Vous êtes sur la page 1sur 66

INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO

Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA


POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE
INDEPENDENCIA

INFORME DE
SIMULACIONES
HIDRAULICAS DEL
SISTEMA DE
ALCANTARILLADO

Pg.1
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

INDICE
1 NOMBRE DEL PROYECTO ................................................................................. 6

2 OBJETIVO ............................................................................................................ 6

3 DESCRIPCION DE la SOLUCION TECNICA PROPUESTA EN EL ESTUDIO


DE PREINVERSION ................................................................................................... 6

3.1 DESCRIPCION DEL SISTEMA PROYECTADO DE ALCANTARILLADO ......6

4 POBLACIN ......................................................................................................... 9

4.1 POBLACION EXISTENTE ......................................................................................9


4.1.1 DENSIDAD ......................................................................................................................................................9
4.1.2 CONTEO DE LOTES ................................................................................................................................... 10

4.2 POBLACION PROYECTADA ............................................................................... 11


4.2.1 CENSOS ........................................................................................................................................................ 11
4.2.2 PROYECCION DE LA POBLACION FUTURA ....................................................................................... 11

5 CALCULO DEL CUADRO DE DEMANDA....................................................... 15

5.1 CONSUMOS ........................................................................................................... 15

5.2 PERDIDAS DE AGUA ............................................................................................ 17

5.3 COBERTURA DE AGUA POTABLE .................................................................... 17

5.4 MICROMEDICION................................................................................................ 18

5.5 ESTIMACIN DE LA DEMANDA ....................................................................... 18


5.5.1 DEMANDA DE ALCANTARILLADO ...................................................................................................... 18

6 DATOS BSICOS Y CRITERIOS DE DISEO.................................................. 23

6.1 CRITERIOS Y PARAMETROS DE DISEO DE LA INFRAESTRUCTURA


SANITARIA DE ALCANTARILLADO ........................................................................... 23
6.1.1 COEFICIENTE DE RETORNO ................................................................................................................... 23
6.1.2 CAUDALES DE DISEO............................................................................................................................ 23
6.1.3 DIAMETRO MINIMO DE LAS REDES SECUNDARIAS ....................................................................... 23
6.1.4 VELOCIDAD MINIMA ............................................................................................................................... 23
6.1.5 PENDIENTE MNIMA DE COLECTORES ............................................................................................... 23
6.1.6 CAMARAS DE INSPECCION O BUZONES ............................................................................................ 23
6.1.7 UBICACIN DE CAMARAS DE INSPECCION O BUZONES .............................................................. 24
6.1.8 TAMAO DE LAS CAMARAS DE INSPECCION .................................................................................. 24
6.1.9 SEPARACION MAXIMA ENTRE BUZONES .......................................................................................... 24
6.1.10 UBICACIN DE COLECTORES ........................................................................................................... 24
6.1.11 Coeficiente de Manning ............................................................................................................................ 25

Pg.2
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

6.1.12 Criterio de Fuerza Tractiva ....................................................................................................................... 25


6.1.13 TIRANTE NORMAL MAXIMO............................................................................................................. 26

7 DISEO PRELIMINAR DE COLECTORES ...................................................... 27

7.1 METODOLOGIA EMPLEADA ............................................................................. 27

7.2 CALCULO DE COLECTORES PRINCIPALES................................................... 27


7.2.1 clculos hidrulicos Colector Tpac Amaru ................................................................................................ 27
7.2.2 clculos hidrulicos Colector cesar vallejo .................................................................................................. 31
7.2.3 clculos hidrulicos Colector Independencia ............................................................................................... 36
7.2.4 clculos hidrulicos Colector Los Pinos 1.................................................................................................... 43
7.2.5 clculos hidrulicos Colector Los Pinos 2.................................................................................................... 45
7.2.6 clculos hidrulicos Colector El Ermitao ................................................................................................... 49
7.2.7 clculos hidrulicos Colector Unificada ....................................................................................................... 55
7.2.8 CLCULOS HIDRULICOS COLECTOR LOS ALAMOS .................................................................... 59
7.2.9 clculos hidrulicos Colector El ngel ....................................................................................................... 62

INDICE DE CUADROS
Cuadro 1: Resumen de habilitaciones en el rea de estudio (Eje de Independencia-Ermitao-Unificada)...................... 9
Cuadro 2: Censos Distrito de Independencia. ................................................................................................. 10
Cuadro 3: Conteo de lotes en el rea de estudio. ............................................................................................. 11
Cuadro 4: Censos Distrito de Independencia. ................................................................................................. 11
Cuadro 5: Tarifa por Suministro.................................................................................................................. 15
Cuadro 6: Estado del Suministro ................................................................................................................. 15
Cuadro 7: Cuadro por tipo de conexin considerando el estado de suministro en situacin correcta (EC012). ............. 16
Cuadro 8: cuadros de consumes por tipo de conexin (PERFIL). ....................................................................... 16
Cuadro 9: Lotes por sub reas de drenaje. ..................................................................................................... 18
Cuadro 10: Datos bsicos para la elaboracin del Cuadro de demanda AD-01 ................................................... 19
Cuadro 11: Datos bsicos para la elaboracin del Cuadro de demanda AD-02 ................................................... 19
Cuadro 12: Datos bsicos para la elaboracin del Cuadro de demanda AD-03 ................................................... 19
Cuadro 13: Cuadro de demanda de Alcantarillado rea Drenaje 01 ................................................................... 20
Cuadro 14: Cuadro de demanda de Alcantarillado rea Drenaje 02 ................................................................... 21
Cuadro 15: Cuadro de demanda de Alcantarillado rea Drenaje 03 ................................................................... 22
Cuadro 16: Dimetro interior de cmaras de inspeccin de alcantarillado. ........................................................... 24
Cuadro 17: Caudal de Descarga para cada buzn del Colector Tpac Amaru, Ao 20 ............................................ 27
Cuadro 18: Reporte de Buzones del colector Tpac Amaru. ............................................................................. 28
Cuadro 19: Reporte de Tuberas del colector Tpac Amaru, Caudal Mximo Ao 20. ........................................... 29
Cuadro 20: Reporte de Tuberas del colector Tpac Amaru, Caudal Mximo Ao 20 (tubera estructural) ................. 30
Cuadro 21: Reporte de Outfall del colector Tpac Amaru, Caudal Mximo Ao 20............................................... 31
Cuadro 22: Caudal de Contribucin para cada buzn del Colector Cesar Vallejo, ao 20 ........................................ 31
Cuadro 23: Reporte de Buzones del colector Cesar Vallejo. .............................................................................. 32
Cuadro 24: Reporte de Tuberas del colector Cesar Vallejo, Caudal Mximo ao 20 ............................................. 33
Cuadro 25: Reporte de Tuberas del colector Cesar Vallejo, Caudal Mximo ao 20 (tubera estructural) .................. 34
Cuadro 26: Reporte de Tuberas del colector Cesar Vallejo, Caudal Mximo ao 20 ............................................. 36

Pg. 3
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 27: Aportes al Colector Independencia ao 20 ..................................................................................... 36


Cuadro 28: Reporte de Buzones del colector Independencia. ............................................................................ 37
Cuadro 29: Reporte de Tuberas del colector Independencia, Caudal Mximo ao 20 ............................................ 39
Cuadro 30: Reporte de Tuberas del colector Independencia, Caudal Mximo ao 20 (Tubera estructural) ................ 40
Cuadro 31: Reporte de Tuberas del colector Independencia, Caudal Mximo ao 20 ............................................ 43
Cuadro 32: Caudal de Contribucin para cada buzn del Colector Los Pinos 1, ao 20 .......................................... 43
Cuadro 33: Reporte de Buzones del Colector Los Pinos 1. ............................................................................... 43
Cuadro 34: Reporte de Tuberas del Colector Los Pinos 1, Caudal Mximo ao 20 ............................................... 44
Cuadro 35: Reporte de Tuberas del Colector Los Pinos 1, Caudal Mximo ao 20 (Tubera estructural) ................... 44
Cuadro 36: Reporte de Outfall del Colector Los Pinos 1, Caudal Mximo ao 20 ................................................. 45
Cuadro 37: Caudal de Contribucin para cada buzn del Colector Los Pinos 2, ao 20 .......................................... 45
Cuadro 38: Reporte de Buzones del colector los Pinos 2. ................................................................................. 45
Cuadro 39: Reporte de Tuberas del colector los Pinos 2, Caudal Mximo, ao 20 ................................................ 47
Cuadro 40: Reporte de Tuberas del colector los Pinos 2, Caudal Mximo, ao 20 (Tubera estructural) .................... 48
Cuadro 41: Reporte de Outfall del colector los Pinos 2, Caudal Mximo, ao 20 .................................................. 49
Cuadro 42: Caudal de Contribucin para cada buzn del Colector El Ermitao, ao 20 .......................................... 49
Cuadro 43: Reporte de Buzones del colector El Ermitao. ................................................................................ 50
Cuadro 44: Reporte de Tuberas del colector El Ermitao Caudal Mximo ao 20 ................................................ 51
Cuadro 45: Reporte de Tuberas del colector El Ermitao Caudal Mximo ao 20 (Tubera estructural) .................... 53
Cuadro 46: Reporte de Outfall del colector El Ermitao Caudal Mximo ao 20 .................................................. 55
Cuadro 47. Caudal de contribucin para cada buzn del colector Unificada, ao 20 .............................................. 55
Cuadro 48: Reporte de Buzones del colector Unificada. ................................................................................... 56
Cuadro 49: Reporte de Tuberas del colector Unificada, Caudal Mximo, ao 20.................................................. 57
Cuadro 50: Reporte de Tuberas del colector Unificada, Caudal Mximo, ao 20 (Tubera estructural) ..................... 58
Cuadro 51: Reporte de Outfall del colector Unificada, Caudal Mximo, ao 20 .................................................... 59
Cuadro 52: Caudal de Contribucin para cada buzn del Colector Los lamos, ao 20 .......................................... 59
Cuadro 53: Reporte de Buzones del colector Los lamos. ................................................................................ 60
Cuadro 54: Reporte de Tuberas del colector Los lamos, Caudal Mximo ao 20 ............................................... 61
Cuadro 55: Reporte de Outfall del colector Los lamos, Caudal Mximo, ao 20 ................................................. 62
Cuadro 56: Caudal de Contribucin para cada buzn del Colector el ngel, ao 20............................................... 62
Cuadro 57: Reporte de Buzones del colector el ngel...................................................................................... 63
Cuadro 58: Reporte de Tuberas del colector el ngel Caudal Mximo ao 20 ..................................................... 64
Cuadro 59: Reporte de Tuberas del colector el ngel Caudal Mximo ao 20 (Tubera estructural) ......................... 65
Cuadro 60: Reporte de Outfall del colector el ngel Caudal Mximo ao 20 ....................................................... 66

Pg. 4
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

INDICE DE TABLAS
Tabla 4-1: Comportamiento Histrico de las ecuaciones. ................................................................................. 12
Tabla 4-2: Resumen de la Poblacin Futura en el rea de Estudio. .................................................................... 13
Tabla 4-3: Resumen de la Poblacin Futura en el rea de Estudio considerando lotes adicionales que se encuentran fuera
de los planos visados asegurando la demanda futura. ....................................................................................... 13
Tabla 4-4: Resumen de la Poblacin Futura en el rea de Drenaje 01 considerando lotes adicionales que se encuentran
fuera de los planos visados asegurando la demanda futura. ............................................................................... 14
Tabla 4-5: Resumen de la Poblacin Futura en el rea de Drenaje 02 considerando lotes adicionales que se encuentran
fuera de los planos visados asegurando la demanda futura. ............................................................................... 14
Tabla 4-6: Resumen de la Poblacin Futura en el rea de Drenaje 03 considerando lotes adicionales que se encuentran
fuera de los planos visados asegurando la demanda futura. ............................................................................... 14

INDICE DE GRAFICOS
Grfico 1: Esquema del sistema Proyectado de Alcantarillado............................................................................. 8

Pg. 5
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

1 NOMBRE DEL PROYECTO

AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA


INDEPENDENCIA, UNIFICADA Y ERMITAO-DISTRITO DE INDEPENDENCIA.

2 OBJETIVO

EL presente final informe tiene como objetivo presentar la informacin procesada luego de efectuar las
simulaciones hidrulicas del sistema de alcantarillado proyectado del Estudio Definitivo AMPLIACIN Y
MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA
INDEPENDENCIA, UNIFICADA Y ERMITAO-DISTRITO DE INDEPENDENCIA empleando la
tubera de PVC-U para alcantarillado sanitario Norma NTP ISO 21138:2010.

3 DESCRIPCION DE LA SOLUCION TECNICA PROPUESTA EN EL


ESTUDIO DE PREINVERSION

Para llevar a cabo nuevamente la revisin de la propuesta de descripcin de la solucin tcnica planteada en
el estudio de pre inversin (PERFIL), se ha tenido en cuenta la informacin actualizada entregada por las
reas operativas de Sedapal, as como de las inspecciones o visitas conjuntas de trabajos especficos de
campo, a la informacin de parte del equipo social, los trminos de referencia y las reuniones realizadas en
PROSEAR y con las diferentes reas tcnicas de Sedapal (Equipo de Control de Perdidas y Fugas ,Equipo de
Redes Primarias, Equipo de Micromedicin y Gestin Comercial ,especialistas del Equipo de Operacin y
Mantenimiento de Redes Comas ), por lo que con toda la informacin actualizada del rea de estudio y lo
que se presente durante el desarrollo del estudio definitivo nos lleven a la consolidacin de la alternativa
tcnica ms conveniente para la solucin de la problemtica de los servicios de agua potable y desage que
estn comprendidos en cada sector y rea de drenaje del distrito de Independencia.

3.1 DESCRIPCION DEL SISTEMA PROYECTADO DE ALCANTARILLADO

La configuracin topogrfica del rea de estudio que se desarrolla en laderas de cerros con pendiente
moderada, facilita la evacuacin de los desages ntegramente por gravedad y con los dimetros mnimos
reglamentarios y en zonas planas conformado por vas asfaltadas y topografa irregular; verificando as
mismo que los colectores existentes en uso tengan capacidad suficiente para recepcionar los desages de las
habilitaciones servidas y si no cuentan con la capacidad se reemplazar por otro que tenga la capacidad de
transporte del desage. Es por ello que se viene coordinando en las oficinas tcnicas de La Atarjea
(PROSEAR) y personal tcnicos de colectores primarios y redes secundarias la informacin actualizada
especialmente en el rea de drenaje de los Colectores de Ingeniera (Nuevo y antiguo) referidos a los
empalmes o mejoras realizadas en las vas de transporte masivo rpido del Metropolitano (av. Tpac Amaru).

En tal sentido, para el presente proyecto los caudales de acuerdo a sus respectivos esquemas de flujo irn
acumulando los desages hasta su descarga en los colectores principales y estos a su vez en los colectores
Ingeniera y Nuevo Ingeniera, empalmndose estos al colector de Comas de 1000 mm CSN en la Av. Carlos
Izaguirre con direccin a la planta de tratamiento Taboada.

Pg. 6
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

En este sentido para un mejor anlisis de los caudales de descarga tanto de los colectores proyectados como
existentes, se ha considerado 03 reas de drenaje (Independencia, Ermitao y Unificada), con sus
respectivas sub reas de drenaje teniendo en cuenta la topografa del rea de estudio.

Las descargas de las reas de drenaje se realizarn a los colectores existentes Ingeniera e Ingeniera Nuevo
considerando (06) empalmes, (02) en el colector Nuevo Ingeniera de 600mm PVC y (04) empalmes al
colector Ingeniera de 525mm CSN.

Pg. 7
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Grfico 1: Esquema del sistema Proyectado de Alcantarillado


INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

4 POBLACIN

4.1 POBLACION EXISTENTE

Para la determinacin de la poblacin existente ha considerado los resultados del estudio de campo,
lotizacin actualizada segn el avance final de topografa, recoleccin de planos visados y fichas catastrales
que se han realizado en los ejes Independencia Ermitao - Unificada, por parte del equipo de intervencin
social con la finalidad de obtener un valor de densidad, adicionalmente se realiz un conteo de lotes por rea
de drenaje, aquella que en coordinacin con el equipo social se trabaj los lmites de habilitacin.

4.1.1 DENSIDAD
En la revisin del rea de estudio existen un total de 68 habilitaciones segn el Estudio de Pre-inversin
(PERFIL) y los Trminos de Referencia, dentro de las cuales se encuentra las habilitaciones con servicio y las
reas de ampliacin sin servicio de agua potable. En el presente informe se presenta las habilitaciones
correspondientes a los Ejes de Independencia-Ermitao-Unificada, con referencia a las fichas
catastrales actualizadas por el Equipo de Intervencin social y que son:

Cuadro 1: Resumen de habilitaciones en el rea de estudio (Eje de Independencia-Ermitao-


Unificada)
TOTAL LOTES (PLANOS
CODIGO HABILITACIONES
VISADOS)
1
A.H. Comit 41 -A 95
2
3 P.J. Pampa de Cueva - Comit 41 A Ampliacin 18
4 A.H. Independencia - Ampliacin comit 122-A 51
5 Segundo Sector Independencia -Comit 125 - II Sector - Ampliacin 33
6 A.H. Los Conquistadores 87
7 A.H. Ampliacin los conquistadores 9
8 Comit 120 Ampliacin 5
9 Ampliacin Comit 119 39
10 Comit 112 Ampliacin 36
11 Comit 93 B 45
12 Comit Vecinal Cerro Las Gardenias 29
13 Comit Cerros Los Incas Ampliacin 73
14 Ampliacin Comit 41 B 7
15 Comit Vecinal 30 de Agosto Ampliacin 12
16 Comit 122 - Ampliacin 37
17 Ampliacin Comit 123 32
18 A.H. Pampa de Cueva MZ 120,121 120A,124A 27
19 Comit Vecinal Nueva Unin 38
20 Comit 03 de Octubre Ampliacin A.H. Independencia o Pampa de cueva 55
21 Comit 122 Cahuide III Sector 16
22 Comit 111 - B 0
23 Ampliacin Comit 121 III Sector 6
Ampliacin Comit 94 B - III Sector
24 84
Comit 94 B Ampliacin
25 Ampliacin Comit 56 A 0
26 Comit Ramn Castilla Ampliacin 86
27 P.J. San Juan de Dios Comit 14 B 103
28 Comit 10 -Ampliacin 56
29 A.H. San Juan de Dios Ampliacin Comit 19 52
30 A.H. San Albino II Etapa Ampliacin 102
31 A.H. Santa Rosa de Lima 74
71
32 AH. 6 de Julio
41
34 Ampliacin San Juan de Dios Comit 1 55
35 P.J. 6 de Julio Comit 12 35
36 P.J. San Juan de Dios Comit 12 Ampliacin 42
37 Comit 17 Ampliacin San Juan de Dios 15
38 Ampliacin San Juan de Dios Comit 15 27

Pg. 9
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

TOTAL LOTES (PLANOS


CODIGO HABILITACIONES
VISADOS)
39 AA.H.H. Comit 18 -Ampliacin 70
40 A.H. San Camilo 374
41 A.H. El Milagro de la Fraternidad 665
42 A.H. Villa El ngel 264
43 P.J. El Volante Ampliacin 389
44 A.H. El Volante Comit (08,11,13) Ampliacin 88
45 A.H. Nueva Villa El Carmen II Ampliacin 88
46 P.J Villa El Carmen 234
47 Comit 30 de Agosto Ampliacin 59
48 Comit 123- Ampliacin 42
49 Comit 111 22
50 Comit 92 A 19
51 A.H. Independencia Sector: Comit Unificado Villa Canta 272
52 Comit 120 21
53 A.H. El Volante II 76
54 A.H. Santa Cruz 165
55 A.H. La Melchorita 126
56 Urb. Jos Glvez 442
57 Asociacin de Profesionales Choferes del Per 115
58 Distrito de Independencia- Eje Ermitao 2865
59 A.H. San Albino 442
60 P.J. San Juan de Dios 583
61 A.H. 3 de junio 42
62 A.H. Virgen del Carmen 29
63 A.H. 6 de julio 354
64 PJ. Jos Carlos Maritegui 28
65 A.H. Jos Carlos Maritegui 70
66 A.H. Comit Vecinal 19 A 10
67 Distrito de Independencia- Eje Independencia 3339
68 A.H. Marginal Cruz de Mayo 173
69 A.H. Volante III 30
Total 13089

A fin de determinar la densidad poblacional en el rea de drenaje del Proyecto, se han recogido datos
respecto a nmero de habitantes por lote durante la actividad de levantamiento catastral. De los lotes
encuestados se ha obtenido el promedio de nmero de personas por vivienda.

Se ha considerado las encuestas realizadas de acuerdo al cronograma del equipo de intervencin social en el
rea de Estudio. Asimismo se ha considerado datos de aspectos demogrficos presentados en el informe de
Intervencin social donde se obtiene el siguiente cuadro:
Cuadro 2: Censos Distrito de Independencia.
NUMERO DE LOTES DE
DENSIDAD
USO VIVIENDA POBLACIN
(Hab/Viv)
HABITADOS

12335 74010 6

4.1.2 CONTEO DE LOTES


Con la informacin actualizada de topografa y los planos visados realiz un conteo de lotes respetando las
sub rea de drenaje y los lmites de cada rea de drenaje, cabe mencionar que en el conteo de lotes se
considerado aquellos lotes adicionales fuera de los planos visado con la finalidad de asegurar una demanda
futura obteniendo el siguiente cuadro:

Pg. 10
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 3: Conteo de lotes en el rea de estudio.


REA DE SUB REA DE LOTES TOTAL DE Q desage
DRENAJE DRENAJE (*) LOTES (lps)
SUB AREA 01A 373 4.98
SUB AREA 01B 1026 13.70
SUB AREA 01C 757 10.11
AD-01 5310
SUB AREA 01D 1738 23.20
SUB AREA 01E 935 12.48
SUB AREA 01F 481 6.42
SUB AREA 02A 900 11.92
SUB AREA 02B 1151 15.24
AD-02 SUB AREA 02C 1563 7366 20.70
SUB AREA 02D 2270 30.07
SUB AREA 02E 1482 19.63
AD-03 - 967 967 12.81
TOTAL 13643 13643 181.26
(*) conteo considerando lotes adicionales fuera de los
planos visados y
asegurando demanda futura

4.2 POBLACION PROYECTADA

4.2.1 CENSOS

La poblacin de Independencia creci desde 115,788 habitantes en el ao 1972 hasta 207,647 habitantes en
el ao 2007 en el siguiente cuadro, se puede apreciar las poblaciones obtenidas en los censos poblacionales.

Para efectos del estudio poblacional se ha utilizado los datos correspondientes a las proyecciones censales
publicadas por el Instituto Nacional de Estadstica e Informtica (INEI) segn se muestra en el siguiente
cuadro 9:

Cuadro 4: Censos Distrito de Independencia.


Censo (ao) Poblacin (habitantes)

1,972 115,788
1,981 159,919
1,993 183,927
2,007 207,647
(Fuente: INEI)

4.2.2 PROYECCION DE LA POBLACION FUTURA

El anlisis de la proyeccin poblacional se basa en informacin oficial publicada por el INEI. A fin de poder
definir el mtodo de proyeccin, se ha efectuado una serie de clculos basados en los sistemas aritmtico,
geomtrico, parablicos la curva exponencial modificada e incrementos Variable. Utilizando los diferentes
mtodos de clculo poblacional.

Por lo tanto con el fin de calcular la poblacin futura, se ha recurrido al Mtodo Geomtrico. El crecimiento
geomtrico se describe a partir de la siguiente ecuacin:

Pg. 11
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Dnde:
Pi y Pf = Poblacin al inicio y al final del perodo.
T = Tiempo en aos, entre Ni y Nf.
r = Tasa de crecimiento observado en el perodo. Y puede medirse a partir de una tasa promedio anual de
crecimiento constante del perodo; y cuya aproximacin aritmtica sera la siguiente:

Dnde:
1/t = Tiempo intercensal invertido.
Utilizando los ltimos censos del INEI tenemos:

Ecuacin : Pf = Po ( 1 + r ) t

Combinaciones con dos censos :


1,972 1,981 === > r = 3.65%
1,972 1,993 === > r = 2.23%
1,972 2,007 === > r = 1.68%
1,981 1,993 === > r = 1.17%
1,981 2,007 === > r = 1.01%
1,993 2,007 === > r = 0.87%

Combinaciones con tres censos :


1,972 1,981 1,993 === > r1 = 1.91%
1,972 1,981 2,007 === > r2 = 1.41%
1,972 1,993 2,007 === > r3 = 1.53%
1,981 1,993 2,007 === > r4 = 1.00%
Combinacin con cuatro censos :
1,972 1,981 1,993 2,007 === > r5 = 1.39%

Tabla 4-1: Comportamiento Histrico de las ecuaciones.


Tasa de
Curva 1,972 1,981 1,993 2,007 Sumatoria Diferencia
Crecimiento
Censo 115,788 159,919 183,927 207,647 667,281 ---
1 1.91% 107,155 127,027 159,368 207,647 601,197 66,084
2 1.41% 127,411 144,462 170,797 207,647 650,317 16,964
3 1.53% 122,056 139,927 167,888 207,647 637,518 29,763
4 1.00% 146,654 160,373 180,681 207,647 695,355 28,074
5 1.39% 127,914 144,885 171,066 207,647 651,512 15,769

Aplicando los mtodos matemticos de proyeccin para el clculo de la Poblacin para el Distrito de
Independencia se obtuvo que la curva ms adecuada es la de proyeccin geomtrica y resulto una tasa de
1.39%.
Asimismo la mayora de la poblacin ha crecido bajo dos modalidades informales por invasiones o
reubicaciones sobre zonas eriazas. Este incremento poblacional tambin se encuentra relacionado con la gran
concentracin de actividades del pas en estos territorios, estando colindantes con distritos completamente

Pg. 12
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

urbanizados. Por esta misma razn en este sector se puede presentar crecimiento vertical, as como
densificacin de la poblacin.
La tasa de 1.39% ha sido determinada de los ltimos 4 censos del INEI, realizando interpolaciones para
determinar el valor estadstico ms adecuado. Siendo este valor ms adecuado estadsticamente que la
utilizacin de solamente los dos ltimos censos.
Asimismo si realizamos el anlisis con la tasa de 0.87% resultado de los dos ltimos censos del INEI 1993 y
2007 en la regresin lineal comprobamos que la diferencia con respecto a los 4 censos es mayor que
considerando el valor de 1.39%.

Tabla 4-2: Resumen de la Poblacin Futura en el rea de Estudio.


