Schedule of Reinforcement for Deck Slab

Sl. Spacing Total Weight /


Type Dia mm Length Nos.
No. mm length m kg

0.32

0.32
Bottom
1 Main Rod a # 12 150 4.80 1 X 8 38.42 0.89
4.74

0.32

0.32
Bottom
2 Main Rod b # 16 150 4.53 1 X 8 36.24 0.89
1
Bottom
3 Distributo d # 12 150 1.00 1 X 33 33.00 0.89
rs 1
0.29

0.29
Top Main
4 Rod c # 10 300 5.32 1 X 17 90.44 0.62
4.74
Top
5 Distributo e # 10 300 1.00 1 X 17 17.00 0.62
r 1
Total
Total
1 x 1 X 162.42
(or)
Schedule of Reinforcement for Bed Block and Dirt wall Fe 415 steel

Sl. Dia Spacing Total Weight /


Type Length Nos.
No. mm mm length m kg
Bed
1 Block a1 # 12 1 1 X 14 14.00 0.89
Main 1
0.23

0.23

Bed
2 Block b2 # 12 150 1.47 1 X 8 11.27 0.89
Stirrups -0.10
0.23

0.23
Dirt
2 wallStirru b1 # 12 150 1.58 1 X 8 12.11 0.89
ps 0.20
Total
Total
For 2 Bed Blocks 1x 2 X 33.16
(or)
Total
Weight

34.19

32.25

29.37

56.07

10.54

162.42
162.42
162.42
0.163 MT

Total
Weight

12.42

10.00
10.74

33.16
33.16
66.32
0.067 MT
1.10 0.30 0.30

0.300
0.15

0.42
3.00

0.99 0.27 BL
1.98 0.30
0.25 0.11 0.03 0.25 0.40
2.62 0.40
3.02 0.40
0.20 0.20
3.42 0.20
0.25 0.25

3.92 0.20
1.10 0.30 0.30 0.4 0.50 0.15

0.300
0.15

0.30 3.375
3.00

0.99 0.27 BL 0.36 0.50 0.14 BL


1.86 0.30 0.30
0.2 0.11 0.03 0.2 0.20 0.04 1.05 0.01
2.40 0.40 0.40
2.60 0.40 0.40
0.20 0.20 0.20 1.10 0.20
3.00 0.20
0.20 0.20
0.40
3.40 0.20 1.5
DETAILED ESTIMATE

Name of work Widening of Narrow culvert at km 6/4 of Kurinjipadi - Palur road

Sl
Description No Length Breadth Depth Qty
No

Earthwork excavation in all classes of soil except hard rock requiring blasting and deposing on bank with all leads
and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water,
providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal
1
of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation back filling ,
and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification
FOUNDATION .

Abutment 2 1.000 3.920 1.500 11.760

11.760

Vibrated cement Concrete M.20 grade Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and
2 conveyance of all materials to site, including cost and labour charges for formwork and centering and labour
charges compacting curing and all other incidental charges etc,. complete for Foundation

Abutment
I Footing 2 1.000 3.920 0.200 1.568

II Footing 2 1.000 3.420 0.200 1.368

III Footing 2 1.000 3.020 0.400 2.416

IVFooting 2 1.000 3.020 + 2.620 0.400 2.256

7.608

Vibrated cement Concrete M.20 grade Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and
3 conveyance of all materials to site, including cost and labour charges for formwork and centering and labour
charges compacting curing and all other incidental charges etc,. complete for below sill.

Abutment

Front Batter 2 1.000 0.285 0.300 0.171

(0.3+0.27)
/2
Bearing 2 1.000 0.420 0.300 0.252

Dirt wall 2 1.000 0.300 0.300 0.18

Rear Batter 2 1.000 1.045 0.300 0.627

(1.1+0.99)
/2
1.23
Vibrated cement Concrete M.20 grade Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and
3 conveyance of all materials to site, including cost and labour charges for formwork and centering and labour
charges compacting curing and all other incidental charges etc,. complete for Above sill.

Abutment

Front Batter 2 1.000 0.135 2.550 0.6885

(0+0.27)/2

Bearing 2 1.000 0.420 2.550 2.142

Dirt wall 2 1.000 0.300 3.000 1.8

Rear Batter 2 1.000 0.495 2.550 2.5245


(0+0.99)/2
Parapet

Over Deck 2 4.588 0.400 0.500 1.84

8.99
Vibrated reinforced Cement Concrete M25 (Design mix) using crusher ISS size HBG graded metal 20mm including

cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel
4
but including cost and labour charges for mixing ,transporting laying and curing concrete, working at heights, hire

charges for fools plants including all other incidental charges complete for BED BLOCK .
2 1.000 0.445 0.150 0.1335
Bed Block

0.134

Vibrated reinforced Cement Concrete M25 (Design mix) using crusher ISS size HBG graded metal 20mm including
cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel
5
but including cost and labour charges for mixing ,transporting laying and curing concrete, working at heights, hire
charges for fools plants including all other incidental charges complete for DECK SLAB .

