Safety measures provided by the Contractors at the diversions and at work site are not
sufficient.
There is an urgent need to improve traffic control and safety devices such as signs,
delineators, blinkers, barricades etc at work site as per relevant standards and technical
specifications viz: IRC SP 55:2001 & IRC 67:2012
The Concessionaire shall take necessary steps to improve the safety measures
immediately as where safety lapses observed. The following recommendations shall be
made
The Authority shall appoint a Safety Consultant as specified as per Clause 4 of Schedule L of the
Concession agreement within 90 (Ninety) days from the date of concession agreement
Traffic Signs
During our inspection it was observed that traffic signs installed on project stretch is not
sufficient and sub standard. Following Traffic signs are mandatory during the
construction stage
- Cautionary/ Warning signs : Triangular shape with red boarder and black symbol in
white back ground used to caution and alert the road user to potential danger and
existence of certain hazardous condition either on or adjacent to the road way so
that they take desired action. These signs indicate the need for special caution by
road users and they may require a reduction in speed
- Informatory / Guide signs : rectangle in shape and are used to give such information
to road users which will help them along the route in most simple and direct manner
During our inspection it was observed that diversion provided at about 10 locations was
not compliance with safety regulations. The traffic management measures were
insufficient with potential danger areas for cause of accidents. The black spot areas
with potential chances of accident occurrences are @ chainages 89 +380KM and 97+00
KM
The road users need to alert with warning measures about the change of TWO LANE to
ONE WAY traffic and about the merging points
During our inspection it was observed that the construction site is exposed to danger due to
insufficient barricading and shoring measures. Following measures are recommended:
It is recommended to cordon off the construction site restricting public to enter to the
site
Blinkers and Illuminators shall be provided for night vision to enhance safety
Monthly Safety workshops for all staffs including Supervisors and Management
Risk assessment and precautionary actions have to carried out on a regular basis
Safety team to monitor on weekly basis to rectify defects like misplacement of gunny
bags, barricades, signs etc
Cordon off work areas to prevent entry of public into the work zone
*****