Vous êtes sur la page 1sur 12

COMPANY PROFILE

A. COMPANY BACKGROUND
PT. WASTUWIDYAWANis a dedicated national consultant, commited in providing
quality, efficient, and effective services, responsive to the public, private and public
interest. The company staffs are selected from individuals who uphold the code of
ethics, integrity and high standard professional achievement.
PT. WASTUWIDYAWAN provides more than 183 experts and sub-professional, in the
field of Arhitecture, Urban Design, Transit Oriented Development Planning and Design,
Landscape, Urban Revitalization and Conservation, Tourism Planning and
Development, Rural/Urban and Regional planning, Infrastructure planning, Road and
Bridges, hydrology, Water and Sanitation, Transportation and Traffic Management,
Institutional development, Financial and Policy Analysis, Programming, Budgeting an
Project Management,

B. SCOPE OF SERVICE AND ORGANIZATIONAL STRUCTURE


I. SCOPE OF SERVICE
The main service activity of PT. WASTUWIDYAWANincluding three fields with 8 sub
areas of service, ie :
1. Architectural
1) Advisory services / pre - design, architectural design, and contract
administration;
2) landscape architecture;
3) Interior design.
2. Civil Engineering
1) Advisory services / predesign and building engineering design;
2) Advisory services / pre design and water resources engineering design;
3) Advisory services / pre design and civil engineering transportation design

3. Environmental Planning
1) Environmental consulting;
2) Urban Planning.

II. PERSONNEL DATA(PERMANENT STAFF)


No. Name Level of education Expertise / Specialization
1. Kristiningsih, ST Bachelor of Architecture,UNIKA Architecture Associate
Soegijapranata Semarang 1996
2. Dra. Haniek Listyorini, MBA Bachelor of Economic and Development Study, Economic Expert
UKSW Salatiga 1988
Master of Business

-1
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
No. Name Level of education Expertise / Specialization
3. Ari Kurniawan, ST Bachelor of Civil Engineering, UNDIP Semarang Building Engineering
1999 Associate
4. Rosi Trinovita, ST Bachelor of Civil Engineering, UNDIP Semarang Building Engineering
1997 Associate
5. Radityo Wahyu Hernawan, Bachelor of Urban and Regional Planning, Urban and Regional
ST UNISSULA Semarang 2006 Planning
6. Zaki Nur Muhammad Bachelor of Architecture, UGM Yogyakarta 2009 Architecture
Odang, ST
7. KrisnaharelBungaSatria, ST Bachelor of Architecture, UNIKOM Bandung 2006 Architecture
8. Dina ArianiSekarnegari, ST Bachelor of Architecture, UNDIP Semarang Architecture
2008
Master of Architecture, UNDIP Semarang 2012
9. PuputFitria Diploma degree of Accountant Administration/ Invoice
10. EvyLuthfiyatti Diploma degree of Accountant Administration/ Invoice
11. Hartatik Vocational Schoolof Accountant Administration/ Invoice
12. Yesica Bachelor of Architecture Architecture
13. Dzulfikar Bachelor of Architecture Architecture
14. JayusRiskiyanto Vocational Schoolof Building Engineering, SMK Dr. Surveyor /Drafter
Tjipto Semarang 2006
15. Maria PutriKartikasari, ST Bachelor of Architecture, UNIKA Soegijapranata Drafter
Semarang 2012
16. BernikaDiptyaPuspasari, ST Bachelor of Architecture, UNDIP Semarang 2012 Drafter
17. HervindaMeiadiPutranto, Bachelor of Architecture, UNIKA Soegijapranata Drafter
ST Semarang 2010
18. RachmadantiNurAnisa, ST Bachelor of Architecture, UNIKA Soegijapranata Drafter
Semarang 2014
19. NurGhozali, A.Md Diploma degree of Architecture Design, UNDIP Drafter
Semarang 2014
20. NisaLuthfiana, A.Md Diploma degree of Architecture Design, UNDIP Drafter
Semarang 2014
21. SetyaRohmahDewiHastuti Vocational Schoolof Building Engineering, SMKN 7 Drafter
Semarang 2011
22. PraditaIswardani Vocational Schoolof Building Engineering, SMKN 7 Drafter
Semarang 2010

III. ORGANIZATIONAL STRUCTURE


In the daily operation, PT WASTUWIDYAWAN supported by staff who are coordinated
by the company management. Generally, the diagram of PT WASTUWIDYAWAN
organizational structure can be shown below:

