Welcome to the 2008 annual report


for the GREEN WAYTM environmental program.
This was the first formal year of our GREEN WAYTM program since its launch on
10 December 2007. It was the natural next step in the evolution of CSC’s environmental
portfolio, which had first begun with a staff initiative called Project Kermit.

CSC has made a long term commitment � Measuring improvements and their and Charlotte Scallon for their hard
to the environment in which we believe impacts has been hard – we recognise, work – especially for helping CSC
our actions need to speak louder than our however, that it is the first time we’ve achieve its ISO14001 accreditation
words. This report highlights some of our had to quantify carbon equivalents. in our first twelve months.
major successes from our inaugural year.
Our recent accreditation to the international We can’t underestimate the impact of Wayne Banks
ISO14001 standard is a key differentiator resistance to change and/or low levels Vice President Finance & Administration
for CSC and positions us well to achieve of awareness about sustainability. The Chief Financial Officer
our vision of reducing our carbon emissions GREEN WAYTM committee has worked
hard to be noticed by the rest of CSC Sponsor for CSC GREEN WAY™
by 25% from 2007 levels by 2010.
globally with the message that the environmental program
We’ve experienced success and learnt environment and sustainability is not
some ‘lessons’ during the year: just a part of one department’s remit
– it’s the responsibility of each of us.
� Developing activities and building
awareness of environmental issues that I would like to thank all staff who have We’d like to acknowledge the initial seed
impact CSC and staff take time – a long participated and contributed towards sown by the late Dr Derek J Binney who
time – especially as we try to broaden the the GREEN WAYTM program in 2008. In passed away in mid-2008 after a long
scope of GREEN WAYTM and our activities particular, I thank the GREEN WAYTM illness. Derek was instrumental with
committee and the Environmental leading Project Kermit, our staff initiative
Sustainability team of Anthony Ogilvie which then evolved into Green WayTM,
our environmental program.

Copyright © 2009 CSC Australia Pty Limited. (ACN: 008 476 944) All rights reserved. 1208-24
our
vision

Reduce our net carbon emissions by 25% by 2010 (from 2007 levels)
how are we
progressing?
We’ve achieved a reduction in carbon dioxide equivalent
(CO2-e) emissions from the use of energy in our offices,
It’s been a year of mixed results
with emissions falling by 2.7%.
30000
CO2-e emissions from our flights have At the beginning of 2008 we set a 12 month Reduce waste
dropped by 17%. This is a combination of plan on key activities we wanted to achieve: a Fix commingle (recycle) bins in
25000
our restrictions on travel and the trial of Macquarie Park campus and ensure
Reduce water usage
CO2-e emissions (tonnes)

improved video conferencing facilities. they’re correctly labelled


20000 The planned expansion of the video a Restricted flow EcoPink urinal pilot
conferencing program should continue at Macquarie Park a Roll recycling bins out to Australian
this reduction. sites that do not have them.
15000
a Low flow tap filters installed at all sites.
CO2-e emissions continue to rise in And also...
10000 data centres owing to the increase in Lower energy consumption a Achieve minimum 4 star external and
energy demand to support our growing a Air conditioning and cooling changes internal green star ratings for our new
5000 business. Data Centre power requirements in data centres and offices Docklands campus in Melbourne
remains a substantial issue for the IT industry.
We continue to explore ways to deliver a Change to more efficient light bulbs a Develop and implement an Environmental
0
Offices Data Centres Flights the services our clients require whilst in Macquarie Park pilot Management System and achieve ISO
� = January – November 2007 satisfying societies demands for reduced 14001 certification.
� = January – November 2008 a Review better power monitoring
CO2-e emissions.
and management in data centres
(at business case stage)

a Internal systems Virtualisation.


04 Green Way Annual Report
additional
achievements
in 2008
Staff � Held our first green Sustainability Fair

� Invited Australian Conservation for staff in Macquarie Park, Wollongong,


Foundation to present The Inconvenient Bourke Street and Perth. An array of
Truth video to staff at our major sites. goods were sold, including fair trade
(Thanks to the Regional Leadership items, organic wines and olive oils,
Councils for managing logistics!) toys, beauty products and the chance
to support families in the developing
� Fifty CSC women took part in a staff world by purchasing mosquito nets,
initiative: a free fashion swap day at pigs and chickens! Our in-house café
Macquarie Park – May 2008 also served sustainable and fair trade
coffee at Macquarie Park. Over $7000
� Celebrated World Environment Day
was spent by our staff at Sustainability
(June 5) with a family-friendly colouring
Fairs around Australia, with more
competition with environmentally
purchases made online
friendly prizes for children. Nearly 100
children took part from across Australia. � Participated in our online Ideation
Prizes included Apple iTune vouchers, events on developing our corporate
eco-friendly sneakers and books point of view on Green IT

