GANT CHART (DRIVERAIN DEPARTMENT)

PROCESS WEEK
1 2 3 4 5 6 7 8 9
OVERALL BRIEFING

ORGANIZATION STURCTURE SETUP

CONCEPT STUDIES AND DEVELOPMENT

CONCEPT REVIEW

PROBLEM DISCRIPTION

GATHER RAW IDEAS FOR DRIVETRAIN

DESIGN FINALIZATION
DESIGN SPECIFICATION FOR DRIVETRAIN

FINAL DESIGN

DETAILED DRAWING

SYSTEM ASSEMBLY AND TESTING


SIMULATION AND ANALYZING

IMPROVEMENT AND MODIFICATION

FINAL ASSEMBLY

PRESENTATION AND REPORT


PREPARATION

PRESENTATION
10 11 12 13 14