Vous êtes sur la page 1sur 14
conmecsoncemen | G08 (1) SHES URGATRBARARAS cone POoWeEl peeks PLANT PROJECT. Project Location : REPUBLIKA SRPSKA, BOSNIA & HERZEGOVINA (BIH) ISENIOR TURG! ea) ENGINEER [SENIOR SURAJ MECHANICAL ENGINEER [BAMEANG VITA HERIVANTO PRONECT acuns suena EEMOREOTER | apingqercana cod EB Foun Oy PROJECTLEADER | unidnycameacch dae Sting [WATER ENGINEER |shring@edepcicom 4 Ince suusTvo Banker feted Sy iv znan - SeEMCAL zroin@ssopccom atin comsar encinceninc sa gr ign J mrsrancoen | SUG () Sire WESATES MEARS UGLIEVIK 2X230MW COAL FIRED POWER PLANT PROJECT Project Location : REPUBLIKA SRPSKA, BOSNIA & HERZEGOVINA (BIH) SDEPCINO: | PAGE UGLJEVIKMOM-GENO4 | "215 BE eT Re [i GONTRACT NEGOTIATING. capac is about 400mm, Three aula cooing water pumps {one pump per un of turbine, one for standby) wil be set in the want to use IDCT for the ae Gann oo acu ao ene tien : tect a ee ed eeeerneel . 2 [mest with BiH waster| rare fon nu oy COMA. Trl aot eon opt tc atest tn [omer resonator 0° g aaayaie com neo eed ee ran ana ie Ae | Gowan ua teat tt |__| ona " | LAs oS - Bae REALS ARAT SNPTC sucorsaciseostouesnecnamersmccmis UGLIEVIK 2X 230MW COAL FIRED POWER PLANT PROJECT Project Location: REPUBLIKA SRPSKA, BOSNIA & HERZEGOVINA (Bi) VoL EPGINO: | PAGE ; 5 [TTROMSAR'S” "| CONTRACTOR'S Tre abe. COMMENT. | COMMENT fate amp ous sory cevatng wal For ACC astm The design wind peed ovine ~ —|Conoed Conti Omi, desgn tempera, 186, HO (ral Temperate Diferenee 36%, Deagn turbine exaust back ressur(erhaust 4 |Seemouttotseam wines ta jrany20%2 he tukowput design basis of ACC is 25°, ITDIs 36 oven, COMSAR reqest instal the ACC a8 lw as posse. The caledatonto deeming of high of KCC should be subi eTabraony tos and spoatcston caning water colo [COntve@ nto 5 |_ © _|gnehas been dscussd and coniuded 1 january 2012 The ecope of work are urely workshop ony for enupmert 7 |Forscope of aborstony eaupmen, cute design| OMY OF SOUP ary 2012 ef workshop . supperiton| PY ung tation The workahop eqimanis machines and apeciiaon fr —— Conted ont 8 | suoporing be powerplant operaton hes boon lcusbed and 18° janaary2012 once, For workshop scope of work “The scope of work ar| sup workshop equipment, outine design of workshop . suppeniton only for equipment supply SD secmanoom | 08 (EGG UREATRRANARAA [con UGLIEVIK 2X 230MW COAL FIRED POWER PROJECT Project Location: REPUBLIKA SRPSKA, BOSNIA & HERZEGOVINA (BiH) 'SDEPCINO, PASE UGLJEVIKMON-GENO |" 45 uring instalation COMSAR suggested that drainage system of power plant shall be designed [eMC roquiced water level record data of ver surounding the pant 10 [Contactor witbuioneran water dschapepumprowse PAE sal % GEHOMES oa then dtaing | Oar 2012 = WEIN nether the dacharge ne erage pure nouse| wm eee | ied orn = ot 11 _| Fre ighng system according to NFPA Standars Conmed Contened 6 jonuan.20%2 The frefigting pumps which includes one 100% let motor Confmed ven fre pump, one 100% deel engine cron fre pump ana sot offckoy pum for epi aye use ic) | ur eee oc aoa contre 1 jorwan. 2012 | me enon pumps which indudes one 1005 sac meter ven re pump, ane 1003 ease engine van fre pump and se ofjockey pump forhystan system use 7 incl pate ar basin wl be Uso for pre-Fasimant Gray 12. | ri be use as poasie water Unraiaton ana UY confemed Contes oP joman 2012 Ssintocion system fr dering water - Insti water pond shold Rod 2 hours Warage, one 10000" 14 |sorviotiro-ighing water pond and ane 500m? potable water |Conimed Conte eM enuan.2042 i x ™ BRU q ots > UGLIEVIK 2X 230MW | commnsrcncammen | SO C) SEE WALES BRARAT [con