Vous êtes sur la page 1sur 210

Res ID Resource Name Unit of Measure Budgeted Units / Time

KPM1 Name UOM


KPM2 Name UOM
KPM3 Name UOM
KPM4 Name UOM
KPM5 Name UOM
KPM6 Name UOM
KPM7 Name UOM
KPM8 Name UOM
KPM9 Name UOM
KPM10 Name UOM
KPM11 Name UOM
KPM12 Name UOM
KPM13 Name UOM
KPM14 Name UOM
KPM15 Name UOM
KPM16 Name UOM
KPM17 Name UOM
KPM18 Name UOM
KPM19 Name UOM
KPM20 Name UOM
Actual Units / Time Remaining Units / Time
KPM Uncertianty Input Sheet Base Estimate Estimate Uncertainty Impact on Duration - Minimum & Maximum

KPM ID Key Production Measure (KPM) Unit of Expected Daily Best Case Worse Case Calculated Best Case Calaculated Worst Case
Measure Production Production Production Production Production
(P6 Budgeted (Use either actual (Use either actual Reduce Durations Increase Durations
Units/per time) or benchmarked or benchmarked where Resource where Resource
rates) rates) assigned by % assigned by %

KPM1 Example: Scraper Fleet m3 4000 5000 2350 -20 70


KPM2 Example: Lay Pipe LM 2000 2500 1000 -20 100
KPM3 Name UOM 0 #REF! #REF!
KPM4 Name UOM 0 #REF! #REF!
KPM5 Name UOM 0 #REF! #REF!
KPM6 Name UOM 0 #REF! #REF!
KPM7 Name UOM 0 #REF! #REF!
KPM8 Name UOM 0 #REF! #REF!
KPM9 Name UOM 0 #REF! #REF!
KPM10 Name UOM 0 #REF! #REF!
KPM11 Name UOM 0 #REF! #REF!
KPM12 Name UOM 0 #REF! #REF!
KPM13 Name UOM 0 #REF! #REF!
KPM14 Name UOM 0 #REF! #REF!
KPM15 Name UOM 0 #REF! #REF!
KPM16 Name UOM 0 #REF! #REF!
KPM17 Name UOM 0 #REF! #REF!
KPM18 Name UOM 0 #REF! #REF!
KPM19 Name UOM 0 #REF! #REF!
KPM20 Name UOM 0 #REF! #REF!

Input Required

No Input Required
Comment / Required Action
Risk ID

1
2
3
4
5
6
7
8
9
10
11
Risk Title

Design delay
Avaliability if resources to meet squeezed program
Not acheiveing porgram outputs
Weather - Current wet weather calender allowance too low
Service relocations
Existing infrastructure needs upgrading
Pre-cast avaliablity (Kempsey window)
Pre-cast ramp up to meet squeeed program
Revised traffic switch seqence - More traffic switches to complete smaller section due to existing delays to program
Property Access
Ground uncertainy
Probablity (%)

80
Activity ID Activity Name
SC2T-17960 Bulk Earthworks - Fill 7 from Cut 8 (10,650m3) - Scr
SC2E-22570 Bulk Earthworks - Fill 12 from Cut 12 (3,784m3) - Scr
SC2E-22580 Bulk Earthworks - Fill 12 from Cut 13 (6,889m3) - Scr
SC2E-23760 Bulk Earthworks - Fill 5B from Cut 5A (6,757m3) - Scr
SC2E-20950 Bulk Earthworks - Cut 1A within (4,839m3) - Scr
SC2E-15010 Bulk Earthworks - Fill 1A from Cut 1A (38,857m3) - Scr
SC2E-20500 Bulk Earthworks - Fill 14 from Cut 14 (22,416m3) - Scr
SC2E-20880 Bulk Earthworks - Cut 14 within (7,216m3) - Scr
SC2E-15060 Bulk Earthworks - Fill 1B from Cut 1B (20,140m3) - Scr
SC2E-20540 Bulk Earthworks - Fill 13 from Cut 14 (6,844m3) - Scr
SC2E-21970 Bulk Earthworks - Fill 5A from Cut 5A (16,224m3) - Scr
SC2E-22000 Bulk Earthworks - Fill 5B from Cut 5B (18,810m3) - Scr
SC2T-17360 Bulk Earthworks - Fill 6 from Cut 6 (15,700m3) - Scr
SC2E-24090 Bulk Earthworks - Cut 11 within (17,505m3) - Doz
SC2E-15030 Bulk Earthworks - Cut 1B within (3,382m3) - Scr
SC2E-20200 Bulk Earthworks - Fill 9 from Cut 9 (20,604m3) - Scr
SC2E-24140 Bulk Earthworks - Fill 11 within (3,999m3) - Scr
SC2E-20620 Bulk Earthworks - Fill 10A from Cut 9 (10,293m3) - Scr
SC2E-20470 Bulk Earthworks - Fill 15 from Cut 15 (20,286m3) - Scr
SC2E-24260 Bulk Earthworks - Fill 14 within (3,078m3) - Scr
SC2E-21830 Bulk Earthworks - Fill 2 from Cut 2 (12,959m3) - Scr
SC2E-22380 Bulk Earthworks - Fill 10B from Cut 10 (8,042m3) - Scr
SC2E-21900 Bulk Earthworks - Fill 4 from Cut 4 (35,274m3) - Scr
SC2E-20220 Bulk Earthworks - Fill 10A from Cut 10 (17,540m3) - Scr
SC2E-15140 Bulk Earthworks - Cut 1A within (3,279m3) - Scr
SC2T-18120 Bulk Earthworks - Fill 6 within (3,745m3) - Scr
SC2E-15000 Bulk Earthworks - Fill 1A from Cut 1B (12,262m3) - Scr
SC2E-21950 Bulk Earthworks - Cut 5B within (7,936m3) - Scr
SC2E-20590 Bulk Earthworks - Fill 11 From Cut 11 (6,165m3) - Scr
SC2E-21040 Bulk Earthworks - Fill 6 from Cut 6 (6699m3) - Scr
SC2E-21870 Bulk Earthworks - Fill 3 from Cut 3 (3,516m3) - Scr
SC2E-20890 Bulk Earthworks - Fill 6 from Cut 5C (6,401m3) - Scr
SC2E-21470 Bulk Earthworks - Fill 11 from Cut 12 (9,369m3) - Scr
SC2E-21060 Bulk Earthworks - Fill 7 from Cut 7 (11,415m3) - Scr
SC2E-80630 Bulk Earthworks - Fill 9 from Cut 8 (14,306m3) - Scr
SC2E-80640 Bulk Earthworks - Fill 10B from Cut 9 (7,661m3) - Scr
SC2T-18760 Bulk Earthworks - Cut 8 within (3,543m3) - Scr
SC2E-20810 Bulk Earthworks - Fill 22 from Cut 23 (21,363m3) - Scr
SC2E-22100 Bulk Earthworks - Fill 16B from Cut 17 (7,242m3) - Scr
SC2E-20690 Bulk Earthworks - Fill 17 from Cut 17 (28,258m3) - Scr
SC2E-22590 Bulk Earthworks - Cut 17 within (6,700m3) - Scr
SC2E-21200 Bulk Earthworks - Fill 31 from Cut 32 (9,000m3) - Scr [Stage 1]
SC2E-22810 Bulk Earthworks - Fill 17 within (8,200m3) - Scr
SC2E-22790 Bulk Earthworks - Fill 16C within (3,100m3) - Scr
SC2E-23000 Bulk Earthworks - Fill 22 within (6,700m3) - Scr
SC2T-17860 Foundation Treatment [Drainage Blanket] - Cut 31 (1355m3)
SC2E-20820 Bulk Earthworks - Fill 16B from Cut 16 (17,700m3) - Scr
SC2T-17660 Bulk Earthworks - Fill 34 from Cut 35 (29,305m3) - Scr
SC2E-21220 Bulk Earthworks - Fill 32 from Cut 32 (5,586m3) - Scr
SC2E-22930 Bulk Earthworks - Fill 17 from Cut 18 (13,644m3) - Scr [Stage 2]
SC2E-23370 Bulk Earthworks - Fill 22 from Cut 22 (10,424m3) - Scr [Stage 2]
SC2E-22230 Bulk Earthworks - Cut 19 BSG from Cut 21 (30,000m3) - Scr
SC2E-80810 Bulk Earthworks - Fill 18 from Cut 18 (13,644m3) - Scr [Stage 2]
SC2E-23690 Bulk Earthworks - Fill 20 from Cut 21 (28,669m3) - Scr [Stage 2]
SC2T-19130 Foundation Treatment [Drainage Blanket] - Cut 32 (1435m3)
SC2T-19180 Foundation Treatment [Drainage Blanket] - Cut 35 (4,105m3)
SC2T-19200 Foundation Treatment [Bridging] - Fill 37 (5,504m3)
SC2T-19210 Foundation Treatment [Bridging] - Fill 39 (2,348m3)

2367.1165413534
Budgeted Units / Time Remaining Units / Time Budgeted Units Remaining Units
2663/d 2663/d 10650 10650
1892/d 1892/d 3784 3784
2296/d 2296/d 6889 6889
2252/d 2252/d 6757 6757
2420/d 2420/d 4839 4839
3008/d 3008/d 39105 39105
2802/d 2802/d 22416 22416
2405/d 2405/d 7216 7216
2877/d 2877/d 20140 20140
2281/d 2281/d 6844 6844
2704/d 2704/d 16224 16224
2687/d 2687/d 18810 18810
2617/d 2808/d 15700 11231
2917/d 2917/d 17504 17504
1941/d 1941/d 3882 3882
2877/d 2877/d 23019 23019
2000/d 2000/d 3999 3999
2573/d 2573/d 10293 10293
2898/d 2898/d 20286 20286
1539/d 1539/d 3078 3078
2592/d 2592/d 12959 12959
2681/d 2681/d 8042 8042
2940/d 2940/d 35274 35274
2923/d 2923/d 17540 17540
1865/d 1865/d 3729 3729
1873/d 1873/d 3745 3745
2452/d 2452/d 12262 12262
2645/d 2645/d 7936 7936
2888/d 2888/d 5776 5776
2233/d 2233/d 6699 6699
1758/d 1758/d 3516 3516
2134/d 2134/d 6401 6401
2342/d 2342/d 9369 9369
2854/d 2854/d 11415 11415
2861/d 2861/d 14306 14306
2554/d 2554/d 7661 7661
1772/d 1772/d 3543 3543
2822/d 2822/d 25400 25400
2414/d 2414/d 7242 7242
2826/d 2826/d 28258 28258
2233/d 2233/d 6700 6700
3000/d 3000/d 9000 9000
2050/d 2050/d 8200 8200
1550/d 1550/d 3100 3100
2233/d 2233/d 6700 6700
3/d 3/d 5 5
2950/d 2950/d 17700 17700
2093/d 2176/d 29305 6527
2793/d 2793/d 5586 5586
2589/d 2693/d 12945 10772
2085/d 2085/d 10424 10424
1049/d 1049/d 15741 15741
2729/d 2494/d 13644 12470
2867/d 2867/d 28669 28669
3/d 3/d 5 5
1/d 1/d 5 5
1/d 1/d 5 5
2/d 2/d 5 5
686368
VAR Original Duration Remaining Duration VAR
0 4 4 0
0 2 2 0
0 3 3 0
0 3 3 0
0 2 2 0
0 13 13 0
0 8 8 0
0 3 3 0
0 7 7 0
0 3 3 0
0 6 6 0
0 7 7 0
4469 6 4 2
0 6 6 0
0 2 2 0
0 8 8 0
0 2 2 0
0 4 4 0
0 7 7 0
0 2 2 0
0 5 5 0
0 3 3 0
0 12 12 0
0 6 6 0
0 2 2 0
0 2 2 0
0 5 5 0
0 3 3 0
0 2 2 0
0 3 3 0
0 2 2 0
0 3 3 0
0 4 4 0
0 4 4 0
0 5 5 0
0 3 3 0
0 2 2 0
0 9 9 0
0 3 3 0
0 10 10 0
0 3 3 0
0 3 3 0
0 4 4 0
0 2 2 0
0 3 3 0
0 2 2 0
0 6 6 0
22778 14 3 11
0 2 2 0
2173 5 4 1
0 5 5 0
0 15 15 0
1174 5 5 0
0 10 10 0
0 2 2 0
0 4 4 0
0 6 6 0
0 3 3 0 1329 Actual Production supplied by AW
84111 337 104 809 Average Production Achieved (Actual U
2037 Production Required (Remaining Units /
2200 Most Likely in OPRA Outputs
3000 BOS Assumption

Tender (BOS) (Per this Workbook) Current Perf


Best Case Most Likely Worst Case
3000 2200 809

Issue: Actual supplied by AW does not match P6 average. If AW figures are correct then the remaining m3 in P6 is overstated b
54105m3 which will decrease the required productions to 1876. This some way short of the suggested Most likely which mean
durations in P6 are too conservative and could be shortened by roughly 15%
oduction supplied by AW
Production Achieved (Actual Units/Actual duration)
on Required (Remaining Units / Remaining Duration
ly in OPRA Outputs

aining m3 in P6 is overstated by
gested Most likely which means
Activity ID Activity Name
SC2E-21770 Bulk Earthworks - Cut 36 to Fill 37 (18,700m3) - Scr
SC2E-21680 Bulk Earthworks - Fill 29 from Cut 27 (23,772m3) - Scr
SC2E-21450 Bulk Earthworks - Fill 39 from Cut 39 (9,500m3) - Scr
SC2E-22870 Bulk Earthworks - Fill 29 from Cut 25 & 26 (37,235m3) - Scr
SC2T-17670 Bulk Earthworks - Fill 37 from Cut 36 (18,700m3) - Scr
SC2T-17640 Bulk Earthworks - Fill 30 from Cut 31 (72,561m3) - Scr
SC2E-21260 Bulk Earthworks - Fill 35 from Cut 35 (57,700m3) - Scr
SC2E-22360 Bulk Earthworks - Fill 40 from Cut 39 (5900m3) - Scr
SC2E-21790 Bulk Earthworks - Fill 38 from Cut 37 (5,700m3) - Scr
SC2E-21740 Bulk Earthworks - Fill 32 from Cut 34 (6,912m3) - Scr
SC2E-22330 Bulk Earthworks - Fill 32 from Cut 33 (9,576m3) - Scr
SC2E-21370 Bulk Earthworks - Fill 26 from Cut 27 (6,097m3) - Scr
SC2E-21160 Bulk Earthworks - Fill 29 from Cut 29 (17,465m3) - Scr
SC2E-21420 Bulk Earthworks - Cut 35 to Fill 35 (57,700m3) - Scr
SC2E-20770 Bulk Earthworks - Fill 21 from Cut 22 (9,200m3) - Scr [Stage 1]
SC2T-17700 Bulk Earthworks - Fill 40 from Cut 40 (7600m3) - Scr
SC2T-17680 Bulk Earthworks - Fill 37 from Cut 37 (8,200m3) - Scr
SC2E-21690 Bulk Earthworks - Fill 29 from Cut 28 (37,478m3) - Scr
SC2E-21140 Bulk Earthworks - Fill 27 & 28 from Cut 28 (21,610m3) - Scr
SC2E-80200 Bulk Earthworks - Fill 36 within (10,900m3) - Scr
SC2E-80300 Bulk Earthworks - Fill 40 within (8,100m3) - Scr
SC2T-18720 Bulk Earthworks - Fill 30 from Cut 30 (28,025m3) - Scr [Stage 2]
SC2E-80420 Bulk Earthworks - Fill 31 from Cut 32 (15,898m3) - Scr [Stage 2]
SC2E-80440 Bulk Earthworks - Fill 33 from Cut 34 (6,783m3) - Scr [Stage 2]
SC2E-23410 Bulk Earthworks - Fill 20 from Cut 22 (12,744m3) - Scr
SC2E-25900 Bulk Earthworks - Fill 29 from Cut 30 (43,493m3) - Scr
SC2E-23780 Bulk Earthworks - Fill 23B from Cut 24 (4,980m3) - Scr
SC2E-23900 Bulk Earthworks - Fill 23A from Cut 23 (4,037m3) - Scr
SC2E-20930 Bulk Earthworks - Fill 19 from Cut 19 (6,400m3) - Scr [Stage 2]
SC2E-23500 Bulk Earthworks - Fill 21 from Cut 22 (9,200m3) - Scr [Stage 2]
SC2E-21300 Bulk Earthworks - Fill 37 from Cut 35 (46,500m3) - Scr