AO POBLACIN
2,014 Base 78,534
2,015 0 79,626
2,016 1 80,732
2,017 2 81,855
2,018 3 82,992
2,019 4 84,146
2,020 5 85,316
2,021 6 86,501
2,022 7 87,704
2,023 8 88,923
2,024 9 90,159
2,025 10 91,412
2,026 11 92,683
2,027 12 93,971
2,028 13 95,277
2,029 14 96,602
2,030 15 97,944
2,031 16 99,306
2,032 17 100,686
2,033 18 102,086
2,034 19 103,505
2,035 20 104,943

Tabla 4-3: Resumen de la Poblacin Futura en el rea de Estudio considerando lotes adicionales
que se encuentran fuera de los planos visados asegurando la demanda futura.
AO POBLACIN
2,014 Base 81,636
2,015 0 82,771
2,016 1 83,921
2,017 2 85,088
2,018 3 86,270
2,019 4 87,470
2,020 5 88,685
2,021 6 89,918
2,022 7 91,168
2,023 8 92,435
2,024 9 93,720
2,025 10 95,023
2,026 11 96,344
2,027 12 97,683
2,028 13 99,041
2,029 14 100,417
2,030 15 101,813
2,031 16 103,228
2,032 17 104,663
2,033 18 106,118
2,034 19 107,593
2,035 20 109,089

Pg. 13
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Tabla 4-4: Resumen de la Poblacin Futura en el rea de Drenaje 01 considerando lotes


adicionales que se encuentran fuera de los planos visados asegurando la demanda futura.
AO POBLACION
2,014 Base 31,860
2,015 0 32,303
2,016 1 32,752
2,017 2 33,207
2,018 3 33,669
2,019 4 34,137
2,020 5 34,611
2,021 6 35,092
2,022 7 35,580
2,023 8 36,075
2,024 9 36,576
2,025 10 37,084
2,026 11 37,600
2,027 12 38,123
2,028 13 38,652
2,029 14 39,190
2,030 15 39,734
2,031 16 40,287
2,032 17 40,847
2,033 18 41,415
2,034 19 41,990
2,035 20 42,574

Tabla 4-5: Resumen de la Poblacin Futura en el rea de Drenaje 02 considerando lotes


adicionales que se encuentran fuera de los planos visados asegurando la demanda futura.
AO POBLACION
2,014 Base 44,196
2,015 0 44,810
2,016 1 45,433
2,017 2 46,065
2,018 3 46,705
2,019 4 47,354
2,020 5 48,012
2,021 6 48,680
2,022 7 49,356
2,023 8 50,043
2,024 9 50,738
2,025 10 51,443
2,026 11 52,158
2,027 12 52,883
2,028 13 53,619
2,029 14 54,364
2,030 15 55,119
2,031 16 55,886
2,032 17 56,662
2,033 18 57,450
2,034 19 58,249
2,035 20 59,058

Tabla 4-6: Resumen de la Poblacin Futura en el rea de Drenaje 03 considerando lotes


adicionales que se encuentran fuera de los planos visados asegurando la demanda futura.
AO POBLACION
2,014 Base 5,802
2,015 0 5,883
2,016 1 5,964

Pg. 14
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

AO POBLACION
2,017 2 6,047
2,018 3 6,131
2,019 4 6,217
2,020 5 6,303
2,021 6 6,391
2,022 7 6,479
2,023 8 6,570
2,024 9 6,661
2,025 10 6,753
2,026 11 6,847
2,027 12 6,942
2,028 13 7,039
2,029 14 7,137
2,030 15 7,236
2,031 16 7,337
2,032 17 7,439
2,033 18 7,542
2,034 19 7,647
2,035 20 7,753

5 CALCULO DEL CUADRO DE DEMANDA.

Para el clculo del cuadro de demanda del presente informe, primero se realiz un anlisis de la informacin
entregada por Sedapal del Equipo de Micromedicin y Registros el da 05.03.2014 en la visita del Ing.
Especialista en Diseos de Sistemas de Alcantarillado, dicha informacin corresponde a una base de datos
sobre las conexiones existentes en los sectores 333 y 332 con registros actualizados hasta enero 2014 y
facturacin registrada desde Ene-2013 Hasta Ene-2014, informacin que el consorcio Independencia est
oficializando mediante carta N126-2014-CI/RL con cargo 14-03-14.
De lo mencionado se ha podido procesar y obtener lo siguiente:

5.1 CONSUMOS

Para La asignacin de los consumos se ha determinado en funcin al volumen facturado para cada tipo de
usuario por SEDAPAL, y por el nmero de conexiones activas; segn reportes proporcionados por la Entidad.
Como se muestra en los siguientes cuadros:

Cuadro 5: Tarifa por Suministro


TARIFA Descripcin
T01 Social
T02 Domestico
T03 Comercial
T04 Industrial
T05 Estatal
T06 Multifamiliar No Individualiza
T07 Multifamiliar Individualizado
(Fuente: rea de micromedicin Sedapal)

Cuadro 6: Estado del Suministro


ESTADO Descripcin
EC000 Sin Contrato
EC011 Pendiente de Conexin

Pg. 15
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

ESTADO Descripcin
EC012 Situacin Correcta
EC013 Cortado Por Impago
EC014 Alta Pendiente de Facturacin
EC020 Baja Con Retiro de Conexin
EC021 Baja Voluntaria
EC022 Baja Voluntaria Pendiente Facturacin
EC025 Baja Forzada
EC026 Baja Forzada Pendiente Facturacin
EC027 Baja de unidades de uso
EC028 Facturacin suspendida
(Fuente: rea de micromedicin Sedapal)

De la informacin entregada por SEDAPAL, se ha podido procesar y obtener los siguientes cuadros de
conexiones por tipo de usuario correspondiente al estado correcto y total de suministro (situacin
Correcta es conexin activa desde el punto de vista comercial):

Cuadro 7: Cuadro por tipo de conexin considerando el estado de suministro en situacin


correcta (EC012).
CNX POR TIPO AGUA POTABLE
TIPO DE MEDICIN
DE USUARIO No. De Conex. TOTAL Conex.
C/MEDIDOR 350
DOMSTICO 10795
S/MEDIDOR 10445
C/MEDIDOR 20
COMERCIAL 74
S/MEDIDOR 54
C/MEDIDOR 1
INDUSTRIAL 4
S/MEDIDOR 3
C/MEDIDOR 2
ESTATAL 2
S/MEDIDOR 0
C/MEDIDOR 3
SOCIAL 53
S/MEDIDOR 50
TOTAL 10928 10928
(Fuente: rea de micromedicin Sedapal)

Cuadro 8: cuadros de consumes por tipo de conexin (PERFIL).


DATOS DE CONSUMO POR CONEXIN (m3/mes/cnx)
DOMESTICO
CONSUMO UNITARIO C/MEDIDOR 17.840
CONSUMO UNITARIO S/MEDIDOR 19.310
COMERCIAL
CONSUMO UNITARIO C/MEDIDOR 35.30
CONSUMO UNITARIO S/MEDIDOR 38.21
INDUSTRIAL
CONSUMO UNITARIO C/MEDIDOR 10.13
CONSUMO UNITARIO S/MEDIDOR 10.96
ESTATAL
CONSUMO UNITARIO C/MEDIDOR 16.00
CONSUMO UNITARIO S/MEDIDOR 17.32
SOCIAL
CONSUMO UNITARIO C/MEDIDOR 16.00
CONSUMO UNITARIO S/MEDIDOR 17.32
(Fuente: Perfil consolidado mediante acta con fecha 17.03.14)
De los cuadros 7 y 8 cabe mencionar que el consumo en algunos tipo de usuarios han variado respecto al
perfil, como es el caso del tipo domestico con medidor, comercial con medidor, etc. Los Valores obtenidos del

Pg. 16
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

procesamiento de la base de datos entregada por Sedapal es por el bajo porcentaje de micromedicin en el
rea de estudio, a estos se suma que esos beneficiaros tienen una asignacin por consumo y finalmente una
cantidad de horas de abastecimiento menor a 24 horas, por ello los datos de los cuadros no son reales.

Hay que tener en cuenta que de los consumos reportados por Sedapal en la elaboracin del perfil se opt
para el consumo domstico el reportado por el sector Pampa de Independencia siendo este el valor promedio
del rea de estudio, el valor reportado en la Unificada fue descartado por ser muy bajo ya que en ese
momento el servicio era con racionamiento siendo en promedio de 3 a 12 horas, con el proyecto se
conseguir un servicio de 24 horas.

Adicionalmente en la reunin realizada el 18.04.14 en la oficina de PROSEAR (Sedapal) se defini, en


presencia de EGP-N, PROSEAR, EPFPI Y EOMASBA considerar los valores de consumos del perfil, siendo
estos los ms recomendables por ser lo ms desfavorables para los diseos.

5.2 PERDIDAS DE AGUA

Las prdidas se determina en base al volumen producido y volumen total facturado, estas prdidas incluyen
las fsicas como las fugas en las redes de distribucin, rebose en los reservorios y las no fsicas como los
desperdicios domiciliarios y otros.

Actualmente para los sectores 332 y 333 no se cuenta con un sistema de medicin de caudal en
funcionamiento al ingreso del sector por lo que se utilizara la informacin del perfil, pues esa informacin fue
indicada en el Anuario Estadstico de Sedapal del 2009 el cual indica que el porcentaje de Prdidas es de
38.08%.

En el clculo de la Demanda para el expediente, el % perdida de agua potable ser de la siguiente manera
20% de prdida desde el ao 1 (Ao 2016) en el cual se empieza a operar las obras ejecutadas en el
presente proyecto, hasta el final del horizonte de estudio.

5.3 COBERTURA DE AGUA POTABLE

De la informacin entrega por el equipo de Micromedicion y Registros se ha podido procesar el siguiente


cuadro de la cantidad de conexiones en el eje de Independencia, sumando un total de 3998.

De la informacin entregada por el equipo de intervencin social se puede obtener el total de lotes,
resultando en el eje de independencia un total de 4622 lotes, por lo tanto se cuenta con una cobertura de
85.53 %.

Con la ampliacin de redes de servicio de agua y alcantarillado y mejoramiento de las infraestructuras


comprendidas en el sistema existente, la cobertura de los servicios se ver incrementada en el primer ao de
operacin del sistema en un 100%.

Pg. 17
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

5.4 MICROMEDICION

Del cuadro N7 se puede observar un total de 376 conexiones con medidor y considerando un total de 10928
conexiones con el estado de suministro en situacin correcta (EC012) en el rea del proyecto (Eje
Independencia Ermitao - Unificada).

Por lo tanto, en el rea de estudio se cuenta con una micromedicin de 3.44%, con el estudio se espera
llegar a obtener una micromedicin del 100% en las conexiones existentes y proyectadas.

5.5 ESTIMACIN DE LA DEMANDA

5.5.1 DEMANDA DE ALCANTARILLADO

Para la proyeccin de la demanda de alcantarillado se realiz un conteo total de lotes en las reas de drenaje
con sus respectivas sub reas, obteniendo el siguiente cuadro de resumen:

Cuadro 9: Lotes por sub reas de drenaje.

REA DE SUB REA DE LOTES TOTAL DE Q desague


DRENAJE DRENAJE (*) LOTES (lps)
SUB AREA 01A 373 4.98
SUB AREA 01B 1026 13.70
SUB AREA 01C 757 10.11
AD-01 5310
SUB AREA 01D 1738 23.20
SUB AREA 01E 935 12.48
SUB AREA 01F 481 6.42
SUB AREA 02A 900 11.92
SUB AREA 02B 1151 15.24
AD-02 SUB AREA 02C 1563 7366 20.70
SUB AREA 02D 2270 30.07
SUB AREA 02E 1482 19.63
AD-03 - 967 967 12.81
TOTAL 13643 13643 181.26

Pg. 18
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

5.5.1.1 AREAS DE DRENAJE

AREA DE DRENAJE 01

Cuadro 10: Datos bsicos para la elaboracin del Cuadro de demanda AD-01
Sin Con
Parmetros
proyecto proyecto
Poblacin actual (habitantes) 31860 33207
Nmero de viviendas 5310 5535
Tasa crecimiento anual de poblacin 1.39 1.39
Densidad por lote (hab/lote) 6 6
Porcentaje de prdidas 38.08 0.2
Aporte de aguas residuales - 0.8

AREA DE DRENAJE 02

Cuadro 11: Datos bsicos para la elaboracin del Cuadro de demanda AD-02
Sin Con
Parmetros
proyecto proyecto
Poblacin actual (habitantes) 44196 46065
Nmero de viviendas 7366 7677
Tasa crecimiento anual de poblacin 1.39 1.39
Densidad por lote (hab/lote) 6 6
Porcentaje de prdidas 38.08 0.2
Aporte de aguas residuales - 0.8

AREA DE DRENAJE 03

Cuadro 12: Datos bsicos para la elaboracin del Cuadro de demanda AD-03
Sin Con
Parmetros
proyecto proyecto
Poblacin actual (habitantes) 5802 6047
Nmero de viviendas 967 1008
Tasa crecimiento anual de poblacin 1.39 1.39
Densidad por lote (hab/lote) 6 6
Porcentaje de prdidas 38.08 0.2
Aporte de aguas residuales - 0.8

Pg. 19
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 13: Cuadro de demanda de Alcantarillado rea Drenaje 01


COBERTURA (%) CONEXIONES CONSUMO DE AGUA (l/da) DEMANDA DESAGUE
VIVIENDAS Qmh
POBLACION CONSUMO Qp
AO POBLACION OTROS SERVIDA (hab) SERVIDAS CNX CNX CNX CNX CNX TOTAL CONSUMO CONSUMO CONSUMO CONSUMO CONSUMO Qp desague Qp desague desague
CONEX. (unidades) TOTAL desague (lt/seg)
MEDIOS (*) DOME COMER IND ESTAT SOCIAL CNX DOMESTICO COMERCIAL INDUSTRIAL ESTATAL SOCIAL (lt/dia) (m3/ao)
CONECTADO (lt/seg)

2,014 Base 31,860 74.60% 25.40% 23,766 3,961 3,961 20 4 0 13 3,998 2,544,909 25,376 1,434 0 7,417 2,579,135 23.88 2,063,308 753,107 42.99
2,015 0 32,303 74.60% 25.40% 24,096 4,016 3,978 20 4 0 13 4,016 2,544,909 25,279 1,462 0 7,461 2,579,110 23.88 2,063,288 753,100 42.99

2,016 1 32,752 85.74% 14.26% 28,081 4,680 4,680 21 4 0 13 4,718 2,544,909 26,552 1,462 0 7,461 2,580,383 23.89 2,064,307 753,472 43.01
2,017 2 33,207 100.00% 0.00% 33,207 5,535 5,535 21 4 0 14 5,574 3,291,480 24,710 1,351 0 7,467 3,325,007 30.79 2,660,006 970,902 55.42
2,018 3 33,669 100.00% 0.00% 33,669 5,612 5,612 21 4 0 14 5,651 3,337,269 24,710 1,351 0 7,467 3,370,797 31.21 2,696,637 984,273 56.18
2,019 4 34,137 100.00% 0.00% 34,137 5,690 5,690 21 4 0 14 5,729 3,383,653 24,710 1,351 0 7,467 3,417,181 31.64 2,733,745 997,817 56.95
2,020 5 34,611 100.00% 0.00% 34,611 5,769 5,769 21 4 0 14 5,808 3,430,632 24,710 1,351 0 7,467 3,464,159 32.08 2,771,327 1,011,535 57.74
2,021 6 35,092 100.00% 0.00% 35,092 5,849 5,849 21 4 0 14 5,888 3,478,205 24,710 1,351 0 7,467 3,511,733 32.52 2,809,386 1,025,426 58.53
2,022 7 35,580 100.00% 0.00% 35,580 5,930 5,930 21 4 0 14 5,969 3,526,373 24,710 1,351 0 7,467 3,559,901 32.96 2,847,921 1,039,491 59.33
2,023 8 36,075 100.00% 0.00% 36,075 6,013 6,013 21 4 0 14 6,052 3,575,731 24,710 1,351 0 7,467 3,609,258 33.42 2,887,406 1,053,903 60.15
2,024 9 36,576 100.00% 0.00% 36,576 6,096 6,096 21 4 0 14 6,135 3,625,088 24,710 1,351 0 7,467 3,658,615 33.88 2,926,892 1,068,316 60.98

2,025 10 37,084 100.00% 0.00% 37,084 6,181 6,181 21 4 0 14 6,220 3,675,635 24,710 1,351 0 7,467 3,709,162 34.34 2,967,330 1,083,075 61.82
2,026 11 37,600 100.00% 0.00% 37,600 6,267 6,267 21 4 0 14 6,306 3,726,776 24,710 1,351 0 7,467 3,760,303 34.82 3,008,243 1,098,009 62.67
2,027 12 38,123 100.00% 0.00% 38,123 6,354 6,354 21 4 0 14 6,393 3,778,512 24,710 1,351 0 7,467 3,812,039 35.30 3,049,631 1,113,115 63.53
2,028 13 38,652 100.00% 0.00% 38,652 6,442 6,442 21 4 0 14 6,481 3,830,843 24,710 1,351 0 7,467 3,864,370 35.78 3,091,496 1,128,396 64.41

2,029 14 39,190 100.00% 0.00% 39,190 6,532 6,532 21 4 0 14 6,571 3,884,363 24,710 1,351 0 7,467 3,917,890 36.28 3,134,312 1,144,024 65.30
2,030 15 39,734 100.00% 0.00% 39,734 6,622 6,622 21 4 0 14 6,661 3,937,883 24,710 1,351 0 7,467 3,971,410 36.77 3,177,128 1,159,652 66.19
2,031 16 40,287 100.00% 0.00% 40,287 6,715 6,715 21 4 0 14 6,754 3,993,187 24,710 1,351 0 7,467 4,026,714 37.28 3,221,371 1,175,800 67.11
2,032 17 40,847 100.00% 0.00% 40,847 6,808 6,808 21 4 0 14 6,847 4,048,491 24,710 1,351 0 7,467 4,082,018 37.80 3,265,614 1,191,949 68.03
2,033 18 41,415 100.00% 0.00% 41,415 6,903 6,903 21 4 0 14 6,942 4,104,984 24,710 1,351 0 7,467 4,138,511 38.32 3,310,809 1,208,445 68.98

2,034 19 41,990 100.00% 0.00% 41,990 6,998 6,998 21 4 0 14 7,037 4,161,477 24,710 1,351 0 7,467 4,195,005 38.84 3,356,004 1,224,941 69.92
2,035 20 42,574 100.00% 0.00% 42,574 7,096 7,096 21 4 0 14 7,135 4,219,755 24,710 1,351 0 7,467 4,253,282 39.38 3,402,626 1,241,958 70.89

Pg. 20
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 14: Cuadro de demanda de Alcantarillado rea Drenaje 02


COBERTURA (%) CONEXIONES CONSUMO DE AGUA (l/da) DEMANDA DESAGUE
VIVIENDAS
POBLACION CONSUMO Qmh desague
AO POBLACION OTROS SERVIDA (hab) SERVIDAS CNX CNX CNX CNX CNX TOTAL CONSUMO CONSUMO CONSUMO CONSUMO CONSUMO Qp desague Qp desague Qp desague
CONEX. TOTAL (lt/seg)
MEDIOS (*) (unidades) DOME COMER IND ESTAT SOCIAL CNX DOMESTICO COMERCIAL INDUSTRIAL ESTATAL SOCIAL (lt/seg) (lt/dia) (m3/ao)
CONECTADO

2,014 Base 44,196 85.26% 14.74% 37,680 6,280 6,280 0 0 0 0 6,280 4,032,427 0 0 0 0 4,032,427 37.34 3,225,941 1,177,469 67.21
2,015 0 44,810 85.26% 14.74% 38,204 6,367 6,367 0 0 0 0 6,367 4,032,427 0 0 0 0 4,032,427 37.34 3,225,941 1,177,469 67.21
2,016 1 45,433 100.00% 0.00% 45,433 7,572 7,572 0 0 0 0 7,572 3,734,507 0 0 0 0 3,734,507 34.58 2,987,605 1,090,476 62.24
2,017 2 46,065 100.00% 0.00% 46,065 7,678 7,678 0 0 0 0 7,678 4,565,851 0 0 0 0 4,565,851 42.28 3,652,681 1,333,228 76.10
2,018 3 46,705 100.00% 0.00% 46,705 7,784 7,784 0 0 0 0 7,784 4,628,885 0 0 0 0 4,628,885 42.86 3,703,108 1,351,635 77.15
2,019 4 47,354 100.00% 0.00% 47,354 7,892 7,892 0 0 0 0 7,892 4,693,109 0 0 0 0 4,693,109 43.45 3,754,487 1,370,388 78.22
2,020 5 48,012 100.00% 0.00% 48,012 8,002 8,002 0 0 0 0 8,002 4,758,523 0 0 0 0 4,758,523 44.06 3,806,818 1,389,489 79.31
2,021 6 48,680 100.00% 0.00% 48,680 8,113 8,113 0 0 0 0 8,113 4,824,531 0 0 0 0 4,824,531 44.67 3,859,625 1,408,763 80.41
2,022 7 49,356 100.00% 0.00% 49,356 8,226 8,226 0 0 0 0 8,226 4,891,728 0 0 0 0 4,891,728 45.29 3,913,382 1,428,385 81.53
2,023 8 50,043 100.00% 0.00% 50,043 8,341 8,341 0 0 0 0 8,341 4,960,115 0 0 0 0 4,960,115 45.93 3,968,092 1,448,353 82.67
2,024 9 50,738 100.00% 0.00% 50,738 8,456 8,456 0 0 0 0 8,456 5,028,501 0 0 0 0 5,028,501 46.56 4,022,801 1,468,322 83.81

2,025 10 51,443 100.00% 0.00% 51,443 8,574 8,574 0 0 0 0 8,574 5,098,672 0 0 0 0 5,098,672 47.21 4,078,938 1,488,812 84.98
2,026 11 52,158 100.00% 0.00% 52,158 8,693 8,693 0 0 0 0 8,693 5,169,437 0 0 0 0 5,169,437 47.87 4,135,550 1,509,476 86.16
2,027 12 52,883 100.00% 0.00% 52,883 8,814 8,814 0 0 0 0 8,814 5,241,392 0 0 0 0 5,241,392 48.53 4,193,114 1,530,486 87.36
2,028 13 53,619 100.00% 0.00% 53,619 8,937 8,937 0 0 0 0 8,937 5,314,536 0 0 0 0 5,314,536 49.21 4,251,629 1,551,845 88.58
2,029 14 54,364 100.00% 0.00% 54,364 9,061 9,061 0 0 0 0 9,061 5,388,275 0 0 0 0 5,388,275 49.89 4,310,620 1,573,376 89.80
2,030 15 55,119 100.00% 0.00% 55,119 9,187 9,187 0 0 0 0 9,187 5,463,203 0 0 0 0 5,463,203 50.59 4,370,562 1,595,255 91.05
2,031 16 55,886 100.00% 0.00% 55,886 9,314 9,314 0 0 0 0 9,314 5,538,725 0 0 0 0 5,538,725 51.28 4,430,980 1,617,308 92.31
2,032 17 56,662 100.00% 0.00% 56,662 9,444 9,444 0 0 0 0 9,444 5,616,032 0 0 0 0 5,616,032 52.00 4,492,826 1,639,881 93.60
2,033 18 57,450 100.00% 0.00% 57,450 9,575 9,575 0 0 0 0 9,575 5,693,933 0 0 0 0 5,693,933 52.72 4,555,147 1,662,629 94.90
2,034 19 58,249 100.00% 0.00% 58,249 9,708 9,708 0 0 0 0 9,708 5,773,024 0 0 0 0 5,773,024 53.45 4,618,419 1,685,723 96.22
2,035 20 59,058 100.00% 0.00% 59,058 9,843 9,843 0 0 0 0 9,843 5,853,304 0 0 0 0 5,853,304 54.20 4,682,643 1,709,165 97.56

Pg. 21
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 15: Cuadro de demanda de Alcantarillado rea Drenaje 03


COBERTURA (%) CONEXIONES CONSUMO DE AGUA (l/da) DEMANDA DESAGUE
VIVIENDAS Qmh
POBLACION CONSUMO Qp
AO POBLACION OTROS SERVIDA (hab) SERVIDAS CNX CNX CNX CNX CNX TOTAL CONSUMO CONSUMO CONSUMO CONSUMO CONSUMO Qp desague Qp desague desague
CONEX. (unidades) TOTAL desague (lt/seg)
MEDIOS (*) DOME COMER IND ESTAT SOCIAL CNX DOMESTICO COMERCIAL INDUSTRIAL ESTATAL SOCIAL (lt/dia) (m3/ao)
CONECTADO (lt/seg)

2,014 Base 5,802 87.38% 12.62% 5,070 845 845 0 0 0 0 845 540,958 0 0 0 0 540,958 5.01 432,767 157,960 9.02
2,015 0 5,883 87.38% 12.62% 5,140 857 857 0 0 0 0 857 540,958 0 0 0 0 540,958 5.01 432,767 157,960 9.02

2,016 1 5,964 100.00% 0.00% 5,964 994 994 0 0 0 0 994 591,099 0 0 0 0 591,099 5.47 472,879 172,601 9.85
2,017 2 6,047 100.00% 0.00% 6,047 1,008 1,008 0 0 0 0 1,008 599,424 0 0 0 0 599,424 5.55 479,539 175,032 9.99
2,018 3 6,131 100.00% 0.00% 6,131 1,022 1,022 0 0 0 0 1,022 607,749 0 0 0 0 607,749 5.63 486,199 177,463 10.13
2,019 4 6,217 100.00% 0.00% 6,217 1,036 1,036 0 0 0 0 1,036 616,075 0 0 0 0 616,075 5.70 492,860 179,894 10.27
2,020 5 6,303 100.00% 0.00% 6,303 1,051 1,051 0 0 0 0 1,051 624,995 0 0 0 0 624,995 5.79 499,996 182,498 10.42
2,021 6 6,391 100.00% 0.00% 6,391 1,065 1,065 0 0 0 0 1,065 633,320 0 0 0 0 633,320 5.86 506,656 184,929 10.56
2,022 7 6,479 100.00% 0.00% 6,479 1,080 1,080 0 0 0 0 1,080 642,240 0 0 0 0 642,240 5.95 513,792 187,534 10.70
2,023 8 6,570 100.00% 0.00% 6,570 1,095 1,095 0 0 0 0 1,095 651,160 0 0 0 0 651,160 6.03 520,928 190,139 10.85
2,024 9 6,661 100.00% 0.00% 6,661 1,110 1,110 0 0 0 0 1,110 660,080 0 0 0 0 660,080 6.11 528,064 192,743 11.00

2,025 10 6,753 100.00% 0.00% 6,753 1,126 1,126 0 0 0 0 1,126 669,595 0 0 0 0 669,595 6.20 535,676 195,522 11.16
2,026 11 6,847 100.00% 0.00% 6,847 1,141 1,141 0 0 0 0 1,141 678,515 0 0 0 0 678,515 6.28 542,812 198,126 11.31
2,027 12 6,942 100.00% 0.00% 6,942 1,157 1,157 0 0 0 0 1,157 688,029 0 0 0 0 688,029 6.37 550,423 200,905 11.47
2,028 13 7,039 100.00% 0.00% 7,039 1,173 1,173 0 0 0 0 1,173 697,544 0 0 0 0 697,544 6.46 558,035 203,683 11.63

2,029 14 7,137 100.00% 0.00% 7,137 1,190 1,190 0 0 0 0 1,190 707,653 0 0 0 0 707,653 6.55 566,123 206,635 11.79
2,030 15 7,236 100.00% 0.00% 7,236 1,206 1,206 0 0 0 0 1,206 717,168 0 0 0 0 717,168 6.64 573,734 209,413 11.95
2,031 16 7,337 100.00% 0.00% 7,337 1,223 1,223 0 0 0 0 1,223 727,277 0 0 0 0 727,277 6.73 581,822 212,365 12.12
2,032 17 7,439 100.00% 0.00% 7,439 1,240 1,240 0 0 0 0 1,240 737,387 0 0 0 0 737,387 6.83 589,909 215,317 12.29
2,033 18 7,542 100.00% 0.00% 7,542 1,257 1,257 0 0 0 0 1,257 747,496 0 0 0 0 747,496 6.92 597,997 218,269 12.46

2,034 19 7,647 100.00% 0.00% 7,647 1,275 1,275 0 0 0 0 1,275 758,200 0 0 0 0 758,200 7.02 606,560 221,394 12.64
2,035 20 7,753 100.00% 0.00% 7,753 1,292 1,292 0 0 0 0 1,292 768,309 0 0 0 0 768,309 7.11 614,647 224,346 12.81

Pg. 22
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

6 DATOS BSICOS Y CRITERIOS DE DISEO.

6.1 CRITERIOS Y PARAMETROS DE DISEO DE LA INFRAESTRUCTURA


SANITARIA DE ALCANTARILLADO

El sistema de alcantarillado sanitario ser un sistema a gravedad y se emplear cuando la topografa y las
caractersticas del terreno presentan condiciones adecuadas para su evacuacin, permitiendo la instalacin
de una lnea de tuberas al centro de la va y conexiones domiciliarias en cada frente de lote con descarga
por gravedad al colector. Este diseo se enmarca dentro del Reglamento de Elaboracin de Proyectos de
Agua Potable y Alcantarillado para habilitaciones Urbanas de Lima metropolitana y El Callao.

