Académique Documents
Professionnel Documents
Culture Documents
AE Summit 2016
Page 2
2014 EXFO Inc. All rights reserved. 2
FH Addressable Market
AMERICAS
Page 6
Fronthaul BDM Team Role
Page 8
Fronthaul Technology Recap
Page 9
2014 EXFO Inc. All rights reserved. 9
Evolution of the Cell Tower
The Move to Fiber: Cost Savings and Other Advantages
Page 10
10
Legacy Mobile Installation
Before Fronthaul approach : Copper / Coax Installs
Coax Cable
- High power loss in cable
- Bulky & heavy
Base Station Enclosure
Antennas
- Need for colocation with tower
- Need for Climate Control
- Need for Large Battery Backup
- Extra Rental property space required
Copper /
Loss depends on the cable size and the frequency
Coax Cables At 900MHz : 3.7dB / 100m (7/8" cable)
At 2100MHz : 6dB / 100m (7/8" cable)
RF
Radio
Amp
Base
RF
Radio Band BACKHAUL
Amp
Unit
RF
Radio
Amp NID MPLS CS/PS Core
Cell
Site
Router
CSR
Typical architecture for 2G / 3G
cellular deployments Page 11
Cell Site Cabinet
2014 EXFO Inc. All rights reserved. 11
Evolution of the Cell Tower
FTTA : Fiber To The Antenna Fronthaul: The new network architecture
RRHs
RF RF
Radio RF
Radio RFAnt
Amp Radio
Amp Radio
Amp RF AmpRF Ant
RadioAntennas
Radio Ant
Amp Amp
Optical Fiber
cables Fronthaul
Copper /
Coax Cables Typical architecture for 4G / LTE cellular deployments
RF
Radio
Amp
Base
RF
Radio Band BACKHAUL
Amp
Unit
RF
Radio
Amp NID MPLS EPC
Cell
Site
Router
CSR
Cost Savings
Remote Radio Head (RRH)
Radio + Power Amplifier
- Reduced power consumption from the RRH
(50% savings)
Page 13
13
Mobile Architecture Evolution
Centralize Radio Access Networks: Even More Cost Savings
Page 14
14
System Architecture
CPRI Communication Flows
Page 15
15
CPRI Layer 1
Physical Interface Line Rates (CPRI Version 6.1)
1 614.4 Mbit/s
2 1228.8 Mbit/s
Version 1: No Scrambling
3 2457.6 Mbit/s
5 4915.2 Mbit/s
Version 1: No Scrambling
Version 2: Scrambling
6 6144.0 Mbit/s
Scrambling Recommended
7 9830.4 Mbit/s
7A 8110.08 Mbit/s
9 12165.12 Mbit/s
Page 16
16
Sales Strategies
Page 17
2014 EXFO Inc. All rights reserved. 17
Deployment Challenges
CPRI Validation
Connectivity
Alarm & Error Monitoring
Latency Measurement
SDT Measurement
CPRI BERT
RF Monitoring
Interference Identification
Uplink Spectrum and Spectrogram
Backhaul Validation
SyncE, 1588PTP
Ethernet, SONET/SDH
2013 EXFO Inc. All rights reserved.. 19
TestFlow
1 Engage Define Configure
2 TestNetwork UploadResults
3 AnalyzeResults
1
3
2
Our Challenges and Strategies
Stay focus on a short list of targeted
accounts
Work with USA team, EMEA team and APAC team
Understand regional market reality
Understand their actual FH deployment process
Understand who is doing what (managed
services (MS), contractors)
Find the Method of Procedure (MOP) main contact
As much as we can write their MOP with them
(influence)
Make sure we are an approved supplier
Find their main contractors (work with one or two)
Train them (make them look and act like
champions)
Fronthaul BDM initiative 2014 EXFO Inc. All rights reserved. 21
Our Challenges and Strategies
Demonstrate our expertise (trusted adviser)
Leverage our knowledge about C-RAN technology
(WDM, Latency, Synchro)
Application note
Webinars / Seminars / Training programs / NIS
video
Business case / Leverage what we have done in
the USA
Generic MOP (including the close-out package)
Work with large training centers in the US and
around the world
Page 24
2014 EXFO Inc. All rights reserved. 24
5G Estimated Requirements
Ericsson
Page 25
25
Fronthaul is the new RAN Foundation
Building an infrastructure
BBU hotel
DEMUX
MUX
BBU
DWDM Fiber
BBU
BBU
Demux Mux
2 dB < < 3 dB 2 dB < < 3 dB
Latency!
