PROJECT DESCRIPTION
The contract was awarded to replace the 331-R102 regenerator head, including the cy-
clones, nozzles and coating, in the FCC plant.
The work was scheduled to take place during FCC plant turnaround in January 2006.
SCOPE OF WORK
- Rental of a 1600 tons crane to handle the old and new regenerator head;
- Cutting of the existing head by water jet;
- Fabrication and installation of the new head, completed with refractory coating;
- Assembling of new primary and secondary cyclones, as supplied by Customer, with a
new head;
- Regenerator sandblasting and temperature sensitive painting;
- Reinstallation of thermocouples and electrical system;
- Demolition of old cyclones and material selection of ferrous materials from the refractory
ones.