ANNEXURE-III

WORK ORDER UNDER ZONE CONTRACT

WORK ORDER NO___________________DATED______________ UNDER CONTRACT AGREEMENT

NO. SE/96 DATES. 06/09/2016.

Name of work: - At LMG:Petty Repair works at Railway Qtr.Nos.including painting and whitewashing
due to Change of Occupation against zone no. 4 under SSE/W/N/LMG.

At LMG:Petty Repair works at Railway Qtr.Nos.including painting and whitewashing due to Shortage
of departmental staff against zone no. 4 under SSE/W/N/LMG.

(SITE) _________________Schedule of drawings ___________________________________

Authority___________________ Allocation _____________________________________

The contractor(s)Sri Avijit Dutta is/are hereby ordered to carry out the following works at
______________% above/below the Unified Standard Schedule of Rates (Works & Materials)/2010
of the Northeast Frontier Railway corrected up to Printed /Advance Correction Slip No____________
Dated__________ of Division, under Zone Contract Agreement here-in-before referred to:-

The works herein mentioned are required to be completed on or before 01/05/16 (Date). The
quantities provided herein are approximate and subject to variation under Clause 42 of the General
Condition of Contract corrected up to Printed/Advance Slip No_______________ Dated

I agree to complete the works herein set forth on or before the date specified under the Zone
Contract Agreement herein before referred to in conformity with the drawings here to annexed and
in accordance with the General and Special (if any) Conditions of Contract corrected up to Printed
/Advance Correction Slip No________ Dated ___________ and the Indian Railway Unified Standard
Schedule of Rates (Works & Materials) Volume I & II /2010 up to Printed/ Advance Correction Slip
No_______________ Dated ________________

I also agree to maintain such works for the period specified below from the date of completion.

a) Repair and maintenance work including white/colour washing three calendar months from
date of completion.
b) All new works except earth work six calendar months from date of completion.
Name of work: - At LMG:Petty Repair works at Railway Qtr.Nos.645(F),650(H),641(A),K-2/A,838/A,L-
156,K-4/A,L-164,L-406 & K-7/B including painting and whitewashing due to Change of Occupation
against zone no. 4 under SSE/W/N/LMG. 4

Name of work: - At LMG:Petty Repair works at Railway Qtr.Nos.L-85/A,L-85/B,650/E,K-


22/B,651/F,644/H,649/H,644/A,651/E,L-411/B,L-86/A including painting and whitewashing due to
Change of Occupation against zone no. 4 under SSE/W/N/LMG. 4

Name of work: - At LMG:Petty Repair works at Railway Qtr.Nos.E-22/B,E-39/C,660/A,E-49/G,E-


69/C,118/A,E-40/C including painting and whitewashing due to Change of Occupation woodwork
and masonry repairs to Qtr.nos.T-12/A,T-139/B,E/92,P-324/B against zone no. 7 under
SSE/W/N/LMG. 7

Name of work: - At LMG:Petty Repair works at Railway Qtr.Nos. including painting and whitewashing
due to Change of Occupation against zone no. 7 under SSE/W/N/LMG. 7

At LMG:Petty Repair works at Railway Qtr.Nos.including painting and whitewashing due to Shortage
of departmental staff against zone no. 4 under SSE/W/N/LMG.

Contractor _________________ Designation ____________________ N.F.Rly.

(For President of India)

.
ANNEXURE-III

WORK ORDER UNDER ZONE CONTRACT

WORK ORDER NO_________________DATED____________UNDER CONTRACT AGREEMENT NO_ SE/128

DATES _20/11/15

Name of work: - Supply of NS items for departmental use in Zone No.13/LMG.


(SITE) ________________________________ Schedule of drawings ___________________________________

Authority____________________________________________Allocation _____________________________________

The contractor(s) Ayemi Construction, Dimapur is/are hereby ordered to carry out
the following works at ______________% above/below the Unified Standard Schedule of Rates (Works
& Materials)/2010 of the Northeast Frontier Railway corrected up to Printed /Advance Correction
Slip No____________ Dated__________ of Division, under Zone Contract Agreement here-in-before
referred to:-

The works herein mentioned are required to be completed on or before 30/04/16 (Date). The
quantities provided herein are approximate and subject to variation under Clause 42 of the General
Condition of Contract corrected up to Printed /Advance Slip No_______________ Dated ______________

I agree to complete the works herein set forth on or before the date specified under the Zone Contract
Agreement herein before referred to in conformity with the drawings here to annexed and in accordance
with the General and Special (if any) Conditions of Contract corrected up to Printed /Advance
Correction Slip No________Dated ___________ and the Indian Railway Unified Standard Schedule of
Rates (Works & Materials) Volume I & II /2010 up to Printed/ Advance Correction Slip
No_______________ Dated ________________

I also agree to maintain such works for the period specified below from the date of
completion.

a) Repair and maintenance work including white/colour washing three calendar months from date
of completion.
b) All new works except earth work six calendar months from date of completion.

Contractor________________ Designation ____________________ N.F.Rly.

