Installation of NH3-vessel (V=60m3) outside next to E-Filter Balcke Durr inlcuding Pump
Installation of dosing unit
Injection lances
9x penetrations Diam 50 in ducting dub
9x installation of lances with valve and flowmeter
Installation of manifold and connect to 9 lances
N25 SS304
DN15 SS304
DN15 SS304
bbel uitvoeren
Balcke Durr - SCR site activities
Installation works
Cutting the existing ducting at two locations
Removal of the Boiler fluegas outlet duct (bypass)
Installation of supporting steelconstruction by Solvay
Transport of the reactor
Hoisting of the reactor
Installation of the reactor
Installation of 3 sootblowers
Installation of piping
Modification platform of exisitng fan for clean bagfilter of coal conveyer
Transport and installation of Reactor blocks
Fixation of Reactor blocks
Modification of existing fluegas damper in Boiler outlet
Installation of supports for the ducts
Installation of connecting ducts to the boiler outlet and fluegas duct towards Rotary air h
Installation of two (2) expansion joints
Inlet duct x
Side 4,500 1,000 0,005 1,5 2 8000 19
Front 1,500 1,000 0,005 1,5 2 8000 19
Outlet duct
Side 4,800 1,000 0,005 1,5 2 8000 6
Front 1,700 1,000 0,005 1,5 2 8000 6
(in scope FV)
r (in scope FV)
r (in scope FV)
heater
2198 kg
632 kg
1477 kg
4308 kg.
2048 kg
644 kg
859 kg
1355 kg
3005 kg
7910 kg
10260 kg
3420 kg
13680 kg
3456 kg
1224 kg
4680 kg
Sulzer - SCR site activities
Installation works
Cutting the existing ducting at two locations
Removal of the Boiler fluegas outlet ducts
Installation of supporting steelconstruction by Solvay
Transport of the reactor
Hoisting of the reactor
Installation of the reactor
Installation of 3 sootblowers
Installation of piping
Modification platform of exisitng fan for clean bagfilter of coal conveyer
Transport and installation of Reactor blocks
Fixation of Reactor blocks
Installation of supports for the ducts
Installation of connecting ducts to the boiler outlet and fluegas duct towards Rotary air heater
Installation of two (2) expansion joints
Inlet duct x
Side 4,000 1,500 0,005 1,5 2 8000 14 10080
Front 0,900 1,000 0,005 1,5 2 8000 14 1512
11592
Outlet duct
Side 1,700 1,000 0,005 1,5 2 8000 6 1224
Front 1,700 1,000 0,005 1,5 2 8000 6 1224
(in scope FV)
(in scope FV)
(in scope FV)
kg
kg
kg
kg.
kg
kg
kg
kg
kg
kg
kg
kg
2448 kg