-2
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
PRESIDENT
DIRECTOR PT. WASTUWIDYAWAN
SECRETARY

DIRECTOR GENERAL DIVISION

HRD GENERAL

TECHNICAL FINANCE ADMINISTRATION


DIRECTORS

HEAD OFFICE BRANCH OFFICE

CULTURAL CONSERVATION URBAN DESIGN URBAN & REGIONAL ARCHITECTURE LANDSCAPE & INFRASTRUCTURE INFORMATION FEASIBILITY STUDY
& TOURISM PLANNING DEVELOPMENT Planning & PROPERTY ENVIRONMENTAL &MUNICIPLE SYSTEM Technical FS
New Town PLANNING ENGINEERING Economic
Tourism Development and Historic Area Urban & Regional Building Deisgn Management &Finance
Planning Urban Planning Property Design Environmental Engineering Management Ability
Special Interest Tourism Conservation Urban Development Real Estate Management Design Training &Willingness to
Planning Urban Program Housing Effort (UKL) Teknik Watsan Division Pay
National and Regional Redevelopment Rural Development Development Environmental Infrastructure Development Economic
Tourism Planning Water Front Strategic Planning Landscape Monitoring design, and Institutional
Institutional Tourism Planning Development Institutional Effort (UPL) Transportation, Endurance Capability
Community level of Tourism Area Planning and Deelopment Environmental Drainage dan System Investment
Planning Development Financial Management Impact Irigation System Application Socio Culture
Land Consolidation and Assesment Water Division
Development Environmental Resources
Urban Infrastructure Management
Community base Urban Plan (RKL)
Nerwork and
Development
Urban Renewal

-3
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
D. COMPANY DATA
I. Administration Data
1 Company Name : PT. WASTUWIDYAWAN
2 Status : Head Branch
X Office Office
nd
3 Head Office Address : Jl. Semeru No.9 C 2 floor Semarang
Phone : 024 8440256
Fax : 024 8442615
E-mail : wastu_smg@yahoo.com
4 Branch Office Address : -
Phone : -
Fax : -
E-mail : -

II. The legality of the company


1 Company Establishment Act
a. Number : 49
b. Date : January 25, 1983
c. Notary Name : IwanHertanto, SH
d. Ratification of the Ministry of Justice : C2-2054 HT.01.01 Yr.84, March31, 1984
and Human Rights
2 Recently Amendment Act
a. Number : 7
b. Date : August 7, 2015
c. Notary Name : SubiyantoPutro, SH., M.Kn
d. Ratification of the Ministry of Justice : AHU-AH.01.03-0955931 - August 11, 2015
and Human Rights

III. Board of Directors


No Name Identity Number Position
1 Jonathan Kwik Han Chung 33.7411.190393.001 Commissioner
2 WahyuSusilarso, SE 33.7301.010666.0001 President Director
3 RasdamDwiRendra, ST 35.0731.170663.0002 Director I
4 RadityoWahyuHernawan 33.7101.120981.0002 Director II

IV. Permit
1. Business Licenses Services: : 1.3374.1.00042.003261
Dated: January12, 2015
2. The validity of business licenses : December23, 2017
3. Agencies licensor of business : Semarang Municipality

V. Certificate
1. Certificate of Business Entities : 0198032 - December24, 2014
0161286 - September24, 2014
0198034- December24, 2014
0198033- December24, 2014
2. Sub Classification of Business Spatial Planning: PR101, PR102, PR103, PR104
Architectural Planning: AR101, AR102

-4
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
Engineering: RE102, RE103, RE104, RE105
OtherConsultancyService: KL401, KL403
3. The validity of business : March 17, 2018
licenses
4. Business licensors agencies : Construction Services Development Board (LPJK)
5. Qualification : Big
6. Classification : Spatial Planning, Architectural Planning, Engineering, Other
Consultancy Service

