HEALTH, SAFETY AND ENVIRONMENTAL RISK ASSESSMENT. .

,,,,,, z-

Title: RISK ASSESSMENT ; Excessive Noise, Vibration, Explosion & Fire from Concrete Pump Installation
Company: Shapporji Pallonji Middle east LLC
Site: PALM JUMEIRAH GATEWAY TOWERS AND CAR PARK PODIUM
Ref: SPML/HSE/PJGT/RA-001 20/08/2017 Rev:00
Prepared by: Macnamara Fuh Ndifor
..,4.
Approved by:

HSE MANAGER;
,__1'
'
Project Director:

1. Hazards and Risk identifications 2. Risk Evaluations and Controls


Initial Risk Residual Risk
Ratings
Law Ratings
Health, Safety /
Health, Safety Risks and Person-ln-
S/n Activity Description Hazards and Control Measures Corn
Environmental Impacts Charge (PIC)
Environmental Aspects L 5 R plian L S R
ce

Designate the traffic route.


Use tested lifting gears and ensures
condition of gears and equipment prior to start
of unloading.
Obtain weather report 24 hours in advance.
Wind speed to be checked by use of tower
Struck by reversing crane anemometer.
vehicles. Injury to body parts.
Unloading location to be clear of obstruction
Damaged of Construction
Placement of Limited space and area to be agreed by Main Nakheel
manager/
4 Concrete pump at Struck by equipment, equipments & tools 2 4 8 Atkins and SPML. Y 1 4 4
Injuries to personnel. Ensure proper illumination and Banksman to Engineer/HSE /
Central Tower hose or boom.
Property damages. guide vehicle movement. Foreman.
Collapse of Concrete Collision.
Area of unloading must be barricaded and
pump, visible signage/ board to be placed.
Restrict vehicle movement in this area by
installing hard barriers.
Ensure trained and competent persons with
approved third party certificates.
Use required PPE always.