6.1.1 COEFICIENTE DE RETORNO


Se considerar que el ochenta por ciento (80%) del caudal de agua potable consumido ingresa al sistema de
alcantarillado. El porcentaje sealado se aplicar al caudal mximo horario de agua potable.

6.1.2 CAUDALES DE DISEO


Las tuberas debern ser diseadas para la conduccin de los caudales mximos de desages, segn lo
sealado en el Reglamento de Elaboracin de proyectos de SEDAPAL (ver tem 9.2.3), con una altura
mxima de la lmina de flujo del 75% del dimetro de la tubera, admitiendo un rgimen de flujo uniforme y
permanente.

6.1.3 DIAMETRO MINIMO DE LAS REDES SECUNDARIAS


El dimetro mnimo de las redes secundarias ser de DN 200 mm. Para casos de excepcin y slo en
habilitaciones de uso de vivienda, previo sustento tcnico y la autorizacin de SEDAPAL, podr utilizarse
colectores de DN 160 mm.

6.1.4 VELOCIDAD MINIMA


La velocidad mnima de escurrimiento en las redes de alcantarillado a considerar ser la necesaria para
garantizar una fuerza de arrastre, de tal manera que se garantice la auto limpieza de la tubera, en promedio
esta velocidad mnima ser de 0.60m/s.

6.1.5 PENDIENTE MNIMA DE COLECTORES


Las pendientes mnimas a considerar estarn en funcin de la velocidad mnima de escurrimiento o de la
Fuerza Tractiva mnima requerida para la auto limpieza de la tubera.
Estas pendientes pueden variar en funcin al caudal que discurre por la tubera, pues en los ltimos tramos
la pendiente a considerar ser la mnima posible evitando profundizar innecesariamente garantizando la
capacidad de auto limpieza de la tubera.

6.1.6 CAMARAS DE INSPECCION O BUZONES


Las cmaras de inspeccin podrn ser:
Buzonetas, que se utilizarn slo en vas peatonales o con poco espacio disponible para la
instalacin de tuberas, cuando la profundidad sea tal, que no permita recubrimiento
mnimo de 1,00 m sobre la clave del tubo. Se proyectarn slo para colectores de DN 200
mm y en casos excepcionales para colectores de DN 160 mm.

Pg. 23
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Buzn Tipo I, II y III, dependiendo del dimetro del colector y la profundidad de


enterramiento mnima de un 1,00 m sobre la clave del tubo.
Cmaras especiales de desage, cuando la magnitud de las tuberas y/o cambios de
direccin, no permitan proyectar buzones.
Cmaras prefabricadas con dimetro interior no menor a 1.00m, para permitir las labores
de mantenimiento respectivas

6.1.7 UBICACIN DE CAMARAS DE INSPECCION O BUZONES


Se proyectar cmaras de inspeccin en:
El inicio de los tramos de arranque
Empalmes entre colectores
Cambios de direccin
Cambios de pendientes
Cambios de dimetro
Cambios de material
Lugares donde sea necesario por razones de inspeccin y limpieza.

6.1.8 TAMAO DE LAS CAMARAS DE INSPECCION


Los buzones podrn ser prefabricados de concreto o de concreto vaciado en sitio. De acuerdo al dimetro de
la tubera, sobre la que se coloca el buzn, estos se clasifican en tres tipos:

Cuadro 16: Dimetro interior de cmaras de inspeccin de alcantarillado.

6.1.9 SEPARACION MAXIMA ENTRE BUZONES


La separacin mxima entre cmaras de inspeccin ser para tuberas de:
DN 160 mm 60 m
DN 200 mm 80 m
DN 250 mm a DN 300 mm 100 m
Dimetros mayores 150 m

6.1.10 UBICACIN DE COLECTORES


Los colectores se proyectarn a una profundidad tal, que asegure satisfacer a la ms desfavorable de las
siguientes condiciones:
La profundidad requerida para prever el drenaje de las reas futuras.
La profundidad necesaria para no interferir con otros servicios pblicos existentes y/o
proyectados, ubicados principalmente en las calles transversales a la lnea del colector.
Asimismo, sus cotas de tapa debern disearse y ejecutarse en funcin a la rasante
definitiva de las pistas y veredas aprobadas por la Entidad competente (Municipios de la
jurisdiccin.

Pg. 24
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Un recubrimiento mnimo de 1,00 m sobre la clave del colector en relacin con el nivel de
la calzada; salvo en vas peatonales donde el recubrimiento podr ser menor hasta un
mnimo de 0.30 m.
Asegurar el drenaje de todos los lotes que den frente a la calle en la que estar ubicado el
colector, considerando la descarga por gravedad de la conexin domiciliaria entre la caja
de registro y el colector, con una pendiente mnima de quince por mil (15 %o).
El proyectista deber detallar en los planos y en la Memoria Descriptiva los aspectos
constructivos sobre terreno inestable, que no estn contemplados en las especificaciones
tcnicas de la Empresa.

6.1.11 COEFICIENTE DE MANNING


Segn el Reglamento de proyectos de SEDAPAL y El Reglamento Nacional de Edificaciones, el coeficiente de
Manning n para las tuberas de PVC y Polietileno de alta densidad, el valor de diseo debe ser igual a 0.009
y sin importar el tiempo en operacin o periodo de diseo.
Material n n
Del fabricante SEDAPAL

PVC 0.009 0.009

6.1.12 CRITERIO DE FUERZA TRACTIVA


La Fuerza tractiva o Fuerza de arrastre (t) es el esfuerzo tangencial unitario ejercido por el lquido sobre el
colector y consecuentemente, sobre el material depositado. El criterio de la Fuerza tractiva para fines de
clculo de colectores busca establecer una pendiente para el tramo que es capaz de provocar una Fuerza
suficiente como para arrastrar el material que se deposita en el fondo. El valor mnimo que se recomienda
para la Fuerza tractiva es de 1 Pa. Para los tramos de arranque, se deber verificar una Fuerza Tractiva
mnima de 0.60 Pa.
La Fuerza tractiva es igual a la fuerza de arrastre, dividida por el rea sobre la cual acta. La fuerza de
arrastre es el componente tangencial del peso del lquido que se desplaza en un plano inclinado.
Estos valores de tensin tractiva y coeficiente de Mannnig ser usada para las tuberas de PVC, las cuales se
pueden apreciar en las simulaciones del Sewercad.

t = RH S (1)

Dnde:
= Peso especfico del lquido.
RH = Radio Hidrulico.
S = Pendiente

Frmula de Manning
Tiene la siguiente expresin: (2)

Dnde: V = Velocidad de flujo (m/s)


n = Coeficiente de rugosidad de Manning (adimensional)
R = Radio hidrulico (m)
S = Pendiente (m/m)

Pg. 25
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Para tuberas con seccin llena:

(3)
(4)
Dnde: Q = Caudal de agua residual (m3/s)

A = rea de la seccin circular (m2)

(5)
Para tuberas con seccin parcialmente llena:

El Angulo central (en grado sexagesimal)

(6)

Radio Hidrulico

(7)

Velocidad

(8)
(8)

Caudal

(9)

6.1.13 TIRANTE NORMAL MAXIMO

Para el clculo de los colectores debemos considerar que el tirante normal del flujo en el colector no debe ser
mayor que el 75% del dimetro interno del colector.
Relacin Y/D mximo = 75%

Pg. 26
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

7 DISEO PRELIMINAR DE COLECTORES

7.1 METODOLOGIA EMPLEADA

El mtodo que se ha seguido para el dimensionamiento de la red de alcantarillado es la siguiente:

Tomando en cuenta el rea de drenaje de que se trate, los buzones asignados a cada rea de
drenaje.
Los datos de cotas de los buzones existentes segn la informacin de las diferentes reas de
Sedapal o tambin la informacin del perfil.
Para cada cmara de inspeccin (nudo) de la red de alcantarillado se han definido los respectivos
aportes a partir de la cantidad de lotes que descarga hacia la cmara de inspeccin ms cercana.

Los clculos hidrulicos se efectuarn con el programa SEWERCAD para AutoCAD


Los datos de ingreso son principalmente las cotas de nudos, los aportes por nudo, el coeficiente de Manning
y las dimensiones (dimetro interior), tipo y material de las tuberas (PVC).

7.2 CALCULO DE COLECTORES PRINCIPALES

7.2.1 CLCULOS HIDRULICOS COLECTOR TPAC AMARU

El colector se ubica en el sector 333 e inicia en el cruce de los pasajes Sta. Rosa y el Psje. Las Flores; la
descarga del colector es hacia el Colector Ingeniera (Antiguo) en el cruce de la Av. Tpac Amaru con la calle
Hnos. Angulo el Colector Tpac Amaru tiene las siguientes caractersticas: DN 200 mm, material Concreto
Simple Normalizado y una longitud de 426.4 m que recolecta las aguas residuales del rea de drenaje AD-
01A, donde se proyectar redes secundarias de alcantarillado.
Se proyecta realizar el mejoramiento del Colector Tpac Amaru el cual tendr las siguientes caractersticas:
DN200mm, material PVC y una longitud de 432.33m, en este colector se plantea colocar buzonetas
proyectadas en los tramos desde el Bz-1 hasta el Bz-14, y el mejoramiento de buzones en los tramos desde
el Bz-15 al Bz-23 para finalmente realizar la descarga en el Colector Ingeniera Antiguo y la proyeccin del
Bz-17.

Cuadro 17: Caudal de Descarga para cada buzn del Colector Tpac Amaru, Ao 20
Buzn Q(lps)
Bz-1 (*) 16.68
Bz-2 0
Bz-3 0
Bz-4 0.01
Bz-5 0.03
Bz-6 0.01
Bz-7 0
Bz-8 0.03
Bz-9 0.01
Bz-10 0.03
Bz-11 0.03
Bz-12 0.29
Bz-13 0.01
Bz-14 0.01
Bz-15 0.04
Bz-16 0.75
Bz-17 0.14
Bz-18 0.07
Bz-19 1.52

Pg. 27
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Buzn Q(lps)
Bz-20 0.56
Bz-21 0.34
Bz-22 0.32
Bz-23 0.78
Total 21.66

(*) Se est considerando el aporte del caudal del rebose del reservorio RAE-04 en el buzn Bz-1

Cuadro 18: Reporte de Buzones del colector Tpac Amaru.


Hydraulic Hydraulic
Elevation Elevation Elevation Flow
Grade Grade
Label (Ground) (Invert) (Invert (Total
Line (In) Line (Out)
(m) (m) in 1) (m) Out) (L/s)
(m) (m)
Bz-1 149.82 148.82 (N/A) 16.68 148.93 148.93
Bz-2 140.66 139.66 139.76 16.68 139.77 139.77
Bz-3 134.27 133.27 133.37 16.68 133.38 133.38
Bz-4 123.32 122.32 122.42 16.69 122.43 122.43
Bz-5 122.32 121.32 121.37 16.72 121.43 121.43
Bz-6 119.68 118.68 118.73 16.73 118.79 118.79
Bz-7 116.5 115.5 115.6 16.73 115.61 115.61
Bz-8 112.34 111.34 111.44 16.76 111.45 111.45
Bz-9 109.91 108.91 109.01 16.77 109.02 109.02
Bz-10 103.65 102.65 102.75 16.8 102.76 102.76
Bz-11 101.58 100.58 100.63 16.83 100.69 100.69
Bz-12 101.24 100.24 100.34 17.12 100.35 100.35
Bz-13 95.46 94.46 94.56 17.13 94.57 94.57
Bz-14 89.25 88.25 88.35 17.14 88.36 88.36
Bz-15 82.95 81.95 82.05 17.18 82.06 82.06
Bz-16 82.58 81.03 81.13 17.93 81.15 81.15
Bz-17 79.17 77.37 77.47 18.07 77.49 77.49
Bz-18 77.07 75.07 75.17 18.14 75.19 75.19
Bz-19 76.04 73.61 73.71 19.66 73.73 73.73
Bz-20 73.23 71.13 71.23 20.22 71.25 71.25
Bz-21 70.03 68.01 68.11 20.56 68.13 68.13
Bz-22 69.2 67.36 67.46 20.88 67.49 67.49
Bz-23 68.45 65.81 65.91 21.66 65.94 65.94

Pg. 28
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 19: Reporte de Tuberas del colector Tpac Amaru, Caudal Mximo Ao 20.
Capacity Tractive Depth
Invert Invert Length Velocity
Start Stop Manning's Diameter Flow Length Slope (Full Stress (Average
Label (Start) (Stop) (Scaled) Material (Average)
Node Node n (mm) (L/s) (m) (m/km) Flow) (Calculated) End) /
(m) (m) (m) (m/s)
(L/s) (Pascals) Rise (%)
P-1 Bz-4 122.32 Bz-5 121.37 2.3 PVC 0.009 192.2 16.69 2.1 445.257 284.31 5.36 84.736 39
P-2 Bz-3 133.27 Bz-4 122.42 15.9 PVC 0.009 192.2 16.68 15.8 684.56 352.52 6.23 118.328 36.5
P-3 Bz-5 121.32 Bz-6 118.73 2.7 PVC 0.009 192.2 16.72 2.7 944.153 414 6.97 152.143 36.7
P-4 Bz-8 111.34 Bz-9 109.01 4.2 PVC 0.009 192.2 16.76 4.3 546.025 314.84 5.76 99.483 37.4
P-5 Bz-7 115.5 Bz-8 111.44 5.8 PVC 0.009 192.2 16.73 5.8 701.064 356.75 6.29 120.698 36.5
P-6 Bz-15 81.95 Bz-16 81.13 4.4 PVC 0.009 192.2 17.18 4.6 179.353 180.44 3.92 42.266 40.9
P-7 Bz-14 88.25 Bz-15 82.05 10.1 PVC 0.009 192.2 17.14 10.1 616.4 334.51 6.05 110.407 37.2
P-8 Bz-6 118.68 Bz-7 115.6 6 PVC 0.009 192.2 16.73 6.1 505.249 302.86 5.6 93.585 37.1
P-9 Bz-10 102.65 Bz-11 100.63 6 PVC 0.009 192.2 16.8 6.1 331.365 245.27 4.84 67.515 38.2
P-10 Bz-9 108.91 Bz-10 102.75 10.8 PVC 0.009 192.2 16.77 10.7 577.428 323.77 5.88 103.928 36.9
P-11 Bz-2 139.66 Bz-3 133.37 8.5 PVC 0.009 192.2 16.68 8.5 737.017 365.78 6.38 125.453 36.4
P-12 Bz-1 148.82 Bz-2 139.76 13.4 PVC 0.009 192.2 16.68 13.4 675.555 350.2 6.2 117.117 36.5
P-13 Bz-13 94.46 Bz-14 88.35 13.2 PVC 0.009 192.2 17.13 13.1 466.184 290.91 5.48 88.839 37.7
P-14 Bz-12 100.24 Bz-13 94.56 10.6 PVC 0.009 192.2 17.12 10.7 532.433 310.9 5.75 98.482 37.5
P-15 Bz-11 100.58 Bz-12 100.34 13.2 PVC 0.009 192.2 16.83 13.1 18.312 57.66 1.73 6.965 47.8
P-16 Bz-23 65.81 EMP-1 64.94 14.7 PVC 0.009 192.2 21.66 14.6 59.465 103.9 2.83 19.668 48.8
P-17 Bz-22 67.36 Bz-23 65.91 47.7 PVC 0.009 192.2 20.88 47.9 30.301 74.17 2.19 11.369 50.9
P-18 Bz-18 75.07 Bz-19 73.71 14.8 PVC 0.009 192.2 18.14 14.6 92.957 129.9 3.15 25.888 43
P-19 Bz-17 77.37 Bz-18 75.17 24.6 PVC 0.009 192.2 18.07 24.7 89.109 127.19 2.8 19.97 44.1
P-20 Bz-16 81.03 Bz-17 77.47 55.7 PVC 0.009 192.2 17.93 55.8 63.824 107.64 2.92 21.847 43.4
P-21 Bz-21 68.01 Bz-22 67.46 49.8 PVC 0.009 192.2 20.56 49.7 11.07 44.83 1.51 5.044 56.2
P-22 Bz-19 73.61 Bz-20 71.23 48.6 PVC 0.009 192.2 19.66 48.5 49.109 94.42 2.57 16.234 47.2
P-23 Bz-20 71.13 Bz-21 68.11 49.3 PVC 0.009 192.2 20.22 49.4 61.161 105.37 2.8 19.532 47

Pg. 29
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 20: Reporte de Tuberas del colector Tpac Amaru, Caudal Mximo Ao 20 (tubera estructural)
Section Capacity Tractive Depth
Invert Invert Length Velocity
Start Stop Manning's Size Diameter Flow Length Slope (Full Stress (Average
Label (Start) (Stop) (Scaled) Material (Average)
Node Node n (Catalog (mm) (L/s) (m) (m/km) Flow) (Calculated) End) /
(m) (m) (m) (m/s)
Conduit) (L/s) (Pascals) Rise (%)
P-1 Bz-4 122.32 Bz-5 121.37 2.3 PVC 0.009 200mm 185.2 16.69 2.1 445.257 257.53 5.38 85.284 41
P-2 Bz-3 133.27 Bz-4 122.42 15.9 PVC 0.009 200mm 185.2 16.68 15.8 684.56 319.32 6.26 119.171 38.3
P-3 Bz-5 121.32 Bz-6 118.73 2.7 PVC 0.009 200mm 185.2 16.72 2.7 944.153 375.01 6.98 153.523 38.5
P-4 Bz-8 111.34 Bz-9 109.01 4.2 PVC 0.009 200mm 185.2 16.76 4.3 546.025 285.18 5.79 100.178 39.3
P-5 Bz-7 115.5 Bz-8 111.44 5.8 PVC 0.009 200mm 185.2 16.73 5.8 701.064 323.14 6.32 121.559 38.3
P-6 Bz-15 81.95 Bz-16 81.13 4.4 PVC 0.009 200mm 185.2 17.18 4.6 179.353 163.44 3.94 42.525 43
P-7 Bz-14 88.25 Bz-15 82.05 10.1 PVC 0.009 200mm 185.2 17.14 10.1 616.4 303 6.08 111.184 39.1
P-8 Bz-6 118.68 Bz-7 115.6 6 PVC 0.009 200mm 185.2 16.73 6.1 505.249 274.33 5.63 94.179 39
P-9 Bz-10 102.65 Bz-11 100.63 6 PVC 0.009 200mm 185.2 16.8 6.1 331.365 222.16 4.87 67.911 40.1
P-10 Bz-9 108.91 Bz-10 102.75 10.8 PVC 0.009 200mm 185.2 16.77 10.7 577.428 293.27 5.9 104.658 38.7
P-11 Bz-2 139.66 Bz-3 133.37 8.5 PVC 0.009 200mm 185.2 16.68 8.5 737.017 331.33 6.42 126.206 38.2
P-12 Bz-1 148.82 Bz-2 139.76 13.4 PVC 0.009 200mm 185.2 16.68 13.4 675.555 317.21 6.23 117.952 38.3
P-13 Bz-13 94.46 Bz-14 88.35 13.2 PVC 0.009 200mm 185.2 17.13 13.1 466.184 263.51 5.51 89.414 39.6
P-14 Bz-12 100.24 Bz-13 94.56 10.6 PVC 0.009 200mm 185.2 17.12 10.7 532.433 281.61 5.78 99.106 39.3
P-15 Bz-11 100.58 Bz-12 100.34 13.2 PVC 0.009 200mm 185.2 16.83 13.1 18.312 52.23 1.73 6.987 50.3
P-16 Bz-23 65.81 EMP-1 64.94 14.7 PVC 0.009 200mm 185.2 21.66 14.6 59.465 94.11 2.84 19.747 51.2
P-17 Bz-22 67.36 Bz-23 65.91 47.7 PVC 0.009 200mm 185.2 20.88 47.9 30.301 67.18 2.2 11.395 53.4
P-18 Bz-18 75.07 Bz-19 73.71 14.8 PVC 0.009 200mm 185.2 18.14 14.6 92.957 117.67 3.17 26.034 45.2
P-19 Bz-17 77.37 Bz-18 75.17 24.6 PVC 0.009 200mm 185.2 18.07 24.7 89.109 115.21 3.11 25.148 45.2
P-20 Bz-16 81.03 Bz-17 77.47 55.7 PVC 0.009 200mm 185.2 17.93 55.8 63.824 97.5 2.75 19.299 46.3
P-21 Bz-21 68.01 Bz-22 67.46 49.8 PVC 0.009 200mm 185.2 20.56 49.7 11.07 40.61 1.51 5.046 59.2
P-22 Bz-19 73.61 Bz-20 71.23 48.6 PVC 0.009 200mm 185.2 19.66 48.5 49.109 85.53 2.58 16.299 49.6
P-23 Bz-20 71.13 Bz-21 68.11 49.3 PVC 0.009 200mm 185.2 20.22 49.4 61.161 95.45 2.81 19.629 49.4

Pg. 30
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 21: Reporte de Outfall del colector Tpac Amaru, Caudal Mximo Ao 20.
Elevation Set Rim to Boundary
Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type
EMP-1 66.9 True 66.9 64.94 Free Outfall 21.66

7.2.2 CLCULOS HIDRULICOS COLECTOR CESAR VALLEJO


El colector se ubica en el rea de drenaje e inicia en el cruce de los pasajes Los Incas; la descarga del
colector es hacia el Colector Independencia en el cruce de la Av. Tpac Amaru con la av. Cesar Valle. El
Colector Csar Vallejo tiene las siguientes caractersticas: DN 200 mm, material Concreto Simple Normalizado
y una longitud de 1328.3 m, recolecta las aguas residuales de las reas de drenaje AD-01B y AD-01F, donde
se proyectar redes secundarias de alcantarillado.
Se proyecta realizar el mejoramiento y proyeccin del Colector Cesar Vallejo el cual tendr una longitud total
de 1306.00m con las siguientes caractersticas: DN200mm, material PVC y una longitud de 625.08,
DN250mm, material PVC y una longitud de 680.92m, en este colector se plantea el mejoramiento de
buzonetas en los tramos desde el Bz-24 hasta el Bz-30, y proyectar buzones en los tramos desde el Bz-31 al
Bz-58.

Cuadro 22: Caudal de Contribucin para cada buzn del Colector Cesar Vallejo, ao 20

Buzn Q(lps)
Bz-24 (*) 11.31
Bz-25 0.01
Bz-26 0.01
Bz-27 0.05
Bz-28 0.03
Bz-29 0.01
Bz-30 0.51
Bz-31 0.25
Bz-32 0.1
Bz-33 0.04
Bz-34 0.08
Bz-35 0.03
Bz-36 6.45
Bz-37 0.09
Bz-38 0.13
Bz-39 0.26
Bz-40 0.14
Bz-41 1.81
Bz-42 0.09
Bz-43 1.34
Bz-44 0.68
Bz-45 0.18
Bz-46 0.04
Bz-47 0.36
Bz-48 1.54
Bz-49 0.15
Bz-50 0.16
Bz-51 0.16
Pg. 31
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Bz-52 0.21
Bz-53 3.94
Bz-54 0.16
Bz-55 0.04
Bz-56 0.2
Bz-57 0.12
Bz-58 0.63
Bz-59 0.09
Total 31.40
(*) Se est considerando el caudal del rebose del reservorio RAE-06 en el buzn Bz-24

Cuadro 23: Reporte de Buzones del colector Cesar Vallejo.