3516
Budgeted Units / Time Remaining Units / Time Budgeted Units Remaining Units VAR
4675/d 4675/d 18700 18700 0
4754/d 4754/d 23772 23772 0
4750/d 4750/d 9500 9500 0
4654/d 4654/d 37235 37235 0
4675/d 4675/d 18700 18700 0
621/d 621/d 20500 20500 0
4808/d 4808/d 57700 57700 0
2950/d 2950/d 5900 5900 0
2850/d 2850/d 5700 5700 0
1950/d 1950/d 3900 3900 0
4788/d 4788/d 9576 9576 0
3049/d 3049/d 6097 6097 0
4366/d 4366/d 17465 17465 0
4808/d 4808/d 57700 57700 0
3050/d 3050/d 12200 12200 0
3800/d 3800/d 7600 7600 0
4100/d 4100/d 8200 8200 0
4685/d 4685/d 37478 37478 0
4322/d 4322/d 21610 21610 0
3633/d 3633/d 10900 10900 0
4050/d 4050/d 8100 8100 0
4671/d 4671/d 28025 28025 0
3550/d 3550/d 14200 14200 0
4450/d 4450/d 8900 8900 0
4248/d 4248/d 12744 12744 0
4833/d 4833/d 43493 43493 0
2297/d 2297/d 4594 4594 0
2019/d 2019/d 4037 4037 0
2133/d 2133/d 6400 6400 0
3067/d 3067/d 9200 9200 0
4650/d 4650/d 46500 46500 0
614326 239617
=

Tender (BOS)
Best Case
5000
576626 164 3516.012195122

Issue: Actual supplied by AW does not match P6 average.


by24069m3 which will decrease the required productions
P6 are too conservative and could be reduced by roughly
This means durations in P6 are too conservative and could
Original Duration Remaining Duration VAR
4 4 0
5 5 0
2 2 0
8 8 0
4 4 0
33 33 0
12 12 0
2 2 0
2 2 0
2 2 0
2 2 0
2 2 0
4 4 0
12 12 0
4 4 0
2 2 0
2 2 0
8 8 0
5 5 0
3 3 0
2 2 0
6 6 0
4 4 0
2 2 0
3 3 0
9 9 0
2 2 0
2 2 0
3 3 0
3 3 0
10 10 0 2334 Actual Production supplied by AW
192 113 2121 Average Production Achieved
3200 Production Required
4000 Most Likely in OPRA Outputs
(Per this Workbook) Current Perf 5000 BOS Assumption
Most Likely Worst Case
4000 2121

AW does not match P6 average. If AW figures are correct then the remaining m3 in P6 is overstated
ecrease the required productions to 3071. This is some way short of Most Likely which means durations in
and could be reduced by roughly
P6 are too conservative and could be shortened by roughly 30%
Activity ID Activity Name
SC7H-20461 Bored Piling for Abutment B
SC7W-17371 Bored Piling for Abutment B
SC7E-12401 Piling for Abutment A & B + middle Portal Pier
SC7T-14391 Piling (Piers 1 & 2)
SC7W-20471 Piling for Abutment A
SC7H-20451 Bored Piling for Abutment B
SC7H-11451 Bored Piling for Abutment B + middle Portal Pier
SC7H-11831 Bored Piling for Abutment A & B
SC7H-13490 Bored Piling for Abutments A & B + middle Pier 1 (NB & SB)
SC7H-20441 Bored Piling for Abutment B + middle Pier
SC7H-19911 Bored Piling for Abutment A & B
SC7H-20311 Bored Piling for Abutment A & B
SC7H-16431 Bored Piling for Abutment A & middle Portal Piers 1& 2
SC7E-14401 Piling (Abutments A & B)
SC7H-15861 Bored Piling
SC7H-16761 Bored Piling for Abutment B
SC7E-15111 Excavate & Piling
SC7H-16391 Bored Piling
SC7H-17991 Bored Piling for Abutments A & B + middle Portals Pier 1& 2
SC7H-17271 Bored Piling for Abutments A & B + middle Portal Piers
SC7H-17351 Bored Piling for Abutments A + middle Portal Pier 1
SC7H-17250 Bored Piling for Abutment A + middle Portal Piers 1 & 2
SC7H-17850 Bored Piling for Abutments A & B + middle Portal Pier 1 & 2
SC7H-18790 Bored Piling for Abutments A & B + middle Portals Pier 1& 2
SC7H-19861 Bored Piling for Abutments A & B + middle Portals Pier 1& 2
SC7H-17891 Bored Piling for Abutments A & B
SC7H-19431 Bored Piling for Abutment A + middle Portal Pier
SC7H-19441 Bored Piling for Abutment A & B + middle Portal Pier
SC7H-18701 Piling for Abutments A & B + middle Portals Pier
SC7H-19341 Bored Piling for Abutments A + middle Portal Pier
Budgeted Units / Time Remaining Units / Time Budgeted Units Remaining Units
20/d 20/d 120 120
17/d 17/d 66 66
17/d 17/d 116 116
11/d 11/d 66 0
8/d 8/d 42 42
13/d 13/d 64 64
7/d 7/d 40 40
14/d 14/d 109 109
19/d 21/d 288 0
8/d 8/d 42 42
14/d 14/d 82 82
21/d 21/d 106 106
11/d 11/d 99 99
12/d 12/d 72 72
10/d 10/d 40 40
8/d 8/d 40 40
4/d 4/d 40 40
10/d 10/d 40 40
24/d 24/d 379 379
24/d 24/d 378 378
22/d 22/d 241 241
13/d 13/d 78 78
46/d 0/d 368 0
17/d 17/d 165 0
18/d 18/d 183 183
15/d 22/d 88 0
17/d 17/d 116 116
14/d 14/d 142 142
20/d 20/d 140 140
15/d 15/d 120 120
2895
VAR Original Duration Remaining Duration VAR
0 6 6 0
0 4 4 0
0 7 7 0
66 6 0 6
0 5 5 0
0 5 5 0
0 6 6 0
0 8 8 0
288 15 0 15
0 5 5 0
0 6 6 0
0 5 5 0
0 9 9 0
0 6 6 0
0 4 4 0
0 5 5 0
0 10 10 0
0 4 4 0
0 16 16 0
0 16 16 0
0 11 11 0
0 6 6 0
368 8 0 8
165 10 0 10
0 10 10 0
88 6 0 6
0 7 7 0
0 10 10 0
0 7 7 0
0 8 8 0
975 186 45
22 Average Production Achieved
16 Production Required
30 Most Likely in OPRA Outputs
40 BOS Assumption
Average Production Achieved
Production Required
Most Likely in OPRA Outputs
BOS Assumption
Activity ID Activity Name
Tranverse Drainage RCP
SC2D-21680 Install 1 x RCP culvert @ 18640 (1200)
SC2D-21650 Install 1 x RCP culvert @ ch.10040 (900)
SC2D-18260 Install 1 x RCP culvert @ ch.10040 (900)
SC2D-17200 Install 1 x RCP culvert @ ch.12320 (675)
SC2D-17190 Install 1 x RCP culvert @ ch.12350 (675)
SC2D-21470 Install 1 x RCP culvert @ ch.12550 (600) (Hoys Rd)
SC2D-17220 Install 1 x RCP culvert @ ch.12740 (375) (Hoys Rd)
SC2D-17300 Install 1 x RCP culvert @ ch.15520 (450)
SC2D-17650 Install 1 x RCP culvert @ ch.16850 (450) (Local Road)
SC2D-17660 Install 1 x RCP culvert @ ch.16950 (450) (Local Road)
SC2D-21270 Install 1 x RCP culvert @ ch.17400 Access Rd (450) (Local Rd)
SC2D-21570 Install 1 x RCP culvert @ ch.17900 (600)
SC2D-21580 Install 1 x RCP culvert @ ch.18000 (675) (Local Rd)
SC2D-17450 Install 1 x RCP culvert @ ch.18630 (900)
SC2D-17980 Install 1 x RCP culvert @ ch.18640 (1200)
SC2D-17470 Install 1 x RCP culvert @ ch.18890 (900)
SC2D-17460 Install 1 x RCP culvert @ ch.18890 (900)
SC2D-20940 Install 1 x RCP culvert @ ch.20540 (750)
SC2D-17480 Install 1 x RCP culvert @ ch.20540 (750)
SC2D-17520 Install 1 x RCP culvert @ ch.22020 (750) - Western Bridge Ramp
SC2D-17540 Install 1 x RCP culvert @ ch.22150 (1200) - Mainline
SC2D-17560 Install 1 x RCP culvert @ ch.22400 (1050) - Mainline
SC2D-17550 Install 1 x RCP culvert @ ch.22400 (1200) - Eastern Roundabout
SC2D-17590 Install 1 x RCP culvert @ ch.22950 (750) - Mainline
SC2D-80170 Install 1 x RCP culvert @ ch.22970 (900)
SC2D-17630 Install 1 x RCP culvert @ ch.22980 (900)
SC2D-17710 Install 1 x RCP culvert @ ch.24070 (450)
SC2D-17770 Install 1 x RCP culvert @ ch.26130 (450)
SC2D-18230 Install 1 x RCP culvert @ ch.26200 (1200) - Mainline
SC2D-17760 Install 1 x RCP culvert @ ch.26200 (1200) - Property Access
SC2D-17820 Install 1 x RCP culvert @ ch.27745 (1200)
SC2D-17890 Install 1 x RCP culvert @ ch.29930 (750)
SC2D-17910 Install 1 x RCP culvert @ ch.31000 (750)
SC2D-80180 Install 1 x RCP culvert @ ch.31480 (900)
SC2D-17050 Install 1 x RCP culvert @ ch.7060 (1200)
SC2D-21440 Install 1 x RCP culvert @ ch.7380 (600)
SC2D-17070 Install 1 x RCP culvert @ ch.7740 (750)
SC2D-17060 Install 1 x RCP culvert @ ch.7740 (750)
SC2D-17080 Install 1 x RCP culvert @ ch.8170 (900)
SC2D-18220 Install 1 x RCP culvert @ ch.8720 (750)
SC2D-17130 Install 1 x RCP culvert @ ch.8850 (1050)
SC2D-17100 Install 1 x RCP culvert @ ch.8850 (1050)
SC2D-18250 Install 1 x RCP culvert @ ch.9500 (750)
SC2D-21480 Install 1 x RCP culverts @ ch.13280
SC2D-21500 Install 1 x RCP culverts @ ch.16320 (450) (Smiths Rd)
SC2D-21510 Install 1 x RCP culverts @ ch.16330 (375) (Smiths Rd)
SC2D-21520 Install 1 x RCP culverts @ ch.16350 (450) (Smiths Rd)
SC2D-21530 Install 1 x RCP culverts @ ch.16360 (450) (Smiths Rd)
SC2D-21540 Install 1 x RCP culverts @ ch.16470 (450) (Smiths Rd)
SC2D-21550 Install 1 x RCP culverts @ ch.16500 (900) (Smiths Rd)
SC2D-21250 Install 1 x RCP culverts @ ch.23470 (900)
SC2D-18190 Install 1 x RCP culverts @ ch.24970 (1350)
SC2D-17340 Install 11 x RCP culverts @ ch.17150 (1200)
SC2D-21170 Install 11 x RCP culverts @ ch.17150 (1200)
SC2D-17350 Install 11 x RCP culverts @ ch.17190 (1200)
SC2D-21200 Install 11 x RCP culverts @ ch.17190 (1200)
SC2D-21190 Install 11 x RCP culverts @ ch.17280 (1200)
SC2D-17370 Install 11 x RCP culverts @ ch.17280 (1200)
SC2D-17380 Install 11 x RCP culverts @ ch.17320 (1200)
SC2D-21210 Install 11 x RCP culverts @ ch.17320 (1200)
SC2D-17400 Install 11 x RCP culverts @ ch.17420 (1200)
SC2D-21180 Install 11 x RCP culverts @ ch.17420 (1200)
SC2D-17410 Install 11 x RCP culverts @ ch.17480 (1200)
SC2D-21220 Install 11 x RCP culverts @ ch.17480 1200)
SC2D-21240 Install 1x RCP culvert @ ch.23030 (1200)
SC2D-17990 Install 1x RCP culvert @ ch.23150 (450)
SC2D-18050 Install 1x RCP culvert @ ch.23160 (750)
SC2D-18170 Install 2 x RCP culvert @ ch.22150 (750) - Western Roundabout
SC2D-17900 Install 2 x RCP culvert @ ch.29040 (1200)
SC2D-17210 Install 2 x RCP culverts @ ch.12710 (600) (Hoys Rd)
SC2D-17230 Install 2 x RCP culverts @ ch.12850 (750) (Hoys Rd)
SC2D-21660 Install 2 x RCP culverts @ ch.13410 (1500)
SC2D-17250 Install 2 x RCP culverts @ ch.13410 (1500)
SC2D-81110 Install 2 x RCP culverts @ ch.13410 (1500)
SC2D-17270 Install 2 x RCP culverts @ ch.14010 (1050)
SC2D-17360 Install 2 x RCP culverts @ ch.17240 (1800)
SC2D-21150 Install 2 x RCP culverts @ ch.17240 (1800) (Local Rd)
SC2D-17430 Install 2 x RCP culverts @ ch.18080 (600)
SC2D-17970 Install 2 x RCP culverts @ ch.18090 (750)
SC2D-21670 Install 2 x RCP culverts @ ch.18090 (750)
SC2D-17600 Install 2 x RCP culverts @ ch.22790 (900)
SC2D-18060 Install 2 x RCP culverts @ ch.24970 (1200)
SC2D-17780 Install 2 x RCP culverts @ ch.27000 (1200)
SC2D-17830 Install 2 x RCP culverts @ ch.28030 (1200)
SC2D-17090 Install 2 x RCP culverts @ ch.8720 (750)
SC2D-21640 Install 2 x RCP culverts @ ch.9500 (750)
SC2D-20910 Install 3 x RCP culverts @ ch.10980 (1050 x 1350)
SC2D-17150 Install 3 x RCP culverts @ ch.10980 (1050 x 1350)
SC2D-81100 Install 3 x RCP culverts @ ch.10980 (1050 x 1350)
SC2D-17260 Install 3 x RCP culverts @ ch.13970 (1050)
SC2D-18010 Install 3 x RCP culverts @ ch.13970 (1050)
SC2D-17310 Install 3 x RCP culverts @ ch.16480 (450) (Smiths Rd)
SC2D-17330 Install 3 x RCP culverts @ ch.17110 (1800)
SC2D-21160 Install 3 x RCP culverts @ ch.17110 (1800)
SC2D-17390 Install 3 x RCP culverts @ ch.17350 (1800)
SC2D-21140 Install 3 x RCP culverts @ ch.17350 (1800)
SC2D-17440 Install 3 x RCP culverts @ ch.18630 (900)
SC2D-18030 Install 3 x RCP culverts @ ch.20070 (1200)
SC2D-18040 Install 3 x RCP culverts @ ch.20070 (1200)
SC2D-17500 Install 3 x RCP culverts @ ch.21140 (900)
SC2D-17670 Install 3 x RCP culverts @ ch.23560 (900)
SC2D-17800 Install 3 x RCP culverts @ ch.27300 (1200)
SC2D-17810 Install 3 x RCP culverts @ ch.27400 (1200)
SC2D-17840 Install 3 x RCP culverts @ ch.28190 (1350)
SC2D-17040 Install 3 x RCP culverts @ ch.6930 (750)
SC2D-17240 Install 4 x RCP culverts @ ch.12720 (750) (Hoys Rd)
SC2D-21490 Install 4 x RCP culverts @ ch.14000 (900) (Bucca Rd)
SC2D-17290 Install 4 x RCP culverts @ ch.15220 (900)
SC2D-18000 Install 4 x RCP culverts @ ch.20900 (900)
SC2D-17490 Install 4 x RCP culverts @ ch.20900 (900)
SC2D-17510 Install 4 x RCP culverts @ ch.21140 (900)
SC2D-21690 Install 5 x RCP culverts @ ch.10050 (1500)
SC2D-17140 Install 5 x RCP culverts @ ch.10050 (1500)
SC2D-17640 Install 5 x RCP culverts @ ch.12300 (1200)
SC2D-17170 Install 5 x RCP culverts @ ch.12300 (1200)
SC2D-20920 Install 5 x RCP culverts @ ch.16540 (1050)
SC2D-17320 Install 5 x RCP culverts @ ch.16540 (1050)
SC2D-17420 Install 5 x RCP culverts @ ch.18080 (600)
SC2D-17730 Install 5 x RCP culverts @ ch.24620 (1050)
SC2D-17850 Install 6 x RCP culverts @ ch.28485 (1200)
SC2D-17180 Install 7 x RCP culverts @ ch.12310
SC2D-18380 Install RCP culvert (Stokes Property) @ ch.17100 - 17400
SC2D-18180 Install RCP Headwall @ ch.24620 (1050)
Tranverse Drainage RCBC
SC2D-18300 Install 1 x RCBC culvert @ ch.11510 (2400 x 2400 Fauna Crossin
SC2D-18020 Install 1 x RCBC culvert @ ch.11510 (2400 x 2400 Fauna Crossin
SC2D-81080 Install 1 x RCBC culvert @ ch.11510 (2400 x 2400 Fauna Crossin
SC2D-21350 Install 1 x RCBC culvert @ ch.18320 (2400 x1200)
SC2D-18210 Install 1 x RCBC culvert @ ch.8250 (3000 x 3000)
SC2D-18240 Install 1 x RCBC culvert @ ch.9260 (1200 x 1200)
SC2D-17740 Install 1 x RCBC culverts @ ch.24950
SC2D-20930 Install 2 x RCBC culverts @ ch.17720 (2400 x 1500)
SC2D-18370 Install 2 x RCBC culverts @ ch.17720 (2400 x 1500)
SC2D-81140 Install 2 x RCBC culverts @ ch.17720 (2400 x 1500)
SC2D-21560 Install 2 x RCBC culverts @ ch.17750 (2400 x 1500)
SC2D-21460 Install 3 x RCBC culverts @ 10360 (1800 x 1500) (Property Acces
SC2D-18270 Install 3 x RCBC culverts @ ch.10370 (2400 x 1500) (Property Ac
SC2D-20900 Install 3 x RCBC culverts @ ch.10380 (2100 x 2100)
SC2D-17120 Install 3 x RCBC culverts @ ch.10380 (2100 x 2100)
SC2D-81090 Install 3 x RCBC culverts @ ch.10380 (2100 x 2100)
SC2D-18290 Install 3 x RCBC culverts @ ch.11500 (2100 x 2100)
SC2D-17280 Install 3 x RCBC culverts @ ch.11500 (2100 x 2100)
SC2D-21360 Install 3 x RCBC culverts @ ch.18320 (2400 x 1200)
SC2D-18390 Install 3 x RCBC culverts @ ch.18330 (2400 x 1200)
SC2D-18400 Install 3 x RCBC culverts @ ch.18330 (2400 x 1200)
SC2D-18490 Install 3 x RCBC culverts @ ch.19900 (2400 x 600)
SC2D-18480 Install 3 x RCBC culverts @ ch.19900 (2400 x 600)
SC2D-18510 Install 3 x RCBC culverts @ ch.20050 (2400 x 600)
SC2D-18500 Install 3 x RCBC culverts @ ch.20050 (2400 x 600)
SC2D-18200 Install 3 x RCBC culverts @ ch.7550 (1800 x 1500)
SC2D-18310 Install 4 x RCBC culverts @ ch.14600 (2400 x 1200)
SC2D-18320 Install 4 x RCBC culverts @ ch.14600 (2400 x 1200)
SC2D-81130 Install 4 x RCBC culverts @ ch.14600 (2400 x 1200)
SC2D-18360 Install 4 x RCBC culverts @ ch.15950 (2400 x 1200)
SC2D-18430 Install 4 x RCBC culverts @ ch.19660 (2400 x 600)
SC2D-18420 Install 4 x RCBC culverts @ ch.19660 (2400 x 600)
SC2D-18440 Install 4 x RCBC culverts @ ch.19720 (2400 x 600)
SC2D-18450 Install 4 x RCBC culverts @ ch.19720 (2400 x 600)
SC2D-18460 Install 4 x RCBC culverts @ ch.19780 (2400 x 600)
SC2D-18470 Install 4 x RCBC culverts @ ch.19780 (2400 x 600)
SC2D-18330 Install 5 x RCBC culverts @ ch.14800 (2400 x 1800)
SC2D-18340 Install 5 x RCBC culverts @ ch.15000 (2400 x 1200)
SC2D-18350 Install 5 x RCBC culverts @ ch.15660 (2400 x 1800)
SC2D-18520 Install 5 x RCBC culverts @ ch.20130 (2400 x 600)
SC2D-18530 Install 5 x RCBC culverts @ ch.20130 (2400 x 600)
SC2D-18540 Install 5 x RCBC culverts @ ch.20200 (2400 x 600)
SC2D-18550 Install 5 x RCBC culverts @ ch.20200 (2400 x 600)
SC2D-18560 Install 5 x RCBC culverts @ ch.20260 (2400 x 600)
SC2D-18570 Install 5 x RCBC culverts @ ch.20260 (2400 x 600)
SC2D-18580 Install 5 x RCBC culverts @ ch.20340 (2400 x 600)
SC2D-18590 Install 5 x RCBC culverts @ ch.20340 (2400 x 600)
SC2D-80200 Install 5 x RCBC culverts @ ch.30050 SB
SC2D-80190 Install 5 x RCBC culverts @ ch.30060 NB
SC2D-80210 Install 5 x RCBC culverts @ ch.30400 NB
SC2D-80220 Install 5 x RCBC culverts @ ch.30410 SB
SC2D-18740 Install 5 x RCBC culverts @ ch.31550 Eastern Roundabout
SC2D-18730 Install 5 x RCBC culverts @ ch.31550 Mainline
SC2D-18760 Install 5 x RCBC culverts @ ch.31940 E
SC2D-18750 Install 5 x RCBC culverts @ ch.31940 W
Budgeted Units / Time Remaining Units / Time Budgeted Units

