Académique Documents
Professionnel Documents
Culture Documents
Process:
Upon intimation to STPI with proof of CG being de-bonded, the CG value shall by credited into the CG
Balance.
IC Procedure:
1. Bond- Bond Sales, HSS, Outright purchases , Lease basis, Second hand CGs ( etc) imported
allowed by StP
2. Checklist:
a. Request Letter with Annexure IX & PI to STPI
b. STP to have valid STP status, legal agreement, PBWHL, Location of unit, where CG is
proposed to be imported.
c. Verify/ Match Annexure IX and PI with request letter
i. Name, Location, Name supplier, country of origin, Inv. No. & Date
ii. Description of goods, New /Used equip, Currency of inv.
d. Check whether invoices is in CIF value or FOB Value
If FOB then add 21.125% to the FOB Value and derive the CIF Value.
3. Type of Sale:
a. Loan Basis equip to be re exported back to supplier after project
b. Free of Charge - invoice should clearly state.
c. HSS request letter + HSS Agreement
d. B2B - request letter + proof of EoU status of supplier + Bond Bond Sales needs to be
indicated in invoice
e. Lease invoice + lease agreement
f. Second Hand CG Self declaration along with Import request & invoice
1. Import request filed by STP member units at STPI Import Approval issued by STPI along with
attested PI.
2. CIF Value of imported CG is deducted by balance CG irrespective of type of imported. Also LOP
specifies Imported CG Limits STP Units to ensure operations are within limits.
3. STP Member Unit Approach Customs with Import Approval by STPI for Clearance of CG
STP Member Unit to approach STPI for bonding the equipment.