emeo rower ; SNPTC sumuresannnmnmaenss | rant Peoicey Project Location: REPUBLIKA SRPSKA, BOSNIA & HERZEGOVINA (i ‘SOEPCING: | PAGE voLievicomcena | "36 ITEM DESC "GOMSAR'S CONTRACTOR'S: er | esohenn comment |. comment ouzeAte | | The end [ g 4 Sofs alow 22300 Coal Feed Power Plant Projet Append Tene! Speciation UGLJEVIK 2x230MW COAL FIRED POWER PLANT PROJECT IN REPUBLIKA SRPSKA, BOSNIA & HERZEGOVINA (BiH) APPENDIX B1 TECHNICAL SPECIFICATION BETWEEN COMSAR ENGINEERING sa AND (Qe China National Machinery imp. & Exp. Corp. rae) BRee WRN LESORARAS SNPTC swscccusmcronroiocmmsoomnine nerinccoears Ualv 22901 Coa Fired Power ant Projet Appendix B Tet! Specifeton ———————S—_=_=nnnh eri eee January, 2012 LIST OF CONTENTS: No. CONTENTS Chapter 3_| Equipment And Systems Description 326 | Air Cooled Condenser (ACC) System alow 2230 Coa! Fred Power Plant Project Anpendix 8: Tecnicl Speciation 3.28 Air Cooled Condenser (ACC) 3.261 Process of ACC system ‘Steam exhausted from turbine goes directly into air cooled condenser through steam duct and condensates through exchanging heat with the ambient air without riddle heat transfer medium, ‘The process flow of ACC is: After being induced out ofthe turbine house through steam duct, and rising up to one vertical ide and sharing some branches. the ‘exhausted steam flows to bundle top header which Is on the top of air cooled condenser, ‘When the exhausted steam crosses the finned tube bundle, a great deal of cold sucked in by axial flow fan, and the heat-exchange works on the surface of finned tube bundle. Then the exhausted stoam condensates to water which le collected to the ‘condensate tank by condensate collection pipe and pumped to steam turbine thermal system for the next cycle. 3.282 ACC system dasign basis ‘According to the "ACC - TECHNICAL DESIGN INPUT DATA" given by COMSAR, ‘The design wind speed of windward is. ~3.0mis, Design temperature: 160 TTD (internal Temperature Difference); 36°C Design turbine exhaust back pressure(exhaust steam outlet of steam 14KPa Output capability in TRL condition: ~230MW Design standard are refering to Heat Exchanger Insittute(H for ACC system. 328.3 ACC spec! ‘Mechanical vent 9 equal applicable ir cooled condenser system is adopted and laid on the high platform out of Row A of main power b ing. According to the result of preliminary ‘optimization, 24 cooling sections are distributed for per unit and single row tube bundle is adopted. The final specification of ACC will be determinated after the the bid Uslovic 2290 Coal Fred Power Pant Projet ‘Anson 8 Techni! Speciation Cootng sections: 24 (6 rows 4 lines) 3263.2 Axial flow fan specication One set of section. Axi flow fan withthe variable speed motor ls distributed for each cooled an specification is: Fan diameter: ~8.14m Quantity: 24 sets 3.263.3 Washing system of ACC ‘According local condition and to keep high heat transfer ficiency, ACC surface wil to clean the dust between finned tube bundles. One installed using high pressure water whose pressure is. be washed 1 or imes per yer semiautomatic washing system about 130 bar, (One passenger-cargo elevator i installed in this ACC system, 3.28.4 Overall arrangement of ACC system For ACC system, the wind influence (hot reflux) on ACC heat exchange is ‘considered chiefly in overall arrangement of ACC system. The hot reflux felated to focal landform, surrounding constructions and the wind primary. According to ‘experimental investigation and operating test, ACC system arrangement principle is taken summer prevailing wind direction as the main Intake