13/d 13/d 52
14/d 14/d 27
32/d 32/d 63
14/d 14/d 42
17/d 17/d 85
13/d 13/d 63
9/d 9/d 17
13/d 25/d 50
12/d 12/d 23
9/d 9/d 17
14/d 14/d 27
11/d 11/d 22
10/d 10/d 29
15/d 15/d 77
7/d 7/d 13
14/d 14/d 56
12/d 12/d 24
4/d 4/d 7
7/d 7/d 29
26/d 26/d 26
16/d 16/d 65
29/d 29/d 87
29/d 29/d 88
14/d 14/d 57
18/d 18/d 18
29/d 29/d 57
23/d 45/d 45
22/d 22/d 66
28/d 28/d 56
10/d 10/d 10
26/d 26/d 78
17/d 17/d 34
25/d 25/d 98
23/d 23/d 46
13/d 13/d 26
8/d 8/d 15
10/d 10/d 20
26/d 26/d 79
5/d 5/d 10
21/d 21/d 107
4/d 4/d 7
20/d 20/d 80
25/d 25/d 203
11/d 11/d 34
10/d 10/d 20
6/d 6/d 12
6/d 6/d 23
7/d 7/d 20
7/d 7/d 20
5/d 5/d 21
12/d 12/d 24
22/d 22/d 44
11/d 15/d 293
16/d 15/d 457
7/d 7/d 134
15/d 10/d 349
19/d 12/d 403
4/d 8/d 108
4/d 9/d 107
17/d 12/d 429
4/d 4/d 80
16/d 16/d 510
7/d 7/d 107
13/d 13/d 528
34/d 8/d 515
16/d 16/d 16
14/d 14/d 27
10/d 10/d 10
20/d 20/d 140
17/d 17/d 34
12/d 12/d 49
14/d 14/d 54
15/d 15/d 46
3/d 3/d 54
20/d 20/d 39
1/d 1/d 24
8/d 8/d 68
59/d 59/d 177
27/d 27/d 82
28/d 28/d 55
24/d 24/d 122
26/d 26/d 132
29/d 46/d 229
22/d 22/d 132
6/d 6/d 12
22/d 22/d 87
16/d 16/d 64
24/d 24/d 97
5/d 5/d 97
26/d 26/d 77
24/d 24/d 73
8/d 8/d 23
5/d 3/d 48
3/d 3/d 73
2/d 2/d 26
4/d 4/d 125
22/d 22/d 44
27/d 27/d 53
40/d 40/d 79
4/d 4/d 7
36/d 36/d 72
29/d 29/d 285
26/d 41/d 285
24/d 24/d 212
13/d 13/d 26
22/d 22/d 109
33/d 33/d 98
17/d 19/d 244
12/d 12/d 24
16/d 16/d 93
15/d 15/d 77
13/d 13/d 50
13/d 13/d 263
31/d 31/d 371
23/d 43/d 690
5/d 11/d 134
21/d 21/d 208
9/d 9/d 18
29/d 29/d 380
28/d 28/d 393
36/d 36/d 547
20/d 20/d 400
32/d 32/d 63

1/d 1/d 31
3/d 3/d 72
4/d 4/d 72
9/d 9/d 37
3/d 3/d 44
4/d 4/d 71
2/d 6/d 30
2/d 2/d 60
9/d 9/d 140
3/d 3/d 60
5/d 5/d 36
3/d 3/d 22
4/d 4/d 22
5/d 5/d 142
5/d 5/d 94
5/d 5/d 94
1/d 1/d 86
6/d 6/d 137
20/d 20/d 80
14/d 14/d 115
10/d 10/d 77
2/d 2/d 18
8/d 8/d 92
5/d 5/d 15
7/d 7/d 80
7/d 7/d 148
10/d 10/d 230
11/d 11/d 345
19/d 19/d 345
3/d 4/d 206
5/d 5/d 20
10/d 10/d 137
9/d 9/d 127
5/d 5/d 20
9/d 9/d 132
6/d 6/d 24
9/d 9/d 317
5/d 4/d 246
4/d 4/d 241
6/d 6/d 109
5/d 5/d 19
6/d 6/d 110
5/d 5/d 19
7/d 7/d 116
5/d 5/d 18
8/d 8/d 141
5/d 5/d 18
12/d 12/d 183
4/d 4/d 64
11/d 11/d 171
13/d 13/d 195
6/d 6/d 96
4/d 4/d 64
1/d 1/d 7
1/d 1/d 37
Remaining Units VAR Original Duration Remaining Duration

52 0 4 4
27 0 2 2
63 0 2 2
42 0 3 3
85 0 5 5
63 0 5 5
17 0 2 2
0 50 4 0
23 0 2 2
17 0 2 2
27 0 2 2
22 0 2 2
29 0 3 3
77 0 5 5
13 0 2 2
56 0 4 4
24 0 2 2
7 0 2 2
29 0 4 4
26 0 1 1
65 0 4 4
87 0 3 3
88 0 3 3
0 57 4 0
18 0 1 1
57 0 2 2
0 45 2 0
66 0 3 3
56 0 2 2
10 0 1 1
78 0 3 3
34 0 2 2
98 0 4 4
46 0 2 2
26 0 2 2
15 0 2 2
20 0 2 2
79 0 3 3
10 0 2 2
107 0 5 5
7 0 2 2
80 0 4 4
203 0 8 8
34 0 3 3
20 0 2 2
12 0 2 2
23 0 4 4
20 0 3 3
20 0 3 3
21 0 4 4
24 0 2 2
44 0 2 2
293 0 28 19
457 0 28 31
134 0 20 19
349 0 23 34
403 0 21 35
108 0 30 14
107 0 30 12
429 0 26 36
80 0 19 19
510 0 31 31
107 0 15 15
528 0 42 42
0 515 15 0
16 0 1 1
27 0 2 2
10 0 1 1
140 0 7 7
34 0 2 2
49 0 4 4
54 0 4 4
46 0 3 3
54 0 18 18
39 0 2 2
24 0 21 21
68 0 9 9
177 0 3 3
82 0 3 3
55 0 2 2
122 0 5 5
132 0 5 5
229 0 8 5
0 132 6 0
12 0 2 2
87 0 4 4
64 0 4 4
97 0 4 4
97 0 18 18
77 0 3 3
73 0 3 3
23 0 3 3
48 0 10 18
73 0 26 26
26 0 15 15
125 0 31 31
44 0 2 2
53 0 2 2
79 0 2 2
7 0 2 2
0 72 2 0
285 0 10 10
285 0 11 7
0 212 9 0
26 0 2 2
109 0 5 5
98 0 3 3
244 0 14 13
24 0 2 2
93 0 6 6
77 0 5 5
50 0 4 4
263 0 20 20
371 0 12 12
690 0 30 16
134 0 28 12
208 0 10 10
18 0 2 2
380 0 13 13
0 393 14 0
547 0 15 15
400 0 20 20
63 0 2 2
1476
31 0 58 58
72 0 24 24
72 0 20 20
37 0 4 4
44 0 17 17
71 0 18 18
30 0 20 5
60 0 35 35
140 0 15 15
60 0 24 24
36 0 7 7
22 0 7 7
22 0 6 6
142 0 28 28
94 0 18 18
94 0 18 18
86 0 58 58
137 0 24 24
80 0 4 4
115 0 8 8
77 0 8 8
18 0 12 12
92 0 12 12
15 0 3 3
80 0 12 12
148 0 21 21
230 0 24 24
345 0 32 32
345 0 18 18
206 0 70 53
20 0 4 4
137 0 14 14
127 0 14 14
20 0 4 4
132 0 14 14
24 0 4 4
317 0 36 36
246 0 50 55
241 0 60 60
109 0 17 17
19 0 4 4
110 0 17 17
19 0 4 4
116 0 17 17
18 0 4 4
141 0 17 17
18 0 4 4
183 0 15 15
64 0 15 15
171 0 15 15
195 0 15 15
96 0 15 15
64 0 15 15
7 0 10 10
37 0 30 30
VAR ### ### ### ### ### ### ### ###

