Académique Documents
Professionnel Documents
Culture Documents
1
2
3
4
6
7
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
1
2
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
1
2
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
1
2
1
2
2
3
4
1
2
3
4
5
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1
2
3
4
5
6
7
2
3
7
8
10
11
1
2
3
4
9
10
11
12
13
14
15
16
17
18
19
Babylon Group
2B/1,Darussalam Road ,Mirpur ,Dhaka
Requirements
Warehouse, Fabric & Materials Storage Control
Raw materials receive with proper receive documnents i.e. PI, Challan, Invoice
etc.
Raw materials should keep in Quratine area before Inspection.
Inventory of the goods with proper records.
3 days stock Capacity at the store
Accessories inspection should 10% of receive Quantity for all customers, AQL
1.5 for H&M and George, AQL 2.5 for VF Asia and Perryellis. IF fails 15%
goods need to be inspected .
In house accessories testing report i.e. colour fastness to wash, Nikel test,
Color bled test.
All approved trim cards /PO sheet are available to the Inspector .
Rejects goods keeping area, left over area and non confirming area should be
lockable and record need to be avalable in place.
All raw materials need to be kept buyer wise, rack wise with proper
identification no & well described Bin Card.
FIFO system of raw materials delivery with Proper records.
Pareto analysis & top 5 defect analysis.
Humidity kept under 60% by using dehumidifiers, fans, heat, etc & proper
records need to be kept.
Visual colour evaluation of trims and bulk fabric need to be done in Light box
against colour standard (Light requirments are A Light, UV Light ,TL83, TL84,
D65, CWF)
All rolls are covered /Protected by poly from dust, Sun light, stain etc.
5S audits need to be done at least once in a month & audit results must have
with a defined goal and development plan.There should be training records
for 5's.
Sufficient space
Need proper ventilation for fabric , accessories & ctn warehouse
Supplier selection & Evaluation
All record must keep 1 years from the shipment date &
broken needle ercord sh0uld keep 6 years .
All organic materials should be kept in separate rack/place.
Sharp tools control policy should be maintained properly.
Internal lab test requirement
GSM, Rubbing test, Colour Fastness to wash etc.
On site trained technician.
Work Instruction or SOP for Rubbing test , Colour Fastness to wash.
Sample section
Samples section required to have equiped with relevant machines.
Need to conduct Pre-Production meeting for all new styles and record keeping i
The sample room need to have guideline (Tech pack, PO sheet,
measurements chart/ sketch sheet, etc. for production for each order.
Sample inspection report.
Shrinakage test report.
Product Risk assesment record.
Metal check report.
Marker printer calibration 100cmX100cm CHECK daily & keep records.
Tech packs needs translated into local language & needs communicated to
all concerned.
Technicians will evaluate & make report for all samples.
The facility should use mannequins to fit samples prior to sending to buyer &
dummy fitting report
Pattern and Marker checking with records. Maker / checker's name, signature
& date.
All hard patterns distributed to the production floor with pattern maker /
checker's name , signature & date.
Sharp tools ( Needle, Scissor, Cutter, Zimlet, Screw Driver etc.) control system
should be tagged with central account.
If fabric is within one shade it will be cut in a single lay. In case of mixed up
shade facility should use paper separators for every roll being spread.
Fabric width never be less than markers width.
Spreading fabric with reasonable ply height e.g (Lay of T,C fabric is 300 lay
& ply height 3 inch & Lay of CVC fabric is 300 lay & ply height 2 inch ).
Weights & clamps used over the marker to secure plies while cutting.
For manual cutting ensure 8 inch Knife.
WIP will not more than 1 days if no value addition like print, embroidery, wash
etc. If products are with value addition, WIP remains for 2 days at best.
Sharp tools control policy
White colour parts should be cover by poly/separation.
Sewing section
PP meeting report on new styles with attendance record of participants & pp
sample reports need availabe
Pilot Run procedure on new styles before Bulk starts & Show reports.
Product spec & approved trimcards will available on the line for each running
style
Broken needle record kept marked with Date/Time , Order no, Needle, Action
taken, Supervisor sign.
Product Quality ( Check 5 pcs at random of first output) - PASS for Visual /
Major Defects.
Visual and relevant SOP present both in English & local in language in place.
Fusing section
Temperature and bonding strength are checked every 4 hours by
temperature strips or digital/ analogue calibrated temperature checking
device (thermocouple). Reports needs available in place.
Fusing check report.
Shrinkage report.
Button attach
All buttons must attached with lockstitch machine.
If operator off the machine for any reason for a certain time, he will do the
mock up while starting the work again in the machine.
Pull test
Pull test after 2 Hours , H&M 3 (90N, 10 sec)
Visual and relevant SOP present both English & local language
Snap Button
All packaging labels are stored securely and independently by style size and
colour and issued/used on a style, size and colour basis.
Callibration record & all Inspection record must keep 6 years from the
shipment .