Elevation Elevation Elevation Hydraulic Hydraulic
Flow (Total
Label (Ground) (Invert) (Invert in Grade Line Grade Line
Out) (L/s)
(m) (m) 1) (m) (In) (m) (Out) (m)
Bz-24 200.18 199.18 (N/A) 11.31 199.27 199.27
Bz-25 195.64 194.64 194.69 11.32 194.73 194.73
Bz-26 193.33 192.33 192.43 11.33 192.42 192.42
Bz-27 181.09 180.09 180.19 11.38 180.18 180.18
Bz-28 169.87 168.87 168.97 11.41 168.96 168.96
Bz-29 163.87 162.87 162.97 11.42 162.96 162.96
Bz-30 161.02 159.82 159.92 11.93 159.91 159.91
Bz-31 156.16 154.96 155.06 12.18 155.05 155.05
Bz-32 152.26 151.06 151.16 12.28 151.16 151.16
Bz-33 149.64 148.54 148.64 12.32 148.64 148.64
Bz-34 149.92 148.05 148.15 12.4 148.15 148.15
Bz-35 147.7 146.5 146.6 12.43 146.6 146.6
Bz-36 145.95 144.45 144.55 18.88 144.57 144.57
Bz-37 143.74 142.34 142.44 18.97 142.46 142.46
Bz-38 139.45 137.95 138.05 19.1 138.07 138.07
Bz-39 135.48 134.03 134.13 19.36 134.15 134.15
Bz-40 131.61 129.95 130.05 19.5 130.07 130.07
Bz-41 127.53 125.93 126.03 21.31 126.06 126.06
Bz-42 123.22 121.22 121.32 21.4 121.35 121.35
Bz-43 118.89 117.64 117.74 22.74 117.77 117.77
Bz-44 115.76 114.26 114.36 23.42 114.39 114.39
Bz-45 113.17 111.83 111.83 23.6 111.96 111.96
Bz-46 110.54 108.52 108.62 23.64 108.65 108.65
Bz-47 107.85 105.24 105.34 24 105.37 105.37
Bz-48 105.05 103.41 103.51 25.54 103.54 103.54
Bz-49 102.07 100.24 100.34 25.69 100.37 100.37
Bz-50 98.94 97.43 97.53 25.85 97.56 97.56
Bz-51 96.01 94.53 94.63 26.01 94.66 94.66
Bz-52 91.77 90.32 90.42 26.22 90.45 90.45
Bz-53 88.48 87.02 87.12 30.16 87.16 87.16
Bz-54 85.93 84.6 84.7 30.32 84.74 84.74
Bz-55 83.37 81.39 81.49 30.36 81.53 81.53
Bz-56 80.94 79.51 79.61 30.56 79.65 79.65
Bz-57 78.25 76.45 76.55 30.68 76.59 76.59
Bz-58 75.38 73.54 73.64 31.31 73.69 73.69
Bz-59 73.45 71.55 71.59 31.4 71.7 71.7

Pg. 32
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 24: Reporte de Tuberas del colector Cesar Vallejo, Caudal Mximo ao 20
Capacity Tractive Depth
Invert Invert Length Velocity
Start Stop Diameter Flow Length Slope (Full Stress (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Average)
Node Node (mm) (L/s) (m) (m/km) Flow) (Calculated) End) /
(m) (m) (m) (m/s)
(L/s) (Pascals) Rise (%)
P-1 Bz-43 117.64 Bz-44 114.36 45.5 PVC 0.009 192.2 22.74 45.4 72.223 114.5 3.07 23.399 49.3
P-2 Bz-25 194.64 Bz-26 192.43 5.8 PVC 0.009 192.2 11.32 5.8 381.613 263.21 4.51 63.252 30.8
P-3 Bz-26 192.33 Bz-27 180.19 16.4 PVC 0.009 192.2 11.33 16.5 737.581 365.92 5.71 105.256 29.8
P-4 Bz-36 144.45 Bz-37 142.44 18.8 PVC 0.009 192.2 18.88 18.9 106.363 138.96 3.35 29.272 43.5
P-5 Bz-27 180.09 Bz-28 168.97 20.8 PVC 0.009 192.2 11.38 20.7 536.514 312.09 5.11 82.486 30.3
P-6 Bz-30 159.82 Bz-31 155.06 19.5 PVC 0.009 192.2 11.93 19.5 244.012 210.47 3.92 45.719 32.5
P-7 Bz-33 148.54 Bz-34 148.15 20.1 PVC 0.009 192.2 12.32 20.1 19.387 59.32 1.61 6.402 40.3
P-8 Bz-29 162.87 Bz-30 159.92 21.3 PVC 0.009 192.2 11.42 21.3 138.264 158.43 3.17 28.83 33
P-9 Bz-34 148.05 Bz-35 146.6 22.2 PVC 0.009 192.2 12.4 22.3 65.167 108.77 2.49 16.631 36.3
P-10 Bz-35 146.5 Bz-36 144.55 23.5 PVC 0.009 192.2 12.43 23.5 83.086 122.81 2.72 20.107 35.7
P-11 Bz-44 114.26 Bz-45 111.83 39.1 PVC 0.009 192.2 23.42 39 62.285 106.33 2.94 21.096 50.7
P-12 Bz-24 199.18 Bz-25 194.69 7.3 PVC 0.009 192.2 11.31 7.3 613.79 333.81 5.35 91.265 30
P-13 Bz-37 142.34 Bz-38 138.05 43.8 PVC 0.009 192.2 18.97 43.9 97.742 133.21 3.25 27.452 43.9
P-14 Bz-42 121.22 Bz-43 117.74 55.9 PVC 0.009 192.2 21.4 55.8 62.39 106.42 2.87 20.32 48.3
P-15 Bz-32 151.06 Bz-33 148.64 20 PVC 0.009 192.2 12.28 19.8 122.148 148.91 3.1 27.046 34.5
P-16 Bz-31 154.96 Bz-32 151.16 21.4 PVC 0.009 192.2 12.18 21.3 178.103 179.81 3.54 36.108 33.5
P-17 Bz-28 168.87 Bz-29 162.97 10.9 PVC 0.009 192.2 11.41 11 537.693 312.43 5.11 82.725 30.4
P-18 Bz-41 125.93 Bz-42 121.32 58.9 PVC 0.009 192.2 21.31 58.8 78.366 119.27 3.11 24.246 47.3
P-19 Bz-39 134.03 Bz-40 130.05 56.8 PVC 0.009 192.2 19.36 56.7 70.203 112.89 2.91 21.354 45.5
P-20 Bz-40 129.95 Bz-41 126.03 56 PVC 0.009 192.2 19.5 56.1 69.896 112.64 2.91 21.341 45.6
P-21 Bz-38 137.95 Bz-39 134.13 50 PVC 0.009 192.2 19.1 50 76.42 117.78 2.98 22.715 44.9
P-22 Bz-47 105.24 Bz-48 103.51 40.9 PVC 0.009 240.2 24 40.8 42.357 158.9 2.53 15.249 39.4
P-23 Bz-48 103.41 Bz-49 100.34 42.9 PVC 0.009 240.2 25.54 43 71.434 206.36 3.1 23.574 39
P-24 Bz-53 87.02 Bz-54 84.7 46.9 PVC 0.009 240.2 30.16 46.9 49.426 171.65 2.85 18.982 43.8
P-25 Bz-58 73.54 Bz-59 71.59 49.2 PVC 0.009 240.2 31.31 49.1 39.737 153.91 2.66 16.249 45.5
P-26 Bz-46 108.52 Bz-47 105.34 44.6 PVC 0.009 240.2 23.64 44.5 71.459 206.39 3.03 22.827 37.5
P-27 Bz-57 76.45 Bz-58 73.64 47 PVC 0.009 240.2 30.68 46.9 59.865 188.91 3.07 22.243 43.5
P-28 Bz-59 71.55 Bz-119 70.69 10.2 PVC 0.009 240.2 31.4 10.1 85.501 225.76 3.51 29.706 43.3
P-29 Bz-52 90.32 Bz-53 87.12 63.4 PVC 0.009 240.2 26.22 63.4 50.474 173.46 2.76 18.177 40.7
P-30 Bz-51 94.53 Bz-52 90.42 66.8 PVC 0.009 240.2 26.01 66.8 61.572 191.58 2.95 21.17 39.9
P-31 Bz-50 97.43 Bz-51 94.63 46.3 PVC 0.009 240.2 25.85 46.3 60.437 189.81 2.93 20.808 39.8
P-32 Bz-56 79.51 Bz-57 76.55 55.2 PVC 0.009 240.2 30.56 55.2 53.654 178.84 2.95 20.362 43.8
P-33 Bz-55 81.39 Bz-56 79.61 51.8 PVC 0.009 240.2 30.36 51.8 34.352 143.1 2.51 14.301 45.4
P-34 Bz-54 84.6 Bz-55 81.49 46.7 PVC 0.009 240.2 30.32 46.6 66.689 199.39 3.18 24.079 42.9
P-35 Bz-49 100.24 Bz-50 97.53 46.9 PVC 0.009 240.2 25.69 46.9 57.734 185.52 2.88 20.021 39.8
P-36 Bz-45 111.83 Bz-46 108.62 39 PVC 0.009 240.2 23.6 39 82.277 221.47 3.18 25.454 37.1

Pg. 33
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 25: Reporte de Tuberas del colector Cesar Vallejo, Caudal Mximo ao 20 (tubera estructural)

Depth
Invert Invert Length Section Size Capacity Velocity Tractive Stress
Start Stop Manning's Diameter Flow Length Slope (Average
Label (Start) (Stop) (Scaled) Material (Catalog (Full Flow) (Average) (Calculated)
Node Node n (mm) (L/s) (m) (m/km) End) / Rise
(m) (m) (m) Conduit) (L/s) (m/s) (Pascals)
(%)

P-1 Bz-43 117.64 Bz-44 114.36 45.5 PVC 0.009 200mm 185.2 22.74 45.4 72.223 103.72 3.08 23.526 51.7
P-2 Bz-25 194.64 Bz-26 192.43 5.8 PVC 0.009 200mm 185.2 11.32 5.8 381.613 238.41 4.54 63.659 32.4
P-3 Bz-26 192.33 Bz-27 180.19 16.4 PVC 0.009 200mm 185.2 11.33 16.5 737.581 331.45 5.73 106.104 31.3
P-4 Bz-36 144.45 Bz-37 142.44 18.8 PVC 0.009 200mm 185.2 18.88 18.9 106.363 125.87 3.36 29.436 45.7
P-5 Bz-27 180.09 Bz-28 168.97 20.8 PVC 0.009 200mm 185.2 11.38 20.7 536.514 282.69 5.12 83.182 31.9
P-6 Bz-30 159.82 Bz-31 155.06 19.5 PVC 0.009 200mm 185.2 11.93 19.5 244.012 190.64 3.94 46.011 34.1
P-7 Bz-33 148.54 Bz-34 148.15 20.1 PVC 0.009 200mm 185.2 12.32 20.1 19.387 53.74 1.62 6.427 42.3
P-8 Bz-29 162.87 Bz-30 159.92 21.3 PVC 0.009 200mm 185.2 11.42 21.3 138.264 143.51 3.19 28.969 34.6
P-9 Bz-34 148.05 Bz-35 146.6 22.2 PVC 0.009 200mm 185.2 12.4 22.3 65.167 98.52 2.51 16.695 38.1
P-10 Bz-35 146.5 Bz-36 144.55 23.5 PVC 0.009 200mm 185.2 12.43 23.5 83.086 111.25 2.73 20.243 37.5
P-11 Bz-44 114.26 Bz-45 111.83 39.1 PVC 0.009 200mm 185.2 23.42 39 62.285 96.32 2.95 21.156 53.1
P-12 Bz-24 199.18 Bz-25 194.69 7.3 PVC 0.009 200mm 185.2 11.31 7.3 613.79 302.36 5.37 91.987 31.5
P-13 Bz-37 142.34 Bz-38 138.05 43.8 PVC 0.009 200mm 185.2 18.97 43.9 97.742 120.66 3.26 27.613 46.1
P-14 Bz-42 121.22 Bz-43 117.74 55.9 PVC 0.009 200mm 185.2 21.4 55.8 62.39 96.4 2.88 20.391 50.7
P-15 Bz-32 151.06 Bz-33 148.64 20 PVC 0.009 200mm 185.2 12.28 19.8 122.148 134.88 3.11 27.196 36.2
P-16 Bz-31 154.96 Bz-32 151.16 21.4 PVC 0.009 200mm 185.2 12.18 21.3 178.103 162.87 3.56 36.298 35.2
P-17 Bz-28 168.87 Bz-29 162.97 10.9 PVC 0.009 200mm 185.2 11.41 11 537.693 283 5.13 83.433 31.9
P-18 Bz-41 125.93 Bz-42 121.32 58.9 PVC 0.009 200mm 185.2 21.31 58.8 78.366 108.04 3.12 24.397 49.7
P-19 Bz-39 134.03 Bz-40 130.05 56.8 PVC 0.009 200mm 185.2 19.36 56.7 70.203 102.26 2.91 21.484 47.8
P-20 Bz-40 129.95 Bz-41 126.03 56 PVC 0.009 200mm 185.2 19.5 56.1 69.896 102.03 2.92 21.474 47.9
P-21 Bz-38 137.95 Bz-39 134.13 50 PVC 0.009 200mm 185.2 19.1 50 76.42 106.69 3 22.802 47.1
P-22 Bz-47 105.24 Bz-48 103.51 40.9 PVC 0.009 250mm 231.2 24 40.8 42.357 143.52 2.54 15.32 41.5
P-23 Bz-48 103.41 Bz-49 100.34 42.9 PVC 0.009 250mm 231.2 25.54 43 71.434 186.38 3.11 23.736 41.1
P-24 Bz-53 87.02 Bz-54 84.7 46.9 PVC 0.009 250mm 231.2 30.16 46.9 49.426 155.03 2.86 19.09 46.1
P-25 Bz-58 73.54 Bz-59 71.59 49.2 PVC 0.009 250mm 231.2 31.31 49.1 39.737 139.01 2.68 16.317 47.9

Pg. 34
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Depth
Invert Invert Length Section Size Capacity Velocity Tractive Stress
Start Stop Manning's Diameter Flow Length Slope (Average
Label (Start) (Stop) (Scaled) Material (Catalog (Full Flow) (Average) (Calculated)
Node Node n (mm) (L/s) (m) (m/km) End) / Rise
(m) (m) (m) Conduit) (L/s) (m/s) (Pascals)
(%)

P-26 Bz-46 108.52 Bz-47 105.34 44.6 PVC 0.009 250mm 231.2 23.64 44.5 71.459 186.41 3.04 22.979 39.5
P-27 Bz-57 76.45 Bz-58 73.64 47 PVC 0.009 250mm 231.2 30.68 46.9 59.865 170.62 3.08 22.339 45.8
P-28 Bz-59 71.55 Bz-119 70.69 10.2 PVC 0.009 250mm 231.2 31.4 10.1 85.501 203.9 3.52 29.876 45.6
P-29 Bz-52 90.32 Bz-53 87.12 63.4 PVC 0.009 250mm 231.2 26.22 63.4 50.474 156.67 2.77 18.263 42.8
P-30 Bz-51 94.53 Bz-52 90.42 66.8 PVC 0.009 250mm 231.2 26.01 66.8 61.572 173.03 2.97 21.292 41.9
P-31 Bz-50 97.43 Bz-51 94.63 46.3 PVC 0.009 250mm 231.2 25.85 46.3 60.437 171.43 2.94 20.927 41.9
P-32 Bz-56 79.51 Bz-57 76.55 55.2 PVC 0.009 250mm 231.2 30.56 55.2 53.654 161.53 2.96 20.483 46.1
P-33 Bz-55 81.39 Bz-56 79.61 51.8 PVC 0.009 250mm 231.2 30.36 51.8 34.352 129.25 2.52 14.365 47.7
P-34 Bz-54 84.6 Bz-55 81.49 46.7 PVC 0.009 250mm 231.2 30.32 46.6 66.689 180.08 3.19 24.196 45.1
P-35 Bz-49 100.24 Bz-50 97.53 46.9 PVC 0.009 250mm 231.2 25.69 46.9 57.734 167.56 2.89 20.136 41.9
P-36 Bz-45 111.83 Bz-46 108.62 39 PVC 0.009 250mm 231.2 23.6 39 82.277 200.02 3.2 25.594 39

Pg. 35
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 26: Reporte de Tuberas del colector Cesar Vallejo, Caudal Mximo ao 20

Elevation Set Rim to Boundary


Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type
Bz-119 73.09 True 73.09 70.49 Free Outfall 31.40

7.2.3 CLCULOS HIDRULICOS COLECTOR INDEPENDENCIA


El colector se ubica en el rea de drenaje 01 e inicia en el pasaje Manco Cpac; la descarga del colector es
hacia el Colector Ingeniera (Antiguo) en el cruce de la Av. Tpac Amaru con la av. Cesar Vallejo. El Colector
Independencia tiene las siguientes caractersticas: DN 200 mm, material
Concreto Simple Normalizado y una longitud de 2121.7 m, recolecta las aguas residuales de las reas de
drenaje AD-01B, AD-01C, AD-01D y AD-01E, donde se proyectar redes secundarias de alcantarillado.
Se proyecta realizar el mejoramiento y proyeccin del Colector Independencia el cual tendr una longitud
total de 2070.81 con las siguientes caractersticas: DN200mm, material PVC y una longitud de 718.21m,
DN250mm, material PVC y una longitud de 510.84m, DN315mm, material PVC y una longitud de 628.31m,
DN350mm, material PVC y una longitud de 213.45m en este colector se plantea el mejoramiento de los
buzones en los tramos desde el Bz-59 hasta el Bz-118.

Cuadro 27: Aportes al Colector Independencia ao 20

Buzn Q(lps) Buzn Q(lps) Buzn Q(lps)


Bz-60 (*) 5.8 Bz-79 1.27 Bz-98 0.86
Bz-61 0.03 Bz-80 0.16 Bz-99 0.52
Bz-62 0 Bz-81 0.64 Bz-100 0.11
Bz-63 0.01 Bz-82 0.16 Bz-101 0.04
Bz-64 0.01 Bz-83 (**) 22.49 Bz-102 0
Bz-65 0.11 Bz-84 1.19 Bz-103 0.28
Bz-66 0.03 Bz-85 0.11 Bz-104 0.2
Bz-67 0.04 Bz-86 0.21 Bz-105 0.07
Bz-68 0.03 Bz-87 0.2 Bz-106 0.07
Bz-69 0.03 Bz-88 0.21 Bz-107 0.03
Bz-70 0 Bz-89 0.17 Bz-108 0.24
Bz-71 0.03 Bz-90 0.21 Bz-109 0.15
Bz-72 0.65 Bz-91 0.16 Bz-110 0.09
Bz-73 0.75 Bz-92 0.17 Bz-111 0.08
Bz-74 0.05 Bz-93 0.05 Bz-112 0.12
Bz-75 0.25 Bz-94 0.07 Bz-113 0.03
Bz-76 11.22 Bz-95 0.11 Bz-114 0.03
Bz-77 0.35 Bz-96 1.64 Bz-117 10.11
Bz-78 0.17 Bz-97 (***) 20.39 Bz-119 20.12
Total 102.32
(*)Se est considerando el caudal del rebose del RAP-01 en el buzn Bz-60
(**)Se est considerando el caudal del rebose del RRE-05 en el buzn Bz-83
(***)Se est considerando el caudal del rebose de la Cisterna en el buzn Bz-97

Pg. 36
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

El caudal de los reboses considerados en los tramos correspondientes a los reservorios ms los aportes
domsticos sumaran el caudal total de diseo en cada tramo calculando de esta manera la capacidad real de
las tuberas.
Cuadro 28: Reporte de Buzones del colector Independencia.

Elevation Elevation Hydraulic Hydraulic


Elevation Flow (Total
Label (Ground) (Invert in Grade Line Grade Line
(Invert) (m) Out) (L/s)
(m) 1) (m) (In) (m) (Out) (m)

Bz-60 261.62 260.62 (N/A) 5.8 260.68 260.68


Bz-61 255.69 254.69 254.79 5.83 254.75 254.75
Bz-62 254.54 253.54 253.54 5.83 253.6 253.6
Bz-63 252.45 251.45 251.5 5.84 251.51 251.51
Bz-64 251.52 250.52 250.57 5.85 250.58 250.58
Bz-65 247.53 246.53 246.63 5.96 246.6 246.6
Bz-66 242.57 241.57 241.67 5.99 241.64 241.64
Bz-67 236.48 235.48 235.58 6.03 235.55 235.55
Bz-68 230.47 229.47 229.57 6.06 229.54 229.54
Bz-69 227.63 226.63 226.73 6.09 226.7 226.7
Bz-70 223.63 222.63 222.73 6.09 222.7 222.7
Bz-71 221.45 220.45 220.55 6.12 220.52 220.52
Bz-72 219.4 217.74 217.79 6.77 217.81 217.81
Bz-73 217.43 216.13 216.23 7.52 216.2 216.2
Bz-74 211.41 210.21 210.31 7.57 210.28 210.28
Bz-75 206.02 204.52 204.62 7.82 204.6 204.6
Bz-76 202.99 201.14 201.24 19.04 201.26 201.26
Bz-77 200.1 198.53 198.63 19.39 198.65 198.65
Bz-78 194.06 192.56 192.66 19.56 192.68 192.68
Bz-79 189.14 187.65 187.75 20.83 187.78 187.78
Bz-80 184.78 183.33 183.43 20.99 183.46 183.46
Bz-81 180.27 178.7 178.8 21.63 178.83 178.83
Bz-82 174.16 172.71 172.81 21.79 172.84 172.84
Bz-83 167.71 165.99 166.09 44.28 166.17 166.17
Bz-84 162.46 160.96 161.06 45.47 161.14 161.14
Bz-85 157.52 155.8 155.9 45.58 155.98 155.98
Bz-86 154.21 152.82 152.82 45.79 153 153
Bz-87 149.76 148.15 148.25 45.99 148.33 148.33
Bz-88 143.95 142.3 142.4 46.2 142.48 142.48
Bz-89 138.17 136.17 136.27 46.37 136.35 136.35
Bz-90 132.88 131.02 131.12 46.58 131.2 131.2
Bz-91 126.69 124.97 125.07 46.74 125.15 125.15
Bz-92 121.26 119.88 119.98 46.91 120.06 120.06
Bz-93 117.91 116.41 116.51 46.96 116.59 116.59
Bz-94 117.39 115.68 115.78 47.03 115.86 115.86
Bz-95 112.96 111.23 111.33 47.14 111.41 111.41
Bz-96 108.4 106.87 106.97 48.78 107.05 107.05
Bz-97 108.51 106.4 106.5 69.17 106.6 106.6
Bz-98 105.61 103.99 104.09 70.03 104.2 104.2

Pg. 37
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Elevation Elevation Hydraulic Hydraulic


Elevation Flow (Total
Label (Ground) (Invert in Grade Line Grade Line
(Invert) (m) Out) (L/s)
(m) 1) (m) (In) (m) (Out) (m)

Bz-99 103.04 101.03 101.13 70.55 101.24 101.24


Bz-100 100.54 98.89 98.99 70.66 99.1 99.1
Bz-101 97.84 96.17 96.27 70.7 96.38 96.38
Bz-102 95.43 93.98 94.08 70.7 94.19 94.19
Bz-103 95.16 93.14 93.24 70.98 93.35 93.35
Bz-104 91.63 90.25 90.35 71.18 90.46 90.46
Bz-105 88.24 86.56 86.66 71.25 86.77 86.77
Bz-106 85.49 84.03 84.08 71.32 84.24 84.24
Bz-107 83.46 81.66 81.71 71.35 81.87 81.87
Bz-108 83.42 81.22 81.32 71.59 81.43 81.43
Bz-109 80.69 79.27 79.37 71.74 79.48 79.48
Bz-110 79.64 78.12 78.22 71.83 78.33 78.33
Bz-111 78.36 76.86 76.96 71.91 77.07 77.07
Bz-112 77.08 75.33 75.43 72.03 75.54 75.54
Bz-113 75.74 74.24 74.29 72.06 74.45 74.45
Bz-114 75.59 73.85 73.95 72.09 74.05 74.05
Bz-115 75.28 73.63 73.63 72.09 73.83 73.83
Bz-116 74.39 72.89 72.89 72.09 73.09 73.09
Bz-117 74.28 72.28 72.33 82.2 72.5 72.5
Bz-118 74.09 71.59 71.59 82.2 71.81 71.81
Bz-119 73.09 69.89 69.94 102.32 70.13 70.13

Pg. 38
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 29: Reporte de Tuberas del colector Independencia, Caudal Mximo ao 20