VI. Financial Data


a. Details of Shareholders
No Name Identity Number Address Percentage
1 Dra. Han Siang Lie 33.7409.610863.000 Jl. Tumpang No. 3 Semarang 89
1
2 Jonathan Kwik Han 33.7411.491156.000 Jl. Bukit Ganda no. 11 11
Chung 1 Semarang
b. Taxes
1. ID number : 01.202.189.5-517.000
2. Last year tax : Income Tax Article 25, 2015
payment No. / Date No .: S-05014949/PPWBIDR/WPJ.10/KP.1503/2016
Date: April 28, 2016
3. Monthly Income Tax : Income Tax Article 21, last 3 months (November and December
/ VAT three months, 2016, January 2017)
Number / Date Income Tax Article 21, November 2016
No. : S-01114452/PPH2114/WPJ.10/KP.1503/2016
Date: December 20, 2016
Income Tax Article 21, December 2016
No. : S-01006863/PPH2114/WPJ.10/KP.1503/2017
January 19, 2017
Income Tax Article 21, January 2017
No. : S-01013576/PPH2114/WPJ.10/KP.1503/2017
February 13, 2017
Income Tax Article 25, last 3 months (November and December
2016, January 2017)
Income Tax Article 25, November 2016
No: S-01114444/PPH25/WPJ.10/KP.1503/2016
Date: December 20, 2016
Income Tax Article 25, December 2016
No: S-01006872/PPH25/WPJ.10/KP.1503/2017
Date: January 19, 2017
Income Tax Article 25, January 2017
No: S-01013564/PPH25/WPJ.10/KP.1503/2017
Date: February 13, 2017
VAT on luxury goods, last 3 months (November and December 2016,
Date: January 2017)
VAT on luxury goods, November 2016
No: S-01114455/PPN1111/WPJ.10/KP.1503/2016
Date: December 23, 2016
VAT on luxury goods, December 2016
No: S-01006067/PPN1111/WPJ.10/KP.1503/2017

-5
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
Date: January 26, 2017
VAT on luxury goods, January 2017
No: S-01013569/PPN1111/WPJ.10/KP.1503/2017
Date: February 13, 2017

-6
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
E. WORK EXPERIENCE LAST 3 YEARS

NAME OF CLIENTS CONTRACTS


NO PROJECTS LOCATION
Name Address/Phone No. / Date Value (IDR)

1 Feasibility Study and Central Java Center of Strategic Region Jl. Patimura No.20 No. HK.01.24/BPIW-
Pre Design of Priority and East Development, KebayoranBaru, Jakarta Selatan PPK.WK/IV/2016/008 3,401,000,000
Areas In Kedungsepur Java Regional Infrastructure Telp. 021.7252770 7 April 2016
and Development Agency (BPIW)
Gerbangkertosusila
Metropolitan Region
2 Borobudur Tourism Central Java Fisherman Settlement Jl. Cipaku V No. 1 KebayoranBaru
Planning, Central Java Development, Work Unit of Jakarta Selatan
Province Strategic Settlement HK.02.03/PKPS-N/391/VI/2016
1,321,870,000
Development 3 June 2016

3 Architectural and West Cross-Border Development, Jl. Cipaku V No. 1, No. KU.01.01/SPK/SATKER-
environmental design Kalimantan Work Unit of Special Settlement KebayoranBaru, Jaksel PKPK/VI/317.a/2016 2,844,572,500
and detail Development Telp. 021.7395673 21 June - 17 December 2016
engineering design of
BalaiKarangan
Riverfront Inner City,
Sanggau District,
West Kalimantan
4 Conceptual Planning Indonesia Committing Officer of Jl. Pattimura No. 20, No. KU.08.08/STARBAG/IV/
of Settlement Areas Standarisation and Institutional KebayoranBaru, Jakarta Selatan P27/2016 1,900,000,000
Telp 021.7393867 6 April - 2 November 2015

5 Masterplan of Semarang Fisherman Settlement Jl. Cipaku V No. 1 KebayoranBaru HK.02.03/PKPS-N/305/V/2016


Fisherman Village / City Development, Work Unit of Jakarta Selatan 11 May 2016 995,478,000
Waterfront Strategic Settlement
Kampoong in Development
TambakLorok Village,
Semarang City

-7
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
NAME OF CLIENTS CONTRACTS
NO PROJECTS LOCATION
Name Address/Phone No. / Date Value (IDR)

6 Prevention and Belitung Development and Supervision of Jl. R.E Martadinata No. 35 221/SP/PKP.PP-
Quality Improvement Settlement Area Development, Pangkalpinang BB/APBN/V/2016 755,980,500
Plan of Urban Slum in Bangka Belitung Islands Province 3 May 2016
Belitung District

