MECHANICAL MAINTENANCE
1 Chain pulley block with variable chain length, 10MT 4
2 Chain pulley block with variable chain length, 5MT 8
3 Max Puller 1MT 2
4 General mechanical tools 6 sets
5 Personal Protective Equipment for every work man /staff as per IOCL LOT
safety rules
6 Hand drilling machine 1 set
7 Slings (up to 10 Ton) 8 lot
8 D-Shackles (up to 5 Ton) 8 Lot
9 Hydralic Jack 25 T. capacity with screwedram and saftylock nut with lift minimum
4
160mm
10 Allen Key set (MM & Inches) 6 sets
11 Ring and D Spanner set (complete range upto 60mm) 6 sets
12 Adjustable slide and pipe wrenches (6" & 12") 4 sets
13 Screw operated puller (12") x 3 legs 4
14 Grease Gun manual 1/4" 8
15 Bucket Grease Gun (Manual) 5Kg 2
16 Pneumatic Grease Gun 25 Kgs 2
17 Bastard (Rough cut) Files a. Flat, b. Round 5 sets
18 Fine cut Files (a) Flat, (b) Round, (c) Half Round 5 sets
19 Hack saw frame with 1 dozen blades(12") 8
20 Welding machine (with min. 2 nos. of 300m long cable each), 400 amp 1
2
28 Venier calipers 0_300mm
29 Universal Spirit level 150mm 4
30 Dial gauges 0-10mm, 0.01LC 4
31 Feeler Guage 01No. Each size Metric 0.01to 1mm (26 Blades) 6" 02
32 Feeler Guage 01No. Each size Metric 0.01 to 1mm (26 Blades) 12" 02
42 Tubuler box spanner Hewgonal socket spanner (9/10 to 30/32mm)zinc plate 2 set
Note: The above list is tentative only, any other tools & tackles or consumables etc. required for routine and
breakdown maintenance shall be arranged by the contractor and replenished as and when required without any
extra cost.