Capacity Depth
Invert Invert Length Section Size Velocity Tractive Stress
Start Stop Diameter Flow Slope (Full (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Catalog (Average) (Calculated)
Node Node (mm) (L/s) (m/km) Flow) End) / Rise
(m) (m) (m) Conduit) (m/s) (Pascals)
(L/s) (%)
P-1 Bz-118 71.59 Bz-119 69.94 50.1 PVC 0.009 355mm SN4 337.6 82.2 33.008 347.69 3.18 20.208 48.6
P-2 Bz-114 73.85 Bz-115 73.63 7.1 PVC 0.009 355mm SN4 337.6 72.09 31.382 339.02 3.01 18.378 48.2
P-3 Bz-63 251.45 Bz-64 250.57 3.1 PVC 0.009 200mm 192.2 5.84 288.714 228.94 3.36 37.829 22.5
P-4 Bz-113 74.24 Bz-114 73.95 3.4 PVC 0.009 315mm 302.6 72.06 86.495 420.36 4.37 41.414 53.5
P-5 Bz-61 254.69 Bz-62 253.54 4.1 PVC 0.009 200mm 192.2 5.83 290.228 229.54 3.36 37.953 22.3
P-6 Bz-102 93.98 Bz-103 93.24 4.5 PVC 0.009 315mm 302.6 70.7 161.855 575.03 5.44 67.109 49.1
P-7 Bz-70 222.63 Bz-71 220.55 5.9 PVC 0.009 200mm 192.2 6.09 341.207 248.88 3.61 43.874 22.6
P-8 Bz-62 253.54 Bz-63 251.5 6.1 PVC 0.009 200mm 192.2 5.83 334.646 246.48 3.54 42.375 22.1
P-9 Bz-93 116.41 Bz-94 115.78 7.8 PVC 0.009 250mm 240.2 46.96 79.497 217.69 3.83 33.334 54.7
P-10 Bz-68 229.47 Bz-69 226.73 7.9 PVC 0.009 200mm 192.2 6.06 345.75 250.53 3.62 44.226 22.5
P-11 Bz-71 220.45 Bz-72 217.79 8 PVC 0.009 200mm 192.2 6.12 335.655 246.85 3.59 43.417 22.7
P-12 Bz-64 250.52 Bz-65 246.63 10.4 PVC 0.009 200mm 192.2 5.85 375.367 261.04 3.69 46.382 22
P-13 Bz-65 246.53 Bz-66 241.67 11.8 PVC 0.009 200mm 192.2 5.96 408.843 272.43 3.82 49.97 22.1
P-14 Bz-69 226.63 Bz-70 222.73 12 PVC 0.009 200mm 192.2 6.09 328.084 244.05 3.56 42.563 22.6
P-15 Bz-96 106.87 Bz-97 106.5 12.4 PVC 0.009 250mm 240.2 48.78 29.608 132.85 2.71 15.452 60
P-16 Bz-60 260.62 Bz-61 254.79 13.8 PVC 0.009 200mm 192.2 5.8 425.051 277.78 3.84 50.863 21.8
P-17 Bz-66 241.57 Bz-67 235.58 16.1 PVC 0.009 200mm 192.2 5.99 370.797 259.45 3.7 46.44 22.3
P-18 Bz-112 75.33 Bz-113 74.29 17.6 PVC 0.009 315mm 302.6 72.03 58.829 346.67 3.8 30.579 50.5
P-19 Bz-111 76.86 Bz-112 75.43 18.7 PVC 0.009 315mm 302.6 71.91 76.911 396.39 4.18 37.754 49.2
P-20 Bz-67 235.48 Bz-68 229.57 19.6 PVC 0.009 200mm 192.2 6.03 302.965 234.52 3.45 39.839 22.6
P-21 Bz-119 69.89 EMP-02 66.87 21.2 PVC 0.009 355mm SN4 337.6 102.32 143.596 725.19 5.72 70.558 48.7
P-22 Bz-109 79.27 Bz-110 78.22 29.3 PVC 0.009 315mm 302.6 71.74 35.884 270.75 3.18 20.656 52
P-23 Bz-107 81.66 Bz-108 81.32 30.2 PVC 0.009 315mm 302.6 71.35 11.268 151.72 2.08 8.161 58.4
P-24 Bz-110 78.12 Bz-111 76.96 31.1 PVC 0.009 315mm 302.6 71.83 37.312 276.09 3.23 21.315 51.8
P-25 Bz-85 155.8 Bz-86 152.82 37.1 PVC 0.009 200mm 192.2 45.58 80.139 120.62 3.87 33.853 67.4
P-26 Bz-84 160.96 Bz-85 155.9 38.5 PVC 0.009 200mm 192.2 45.47 131.754 154.66 4.64 50.271 64.6
P-27 Bz-98 103.99 Bz-99 101.13 41.3 PVC 0.009 315mm 302.6 70.03 68.994 375.43 4 34.258 48.6
P-28 Bz-99 101.03 Bz-100 98.99 43.1 PVC 0.009 315mm 302.6 70.55 47.467 311.4 3.51 25.576 50.3
P-29 Bz-75 204.52 Bz-76 201.24 43.9 PVC 0.009 200mm 192.2 7.82 74.73 116.47 2.28 15.091 28.4
P-30 Bz-83 165.99 Bz-84 161.06 44.5 PVC 0.009 200mm 192.2 44.28 110.785 141.82 4.32 43.317 64.9
P-31 Bz-76 201.14 Bz-77 198.63 44.5 PVC 0.009 200mm 192.2 19.04 56.403 101.19 2.67 17.867 45.9
P-32 Bz-86 152.82 Bz-87 148.25 46.5 PVC 0.009 250mm 240.2 45.79 98.641 242.49 4.11 39.089 51.4
P-33 Bz-100 98.89 Bz-101 96.27 46.6 PVC 0.009 315mm 302.6 70.66 56.182 338.78 3.72 29.25 49.7
P-34 Bz-97 106.4 Bz-98 104.09 47 PVC 0.009 315mm 302.6 69.17 49.213 317.08 3.53 26.114 49.6
P-35 Bz-101 96.17 Bz-102 94.08 47.1 PVC 0.009 315mm 302.6 70.7 44.238 300.62 3.42 24.224 50.7
P-36 Bz-106 84.03 Bz-107 81.71 47.6 PVC 0.009 315mm 302.6 71.32 48.792 315.72 3.54 26.289 50.5
P-37 Bz-79 187.65 Bz-80 183.43 47.7 PVC 0.009 200mm 192.2 20.83 88.186 126.53 3.22 26.392 46.4
P-38 Bz-77 198.53 Bz-78 192.66 47.8 PVC 0.009 200mm 192.2 19.39 122.666 149.23 3.54 33.137 43.7

Pg. 39
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Capacity Depth
Invert Invert Length Section Size Velocity Tractive Stress
Start Stop Diameter Flow Slope (Full (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Catalog (Average) (Calculated)
Node Node (mm) (L/s) (m/km) Flow) End) / Rise
(m) (m) (m) Conduit) (m/s) (Pascals)
(L/s) (%)
P-39 Bz-78 192.56 Bz-79 187.75 47.9 PVC 0.009 200mm 192.2 19.56 100.515 135.08 3.31 28.435 44.5
P-40 Bz-105 86.56 Bz-106 84.08 47.9 PVC 0.009 315mm 302.6 71.25 51.825 325.38 3.62 27.545 50.2
P-41 Bz-80 183.33 Bz-81 178.8 48.2 PVC 0.009 200mm 192.2 20.99 94.065 130.68 3.3 27.841 46.4
P-42 Bz-92 119.88 Bz-93 116.51 48.5 PVC 0.009 250mm 240.2 46.91 69.537 203.6 3.65 29.964 53.5
P-43 Bz-89 136.17 Bz-90 131.12 53 PVC 0.009 250mm 240.2 46.37 95.22 238.25 4.07 38.215 51.9
P-44 Bz-72 217.74 Bz-73 216.23 54 PVC 0.009 200mm 192.2 6.77 27.989 71.28 1.55 6.589 28.6
P-45 Bz-81 178.7 Bz-82 172.81 54.3 PVC 0.009 200mm 192.2 21.63 108.563 140.39 3.51 31.543 46.6
P-46 Bz-88 142.3 Bz-89 136.27 55.7 PVC 0.009 250mm 240.2 46.2 108.106 253.86 4.25 42.194 51.3
P-47 Bz-87 148.15 Bz-88 142.4 56.1 PVC 0.009 250mm 240.2 45.99 102.526 247.22 4.17 40.378 51.4
P-48 Bz-82 172.71 Bz-83 166.09 56.9 PVC 0.009 200mm 192.2 21.79 116.145 145.21 3.6 33.364 46.5
P-49 Bz-91 124.97 Bz-92 119.98 58.1 PVC 0.009 250mm 240.2 46.74 86.165 226.64 3.94 35.44 52.5
P-50 Bz-90 131.02 Bz-91 125.07 60.5 PVC 0.009 250mm 240.2 46.58 98.591 242.43 4.13 39.353 51.9
P-51 Bz-94 115.68 Bz-95 111.33 61 PVC 0.009 250mm 240.2 47.03 71.358 206.25 3.69 30.608 53.4
P-52 Bz-103 93.14 Bz-104 90.35 61.7 PVC 0.009 315mm 302.6 70.98 45.315 304.26 3.45 24.746 50.7
P-53 Bz-95 111.23 Bz-96 106.97 62.3 PVC 0.009 250mm 240.2 47.14 68.177 201.6 3.63 29.566 53.7
P-54 Bz-108 81.22 Bz-109 79.37 65 PVC 0.009 315mm 302.6 71.59 28.496 241.28 2.92 17.185 53
P-55 Bz-104 90.25 Bz-105 86.66 65.9 PVC 0.009 315mm 302.6 71.18 54.529 333.76 3.69 28.658 50
P-56 Bz-73 216.13 Bz-74 210.31 21.9 PVC 0.009 200mm 192.2 7.52 265.201 219.42 3.53 39.64 25.5
P-57 Bz-74 210.21 Bz-75 204.62 24.9 PVC 0.009 200mm 192.2 7.57 223.657 201.5 3.33 34.854 25.9
P-58 Bz-115 73.63 Bz-116 72.89 43.2 PVC 0.009 355mm SN4 337.6 72.09 17.097 250.23 2.42 11.371 48.3
P-59 Bz-117 72.28 Bz-118 71.59 46.8 PVC 0.009 355mm SN4 337.6 82.2 14.7 232.03 2.37 10.634 52.6
P-60 Bz-116 72.89 Bz-117 72.33 51.9 PVC 0.009 355mm SN4 337.6 72.09 10.807 198.95 2.05 7.885 50.8

Cuadro 30: Reporte de Tuberas del colector Independencia, Caudal Mximo ao 20 (Tubera estructural)

Section Capacity Tractive Depth


Invert Invert Length Velocity
Start Stop Size Diameter Flow Length Slope (Full Stress (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Average)
Node Node (Catalog (mm) (L/s) (m) (m/km) Flow) (Calculated) End) /
(m) (m) (m) (m/s)
Conduit) (L/s) (Pascals) Rise (%)
P-1 Bz-118 71.59 Bz-119 70.54 50.1 PVC 0.009 355mm 328.6 82.2 50 21.005 258.08 2.7 14.167 52.6
P-2 Bz-114 73.85 Bz-115 73.63 7.1 PVC 0.009 355mm 328.6 72.09 7 31.382 315.45 3.02 18.433 50
P-3 Bz-63 251.45 Bz-64 250.57 3.1 PVC 0.009 200mm 185.2 5.84 3 288.714 207.37 3.38 38.116 23.6
P-4 Bz-113 74.24 Bz-114 73.95 3.4 PVC 0.009 315mm 291 72.06 3.4 86.495 378.75 4.38 41.651 56.3
P-5 Bz-61 254.69 Bz-62 253.54 4.1 PVC 0.009 200mm 185.2 5.83 4 290.228 207.92 3.38 38.241 23.4
P-6 Bz-102 93.98 Bz-103 93.24 4.5 PVC 0.009 315mm 291 70.7 4.6 161.855 518.11 5.45 67.568 51.7
P-7 Bz-70 222.63 Bz-71 220.55 5.9 PVC 0.009 200mm 185.2 6.09 6.1 341.207 225.44 3.63 44.209 23.7
P-8 Bz-62 253.54 Bz-63 251.5 6.1 PVC 0.009 200mm 185.2 5.83 6.1 334.646 223.26 3.55 42.7 23.2

Pg. 40
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Section Capacity Tractive Depth


Invert Invert Length Velocity
Start Stop Size Diameter Flow Length Slope (Full Stress (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Average)
Node Node (Catalog (mm) (L/s) (m) (m/km) Flow) (Calculated) End) /
(m) (m) (m) (m/s)
Conduit) (L/s) (Pascals) Rise (%)
P-9 Bz-93 116.41 Bz-94 115.78 7.8 PVC 0.009 250mm 231.2 46.96 7.9 79.497 196.62 3.85 33.467 57.5
P-10 Bz-68 229.47 Bz-69 226.73 7.9 PVC 0.009 200mm 185.2 6.06 7.9 345.75 226.93 3.64 44.565 23.6
P-11 Bz-71 220.45 Bz-72 217.79 8 PVC 0.009 200mm 185.2 6.12 7.9 335.655 223.6 3.61 43.748 23.8
P-12 Bz-64 250.52 Bz-65 246.63 10.4 PVC 0.009 200mm 185.2 5.85 10.4 375.367 236.45 3.7 46.741 23.1
P-13 Bz-65 246.53 Bz-66 241.67 11.8 PVC 0.009 200mm 185.2 5.96 11.9 408.843 246.77 3.84 50.358 23.2
P-14 Bz-69 226.63 Bz-70 222.73 12 PVC 0.009 200mm 185.2 6.09 11.9 328.084 221.06 3.58 42.886 23.8
P-15 Bz-96 106.87 Bz-97 106.5 12.4 PVC 0.009 250mm 231.2 48.78 12.5 29.608 119.99 2.71 15.481 63.1
P-16 Bz-60 260.62 Bz-61 254.79 13.8 PVC 0.009 200mm 185.2 5.8 13.7 425.051 251.62 3.86 51.259 22.8
P-17 Bz-66 241.57 Bz-67 235.58 16.1 PVC 0.009 200mm 185.2 5.99 16.2 370.797 235.01 3.71 46.798 23.4
P-18 Bz-112 75.33 Bz-113 74.29 17.6 PVC 0.009 315mm 291 72.03 17.7 58.829 312.36 3.82 30.722 53.1
P-19 Bz-111 76.86 Bz-112 75.43 18.7 PVC 0.009 315mm 291 71.91 18.6 76.911 357.15 4.2 37.938 51.7
P-20 Bz-67 235.48 Bz-68 229.57 19.6 PVC 0.009 200mm 185.2 6.03 19.5 302.965 212.43 3.47 40.14 23.8
P-21 Bz-119 70.49 EMP-02 66.87 21.2 PVC 0.009 355mm 328.6 102.32 21 172.125 738.77 6.12 81.663 49.7
P-22 Bz-109 79.27 Bz-110 78.22 29.3 PVC 0.009 315mm 291 71.74 29.3 35.884 243.95 3.19 20.732 54.7
P-23 Bz-107 81.66 Bz-108 81.32 30.2 PVC 0.009 315mm 291 71.35 30.2 11.268 136.7 2.08 8.162 61.7
P-24 Bz-110 78.12 Bz-111 76.96 31.1 PVC 0.009 315mm 291 71.83 31.1 37.312 248.76 3.23 21.413 54.6
P-25 Bz-85 155.8 Bz-86 152.92 37.1 PVC 0.009 200mm 185.2 45.58 37.2 77.449 107.41 3.83 32.993 69.9
P-26 Bz-84 160.96 Bz-85 155.9 38.5 PVC 0.009 200mm 185.2 45.47 38.4 131.754 140.09 4.65 50.419 66.7
P-27 Bz-98 103.99 Bz-99 101.13 41.3 PVC 0.009 315mm 291 70.03 41.5 68.994 338.27 4.01 34.435 51.2
P-28 Bz-99 101.03 Bz-100 98.99 43.1 PVC 0.009 315mm 291 70.55 43 47.467 280.58 3.51 25.714 53
P-29 Bz-75 204.52 Bz-76 201.24 43.9 PVC 0.009 200mm 185.2 7.82 43.9 74.73 105.5 2.29 15.224 29.8
P-30 Bz-83 165.99 Bz-84 161.06 44.5 PVC 0.009 200mm 185.2 44.28 44.5 110.785 128.46 4.33 43.442 67.1
P-31 Bz-76 201.14 Bz-77 198.63 44.5 PVC 0.009 200mm 185.2 19.04 44.5 56.403 91.66 2.68 17.95 48.2
P-32 Bz-86 152.82 Bz-87 148.25 46.5 PVC 0.009 250mm 231.2 45.79 46.3 98.641 219.01 4.12 39.28 54
P-33 Bz-100 98.89 Bz-101 96.27 46.6 PVC 0.009 315mm 291 70.66 46.6 56.182 305.25 3.73 29.39 52.2
P-34 Bz-97 106.4 Bz-98 104.09 47 PVC 0.009 315mm 291 69.17 46.9 49.213 285.69 3.54 26.253 52.3
P-35 Bz-101 96.17 Bz-102 94.08 47.1 PVC 0.009 315mm 291 70.7 47.2 44.238 270.87 3.43 24.336 53.3
P-36 Bz-106 84.03 Bz-107 81.71 47.6 PVC 0.009 315mm 291 71.32 47.5 48.792 284.47 3.56 26.4 53.1
P-37 Bz-79 187.65 Bz-80 183.43 47.7 PVC 0.009 200mm 185.2 20.83 47.9 88.186 114.61 3.24 26.475 48.7
P-38 Bz-77 198.53 Bz-78 192.66 47.8 PVC 0.009 200mm 185.2 19.39 47.9 122.666 135.17 3.56 33.302 45.8
P-39 Bz-78 192.56 Bz-79 187.75 47.9 PVC 0.009 200mm 185.2 19.56 47.9 100.515 122.36 3.32 28.608 46.7
P-40 Bz-105 86.56 Bz-106 84.08 47.9 PVC 0.009 315mm 291 71.25 47.9 51.825 293.17 3.63 27.688 52.8
P-41 Bz-80 183.33 Bz-81 178.8 48.2 PVC 0.009 200mm 185.2 20.99 48.2 94.065 118.37 3.32 27.958 48.7
P-42 Bz-92 119.88 Bz-93 116.51 48.5 PVC 0.009 250mm 231.2 46.91 48.5 69.537 183.89 3.66 30.116 56.2
P-43 Bz-89 136.17 Bz-90 131.12 53 PVC 0.009 250mm 231.2 46.37 53 95.22 215.18 4.09 38.415 54.5
P-44 Bz-72 217.74 Bz-73 216.23 54 PVC 0.009 200mm 185.2 6.77 53.9 27.989 64.57 1.55 6.629 30
P-45 Bz-81 178.7 Bz-82 172.81 54.3 PVC 0.009 200mm 185.2 21.63 54.3 108.563 127.16 3.52 31.7 48.9
P-46 Bz-88 142.3 Bz-89 136.27 55.7 PVC 0.009 250mm 231.2 46.2 55.8 108.106 229.28 4.27 42.381 53.9
P-47 Bz-87 148.15 Bz-88 142.4 56.1 PVC 0.009 250mm 231.2 45.99 56.1 102.526 223.28 4.19 40.567 53.9

Pg. 41
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Section Capacity Tractive Depth


Invert Invert Length Velocity
Start Stop Size Diameter Flow Length Slope (Full Stress (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Average)
Node Node (Catalog (mm) (L/s) (m) (m/km) Flow) (Calculated) End) /
(m) (m) (m) (m/s)
Conduit) (L/s) (Pascals) Rise (%)
P-48 Bz-82 172.71 Bz-83 166.09 56.9 PVC 0.009 200mm 185.2 21.79 57 116.145 131.53 3.62 33.508 48.8
P-49 Bz-91 124.97 Bz-92 119.98 58.1 PVC 0.009 250mm 231.2 46.74 57.9 86.165 204.7 3.95 35.596 55.1
P-50 Bz-90 131.02 Bz-91 125.07 60.5 PVC 0.009 250mm 231.2 46.58 60.4 98.591 218.96 4.14 39.554 54.5
P-51 Bz-94 115.68 Bz-95 111.33 61 PVC 0.009 250mm 231.2 47.03 61 71.358 186.28 3.7 30.774 56.1
P-52 Bz-103 93.14 Bz-104 90.35 61.7 PVC 0.009 315mm 291 70.98 61.6 45.315 274.14 3.46 24.845 53.3
P-53 Bz-95 111.23 Bz-96 106.97 62.3 PVC 0.009 250mm 231.2 47.14 62.5 68.177 182.08 3.64 29.707 56.4
P-54 Bz-108 81.22 Bz-109 79.37 65 PVC 0.009 315mm 291 71.59 64.9 28.496 217.39 2.93 17.252 55.9
P-55 Bz-104 90.25 Bz-105 86.66 65.9 PVC 0.009 315mm 291 71.18 65.8 54.529 300.72 3.7 28.788 52.6
P-56 Bz-73 216.13 Bz-74 210.31 21.9 PVC 0.009 200mm 185.2 7.52 21.9 265.201 198.75 3.54 39.952 26.8
P-57 Bz-74 210.21 Bz-75 204.62 24.9 PVC 0.009 200mm 185.2 7.57 25 223.657 182.52 3.35 35.035 27.1
P-58 Bz-115 73.63 Bz-116 72.89 43.2 PVC 0.009 355mm 328.6 72.09 43.3 17.097 232.84 2.42 11.391 50.1
P-59 Bz-117 72.28 Bz-118 71.59 46.8 PVC 0.009 355mm 328.6 82.2 46.9 14.7 215.9 2.37 10.648 54.6
P-60 Bz-116 72.89 Bz-117 72.33 51.9 PVC 0.009 355mm 328.6 72.09 51.8 10.807 185.12 2.05 7.897 52.7

Pg. 42
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 31: Reporte de Tuberas del colector Independencia, Caudal Mximo ao 20


Elevation Set Rim to Boundary
Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type
EMP-02 68.87 True 68.87 66.67 Free Outfall 102.32

7.2.4 CLCULOS HIDRULICOS COLECTOR LOS PINOS 1

El colector se ubica en el rea de drenaje 02 e inicia en el cruce de la Calle Madre Selva y la avenida los
Pinos; la descarga del colector es hacia el Colector Ingeniera (Antiguo) en el cruce de la Av. Tpac Amaru
con la Av. Los Pinos.
El Colector Los Pinos 1 tiene las siguientes caractersticas: DN 200 mm, material Concreto Simple
Normalizado y una longitud de 640.5 m que recolecta las aguas residuales de las sub rea de drenaje AD-
02A y AD-02B, donde se considera mejoramiento redes secundarias de alcantarillado.
Se proyecta realizar el mejoramiento del Colector Los Pinos 1 el cual tendr las siguientes caractersticas:
DN250mm, material PVC y una longitud de 536.05m, en este colector se plantea el mejoramiento de los
buzones en los tramos desde el Bz-119 hasta el Bz-130.

Cuadro 32: Caudal de Contribucin para cada buzn del Colector Los Pinos 1, ao 20
Buzn Q(lps)
Bz-120 15.26
Bz-121 0.12
Bz-122 0.05
Bz-123 0.07
Bz-124 1.15
Bz-125 0.45
Bz-126 0.21
Bz-127 0.07
Bz-128 0.05
Bz-129 0.08
Bz-130 2.83
Bz-131 0.48

Cuadro 33: Reporte de Buzones del Colector Los Pinos 1.


Elevation Elevation Hydraulic Hydraulic
Elevation Flow (Total
Label (Ground) (Invert in Grade Line Grade Line
(Invert) (m) Out) (L/s)
(m) 1) (m) (In) (m) (Out) (m)
Bz-120 93.82 92.12 (N/A) 15.26 92.22 92.22
Bz-121 90.96 89.32 89.42 15.38 89.42 89.42
Bz-122 88.67 86.99 87.09 15.43 87.09 87.09
Bz-123 86.44 84.93 85.03 15.5 85.03 85.03
Bz-124 84.4 82.98 83.08 16.65 83.08 83.08
Bz-125 82.27 80.18 80.28 17.1 80.29 80.29
Bz-126 79.59 77.51 77.61 17.31 77.62 77.62
Bz-127 77.5 75.88 75.98 17.38 75.99 75.99
Bz-128 75.83 74.35 74.45 17.43 74.46 74.46
Bz-129 73.89 72.39 72.49 17.51 72.5 72.5
Bz-130 73 71.45 71.55 20.34 71.57 71.57
Bz-131 72.93 71.05 71.15 20.82 71.17 71.17

Pg. 43
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 34: Reporte de Tuberas del Colector Los Pinos 1, Caudal Mximo ao 20
Section Capacity Tractive Depth
Invert Invert Length Velocity
Start Stop Size Diameter Flow Slope (Full Stress (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Average)
Node Node (Catalog (mm) (L/s) (m/km) Flow) (Calculated) End) /
(m) (m) (m) (m/s)
Conduit) (L/s) (Pascals) Rise (%)
P-1 Bz-120 92.12 Bz-121 89.42 47.8 PVC 0.009 250mm 240.2 15.26 56.422 183.4 2.45 15.659 30.5
P-2 Bz-121 89.32 Bz-122 87.09 40.1 PVC 0.009 250mm 240.2 15.38 55.426 181.77 2.44 15.496 30.7
P-3 Bz-122 86.99 Bz-123 85.03 39.9 PVC 0.009 250mm 240.2 15.43 49.087 171.06 2.34 14.117 31
P-4 Bz-123 84.93 Bz-124 83.08 41.3 PVC 0.009 250mm 240.2 15.5 44.629 163.11 2.27 13.131 31.3
P-5 Bz-124 82.98 Bz-125 80.28 47.9 PVC 0.009 250mm 240.2 16.65 56.422 183.4 2.52 16.272 31.9
P-6 Bz-125 80.18 Bz-126 77.61 51.6 PVC 0.009 250mm 240.2 17.1 49.892 172.46 2.43 14.953 32.7
P-7 Bz-126 77.51 Bz-127 75.98 51 PVC 0.009 250mm 240.2 17.31 30.058 133.86 2.03 10.122 34.3
P-8 Bz-127 75.88 Bz-128 74.45 50.1 PVC 0.009 250mm 240.2 17.38 28.607 130.59 2 9.75 34.5
P-9 Bz-128 74.35 Bz-129 72.49 60.2 PVC 0.009 250mm 240.2 17.43 30.976 135.89 2.06 10.396 34.3
P-10 Bz-129 72.39 Bz-130 71.55 60.1 PVC 0.009 250mm 240.2 17.51 13.989 91.32 1.55 5.579 37.1
P-11 Bz-130 71.45 Bz-131 71.15 48.9 PVC 0.009 250mm 240.2 20.34 6.152 60.56 1.2 3.1 44.1
P-12 Bz-131 71.05 EMP-5 70.52 11 PVC 0.009 250mm 240.2 20.82 48.301 169.69 2.54 15.884 36.4

Cuadro 35: Reporte de Tuberas del Colector Los Pinos 1, Caudal Mximo ao 20 (Tubera estructural)

Depth
Invert Invert Length Section Size Capacity Velocity Tractive Stress
Start Stop Manning's Diameter Flow Length Slope (Average
Label (Start) (Stop) (Scaled) Material (Catalog (Full Flow) (Average) (Calculated)
Node Node n (mm) (L/s) (m) (m/km) End) / Rise
(m) (m) (m) Conduit) (L/s) (m/s) (Pascals)
(%)
P-1 Bz-120 92.12 Bz-121 89.42 47.8 PVC 0.009 250mm 231.2 15.26 47.9 56.422 165.64 2.46 15.764 32.1
P-2 Bz-121 89.32 Bz-122 87.09 40.1 PVC 0.009 250mm 231.2 15.38 40.2 55.426 164.17 2.45 15.599 32.2
P-3 Bz-122 86.99 Bz-123 85.03 39.9 PVC 0.009 250mm 231.2 15.43 39.9 49.087 154.5 2.35 14.206 32.6
P-4 Bz-123 84.93 Bz-124 83.08 41.3 PVC 0.009 250mm 231.2 15.5 41.5 44.629 147.32 2.28 13.214 32.9
P-5 Bz-124 82.98 Bz-125 80.28 47.9 PVC 0.009 250mm 231.2 16.65 47.9 56.422 165.64 2.53 16.375 33.5
P-6 Bz-125 80.18 Bz-126 77.61 51.6 PVC 0.009 250mm 231.2 17.1 51.5 49.892 155.76 2.44 15.051 34.3
P-7 Bz-126 77.51 Bz-127 75.98 51 PVC 0.009 250mm 231.2 17.31 50.9 30.058 120.9 2.04 10.179 36.1
P-8 Bz-127 75.88 Bz-128 74.45 50.1 PVC 0.009 250mm 231.2 17.38 50 28.607 117.95 2.01 9.807 36.3
P-9 Bz-128 74.35 Bz-129 72.49 60.2 PVC 0.009 250mm 231.2 17.43 60 30.976 122.73 2.07 10.453 36.1
P-10 Bz-129 72.39 Bz-130 71.55 60.1 PVC 0.009 250mm 231.2 17.51 60 13.989 82.48 1.56 5.607 39.1
P-11 Bz-130 71.45 Bz-131 71.15 48.9 PVC 0.009 250mm 231.2 20.34 48.8 6.152 54.69 1.21 3.105 46.4
P-12 Bz-131 71.05 EMP-5 70.52 11 PVC 0.009 250mm 231.2 20.82 11 48.301 153.26 2.55 15.989 38.3

Pg. 44
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 36: Reporte de Outfall del Colector Los Pinos 1, Caudal Mximo ao 20
Elevation Set Rim to Boundary
Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type
EMP-5 72.87 True 72.87 70.52 Free Outfall 20.82

7.2.5 CLCULOS HIDRULICOS COLECTOR LOS PINOS 2

El colector se ubica en el rea de drenaje 02 e inicia en el pasaje Cancha Cancha; la descarga del colector es
hacia el Colector El Ermitao en la Av. Los Pinos con el cruce de la Calle Los Arrayanez. El Colector los Pinos
2 tiene las siguientes caractersticas: DN 200mm de material Concreto Simple Normalizado con una longitud
total 363.60m, recolecta las aguas residuales de las sub reas de drenaje AD-02D, donde se proyectar
redes secundarias de alcantarillado.
Se proyecta realizar el mejoramiento del Colector Los Pinos 2 el cual tendr una longitud total de 361.40m
con las siguientes caractersticas: DN200mm, material PVC y una longitud de 153.80m, DN250mm, material
PVC y una longitud de 207.60m en este colector se plantea el mejoramiento de las buzonetas en los tramos
desde el Bz-131 hasta el Bz-137 y los buzones en los tramos desde el Bz-138 hasta el Bz-150.