7 Infrastructure Indonesia Center of Strategic Region Jl. Pattimura No. 20 HK.02.03/BPIW-


Support Index Development, KebayoranBaru Jakarta Selatan PPK.P4/VI/2015/029 - 15 June 1,895,279,500
Against Urban Regional Infrastructure 2015
Sustainability Development Agency (BPIW)
8 Urban Settlement Pangkalpina Development and Supervision of Jl. Pulau Bangka HK.02.03-cp.pkppb.bb/358 -
Plan in Pangkalpinang ng Settlement Area Development, KomplekPerkantorandanPermuki 05 June 2015 733,160,000
City Bangka Belitung Islands Province manTerpaduPemprov. Kep.
Bangka Belitung Kel. Air
ItamPangkalpinang

9 Architectural and Banten Office of Building Development Jl. SyahNawawiAlbatani Kaw. HK 0203-Cb.PBLB/41 - 19 June
environmental design PusatPemerintahan Prov. Banten 2014 680,460,000
(RTBL) of Ciruas Inner
Region, Serang
District
10 Mitigation Action Indonesia Work Unit of the Directorate Jl. Patimura No.20 KU.08.09/PBL/PK.1-5/512 - 2
Plan for Tsunami Building and Environment KebayoranBaru Jakarta Selatan June 2014 1,320,997,000
Disaster Prone Area Planning
11 Development Plan of Balikpapan PT. Avica Jaya Nusantara Jl. Imam Bonjol No. 68/70, No. 016/CR BPP/SIP-
Segment VIII (Small Menteng WW/IX/2014 1,302,083,333
Paradise) in Coastal Jakarta Pusat 10 September - 20 October
Road Area, 2014
Balikpapan City

-8
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
NAME OF CLIENTS CONTRACTS
NO PROJECTS LOCATION
Name Address/Phone No. / Date Value (IDR)

12 Development Plan of Balikpapan PT. SugicoGraha Jl. Imam Bonjol No. 68/70, No. 015/CR BPP/SIP-
Segment II (Tower Menteng WW/IX/2014 1,302,083,333
Park) in Coastal Road Jakarta Pusat 10 September - 20 October
Area, Balikpapan City 2014
13 Mitigation Palembang Development Planning Board, Jl. Merdeka No. 74 Palembang 03/PPK/Bencana/ BPP/2014 -
Masterplan of Palembang City 15 May 2014 376,025,000
Disaster Prone Areas
14 Development Plan of Balikpapan PT. KaruniaWahananusa Jl. SepingganBaru No. 88 RT. 34 No. 17/CRBPP/SIP-
Segment VII (Housing Balikpapan Balikpapan WW/IX/2014 1,500,000,000
Park) in Coastal Road 12 September - 20 October
Area, Balikpapan City 2014
15 Academic Draft of Labuan Building Management and JlPolisiMiliter No. 1 Kupang 674.8/KTR/PPBL/PBL-
Architectural and Bajo, Environmental Development NTT/V/2014 - 14 May 2014 782,760,000
environmental design Manggarai Work Unit
(RTBL) of District -
LabuhanBajo NTT
Strategic Urban Area
(Cluster A)
16 Technical Planning of Batam Green City Development, Non- Jl. Patimura No.20 HK.02.03/PKH-
Batam Botanical Vertical Specific Unit of KebayoranBaru Jakarta Selatan Rc.9/IV/2014/SP/ JK.4 - 21 663,795,000
Garden Development Implementation and Using of March 2014
- Phase II Urban Green Space

17 Technical Assistance Papua & Directorate of Settlement Jl. Pattimura No. 20, KU.08.08/PP-WIL
of Urban and Rural Maluku Development KebayoranBaru, II/SP/01/IV/2013 - 16 April 1,063,018,000
Settlements Islands Jaksel 2013
Infrastructure on
Papua and Maluku
Islands Corridor

-9
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
NAME OF CLIENTS CONTRACTS
NO PROJECTS LOCATION
Name Address/Phone No. / Date Value (IDR)

18 Identification and Java Island Sub Directorate of Region I Jl. Pattimura No. 20, KU.03.08-PK.2/PBL-2.404 - 22
Inventory of Strategic KebayoranBaru, April 2013 1,006,720,000
Area Building and Jaksel
Environment
Planning in Java
Region, 2014
19 Development Plan of Berau Work Unit of East Kalimantan Jl. Tengkawang No. 1 Samarinda 348/SPK.BERAU/PKPP.RPKPP/2
Priority Urban District Settlement and Border Area 013, 18 March 2013 785,471,000
Settlement (RPKPP) Development
in Berau District.

