Vous êtes sur la page 1sur 64

TEXCEL ENGINEERS PVT LTD

(An ISO 9001:2008 Certified Company)


O Block, #1, Ganapathy Colony, Anna Nagar East,
Chennai 600 102
[Phone: +91 44 26221841/42/43] - [Fax: +91 44 26441844] - [E-Mail : info@texcelengineers.net]

TEXCEL CONTRACTING L.L.C


P.O. box 114634 ABUDHABI, U.A.E
[Phone: +971 2 550 8509] [Fax: +971 2 550 8519] [E-Mail: abhilash@texcelengineers.net]
Contents
About us

Organization Setup

Achievements

Strong Fundamentals

Present and Future

Client List

Performance Awards

Safety Awards

Work Completion Awards


About Us
Texcel Engineers the name is synonym for
Technical Excellence. Texcel Engineers has
been well established in India since late 80s
and has been involved in successful
completion of vast range of turnkey contracts
in the infrastructure sector. By embracing
innovative ideas and adapting to the ever
changing industrial needs, Texcel has proved
time and again their mettle to execute a vast
range of turnkey contracts infrastructure
sector.
Texcel Engineers is managed by a Board of
Directors of eminent personalities known for
their education, enlightenment and integrity
along with a core team of Engineers and
Technicians
Our Services include:
Fabrication, supply and installation of structural steel.
Erection of complete conventional or waste heat recovery boilers.
Erection of equipment of power plants, chemical industry, refineries, petrochemical and gas plants.
Fabrication, erection, testing and commissioning of Power and Desalination, Oil and Gas, Petrochemical,
Cement plants.
Life extension projects (renovation and repair) of existing the power and Desalination, Oil and Gas,
Petrochemical plants.
Power Cycle Piping for Power Plants.
Shutdowns and maintenance works of boilers, turbines, mills and rotating equipment's like fans (ID & FD),
Air Preheater for power plants and oil and gas plants.
The experience and expertise of Texcel Engineers can be put at the services for execution of large and
sophisticated projects to achieve the highest level of quality yet maintaining price competitiveness.
Organization Setup
MD

Secretary

Director - Director Finance, HR


Projects & Admin

GM Projects
Accounts HR/Admin Purchase
Manager Manager Manager

AGM Site

Accounts HR Lead Purchase


HSE QA / QC Const. Officer Officer
Manager Manager Manager

Planning Site Engineer Admin Accounts Stores


Engineer Manager Manger Manager

Erection Site Admin Accounts Stores


Engineer Co-Ordinator Assistant Assistant Assistant

Erection Erection Erection


Piping Structure -Equip

Foreman Foreman Foreman


List of Key Personnel
M.P. Sudhakaran Managing Director is a Post Graduate in Economics, (Nagpur University). He
has hands on experience of about 30 years in Erection, testing and
Email: mps@texcelengineers.net commissioning of Power Projects.
Ph. 044 -26221841

M.S. Abhilash BE (Mech.), MBA (London). He has worked in Field of Sales and Marketing in
UK and Middle East before joining as director of the company. He is presently
Email: abilash@texcelengineers.net managing operations in India and UAE.
Ph. 044 -26221841

B.E Industrial Engineering from Mangalore University and MBA from


Jiji T Sukumar Meinders School of Business, USA. 10 Years of experience in corporate
Email : sjiji@texcelengineers.net America. He has joined Texcel in August 2011 as Director and oversees
Ph. 044- 26221841 Finance and resource Management

Shaik Fairoz General Manager, Bachelor in mechanical engineering; has 32 Years


Email: shaikfairoz@texcelengineers.net experience in the field of construction works of power plants, ammonia plant,
refinery, etc. in India and abroad.
Ph. 044 -26221841

Mathew Cherian General Manager-Projects, 22 Years experience in Boiler, Heavy


Equipments, Auxiliaries, Piping, etc.
+91 8827066382, +91 8103570390

L.Neelakantan General Manager-Projects, 22 Years experience in Boiler, Heavy


Equipments, Auxiliaries, Piping, etc.
Email: Neelakantan@texcelengineers.net
Ph. 044 -26221841

Addl. General Manager-Projects, 35 Years experience in ESP, Boilers,


C.K. Sekharan Auxiliaries, Piping, etc.
+91 9921280590, +91 9503897168

Ajith Krishandev Addl. General Manager-Projects, 20 Years experience in Boiler, Heavy


