0.00 15.22 0.03 0.09
0.00 440.92 0.75
3.00 0.07 0.00 0.75
0.84

0.00 19.46 0.02


0.01 11.93 0.06
0.00 15.22 0.03 0.11
0.00 440.92 0.75
3.00 0.09 0.00 0.75
1.00 9.51 9.51 9.51
10.37

0.00 19.46 0.02


0.00 13.23 0.03
0.01 11.93 0.12
0.00 15.22 0.06
0.00 15.22 0.02 0.25
0.00 77.03 0.15
0.00 4.62 0.02
0.00 408.80 0.41
0.00 223.20 0.89
0.00 206.12 0.10
3.00 0.23 0.01 1.58
1.00 9.51 9.51 9.51
11.34
0.05 1.39 0.07
1.00 1.70 1.70 1.77
0.01 19.46 0.19
0.20 11.93 2.39
0.02 15.22 0.30
0.01 15.22 0.15 3.04
0.01 223.20 2.23
0.01 154.82 1.55
0.01 32.67 0.16
0.01 101.00 1.01
3.00 2.76 0.08 5.04
9.84