Radio Field
NOC
Eng. Crew
ANALYZE CUSTOMER FIND THE ROOT CAUSE RIGGER TEAM TO FIX
TROUBLE TICKET THE PROBLEM
Seriously degraded throughput No diagnostic from Network Get a Rigger on site to fix the
Equipment problem
Investigation on E2E
possible issues Drive test: High BER from 1 Mobile operator Truck Roll
cell Tower Crew to climb to the RRH
Transfer the TT to RAN
Engineering CPRI monitoring on the Check Connectors + Clean +
DL&UL fibers of this cell FIP test
OTDR test: 15 dB power loss
on the connector before RRH
2015: Backhaul trial turned out to be a deal stopper (30+ units) since the
Throughput test did not meet US Cell troubleshooting needs.
Thanksfortakingtheadditionaltimeandefforttoinvestigate
otherpossibilitiesatthesitewhichmaybecausingor
contributingtotheissuesweareseeing.
Thanks,
Mike Raether
Lead Data Network Engineer
Cellular Update
Made cables No strain relief Causes signal loss / PIM
e 18.5 ft-lb over / under torque Signal loss / Interference
Cellular Update
Signal loss, RF issues
Cellular Update
Bolt Effect PIM issues, Interference
nthaul Roadmap
Service Disruption Time (Nov 2015)
RRH
RRH CPRI Transport System
(WDM - OTN)
Working path
BBU
Protection path
BBU
C-RAN Ring-Architecture
CPRI Service Disruption Time (SDT) Measurement
RRH
RRH CPRI Transport System
(WDM - OTN)
Working path
BBU
Protection path
BBU
C-RAN Ring-Architecture
CPRI Service Disruption Time (SDT) Measurement
In this example
re occurred on the working path
Switch time : 131.14msec
Failed SDT!
RRH
RRH CPRI Transport System
(WDM - OTN)
Working path
BBU
Protection path
BBU
Dual / Quad Port CPRI
CRAN Lab & Field Testing
Dual / Quad Port CPRI
dependent CPRI
mulation Mode on
ch port (BBU / RRU)
dependent Frequency
fset injection of +/-
0ppm
CRAN Lab & Field Testing
Dual / Quad Port CPRI
700Gv2
Legacy Transport
Ethernet / Transport / CPRI
Dual Port Testing
Optical OTDR / iOLM
880Q
Legacy Transport
Ethernet / Transport /CPRI
Quad Port CPRI Testing
(Beta Load - Feb 2016)
FTB-1 Pro
870Q
Ethernet / Transport /CPRI
Quad Port CPRI Testing
(Beta Load - Feb 2016)
CRAN Lab & Field Testing
Dual / Quad Port CPRI
nk
Wireless CPRI
CentralOffice
DataCenter
Source:Orange
Optical,
CPRI&RF
validation
RF over CPRI
RF over CPRI Analysis
Complete Fronthaul Solution
CentralOffice
ruck roll to the DataCenter
nna, see RF
ference within the
tral Office
RA simple 3 step approach, but now including TCP testing all the way to 100Gig!
Sync
Sync Measurement
Sync Measurement
Upcoming Feature June 2016
S Status Check
Show: SNR, Satellite number and quantity, Lock/unlock status, export logs and survey of
satellite over a 24 hour period
GPS status available during conditioning of atomic clock
e error
Measure and display a graph of the Time Error compared to a 1PPS reference.
The 1 PPS reference could be
1 PPS source (from an external GPS or any other reliable 1 PPS source)
DV measurement
Graph of iPDV vs time
EXFOs Fronthaul Testing Solution
B-700G V2 Series
CombiningthePowerofOptical,EthernetandCPRI
Applications:
Fronthaul and Backhaul
Ethernet Business Services
Metro networks turn-up
Network
Connectivity
Service
Validation
Your Journey to take Fiber to the Top
VZW Contractor Success Story - NIS
Thank you