� Doubled our environmental � Communicated to staff via the green@


sustainability team to two people! csc wiki, internal announcements
and posters
� Staff suggestions in the GREEN WAY
inbox were incorporated into fortnightly � Set up and delivered online Environmental
meetings with Facilities and actioned Training Module for Australian staff. Over
where appropriate 1300 people completed the training and
the module remains open for all staff to
complete at their leisure.
additional
achievements
in 2008 Corporate Services � Answered bid questions from inside Facilities
� Reinforced our ‘green message’ for CSC’s and outside Australia. For example, � Monitored the CO2-e emissions of our
new branding – for example, encouraging CSC Sweden asked for our expertise offices, data centres and flights through
staff to keep using our old branded CSC on a Request for Tender document the use of an environmental dashboard
business cards until end FY09
� Played key role in first development � Set bathrooms on 10 minute lighting
� Promoted GREEN WAY Expo at CSC’s stages of Corporate Responsibility timers in offices where natural light
internal brand launch (May 08) (CR) approach. is available

� Finished the first stage of Environmental Supply Chain � Meeting room motion sensors installed
Management System with the production � Selected Forest Stewardship Council at Macquarie Park, Newcastle and Subiaco
of our Environmental Sustainability (FSC) approved paper for new CSC
Policy which presents our environmental � Re-programmed the lighting schedules
business cards for Australian staff
objectives. It is displayed at all CSC on local Building Management Systems
sites (July/August 08) � Maintained our IT asset redeployment, to reduce energy consumption
recycling and remanufacturing program
� Became members of global and local � Re-programmed filtered water units at
through an ISO 9001 e-waste contractor
green groups such as Climate Savers and all sites to reduce the amount of energy
Green Grid. We are a founding member � Set up video conferencing pilot between used to heat and cool the water
of the Green Building Council of Australia Macquarie Park, Subiaco and Braddon sites
� EcoPink urinals rolled out to Adelaide
as part of a global initiative to link our major
� Reviewed our stationery purchasing and Newcastle after a successful trial at
offices and save transportation costs.
to offer ‘greener’ alternatives Macquarie Park. This means that we
save an estimated 66,548 kilolitres of
water a year, which is equivalent over
two million cups of coffee

06 Green Way Annual Report


� Installed flow restrictors in all kitchen Data Centres � Enhanced our brand reputation – CSC was
and bathroom taps. This reduced the � Installed rainwater tanks in Pyrmont invited to many speaking engagements
flow from 17 litres per minute to 1.7 litres to supplement AC chiller water as the Subject Matter Experts on Green
per minute (on average) IT, for groups such as:
� Engaged a Technical Architect to
� Installed low voltage downlights in investigate energy savings from IT groups within the Australian
foyers and meeting rooms, saving 796 kWh equipment virtualisation and Computing Society (ACS) around
per year. That’s the energy equivalent consolidation opportunities green knowledge bases. To give an
to doing over 3,000 loads of washing idea of the breadth of thought
in your washing machine! � Powered off and removed all redundant leadership, we provided an assessment
DC equipment of the US government’s IT purchasing
� The Nortel IP Telephony system was guidelines (EPEAT)
installed at Melbourne sites after � In-rack monitors have been removed
substantial CO2 savings were achieved where possible or powered down. Australian Graduate School
from installation at five other sites, when of Management
compared to another leading vendor. We Community and External
predict we’ll save 106 tonnes of CO2 over � Turned our lights off for Earth Hour Copland Institute
five years from our Melbourne installation. – second year in a row and encouraging
Leadership Academy (internal)
all our offices globally to take part in 2009.
We aim to sign up every year Southern Region Forum
for customers (internal).
� We’ve had media exposure with
mentions in Australian Reseller News,
CFO magazine and ZD Net Australia

Green Way Annual Report 07


CSC’s COMMITMENT
CSC Australia committed to planting one tree per
employee at our program launch in December 2007.
We partnered with Greenfleet, who has progressively
planted trees during 2008 based on the location of
each employee’s residence.

Pictured: Planting fields in Tumut NSW.


When CSC Australia’s Queensbridge Street Other major beneficiaries from our move
office in Melbourne moved to their temporary included the Save the Children Fund
premises in Bourke Street, Facilities invited (provides health, education and child
local community groups, charities and protection for children in marginalised
non-profit organisations to avail themselves circumstances) and The Youth Junction
to various surplus items free-of-charge Inc (a Melbourne organisation that assists
during the cleanout. over 1200 young people a month by
providing housing, education, health and
Individuals and small businesses could also legal services).
obtain items in return for a donation to
the St Vincent’s – MacKillop Family Services We stripped down and recycled the 385
organisation, which works with disadvantaged workstations left behind. All contents,
children, young people and their families. including general rubbish, were processed
via the split waste method.
The offer was well received by the various
groups and organisations, who expressed How much did we recycle?
their gratitude with letters, certificates of � Over 1.5 tonnes of paper and cardboard
appreciation and highlights on their own
� 29.775 tonnes of metal
websites about the support and generosity
of CSC. � 320 kg of hard plastics

� 3.082 tonnes of aluminium.