side, while considering the st, But because the parameter of summer prevalling wind direction weren't provided in the bidder document, So Row A of ‘wind speed. wind frequency from jer house is sms main power bulding of ACC is to be laid to northwest which wil be propitious to the evacuation. The AGC equipment and layout of the building will be optimized after the ‘meteorological material is given in next phase. ‘The exhausted steam from low pressure cylinder Is induced out of main power building house by steam duct of DN4800mm and then f Into 6 steam distributing ducts of ON2000mm, and then enters the inned tube bund, per steam turbine, which bi groups; there are 4 cooling sections in per group. All he cooling sections a high platform, which is atthe alttude of 36m. One a» under per cooling section, and the driven device ison the fan bridge, where steel spring 24 cooling sections are installed I flow fan of 140mm is laid oli 22208 Coa Fired Power Pint Projet Aopen : Tacnel Speciation Isolation mounting. The fan and motor are driven ith damping joint Is used as vt by spurgear driven system, and all the fans adopt adjustable-speed motor, which can change the speed separately to adjust to the optimum condition according to the operating load and environment temper Each units a separate cooling section system, ACC system is laid out of row A of main power building and parallel to row A, the ACC platform size for two units is about 197mX45.0m, with the altitude of 35m and one elevator is installed inthis ACC. system, ‘To prevent the hot reflux, wind walls set around the platform, whichis from platform to top of steam distribution duct. Transformer, unit auxiliary transformer and switching room of axial flow fan and so on are laid under ACC platform. The detail ofthe system, ‘outline can be seen in the Drawing List: 37-FA12611TB-$03,04,06. rigtcons wn wmuern (By [Taree 1.410.01-1-059 TECHNICALBIO EVALUATION FoRtA = — Teo PnoaeN® | nic Cooled Condenser 3 Josie] COALTHERMAL ELECTRICAL POWER PLANT? x | eommeNrme one ‘comsancaciaetnicin a - : Seope of Su nua = [et 200 MWe UGLEIVIK 9, sit ‘macs | FORMA:SconeOFSURPIY | ayy | 9Jenuary 2032 COMSAR ENGINEERING, sx. — For Review a 1A a 'CONSTRATOR alsa ace pe Insane fips poea Teor pee ete Issue Liaosin isp a Tense eee Sab iegpgeonetae oe Senate —| io aT ES Thee ts mes go =o 11001-4059 TEGHNIAL AD EVALUATION Font a 0 GAG) cooled condenser TE] GoAL THERNAL ELECTRICAL POWER RAWT x BeaowrmE - or conran enatnecn fase —) SON TO ne UGLNC Hen navoomme | FORMA:Scope ofSupply | | 9lamuary 2032 mes COMSAR ENGINEERING, «a For Review EasofP nari epee te $ret 9670 epetetety ol Sond ee ra TOS TRDT — Tats afte surron srcrune Ee RT — fose20h2 Rk, race ase 7 eee] _seseres | soon watanonrone : oO = Teo fires] ) mana mre london . rmonernwne [GOAL THERMAL | "=" —FORMB; Technical Dare 3 Comm ence “Namo Provek ELECTRICAL Specifications Tanggol nd tee ESAS! aggee |__feetin a = are ConmnaToR Taleo tom test cre “sae mas - — LudSeonenioo Too 3 apg | “ELIT rena ergata Gleam] | 36 3 eed 2alive Mode Sonal chanical venting | 2a|Nonber of ode cn Bperin = 7 “Ewa sears : = [enaacrosesty - sing scours — =f endorses 4 27lfop Manton on = t = Ri \. dp 24 Tale “Lialoesan sre Tee Wadd Ramon Come is Outside Sereeons 2193 80 Talia soe arora aw abe Saeot teh Tio) nero Hest rant eas Taifturbe of sunses 1.2 |turber of Tbe: pr Bae Taalnaera an Ex2|Ounete 36071053 allo Matera eda Tig orn peed THRE “LA Worn Power unt Spear lors Sound Power to oT Tago Tegitow os [ as [Ex Arar Contd weiss CS Nari sed 2. Ao

Vous aimerez peut-être aussi