(For President of India)

ANNEXURE-III
WORK ORDER UNDER ZONE CONTRACT

WORK ORDER NO__________________ DATED____________ UNDER CONTRACT AGREEMENT NO. SE/ 128

DATES 20/11/2015

Name of work: AT DMV-OTN Construction of steel truss shed with precoated roofing & ancillary works
at gate goomty in zone no.13/LMG

(SITE) ___________________________________ Schedule of drawings ____________________________


Authority________________________________ Allocation _____________________________________

The contractor(s) Ayemi Construction, Dimapur, is/are hereby ordered to carry out the following works
at ______________% above/below the Unified Standard Schedule of Rates (Works & Materials)/2010 of the
Northeast Frontier Railway corrected up to Printed /Advance Correction Slip No____________
Dated__________ of Division, under Zone Contract Agreement here-in-before referred to:-

The works herein mentioned are required to be completed on or before 31.03.2016 (Date). The quantities
provided herein are approximate and subject to variation under Clause 42 of the General Condition of Contract
corrected up to Printed /Advance Slip No_______________ Dated ______________

I agree to complete the works herein set forth on or before the date specified under the Zone Contract
Agreement herein before referred to in conformity with the drawings here to annexed and in accordance with
the General and Special (if any) Conditions of Contract corrected up to Printed /Advance Correction Slip
No________ Dated ___________ and the Indian Railway Unified Standard Schedule of Rates (Works &
Materials) Volume I & II /2010 up to Printed/ Advance Correction Slip No_______________ Dated
________________

I also agree to maintain such works for the period specified below from the date of completion.

a) Repair and maintenance work including white/colour washing three calendar months from date of
completion.
b) All new works except earth work six calendar months from date of completion.

Contractor _________________ Designation ____________________ N.F.Rly.


(For President of India)

ANNEXURE-III
WORK ORDER UNDER ZONE CONTRACT

WORK ORDER NO_________________DATED____________UNDER CONTRACT AGREEMENT NO______________

DATES _____________

Name of work: - ATBXP: Tites, Kota Stone, UTS counter slab (granite) and floor C.C in Waiting Hall
& tiles in newly constructed Latrine/Bathroom, in connection with GM Inspection in Zone No. 13/LMG.

(SITE) ________________________________ Schedule of drawings ___________________________________

Authority____________________________________________Allocation _____________________________________

The contractor(s) Ayemi Construction, Dimapur is/are hereby ordered to carry out
the following works at ______________% above/below the Unified Standard Schedule of Rates (Works
& Materials)/2010 of the Northeast Frontier Railway corrected up to Printed /Advance Correction
Slip No____________ Dated__________ of Division, under Zone Contract Agreement here-in-before
referred to:-

The works herein mentioned are required to be completed on or before _______________ (Date). The
quantities provided herein are approximate and subject to variation under Clause 42 of the General
Condition of Contract corrected up to Printed /Advance Slip No_______________ Dated ______________

I agree to complete the works herein set forth on or before the date specified under the Zone Contract
Agreement herein before referred to in conformity with the drawings here to annexed and in accordance
with the General and Special (if any) Conditions of Contract corrected up to Printed /Advance
Correction Slip No________Dated ___________ and the Indian Railway Unified Standard Schedule of
Rates (Works & Materials) Volume I & II /2010 up to Printed/ Advance Correction Slip
No_______________ Dated ________________

I also agree to maintain such works for the period specified below from the date of
completion.

a) Repair and maintenance work including white/colour washing three calendar months from date
of completion.
b) All new works except earth work six calendar months from date of completion.

Contractor________________ Designation ____________________ N.F.Rly.

(For President of India)


Address ______________
Date______________ Date____________

ANNEXURE-III
WORK ORDER UNDER ZONE CONTRACT

WORK ORDER NO___________________DATED______________ UNDER CONTRACT AGREEMENT

NO. SE/ DATES.

Name of work: - At DMV-OTN-Cleaning disinfecting painting and repairs to overhead water storage
tank&in zone no.13/LMG.

(SITE) _________________Schedule of drawings ___________________________________

Authority___________________ Allocation _____________________________________

The contractor(s) Ayemi Construction is/are hereby ordered to carry out the following
works at ______________% above/below the Unified Standard Schedule of Rates (Works &
Materials)/2010 of the Northeast Frontier Railway corrected up to Printed /Advance Correction Slip
No____________ _ Dated__________ of Division, under Zone Contract Agreement here-in-before
referred to:-

The works herein mentioned are required to be completed on or before ______Date). The quantities
provided herein are approximate and subject to variation under Clause 42 of the General Condition
of Contract corrected up to Printed /Advance Slip No_______________ Dated ______________

I agree to complete the works herein set forth on or before the date specified under the Zone
Contract Agreement herein before referred to in conformity with the drawings here to annexed and
in accordance with the General and Special (if any) Conditions of Contract corrected up to Printed
/Advance Correction Slip No________ Dated ___________ and the Indian Railway Unified Standard
Schedule of Rates (Works & Materials) Volume I & II /2010 up to Printed/ Advance Correction Slip
No_______________ Dated ________________

I also agree to maintain such works for the period specified below from the date of completion.

a) Repair and maintenance work including white/colour washing three calendar months from
date of completion.
b) All new works except earth work six calendar months from date of completion.

Contractor _________________ Designation ____________________ N.F.Rly.

(For President of India)


Address _____________
Date ________________ Date__________________