Equipments, Auxiliaries, Piping, etc.
+91 9617948272
Achievements

Texcel had a humble beginning 30 years ago by Mr. M.P. Sudhakaran with a vision to
identify the power and construction sectors as central to nation building. Ever
since, Texcel has an impeccable track record. Initially operating as a Sole
Proprietor company, Texcel Engineers was incorporated as a Pvt. Ltd Company in
1987
T
E
X
C
E
L
E
N
G
I
N
E
E
R
S
SUMMARY
I. IBR WORKS States No. of units
A. ERECTION OF BOILERS IN DIFFERENT STATES 800 MW
Gujarat 1 No
660MW
Maharashtra 1 No
600 MW
Chhattisgarh 2 No
500 MW
Tamil Nadu 1 No
Maharashtra 1 No
Andhra Pradesh 1 No
Karnataka 1 No
Chhattisgarh 1 No
Bihar 1 No
350 MW
Gujarat 1 No
Karnataka 1 No
Bihar 1 No
270MW
Maharashtra 2 No
210 MW
Rajasthan 1 No
Orissa 1 No
Haryana 1 No
Utter Pradesh 1 No
Kerala 1 No
B. PIPING

States No. of units


685 MW
Chhattisgarh 1 No
500 MW
Tamil Nadu 3 No
Andhra Pradesh 1 No
Karnataka 1 No
Chhattisgarh 1 No
270MW
Maharashtra 2 No

II. TURBINES
States No. of units
660MW
Utter Pradesh 1 No
600MW
Chhattisgarh 1 No
270MW
Maharashtra 1 No
150MW
Maharashtra 2 No
72MW
Gujarat 1 No
III. ELECTRO STATIC PRECIPITATORS

States No. of units

660MW

Utter Pradesh 1 No
500MW

Bihar 1 No

IV.COAL BUNKERS

States No.of units


800MW
Madhya Pradesh 1 No
Strong Fundamentals

LIST OF MACHINERY, MAJOR TOOLS AND PLANTS


Heavy Cranes
150 Ton Fuwa Hydraulic Crawler Crane 1
100 Ton Kobelco Crawler Crane 1
80 Ton Fuwa Hydraulic Crawler Crane 2
75 Ton Tata TFC Crawler Crane 3
45 Ton NCK 41 B Crawler Crane 3
40 Ton Tyre Mounted TIL Crane 2
35 Ton P & H 655 Crawler Crane 2
25 Ton Tata TFC 75 Crawler Crane 3
20 Ton Tata P & H 320 Crawler Crane 2
18 Ton Tata 320 Crawler Crane 4
All the pool of
machines and
equipment's are well
maintained and
equipped in order to
make them work at
any point of time for
which we have
dedicated team of
well qualified and
experienced
machines /
technicians
Heavy Equipments
Mobile Cranes
18 Ton Hydra 4

14 Ton Hydra 6
12 Ton Hydra 13

11 Ton Hydra 2

10 Ton Hydra 3

08 Ton Hydra 3

Transport Vehicle
Tractor Hindustan, HMT 6

Trailer Ashok Leyland 9

Trailer with Horse 5

Mini Bus 4
Pick Van/Load King/Tata
5
Ace
Jeep (Sumo, Bolero, Etc.) 13

Omini Ambulance 1
Lifting Equipments
Rack & Pinion Elevator PC 130-7
3
(Passenger Lift)
Electrical Winches (1 Ton-15 Ton) 80
Chain Pulley Blocks (1 Ton-25 Ton) 786
Max Puller (Hook Chucks (1.6 Ton-
81
5Ton))
Lathe Machine 1
Surface Grinder 1
Wire Rope Sling 90 MM X 16 Mtrs 2
Wire Rope Sling 80 MM X 18 Mtrs 6
Wire Rope Sling 80 MM X 16 Mtrs 6
Wire Rope Pulley 5 Sheave 50 Ton 12
Wire Rope Pulley 4/5 Sheave 25 Ton 24
Beam Lifting Clamps (3Ton- 10 Ton) 25
Scaffolding Materials
Pipes (assorted Lift) 6000
Right angle Couples 8000
Scaffolding Platform 1000
Beam Brackets 500
Swivel Couples 3000
Other Major Equipments
Pipe Bending Machine Heavy Duty 6
Tube Bending Machine 4
Hydraulic Test Pumps Heavy Duty 4
Air Compressors 3
Electrode Backing Oven 21
High Intensity Illuminator 5
Impact Wrench GDS 30 8
MS Rail 33
Plasma Cutting Machine 4
Torque Wrench Assorted (750 LBS-2400 LBS) 44

