C. UNIT.
A. TECHADA UNID
CONCEPTO W/m2
REA TECHADA / TOMACORRIENTES 140 10
CALENTADOR DE AGUA 110lt. 02 UND. 2
REFLECTORES 13 UNID 400W. 13
LUMINARIAS LED 240W TIPO HIGH-BAY-TECHO COLISEO. 12
BRAQUET DE PARED 27UND 36W 27
LUMINARIAS DE PISO 05 UNID. 150W 5
FAROLAS 05 UNID. 70W 5
CARGAS FUTURAS
MAXIMA DEMANDA W
900 223.35
1333.8
STALADA TOTAL
CARGA TOTAL
2233.5
66690
9000
A DEMANDA
MAXIMA DEMANDA
34461.75
6750
41211.75
CORRIENTE NOMINAL 1ERA ETAPA
FORMULA TOTAL
In=/ In=11573.8/
() (3800.91.73
TOTAL
) In= 19.6 A
LEYENDA
In Corriente Nominal 19.6
MD Mxima Demanda de la 1era Etapa 11573.8
V Voltaje Trifasico 380v - Voltaje Monofasico 220 - 230v 380
FP Factor de Potencia 0.9 0.9
k K = 2 para Circ.Monofsicos y 1.73 para Circ.Trifsic. 1.73
FC Factor de correccin = 1.25 1.25
20 A
24 A
29 A
CORRIENTE NOMINAL 2DA ETAPA
FORMULA TOTAL
In=/ In=64655.95/
() (3800.91.73
TOTAL
) In= 109 A
In 109
MD 64655.95
V 380
FP 0.9
k 1.73
109 A
137 A
164 A
CAIDA DE TENSION CAIDA DE TENSION
FORMULA v = (K x Id x L x Rcu x Fp)/S FORMULA v = (K x Id x L x Rcu x Fp)/S
LEYENDA
K Constante 1.73
Id Corriente de Diseo 24
L Longitud 10
Rcu Resistividad del cobre = 0.0175 mm2/m 0.0175
Fp Factor de potencia 0.9
S Seccin del conductor 50
DA DE TENSION
v = (K x Id x L x Rcu x Fp)/S
D Distancia mnima entre fases a medio vano, en metros.
Un Tensin entre fases, en kV. (=10 kV)
F Factor de correccin por altitud (=1)
f Flecha mxima a 40C (=1.219m.) con el Vano Bsico de 90 m.
DMT 76.26
3 1.73 I n D.M .total
3 * V * Cos
V 10
COS 0.9
In = 4.9
CALCULO DE FUSIBLES
KVA
Subestacin 100kVA I
3 * KV
kVA 100
V 10 I= 5.78 A
3 1.73
Factor de 1.3 Id= 8.67 A
correccin 1.5
Seleccin de fusibles tipo k de 10A y 5A
a 4*l (2 * H l )
RPAT 1 Ln *
2 * * l 1,36 * d ( 4 * H l )
R PAT - 1 = ?
Pa = 43.725
L= 2.4
d= 16
H= 0.3
1
1.25
4500
1000
RESUMEN ECONOMICO DE LA RED DE MEDIA TENSIN 10 kV
RED DE MEDIA
ITEM DESCRIPCIN TENSIN (S/.)
TOTAL
(S/.)
S/. 114,839.92
S/. 67,183.83
PERNO MAQUINADO DE AG, 16mm x 102mm LONG., 152 MAQUINADO, CON TUERCA Y CON
PERNO MAQUINADO DE AG, 16mm x 305mm LONG., 152 MAQUINADO, CON TUERCA Y CON
PERNO TIPO DOBLE ARMADO DE AG DE 16 mm x 508 mm, PROVISTO DE 4 TUERCAS
PERNO CON OJAL DE 16 mm
TUERCA-OJO PARA PERNO DE 16 mm
BRAZO-SOPORTE (RIOSTRA) DE PERFIL ANGULAR DE AG 50x50x6.35mm SECCION, 1961mm. DE
ARANDELA CUADRADA PLANA DE A G, 57 x 57 x 5 mm, AGUJERO DE 18 mm
ARANDELA CUADRADA CURVA DE A G, 57 x 57 x 5 mm, AGUJERO DE 18 mm
TUBO DE FG DE 4" x6.0m
TUBO DE FG DE 3" x6.0m
HEBILLA PARA FLEJE DE ACERO INOXIDABLE 19 mm ANCHO
FLEJE DE ACERO INOXIDABLE 19 mm ANCHO
BREA UNDERCAUTING Y DISOLVENTE
TOTA
COSTO (S/.)