All the goods keep in 1 hour Quarantine area (1 Hour keeping area)
There should be approved (sign & date) packing samples,Tech pack, or PO
sheet for each running style present in Finishing section.
100% presentation check & hourly lot pass report & packing check report
according to the sample ,Tech pack & trims card.
5S audits done at least once/month & need to show results and plan for each
area.
The factory has sufficient well equipped inspection room.
Internal pre-final or final report by the concern GPQ ( (Level 2, AQL 2.5
for Major & 4.0 for minor )
Master File including PO, fabric /yarn standard, trims card, wash approval ,
print approval, specification sheet, product claims documentation, pilot
run/size set, sample production records, risk assessment report, red/green
seal fit comments etc. have to have a facility in FCCA audit.
Visual and relevant SOP present both in English & in local language.
Pest control intrnally or externally from certified company. We are doing pest
control periodically ( 6 month )
Insect net to be used in finishing area/ packing area/ metal free zone and to
close/cover doors and windows .
KPI ( For all deparment ) , Departmentwise goal & Goal follow up data.
Visual and relevant SOP present both in English & in local language.
Wastage area must be identified like Glass keeping area, Poly keeping area.
ETI base code & protector line must be hanged on the facility .
People Management
Training Plan & feedback system for for all QC & Operator .
Spot cleaning
Spot cleaning record.
Spot cleaner must use PPE & industrial eye shower need to have at the area.
Spot will be removed only by water & detergent for kids item .
House keeping should be Ok.
Skilled sample room technician available and capable of modification of patterns when required and
responsible for pattern handover to production floor with record available (Critical )
All fabrics / yarns / trims / accessories organized and stored indoors, off of floors, and remain covered /
protected until ready for use and has required space( Critical )
Inventory system (Fabric & Accessories) at the warehouse & proper ventilation
system at warehouse, Finished Goods area . (Critical )
Sharp objects such as trimmers and scissors effectively tracked e.g. that they are
permanently attached to the machines during production and there is regular
monitoring, so missing of 'attached' sharp objects will not go unnoticed.(Critical )
Factory have inspection system at inline and end line. Factory measure complete
garments. Completed garments are measured at least at Level 1 at AQL 1.5 or 20
pieces minimum from total production covering color & size daily all through the day
and records kept. (Critical )
QA/QC department have an independent reporting structure & all QA/ QCs trained
regularly.
(Critical )
There should be a 100% final checking after finishing and is there a random audit
done after finishing. There also should be a 100% measurement for key points like
Length, Sleeve Length, Chest, Hem, Shoulder, Bottoms: Waist, Front Rise, Back Rise,
Inseam/Outseam) & audit done after finishing.
- Records are available. (Critical )
Factory conduct final audit based on AQL inspection level 2, AQL 2.5 for major & 4
for Minor
of buyer.There is pre-final inspection after packing with acceptable sampling method
both in size & color for all POs. After 80%-100% packed, QA will do prefinal
inspection based on buyer's requirement .( AQL inspection level 2 ,AQL 2.5 for major
& 4 for Minor ) (Critical )
Factory has a sufficient & proper metal detection process for all the products &
Metal detection is Mandatory for all products .(Critical )
Factory use lockstitch for button attach Mandatory for childrenswear dept. 26, 24,
33, score 10-0 and adult 10-5-0 hence scoring dept. 26, 24, 33, score 10-0 and adult
10-5-0 (Critical )
Snap/Rivet (or any metal fastener) attaching process & machinery in the factory.
There should be arrangement for disposal of non-conforming goods & materials- Red
Tag area is Physically designated and marked, labeled or tags Area for Non-
conforming goods & materials which are easily visible for all such nonconforming
products.
-Found Red Tagged/ designated and marked areas in metal detector area, pull testing
area for buttons/snaps/rivet or any other fastener, button attaching/ lock stitching
area, snap/riveting or any metal fastener attaching area
- Found all non-confirming goods/materials stored separately.( Critical )
Finished carton must be close & access control system at the finished
goods area .(Critical )
A deficiency which requires prompt attention to prevent a potential product safety failure or legal issue
from arising; where this failure may potentially put customers or brand integrity at risk
Example : Though plant tour it was noted that factory attached all finishing label like hang tag,
packing sticker etc after metal pass at metal free area. During plant tour it was observed that the
garments cannot pass through metal detector due to RFID hang tag but it was not discussed with
Tesco concern person .
A deficiency which requires attention to improve Good Manufacturing Practice standards, Due Diligence
documentation (our ability to defend a legal challenge) or to achieve compliance with Tesco standards
Example : Factory does not check cut panel against master pattern for solid fabric, they used to
check the cut panel by master pattern for strip fabric.
Highest requirement by VF
Standard requirement for all buyer
Highest requirement by H&M
Standard requirement for all buyer
Critical by George
Critical by George
Critical by George
Critical by George
Critical by George
Critical by George
Critical by george
Critical by George