1 1.000 4.580 0.380 1.740


Deck slab

1.740

Supply and fabrication of steel grade S-415/steel required for all RCC items of works involved in the schedule
including cost of steel , cost of fabrication, labour charges for cleaning the bars straightening , cutting, bending,
6 tying grills, hoisting, and placing the reinfiorcement in position as specified in the drawings including cost of binding
wire , provisions od spacer bars, cover blocks, and all other incidental charges etc., complete as per standard
specification.

Deck slab 1 0.163


Bed Block 1 0.07

0.23
Add 5% Wastage 0.0115

0.24
Providing and fixing of 60mm Bitumen TAR FELT joint seating of deck slab and including cost & conveyance to
7
work site, labour chjarges for fixing the same in the correct position and other incidental charges etc., complete

Between Dirt wall & Deck


2 1.00 0.38 0.76
slab

0.76

Providing and fixing TAR PAPER for full width of seating of deck slab and including cost and conveyance to work
8 site, labour charges for fixing the same in the correct position and all other incidental charges etc,. complete. Below
Deck slab

Below Deck slab 2 1.00 0.38 0.76

0.76

Providing FILTER MEDIA behind abutments and wings for thick using filter materials confirming to clause of 2.1 of
9 IRC 78-2000 appendix and well packed smaller towards the soil and bigger size towards the wall including cost and
conveyance of all materials and all other incidental etc,. complete as per standard specification.

Filter media 2 1.00 0.60 3.000 3.600

(1.50+0.17-0.225-0.15=1.295) 3.600

Providing and fixing fixing P.V.C pipes of abutment of 100 mm dia of required length for abutments and wings
10 including cost and conveyance of all materials to work site and labour charges for fixing etc,. complete to drain the
back fill as per standeard specification.

2 1.00 2.00 1.50 6

GRAVEL FILLING BEHIND THE ABUTMENTS AND WING wall with clean gritty gravel including cost and
conveyance of gravel to site including labour charges for filling in layers, Watering, tamping under optimum moisture
11
content to get the maximum density and including watering with all leads for water and all incidental charges etc.,
complete.

2 1.00 1.000 3.000 6

Cement concrete of grade M30 for wearing coat 75mm thick using IRC graded metal including labour charges for
12 mixing concrete, laying and curing concrete with water including all charges etc,. Complete for wearing coat of
75mm uniform thickness over deck slab.

Deck slab 1 4.60 1.00 0.075 0.345


13 Dismantling the existing PCC parapet including all labour and other incidental charges etc., complete

Deck slab 1 4.60 0.30 0.450 0.621

Assistant Divisional Engineer Assistant Engineer


Kurinjipadi Kurinjipadi
DETAILED ESTIMATE

Name of work Reconstruction of Slab culvert at km1/6(Span 1.0x1.50)

Sl
Description No Length Breadth Depth Qty
No

Earthwork excavation in all classes of soil except hard rock requiring blasting and deposing on bank with all leads
and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water,
providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal
1
of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation back filling ,
and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification
FOUNDATION .

Abutment 2 2.200 3.400 1.500 22.440

22.440

Vibrated cement Concrete M.20 grade Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and
2 conveyance of all materials to site, including cost and labour charges for formwork and centering and labour
charges compacting curing and all other incidental charges etc,. complete for Foundation

Abutment
I Footing 2 2.200 3.400 0.200 2.992

II Footing 2 2.000 3.000 0.200 2.400

III Footing 2 2.000 2.600 0.400 4.160

IVFooting 2 2.000 2.600 + 2.400 0.400 4

13.552

Vibrated cement Concrete M.20 grade Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and
3 conveyance of all materials to site, including cost and labour charges for formwork and centering and labour
charges compacting curing and all other incidental charges etc,. complete for below sill.