Cuadro 37: Caudal de Contribucin para cada buzn del Colector Los Pinos 2, ao 20

Buzn Q(lps)
Bz-139 (*) 1.51
Bz-140 0
Bz-135 0.03
Bz-136 0.01
Bz-137 0
Bz-147 0.03
Bz-148 1.51
Bz-138 0.5
Bz-132 34.08
Bz-133 0.05
Bz-141 0.03
Bz-134 0.04
Bz-146 0.01
Bz-143 0.01
Bz-144 1.06
Bz-145 0.13
Bz-142 0.05
Bz-149 0.15
Bz-150 0.13
Bz-151 1.13

(*) Se est considerando el caudal del rebose del RRE-03 y RRE-02 en el buzn Bz-139

Cuadro 38: Reporte de Buzones del colector los Pinos 2.


Elevation Elevation Hydraulic Hydraulic
Elevation Flow (Total
Label (Ground) (Invert in Grade Line Grade Line
(Invert) (m) Out) (L/s)
(m) 1) (m) (In) (m) (Out) (m)
Bz-132 196.34 195.34 (N/A) 34.08 195.5 195.5
Bz-133 189 188 188.1 34.13 188.16 188.16
Bz-134 182.41 181.41 181.51 34.17 181.57 181.57
Bz-135 175.01 174.01 174.11 34.19 174.17 174.17
Bz-136 172.59 171.59 171.69 34.21 171.75 171.75
Bz-137 169.66 168.46 168.46 34.21 168.62 168.62
Bz-138 168.63 167.33 167.43 34.71 167.49 167.49
Pg. 45
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Elevation Elevation Hydraulic Hydraulic


Elevation Flow (Total
Label (Ground) (Invert in Grade Line Grade Line
(Invert) (m) Out) (L/s)
(m) 1) (m) (In) (m) (Out) (m)
Bz-139 168.49 166.49 166.59 36.22 166.65 166.65
Bz-140 166.5 165.3 165.3 36.22 165.46 165.46
Bz-141 160.4 159.2 159.3 36.25 159.36 159.36
Bz-142 154 152.8 152.9 36.3 152.96 152.96
Bz-143 147.28 146.08 146.18 36.31 146.24 146.24
Bz-144 142 140.6 140.7 37.37 140.76 140.76
Bz-145 141.6 140.1 140.2 37.5 140.26 140.26
Bz-146 140.63 138.96 139.06 37.52 139.12 139.12
Bz-147 139.46 138.06 138.16 37.54 138.22 138.22
Bz-148 138.97 137.47 137.57 39.05 137.63 137.63
Bz-149 135.9 134.3 134.4 39.2 134.46 134.46
Bz-150 129.46 127.86 127.96 39.33 128.02 128.02
Bz-151 122.3 119.87 119.97 40.46 120.04 120.04

Pg. 46
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 39: Reporte de Tuberas del colector los Pinos 2, Caudal Mximo, ao 20
Section Capacity Tractive Depth
Invert Invert Length Velocity
Start Stop Size Diameter Flow Slope (Full Stress (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Average)
Node Node (Catalog (mm) (L/s) (m/km) Flow) (Calculated) End) /
(m) (m) (m) (m/s)
Conduit) (L/s) (Pascals) Rise (%)
P-1 Bz-151 119.87 EMP 116.72 31.4 PVC 0.009 250mm 240.2 40.46 100.336 244.57 3.99 37.591 48.3
P-2 Bz-132 195.34 Bz-133 188.1 11.9 PVC 0.009 200mm 192.2 34.08 609.058 332.52 7.38 148.204 52.3
P-3 Bz-141 159.2 Bz-142 152.9 18.5 PVC 0.009 200mm 192.2 36.25 338.841 248.02 6.1 96.239 55.5
P-4 Bz-142 152.8 Bz-143 146.18 20 PVC 0.009 200mm 192.2 36.3 329.078 244.42 6.04 94.107 55.7
P-5 Bz-143 146.08 Bz-144 140.7 17.7 PVC 0.009 200mm 192.2 36.31 304.326 235.05 5.88 88.526 55.9
P-6 Bz-144 140.6 Bz-145 140.2 22.9 PVC 0.009 250mm 240.2 37.37 17.498 102.13 2.08 9.119 54.1
P-7 Bz-145 140.1 Bz-146 139.06 17.8 PVC 0.009 250mm 240.2 37.5 58.829 187.27 3.23 23.899 48.4
P-8 Bz-146 138.96 Bz-147 138.16 14 PVC 0.009 250mm 240.2 37.52 57.058 184.43 3.19 23.332 48.8
P-9 Bz-147 138.06 Bz-148 137.57 8.2 PVC 0.009 250mm 240.2 37.54 59.541 188.4 3.24 24.137 49.7
P-10 Bz-148 137.47 Bz-149 134.4 18.7 PVC 0.009 250mm 240.2 39.05 165.118 313.74 4.73 54.617 45.8
P-11 Bz-149 134.3 Bz-150 127.96 43.4 PVC 0.009 250mm 240.2 39.2 146.483 295.5 4.53 49.86 46.2
P-12 Bz-150 127.86 Bz-151 119.97 59.5 PVC 0.009 250mm 240.2 39.33 132.748 281.31 4.38 46.227 46.6
P-13 Bz-133 188 Bz-134 181.51 13.9 PVC 0.009 200mm 192.2 34.13 462.884 289.88 6.71 119.576 53.1
P-14 Bz-134 181.41 Bz-135 174.11 17.6 PVC 0.009 200mm 192.2 34.17 412.933 273.79 6.45 109.407 53.5
P-15 Bz-135 174.01 Bz-136 171.69 6.5 PVC 0.009 200mm 192.2 34.19 362.455 256.51 6.14 98.958 54.8
P-16 Bz-136 171.59 Bz-137 168.46 6.6 PVC 0.009 200mm 192.2 34.21 466.774 291.1 6.74 120.473 53.8
P-17 Bz-137 168.46 Bz-138 167.43 9.2 PVC 0.009 200mm 192.2 34.21 112.642 143 4.05 39.446 59.2
P-18 Bz-138 167.33 Bz-139 166.59 13.3 PVC 0.009 200mm 192.2 34.71 55.178 100.08 3.14 22.51 62.7
P-19 Bz-139 166.49 Bz-140 165.3 6 PVC 0.009 200mm 192.2 36.22 195.21 188.25 5.01 62.411 59.2
P-20 Bz-140 165.3 Bz-141 159.3 13.4 PVC 0.009 200mm 192.2 36.22 447.387 284.99 6.72 119.764 54.7

Pg. 47
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 40: Reporte de Tuberas del colector los Pinos 2, Caudal Mximo, ao 20 (Tubera estructural)

Depth
Invert Invert Length Section Size Capacity Velocity Tractive Stress
Start Stop Manning's Diameter Flow Length Slope (Average
Label (Start) (Stop) (Scaled) Material (Catalog (Full Flow) (Average) (Calculated)
Node Node n (mm) (L/s) (m) (m/km) End) / Rise
(m) (m) (m) Conduit) (L/s) (m/s) (Pascals)
(%)
P-1 Bz-151 119.87 EMP 116.72 31.4 PVC 0.009 250mm 231.2 40.46 31.4 100.336 220.89 4 37.796 50.7
P-2 Bz-132 195.34 Bz-133 188.1 11.9 PVC 0.009 200mm 185.2 34.08 11.9 609.058 301.19 7.4 149.253 54.5
P-3 Bz-141 159.2 Bz-142 152.9 18.5 PVC 0.009 200mm 185.2 36.25 18.6 338.841 224.65 6.12 96.839 57.8
P-4 Bz-142 152.8 Bz-143 146.18 20 PVC 0.009 200mm 185.2 36.3 20.1 329.078 221.39 6.05 94.732 57.9
P-5 Bz-143 146.08 Bz-144 140.7 17.7 PVC 0.009 200mm 185.2 36.31 17.7 304.326 212.91 5.9 88.972 58.2
P-6 Bz-144 140.6 Bz-145 140.2 22.9 PVC 0.009 250mm 231.2 37.37 22.9 17.498 92.24 2.08 9.137 56.9
P-7 Bz-145 140.1 Bz-146 139.06 17.8 PVC 0.009 250mm 231.2 37.5 17.7 58.829 169.14 3.23 24.031 50.9
P-8 Bz-146 138.96 Bz-147 138.16 14 PVC 0.009 250mm 231.2 37.52 14 57.058 166.57 3.21 23.429 51.3
P-9 Bz-147 138.06 Bz-148 137.57 8.2 PVC 0.009 250mm 231.2 37.54 8.2 59.541 170.16 3.25 24.269 52.3
P-10 Bz-148 137.47 Bz-149 134.4 18.7 PVC 0.009 250mm 231.2 39.05 18.6 165.118 283.36 4.74 55.001 48.1
P-11 Bz-149 134.3 Bz-150 127.96 43.4 PVC 0.009 250mm 231.2 39.2 43.3 146.483 266.89 4.55 50.149 48.6
P-12 Bz-150 127.86 Bz-151 119.97 59.5 PVC 0.009 250mm 231.2 39.33 59.4 132.748 254.07 4.39 46.491 49
P-13 Bz-133 188 Bz-134 181.51 13.9 PVC 0.009 200mm 185.2 34.13 14 462.884 262.57 6.72 120.516 55.4
P-14 Bz-134 181.41 Bz-135 174.11 17.6 PVC 0.009 200mm 185.2 34.17 17.7 412.933 248 6.46 110.165 55.7
P-15 Bz-135 174.01 Bz-136 171.69 6.5 PVC 0.009 200mm 185.2 34.19 6.4 362.455 232.35 6.17 99.484 57.1
P-16 Bz-136 171.59 Bz-137 168.46 6.6 PVC 0.009 200mm 185.2 34.21 6.7 466.774 263.68 6.74 121.435 56
P-17 Bz-137 168.46 Bz-138 167.43 9.2 PVC 0.009 200mm 185.2 34.21 9.1 112.642 129.53 4.05 39.655 61.8
P-18 Bz-138 167.33 Bz-139 166.59 13.3 PVC 0.009 200mm 185.2 34.71 13.4 55.178 90.66 3.14 22.575 65.5
P-19 Bz-139 166.49 Bz-140 165.3 6 PVC 0.009 200mm 185.2 36.22 6.1 195.21 170.52 5.02 62.721 61.6
P-20 Bz-140 165.3 Bz-141 159.3 13.4 PVC 0.009 200mm 185.2 36.22 13.4 447.387 258.14 6.76 120.304 56.8

Pg. 48
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 41: Reporte de Outfall del colector los Pinos 2, Caudal Mximo, ao 20
Elevation Set Rim to Boundary
Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type
EMP 119.22 True 119.22 116.72 Free Outfall 40.46

7.2.6 CLCULOS HIDRULICOS COLECTOR EL ERMITAO


El colector se ubica en el rea de drenaje 02 e inicia en el pasaje la Amistad con el cruce de la calle El Sol; la
descarga del colector es hacia el Colector Ingeniera (Antiguo) en la Av. Los Jazmines con el cruce de la av.
Tpac Amaru. El Colector el Ermitao tiene las siguientes caractersticas: DN 200mm de material Concreto
Simple Normalizado con una longitud total 2028.10m, recolecta las aguas residuales de las sub reas de
drenaje AD-02C y AD-02D, donde se proyectar redes secundarias de alcantarillado.
Se proyecta realiza la proyeccin y mejoramiento del Colector El Ermitao el cual tendr una longitud total de
1975.01m con las siguientes caractersticas: DN250mm, material PVC y una longitud de 1050.94m,
DN315mm, material PVC y una longitud de 148.09, DN355mm, material PVC y una longitud de 618.10m,
DN400mm, material PVC y una longitud de 157.88m, en este colector se plantea proyectar buzones en los
tramos desde el Bz-175 hasta el Bz-176 y desde el Bz-214 hasta el Bz-217 y el mejoramiento de los buzones
desde los tramos desde el Bz-177 hasta el Bz-213 y desde el Bz-218 hasta el Bz-228.

Cuadro 42: Caudal de Contribucin para cada buzn del Colector El Ermitao, ao 20
Buzn Q(lps) Buzn Q(lps) Buzn Q(lps)
Bz-180 (*) 29.27 Bz-198 0.09 Bz-216 1.43
Bz-181 0.01 Bz-199 3.59 Bz-217 2.4
Bz-182 0.46 Bz-200 0.01 Bz-218 0
Bz-183 0 Bz-201 0.11 Bz-219 0
Bz-184 0.36 Bz-202 0.38 Bz-220 0
Bz-185 0.11 Bz-203 0.08 Bz-221 0
Bz-186 0.95 Bz-204 0.98 Bz-222 1.95
Bz-187 0.11 Bz-205 1.13 Bz-223 0
Bz-188 0.01 Bz-206 0.07 Bz-224 0
Bz-189 0.01 Bz-207 2.81 Bz-225 0
Bz-190 0.23 Bz-208 0.62 Bz-226 0
Bz-191 0.15 Bz-209 0.33 Bz-227 0
Bz-192 0.11 Bz-210 0.17 Bz-228 4.27
Bz-193 5.51 Bz-211 0.16 Bz-229 0
Bz-230
Bz-194 0.01 Bz-212 0.07 73.95
(***)
Bz-195 0.01 Bz-213 0 Bz-231 0
Bz-196 0.05 Bz-214 (**) 40.57 Bz-232 0
Bz-197 0.07 Bz-215 0.16 Bz-233 4.5

(*) Se considera el caudal del rebose del RAP-03 y RRE-04 en el buzn Bz-180
(**)Se considera el caudal del rebose del RRE-02 y RRE-03 en el buzn Bz-214
(***)Se considera el caudal del rebose del RAE-01 y RRE-02 en el buzn Bz-230

Pg. 49
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 43: Reporte de Buzones del colector El Ermitao.


Elevation Elevation Hydraulic Hydraulic
Elevation Flow (Total
Label (Ground) (Invert in Grade Line Grade Line
(Invert) (m) Out) (L/s)
(m) 1) (m) (In) (m) (Out) (m)
Bz-180 252.46 251.26 (N/A) 29.27 251.4 251.4
Bz-181 247.54 246.28 246.28 29.28 246.42 246.42
Bz-182 241.56 240.16 240.26 29.74 240.3 240.3
Bz-183 239.92 238.48 238.48 29.74 238.62 238.62
Bz-184 238.36 237.03 237.13 30.1 237.17 237.17
Bz-185 233.84 232.47 232.57 30.21 232.61 232.61
Bz-186 225.19 223.49 223.59 31.16 223.63 223.63
Bz-187 217.31 215.87 215.97 31.27 216.02 216.02
Bz-188 215.4 213.92 214.02 31.28 214.07 214.07
Bz-189 211 209.7 209.8 31.29 209.85 209.85
Bz-190 205.42 204.02 204.12 31.52 204.17 204.17
Bz-191 198 196.85 196.95 31.66 197 197
Bz-192 196.47 195.08 195.18 31.77 195.23 195.23
Bz-193 195.78 194.42 194.52 37.28 194.58 194.58
Bz-194 192.78 191.58 191.68 37.29 191.74 191.74
Bz-195 191.01 189.51 189.61 37.31 189.67 189.67
Bz-196 184.8 182.8 182.9 37.36 182.96 182.96
Bz-197 179.26 176.9 177 37.43 177.06 177.06
Bz-198 176.49 174.42 174.52 37.52 174.58 174.58
Bz-199 175.85 173.92 174.02 41.11 174.09 174.09
Bz-200 175.8 173.64 173.74 41.12 173.81 173.81
Bz-201 171.96 170.54 170.64 41.23 170.71 170.71
Bz-202 168.57 166.81 166.91 41.61 166.98 166.98
Bz-203 165.81 163.82 163.92 41.69 163.99 163.99
Bz-204 161.95 159.6 159.7 42.67 159.77 159.77
Bz-205 153.3 152.1 152.2 43.8 152.27 152.27
Bz-206 147.79 146.07 146.17 43.86 146.24 146.24
Bz-207 142.76 140.62 140.72 46.67 140.8 140.8
Bz-208 134.35 132.38 132.48 47.29 132.56 132.56
Bz-209 129.02 127.49 127.59 47.62 127.67 127.67
Bz-210 124.62 123.16 123.26 47.8 123.34 123.34
Bz-211 120.7 118.94 119.04 47.95 119.12 119.12
Bz-212 119.09 117.44 117.54 48.02 117.61 117.61
Bz-213 119.07 117.41 117.41 48.02 117.58 117.58
Bz-214 119.22 116.72 116.82 88.59 116.95 116.95
Bz-215 114.85 113.11 113.21 88.74 113.34 113.34
Bz-216 113.78 111.89 111.99 90.17 112.12 112.12
Bz-217 111.21 109.35 109.35 92.57 109.58 109.58
Bz-218 108.1 106.5 106.5 92.57 106.73 106.73
Bz-219 106.18 104.48 104.48 92.57 104.71 104.71
Bz-220 102.67 101.07 101.07 92.57 101.3 101.3
Bz-221 99.79 98.09 98.09 92.57 98.32 98.32
Bz-222 96.7 95.1 95.2 94.52 95.33 95.33
Bz-223 93.16 91.56 91.56 94.52 91.79 91.79
Bz-224 89.97 88.18 88.18 94.52 88.41 88.41
Bz-225 87.4 85.69 85.69 94.52 85.92 85.92
Bz-226 84.38 82.68 82.68 94.52 82.91 82.91
Bz-227 82.46 80.6 80.6 94.52 80.83 80.83
Bz-228 80.88 79.18 79.28 98.78 79.42 79.42
Bz-229 78.57 76.87 76.87 98.78 77.1 77.1
Bz-230 78.51 76.76 76.86 172.73 77.06 77.06
Bz-231 78 76.2 76.2 172.73 76.5 76.5
Bz-232 78 75.7 75.7 172.73 76 76
Bz-233 77.12 75.17 75.22 177.23 75.48 75.48

Pg. 50
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA
POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 44: Reporte de Tuberas del colector El Ermitao Caudal Mximo ao 20


Section Capacity Depth
Invert Velocity Tractive Stress
Start Stop Invert Length Size Diameter Flow Slope (Full (Average
Label (Start) Material Manning's n (Average) (Calculated)
Node Node (Stop) (m) (m) (Catalog (mm) (L/s) (m/km) Flow) End) / Rise
(m) (m/s) (Pascals)
Conduit) (L/s) (%)
P-1 Bz-229 76.87 Bz-230 76.86 2.1 PVC 0.01 400mm 384.2 98.78 4.687 166.46 1.5 4.696 58.2
P-2 Bz-212 117.44 Bz-213 117.41 4 PVC 0.009 315mm 302.6 48.02 7.571 124.37 1.62 5.078 51.4
P-3 Bz-183 238.48 Bz-184 237.13 8.8 PVC 0.009 250mm 240.2 29.74 152.729 301.74 4.24 45.671 40.4
P-4 Bz-233 75.17 EMP-08 75.07 9.2 PVC 0.009 400mm 384.2 177.23 10.936 282.53 2.57 11.172 71.9
P-5 Bz-182 240.16 Bz-183 238.48 9.6 PVC 0.009 250mm 240.2 29.74 177.8 325.56 4.47 51.423 39.8
P-6 Bz-199 173.92 Bz-200 173.74 11.2 PVC 0.009 250mm 240.2 41.11 15.961 97.54 2.06 8.794 58.5
P-7 Bz-194 191.58 Bz-195 189.61 12.2 PVC 0.009 250mm 240.2 37.29 161.581 310.36 4.63 52.645 44.9
P-8 Bz-215 113.11 Bz-216 111.99 12.8 PVC 0.009 315mm 302.6 88.74 87.489 422.77 4.65 45.674 55.2
P-9 Bz-198 174.42 Bz-199 174.02 13 PVC 0.009 250mm 240.2 37.52 30.519 134.88 2.55 14.234 51.9
P-10 Bz-180 251.26 Bz-181 246.28 15.1 PVC 0.009 250mm 240.2 29.27 333.44 445.84 5.56 83.309 58.4
P-11 Bz-187 215.87 Bz-188 214.02 18.1 PVC 0.009 250mm 240.2 31.27 102.874 247.64 3.73 34.305 42.2
P-12 Bz-193 194.42 Bz-194 191.68 19 PVC 0.009 250mm 240.2 37.28 144.992 294 4.44 48.435 45.1
P-13 Bz-184 237.03 Bz-185 232.57 19.8 PVC 0.009 250mm 240.2 30.1 225.116 366.33 4.88 62.157 39.3
P-14 Bz-181 246.28 Bz-182 240.26 20.6 PVC 0.009 250mm 240.2 29.28 290.451 416.11 5.3 74.85 38.2
P-15 Bz-188 213.92 Bz-189 209.8 22.1 PVC 0.009 250mm 240.2 31.28 187.737 334.54 4.63 54.853 40.5
P-16 Bz-202 166.81 Bz-203 163.92 22.8 PVC 0.009 250mm 240.2 41.61 126.422 274.52 4.37 45.582 48.2
P-17 Bz-189 209.7 Bz-190 204.12 25.8 PVC 0.009 250mm 240.2 31.29 215.377 358.32 4.86 61.068 40.2
P-18 Bz-227 80.6 Bz-228 79.28 28 PVC 0.009 355mm 341 94.52 47.073 426.45 3.75 28.34 50
P-19 Bz-201 170.54 Bz-202 166.91 29.1 PVC 0.009 250mm 240.2 41.23 124.057 271.94 4.33 44.733 48
P-20 Bz-203 163.82 Bz-204 159.7 30.1 PVC 0.009 250mm 240.2 41.69 136.536 285.29 4.49 48.462 47.9
P-21 Bz-211 118.94 Bz-212 117.54 36.1 PVC 0.009 250mm 240.2 47.95 38.598 151.69 2.97 18.955 56.9
P-22 Bz-195 189.51 Bz-196 182.9 37.3 PVC 0.009 250mm 240.2 37.31 177.757 325.52 4.78 56.799 44.5
P-23 Bz-196 182.8 Bz-197 177 37.6 PVC 0.009 250mm 240.2 37.36 154.706 303.68 4.56 50.93 45
P-24 Bz-190 204.02 Bz-191 196.95 38.4 PVC 0.009 250mm 240.2 31.52 184.092 331.27 4.61 54.201 40.7
P-25 Bz-216 111.89 Bz-217 109.35 39 PVC 0.009 315mm 302.6 90.17 65.104 364.69 4.2 36.422 55.5
P-26 Bz-218 106.5 Bz-219 104.48 39.9 PVC 0.009 355mm 341 92.57 50.59 442.1 3.83 29.731 49.2
P-27 Bz-186 223.49 Bz-187 215.97 41 PVC 0.009 250mm 240.2 31.16 182.755 330.07 4.58 53.624 40.5
P-28 Bz-185 232.47 Bz-186 223.59 41.5 PVC 0.009 250mm 240.2 30.21 214.22 357.35 4.8 59.872 39.5
P-29 Bz-205 152.1 Bz-206 146.17 42.7 PVC 0.009 250mm 240.2 43.8 138.967 287.82 4.59 50.19 49.1
P-30 Bz-226 82.68 Bz-227 80.6 42.9 PVC 0.009 355mm 341 94.52 48.398 432.41 3.79 28.964 49.9

Pg. 51
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA
POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Section Capacity Depth