0
0
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9
-3
1
-11
-14
16
18
-10
0
0
0
0
15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
6
0
0
0
0
0
0
0
0
-8
0
0
0
0
0
0
0
2
0
4
9
0
0
0
1
0
0
0
0
0
0
14
16
0
0
0
14
0
0
0
0
0
0
0
0
0
0
15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
17
0
0
0
0
0
0
0
-5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
### ### 1-Oct-02 2-Oct-02 3-Oct-02 4-Oct-02 5-Oct-02 6-Oct-02 7-Oct-02 8-Oct-02
9-Oct-02 10-Oct-02 11-Oct-02 12-Oct-02 13-Oct-02 14-Oct-02 15-Oct-02 16-Oct-02 17-Oct-02 18-Oct-02
19-Oct-02 20-Oct-02 21-Oct-02 22-Oct-02 23-Oct-02 24-Oct-02 25-Oct-02 26-Oct-02 27-Oct-02 28-Oct-02
29-Oct-02 30-Oct-02 31-Oct-02 1-Nov-02 2-Nov-02 3-Nov-02 4-Nov-02 5-Nov-02 6-Nov-02 7-Nov-02
8-Nov-02 9-Nov-02 ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### 1-Dec-02 2-Dec-02 3-Dec-02 4-Dec-02 5-Dec-02 6-Dec-02 7-Dec-02
8-Dec-02 9-Dec-02 ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### 1-Jan-03 2-Jan-03 3-Jan-03 4-Jan-03 5-Jan-03 6-Jan-03
7-Jan-03 8-Jan-03 9-Jan-03 10-Jan-03 11-Jan-03 12-Jan-03 13-Jan-03 14-Jan-03 15-Jan-03 16-Jan-03
17-Jan-03 18-Jan-03 19-Jan-03 20-Jan-03 21-Jan-03 22-Jan-03 23-Jan-03 24-Jan-03 25-Jan-03 26-Jan-03
27-Jan-03 28-Jan-03 29-Jan-03 30-Jan-03 31-Jan-03 1-Feb-03 2-Feb-03 3-Feb-03 4-Feb-03 5-Feb-03
6-Feb-03 7-Feb-03 8-Feb-03 9-Feb-03 ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### 1-Mar-03 2-Mar-03 3-Mar-03 4-Mar-03 5-Mar-03 6-Mar-03 7-Mar-03
8-Mar-03 9-Mar-03 ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### 1-Apr-03 2-Apr-03 3-Apr-03 4-Apr-03 5-Apr-03 6-Apr-03
7-Apr-03 8-Apr-03 9-Apr-03 10-Apr-03 11-Apr-03 12-Apr-03 13-Apr-03 14-Apr-03 15-Apr-03 16-Apr-03
17-Apr-03 18-Apr-03 19-Apr-03 20-Apr-03 21-Apr-03 22-Apr-03 23-Apr-03 24-Apr-03 25-Apr-03 26-Apr-03
27-Apr-03 28-Apr-03 29-Apr-03 30-Apr-03 1-May-03 2-May-03 3-May-03 4-May-03 5-May-03 6-May-03
7-May-03 8-May-03 9-May-03 ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### 1-Jun-03 2-Jun-03 3-Jun-03 4-Jun-03 5-Jun-03
6-Jun-03 7-Jun-03 8-Jun-03 9-Jun-03 10-Jun-03 11-Jun-03 12-Jun-03 13-Jun-03 14-Jun-03 15-Jun-03
16-Jun-03 17-Jun-03 18-Jun-03 19-Jun-03 20-Jun-03 21-Jun-03 22-Jun-03 23-Jun-03 24-Jun-03 25-Jun-03
26-Jun-03 27-Jun-03 28-Jun-03 29-Jun-03 30-Jun-03 1-Jul-03 2-Jul-03 3-Jul-03 4-Jul-03 5-Jul-03
6-Jul-03 7-Jul-03 8-Jul-03 9-Jul-03 10-Jul-03 11-Jul-03 12-Jul-03 13-Jul-03 14-Jul-03 15-Jul-03
16-Jul-03 17-Jul-03 18-Jul-03 19-Jul-03 20-Jul-03 21-Jul-03 22-Jul-03 23-Jul-03 24-Jul-03 25-Jul-03
26-Jul-03 27-Jul-03 28-Jul-03 29-Jul-03 30-Jul-03 31-Jul-03 1-Aug-03 2-Aug-03 3-Aug-03 4-Aug-03
5-Aug-03 6-Aug-03 7-Aug-03 8-Aug-03 9-Aug-03 ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### 1-Sep-03 2-Sep-03 3-Sep-03
4-Sep-03 5-Sep-03 6-Sep-03 7-Sep-03 8-Sep-03 9-Sep-03 ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### 1-Oct-03 2-Oct-03 3-Oct-03
4-Oct-03 5-Oct-03 6-Oct-03 7-Oct-03 8-Oct-03 9-Oct-03 10-Oct-03 11-Oct-03 12-Oct-03 13-Oct-03
14-Oct-03 15-Oct-03 16-Oct-03 17-Oct-03 18-Oct-03 19-Oct-03 20-Oct-03 21-Oct-03 22-Oct-03 23-Oct-03
24-Oct-03 25-Oct-03 26-Oct-03 27-Oct-03 28-Oct-03 29-Oct-03 30-Oct-03 31-Oct-03 1-Nov-03 2-Nov-03
3-Nov-03 4-Nov-03 5-Nov-03 6-Nov-03 7-Nov-03 8-Nov-03 9-Nov-03 ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### 1-Dec-03 2-Dec-03
3-Dec-03 4-Dec-03 5-Dec-03 6-Dec-03 7-Dec-03 8-Dec-03 9-Dec-03 ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### 1-Jan-04
2-Jan-04 3-Jan-04 4-Jan-04 5-Jan-04 6-Jan-04 7-Jan-04 8-Jan-04 9-Jan-04 10-Jan-04 11-Jan-04
12-Jan-04 13-Jan-04 14-Jan-04 15-Jan-04 16-Jan-04 17-Jan-04 18-Jan-04 19-Jan-04 20-Jan-04 21-Jan-04
22-Jan-04 23-Jan-04 24-Jan-04 25-Jan-04 26-Jan-04 27-Jan-04 28-Jan-04 29-Jan-04 30-Jan-04 31-Jan-04
1-Feb-04 2-Feb-04 3-Feb-04 4-Feb-04 5-Feb-04 6-Feb-04 7-Feb-04 8-Feb-04 9-Feb-04 ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### 1-Mar-04
2-Mar-04 3-Mar-04 4-Mar-04 5-Mar-04 6-Mar-04 7-Mar-04 8-Mar-04 9-Mar-04 ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
1-Apr-04 2-Apr-04 3-Apr-04 4-Apr-04 5-Apr-04 6-Apr-04 7-Apr-04 8-Apr-04 9-Apr-04 10-Apr-04
11-Apr-04 12-Apr-04 13-Apr-04 14-Apr-04 15-Apr-04 16-Apr-04 17-Apr-04 18-Apr-04 19-Apr-04 20-Apr-04
21-Apr-04 22-Apr-04 23-Apr-04 24-Apr-04 25-Apr-04 26-Apr-04 27-Apr-04 28-Apr-04 29-Apr-04 30-Apr-04
1-May-04 2-May-04 3-May-04 4-May-04 5-May-04 6-May-04 7-May-04 8-May-04 9-May-04 ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### 1-Jun-04 2-Jun-04 3-Jun-04 4-Jun-04 5-Jun-04 6-Jun-04 7-Jun-04 8-Jun-04 9-Jun-04
10-Jun-04 11-Jun-04 12-Jun-04 13-Jun-04 14-Jun-04 15-Jun-04 16-Jun-04 17-Jun-04 18-Jun-04 19-Jun-04
20-Jun-04 21-Jun-04 22-Jun-04 23-Jun-04 24-Jun-04 25-Jun-04 26-Jun-04 27-Jun-04 28-Jun-04 29-Jun-04
30-Jun-04 1-Jul-04 2-Jul-04 3-Jul-04 4-Jul-04 5-Jul-04 6-Jul-04 7-Jul-04 8-Jul-04 9-Jul-04
10-Jul-04 11-Jul-04 12-Jul-04 13-Jul-04 14-Jul-04 15-Jul-04 16-Jul-04 17-Jul-04 18-Jul-04 19-Jul-04
20-Jul-04 21-Jul-04 22-Jul-04 23-Jul-04 24-Jul-04 25-Jul-04 26-Jul-04 27-Jul-04 28-Jul-04 29-Jul-04
30-Jul-04 31-Jul-04 1-Aug-04 2-Aug-04 3-Aug-04 4-Aug-04 5-Aug-04 6-Aug-04 7-Aug-04 8-Aug-04
9-Aug-04 ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### 1-Sep-04 2-Sep-04 3-Sep-04 4-Sep-04 5-Sep-04 6-Sep-04 7-Sep-04
8-Sep-04 9-Sep-04 ### ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### 1-Oct-04 2-Oct-04 3-Oct-04 4-Oct-04 5-Oct-04 6-Oct-04 7-Oct-04
8-Oct-04 9-Oct-04 10-Oct-04 11-Oct-04 12-Oct-04 13-Oct-04 14-Oct-04 15-Oct-04 16-Oct-04 17-Oct-04
18-Oct-04 19-Oct-04 20-Oct-04 21-Oct-04 22-Oct-04 23-Oct-04 24-Oct-04 25-Oct-04 26-Oct-04 27-Oct-04
28-Oct-04 29-Oct-04 30-Oct-04 31-Oct-04 1-Nov-04 2-Nov-04 3-Nov-04 4-Nov-04 5-Nov-04 6-Nov-04
7-Nov-04 8-Nov-04 9-Nov-04 ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### 1-Dec-04 2-Dec-04 3-Dec-04 4-Dec-04 5-Dec-04 6-Dec-04
7-Dec-04 8-Dec-04 9-Dec-04 ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### 1-Jan-05 2-Jan-05 3-Jan-05 4-Jan-05 5-Jan-05
6-Jan-05 7-Jan-05 8-Jan-05 9-Jan-05 10-Jan-05 11-Jan-05 12-Jan-05 13-Jan-05 14-Jan-05 15-Jan-05
16-Jan-05 17-Jan-05 18-Jan-05 19-Jan-05 20-Jan-05 21-Jan-05 22-Jan-05 23-Jan-05 24-Jan-05 25-Jan-05
26-Jan-05 27-Jan-05 28-Jan-05 29-Jan-05 30-Jan-05 31-Jan-05 1-Feb-05 2-Feb-05 3-Feb-05 4-Feb-05
5-Feb-05 6-Feb-05 7-Feb-05 8-Feb-05 9-Feb-05 ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### 1-Mar-05 2-Mar-05 3-Mar-05 4-Mar-05 5-Mar-05 6-Mar-05
7-Mar-05 8-Mar-05 9-Mar-05 ### ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### 1-Apr-05 2-Apr-05 3-Apr-05 4-Apr-05 5-Apr-05
6-Apr-05 7-Apr-05 8-Apr-05 9-Apr-05 10-Apr-05 11-Apr-05 12-Apr-05 13-Apr-05 14-Apr-05 15-Apr-05
16-Apr-05 17-Apr-05 18-Apr-05 19-Apr-05 20-Apr-05 21-Apr-05 22-Apr-05 23-Apr-05 24-Apr-05 25-Apr-05
26-Apr-05 27-Apr-05 28-Apr-05 29-Apr-05 30-Apr-05 1-May-05 2-May-05 3-May-05 4-May-05 5-May-05
6-May-05 7-May-05 8-May-05 9-May-05 ### ### ### ### ### ###
### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### 1-Jun-05 2-Jun-05 3-Jun-05 4-Jun-05
5-Jun-05 6-Jun-05 7-Jun-05 8-Jun-05 9-Jun-05 10-Jun-05 11-Jun-05 12-Jun-05 13-Jun-05 14-Jun-05
15-Jun-05 16-Jun-05 17-Jun-05 18-Jun-05 19-Jun-05 20-Jun-05 21-Jun-05 22-Jun-05 23-Jun-05 24-Jun-05
25-Jun-05 26-Jun-05 27-Jun-05 28-Jun-05 29-Jun-05 30-Jun-05
Activity ID
SC2D-21680
SC2D-21650
SC2D-18260
SC2D-17200
SC2D-17190
SC2D-21470
SC2D-17220
SC2D-17300
SC2D-17650
SC2D-17660
SC2D-21270
SC2D-21570
SC2D-21580
SC2D-17450
SC2D-17980
SC2D-17470
SC2D-17460
SC2D-20940
SC2D-17480
SC2D-17520
SC2D-17540
SC2D-17560
SC2D-17550
SC2D-17590
SC2D-80170
SC2D-17630
SC2D-17710
SC2D-17770
SC2D-18230
SC2D-17760
SC2D-17820
SC2D-17890
SC2D-17910
SC2D-80180
SC2D-17050
SC2D-21440
SC2D-17070
SC2D-17060
SC2D-17080
SC2D-18220
SC2D-17130
SC2D-17100
SC2D-18250
SC2D-21480
SC2D-21500
SC2D-21510
SC2D-21520
SC2D-21530
SC2D-21540
SC2D-21550
SC2D-21250
SC2D-18190
SC2D-17340
SC2D-21170
SC2D-17350
SC2D-21200
SC2D-21190
SC2D-17370
SC2D-17380
SC2D-21210
SC2D-17400
SC2D-21180
SC2D-17410
SC2D-21220
SC2D-21240
SC2D-17990
SC2D-18050
SC2D-18170
SC2D-17900
SC2D-17210
SC2D-17230
SC2D-21660
SC2D-17250
SC2D-81110
SC2D-17270
SC2D-17360
SC2D-21150
SC2D-17430
SC2D-17970
SC2D-21670
SC2D-17600
SC2D-18060
SC2D-17780
SC2D-17830
SC2D-17090
SC2D-21640
SC2D-20910
SC2D-17150
SC2D-81100
SC2D-17260
SC2D-18010
SC2D-17310
SC2D-17330
SC2D-21160
SC2D-17390
SC2D-21140
SC2D-17440
SC2D-18030
SC2D-18040
SC2D-17500
SC2D-17670
SC2D-17800
SC2D-17810
SC2D-17840
SC2D-17040
SC2D-17240
SC2D-21490
SC2D-17290
SC2D-18000
SC2D-17490
SC2D-17510
SC2D-21690
SC2D-17140
SC2D-17640
SC2D-17170
SC2D-20920
SC2D-17320
SC2D-17420
SC2D-17730
SC2D-17850
SC2D-17180
SC2D-18380
SC2D-18180