The total volume committed to landfill for


the Queensbridge clean up filled only a
single 6 cubic metre bin – for a move of
385 people!

HOW TO FIT
385 PEOPLE
INTO A 6 CUBIC METRE BIN
Green Way Annual Report 09
1. ISO 14001 accreditation 2. Global interlock 3. Facilities trials
CSC successfully passed its ISO 14001 We should be proud that CSC Australia is Thanks to Facilities and Supply Chain
accreditation for our Environmental one of the leading regions within CSC to Management for their collaboration on trials
Management System in December 2008, have an environmental program in place. to reduce our environmental impacts:
making us one of the few IT outsourcing CSC appointed its first global green
organisations in Australia to have been Program Director, Candace Labelle, based � Our EcoPink urinal trials at Macquarie

certified to this international standard. in Ottawa, Canada. Park were hugely successful

This isn’t an easy accreditation to achieve In 2009, CSC’s 50th anniversary year, we’ll be � The trial installation of Flurosave Units

– it required assessing all our activities ensuring our local celebratory achievements on Level 6 at Macquarie Park. Trials
and processes that have an impact on the are green as well as gold! showed lower savings than anticipated,
environment and ensuring appropriate so no further deployments are planned
controls are in place to reduce or eliminate
� The replacement of halogen lights with
these impacts. Audits have been completed
LEDs in foyers will be trialled at Macquarie
on our end-to-end processes in facilities
Park in early 2009. A colour trial was
and asset management and the management
performed in 2008 to ensure that the
programs we have put in place to achieve
more efficient lighting would have the
our environmental objectives.
right look for us.
Our next step is to have our data centres
accredited in early 2009.

hIGHLIGHTS
10 Green Way Annual Report
WHAT DOES 2009
HOLD FOR
GREEN WAY ?
Tm

In 2009, CSC celebrates its 50th anniversary. GREEN WAYTM We’ve also set a plan of tactics for the � Engage with the CSC business as we

will be focusing on four key areas to meet our 2010 next 12 months: approach the beginning of carbon
trading legislation
vision of a 25% net reduction in C02 equivalent emissions: � EcoPink urinals to be installed at Coniston
� Continue promoting brand presence
1. Expand our Environmental Management � Team with environmental consultancies in Green IT
System to cover data centres for ISO to jointly develop and use tools that can
14001 certification prepare our customers for Federal � Appoint a Green Champion at each of our
Government reporting legislation office sites as a local point of contact
2. Make video conferencing part of
business as usual and covering � Continue to engage staff through � Consider staff suggestions made to
more sites various fun and educational events GREEN WAY and engage the relevant
business groups in their implementation.
3. Build awareness of and prepare for � Develop closer ties with the Office of
the Australian Government’s carbon the CIO – will ensure green metrics are
trading scheme included in business case discussions
and captured in projects going forward
4. Continue coordinating with Facilities
to implement measures to reduce � Actively participate in development
energy consumption. of CSC’s CR program

Green Way Annual Report 11


Worldwide CSC Headquarters

The Americas Australia


3170 Fairview Park Drive 26 Talavera Road
Falls Church, Virginia 22042 Macquarie Park, NSW 2113
United States Australia
+0 703 876 1000 +61 (02) 9034 3000

Contact information
Europe, Middle East, Africa Asia GREEN WAY email address for questions, comments
Royal Pavilion 139 Cecil Street and suggestions: Green_way@csc.com
Wellesley Road #06-00 Cecil House
Aldershot, Hampshire GU11 1PZ Singapore 069539 Environmental Sustainability team
United Kingdom Republic of Singapore
Anthony Ogilvie, Environmental Sustainability Lead –
+44 (0) 1252 534000 +65 6221 9095
aogilvie2@csc.com or +61 (0) 413 420 695 – Mondays to Thursdays

Charlotte Scallon, Environmental Sustainability Consultant –


cscallon@csc.com or +61 (2) 9034 2807
About CSC
The mission of CSC is to be a global leader in providing technology enabled business Where to find information on GREEN WAY
solutions and services. Green@CSC wiki:

With the broadest range of capabilities, CSC offers clients the solutions they need
https://portal.csc.com/wiki/display/greenit/Going+Green+at+CSC
to manage complexity, focus on core businesses, collaborate with partners and clients,
and improve operations. Website: csc.com

CSC makes a special point of understanding its clients and provides experts with real-
world experience to work with them. CSC is vendor-independent, delivering solutions
that best meet each client’s unique requirements. Key dates for 2008
Clean Up Australia Sunday, 1 March
For more than 45 years, clients in industries and governments worldwide have trusted
CSC with their business process and information systems outsourcing, systems Earth Hour Saturday, 28 March
integration and consulting needs.
World Environment Day Friday, 5 June
The company trades on the New York Stock Exchange under the symbol “CSC”.
GREEN WAY anniversary date Thursday, 10 December
For more information, visit the company’s web site at www.csc.com