SL ACTIVITY CONTROLLING NATURE & EXTENT ACCEPTANCE CRITERIA PERSON RESP.
No. DOCUMENT OF INSP./TEST AT LOCATION 1 Background Drawings Visual, 100% - Wetted properly to minimise suction Engineer / preparation Contract Specs. - Scabbling, spatter dashing or chipping Foremen/ before rendering BS 8000 : Part 10 done for proper bonding Quality Engineer - Lathing completed & beads fixed - Free of loose materials - Background in dry condition - Background free from cracks, able to arrest movement of render and wetted properly - Contamination of oil, salt, loose material, paint, loose render, splashes and dust removed - Bonding rush coat (BRC) to be used for concrete surfaces(if feasible) or as specified 2 Preparatory works Drawings Visual, 100% - Movement joints & corners clearly identified & Engineer / Contract Specs. and covered by lathing or as specified Foremen/ BS 8000 : Part 10 - Sample panel 1mx1m to be done Quality Engineer (if required) 3 Check if all concealed Drawings Visual, 100% - To be checked prior to actual plastering Engineer / services/ channels (if Contract Specs. Verification, 100% Foremen/ applicable) are BS 8000 : Part 10 Quality Engineer placed as required 4 Check for any groove/ Drawings Visual, 100% - To be checked prior to actual plastering Engineer / strips to be made or Contract Specs. Verification, 100% Foremen/ fixed in plaster BS 8000 : Part 10 Quality Engineer QC~PLAN. Project No. & Name: Name of Client/ Consultant:
SL ACTIVITY CONTROLLING NATURE & EXTENT ACCEPTANCE CRITERIA RESP. PERSON/
No. DOCUMENT OF INSP./TEST AT LOCATION 5 Mix proportions done Drawings Visual, 100% - Mix proportion as per Contract specifications Engineer / with the "Measuring Contract Specs. - Volume batched by "Measuring Boxes" Foremen/ Boxes' BS 8000 : Part 10 - For general purpose CM 1:2:2 ( cement: Quality Engineer coarse sand: fine sand) or as per Customer's instructions -Machine mixed preferably or as per site conditions or hand mixed 6 Application of Drawings Visual, 100% -Thin coat of tight mix Engineer / rendering Contract Specs. -Second coat min. 8mm & max.16mm Foremen/ BS 8000 : Part 10 -Bonding agent used on wet condition Quality Engineer -Subsequent undercoat thick 6mm to 10mm -Final coat 3mm to 6mm Total rendering thickness -Not less than 18mm for two coat work or as specified 7 Final Inspection on Drawings Visual, 100% - Tolerances in plaster finish shall be Engineer / completion Contract Specs. Dimensional, 5% preferably within the following range Foremen/ a) 3mm in 1.8m stretch Quality Engineer b) 10mm in 1.8m for soffits -No bond failure & cracking -No recurrent dampness -Good appearance -No defects in plumb line QC~PLAN. External Rendering Doc.No.CIVIL QC~Plan- 014/ REV. 0