SC2D-18300
SC2D-18020
SC2D-81080
SC2D-21350
SC2D-18210
SC2D-18240
SC2D-17740
SC2D-20930
SC2D-18370
SC2D-81140
SC2D-21560
SC2D-21460
SC2D-18270
SC2D-20900
SC2D-17120
SC2D-81090
SC2D-18290
SC2D-17280
SC2D-21360
SC2D-18390
SC2D-18400
SC2D-18490
SC2D-18480
SC2D-18510
SC2D-18500
SC2D-18200
SC2D-18310
SC2D-18320
SC2D-81130
SC2D-18360
SC2D-18430
SC2D-18420
SC2D-18440
SC2D-18450
SC2D-18460
SC2D-18470
SC2D-18330
SC2D-18340
SC2D-18350
SC2D-18520
SC2D-18530
SC2D-18540
SC2D-18550
SC2D-18560
SC2D-18570
SC2D-18580
SC2D-18590
SC2D-80200
SC2D-80190
SC2D-80210
SC2D-80220
SC2D-18740
SC2D-18730
SC2D-18760
SC2D-18750
Activity Name Budgeted Units / Time
Install 1 x RCP culvert @ 18640 (1200) 13/d
Install 1 x RCP culvert @ ch.10040 (900) 14/d
Install 1 x RCP culvert @ ch.10040 (900) 32/d
Install 1 x RCP culvert @ ch.12320 (675) 14/d
Install 1 x RCP culvert @ ch.12350 (675) 17/d
Install 1 x RCP culvert @ ch.12550 (600) (Hoys Rd) 13/d
Install 1 x RCP culvert @ ch.12740 (375) (Hoys Rd) 9/d
Install 1 x RCP culvert @ ch.15520 (450) 13/d
Install 1 x RCP culvert @ ch.16850 (450) (Local Road) 12/d
Install 1 x RCP culvert @ ch.16950 (450) (Local Road) 9/d
Install 1 x RCP culvert @ ch.17400 Access Rd (450) (Local Rd) 14/d
Install 1 x RCP culvert @ ch.17900 (600) 11/d
Install 1 x RCP culvert @ ch.18000 (675) (Local Rd) 10/d
Install 1 x RCP culvert @ ch.18630 (900) 15/d
Install 1 x RCP culvert @ ch.18640 (1200) 7/d
Install 1 x RCP culvert @ ch.18890 (900) 14/d
Install 1 x RCP culvert @ ch.18890 (900) 12/d
Install 1 x RCP culvert @ ch.20540 (750) 4/d
Install 1 x RCP culvert @ ch.20540 (750) 7/d
Install 1 x RCP culvert @ ch.22020 (750) - Western Bridge Ramp 26/d
Install 1 x RCP culvert @ ch.22150 (1200) - Mainline 16/d
Install 1 x RCP culvert @ ch.22400 (1050) - Mainline 29/d
Install 1 x RCP culvert @ ch.22400 (1200) - Eastern Roundabout 29/d
Install 1 x RCP culvert @ ch.22950 (750) - Mainline 14/d
Install 1 x RCP culvert @ ch.22970 (900) 18/d
Install 1 x RCP culvert @ ch.22980 (900) 29/d
Install 1 x RCP culvert @ ch.24070 (450) 23/d
Install 1 x RCP culvert @ ch.26130 (450) 22/d
Install 1 x RCP culvert @ ch.26200 (1200) - Mainline 28/d
Install 1 x RCP culvert @ ch.26200 (1200) - Property Access 10/d
Install 1 x RCP culvert @ ch.27745 (1200) 26/d
Install 1 x RCP culvert @ ch.29930 (750) 17/d
Install 1 x RCP culvert @ ch.31000 (750) 25/d
Install 1 x RCP culvert @ ch.31480 (900) 23/d
Install 1 x RCP culvert @ ch.7060 (1200) 13/d
Install 1 x RCP culvert @ ch.7380 (600) 8/d
Install 1 x RCP culvert @ ch.7740 (750) 10/d
Install 1 x RCP culvert @ ch.7740 (750) 26/d
Install 1 x RCP culvert @ ch.8170 (900) 5/d
Install 1 x RCP culvert @ ch.8720 (750) 21/d
Install 1 x RCP culvert @ ch.8850 (1050) 4/d
Install 1 x RCP culvert @ ch.8850 (1050) 20/d
Install 1 x RCP culvert @ ch.9500 (750) 25/d
Install 1 x RCP culverts @ ch.13280 11/d
Install 1 x RCP culverts @ ch.16320 (450) (Smiths Rd) 10/d
Install 1 x RCP culverts @ ch.16330 (375) (Smiths Rd) 6/d
Install 1 x RCP culverts @ ch.16350 (450) (Smiths Rd) 6/d
Install 1 x RCP culverts @ ch.16360 (450) (Smiths Rd) 7/d
Install 1 x RCP culverts @ ch.16470 (450) (Smiths Rd) 7/d
Install 1 x RCP culverts @ ch.16500 (900) (Smiths Rd) 5/d
Install 1 x RCP culverts @ ch.23470 (900) 12/d
Install 1 x RCP culverts @ ch.24970 (1350) 22/d
Install 11 x RCP culverts @ ch.17150 (1200) 11/d
Install 11 x RCP culverts @ ch.17150 (1200) 16/d
Install 11 x RCP culverts @ ch.17190 (1200) 7/d
Install 11 x RCP culverts @ ch.17190 (1200) 15/d
Install 11 x RCP culverts @ ch.17280 (1200) 19/d
Install 11 x RCP culverts @ ch.17280 (1200) 4/d
Install 11 x RCP culverts @ ch.17320 (1200) 4/d
Install 11 x RCP culverts @ ch.17320 (1200) 17/d
Install 11 x RCP culverts @ ch.17420 (1200) 4/d
Install 11 x RCP culverts @ ch.17420 (1200) 16/d
Install 11 x RCP culverts @ ch.17480 (1200) 7/d
Install 11 x RCP culverts @ ch.17480 1200) 13/d
Install 1x RCP culvert @ ch.23030 (1200) 34/d
Install 1x RCP culvert @ ch.23150 (450) 16/d
Install 1x RCP culvert @ ch.23160 (750) 14/d
Install 2 x RCP culvert @ ch.22150 (750) - Western Roundabout 10/d
Install 2 x RCP culvert @ ch.29040 (1200) 20/d
Install 2 x RCP culverts @ ch.12710 (600) (Hoys Rd) 17/d
Install 2 x RCP culverts @ ch.12850 (750) (Hoys Rd) 12/d
Install 2 x RCP culverts @ ch.13410 (1500) 14/d
Install 2 x RCP culverts @ ch.13410 (1500) 15/d
Install 2 x RCP culverts @ ch.13410 (1500) 3/d
Install 2 x RCP culverts @ ch.14010 (1050) 20/d
Install 2 x RCP culverts @ ch.17240 (1800) 1/d
Install 2 x RCP culverts @ ch.17240 (1800) (Local Rd) 8/d
Install 2 x RCP culverts @ ch.18080 (600) 59/d
Install 2 x RCP culverts @ ch.18090 (750) 27/d
Install 2 x RCP culverts @ ch.18090 (750) 28/d
Install 2 x RCP culverts @ ch.22790 (900) 24/d
Install 2 x RCP culverts @ ch.24970 (1200) 26/d
Install 2 x RCP culverts @ ch.27000 (1200) 29/d
Install 2 x RCP culverts @ ch.28030 (1200) 22/d
Install 2 x RCP culverts @ ch.8720 (750) 6/d
Install 2 x RCP culverts @ ch.9500 (750) 22/d
Install 3 x RCP culverts @ ch.10980 (1050 x 1350) 16/d
Install 3 x RCP culverts @ ch.10980 (1050 x 1350) 24/d
Install 3 x RCP culverts @ ch.10980 (1050 x 1350) 5/d
Install 3 x RCP culverts @ ch.13970 (1050) 26/d
Install 3 x RCP culverts @ ch.13970 (1050) 24/d
Install 3 x RCP culverts @ ch.16480 (450) (Smiths Rd) 8/d
Install 3 x RCP culverts @ ch.17110 (1800) 5/d
Install 3 x RCP culverts @ ch.17110 (1800) 3/d
Install 3 x RCP culverts @ ch.17350 (1800) 2/d
Install 3 x RCP culverts @ ch.17350 (1800) 4/d
Install 3 x RCP culverts @ ch.18630 (900) 22/d
Install 3 x RCP culverts @ ch.20070 (1200) 27/d
Install 3 x RCP culverts @ ch.20070 (1200) 40/d
Install 3 x RCP culverts @ ch.21140 (900) 4/d
Install 3 x RCP culverts @ ch.23560 (900) 36/d
Install 3 x RCP culverts @ ch.27300 (1200) 29/d
Install 3 x RCP culverts @ ch.27400 (1200) 26/d
Install 3 x RCP culverts @ ch.28190 (1350) 24/d
Install 3 x RCP culverts @ ch.6930 (750) 13/d
Install 4 x RCP culverts @ ch.12720 (750) (Hoys Rd) 22/d
Install 4 x RCP culverts @ ch.14000 (900) (Bucca Rd) 33/d
Install 4 x RCP culverts @ ch.15220 (900) 17/d
Install 4 x RCP culverts @ ch.20900 (900) 12/d
Install 4 x RCP culverts @ ch.20900 (900) 16/d
Install 4 x RCP culverts @ ch.21140 (900) 15/d
Install 5 x RCP culverts @ ch.10050 (1500) 13/d
Install 5 x RCP culverts @ ch.10050 (1500) 13/d
Install 5 x RCP culverts @ ch.12300 (1200) 31/d
Install 5 x RCP culverts @ ch.12300 (1200) 23/d
Install 5 x RCP culverts @ ch.16540 (1050) 5/d
Install 5 x RCP culverts @ ch.16540 (1050) 21/d
Install 5 x RCP culverts @ ch.18080 (600) 9/d
Install 5 x RCP culverts @ ch.24620 (1050) 29/d
Install 6 x RCP culverts @ ch.28485 (1200) 28/d
Install 7 x RCP culverts @ ch.12310 36/d
Install RCP culvert (Stokes Property) @ ch.17100 - 17400 20/d
Install RCP Headwall @ ch.24620 (1050) 32/d

Install 1 x RCBC culvert @ ch.11510 (2400 x 2400 Fauna Crossing) 1/d


Install 1 x RCBC culvert @ ch.11510 (2400 x 2400 Fauna Crossing) 3/d
Install 1 x RCBC culvert @ ch.11510 (2400 x 2400 Fauna Crossing) 4/d
Install 1 x RCBC culvert @ ch.18320 (2400 x1200) 9/d
Install 1 x RCBC culvert @ ch.8250 (3000 x 3000) 3/d
Install 1 x RCBC culvert @ ch.9260 (1200 x 1200) 4/d
Install 1 x RCBC culverts @ ch.24950 2/d
Install 2 x RCBC culverts @ ch.17720 (2400 x 1500) 2/d
Install 2 x RCBC culverts @ ch.17720 (2400 x 1500) 9/d
Install 2 x RCBC culverts @ ch.17720 (2400 x 1500) 3/d
Install 2 x RCBC culverts @ ch.17750 (2400 x 1500) 5/d
Install 3 x RCBC culverts @ 10360 (1800 x 1500) (Property Access) 3/d
Install 3 x RCBC culverts @ ch.10370 (2400 x 1500) (Property Access) 4/d
Install 3 x RCBC culverts @ ch.10380 (2100 x 2100) 5/d
Install 3 x RCBC culverts @ ch.10380 (2100 x 2100) 5/d
Install 3 x RCBC culverts @ ch.10380 (2100 x 2100) 5/d
Install 3 x RCBC culverts @ ch.11500 (2100 x 2100) 1/d
Install 3 x RCBC culverts @ ch.11500 (2100 x 2100) 6/d
Install 3 x RCBC culverts @ ch.18320 (2400 x 1200) 20/d
Install 3 x RCBC culverts @ ch.18330 (2400 x 1200) 14/d
Install 3 x RCBC culverts @ ch.18330 (2400 x 1200) 10/d
Install 3 x RCBC culverts @ ch.19900 (2400 x 600) 2/d
Install 3 x RCBC culverts @ ch.19900 (2400 x 600) 8/d
Install 3 x RCBC culverts @ ch.20050 (2400 x 600) 5/d
Install 3 x RCBC culverts @ ch.20050 (2400 x 600) 7/d
Install 3 x RCBC culverts @ ch.7550 (1800 x 1500) 7/d
Install 4 x RCBC culverts @ ch.14600 (2400 x 1200) 10/d
Install 4 x RCBC culverts @ ch.14600 (2400 x 1200) 11/d
Install 4 x RCBC culverts @ ch.14600 (2400 x 1200) 19/d
Install 4 x RCBC culverts @ ch.15950 (2400 x 1200) 3/d
Install 4 x RCBC culverts @ ch.19660 (2400 x 600) 5/d
Install 4 x RCBC culverts @ ch.19660 (2400 x 600) 10/d
Install 4 x RCBC culverts @ ch.19720 (2400 x 600) 9/d
Install 4 x RCBC culverts @ ch.19720 (2400 x 600) 5/d
Install 4 x RCBC culverts @ ch.19780 (2400 x 600) 9/d
Install 4 x RCBC culverts @ ch.19780 (2400 x 600) 6/d
Install 5 x RCBC culverts @ ch.14800 (2400 x 1800) 9/d
Install 5 x RCBC culverts @ ch.15000 (2400 x 1200) 5/d
Install 5 x RCBC culverts @ ch.15660 (2400 x 1800) 4/d
Install 5 x RCBC culverts @ ch.20130 (2400 x 600) 6/d
Install 5 x RCBC culverts @ ch.20130 (2400 x 600) 5/d
Install 5 x RCBC culverts @ ch.20200 (2400 x 600) 6/d
Install 5 x RCBC culverts @ ch.20200 (2400 x 600) 5/d
Install 5 x RCBC culverts @ ch.20260 (2400 x 600) 7/d
Install 5 x RCBC culverts @ ch.20260 (2400 x 600) 5/d
Install 5 x RCBC culverts @ ch.20340 (2400 x 600) 8/d
Install 5 x RCBC culverts @ ch.20340 (2400 x 600) 5/d
Install 5 x RCBC culverts @ ch.30050 SB 12/d
Install 5 x RCBC culverts @ ch.30060 NB 4/d
Install 5 x RCBC culverts @ ch.30400 NB 11/d
Install 5 x RCBC culverts @ ch.30410 SB 13/d
Install 5 x RCBC culverts @ ch.31550 Eastern Roundabout 6/d
Install 5 x RCBC culverts @ ch.31550 Mainline 4/d
Install 5 x RCBC culverts @ ch.31940 E 1/d
Install 5 x RCBC culverts @ ch.31940 W 1/d
Remaining Units / Time Budgeted Units Remaining Units
13/d 52 52
14/d 27 27
32/d 63 63
14/d 42 42
17/d 85 85
13/d 63 63
9/d 17 17
25/d 50 0
12/d 23 23
9/d 17 17
14/d 27 27
11/d 22 22
10/d 29 29
15/d 77 77
7/d 13 13
14/d 56 56
12/d 24 24
4/d 7 7
7/d 29 29
26/d 26 26
16/d 65 65
29/d 87 87
29/d 88 88
14/d 57 0
18/d 18 18
29/d 57 57
45/d 45 0
22/d 66 66
28/d 56 56
10/d 10 10
26/d 78 78
17/d 34 34
25/d 98 98
23/d 46 46
13/d 26 26
8/d 15 15
10/d 20 20
26/d 79 79
5/d 10 10
21/d 107 107
4/d 7 7
20/d 80 80
25/d 203 203
11/d 34 34
10/d 20 20
6/d 12 12
6/d 23 23
7/d 20 20
7/d 20 20
5/d 21 21
12/d 24 24
22/d 44 44
15/d 293 293
15/d 457 457
7/d 134 134
10/d 349 349
12/d 403 403
8/d 108 108
9/d 107 107
12/d 429 429
4/d 80 80
16/d 510 510
7/d 107 107
13/d 528 528
8/d 515 0
16/d 16 16
14/d 27 27
10/d 10 10
20/d 140 140
17/d 34 34
12/d 49 49
14/d 54 54
15/d 46 46
3/d 54 54
20/d 39 39
1/d 24 24
8/d 68 68
59/d 177 177
27/d 82 82
28/d 55 55
24/d 122 122
26/d 132 132
46/d 229 229
22/d 132 0
6/d 12 12
22/d 87 87
16/d 64 64
24/d 97 97
5/d 97 97
26/d 77 77
24/d 73 73
8/d 23 23
3/d 48 48
3/d 73 73
2/d 26 26
4/d 125 125
22/d 44 44
27/d 53 53
40/d 79 79
4/d 7 7
36/d 72 0
29/d 285 285
41/d 285 285
24/d 212 0
13/d 26 26
22/d 109 109
33/d 98 98
19/d 244 244
12/d 24 24
16/d 93 93
15/d 77 77
13/d 50 50
13/d 263 263
31/d 371 371
43/d 690 690
11/d 134 134
21/d 208 208
9/d 18 18
29/d 380 380
28/d 393 0
36/d 547 547
20/d 400 400
32/d 63 63
12380