Steel Containers (20 Ft-40 Ft with Furnished) 46

Welding & NDT Equipments


Welding Generators (K-320/45) 66

Welding Rectifier 450/600A 321

Welding Transformer 400/6A 25

Diesel Power Generator 3

SR Panel Board 12

Temperature Recorder 19

Theodolite with stand 5

Hardness Tester 2

Induction Heat Machine ( Miller ) 3


Texcel Engineers
Present Future

and
List of Current Projects Under Execution
Date
Contract Present
of
S.no Client Location Capacity Area Scope of work Value (INR) Status
Award
Handling of Materials at BHEL / Clients Stores / Storage Yard and transportation to
Bharat Heavy Erection location, Erection, Testing and Assistance for commissioning and Trial
Electricals Ennore SEZ Operation including supply and application of final Painting of Boiler & auxiliaries, Under
1 2x660MW Boiler 10-10-17 36,25,00,000
Limited Tamil Nadu Air Pre Heaters, Ducts & Dampers, Boiler Integral Piping, structure for bunker, Fans, Mobilization
Bowl mills, Rotating Equipments, Auxiliary boiler and auxiliaries etc., of UNIT-1 of
2x660MW Ennore SEZ Super Critical Thermal Power Project.Thiruvallur Dt, Tamil
Nadu.
Handling at site stores / storage yard, transporting to site inspection, pre-assembly,
erection, alignment, welding, NDT, fixing of hangers & Supports, water flushing,
Bharat Heavy hydro testing, surface finish, supply & application of primer & Finish paints,
Electricals Wrapping & coating including labeling & Flow direction on the equipments, piping 16-09-17 Under
2 Wanakbori, Gujrat 1x800MW FPS 2,93,70,520
Limited Mobilization
& hangers and Supports, pre-commissioning, commissioning, trial operation &
handing over to customer for piping of Fire Protection System and Fire Water Pump
house Equipment etc. 1x800MW, Wanakbori TPS Unit#8
Erection and Commissioning of Electrostatic Precipitator and its Auxiliaries,
Bharat Heavy That includes handling of materials at BHEL \clients stores\storage yard,
North Chennai, transportation to site of Erection, Erection, Testing & Assistance for commissioning
3 Electricals 1x800MW ESP Under
Tamil Nadu and Trial Operation, including supply and application of final Painting of ESP and its 07-02-17 10,70,00,00
Limited Mobilization
Auxiliaries, Ducts& Dampers, duct support structure etc..
Collection of Material from BHEL/ Clients Stores/ Storage yard; Transportation to
site; Erection testing & commissioning, Trial Operation and handing over of steam
Gujrat State turbine, Generator set, Integral Piping, HP/LP Heaters, Tanks & vessels, DG set, 5%
4 Wanakbori, Gujrat 1x800MW STG 03-01-17 7,47,00,00
Electricity Completed
Pumps & Other BOI, Insulation, including supply and application of Final Painting
Corporation
ETC for 1x800MWGSECL Wanakbori Project at 1x800MW GSECL Wanakbori Project
In Gujarat
Receipt of State.
Materials form BHEL/Storage yard, Handling at stores, site of work,
Rattan India Nasik, Maharashtra STG Erection, Testing & commissioning of Steam Turbine and Auxiliaries etc Including 19-02-16 90%
5X270MW 3,97,40,000
Nasik Power Ltd bought items of 5x270MW, Nasik Thermal Power Project, Nasik, Maharashtra. Completed
5
Handling collection of Materials at BHEL/client's storage yard/ stores,
Transportation to site Erection, testing & assistance for commissioning, trail
Boiler, operation and handing over of boiler and its auxiliaries, APH, ducts dampers, Fuel 95%
Rattan India
6 Nasik, Maharashtra 5X270MW Piping, piping, boiler integral piping & associated valves, ESP, fans, power cycle piping, 25-01-16 22,12,95,045 Completed
Nasik Power Ltd
ESP Coal mills & coal feeders, insulation ,final painting etc of Unit #4 of 5X270MW
Nasik TPS
Date of Contract
S.no Client Location Capacity Area Scope of work Award Value (INR) Present
Status
Collection of Materials at BHEL/client's storage yard/stores, Transportation
Gujrat State to site, Erection, testing & assistance for commissioning, trail operation and
7 50%
Electricity Wanakbori, Gujrat 1x800MW Boiler handing over of boiler and its auxilliaries,APH,ducts&dampers,Fuel piping, boiler 17-12-15 47,93,11,352
Completed
Corporation integral piping & associated valves SP,fans,power cycle piping, Coal mills & coal
feeders,Insulation,final painting etc