Invert Velocity Tractive Stress
Start Stop Invert Length Size Diameter Flow Slope (Full (Average
Label (Start) Material Manning's n (Average) (Calculated)
Node Node (Stop) (m) (m) (Catalog (mm) (L/s) (m/km) Flow) End) / Rise
(m) (m/s) (Pascals)
Conduit) (L/s) (%)
P-31 Bz-219 104.48 Bz-220 101.07 44.1 PVC 0.009 355mm 341 92.57 77.156 545.97 4.46 41.421 47.6
P-32 Bz-206 146.07 Bz-207 140.72 44.5 PVC 0.009 250mm 240.2 43.86 120.223 267.71 4.35 44.846 49.6
P-33 Bz-191 196.85 Bz-192 195.18 45 PVC 0.009 250mm 240.2 31.66 37.02 148.56 2.61 15.443 46.1
P-34 Bz-200 173.64 Bz-201 170.64 45.5 PVC 0.009 250mm 240.2 41.12 66.057 198.44 3.45 27.225 50.2
P-35 Bz-220 101.07 Bz-221 98.09 46.1 PVC 0.009 355mm 341 92.57 64.748 500.15 4.18 36.109 48.2
P-36 Bz-230 76.76 Bz-231 76.2 48.3 PVC 0.009 400mm 384.2 172.73 11.628 291.33 2.62 11.647 67.2
P-37 Bz-192 195.08 Bz-193 194.52 48.3 PVC 0.009 250mm 240.2 31.77 11.555 83 1.71 6.131 51.9
P-38 Bz-210 123.16 Bz-211 119.04 48.6 PVC 0.009 250mm 240.2 47.8 85.013 225.12 3.94 35.402 53.1
P-39 Bz-213 117.41 Bz-214 116.82 48.9 PVC 0.009 315mm 302.6 48.02 12.098 157.21 1.92 7.383 46.9
P-40 Bz-214 116.72 Bz-215 113.21 49.1 PVC 0.009 315mm 302.6 88.59 71.526 382.26 4.33 38.927 54.6
P-41 Bz-197 176.9 Bz-198 174.52 51.1 PVC 0.009 250mm 240.2 37.43 46.479 166.45 2.97 19.813 49.3
P-42 Bz-231 76.2 Bz-232 75.7 52.1 PVC 0.009 400mm 384.2 172.73 9.593 264.61 2.43 9.933 69
P-43 Bz-232 75.7 Bz-233 75.22 52.2 PVC 0.009 400mm 384.2 172.73 9.209 259.26 2.39 9.601 69.4
P-44 Bz-209 127.49 Bz-210 123.26 53.5 PVC 0.009 250mm 240.2 47.62 78.852 216.81 3.83 33.324 53.4
P-45 Bz-208 132.38 Bz-209 127.59 55.6 PVC 0.009 250mm 240.2 47.29 86.347 226.88 3.96 35.676 52.8
P-46 Bz-228 79.18 Bz-229 76.87 59.5 PVC 0.009 355mm 341 98.78 38.865 387.5 3.55 24.809 52
P-47 Bz-221 98.09 Bz-222 95.2 59.6 PVC 0.009 355mm 341 92.57 48.624 433.42 3.77 28.816 49.4
P-48 Bz-224 88.18 Bz-225 85.69 59.8 PVC 0.009 355mm 341 94.52 41.68 401.28 3.59 25.735 50.5
P-49 Bz-222 95.1 Bz-223 91.56 60.8 PVC 0.009 355mm 341 94.52 58.363 474.85 4.05 33.572 49.1
P-50 Bz-223 91.56 Bz-224 88.18 61 PVC 0.009 355mm 341 94.52 55.446 462.83 3.98 32.241 49.3
P-51 Bz-217 109.35 Bz-218 106.5 64.7 PVC 0.009 355mm 341 92.57 44.106 412.79 3.64 26.69 49.8
P-52 Bz-225 85.69 Bz-226 82.68 65.4 PVC 0.009 355mm 341 94.52 45.932 421.25 3.72 27.802 50.1
P-53 Bz-204 159.6 Bz-205 152.2 65.9 PVC 0.009 250mm 240.2 42.67 112.399 258.85 4.22 42.044 49.2
P-54 Bz-207 140.62 Bz-208 132.48 69.1 PVC 0.009 250mm 240.2 46.67 117.648 264.83 4.41 45.237 51.3

Pg. 52
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA
POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 45: Reporte de Tuberas del colector El Ermitao Caudal Mximo ao 20 (Tubera estructural)

Depth
Invert Invert Length Section Size Capacity Velocity Tractive Stress
Start Stop Manning's Diameter Flow Length Slope (Average
Label (Start) (Stop) (Scaled) Material (Catalog (Full Flow) (Average) (Calculated)
Node Node n (mm) (L/s) (m) (m/km) End) / Rise
(m) (m) (m) Conduit) (L/s) (m/s) (Pascals)
(%)
P-1 Bz-229 76.87 Bz-230 76.86 2.1 PVC 0.01 400mm 384.2 98.78 2.1 4.687 166.46 1.5 4.696 58.2
P-2 Bz-212 117.44 Bz-213 117.41 4 PVC 0.009 315mm 291 48.02 4 7.571 112.06 1.62 5.087 54.2
P-3 Bz-183 238.48 Bz-184 237.13 8.8 PVC 0.009 250mm 231.2 29.74 8.8 152.729 272.52 4.26 45.959 42.5
P-4 Bz-233 75.17 EMP-08 75.07 9.2 PVC 0.009 400mm 384.2 177.23 9.1 10.936 282.53 2.57 11.172 71.9
P-5 Bz-182 240.16 Bz-183 238.48 9.6 PVC 0.009 250mm 231.2 29.74 9.4 177.8 294.04 4.5 51.748 41.9
P-6 Bz-199 173.92 Bz-200 173.74 11.2 PVC 0.009 250mm 231.2 41.11 11.3 15.961 88.1 2.06 8.806 61.6
P-7 Bz-194 191.58 Bz-195 189.61 12.2 PVC 0.009 250mm 231.2 37.29 12.2 161.581 280.31 4.64 53.007 47.2
P-8 Bz-215 113.11 Bz-216 111.99 12.8 PVC 0.009 315mm 291 88.74 12.8 87.489 380.92 4.67 45.889 57.9
P-9 Bz-198 174.42 Bz-199 174.02 13 PVC 0.009 250mm 231.2 37.52 13.1 30.519 121.82 2.56 14.276 54.6
P-10 Bz-180 251.26 Bz-181 246.28 15.1 PVC 0.009 250mm 231.2 29.27 14.9 333.44 402.67 5.58 83.919 61.3
P-11 Bz-187 215.87 Bz-188 214.02 18.1 PVC 0.009 250mm 231.2 31.27 18 102.874 223.66 3.75 34.48 44.4
P-12 Bz-193 194.42 Bz-194 191.68 19 PVC 0.009 250mm 231.2 37.28 18.9 144.992 265.53 4.46 48.687 47.4
P-13 Bz-184 237.03 Bz-185 232.57 19.8 PVC 0.009 250mm 231.2 30.1 19.8 225.116 330.86 4.9 62.553 41.3
P-14 Bz-181 246.28 Bz-182 240.26 20.6 PVC 0.009 250mm 231.2 29.28 20.7 290.451 375.82 5.32 75.329 40.1
P-15 Bz-188 213.92 Bz-189 209.8 22.1 PVC 0.009 250mm 231.2 31.28 21.9 187.737 302.15 4.65 55.2 42.6
P-16 Bz-202 166.81 Bz-203 163.92 22.8 PVC 0.009 250mm 231.2 41.61 22.9 126.422 247.94 4.39 45.801 50.6
P-17 Bz-189 209.7 Bz-190 204.12 25.8 PVC 0.009 250mm 231.2 31.29 25.9 215.377 323.62 4.88 61.471 42.3
P-18 Bz-227 80.6 Bz-228 79.28 28 PVC 0.009 355mm 328.6 94.52 28 47.073 386.34 3.76 28.472 52.6
P-19 Bz-201 170.54 Bz-202 166.91 29.1 PVC 0.009 250mm 231.2 41.23 29.3 124.057 245.61 4.35 44.947 50.4
P-20 Bz-203 163.82 Bz-204 159.7 30.1 PVC 0.009 250mm 231.2 41.69 30.2 136.536 257.67 4.51 48.75 50.4
P-21 Bz-211 118.94 Bz-212 117.54 36.1 PVC 0.009 250mm 231.2 47.95 36.3 38.598 137 2.98 19.013 59.7
P-22 Bz-195 189.51 Bz-196 182.9 37.3 PVC 0.009 250mm 231.2 37.31 37.2 177.757 294.01 4.79 57.176 46.8
P-23 Bz-196 182.8 Bz-197 177 37.6 PVC 0.009 250mm 231.2 37.36 37.5 154.706 274.28 4.57 51.271 47.2
P-24 Bz-190 204.02 Bz-191 196.95 38.4 PVC 0.009 250mm 231.2 31.52 38.4 184.092 299.2 4.63 54.543 42.8
P-25 Bz-216 111.89 Bz-217 109.35 39 PVC 0.009 315mm 291 90.17 39 65.104 328.59 4.21 36.57 58.3
P-26 Bz-218 106.5 Bz-219 104.48 39.9 PVC 0.009 355mm 328.6 92.57 39.9 50.59 400.52 3.84 29.864 51.6
P-27 Bz-186 223.49 Bz-187 215.97 41 PVC 0.009 250mm 231.2 31.16 41.1 182.755 298.11 4.6 53.963 42.6
P-28 Bz-185 232.47 Bz-186 223.59 41.5 PVC 0.009 250mm 231.2 30.21 41.5 214.22 322.75 4.82 60.271 41.5
P-29 Bz-205 152.1 Bz-206 146.17 42.7 PVC 0.009 250mm 231.2 43.8 42.7 138.967 259.95 4.61 50.435 51.5

Pg. 53
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA
POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Depth
Invert Invert Length Section Size Capacity Velocity Tractive Stress
Start Stop Manning's Diameter Flow Length Slope (Average
Label (Start) (Stop) (Scaled) Material (Catalog (Full Flow) (Average) (Calculated)
Node Node n (mm) (L/s) (m) (m/km) End) / Rise
(m) (m) (m) Conduit) (L/s) (m/s) (Pascals)
(%)
P-30 Bz-226 82.68 Bz-227 80.6 42.9 PVC 0.009 355mm 328.6 94.52 43 48.398 391.74 3.8 29.109 52.4
P-31 Bz-219 104.48 Bz-220 101.07 44.1 PVC 0.009 355mm 328.6 92.57 44.2 77.156 494.62 4.47 41.662 49.9
P-32 Bz-206 146.07 Bz-207 140.72 44.5 PVC 0.009 250mm 231.2 43.86 44.5 120.223 241.79 4.37 45.109 52.1
P-33 Bz-191 196.85 Bz-192 195.18 45 PVC 0.009 250mm 231.2 31.66 45.1 37.02 134.17 2.62 15.51 48.5
P-34 Bz-200 173.64 Bz-201 170.64 45.5 PVC 0.009 250mm 231.2 41.12 45.4 66.057 179.23 3.47 27.347 52.8
P-35 Bz-220 101.07 Bz-221 98.09 46.1 PVC 0.009 355mm 328.6 92.57 46 64.748 453.11 4.2 36.287 50.6
P-36 Bz-230 76.76 Bz-231 76.2 48.3 PVC 0.009 400mm 384.2 172.73 48.2 11.628 291.33 2.62 11.647 67.2
P-37 Bz-192 195.08 Bz-193 194.52 48.3 PVC 0.009 250mm 231.2 31.77 48.5 11.555 74.96 1.71 6.142 54.7
P-38 Bz-210 123.16 Bz-211 119.04 48.6 PVC 0.009 250mm 231.2 47.8 48.5 85.013 203.32 3.96 35.56 55.8
P-39 Bz-213 117.41 Bz-214 116.82 48.9 PVC 0.009 315mm 291 48.02 48.8 12.098 141.65 1.92 7.411 49.5
P-40 Bz-214 116.72 Bz-215 113.21 49.1 PVC 0.009 315mm 291 88.59 49.1 71.526 344.42 4.34 39.109 57.3
P-41 Bz-197 176.9 Bz-198 174.52 51.1 PVC 0.009 250mm 231.2 37.43 51.2 46.479 150.34 2.97 19.929 51.8
P-42 Bz-231 76.2 Bz-232 75.7 52.1 PVC 0.009 400mm 384.2 172.73 52.1 9.593 264.61 2.43 9.933 69
P-43 Bz-232 75.7 Bz-233 75.22 52.2 PVC 0.009 400mm 384.2 172.73 52.1 9.209 259.26 2.39 9.601 69.4
P-44 Bz-209 127.49 Bz-210 123.26 53.5 PVC 0.009 250mm 231.2 47.62 53.6 78.852 195.82 3.85 33.439 56
P-45 Bz-208 132.38 Bz-209 127.59 55.6 PVC 0.009 250mm 231.2 47.29 55.5 86.347 204.91 3.97 35.84 55.4
P-46 Bz-228 79.18 Bz-229 76.87 59.5 PVC 0.009 355mm 328.6 98.78 59.4 38.865 351.05 3.55 24.91 54.6
P-47 Bz-221 98.09 Bz-222 95.2 59.6 PVC 0.009 355mm 328.6 92.57 59.4 48.624 392.66 3.79 28.941 51.8
P-48 Bz-224 88.18 Bz-225 85.69 59.8 PVC 0.009 355mm 328.6 94.52 59.7 41.68 363.54 3.6 25.849 53.1
P-49 Bz-222 95.1 Bz-223 91.56 60.8 PVC 0.009 355mm 328.6 94.52 60.7 58.363 430.19 4.07 33.732 51.6
P-50 Bz-223 91.56 Bz-224 88.18 61 PVC 0.009 355mm 328.6 94.52 61 55.446 419.3 3.99 32.408 51.8
P-51 Bz-217 109.35 Bz-218 106.5 64.7 PVC 0.009 355mm 328.6 92.57 64.6 44.106 373.97 3.65 26.805 52.2
P-52 Bz-225 85.69 Bz-226 82.68 65.4 PVC 0.009 355mm 328.6 94.52 65.5 45.932 381.63 3.73 27.92 52.6
P-53 Bz-204 159.6 Bz-205 152.2 65.9 PVC 0.009 250mm 231.2 42.67 65.8 112.399 233.79 4.23 42.279 51.7
P-54 Bz-207 140.62 Bz-208 132.48 69.1 PVC 0.009 250mm 231.2 46.67 69.2 117.648 239.18 4.42 45.496 53.8

Pg. 54
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 46: Reporte de Outfall del colector El Ermitao Caudal Mximo ao 20

Elevation Set Rim to Boundary


Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type
EMP-08 77.27 True 77.27 75.07 Free Outfall 177.23

7.2.7 CLCULOS HIDRULICOS COLECTOR UNIFICADA

El colector se ubica en el rea de drenaje 02 e inicia en la calle las Amricas; la descarga del colector es
hacia el Colector Ingeniera (Antiguo) en la Av. Tpac Amaru con el cruce de la av. 16 de Marzo. El Colector
Unificada tiene las siguientes caractersticas: DN 200mm de material PVC y Concreto Simple Normalizado, DN
250mm y 315mm de PVC con una longitud total 947.50m, recolecta las aguas residuales de las sub reas de
drenaje AD-02E, donde se proyectar redes secundarias de alcantarillado.
Se proyecta realizar el mejoramiento del Colector Unificada el cual tendr una longitud total de 890.79 con
las siguientes caractersticas: DN200mm, material PVC y una longitud de 150.79m, DN250mm, material PVC
y una longitud de 504.32m, DN315mm, material PVC y una longitud de 235.68m, en este colector se plantea
el mejoramiento de los buzones en los tramos desde el Bz-229 hasta el Bz-255.

Cuadro 47. Caudal de contribucin para cada buzn del colector Unificada, ao 20

Buzn Q(lps)
Bz-234 (*) 21.88
Bz-235 0.33
Bz-236 0
Bz-237 0.07
Bz-238 0.21
Bz-239 0.04
Bz-240 0.07
Bz-241 0.03
Bz-242 0.03
Bz-243 0.33
Bz-244 0.33
Bz-245 0.01
Bz-246 0
Bz-247 1.1
Bz-248 0.24
Bz-249 5.13
Bz-250 0.07
Bz-251 0.07
Bz-252 0.27
Bz-253 1.14
Bz-254 4.16
Bz-255 1.44
Bz-256 0
Bz-257 0.32
Bz-258 0.45
Bz-259 3.3
Bz-260 0.21

(*)Se considera el caudal del rebose del REE-01 y RAP-03 en el buzn Bz-234

Pg. 55
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 48: Reporte de Buzones del colector Unificada.


Hydraulic Hydraulic
Elevation Elevation Elevation Flow
Grade Grade
Label (Ground) (Invert) (Invert in (Total Out)
Line (In) Line (Out)
(m) (m) 1) (m) (L/s)
(m) (m)
Bz-234 152.41 150.96 (N/A) 21.88 151.09 151.09
Bz-235 145.76 144.31 144.36 22.21 144.44 144.44
Bz-236 135.29 133.84 133.84 22.21 133.97 133.97
Bz-237 126.71 125.16 125.21 22.28 125.29 125.29
Bz-238 118.58 117.18 117.23 22.49 117.31 117.31
Bz-239 113.65 112.25 112.3 22.53 112.38 112.38
Bz-240 106.73 105.18 105.23 22.59 105.31 105.31
Bz-241 102.7 101.3 101.35 22.62 101.43 101.43
Bz-242 100.75 99.15 99.15 22.65 99.27 99.27
Bz-243 100.56 98.61 98.66 22.98 98.73 98.73
Bz-244 100.28 98.08 98.13 23.31 98.2 98.2
Bz-245 98 96.01 96.01 23.32 96.13 96.13
Bz-246 92.33 90.98 90.98 23.32 91.1 91.1
Bz-247 91.94 89.29 89.34 24.42 89.42 89.42
Bz-248 90.81 87.96 88.01 24.66 88.09 88.09
Bz-249 90 87.36 87.41 29.78 87.5 87.5
Bz-250 89.91 86.81 86.86 29.85 86.95 86.95
Bz-251 89.82 86.22 86.27 29.92 86.36 86.36
Bz-252 89 85.8 85.85 30.18 85.94 85.94
Bz-253 88.4 85.4 85.45 31.32 85.55 85.55
Bz-254 87.11 84.81 84.81 35.48 84.95 84.95
Bz-255 86.22 84.32 84.37 36.92 84.47 84.47
Bz-256 86 84.2 84.2 36.92 84.35 84.35
Bz-257 85.61 83.91 83.96 37.24 84.06 84.06
Bz-258 85.26 83.51 83.56 37.69 83.66 83.66
Bz-259 85.52 83.02 83.07 40.99 83.18 83.18
Bz-260 85.19 82.94 82.99 41.2 83.1 83.1

Pg. 56
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 49: Reporte de Tuberas del colector Unificada, Caudal Mximo, ao 20


Section Capacity Tractive Depth
Invert Invert Velocity
Start Stop Size Diameter Flow Length Slope (Full Stress (Average
Label (Start) (Stop) Material Manning's n (Average)
Node Node (Catalog (mm) (L/s) (m) (m/km) Flow) (Calculated) End) /
(m) (m) (m/s)
Conduit) (L/s) (Pascals) Rise (%)
P-1 Bz-259 83.02 Bz-260 82.99 PVC 0.009 315mm 302.6 40.99 5.182 5.79 108.76 1.41 3.847 47.9
P-2 Bz-241 101.3 Bz-242 99.15 PVC 0.009 200mm 192.2 22.62 10.058 213.752 196.99 4.51 54.735 45.5
P-3 Bz-245 96.01 Bz-246 90.98 PVC 0.009 250mm 240.2 23.32 12.192 412.566 495.92 5.6 88.877 33.3
P-4 Bz-240 105.18 Bz-241 101.35 PVC 0.009 200mm 192.2 22.59 12.802 299.181 233.05 5.09 71.067 44.6
P-5 Bz-255 84.32 Bz-256 84.2 PVC 0.009 315mm 302.6 36.92 14.326 8.377 130.82 1.56 4.951 42.8
P-6 Bz-238 117.18 Bz-239 112.3 PVC 0.009 200mm 192.2 22.49 16.154 302.085 234.18 5.1 71.457 44.4
P-7 Bz-234 150.96 Bz-235 144.36 PVC 0.009 200mm 192.2 21.88 18.593 354.976 253.85 5.36 80.068 43.4
P-8 Bz-246 90.98 Bz-247 89.34 PVC 0.009 250mm 240.2 23.32 18.898 86.784 227.45 3.23 26.397 36.7
P-9 Bz-244 98.08 Bz-245 96.01 PVC 0.009 250mm 240.2 23.31 20.117 102.899 247.67 3.43 30.15 36.3
P-10 Bz-239 112.25 Bz-240 105.23 PVC 0.009 200mm 192.2 22.53 22.555 311.236 237.7 5.16 73.198 44.4
P-11 Bz-236 133.84 Bz-237 125.21 PVC 0.009 200mm 192.2 22.21 22.86 377.515 261.79 5.5 84.567 43.6
P-12 Bz-237 125.16 Bz-238 117.23 PVC 0.009 200mm 192.2 22.28 22.86 346.894 250.95 5.34 79.268 43.9
P-13 Bz-235 144.31 Bz-236 133.84 PVC 0.009 200mm 192.2 22.21 25.908 404.122 270.86 5.62 89.273 43.5
P-14 Bz-256 84.2 Bz-257 83.96 PVC 0.009 315mm 302.6 36.92 36.271 6.617 116.27 1.43 4.105 43.7
P-15 Bz-260 82.94 EMP-09 82.69 PVC 0.009 315mm 302.6 41.2 38.405 6.51 115.32 1.47 4.232 46.4
P-16 Bz-242 99.15 Bz-243 98.66 PVC 0.009 250mm 240.2 22.65 45.72 10.717 79.93 1.52 5.037 43.7
P-17 Bz-258 83.51 Bz-259 83.07 PVC 0.009 315mm 302.6 37.69 47.854 9.195 137.05 1.63 5.375 42.5
P-18 Bz-247 89.29 Bz-248 88.01 PVC 0.009 250mm 240.2 24.42 48.158 26.579 125.87 2.15 10.653 41.5
P-19 Bz-249 87.36 Bz-250 86.86 PVC 0.009 250mm 240.2 29.78 48.463 10.317 78.42 1.61 5.457 50.8
P-20 Bz-257 83.91 Bz-258 83.56 PVC 0.009 315mm 302.6 37.24 48.768 7.177 121.09 1.48 4.392 43.5
P-21 Bz-252 85.8 Bz-253 85.45 PVC 0.009 250mm 240.2 30.18 50.292 6.959 64.41 1.4 3.995 53.7
P-22 Bz-251 86.22 Bz-252 85.85 PVC 0.009 250mm 240.2 29.92 50.902 7.269 65.83 1.42 4.125 53.2
P-23 Bz-250 86.81 Bz-251 86.27 PVC 0.009 250mm 240.2 29.85 51.206 10.546 79.29 1.63 5.559 50.7
P-24 Bz-248 87.96 Bz-249 87.41 PVC 0.009 250mm 240.2 24.66 51.511 10.677 79.78 1.55 5.196 45.8
P-25 Bz-254 84.81 Bz-255 84.37 PVC 0.009 315mm 302.6 35.48 53.035 8.296 130.19 1.54 4.832 41.7
P-26 Bz-253 85.4 Bz-254 84.81 PVC 0.009 250mm 240.2 31.32 58.522 10.082 77.52 1.62 5.463 52.3
P-27 Bz-243 98.61 Bz-244 98.13 PVC 0.009 250mm 240.2 22.98 60.96 7.874 68.51 1.36 3.965 45.7

Pg. 57
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 50: Reporte de Tuberas del colector Unificada, Caudal Mximo, ao 20 (Tubera estructural)

Depth
Invert Invert Length Section Size Capacity Velocity Tractive Stress
Start Stop Manning's Diameter Flow Length Slope (Average
Label (Start) (Stop) (Scaled) Material (Catalog (Full Flow) (Average) (Calculated)
Node Node n (mm) (L/s) (m) (m/km) End) / Rise
(m) (m) (m) Conduit) (L/s) (m/s) (Pascals)
(%)
P-1 Bz-259 83.02 Bz-260 82.99 5.299 PVC 0.009 315mm 291 40.99 5.182 5.79 97.99 1.41 3.853 50.5
P-2 Bz-241 101.3 Bz-242 99.15 9.984 PVC 0.009 200mm 185.2 22.62 10.058 213.752 178.43 4.55 54.922 47.7
P-3 Bz-245 96.01 Bz-246 90.98 12.31 PVC 0.009 250mm 231.2 23.32 12.192 412.566 447.91 5.63 89.53 35
P-4 Bz-240 105.18 Bz-241 101.35 12.714 PVC 0.009 200mm 185.2 22.59 12.802 299.181 211.1 5.11 71.502 46.7
P-5 Bz-255 84.32 Bz-256 84.2 14.457 PVC 0.009 315mm 291 36.92 14.326 8.377 117.87 1.57 4.965 45.1
P-6 Bz-238 117.18 Bz-239 112.3 16.238 PVC 0.009 200mm 185.2 22.49 16.154 302.085 212.12 5.12 71.894 46.6
P-7 Bz-234 150.96 Bz-235 144.36 18.597 PVC 0.009 200mm 185.2 21.88 18.593 354.976 229.94 5.38 80.584 45.5
P-8 Bz-246 90.98 Bz-247 89.34 18.964 PVC 0.009 250mm 231.2 23.32 18.898 86.784 205.43 3.25 26.575 38.6
P-9 Bz-244 98.08 Bz-245 96.01 20.058 PVC 0.009 250mm 231.2 23.31 20.117 102.899 223.69 3.45 30.341 38.1
P-10 Bz-239 112.25 Bz-240 105.23 22.611 PVC 0.009 200mm 185.2 22.53 22.555 311.236 215.31 5.18 73.646 46.6
P-11 Bz-236 133.84 Bz-237 125.21 22.77 PVC 0.009 200mm 185.2 22.21 22.86 377.515 237.13 5.52 85.109 45.7
P-12 Bz-237 125.16 Bz-238 117.23 22.917 PVC 0.009 200mm 185.2 22.28 22.86 346.894 227.31 5.36 79.775 46
P-13 Bz-235 144.31 Bz-236 133.84 25.894 PVC 0.009 200mm 185.2 22.21 25.908 404.122 245.34 5.66 89.753 45.6
P-14 Bz-256 84.2 Bz-257 83.96 36.365 PVC 0.009 315mm 291 36.92 36.271 6.617 104.76 1.44 4.118 46.1
P-15 Bz-260 82.94 EMP-09 82.69 38.517 PVC 0.009 315mm 291 41.2 38.405 6.51 103.9 1.47 4.242 49
P-16 Bz-242 99.15 Bz-243 98.66 45.798 PVC 0.009 250mm 231.2 22.65 45.72 10.717 72.19 1.52 5.05 46
P-17 Bz-258 83.51 Bz-259 83.07 47.873 PVC 0.009 315mm 291 37.69 47.854 9.195 123.49 1.63 5.394 44.9
P-18 Bz-247 89.29 Bz-248 88.01 48.121 PVC 0.009 250mm 231.2 24.42 48.158 26.579 113.69 2.16 10.708 43.6
P-19 Bz-249 87.36 Bz-250 86.86 48.615 PVC 0.009 250mm 231.2 29.78 48.463 10.317 70.83 1.62 5.467 53.6
P-20 Bz-257 83.91 Bz-258 83.56 48.617 PVC 0.009 315mm 291 37.24 48.768 7.177 109.1 1.48 4.409 45.9
P-21 Bz-252 85.8 Bz-253 85.45 50.419 PVC 0.009 250mm 231.2 30.18 50.292 6.959 58.17 1.4 3.996 56.7
P-22 Bz-251 86.22 Bz-252 85.85 50.81 PVC 0.009 250mm 231.2 29.92 50.902 7.269 59.45 1.42 4.127 56.1
P-23 Bz-250 86.81 Bz-251 86.27 51.291 PVC 0.009 250mm 231.2 29.85 51.206 10.546 71.61 1.63 5.569 53.5
P-24 Bz-248 87.96 Bz-249 87.41 51.511 PVC 0.009 250mm 231.2 24.66 51.511 10.677 72.06 1.55 5.218 48.2
P-25 Bz-254 84.81 Bz-255 84.37 52.945 PVC 0.009 315mm 291 35.48 53.035 8.296 117.3 1.55 4.85 44
P-26 Bz-253 85.4 Bz-254 84.81 58.63 PVC 0.009 250mm 231.2 31.32 58.522 10.082 70.02 1.62 5.471 55.2
P-27 Bz-243 98.61 Bz-244 98.13 60.999 PVC 0.009 250mm 231.2 22.98 60.96 7.874 61.88 1.36 3.975 48.1

Pg. 58
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 51: Reporte de Outfall del colector Unificada, Caudal Mximo, ao 20


Elevation Set Rim to Boundary
Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type
EMP-09 84.87 True 84.87 82.69 Free Outfall 41.2

7.2.8 CLCULOS HIDRULICOS COLECTOR LOS ALAMOS


El colector se ubica en el rea de drenaje 02 e inicia en el cruce de los pasajes Ciro Alegra y Fidel Castro; la
descarga del colector es hacia el Colector El Ermitao en la Av. Los Jazmines con el cruce de la Av. Los
lamos. El Colector los lamos tiene las siguientes caractersticas: DN 200 y 250mm, material Concreto
Simple Normalizado y una longitud de 619.35m, recolecta las aguas residuales de rea de drenaje AD-02C,
donde se proyectar redes secundarias de alcantarillado.
Se proyecta realizar el mejoramiento del Colector los lamos el cual tendr una longitud total de 679.75m
con las siguientes caractersticas: DN250mm material PVC y una longitud de 29.12m, DN315mm material
PVC y una longitud de 261.20m, DN355mm material PVC y una longitud de 293.37m, DN400mm material
PVC y una longitud de 96.06m en este colector se plantea el mejoramiento de los buzones en los tramos
desde el Bz-162 hasta el Bz-230. Y la proyeccin en los tramos Bz-152 hasta el Bz-161.

