CALCULATION OF WATER DEMAND

FLOOR FITTING WATER DEMAND QUANTITY TOTAL


(gallons/day)

GROND FLOOR

- Tandas (L&P) SH 100 0 0


WC 40 6 240
HB 20 6 120
BN 20 6 120
U 40 2 80
560

FIRST FLOOR

- Tandas (L&P) SH 100 0 0


WC 40 6 240
HB 20 6 120
BN 20 6 120
U 40 2 80
560

PRAYERS ROOM

- Male & Female AB 20 8 160


160

TOTAL CAPACITY 1280

20% Safety Factor = 1280 x 20%

= 1536 gallons
1600 gallons

B. WATER STORAGE TANK

ROOF TOP LEVEL

Capacity of Storage Tank = 1600 gallons

Proposed water tank (2 Nos.) ;

Size = 1600mm(D) x 2130mm(H) Polytank


Capacity = 850 gallons each

~ Proposed 2 Nos. of water tank with size 1600mm(D) x 2130mm(H) Polytank with capacity 850 gallons each

Page 1 of 9
Page 2 of 9
C. CALCULATION OF RESIDUAL HEAD PRESSURE

Flow rate Pipe diameter Equivalent Total Effective Friction Friction Available Residual
Ref. Points Loading Unit Length (m) Length (ft)
(gpm) (mm) Length (ft) Length(ft) Loss/ft head head(ft) Head(ft)

T-A 35.5 8.5 20 11.4 37.40 17.3 54.70 0.55 30.09


A - A1 32.5 8 20 11.1 36.42 15.9 52.32 0.5 26.16
A1 - A2 29.5 7.7 20 10.8 35.43 14.5 49.93 0.48 23.97
A2 - A3 26.5 7.2 20 10.5 34.45 13.1 47.55 0.4 19.02
A3 - A4 25 7 25 6.6 21.65 11.1 32.75 0.1 3.28
A4 - A5 23.5 6.8 32 6.3 20.67 9.1 29.77 0.08 2.38
A5 - A6 22 6.5 32 6 19.69 7.7 27.39 0.07 1.92
A6 - A7 20 6.2 32 5 16.41 6 22.41 0.068 1.52
A7 - A8 18 6 32 4 13.12 4.6 17.72 0.065 1.15
A8 - A9 18 6 40 4 13.12 0.4 13.52 0.065 0.88

110.36 25 4.41

A9 - A9.1 15 5.5 20 2.8 9.19 9.7 18.89 0.25 4.72


A9.1 - A9.2 12 5.4 20 2 6.56 7.7 14.26 0.24 3.42
A9.2 - A9.3 10 5.3 20 1.8 5.91 5.7 11.61 0.22 2.55
A9.3 - A9.4 7 5.2 20 1.6 5.25 4.3 9.55 0.21 2.01
A9.4 - A9.5 5 5.1 20 0.8 2.62 1.4 4.02 0.2 0.80
A9.5 - A9.6 2 4.9 20 0.5 1.64 0.9 2.54 0.19 0.48

13.99 25 0.56

T-B 19.5 6.4 20 11.4 37.40 22.7 60.10 0.33 19.83


B - B1 18 6.2 20 10.6 34.78 20.7 55.48 0.32 17.75
B1 - B2 16.5 5.8 20 9.8 32.15 19.3 51.45 0.3 15.44
B2 - B3 16.5 5.8 20 9 29.53 17.3 46.83 0.3 14.05

67.07 25 2.68

Page 2
Flow rate Pipe diameter Equivalent Total Effective Friction Friction Available Residual
Ref. Points Loading Unit Length (m) Length (ft)
(gpm) (mm) Length (ft) Length(ft) Loss/ft head head(ft) Head(ft)
B3 - B3.1 13.5 5.6 20 3.6 11.81 13.3 25.11 0.25 6.28
B3.1 - B3.2 11.5 5.2 20 3.1 10.17 11.9 22.07 0.22 4.86
B3.2 - B3.3 8.5 3.3 20 2.6 8.53 10.5 19.03 0.1 1.90
B3.3 - B3.4 6.5 3.2 25 2.1 6.89 9.1 15.99 0.09 1.44
B3.4 - B3.5 3.5 2.3 25 1.6 5.25 7.7 12.95 0.03 0.39
B3.5 - B3.6 1.5 1.3 32 1.1 3.61 4 7.61 0.02 0.15