ESCRIPCIN DE PARTIDAS UND
UNITARIO
m LONG. 18 60
12 50
TUD Y ACCESORIOS 12 25
6 70.5
7 850
234.8 2.5
0 mm2 6 7.5
2 3 4.5
0 mm2 6 6.5
6 35
66 1.19
468.9 60
RA PUESTA A TIERRA 141 10.1
30 10.1
24 3.45
RCA Y CONTRATUERCA 2 8.45
OJAL GUARDACABO EN UN EXTREMO; TUERCA Y CONTRATUERCA EN EL OTRO 2 31.2
8 7.8
10 8.1
18 mm 2 4.23
RAPUNTA) 2 75
) Y LENGETA (LINEA) DE 27KV 2 70.5
ESISTENCIA 2 21.7
2 10.3
2 28.5
9 150
9 4.9
35 mm2 (SPLIT BOLT) 27 3.7
/ O PERNOS 12 6.5
5 6.3
2 35
18 30
21.2 75
27kV,200 A 6 520
3 7.6
3 7.6
A 6 285
1 14700
O, 60Hz 4500msnm 1 14500
2 120
1 3800
ofundidad 2 500
1 480
15 15
45 75
TOTAL
COSTO (S/.)
PARCIAL
S/. 1,080.0
S/. 1,080.0
S/. 7,700.0
S/. 370.0
S/. 240.0
S/. 900.0
S/. 450.0
S/. 100.0
S/. 9,760.0
S/. 600.0
S/. 300.0
S/. 423.0
S/. 5,950.0
S/. 7,273.0
S/. 587.0
S/. 587.0
S/. 45.0
S/. 13.5
S/. 39.0
S/. 210.0
S/. 78.5
S/. 386.0
S/. 28,134.0
S/. 1,424.1
S/. 303.0
S/. 29,861.1
S/. 162.0
S/. 81.0
S/. 180.0
S/. 27.0
S/. 19.5
S/. 648.0
S/. 136.8
S/. 7.2
S/. 8,100.0
S/. 760.0
S/. 101.8
S/. 440.0
S/. 50.0
S/. 10,713.3
S/. 82.8
S/. 16.9
S/. 62.4
S/. 62.4
S/. 81.0
S/. 8.5
S/. 150.0
S/. 141.0
S/. 43.4
S/. 20.6
S/. 57.0
S/. 726.0
S/. 1,350.0
S/. 44.1
S/. 99.9
S/. 78.0
S/. 31.5
S/. 70.0
S/. 540.0
S/. 1,590.0
S/. 3,803.5
S/. 7,450.0
S/. 7,450.0
S/. 3,120.0
S/. 22.8
S/. 22.8
S/. 1,710.0
S/. 4,875.6
S/. 14,700.0
S/. 14,500.0
S/. 240.0
S/. 3,800.0
S/. 1,000.0
S/. 480.0
S/. 34,720.0
S/. 225.0
S/. 3,375.0
S/. 3,600.0
S/. 114,835.5
ITEM DESCRIPCION DE PARTIDAS
CARTEL DE OBRA
REPLANTEO TOPOGRFICO Y UBICACIN DE ESTRUCTURAS EN RED DE MEDIA TENSION
INGENIERA DE DETALLE DE LA RED DE MEDIA TENSION
TOTAL
COSTO (S/.)
CION DE PARTIDAS UND
UNITARIO PARCIAL
1 1277.38 S/. 1,277.38
URAS EN RED DE MEDIA TENSION 0.23 437.7 S/. 100.67
N 0.23 648.25 S/. 149.10
S/. 1,527.15
ALMACEN A PUNTO DE IZAJE 7 392.13 S/. 2,744.91
0.83 57.58 S/. 47.79
7.43 385.28 S/. 2,862.63
STE DE CONCRETO DE 13 m / 400 Kg 7 226.39 S/. 1,584.73
ONCRETO DE POSTE DE C.A.C.TERRENO NORMAL 0.17 444 S/. 75.48
ONCRETO DE POSTE DE C.A.C. TERRENO ROCOSO 5.95 648.5 S/. 3,858.58
S/. 11,174.12
0.22 57.58 S/. 12.67
1.94 385.28 S/. 747.44
TA 2 114.15 S/. 228.30
LAJE 2.16 90.1 S/. 194.62
S/. 1,183.03
1 97.59 S/. 97.59
1 78.97 S/. 78.97
1 147.13 S/. 147.13
2 196.67 S/. 393.34
1 117.7 S/. 117.70
1 785.15 S/. 785.15
S/. 1,619.88
CIN DE Al DE 50 mm2, POR FASE 0.23 1,299.40 S/. 298.86 0.23
S/. 298.86 1299.4
0.47 5000.64 S/. 2,350.30
ipo 55.38 169.43 S/. 9,383.03
66.45 90.1 S/. 5,987.15
26.58 57.58 S/. 1,530.48
XSY 35 mm2 (8.7/15 KV) 39.87 385.28 S/. 15,361.11
S/. 34,612.07
1.8 57.58 S/. 103.64
16.2 385.28 S/. 6,241.54
9 80.43 S/. 723.87
18 65.7 S/. 1,182.60
S/. 8,251.65
TE 1 7064.8 S/. 7,064.80
E LA RED DE MEDIA TENSIN (1 ORIGINAL + 3 COPIAS) 1 1447.55 S/. 1,447.55
Y PLANOS EN CD.
S/. 8,512.35
TOTAL S/. 67,179.10
298.862