1/d 31 31
3/d 72 72
4/d 72 72
9/d 37 37
3/d 44 44
4/d 71 71
6/d 30 30
2/d 60 60
9/d 140 140
3/d 60 60
5/d 36 36
3/d 22 22
4/d 22 22
5/d 142 142
5/d 94 94
5/d 94 94
1/d 86 86
6/d 137 137
20/d 80 80
14/d 115 115
10/d 77 77
2/d 18 18
8/d 92 92
5/d 15 15
7/d 80 80
7/d 148 148
10/d 230 230
11/d 345 345
19/d 345 345
4/d 206 206
5/d 20 20
10/d 137 137
9/d 127 127
5/d 20 20
9/d 132 132
6/d 24 24
9/d 317 317
4/d 246 246
4/d 241 241
6/d 109 109
5/d 19 19
6/d 110 110
5/d 19 19
7/d 116 116
5/d 18 18
8/d 141 141
5/d 18 18
12/d 183 183
4/d 64 64
11/d 171 171
13/d 195 195
6/d 96 96
4/d 64 64
1/d 7 7
1/d 37 37
5632
VAR Original Duration Actual Duration Remaining Duration
0 4 0 4
0 2 0 2
0 2 0 2
0 3 0 3
0 5 0 5
0 5 0 5
0 2 0 2
50 4 1 0
0 2 0 2
0 2 0 2
0 2 0 2
0 2 0 2
0 3 0 3
0 5 0 5
0 2 0 2
0 4 0 4
0 2 0 2
0 2 0 2
0 4 0 4
0 1 0 1
0 4 0 4
0 3 0 3
0 3 0 3
57 4 4 0
0 1 0 1
0 2 0 2
45 2 0 0
0 3 0 3
0 2 0 2
0 1 0 1
0 3 0 3
0 2 0 2
0 4 0 4
0 2 0 2
0 2 0 2
0 2 0 2
0 2 0 2
0 3 0 3
0 2 0 2
0 5 0 5
0 2 0 2
0 4 0 4
0 8 0 8
0 3 0 3
0 2 0 2
0 2 0 2
0 4 0 4
0 3 0 3
0 3 0 3
0 4 0 4
0 2 0 2
0 2 0 2
0 28 29 19
0 28 31 31
0 20 29 19
0 23 29 34
0 21 31 35
0 30 30 14
0 30 31 12
0 26 32 36
0 19 0 19
0 31 0 31
0 15 0 15
0 42 0 42
515 15 8 0
0 1 0 1
0 2 0 2
0 1 0 1
0 7 0 7
0 2 0 2
0 4 0 4
0 4 0 4
0 3 0 3
0 18 0 18
0 2 0 2
0 21 0 21
0 9 0 9
0 3 0 3
0 3 0 3
0 2 0 2
0 5 0 5
0 5 0 5
0 8 22 5
132 6 3 0
0 2 0 2
0 4 0 4
0 4 0 4
0 4 0 4
0 18 0 18
0 3 0 3
0 3 0 3
0 3 0 3
0 10 25 18
0 26 0 26
0 15 0 15
0 31 0 31
0 2 0 2
0 2 0 2
0 2 0 2
0 2 0 2
72 2 7 0
0 10 0 10
0 11 22 7
212 9 24 0
0 2 0 2
0 5 0 5
0 3 0 3
0 14 16 13
0 2 0 2
0 6 0 6
0 5 0 5
0 4 0 4
0 20 0 20
0 12 0 12
0 30 32 16
0 28 26 12
0 10 0 10
0 2 0 2
0 13 0 13
393 14 7 0
0 15 0 15
0 20 0 20
0 2 0 2
1476 439 861

0 58 0 58
0 24 0 24
0 20 0 20
0 4 0 4
0 17 0 17
0 18 0 18
0 20 22 5
0 35 0 35
0 15 0 15
0 24 0 24
0 7 0 7
0 7 0 7
0 6 0 6
0 28 0 28
0 18 0 18
0 18 0 18
0 58 0 58
0 24 0 24
0 4 0 4
0 8 0 8
0 8 0 8
0 12 0 12
0 12 0 12
0 3 0 3
0 12 0 12
0 21 0 21
0 24 0 24
0 32 0 32
0 18 0 18
0 70 2 53
0 4 0 4
0 14 0 14
0 14 0 14
0 4 0 4
0 14 0 14
0 4 0 4
0 36 0 36
0 50 28 55
0 60 0 60
0 17 0 17
0 4 0 4
0 17 0 17
0 4 0 4
0 17 0 17
0 4 0 4
0 17 0 17
0 4 0 4
0 15 0 15
0 15 0 15
0 15 0 15
0 15 0 15
0 15 0 15
0 15 0 15
0 10 0 10
0 30 0 30
0 52 1012
nil Actual Production supplied
3 Average Production Achieved
14 Production Required
30 Most Likely in OPRA Outputs
30 BOS Assumption
nil Actual Production supplied
0 Average Production Achieved
6 Production Required
8 Most Likely in OPRA Outputs
8 BOS Assumption
Activity ID
SC2D-20950
SC2D-80030
SC2D-80040
SC2D-80050
SC2D-80060
SC2D-80070
SC2D-80080
SC2D-80090
SC2D-80100
SC2D-80110
SC2D-80120
SC2D-80130
SC2D-80140
SC2D-80150
SC2D-80160
SC2D-80460
SC2D-81000
SC2D-81010
SC2D-81020
SC2D-81030
SC2D-81040
SC2D-81050
SC2D-81060
SC2D-81070
SC2D-81120
SC2D-81150
SC2D-81160
SC2D-81170
SC2D-81180

SC2D-80230
SC2D-80240
SC2D-80250
SC2D-80260
SC2D-80270
SC2D-80280
SC2D-80290
SC2D-80300
SC2D-80310
SC2D-80320
SC2D-80330
SC2D-80340
SC2D-80350
SC2D-80360
SC2D-80370
SC2D-80380
SC2D-80390
SC2D-80400
SC2D-80410
SC2D-80420
SC2D-80430
SC2D-80440
SC2D-80450
SC2D-80470
SC2D-80480
SC2D-80490
SC2D-80500
SC2D-80510
SC2D-80520
SC2D-80530
SC2D-80540
SC2D-80550
SC2D-80560
SC2D-80650
SC2D-80660
SC2D-80670
SC2D-80680
SC2D-80690
SC2D-80700
SC2D-80710
SC2D-80720
SC2D-80740
SC2D-80750
SC2D-80760
SC2D-80770
SC2D-80780
SC2D-80790
SC2D-80800
SC2D-80810
SC2D-80820
SC2D-80830
SC2D-80840
SC2D-80850
Activity Name
Install Pavement Drainage Z5/B01 (236m)
Install Pavement Drainage Z5/C01 (114m)
Install Pavement Drainage Z5/C08/C09/C10 Z5/D01 (663m)
Install Pavement Drainage Z5/E01 (405m)
Install Pavement Drainage Z5/G01 (332m)
Pavement Drainage Z5/H01 (144m)
Install Pavement Drainage Z5/I01 & Z5/J01 (404m)
Install Pavement Drainage Z5/L01 (472m)
Install Pavement Drainage Z5/M01 (341m)
Pavement Drainage Z5/N01 (N02/N03/N04/N05/N06/N07/N09/N11) (464m)
Install Pavement Drainage Z5/P01 (582m)
Install Pavement Drainage Z6/A02/A02 (42m)
Install Pavement Drainage Z6/A01 (532m)
Install Pavement Drainage Z6/B01 (277m)
Install Pavement Drainage Z6/C01 (307m)
Install Pavement Drainage Z3/D01, D10 (677m) - Ch.14200 - 15980
Install Pavement Drainage Z6/D04 (359m)
Install Pavement Drainage Z6/D01 (176m)
Install Pavement Drainage Z6/E01 (438m)
Install Pavement Drainage Z6/F01 (1,182m)
Pavement Drainage Z6/G01 (325m)
Install Pavement Drainage Z6/H01 (680m)
Install Pavement Drainage Z6/J01 (352m)
Install Pavement Drainage Z6/L01 (359m NB)
Install Pavement Drainage Z6/K01 (728m SB)
Install Pavement Drainage Z6/S01 (348m)
Install Pavement Drainage Z6/T01 (489m)
Install Pavement Drainage Z6/U01 (822m)
Install Pavement Drainage Z6/V01 (881m)

Install Pavement Drainage Z2/A01 (421m) - Ch.6910 - 7420


Install Pavement Drainage Z2/B01 (355m) - Ch.7420 - 7600
Install Pavement Drainage Z2/C01 (500m) - Ch.7600 - 8160
Install Pavement Drainage Z2/D01(274m) - Ch.8160 - 8320
Install Pavement Drainage Z2/D01/D05/D14/E01 (578m) - Ch.8320 - 8680 & 8760 - 8820
Install Pavement Drainage Z2/E01/E05 (118m) - Ch.8680-8740 & 8820-8880
Install Pavement Drainage Z2/E01/E06/E08 (390m) - Ch.8880-9140
Install Pavement Drainage Z2/F01/F02/F03 (381m) - Ch.9280-9460
Install Pavement Drainage Z2/E01/E17/E21 (245m) - Ch.9140 - 9280
Install Pavement Drainage Z2/F01/F42/F43 (1039m) - Ch.9460-9980
Install Pavement Drainage Z2/G01/G03 (235m) - Ch.9980 - 10100
Install Pavement Drainage Z2/G01 (322m) - Ch.10100 - 10240
Install Pavement Drainage Z2/G01/G04/G10/H02/H04/H08 (723m) - Ch.10240-11020
Install Pavement Drainage Z2/H01/H06 (173m) - Ch.11020 - 11360
Install Pavement Drainage Z2/J01 (447m) - Ch.11360 - 11840
Install Pavement Drainage Z2/K01 (63m) - Ch. 11840 - 12060
Install Pavement Drainage Z2/K01/K03/K07 (263m) - Ch.12060 - 12380
Install Pavement Drainage Z2/L35 (122m) - Ch.12380 - 12580
Install Pavement Drainage Z2/M01 (414m) - Ch.12580 - 12960
Install Pavement Drainage Z3/M06 (95m) - Ch.12960 - 13300
Install Pavement Drainage Z3/B06 (47m) - Ch.13300 - 13620
Install Pavement Drainage Z3/C04 (116m) - Ch.13620 - 13820
Install Pavement Drainage Z3/C10 (127m) - Ch.13820 - 14200
Install Pavement Drainage Z3/H01, G04 (354m) - Ch.15980 - 16500
Install Pavement DrainageZ3/H11 (79m) - Ch.16500 - 16820
Install Pavement Drainage Z3/J03 (24m) - Ch.16820 - 16960
Install Pavement Drainage Z3/K02 (326m) - Ch.16960 - 17820
Install Pavement Drainage Z3/K09 (72m) - Ch.17820 - 17940
Install Pavement Drainage Z3/K10/B05 (47m) - Ch.17940 - 18740
Install Pavement Drainage Z4/C04/E01/E05 (890m) - Ch. 18740-19620
Install Pavement Drainage Z4/E20 (235m) - Ch.19620 - 20580
Install Pavement Drainage Z4/G02/G06 (264m) - Ch.20580 - 20800
Install Pavement Drainage Z4/G08 (80m) - Ch.20800 - 21880
Install Pavement Drainage Z2/H06/H11 (241m) - Ch.11020 - 11360
Install Pavement Drainage Z2/J02/J07 (118m) - Ch.11360 - 11840
Install Pavement Drainage Z2/K07/K09 (111m) - Ch.11840 - 12060
Install Pavement Drainage Z2/L01 (412m) - Ch.12060 - 12380
Install Pavement Drainage Z2/L01 (338m) - Ch.12380 - 12580
Install Pavement Drainage Z2/M01 (78m) - Ch.12580 - 12960
Install Pavement Drainage Z3/A01/M10 (182m) - Ch.12960 - 13300
Install Pavement Drainage Z3/B01 (262m) - Ch.13300 - 13620
Install Pavement Drainage Z3/C02, C04, C08 (410m) - Ch.13820 - 14200
Install Pavement Drainage Z3/D08, D12 (660m) - Ch.14200 - 15980
Install Pavement Drainage Z3/H01, G04 (69m) - Ch.15980 - 16500
Install Pavement Drainage Z3/H04, H09, H11 (195m) - Ch.16500 - 16820
Install Pavement Drainage Z3/J03 (83m) - Ch.16820 - 16960
Install Pavement Drainage Z3/K02 (279m) - Ch.16960 - 17820
Pavement Drainage Z3/K02 (171m) - Ch.17820 - 17940
Install Pavement Drainage Z3/A01, A03 (290m) - Ch.17940 - 18740
Install Pavement Drainage Z4/C03/C04/E06/E09 (379m) - Ch.18740 - 19620
Install Pavement Drainage Z4/F04 (80m) - Ch.19620 - 20580
Install Pavement Drainage Z4/G02/G06 (45m) - Ch.20580 - 20800
Install Pavement Drainage Z4/G06 (136m) Ch.20800 - 21880
Budgeted Units / Time Remaining Units / Time Budgeted Units Remaining Units
79/d 79/d 236 236
57/d 57/d 114 114
74/d 74/d 663 663
45/d 45/d 405 405
66/d 66/d 332 332
72/d 72/d 144 144
81/d 81/d 404 404
79/d 79/d 472 472
68/d 68/d 341 341
77/d 77/d 464 464
73/d 73/d 582 582
42/d 42/d 42 42
76/d 76/d 532 532
69/d 69/d 277 277
77/d 77/d 307 307
45/d 45/d 404 404
79/d 79/d 236 236
59/d 59/d 176 176
39/d 39/d 236 236
16/d 16/d 236 236
81/d 81/d 325 325
70/d 70/d 629 629
47/d 47/d 236 236
47/d 47/d 236 236
24/d 24/d 236 236
47/d 47/d 236 236
34/d 34/d 236 236
21/d 21/d 236 236
21/d 21/d 236 236
9209