Abutment

Front Batter 2 1.500 0.285 0.300 0.2565

(0.3+0.27)
/2

Bearing 2 1.500 0.300 0.300 0.27


Dirt wall 2 1.500 0.300 0.300 0.27

Rear Batter 2 1.500 1.045 0.300 0.9405

(1.1+0.99)
/2
1.737
Vibrated cement Concrete M.20 grade Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and
3 conveyance of all materials to site, including cost and labour charges for formwork and centering and labour
charges compacting curing and all other incidental charges etc,. complete for Above sill.

Abutment

Front Batter 2 1.500 0.135 2.550 1.03275

(0+0.27)/2

Bearing 2 1.500 0.300 2.550 2.295

Dirt wall 2 1.500 0.300 3.000 2.7

Rear Batter 2 1.500 0.495 2.550 3.78675


(0+0.99)/2
Parapet

Over Deck 2 4.588 0.400 0.500 1.84

11.65

Vibrated reinforced Cement Concrete M25 (Design mix) using crusher ISS size HBG graded metal 20mm including

cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel
4
but including cost and labour charges for mixing ,transporting laying and curing concrete, working at heights, hire

charges for fools plants including all other incidental charges complete for BED BLOCK .
2 2.000 0.325 0.150 0.195
Bed Block

0.195

Vibrated reinforced Cement Concrete M25 (Design mix) using crusher ISS size HBG graded metal 20mm including
cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel
5
but including cost and labour charges for mixing ,transporting laying and curing concrete, working at heights, hire
charges for fools plants including all other incidental charges complete for DECK SLAB .
1 2.000 4.580 0.380 3.481
Deck slab

3.481

Supply and fabrication of steel grade S-415/steel required for all RCC items of works involved in the schedule
including cost of steel , cost of fabrication, labour charges for cleaning the bars straightening , cutting, bending,
6 tying grills, hoisting, and placing the reinfiorcement in position as specified in the drawings including cost of binding
wire , provisions od spacer bars, cover blocks, and all other incidental charges etc., complete as per standard
specification.
Deck slab 1 0.163

Bed Block 1 0.07

0.23

Add 5% Wastage 0.618x5/100 0.0115

0.24

Providing and fixing of 60mm Bitumen TAR FELT joint seating of deck slab and including cost & conveyance to
7
work site, labour chjarges for fixing the same in the correct position and other incidental charges etc., complete

Between Dirt wall & Deck


2 1.50 0.38 1.14
slab

1.14

Providing and fixing TAR PAPER for full width of seating of deck slab and including cost and conveyance to work
8 site, labour charges for fixing the same in the correct position and all other incidental charges etc,. complete. Below
Deck slab

Below Deck slab 2 1.50 0.38 1.14

1.14

Providing FILTER MEDIA behind abutments and wings for thick using filter materials confirming to clause of 2.1 of
9 IRC 78-2000 appendix and well packed smaller towards the soil and bigger size towards the wall including cost and
conveyance of all materials and all other incidental etc,. complete as per standard specification.

Filter media 2 1.50 0.60 3.005 5.409

(1.50+0.17-0.225-0.15=1.295) 5.409

Providing and fixing fixing P.V.C pipes of abutment of 100 mm dia of required length for abutments and wings
10 including cost and conveyance of all materials to work site and labour charges for fixing etc,. complete to drain the
back fill as per standeard specification.

2 1.50 2.00 1.50 9


9

GRAVEL FILLING BEHIND THE ABUTMENTS AND WING wall with clean gritty gravel including cost and
conveyance of gravel to site including labour charges for filling in layers, Watering, tamping under optimum moisture
11
content to get the maximum density and including watering with all leads for water and all incidental charges etc.,
complete.

2 1.50 1.000 3.005 9.015

9.015

Cement concrete of grade M30 for wearing coat 75mm thick using IRC graded metal including labour charges for
12 mixing concrete, laying and curing concrete with water including all charges etc,. Complete for wearing coat of
75mm uniform thickness over deck slab.

Deck slab 1 4.60 1.50 0.075 0.5175

13 Dismantling the existing PCC parapet including all labour and other incidental charges etc., complete

Deck slab 1 4.60 0.30 0.450 0.621

Assistant Divisional Engineer Assistant Engineer


Kurinjipadi Kurinjipadi
DETAILED ESTIMATE

Name of work Reconstruction of Slab culvert at km1/6(Span 1.0x1.50)

Sl
Description No Length Breadth Depth Qty
No

Earthwork excavation in all classes of soil except hard rock requiring blasting and deposing on bank with all leads
and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water,
providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal
1
of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation back filling ,
and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification
FOUNDATION .