Cuadro 52: Caudal de Contribucin para cada buzn del Colector Los lamos, ao 20
Buzn Q(lps)
Bz-152 127.2
Bz-153 0.01
Bz-154 0.01
Bz-155 0
Bz-156 0
Bz-157 0.03
Bz-158 0.01
Bz-159 0.15
Bz-160 0
Bz-161 0.45
Bz-162 1.32
Bz-163 0.04
Bz-164 0.83
Bz-165 0.94
Bz-166 0.11
Bz-167 0.13
Bz-168 0.04
Bz-169 0.05
Bz-170 0.42
Bz-171 0.07
Bz-172 0.32
Bz-173 0.03
Bz-174 0.17
Bz-175 0.11
Bz-176 4.23
Bz-177 0.12
Bz-178 0.11
Bz-179 0.13

Pg. 59
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 53: Reporte de Buzones del colector Los lamos.


Elevation Elevation Hydraulic Hydraulic
Elevation Flow (Total
Label (Ground) (Invert in Grade Line Grade Line
(Invert) (m) Out) (L/s)
(m) 1) (m) (In) (m) (Out) (m)
Bz-152 144 143 (N/A) 127.17 143.24 143.24
Bz-153 140.15 139.15 139.2 127.18 139.39 139.39
Bz-154 137.83 136.83 136.88 127.2 137.07 137.07
Bz-155 133.58 132.58 132.58 127.2 132.82 132.82
Bz-156 130.42 129.42 129.42 127.2 129.66 129.66
Bz-157 127.54 126.54 126.59 127.22 126.81 126.81
Bz-158 125.73 124.73 124.78 127.24 125 125
Bz-159 122.55 121.55 121.6 127.38 121.82 121.82
Bz-160 119.73 118.73 118.73 127.38 119 119
Bz-161 113.17 111.85 111.9 127.83 112.12 112.12
Bz-162 112.58 110.48 110.58 129.15 110.75 110.75
Bz-163 106.36 104.61 104.71 129.2 104.88 104.88
Bz-164 98.03 95.93 96.53 130.03 96.2 96.2
Bz-165 97.76 95.6 95.65 130.97 95.87 95.87
Bz-166 92.29 90.47 90.57 131.08 90.74 90.74
Bz-167 87.71 86.34 86.44 131.21 86.61 86.61
Bz-168 85.73 83.89 83.99 131.25 84.16 84.16
Bz-169 83.88 82.08 82.18 131.3 82.35 82.35
Bz-170 83.59 81.14 81.24 131.72 81.41 81.41
Bz-171 83.28 80.78 80.88 131.79 81.05 81.05
Bz-172 82.92 80.32 80.42 132.11 80.59 80.59
Bz-173 82.74 80.09 80.15 132.13 80.36 80.36
Bz-174 82.38 79.63 79.73 132.31 79.9 79.9
Bz-175 81.69 78.86 78.96 132.41 79.13 79.13
Bz-176 79.66 78.14 78.24 136.64 78.42 78.42
Bz-177 79.02 77.69 77.79 136.76 77.96 77.96
Bz-178 78.85 77.45 77.5 136.86 77.72 77.72
Bz-179 78.5 76.84 76.9 136.99 77.11 77.11

Pg. 60
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 54: Reporte de Tuberas del colector Los lamos, Caudal Mximo ao 20

Section Capacity Tractive Depth


Invert Invert Velocity
Start Stop Size Diameter Flow Length Slope (Full Stress (Average
Label (Start) (Stop) Material Manning's n (Average)
Node Node (Catalog (mm) (L/s) (m) (m/km) Flow) (Calculated) End) /
(m) (m) (m/s)
Conduit) (L/s) (Pascals) Rise (%)
P-1 Bz-169 82.08 Bz-170 81.24 PVC 0.009 315mm 302.6 131.3 4.3 196.85 634.15 6.95 102.17 66.4
P-2 Bz-152 143 Bz-153 139.2 PVC 0.009 250mm 240.2 127.17 4.6 831.146 703.89 10.93 337.98 68
P-3 Bz-159 121.55 Bz-160 118.73 PVC 0.009 315mm 302.6 127.38 4.9 578.248 1,086.88 7.8 275.276 60.3
P-4 Bz-154 136.83 Bz-155 132.58 PVC 0.009 250mm 240.2 127.2 4.9 871.473 720.77 11.11 350.863 67.5
P-5 Bz-156 129.42 Bz-157 126.59 PVC 0.009 250mm 240.2 127.2 5.5 515.821 554.52 9.2 231.993 70.1
P-6 Bz-153 139.15 Bz-154 136.88 PVC 0.009 250mm 240.2 127.18 5.8 391.974 483.39 8.34 186.456 71.7
P-7 Bz-164 95.93 Bz-165 95.65 PVC 0.009 315mm 302.6 130.03 5.8 48.349 314.28 4.16 33.344 73.5
P-8 Bz-155 132.58 Bz-156 129.42 PVC 0.009 250mm 240.2 127.2 6.7 471.248 530.02 8.9 215.941 69.8
P-9 Bz-157 126.54 Bz-158 124.78 PVC 0.009 315mm 302.6 127.22 9.1 192.476 627.07 5.25 115.463 64.2
P-10 Bz-158 124.73 Bz-159 121.6 PVC 0.009 315mm 302.6 127.24 9.1 342.301 836.24 6.45 182.226 61.1
P-11 Bz-179 76.84 Bz-225 76.76 PVC 0.009 400mm 384.2 136.99 10.4 7.72 237.37 2.12 7.658 64.3
P-12 Bz-161 111.85 Bz-162 110.58 PVC 0.009 315mm 302.6 127.83 10.4 122.549 500.36 5.39 72.604 65.1
P-13 Bz-160 118.73 Bz-161 111.9 PVC 0.009 315mm 302.6 127.38 12.5 546.54 1,056.66 7.64 263.468 58.7
P-14 Bz-167 86.34 Bz-168 83.99 PVC 0.009 315mm 302.6 131.21 19.8 118.615 492.26 5.79 68.445 63.5
P-15 Bz-172 80.32 Bz-173 80.15 PVC 0.009 355mm 341 132.11 20.1 8.451 180.69 2.16 8.056 72.6
P-16 Bz-168 83.89 Bz-169 82.18 PVC 0.009 315mm 302.6 131.25 25.9 66.003 367.2 4.68 42.919 66.2
P-17 Bz-162 110.48 Bz-163 104.71 PVC 0.009 315mm 302.6 129.15 31.4 183.791 612.75 6.75 96.116 60.4
P-18 Bz-170 81.14 Bz-171 80.88 PVC 0.009 355mm 341 131.72 35.1 7.418 169.28 2.05 7.202 73.2
P-19 Bz-177 77.69 Bz-178 77.5 PVC 0.009 400mm 384.2 136.76 38.7 4.908 189.28 1.78 5.253 66.8
P-20 Bz-176 78.14 Bz-177 77.79 PVC 0.009 355mm 341 136.64 39.9 8.766 184.02 2.21 8.395 72.8
P-21 Bz-173 80.09 Bz-174 79.73 PVC 0.009 355mm 341 132.13 39.9 9.016 186.64 2.22 8.509 71.2
P-22 Bz-171 80.78 Bz-172 80.42 PVC 0.009 355mm 341 131.79 40.2 8.948 185.93 2.21 8.448 71.1
P-23 Bz-165 95.6 Bz-166 90.57 PVC 0.009 315mm 302.6 130.97 41.5 121.343 497.89 5.84 69.638 62.5
P-24 Bz-166 90.47 Bz-167 86.44 PVC 0.009 315mm 302.6 131.08 41.5 97.219 445.66 5.39 58.41 63.6
P-25 Bz-178 77.45 Bz-179 76.9 PVC 0.009 400mm 384.2 136.86 50.6 10.87 281.67 2.41 10.12 59.9
P-26 Bz-163 104.61 Bz-164 96.53 PVC 0.009 315mm 302.6 129.2 53.6 150.62 554.71 6.29 82.152 61.2
P-27 Bz-174 79.63 Bz-175 78.96 PVC 0.009 355mm 341 132.31 59.7 11.215 208.16 2.41 10.215 69.1
P-28 Bz-175 78.86 Bz-176 78.24 PVC 0.009 355mm 341 132.41 67.1 9.246 189 2.24 8.697 71

Debido a las condiciones topolgicas de los buzones existentes del colector los Alamos (Cotas de llegada al Colector Ingeniera) no se tomar en
cuenta la tubera estructural NTP ISO 21138:2010

Pg. 61
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 55: Reporte de Outfall del colector Los lamos, Caudal Mximo, ao 20

Elevation Set Rim to Boundary


Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type
Bz-225 78.51 True 78.51 76.76 Free Outfall 136.99

7.2.9 CLCULOS HIDRULICOS COLECTOR EL NGEL


El colector se ubica en el rea de drenaje 03 e inicia en el cruce de las calles el Milagro y av. Herrera; la
descarga del colector es hacia el Colector Ingeniera (Nuevo) en la Av. Tpac Amaru antes de la av. Tomas
Valles. El Colector el ngel tiene las siguientes caractersticas: DN 200, 250 y 300mm, material Concreto
Simple Normalizado y una longitud de 1450.50m, recolecta las aguas residuales del rea de drenaje AD-03,
donde se proyectar redes secundarias de alcantarillado.
Se proyecta realizar el mejoramiento del Colector El ngel el cual tendr una longitud total de 1405.22m con
las siguientes caractersticas: DN200mm, material PVC y una longitud de 269.04m, DN250mm, material PVC
y una longitud de 879.94m, DN315mm, material PVC y una longitud de 256.24m, en este colector se plantea
el mejoramiento de los buzones en los tramos desde el Bz-246 hasta el Bz-275.

Cuadro 56: Caudal de Contribucin para cada buzn del Colector el ngel, ao 20
Buzn Q(lps)
Bz-261 4.7
Bz-262 0.04
Bz-263 0.01
Bz-264 0.08
Bz-265 0.08
Bz-266 0.12
Bz-267 0.08
Bz-268 2.92
Bz-269 0.81
Bz-270 0.05
Bz-271 0.04
Bz-272 0
Bz-273 3.88
Bz-274 0
Bz-275 0
Bz-276 0
Bz-277 0
Bz-278 0
Bz-279 0
Bz-280 0
Bz-281 0
Bz-282 0
Bz-283 0
Bz-284 0
Bz-285 0
Bz-286 0
Bz-287 0
Bz-288 0
Bz-289 0
Bz-290 0

Pg. 62
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 57: Reporte de Buzones del colector el ngel.

Hydraulic Hydraulic
Elevation Elevation Elevation Flow
Grade Grade
Label (Ground) (Invert) (Invert in (Total Out)
Line (In) Line (Out)
(m) (m) 1) (m) (L/s)
(m) (m)
Bz-261 103.05 101.85 (N/A) 4.7 101.91 101.91
Bz-262 103 101.4 101.45 4.74 101.46 101.46
Bz-263 103.49 101.19 101.24 4.75 101.25 101.25
Bz-264 103.92 101.02 101.07 4.83 101.08 101.08
Bz-265 103.94 100.84 100.89 4.91 100.9 100.9
Bz-266 104 100.6 100.65 5.03 100.66 100.66
Bz-267 104.88 100.28 100.33 5.11 100.34 100.34
Bz-268 104.67 99.97 100.02 8.03 100.04 100.04
Bz-269 104.58 99.58 99.63 8.84 99.66 99.66
Bz-270 104.39 99.39 99.44 8.89 99.47 99.47
Bz-271 102.07 99.07 99.12 8.93 99.15 99.15
Bz-272 100.03 98.43 98.48 8.93 98.51 98.51
Bz-273 100 98.4 98.4 12.81 98.49 98.49
Bz-274 100 98 98 12.81 98.09 98.09
Bz-275 99.67 97.67 97.67 12.81 97.76 97.76
Bz-276 99.36 97.36 97.36 12.81 97.45 97.45
Bz-277 99 97 97 12.81 97.09 97.09
Bz-278 98.68 96.68 96.68 12.81 96.77 96.77
Bz-279 97.81 95.78 95.78 12.81 95.87 95.87
Bz-280 96.81 94.81 94.81 12.81 94.9 94.9
Bz-281 96.19 94.24 94.24 12.81 94.33 94.33
Bz-282 96.11 94.11 94.11 12.81 94.2 94.2
Bz-283 95.2 93.3 93.3 12.81 93.39 93.39
Bz-284 94.69 92.84 92.84 12.81 92.93 92.93
Bz-285 93.55 91.7 91.7 12.81 91.79 91.79
Bz-286 92.26 90.51 90.51 12.81 90.6 90.6
Bz-287 91.69 90.07 90.07 12.81 90.16 90.16
Bz-288 91 89.2 89.2 12.81 89.29 89.29
Bz-289 90.45 88.65 88.65 12.81 88.74 88.74
Bz-290 89 87.23 87.23 12.81 87.32 87.32

Pg. 63
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 58: Reporte de Tuberas del colector el ngel Caudal Mximo ao 20


Depth
Invert Invert Section Size Capacity Velocity Tractive Stress
Start Diameter Flow Length Slope (Average
Label (Start) Stop Node (Stop) Material Manning's n (Catalog (Full Flow) (Average) (Calculated)
Node (mm) (L/s) (m) (m/km) End) / Rise
(m) (m) Conduit) (L/s) (m/s) (Pascals)
(%)
P-1 Bz-272 98.43 Bz-273 98.4 PVC 0.009 250mm 240.2 8.93 2.7 10.936 80.74 1.17 3.439 34.6
P-2 Bz-290 87.23 EMP-10 86.71 PVC 0.009 315mm 302.6 12.81 3.4 155.094 562.89 3.22 30.383 19.8
P-3 Bz-281 94.24 Bz-282 94.11 PVC 0.009 250mm 240.2 12.81 9.8 13.328 89.14 1.4 4.697 31.9
P-4 Bz-264 101.02 Bz-265 100.89 PVC 0.009 200mm 192.2 4.83 10.7 12.186 47.03 1.04 2.968 26.1
P-5 Bz-263 101.19 Bz-264 101.07 PVC 0.009 200mm 192.2 4.75 23.8 5.047 30.27 0.76 1.478 28.5
P-6 Bz-270 99.39 Bz-271 99.12 PVC 0.009 250mm 240.2 8.89 25 10.803 80.25 1.17 3.399 26.9
P-7 Bz-269 99.58 Bz-270 99.44 PVC 0.009 250mm 240.2 8.84 29.6 4.735 53.13 0.87 1.779 29.4
P-8 Bz-271 99.07 Bz-272 98.48 PVC 0.009 250mm 240.2 8.93 36.3 16.266 98.47 1.35 4.689 25.9
P-9 Bz-262 101.4 Bz-263 101.24 PVC 0.009 200mm 192.2 4.74 39.6 4.038 27.07 0.7 1.239 29.3
P-10 Bz-265 100.84 Bz-266 100.65 PVC 0.009 200mm 192.2 4.91 40.2 4.722 29.28 0.75 1.422 29.2
P-11 Bz-287 90.07 Bz-288 89.2 PVC 0.009 315mm 302.6 12.81 39 22.299 213.44 1.63 6.743 22.4
P-12 Bz-277 97 Bz-278 96.68 PVC 0.009 250mm 240.2 12.81 45.1 7.094 65.03 1.12 2.862 34
P-13 Bz-280 94.81 Bz-281 94.24 PVC 0.009 250mm 240.2 12.81 45.7 12.467 86.21 1.36 4.457 32
P-14 Bz-267 100.28 Bz-268 100.02 PVC 0.009 200mm 192.2 5.11 47.5 5.468 31.51 0.8 1.625 29.3
P-15 Bz-283 93.3 Bz-284 92.84 PVC 0.009 250mm 240.2 12.81 48.8 9.432 74.99 1.24 3.579 32.9
P-16 Bz-261 101.85 Bz-262 101.45 PVC 0.009 200mm 192.2 4.7 53.9 7.414 36.69 0.87 1.991 27.2
P-17 Bz-276 97.36 Bz-277 97 PVC 0.009 250mm 240.2 12.81 60 5.995 59.78 1.05 2.507 34.7
P-18 Bz-275 97.67 Bz-276 97.36 PVC 0.009 250mm 240.2 12.81 60 5.163 55.48 1 2.227 35.3
P-19 Bz-273 98.4 Bz-274 98 PVC 0.009 250mm 240.2 12.81 60 6.662 63.02 1.09 2.723 34.2
P-20 Bz-274 98 Bz-275 97.67 PVC 0.009 250mm 240.2 12.81 60 5.496 57.24 1.02 2.342 35
P-21 Bz-278 96.68 Bz-279 95.78 PVC 0.009 250mm 240.2 12.81 60.4 14.913 94.29 1.45 5.129 31.4
P-22 Bz-266 100.6 Bz-267 100.33 PVC 0.009 200mm 192.2 5.03 61.6 4.385 28.22 0.74 1.356 29.9
P-23 Bz-282 94.11 Bz-283 93.3 PVC 0.009 250mm 240.2 12.81 62.8 12.9 87.69 1.38 4.578 31.9
P-24 Bz-268 99.97 Bz-269 99.63 PVC 0.009 250mm 240.2 8.03 62.8 5.415 56.82 0.89 1.894 27.6
P-25 Bz-289 88.65 Bz-290 87.23 PVC 0.009 315mm 302.6 12.81 69.8 20.344 203.87 1.58 6.279 22.6
P-26 Bz-288 89.2 Bz-289 88.65 PVC 0.009 315mm 302.6 12.81 70.1 7.845 126.6 1.13 2.989 24.8
P-27 Bz-286 90.51 Bz-287 90.07 PVC 0.009 315mm 302.6 12.81 79.9 5.51 106.09 1 2.267 25.8
P-28 Bz-279 95.78 Bz-280 94.81 PVC 0.009 250mm 240.2 12.81 74.4 13.043 88.18 1.39 4.618 31.8
P-29 Bz-285 91.7 Bz-286 90.51 PVC 0.009 250mm 240.2 12.81 79.2 15.016 94.61 1.46 5.157 31.4
P-30 Bz-284 92.84 Bz-285 91.7 PVC 0.009 250mm 240.2 12.81 79.2 14.385 92.6 1.44 4.986 31.5

Pg. 64
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE
AGUA POTABLE Y ALCANTARILLADO DEL ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 59: Reporte de Tuberas del colector el ngel Caudal Mximo ao 20 (Tubera estructural)

Section Tractive Depth


Invert Invert Length Capacity Velocity
Start Stop Size Diameter Flow Length Slope Stress (Average
Label (Start) (Stop) (Scaled) Material Manning's n (Full Flow) (Average)
Node Node (Catalog (mm) (L/s) (m) (m/km) (Calculated) End) / Rise
(m) (m) (m) (L/s) (m/s)
Conduit) (Pascals) (%)
P-1 Bz-272 98.43 Bz-273 98.4 2.7 PVC 0.009 250mm 231.2 8.93 2.7 10.936 72.92 1.18 3.459 36.4
P-2 Bz-290 87.23 EMP-10 86.71 3.5 PVC 0.009 315mm 291 12.81 3.4 155.094 507.17 3.24 30.63 20.8
P-3 Bz-281 94.24 Bz-282 94.11 9.9 PVC 0.009 250mm 231.2 12.81 9.8 13.328 80.51 1.4 4.724 33.5
P-4 Bz-264 101.02 Bz-265 100.89 10.7 PVC 0.009 200mm 185.2 4.83 10.7 12.186 42.6 1.05 2.989 27.4
P-5 Bz-263 101.19 Bz-264 101.07 23.7 PVC 0.009 200mm 185.2 4.75 23.8 5.047 27.42 0.76 1.485 29.9
P-6 Bz-270 99.39 Bz-271 99.12 24.9 PVC 0.009 250mm 231.2 8.89 25 10.803 72.48 1.17 3.419 28.3
P-7 Bz-269 99.58 Bz-270 99.44 29.5 PVC 0.009 250mm 231.2 8.84 29.6 4.735 47.99 0.87 1.788 31
P-8 Bz-271 99.07 Bz-272 98.48 36.3 PVC 0.009 250mm 231.2 8.93 36.3 16.266 88.94 1.36 4.719 27.2
P-9 Bz-262 101.4 Bz-263 101.24 39.6 PVC 0.009 200mm 185.2 4.74 39.6 4.038 24.52 0.7 1.246 30.7
P-10 Bz-265 100.84 Bz-266 100.65 40.3 PVC 0.009 200mm 185.2 4.91 40.2 4.722 26.52 0.75 1.432 30.7
P-11 Bz-287 90.07 Bz-288 89.2 38.9 PVC 0.009 315mm 291 12.81 39 22.299 192.31 1.64 6.794 23.5
P-12 Bz-277 97 Bz-278 96.68 45.1 PVC 0.009 250mm 231.2 12.81 45.1 7.094 58.73 1.12 2.877 35.8
P-13 Bz-280 94.81 Bz-281 94.24 45.7 PVC 0.009 250mm 231.2 12.81 45.7 12.467 77.86 1.37 4.485 33.6
P-14 Bz-267 100.28 Bz-268 100.02 47.6 PVC 0.009 200mm 185.2 5.11 47.5 5.468 28.54 0.8 1.632 30.8
P-15 Bz-283 93.3 Bz-284 92.84 48.8 PVC 0.009 250mm 231.2 12.81 48.8 9.432 67.73 1.24 3.601 34.6
P-16 Bz-261 101.85 Bz-262 101.45 54 PVC 0.009 200mm 185.2 4.7 53.9 7.414 33.23 0.87 2.001 28.5
P-17 Bz-276 97.36 Bz-277 97 59.9 PVC 0.009 250mm 231.2 12.81 60 5.995 53.99 1.05 2.517 36.5
P-18 Bz-275 97.67 Bz-276 97.36 60 PVC 0.009 250mm 231.2 12.81 60 5.163 50.11 1 2.238 37.2
P-19 Bz-273 98.4 Bz-274 98 60 PVC 0.009 250mm 231.2 12.81 60 6.662 56.92 1.1 2.735 36
P-20 Bz-274 98 Bz-275 97.67 60.1 PVC 0.009 250mm 231.2 12.81 60 5.496 51.7 1.02 2.352 36.9
P-21 Bz-278 96.68 Bz-279 95.78 60.3 PVC 0.009 250mm 231.2 12.81 60.4 14.913 85.16 1.46 5.159 33
P-22 Bz-266 100.6 Bz-267 100.33 61.7 PVC 0.009 200mm 185.2 5.03 61.6 4.385 25.56 0.74 1.364 31.4
P-23 Bz-282 94.11 Bz-283 93.3 62.7 PVC 0.009 250mm 231.2 12.81 62.8 12.9 79.2 1.39 4.605 33.5
P-24 Bz-268 99.97 Bz-269 99.63 62.8 PVC 0.009 250mm 231.2 8.03 62.8 5.415 51.31 0.89 1.905 29
P-25 Bz-289 88.65 Bz-290 87.23 69.9 PVC 0.009 315mm 291 12.81 69.8 20.344 183.69 1.59 6.326 23.7
P-26 Bz-288 89.2 Bz-289 88.65 70.1 PVC 0.009 315mm 291 12.81 70.1 7.845 114.07 1.13 3.009 26.1
P-27 Bz-286 90.51 Bz-287 90.07 79.7 PVC 0.009 315mm 291 12.81 79.9 5.51 95.59 1 2.282 27.1
P-28 Bz-279 95.78 Bz-280 94.81 74.4 PVC 0.009 250mm 231.2 12.81 74.4 13.043 79.64 1.39 4.645 33.5
P-29 Bz-285 91.7 Bz-286 90.51 79.2 PVC 0.009 250mm 231.2 12.81 79.2 15.016 85.45 1.46 5.187 33
P-30 Bz-284 92.84 Bz-285 91.7 79.2 PVC 0.009 250mm 231.2 12.81 79.2 14.385 83.64 1.44 5.015 33.1

Pg. 65
INFORME DE MODELAMIENTO HIDRAULICO DEL SISTEMA DE ALCANTARILLADO DEL ESTUDIO DEFINITIVO Y EXPEDIENTE
TECNICO DEL PROYECTO: AMPLIACIN Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DEL
ESQUEMA INDEPENDENCIA Y ERMITAO-DISTRITO DE INDEPENDENCIA

Cuadro 60: Reporte de Outfall del colector el ngel Caudal Mximo ao 20

Elevation Set Rim to Boundary


Elevation Elevation
Label (Ground) Ground Condition Flow (L/s)
(Rim) (m) (Invert) (m)
(m) Elevation? Type

EMP-10 89 True 89 86.71 Free Outfall 12.81

Pg. 66

Vous aimerez peut-être aussi