Boiler, Erection, Testing, Commissioning of 2X660MW (Unit 1&2) Boiler & Auxiliaries at 20%
Wardha,
8 Lanco 2x660MW Piping, Lanco vidharbha Thermal Power Project, Mandhva village, wardha dist. 09-09-15 71,04,52,710 Completed
Maharashtra
ESP Maharashtra.
Erection Alignment & Welding, Testing, Painting and Handing over of Bunker
structure, Raw coal bunkers, Transfer points, trestles and conveyer galleries and
9 NTPC Gadarwara, MP 2x800MW Bunker miscl, Civil Works for unit-1 11,76,51,858
7
Supply of Materials for the works of MS embedments, Doors, Windows, Glazing, 90%
Roofing / Side Cladding, Rain Water Down Take Pipes, Structural Steel Painting, Completed
13-07-15
Gratings, Mild Steel Bolts, High Strength Structural Bolts, PTFE Bearings, MS Hand
10 NTPC Gadarwara, MP 2x800MW Bunker Railings, Concreting for Bunker Structures, Raw Coal Bunkers, Coal Handling 7,43,91,176
Transfer Points for Unit-1

Shindke, Maharashtra Erection, Testing, Commissioning and handing over of Steam turbine, Turbo 95%
Generator, Condenser, TG Integral Piping,HP & LP Heaters, Deaerator, with Completed
11 Sintex Infra 2x150MW STG 26-02-14 5,18,59,128
associated Equipments/Tanks/Vessels, FST & Deaerator, LP Bypass system with
Project Ltd
associated platform, power cycle pumps & auxiliaries in Unit 1 & 2

Material handing & Unloading, Erection, Testing commissioning & final 80%
Allahabad, UP
12 NTPC 2x660MW ESP painting of ESP for 2x660Mw for MUNPL, Meja Thermal Power Project, 18-12-13 27,37,41,000 Completed
Allahabad, UP.

Boiler, Erection, Testing, & Commissioning, Trial Operation and Handing over of
13 Visa power Raigrah, 2x660MW Piping, Boiler and its Auxiliaries including ESP, Air Pre heaters, Ducts and 20%
Chattisgarh ESP Dampers, Fans, Fuel Piping, Boiler Integral Piping, Power cycle piping, 27-07-11 61,73,65,000 Completed
Chemical dozing system, Lining & Insulation, Final painting, etc of Unit 1
List of Shutdown Project
UAE

Sl. No. Client and Project


Location Scope of Work Duration Client End User

Overhauling of From 28/03/2016 to


1 ADGAS, DAS Island ADGAS ADGAS
Compressor 03/05/2016

Major Inspection 191- From 30/03/2016 to


2 GASCO ASAB Masood John Brown GASCO
CT-101 13/04/2016

LG 6 Major Inspection From 23/03/2016 To


3 ADGAS, DAS Island Masood John Brown ADGAS
23/04/2016

Overhauling of
From 02/02/2016 To
4 ADGAS, DAS Island Compressor OAG Train ADGAS ADGAS
22/02/2016
1

Overhauling of From 27/01/2016 To


5 ADGAS, DAS Island ADGAS ADGAS
Compressor OAG 16/03/2016

Overhauling of
Compressor OAG & From 26/01/2016 To
6 ADGAS, DAS Island QCON ADGAS
LNG Tr 2 26/02/2016
Client and
Sl. No. Project Location Scope of Work Duration Client End User

Overhauling of Gas & From 09/01/2016


7 Dubai Aluminum Dubal Dubal
Steam turbines To ongoing

Overhauling of From 25/12/2015


8 ADGAS, DAS Island ADGAS ADGAS
Compressor To 15/01/2016

Overhauling of From 24/12/2015


9 ADGAS, DAS Island ADGAS ADGAS
Compressor LTPI To 26/01/2016

LG 6 Major Inspection From 12/12/2016


10 ADGAS, DAS Island Masood John Brown ADGAS
To 17/01/2016

Shuweihat CMS
Shuweihat CMS Shuweihat CMS
International Power Overhauling of Valve
From 30/11/2015 International Power International
11 Company, Abu ,Pumps and
to 30/03/2016 Company, Power Company,
Dhabi Compressor