20 Development Plan of West Committing Officer of Jl. RE Mertadinata No. 35 68.b/SP/PKP.PTPP-


Priority Urban Bangka Settlement Technical Guidance, Samarinda BB/APBN/III/2013 - 11 March 783,376,000
Settlement (RPKPP) Bangka Belitung 2013
in West Bangka
District.
21 Revision of Balikpapan Balikpapan Municipality Jl. Jend. Sudirman RT. 13 No. 1 050.13/04/SP/BPD-
Balikpapan Drainage Balikpapan Telp. 0542-422515 BFP/VII/2012 - 25 July - 20 431,970,000
Master Plan (Phase I: January 2013
The areas south, east
and west)
22 Masterplan, DED of Sangata Office of Public Work Service, KawasanPusatPemerintahan 600/03-KONTRAK/RENC-
Bukit Pelangi East Kutai District Bukit PelangiSangata 2/DPU-CK/IX/2012 - 28 Sept. - 745,635,000
Governmental Office 26 Dec. 2012
to Coastal Sangatta

23 Identification and Java Island Sub Directorate of Region I Jl. Pattimura No. 20, No. KU.08.08/PBL-
Inventory of Strategic KebayoranBaru, 1.3/01/IV/2012 1,022,406,000
Building and Jaksel 11 April - 6 Dec.2012
Environmental

- 10
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
NAME OF CLIENTS CONTRACTS
NO PROJECTS LOCATION
Name Address/Phone No. / Date Value (IDR)

Planning in Java
Region, 2013

24 Architectural and Sijuk, Directorate of Building and Jl. Pattimura No. 20 No. KU 0308/PK.1/PBL-
environmental design Bangka Enviromnet Planning KebayoranBaru, R.14/2024 746,900,000
of Sijuk Region, Belitung Jaksel 1 June - 27 December 2012
Bangka Belitung
District
25 Technical Assistance Menado, Settlement Improvement Region Jl. Pattimura No. 20 No. KU.08.08/PP-WIL
of Urban and Rural Palu, II KebayoranBaru, II/SP/01/IV/2012 896,830,000
Settlements Makasar Jaksel 11 April 2012
Infrastructure on SPMK : 12 April - 7 November
Sulawesi Economic 2012
Corridor

- 11
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615
F. EXPERIENCE ON PROJECTS OF A SIMILAR NATURE

Any
Gross Type of Contract Contract Actual Extension
Land Original Final Contract Contract No. of days Type of Scope of Name of
Project title Address Floor Conditions Commencement Completion Completion Any delay? of Time
Area Contract Sum Sum Duration for EOT? Contract Works Employer
Area of Contract Date Date Date (EOT)
Granted?
Center of
Feasibility Study and Pre Strategic Region
Design of Priority Areas In Central Java Development,
November 6,
Kedungsepur and and East FIDIC/ others 3,401,000,000 3,401,000,000 April 7, 2016 7 months Yes / No Yes / No Lumpsum Regional
2016
Gerbangkertosusila Java Infrastructure
Metropolitan Region Development
Agency (BPIW)
Development Plan of
Segment VIII (Small October 20, PT. Avica Jaya
Balikpapan FIDIC/ others 1,302,083,333 1,302,083,333 September 10, 2014 1 month Yes / No Yes / No Lumpsum
Paradise) in Coastal Road 2014 Nusantara
Area, Balikpapan City
Development Plan of
Segment II (Tower Park) October 20,
Balikpapan FIDIC/ others 1,500,000,000 1,500,000,000 September 10, 2014 1 month Yes / No Yes / No Lumpsum PT. SugicoGraha
in Coastal Road Area, 2014
Balikpapan City
Development Plan of
PT. Karunia
Segment VII (Housing October 20,
Balikpapan FIDIC/ others 1,500,000,000 1,500,000,000 September 12, 2014 1 month Yes / No Yes / No Lumpsum Wahananusa
Park) in Coastal Road 2014
Balikpapan
Area, Balikpapan City
Office of Public
Masterplan, DED of Bukit
Work Service,
Pelangi Governmental Sangatta FIDIC/ others 745,635,000 745,635,000 Sept. 28, 2012 Dec. 26, 2012 3 months Yes / No Yes / No Lumpsum
East Kutai
Office to Coastal Sangatta
District

- 12
PT. WASTUWIDYAWAN
Jl. Semeru Raya No 9c Lt 2 Semarang
Telp. (024) 8440256, Fax (024) 8442615

Vous aimerez peut-être aussi