0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
37/d 37/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
0/d 0/d 0 0
VAR Original Duration Actual Duration Remaining Duration
0 3 0 3
0 2 0 2
0 9 0 9
0 9 0 9
0 5 0 5
0 2 0 2
0 5 0 5
0 6 0 6
0 5 0 5
0 6 0 6
0 8 0 8
0 1 0 1
0 7 0 7
0 4 0 4
0 4 0 4
0 9 0 9
0 3 0 3
0 3 0 3
0 6 0 6
0 15 0 15
0 4 0 4
0 9 0 9
0 5 0 5
0 5 0 5
0 10 0 10
0 5 0 5
0 7 0 7
0 11 0 11
0 11 0 11
0 0 179

0 6 0 6
0 5 0 5
0 7 0 7
0 4 0 4
0 8 0 8
0 2 0 2
0 5 0 5
0 5 0 5
0 4 0 4
0 13 0 13
0 3 0 3
0 4 0 4
0 9 0 9
0 3 0 3
0 6 0 6
0 1 0 1
0 4 0 4
0 2 0 2
0 6 0 6
0 2 0 2
0 1 0 1
0 2 0 2
0 2 0 2
0 5 0 5
0 1 0 1
0 1 0 1
0 4 0 4
0 1 0 1
0 1 0 1
0 12 0 12
0 3 0 3
0 4 0 4
0 1 0 1
0 3 0 3
0 2 0 2
0 2 0 2
0 6 0 6
0 5 0 5
0 1 0 1
0 3 0 3
0 4 0 4
0 6 0 6
0 9 0 9
0 1 0 1
0 3 0 3
0 2 0 2
0 0 0 0
0 3 0 3
0 4 0 4
0 5 0 5
0 1 0 1
0 1 0 1
0 2 0 2
nil Actual Production supplied
#DIV/0! Average Production Achieved
51 Production Required
60 Most Likely in OPRA Outputs
80 BOS Assumption
Activity ID Activity Name Budgeted Units / Time
SC2E-25290 Mainline Clearing ch.21590-21940 (EEC) 88/d
SC2E-23090 Mainline Clearing ch.24350-25500 96/d
SC2E-23250 Mainline Clearing ch.22950-24350 100/d
SC2E-23830 Mainline Clearing ch.28500-29100 120/d
SC2E-23730 Mainline Clearing ch.25500-28500 120/d
SC2E-23850 Mainline Clearing ch.30200-32500 100/d
SC2E-23810 Mainline Clearing ch.29100-30200 75/d
SC2E-23210 Mainline Clearing ch.21500-22950 97/d
SC2E-26620 Mainline Clearing ch.7000-8900 190/d
SC2E-22170 Mainline Clearing ch.8900-9600 (West) 175/d
SC2E-22210 Mainline Clearing ch.9600-13000 (West) 200/d
SC3E-22330 Mainline Clearing ch.14800-16900 191/d
SC3E-22370 Mainline Clearing ch.16900-18000 183/d
SC2E-26670 Mainline Clearing ch.14800-16900 191/d
SC2E-26680 Mainline Clearing ch.16900-18000 183/d
SC2E-26690 Mainline Clearing ch.13000-14800 180/d
SC2E-22130 Mainline Clearing ch.7000-8900 (West) 190/d
SC4E-22490 Mainline Clearing ch.19400-21500 191/d
SC4E-22570 Mainline Clearing ch.18000-19400 200/d
SC3E-22530 Mainline Clearing ch.13000-14800 180/d
SC2E-26610 Mainline Clearing ch.8900-9600 175/d
SC2E-26630 Mainline Clearing ch.9600-13000 200/d
Remaining Units / Time Budgeted Units Remaining Units VAR
88/d 350 0 350
96/d 1150 0 1150
100/d 1400 0 1400
120/d 600 0 600
120/d 3000 0 3000
100/d 1600 1600 0
75/d 1800 1800 0
97/d 1450 0 1450
190/d 1900 1900 0
200/d 700 0 700
200/d 3400 0 3400
2100/d 2100 0 2100
183/d 1100 1100 0
191/d 2100 0 2100
183/d 1100 0 1100
180/d 1800 0 1800
190/d 1900 0 1900
191/d 2100 0 2100
200/d 1400 0 1400
1800/d 1800 0 1800
175/d 700 525 175
200/d 3400 3400 0
10325 26525
Original Duration Actual Duration Remaining Duration
4d 1 0
12d 43 0
14d 30 0
5d 33 0
25d 68 0
16d 0 16
24d 0 24
15d 44 0
10d 0 10
4d 24 0
17d 21 0
11d 16 0
6d 0 6
11d 14 0
6d 14 0 nil Actual Production supplied
10d 12 0 60 Average Production Achiev
10d 18 0 136 Production Required
11d 10 0 140 Most Likely in OPRA Outpu
7d 4 0 200 BOS Assumption
10d 17 0
4d 73 3
17d 0 17
442 76
Actual Production supplied
Average Production Achieved
Production Required
Most Likely in OPRA Outputs
BOS Assumption
Activity ID Activity Name
SC2E-27330 Place & Compact SMZ Layer (300mm) - Fill 16B
SC2E-27340 Place & Compact SMZ Layer (300mm) - Cut 17
SC2P-18020 Place & Compact SMZ Layer (300mm) - Cut 22
SC2P-17930 Place & Compact SMZ Layer (300mm) - Cut 19
SC2P-18050 Place & Compact SMZ Layer (300mm) - Cut 23
SC2P-17840 Place & Compact SMZ Layer (300mm) - Fill 16B
SC2P-17780 Place & Compact SMZ Layer (4,493m3) - Cut 14 (Access Road)
SC2P-17390 Place & Compact SMZ Layer (2,199m3) - Cut 13
SC2P-17210 Place & Compact SMZ Layer (1,452m3) - Cut 7
SC2P-17690 Place & Compact SMZ Layer (4,081m3) - Cut 11
SC2P-17270 Place & Compact SMZ Layer (1,398m3) - Cut 9 (Service Road)
SC2E-27190 Place & Compact SMZ Layer (1050m3) - Cut 6
SC2P-17330 Place & Compact SMZ Layer (2,636m3) - Cut 11
SC2E-27310 Place & Compact SMZ Layer (1908m3) - Cut 14
SC2P-17240 Place & Compact SMZ Layer (2,214m3) - Cut 8
SC2P-17810 Place & Compact SMZ Layer (1,200m3) - Cut 15
SC2P-17630 Place & Compact SMZ Layer (1,155m3) - Cut 9
SC2P-17180 Place & Compact SMZ Layer (1,160m3) - Cut 6 (Access Road)
SC2P-17420 Place & Compact SMZ Layer (5,309m3) - Cut 14
SC2P-17480 Place & Compact SMZ Layer (2,774m3) - Cut 1A (Access Road)
SC2P-17090 Place & Compact SMZ Layer (3,658m3) -Cut 2 & 3
SC2P-17120 Place & Compact SMZ Layer (1,751m3) - Cut 4
SC2P-17750 Place & Compact SMZ Layer (1,402m3) - Cut 13 (Access Road)
SC2P-80180 Place & Compact SMZ Layer (300mm) - Fill 23
SC2P-80190 Place & Compact SMZ Layer (300mm) - Fill 18
SC2P-80520 Place & Compact SMZ Layer (1,262m3) - Fill 1A
SC2P-80540 Place & Compact SMZ Layer (3,933m3) - Cut 1B
SC2P-80560 Place & Compact SMZ Layer (3,633m3) - Fill 1B
SC2P-80590 Place & Compact SMZ Layer (1,931m3) -Fill 2 & 3
SC2P-80620 Place & Compact SMZ Layer (1,419m3) - Fill 4
SC2P-80650 Place & Compact SMZ Layer (7,527m3) - Cut 5B
SC2P-80670 Place & Compact SMZ Layer (1,704m3) - Fill 5A
SC2P-80710 Place & Compact SMZ Layer (2,970m3) - Fill 5B (Access Road)
SC2P-80740 Place & Compact SMZ Layer (2,342m3) - Fill 6 (Access Road)
SC2P-80770 Place & Compact SMZ Layer (3,407m3) - Fill 7
SC2P-80800 Place & Compact SMZ Layer (3,233m3) - Fill 8
SC2P-80830 Place & Compact SMZ Layer (1,114m3) - Fill 9 (Service Road)
SC2P-80860 Place & Compact SMZ Layer (2,014m3) - Fill 10A (Service Road)
SC2P-80880 Place & Compact SMZ Layer (6,301m3) - Fill 10B (Service Road)
SC2P-80910 Place & Compact SMZ Layer (1,233m3) - Fill 11
SC2P-80940 Place & Compact SMZ Layer (3,663m3) - Fill 12
SC2P-80970 Place & Compact SMZ Layer (2,136m3) - Fill 13
SC2P-81000 Place & Compact SMZ Layer (3,453m3) - Fill 14
SC2P-81030 Place & Compact SMZ Layer (2,014m3) - Fill 15 & 16A
SC2P-81090 Place & Compact SMZ Layer (1,155m3) - Fill 6
SC2P-81110 Place & Compact SMZ Layer (2210m3) - Fill 7
SC2P-81140 Place & Compact SMZ Layer (1,062m3) - Fill 8
SC2P-81200 Place & Compact SMZ Layer (1,226m3) - Fill 10A
SC2P-81220 Place & Compact SMZ Layer (11,658m3) - Fill 10B
SC2P-81250 Place & Compact SMZ Layer (1,234m3) - Fill 11
SC2P-81280 Place & Compact SMZ Layer (5,927m3) - Fill 12
SC2P-81310 Place & Compact SMZ Layer (4,010m3) - Fill 13 (Access Road)
SC2P-81340 Place & Compact SMZ Layer (2,888m3) - Fill 14 (SB Off Ramp)
SC2P-81370 Place & Compact SMZ Layer (1,977m3) - Fill 15 & 16A
SC2E-80960 Place & Compact SMZ Layer (2416m3) - Fill 5B
SC2E-80990 Place & Compact SMZ Layer (1002m3) - Cut 9
SC2E-81030 Place & Compact SMZ Layer (1125m3) - Fill 10A
SC2E-81050 Place & Compact SMZ Layer (1477m3) - Fill 10B
Budgeted Units / Time Remaining Units / Time Budgeted Units Remaining Units
320/d 320/d 960 960
288/d 288/d 1440 1440
210/d 210/d 420 420
280/d 280/d 560 560
300/d 300/d 600 600
480/d 480/d 960 960
749/d 749/d 4493 4493
733/d 733/d 2199 2199
726/d 726/d 1452 1452
816/d 816/d 4081 4081
699/d 699/d 1398 1398
525/d 525/d 1050 1050
659/d 659/d 2636 2636
636/d 636/d 1908 1908
738/d 738/d 2214 2214
600/d 600/d 1200 1200
578/d 578/d 1155 1155
580/d 580/d 1160 1160
758/d 758/d 5309 5309
694/d 694/d 2774 2774
732/d 732/d 3658 3658
584/d 584/d 1751 1751
701/d 701/d 1402 1402
300/d 300/d 600 600
317/d 317/d 1900 1900
631/d 631/d 1262 1262
787/d 787/d 3933 3933
727/d 727/d 3633 3633
644/d 644/d 1931 1931
710/d 710/d 1419 1419
753/d 753/d 7527 7527
568/d 568/d 1704 1704
743/d 743/d 2970 2970
781/d 781/d 2342 2342
681/d 681/d 3407 3407
808/d 808/d 3233 3233
557/d 557/d 1114 1114
671/d 671/d 2014 2014
788/d 788/d 6301 6301
617/d 617/d 1233 1233
733/d 733/d 3663 3663
712/d 712/d 2136 2136
691/d 691/d 3453 3453
671/d 671/d 2014 2014
578/d 578/d 1155 1155
737/d 737/d 2210 2210
531/d 531/d 1062 1062
613/d 613/d 1226 1226
833/d 833/d 11658 11658
617/d 617/d 1234 1234
741/d 741/d 5927 5927
802/d 802/d 4010 4010
722/d 722/d 2888 2888
659/d 659/d 1977 1977
805/d 805/d 2416 2416
501/d 501/d 1002 1002
563/d 563/d 1125 1125
739/d 739/d 1477 1477
157312
VAR Original Duration Actual Duration Remaining Duration
0 3 0 3
0 5 0 5
0 2 0 2
0 2 0 2
0 2 0 2
0 2 0 2
0 6 0 6
0 3 0 3
0 2 0 2
0 5 0 5
0 2 0 2
0 2 0 2
0 4 0 4
0 3 0 3
0 3 0 3
0 2 0 2
0 2 0 2
0 2 0 2
0 7 0 7
0 4 0 4
0 5 0 5
0 3 0 3
0 2 0 2
0 2 0 2
0 6 0 6
0 2 0 2
0 5 0 5
0 5 0 5
0 3 0 3
0 2 0 2
0 10 0 10
0 3 0 3
0 4 0 4
0 3 0 3
0 5 0 5
0 4 0 4
0 2 0 2
0 3 0 3
0 8 0 8
0 2 0 2
0 5 0 5
0 3 0 3
0 5 0 5
0 3 0 3
0 2 0 2
0 3 0 3
0 2 0 2
0 2 0 2
0 14 0 14
0 2 0 2
0 8 0 8
0 5 0 5
0 4 0 4
0 3 0 3 nil
0 3 0 3 661
0 2 0 2 300
0 2 0 2 350
0 2 0 2
0 0 238
Actual Production supplied
Production Required
Most Likely in OPRA Outputs
BOS Assumption
Activity ID Activity Name
SC2P-17080 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-19370 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17260 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17320 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17410 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17110 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17140 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17170 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17290 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17350 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17380 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17440 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17860 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-19650 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-18100 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-19750 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-19600 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-18220 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-18430 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-19950 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-20150 Place CRCP Base Pavement (240mm) - 8.0m width
SC2P-17190 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-16920 Place LMC Sub Base Pavement (150mm) - 11.0m width

SC2P-19360 Place LMC Sub Base Pavement (150mm) - 11.0m width


SC2P-17250 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17310 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17430 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17100 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17130 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17160 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17280 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17340 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17370 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17400 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-17850 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-19580 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-19630 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-18090 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-19730 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-18210 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-19930 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-18420 Place LMC Sub Base Pavement (150mm) - 11.0m width
SC2P-20130 Place LMC Sub Base Pavement (150mm) - 11.0m width
Budgeted Units / Time Remaining Units / Time Budgeted Units Remaining Units
8/d 8/d 72 72
8/d 8/d 72 72
8/d 8/d 48 48
8/d 8/d 112 112
8/d 8/d 128 128
8/d 8/d 128 128
8/d 8/d 24 24
8/d 8/d 16 16
8/d 8/d 40 40
8/d 8/d 56 56
8/d 8/d 32 32
8/d 8/d 104 104
8/d 8/d 96 96
8/d 8/d 72 72
8/d 8/d 40 40
8/d 8/d 40 40
8/d 8/d 24 24
8/d 8/d 120 120
8/d 8/d 40 40
8/d 8/d 120 120
8/d 8/d 40 40
8/d 8/d 40 40
8/d 8/d 48 48
1512