Overhauling of Gas & From 24/11/2015


12 Dubai Aluminum Dubal Dubal
Steam turbines To 18/12/2015

Overhauling of From 11/05/2015


13 ADGAS, DAS Island ADGAS ADGAS
Compressor To 31/05/2015

Overhauling of Gas & From 22/03/2015


14 Dubai Aluminum Dubal Dubal
Steam turbines To 30/04/2015
Client and
Sl. No. Project Location Scope of Work Duration Client End User

Overhauling of Gas From 16/03/2015-


15 GASCO - ASAB Masood John Brown GASCO
turbine GE Frame 04/04/2015

Overhauling of From 10/01/2015


16 ADGAS, DAS Island ADGAS ADGAS
Compressor To 02/03/2015

Overhauling of Gas &


From 06/01/2015
17 Dubai Aluminum Steam turbines GE Dubal Dubal
To 06/02/2015
frame

Overhauling of Gas From 12/12/2014


18 ADGAS, DAS Island Masood John Brown ADGAS
turbine GE Frame to 29/01/2015

Shuweihat CMS Shuweihat CMS Shuweihat CMS


Overhauling of Valve
International Power From 13/11/2014 International Power International
19 ,Pumps and
Company, Abu Dhabi to 25/03/2015 Company, Power Company,
Compressor

Overhauling of Gas From 10/08/2014


20 ADGAS, DAS Island ADGAS ADGAS
turbine GE frame To 25/08/2014

Overhauling of Gas
21 ADGAS, DAS Islnd From 25/04/2014 Masood John Brown ADGAS
turbines

ADMA OPCO, Overhauling of


22 From 22/04/2014 Alstom Middle East ADMA OPCO
Offshore Rig Generators

From 22/04/2014
23 ADGAS, DAS Island Maintenance work ADGAS ADGAS
to 04/05/2014
Client and
Sl. No. Project Location Scope of Work Duration Client End User

From 20/04/2014 to
24 GASCO, Habshan Shutdown Job Alstom Middle East GASCO
25/05/2014

ADMA OPCO, Offshore Overhauling of From 29/03/2014 to


25 Alstom Middle East ADMA OPCO
Rig Generators 17/04/2014

Overhauling of Gas From 24/03/2014 to


26 ADGAS, DAS Island Masood John Brown ADGAS
turbines 15/04/2014

Overhauling of Gas
27 ADGAS, DAS Island From 14/03/2014 ADGAS ADGAS
turbines

From 14/03/2014 to
28 ADGAS, DAS Island Maintenance work ADGAS ADGAS
27/03/2014

Dubai Petroleum Overhauling of From 18/02/2014 to


29 Masood John Brown Dubai Petroleum
offshore Rig Generators 22/02/2014

Shuweihat Power Overhauling of From 10/02/2014 to Shuweihat O & M Shuweihat Power


30
Plant Generators 31/03/2014 Limited Plant

ADMA OPCO, Offshore Overhauling of From 18/01/2014 to


31 Alstom Middle East ADMA OPCO
Rig Generators 14/02/2014

From 12/01/2014 to
32 GASCO, Buhasa Maintenance work Masaood John Brown GASCO
24/01/2014

From 04/01/2014 to
33 DUBAL, Jebel Ali Shutdown Job Dubal Dubal
20/04/2014
Client and Project
Sl. No. Location Scope of Work Duration Client End User

ADMA OPCO, Offshore Overhauling of From 16/11/2013 to


34 Alstom Middle East ADMA OPCO
Rig Generator 27/12/2013

Dubai Petroleum Overhauling of From 04/11/2013 to


35 Masood John Brown Dubai Petroleum
offshore Rig Generators 20/12/2013

Overhauling of Gas From 23/10/2013 to


36 ADGAS, DAS Island ADGAS ADGAS
turbines 12/11/2013

Dubai Petroleum Overhauling of From 09/10/2013 to


37 Masood John Brown Dubai Petroleum
offshore Rig Generators 25/10/2013

ADMA OPCO, Offshore Overhauling of From 24/04/2013 to


38 Alstom Middle East ADMA OPCO
Rig Generator 30/06/2013

Overhauling of Gas From 09/04/2013 to


39 ADGAS, DAS Island Masood John Brown ADGAS
turbines 12/05/2013

Overhauling of Gas From 16/03/2013 to


40 GASCO, Habsan Masood John Brown GASCO
turbines 25/03/2013

Overhauling of Gas From 14/03/2013 to


41 ADGAS, DAS Island Masood John Brown ADGAS
turbines 28/03/2013

Umm Al Nar Power Overhauling of Gas From 25/02/2013 to Umm Al Nar


42 Quartzelec Ltd
Plant, Abu Dhabi turbines 27/03/2013 Power Plant

Overhauling of Gas From 15/02/2013 to


43 GASCO, Asab Masood John Brown GASCO
turbines 18/03/2013
Client and Project
Sl. No. Location Scope of Work Duration Client End User

