2. Clearances:
Check the electrical clearance for live parts or as per requirement / drawing
1. HV Phase to Phase OK
2. HV Phase to Earth OK
3. LV Phase to Phase OK
4. LV Phase to Earth OK
APPLIED VOLTAGE
1U 1V 419.8
1V 1W 419.3
1W 1U 418.5
MEASURED VOLTAGE
1V2v 405.3
1W2w 404.6
1U1V 419.8
1V2n 411.5
1V2w 406.8
1W2v 412.1
1U2n 9.55
Acceptance Criteria
Check the Measured Values for satisfaction of the following Conditions
I. 1V2v = 1V2w
405.3=406.8
Acceptance Criteria:
General Pattern is two similar readings on Outer phases and one lower
reading on Center Phase
Note:
Possible Abnormalities shall be found using this test is
Winding inter-turn Failure, Shift of Winding & Core Defects
Acceptance Criteria:
The Voltage Induced in the Center Phase may be 50 to 90% of the applied Voltage
when the Voltage applied in the Outer phase
When the Voltage is applied in Center Phase, then the voltage induced in the outer
phases may be 30% to 70% of applied Voltage
Note:
Zero or Negligible voltage induced in other two phase is not acceptable and should be
investigated
NAME DESIGNATION SIGNATURE DATE
TEST ENGR. Suresh M Testing Engr.
BGRESL Rathina Kumar D Dy.Manager
OPGCL
PROJECT: PROJECT: 2 X 660 MW IB THERMAL POWER STATION
TAP No
Phase Resistance ,Rt (Ohms) Resistance ,R75(Ohms) Remarks
R-Y 649.76
566 m
Y-B 648.62
1 565 m
B-R 648.62
565 m
R-Y 635.99
554 m
Y-B 634.84
2 553 m
B-R 637.14
555 m
R-Y 615.32
536 m
Y-B 616.47
3 537 m
B-R 616.47
537 m
R-Y 602.7
525 m
Y-B 601.55
4 524 m
B-R 601.55
524 m
R-Y 582.03
507 m
Y-B 580.88
5 506 m
B-R 582.03
507m
7.2 LV WINDING
Configuration Star Amb Temp
Resistance
Phase Resistance ,Rt (Ohms) Remarks
,R75(Ohms)
R-Y 833 956.28
Y-B 832 955.13
B-R 833 956.28
Acceptance Criteria: Values shall be approximately equal to factory results
8. INSULATION RESISTANCE
Insulation Resistance PI
Winding Combination values
15S 60S 600S
HV+E 6.04G 7.06G 8.03G 1.13
8.04G 12.3G 17.8G 1.14
LV HV
LV E >1G -
9. WTI Settings:
10. Remarks:
Transformer test results & other protection checks interlocking are found