15.02 25 0.60

T-C 35.5 8.5 20 24.3 79.73 17.3 97.03 0.55 53.37


C - C1 32.5 8 20 24 78.74 15.9 94.64 0.5 47.32
C1 - C2 29.5 7.7 20 23.7 77.76 14.5 92.26 0.48 44.28
C2 - C3 26.5 7.2 20 23.4 76.78 13.1 89.88 0.4 35.95
C3 - C4 25 7 25 16.65 54.63 11.1 65.73 0.1 6.57
C4 - C5 23.5 6.8 32 16.35 53.64 9.1 62.74 0.08 5.02
C5 - C6 22 6.5 32 16.05 52.66 7.7 60.36 0.07 4.23
C6 - C7 20 6.2 32 15.75 51.68 6 57.68 0.068 3.92
C7 - C8 18 6 32 14.55 47.74 4.6 52.34 0.065 3.40
C8 - C9 18 6 40 13.75 45.11 0.4 45.51 0.065 2.96

207.02 25 8.28

C9 - C9.1 15 5.5 20 5.8 19.03 9.7 28.73 0.25 7.18


C9.1 - C9.2 12 5.4 20 5.4 17.72 7.7 25.42 0.24 6.10
C9.2 - C9.3 10 5.3 20 4.9 16.08 5.7 21.78 0.22 4.79
C9.3 - C9.4 7 5.2 20 4.4 14.44 4.3 18.74 0.21 3.93
C9.4 - C9.5 5 5.1 20 3.9 12.80 1.4 14.20 0.2 2.84
C9.5 - C9.6 2 4.9 20 3.4 11.16 0.9 12.06 0.19 2.29

27.14 25 1.09

Page 3
Flow rate Pipe diameter Equivalent Total Effective Friction Friction Available Residual
Ref. Points Loading Unit Length (m) Length (ft)
(gpm) (mm) Length (ft) Length(ft) Loss/ft head head(ft) Head(ft)
T-D 19.5 6.4 20 24.3 79.73 22.7 102.43 0.33 33.80
D - D1 18 6.2 20 23.5 77.10 20.7 97.80 0.32 31.30
D1 - D2 16.5 5.8 20 22.7 74.48 19.3 93.78 0.3 28.13
D2 - D3 16.5 5.8 20 15.3 50.20 17.3 67.50 0.3 20.25

140.62 25 5.62

D3 - D3.1 13.5 5.6 20 14 45.93 13.3 59.23 0.25 14.81


D3.1 - D3.2 11.5 5.2 20 13.5 44.29 11.9 56.19 0.22 12.36
D3.2 - D3.3 8.5 3.3 20 11.7 38.39 10.5 48.89 0.1 4.89
D3.3 - D3.4 6.5 3.2 25 11.2 36.75 9.1 45.85 0.09 4.13
D3.4 - D3.5 3.5 2.3 25 9.9 32.48 7.7 40.18 0.03 1.21
D3.5 - D3.6 1.5 1.3 32 9.4 30.84 4 34.84 0.02 0.70

198.96 25 7.96

Since available head is at 25 ft, all friction figures are acceptable.