8/d 8/d 48 48
8/d 8/d 32 32
8/d 8/d 64 64
8/d 8/d 64 64
8/d 8/d 80 80
8/d 8/d 16 16
8/d 8/d 8 8
8/d 8/d 24 24
8/d 8/d 32 32
8/d 8/d 24 24
8/d 8/d 80 80
8/d 8/d 64 64
8/d 8/d 16 16
8/d 8/d 40 40
8/d 8/d 24 24
8/d 8/d 24 24
8/d 8/d 72 72
8/d 8/d 72 72
8/d 8/d 24 24
8/d 8/d 24 24
832
VAR Original Duration Actual Duration Remaining Duration VAR
0 9 0 9 0
0 9 0 9 0
0 6 0 6 0
0 14 0 14 0
0 16 0 16 0
0 16 0 16 0
0 3 0 3 0
0 2 0 2 0
0 5 0 5 0
0 7 0 7 0
0 4 0 4 0
0 13 0 13 0
0 12 0 12 0
0 9 0 9 0
0 5 0 5 0
0 5 0 5 0
0 3 0 3 0
0 15 0 15 0
0 5 0 5 0 nil
0 15 0 15 0 #DIV/0!
0 5 0 5 0 8
0 5 0 5 0 300
0 6 0 6 0 300
0 0 189

0 6 0 6 0
0 4 0 4 0
0 8 0 8 0
0 8 0 8 0
0 10 0 10 0
0 2 0 2 0
0 1 0 1 0
0 3 0 3 0
0 4 0 4 0
0 3 0 3 0
0 10 0 10 0
0 8 0 8 0
0 2 0 2 0
0 5 0 5 0
0 3 0 3 0
0 3 0 3 0 nil
0 9 0 9 0 #DIV/0!
0 9 0 9 0 8
0 3 0 3 0 500
0 3 0 3 0 500
0 0 104
Actual Production supplied
Average Production Achieved
Production Required
Most Likely in OPRA Outputs
BOS Assumption

Actual Production supplied


Average Production Achieved
Production Required
Most Likely in OPRA Outputs
BOS Assumption
Activity ID Activity Name Budgeted Units / Time
SC2P-20150 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-19950 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-18430 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-18220 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17860 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-19650 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-18100 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-19600 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-19750 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17140 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17080 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17260 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-19370 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17290 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17350 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17410 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17440 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17320 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17170 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17110 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17200 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
SC2P-17380 Place CRCP Base Pavement (240mm) - 8.0m width 1/d
Remaining Units / TimeBudgeted Units Remaining Units Original Duration Actual Duration
1/d 5 5 5d 0d
1/d 15 15 15d 0d
1/d 5 5 5d 0d
1/d 15 15 15d 0d
1/d 12 12 12d 0d
1/d 9 9 9d 0d
1/d 5 5 5d 0d
1/d 3 3 3d 0d
1/d 5 5 5d 0d
1/d 3 3 3d 0d
1/d 9 9 9d 0d
1/d 6 6 6d 0d
1/d 9 9 9d 0d
1/d 5 5 5d 0d
1/d 7 7 7d 0d
1/d 16 16 16d 0d
1/d 13 13 13d 0d
1/d 14 14 14d 0d
1/d 2 2 2d 0d
1/d 16 16 16d 0d
1/d 7 7 7d 0d
1/d 4 4 4d 0d
Remaining Duration
5d
15d
5d
15d
12d
9d
5d
3d
5d
3d
9d
6d
9d
5d
7d
16d
13d
14d
2d
16d
7d
4d
Activity ID Activity Name
SC5E-23230 Install Fencing ch.22950-24350 (West)
SC6E-23710 Install Fencing ch.28500-30900 (West)
SC6E-23790 Install Fencing ch.30900-32500 (West)
SC6E-23830 Install Fencing ch.25500-28500 (East)
SC3E-22310 Install Fencing ch.13000-14800 (West)
SC2E-26420 Install Fencing ch.8900-9600 (East)
SC6E-23910 Install Fencing ch.25500-28500 (West)
SC4E-22580 Install Fencing ch.19400-21500 (East)
SC3E-22380 Install Fencing ch.14800-16900 (East)
SC3E-22340 Install Fencing ch.13000-14800 (East)
SC3E-22410 Install Fencing ch.16900-18000 (East)
SC2E-22110 Install Fencing ch.7000-8900 (West)
SC2E-22150 Install Fencing ch.9600-13000 (West)
SC6E-23870 Install Fencing ch.28500-30900 (East)
SC5E-23270 Install Fencing ch.24350-25500 (West)
SC6E-23430 Install Fencing ch.30900-32500 (East)
SC5E-23350 Install Fencing ch.24350-25500 (East)
SC2E-22190 Install Fencing ch.8900-9600 (West)
SC4E-22550 Install Fencing ch.19400-21500 (West)
SC5E-23150 Install Fencing ch.21500-22950 (West)
SC3E-22390 Install Fencing ch.16900-18000 (West)
SC4E-22510 Install Fencing ch.18000-19400 (West)
SC2E-26410 Install Fencing ch.7000-8900 (East)
SC3E-22350 Install Fencing ch.14800-16900 (West)
SC5E-23190 Install Fencing ch.22950-24350 (East)
SC4E-22470 Install Fencing ch.18000-19400 (East)
SC5E-23110 Install Fencing ch.21500-22950 (East)
Budgeted Units / Time Remaining Units / Time Budgeted Units Remaining Units
200/d 100/d 1400 0
200/d 200/d 2400 2400
200/d 200/d 1600 1600
200/d 200/d 3000 400
200/d 200/d 1800 1800
233/d 233/d 700 700
200/d 200/d 3000 0
191/d 191/d 2100 2100
191/d 191/d 2100 0
200/d 200/d 1800 0
183/d 183/d 1100 1100
190/d 190/d 1900 0
200/d 200/d 3400 0
200/d 200/d 2400 2400
179/d 179/d 1250 0
200/d 200/d 1600 1600
156/d 156/d 1250 0
175/d 175/d 700 0
191/d 191/d 2100 2100
200/d 200/d 1400 0
183/d 183/d 1100 1100
200/d 200/d 1400 1400
190/d 190/d 1900 1900
191/d 191/d 2100 2100
200/d 200/d 1400 0
200/d 200/d 1400 1400
200/d 200/d 1400 1400
25500
VAR Original Duration Actual Duration Remaining Duration VAR
1400 7 64 0 7
0 12 0 12 0
0 8 0 8 0
2600 15 115 2 13
0 9 0 9 0
0 3 0 3 0
3000 15 62 0 15
0 11 0 11 0
2100 11 25 0 11
1800 9 18 0 9
0 6 0 6 0
1900 10 54 0 10
3400 17 12 0 17
0 12 0 12 0
1250 7 5 0 7
0 8 0 8 0
1250 8 9 0 8
700 4 18 0 4
0 11 0 11 0
1400 7 91 0 7
0 6 0 6 0
0 7 0 7 0
0 10 0 10 0
0 11 0 11 0
1400 7 59 0 7
0 7 0 7 0
0 7 100 7 0
22200 632 130 115
nil Actual Production supplied
35 Average Production Achieved
196 Production Required
25 Most Likely in OPRA Outputs
25 BOS Assumption
Activity ID Activity Name Budgeted Units / Time
SC2R-17470 Noise Wall 6NW30 (ch.27430-27575) 10/d
SC2R-17420 Noise Wall 5NW30 (ch.24770-25015) 10/d
SC2R-17460 Noise Wall 6NW30 (ch.27205-27430) 10/d
SC2R-17430 Noise Wall 5NW40 (ch.25085-25390) 10/d
SC2R-17440 Noise Wall 6NW10 (ch.26300-26733) 10/d
SC2R-17410 Noise Wall 5NW20 (ch.24485-24660) 10/d
SC2R-17480 Headlight Screen 6HS40 (ch.30930-31334) 10/d
SC2R-17450 Noise Wall 6NW20 (ch.26770-27065) 10/d
SC2R-17280 Combination (HS & NW) Wall 4CW10 (ch.18120-18340) 10/d
SC2R-17180 Headlight Screen 2HS60 (ch.9940-10140) 10/d
SC2R-17650 Noise Wall 4NW80 (ch.20740-20960) 10/d
SC2R-17130 Combination (Noise) Wall 2CW40 (ch.8260-8870) 10/d
SC2R-16780 Noise Wall 2NW30 (ch.7400-7600) 10/d
SC2R-16790 Combination (Noise) Wall 2CW40 (ch.7395-7440) 9/d
SC2R-17120 Combination (Noise) Wall 2CW40 (ch.7513-8260) 10/d
SC2R-17370 Noise Wall 4NW65 (ch.20410-20620) 10/d
SC2R-17390 Noise Wall 4NW85 (ch.20750-20960) 10/d
SC2R-17200 Headlight Screen 2HS70 (ch.10547-10750) 10/d
SC2R-17590 Combination (Noise) Wall 2CW40 (ch.8870-9125) 10/d
SC2R-16760 Noise Wall 2NW20 (ch. 6915-7225) 10/d
SC2R-17360 Noise Wall 4NW60 (ch.20290-20630) 10/d
Remaining Units / Time Budgeted Units Remaining Units VAR
10/d 95 95 0
10/d 245 245 0
10/d 225 225 0
10/d 305 305 0
10/d 433 433 0
10/d 175 175 0
10/d 404 404 0
10/d 295 295 0
10/d 200 200 0
10/d 200 200 0
10/d 220 220 0
10/d 610 610 0
10/d 200 200 0
9/d 45 45 0
10/d 747 747 0
10/d 210 210 0
10/d 210 210 0
10/d 203 203 0
10/d 255 255 0
10/d 310 310 0
10/d 340 340 0
5927 0
Original Duration Actual Duration Remaining Duration
10 0 10
25 0 25
23 0 23
30 0 30
43 0 43
18 0 18
41 0 41
30 0 30
20 0 20
20 0 20
22 0 22
61 0 61
20 0 20
5 0 5
75 0 75
21 0 21 nil Actual Production supplied
21 0 21 #DIV/0! Average Production Achieved
20 0 20 10 Production Required
26 0 26 10 Most Likely in OPRA Outputs
31 0 31 10 BOS Assumption
34 0 34
0 596
Actual Production supplied
Average Production Achieved
Production Required
Most Likely in OPRA Outputs
BOS Assumption
Activity ID Activity Name Budgeted Units / Time
SC7T-21430 Install Super T (8 x 1800 Super T) 1/d
SC7T-21520 Install Super T (8 x 1800 Super T) 1/d
SC7T-21880 Install Super T (4 x 1800 Super T) 1/d
SC7T-21970 Install Super T (6 x 1800 Super T) 2/d
SC7T-22060 Install Super T (7 x 1800 Super T) 1/d
SC7T-22150 Install Super T (8 x 1800 Super T) 1/d
SC7T-22240 Install Super T (8 x 1800 Super T) 1/d
SC7T-20890 Install Super T (6 x 1500 Super T) 2/d
SC7T-20980 Install Super T (6 x 1500 Super T) 2/d
SC7T-21250 Install Super T (7 x 1500 Super T) 1/d
SC7T-21340 Install Super T (7 x 1500 Super T) 1/d
SC7T-22330 Install Super T (8 x 1500 Super T) 1/d
SC7T-22420 Install Super T (8 x 1500 Super T) 1/d
SC7G-20601 Install Super T (24 x 1500 Super T) 3/d
SC7T-22510 Install Super T (8 x 1500 Super T) 1/d
SC7T-22600 Install Super T (5 x 1500 Super T) 1/d
SC7T-22690 Install Super T (5 x 1500 Super T) 1/d
SC7T-22780 Install Super T (5 x 1500 Super T) 3/d
SC7G-30760 Install Super T (24 x 1500 Super T) 3/d
SC7T-16900 Install Super T (14 x 1200 Super T) 1/d
SC7T-20530 Install Super T (7 x 1200 Super T) 1/d
SC7G-17360 Install Super T (18 x 1200 Super T) 1/d
SC7T-20620 Install Super T (12 x 1200 Super T) 2/d
SC7T-20710 Install Super T (12 x 1200 Super T) 2/d
SC7T-20800 Install Super T (14 x 1200 Super T) 1/d
SC7T-21070 Install Super T (7 x 1200 Super T) 1/d
SC7T-21160 Install Super T (7 x 1200 Super T) 1/d
SC7T-21610 Install Super T (10 x 1200 Super T) 2/d
SC7T-21700 Install Super T (4 x 1200 Super T) 1/d
SC7T-21790 Install Super T (4 x 1200 Super T) 1/d
Remaining Units / Time Budgeted Units Remaining Units VAR
1/d 8 8 0
1/d 8 8 0
1/d 4 4 0
2/d 6 6 0
1/d 7 7 0
1/d 8 8 0
1/d 8 8 0
2/d 6 6 0
2/d 6 6 0
1/d 7 7 0
1/d 7 7 0
1/d 8 8 0
1/d 8 8 0
3/d 24 24 0
1/d 8 8 0
1/d 5 5 0
1/d 5 5 0
3/d 10 10 0
3/d 24 24 0
1/d 14 14 0
1/d 7 7 0
1/d 18 18 0
2/d 12 12 0
2/d 12 12 0
1/d 14 14 0
1/d 7 7 0
1/d 7 7 0
2/d 9 9 0
1/d 4 4 0
1/d 5 5 0
276 0
Original Duration Actual Duration Remaining Duration
6 0 6
6 0 6
3 0 3
4 0 4
5 0 5
6 0 6
6 0 6
4 0 4
4 0 4
5 0 5
5 0 5
6 0 6
6 0 6
8 0 8
6 0 6
4 0 4
4 0 4
4 0 4
8 0 8
10 0 10
5 0 5
13 0 13
8 0 8
8 0 8
10 0 10
5 0 5 nil Actual Production supplied
5 0 5 #DIV/0! Average Production Achieve
6 0 6 2 Production Required
4 0 4 6 Most Likely in OPRA Output
4 0 4 6 BOS Assumption
0 178
Actual Production supplied
Average Production Achieved
Production Required
Most Likely in OPRA Outputs
BOS Assumption
Activity ID Activity Name Budgeted Units / Time
SC7G-30000 Install Planks & Bearing Strip 12/d
SC7G-30640 Install Planks & Bearing Strip 4/d
SC7G-30080 Install Planks & Bearing Strip 3/d
SC7G-30160 Install Planks & Bearing Strip 4/d
SC7G-30240 Install Planks & Bearing Strip 4/d
SC7G-30400 Place Precast Plank Units 7/d
SC7G-30480 Install Planks & Bearing Strip 8/d
SC7G-30560 Place Precast Plank Units 8/d
SC7G-31210 Install Planks & Bearing Strip 8/d
Remaining Units / Time Budgeted Units Remaining Units VAR
12/d 69 0 69
4/d 75 75 0
3/d 17 17 0
4/d 42 42 0
4/d 42 42 0
7/d 74 74 0
8/d 87 87 0
8/d 82 82 0
8/d 87 87 0
506 69
Original Duration Actual Duration Remaining Duration
6 6 0
17 0 17
6 0 6
11 0 11
11 0 11
10 0 10 nil Actual Production supplied
11 0 11 12 Average Production Achieved
10 0 10 6 Production Required
11 0 11 20 Most Likely in OPRA Outputs
6 87 18 BOS Assumption