Abutment 2 1.700 3.800 1.500 19.380

19.380

Vibrated cement Concrete M.20 grade Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and
2 conveyance of all materials to site, including cost and labour charges for formwork and centering and labour
charges compacting curing and all other incidental charges etc,. complete for Foundation and below sill level.

Abutment
I Footing 2 1.700 3.800 0.200 2.584

II Footing 2 1.500 3.400 0.200 2.040

III Footing 2 1.500 3.000 0.400 3.600

IVFooting 2 1.500 3.000 + 2.600 0.400 3.36

11.584
Vibrated cement Concrete M.20 grade Nominal mix 1:2:4 using 40 mm ISS HBG metal including cost and
3 conveyance of all materials to site, including cost and labour charges for formwork and centering and labour
charges compacting curing and all other incidental charges etc,. complete for Above sill.

Abutment

Front Batter 2 1.500 0.500 x 0.300 2.850 1.2825

Bearing 2 1.500 0.300 2.850 2.565

Dirt wall 2 1.500 0.300 2.850 2.565

Rear Batter 2 1.500 0.500 x 1.100 2.850 4.7025

Parapet

Over Deck 2 4.588 0.400 0.500 1.8352

12.9502

Vibrated reinforced Cement Concrete M25 (Design mix) using crusher ISS size HBG graded metal 20mm including

cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel
4
but including cost and labour charges for mixing ,transporting laying and curing concrete, working at heights, hire

charges for fools plants including all other incidental charges complete for BED BLOCK .
2 1.500 0.325 0.150 0.14625
Bed Block

2 1.500 0.300 0.530 0.477


Dirt wall

0.623

Vibrated reinforced Cement Concrete M25 (Design mix) using crusher ISS size HBG graded metal 20mm including
cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel
5
but including cost and labour charges for mixing ,transporting laying and curing concrete, working at heights, hire
charges for fools plants including all other incidental charges complete for DECK SLAB .
1 1.500 4.580 0.380 2.611
Deck slab

2 1.500 0.325 0.5x0.025x3 0.037


Camber

2.647
Supply and fabrication of steel grade S-415/steel required for all RCC items of works involved in the schedule
including cost of steel , cost of fabrication, labour charges for cleaning the bars straightening , cutting, bending,
6 tying grills, hoisting, and placing the reinfiorcement in position as specified in the drawings including cost of binding
wire , provisions od spacer bars, cover blocks, and all other incidental charges etc., complete as per standard
specification.

Deck slab 1 0.218

Bed Block 2 0.20 / Bed block 0.40

0.618

Add 5% Wastage 0.618x5/100 0.0309

0.65

Providing and fixing of 60mm Bitumen TAR FELT joint seating of deck slab and including cost & conveyance to
7
work site, labour chjarges for fixing the same in the correct position and other incidental charges etc., complete

Between Dirt wall & Deck


2 1.50 0.38 1.14
slab

1.14

Providing and fixing TAR PAPER for full width of seating of deck slab and including cost and conveyance to work
8 site, labour charges for fixing the same in the correct position and all other incidental charges etc,. complete. Below
Deck slab

Below Deck slab 2 1.50 0.38 1.14

1.14

Providing FILTER MEDIA behind abutments and wings for thick using filter materials confirming to clause of 2.1 of
9 IRC 78-2000 appendix and well packed smaller towards the soil and bigger size towards the wall including cost and
conveyance of all materials and all other incidental etc,. complete as per standard specification.

Filter media 2 1.50 0.60 3.005 5.409

(1.50+0.17-0.225-0.15=1.295) 5.409
Providing and fixing fixing P.V.C pipes of abutment of 100 mm dia of required length for abutments and wings
10 including cost and conveyance of all materials to work site and labour charges for fixing etc,. complete to drain the
back fill as per standeard specification.

2 2.50 2.00 1.50 15

15

GRAVEL FILLING BEHIND THE ABUTMENTS AND WING wall with clean gritty gravel including cost and
conveyance of gravel to site including labour charges for filling in layers, Watering, tamping under optimum moisture
11
content to get the maximum density and including watering with all leads for water and all incidental charges etc.,
complete.

2 3.00 1.000 3.005 18.03

18.03

Cement concrete of grade M20 for wearing coat 75mm thick using IRC graded metal including labour charges for
12 mixing concrete, laying and curing concrete with water including all charges etc,. Complete for wearing coat of
75mm uniform thickness over deck slab.

Deck slab 1 4.60 3.00 0.075 1.035

13 Dismantling the existing PCC parapet including all labour and other incidental charges etc., complete

Deck slab 1 4.60 3.00 0.075 1.035