Page 4
PROJECT : THE PROPOSED DESIGN, CONSTRUCTION AND COMPLETION OF EMPLOYERS REPRESENTATIVE
SITE OFFICE (VILLA GEMILANG 2) AT PRECINT 4, WILAYAH PERSEKUTUAN PUTRAJAYA, FOR
PUTRAJAYA HOLDINGS SDN BHD

A. CALCULATION OF WATER DEMAND

FLOOR FITTING WATER DEMAND QUANTITY TOTAL


(gallons/day)

GROUND FLOOR

- Toilet (M&F) SK 20 2 40
WC 40 7 280
HB 20 8 160
BN 20 7 140
U 40 2 80
700

FIRST FLOOR

- Toilet (M&F) SK 20 2 40
WC 40 6 240
HB 20 6 120
BN 20 6 120
U 40 2 80
600

PRAYERS ROOM

- Male & Female AB 20 8 160


160

TOTAL CAPACITY 1460

According to SYABAS, the water demand for Putrajaya is for two (2) days, so the total capacity of water demand is;

1460 x 2 = 2920 gallons

B. WATER STORAGE TANK

ROOF TOP LEVEL

Capacity of Storage Tank = 2920 gallons

Proposed water tank (2 Nos.) ;

Size = 2440mm(D) x 1560mm(H) Polytank


Capacity = 1500 gallons each

~ Proposed 2 Nos. of water tank with size 2440mm(D) x 1560mm(H) Polytank with capacity 1500 gallons
each

Page 2
Page 3
C) CALCULATION OF PNEUMATIC PUMP AND SIZING

i) Pumping capacity based on loading units

Water closet 13 x 10 = 130 Lu


Tap/Basin 37 x 3 = 111 Lu
Urinal 4 x 10 = 40 Lu
TOTAL 281 Lu

ii) From `Design flow rate vs Loading units' chart

Q = 40 Igpm = 3 liters / sec

iii) Sizing of delivery pipe

Delivery Rate, Q = AV, V = 1.2 m/s

0.0030 = ((d/4) (1.2))


d = 0.0030 x 4 / 1.2
d = 0.00321
d = 0.05668 m
d = 56.682 mm
d 65 mm

Page 2
iv) Friction Losses

Losses thru Friction loss Total head loss


Pipe size Check valve Gate valve Strainer Tee Elbow
valve & fitting from chart Total + Length x F.Loss = Total
150mm 0 x 60 = 0 0 x 7 = 0 0 x 110 = 0 0 x 30 = 0 0 x 16 = 0 0 0+ x 0 = 0
100mm 0 x 40 = 0 0 x 4.5 = 0 0 x 60 = 0 0 x 21 = 0 0 x 10 = 0 0 0+ x 0 = 0
80mm 0 x 35 = 0 0 x 4 = 0 0 x 48 = 0 0 x 18 = 0 0 x 9 = 0 0 0+ x 0 = 0
75mm 0 x 30 = 0 0 x 3.2 = 0 0 x 42 = 0 0 x 15 = 0 0 x 7.5 = 0 0 0+ x 0 = 0
65mm 2 x 25 = 50 4 x 2.8 = 11.2 2 x 28 = 56 3 x 12 = 36 5 x 6 = 30 183.2 0.013 183.2 + 65 x 0.013 = 3.2266
50mm 0 x 20 = 0 0 x 2.3 = 0 0 x 27 = 0 0 x 10 = 0 0 x 5 = 0 0 0+ x 0 = 0
40mm 0 x 16 = 0 0 x 1.8 = 0 0 x 10 = 0 0 x 8 = 0 0 x 4 = 0 0 0+ x 0 = 0.0000
32mm 0 x 14 = 0 0 x 1.5 = 0 0x 9= 0 0 x 7 = 0 0 x 3.3 = 0 0 0+ x 0 = 0
25mm 0 x 10 = 0 0 x 1 = 0 0x 5= 0 0 x 5 = 0 0 x 2.6 = 0 0 0+ x 0 = 0
Total head loss = 3.227
v) Total Head Loss = 3.23

vi) Minimum Pressure required at flush valve fitting = 1 bar @ 10.2m

Total Head Loss = 3.23 + 10.2


= 13.43 m

20% Safety Factor = 13.43 x 20%


= 16.11 meter
17 meter

Proposed two (2) nos of Pneumatic Pumps with capacity of 3 litres/sec at 17m head each (1 duty, 1 standby)