Overhauling of Gas From 05/02/2013


44 ADGAS, Das Island NuovoPignone S.P.A ADGAS
turbines to 05/03/2013

Overhauling of Gas From 22/01/2013


45 ADGAS, DAS Island GE Oil & Gas ADGAS
turbines to 31/01/2013

Overhauling of Gas From 11/01/2013


46 GASCO, Asab Masood John Brown GASCO
turbines to 14/02/2013

Overhauling of Gas From 05/01/2013


47 ADGAS, DAS Island Masood John Brown ADGAS
turbines to 05/02/2013

Overhauling of Gas From 19/11/2012


48 ADGAS, DAS Island GE Oil & Gas ADGAS
turbines to 24/12/2012

From
49 DUBAL, Jebel Ali Shutdown Job 04/11/2012to Dubal Dubal
30/12/2012

Overhauling of Gas From 03/11/2012


50 ADGAS, DAS Island Masood John Brown ADGAS
turbines to 15/11/2012

Overhauling of Gas From 30/10/2012


51 DUBAL, Jebel Ali Alstom Middle East Dubal
turbines to 06/12/2012

Overhauling of Gas From 28/08/2012


52 ADGAS, DAS Island Masood John Brown ADGAS
turbines to 25/09/2012

Overhauling of Gas From 10/07/2012


53 ADGAS, DAS Island Masood John Brown ADGAS
turbines to 25/07/2012
Client and
Sl. No. Scope of Work Duration Client End User
Project Location
Overhauling of Gas From 26/05/2012 to Masood John Brown
54 GASCO, Asab Gasco
turbines 07/06/2012

Overhauling of Gas From 23/02/2012 to


55 ADGAS, DAS Island Masood John Brown ADGAS
turbines 09/04/2012

Overhauling of Gas From 13/10/2011 to


56 ADGAS, DAS Island Masood John Brown ADGAS
turbines 05/01/2012

Overhauling of Gas From 23/05/2011 to


57 ADGAS, DAS Island Masood John Brown ADGAS
turbines 03/08/2011

Overhauling of Gas From 25/03/2011 to


58 ADGAS, DAS Island Masood John Brown ADGAS
turbines 28/04/2011

Overhauling of Gas From 22/01/2011 to


59 ADGAS, DAS Island Masood John Brown ADGAS
turbines 29/02/2011

Overhauling of Gas From 03/11/2010 to


60 ADGAS, DAS Island Masood John Brown ADGAS
turbines 23/11/2010

Overhauling of Gas From 12/07/2010 to


61 ADGAS, DAS Island Masood John Brown ADGAS
turbines 20/07/2010

From 12/05/2010 to RAK CEMENT


62 RAK CEMENT FACOTRY Shutdown Job RAK CEMENT FACOTRY
29/05/2010 FACOTRY
Overhauling of Gas From 05/03/2010 to
63 ADGAS, DAS Island Masood John Brown ADGAS
turbines 10/04/2010

ADNOC, Mubarraz Overhauling of Gas From 22/01/2010 to


64 Masood John Brown ADNOC
Island turbines 02/02/2010
QATAR

Client and Project


Sl. No. Scope of Work Duration Client End User
Location

QCV- Qatar Vinyl Overhauling of From 31.01.2015 To


1 Alstom Middle East QVC
Co., Qatar Generators 15/03/2015

MESSAIEED NGL 3 Overhauling of From 16/04/2010


2 Masood John Brown Qatar Petroleum
QATAR Gas turbines to 05/05/2010

YEMEN
Client and Project
Sl. No. Scope of Work Duration Client End User
Location

YLNG Shutdown, From 15/03/2014 General Electric Yemen LNG


1 Shutdown Job
Yemen 06/04/2014 International Inc. Company

YLNG Shutdown, From 04/05/2013 General Electric Yemen LNG


2 Shutdown Job
Yemen to 27/05/203 International Inc. Company
IRAQ

Client and Project


Sl. No. Scope of Work Duration Client End User
Location
Erection of Gas
Khor Al Zubar Power From 27/01/2014
1 turbines & Alstom Middle East KAZ Power Plant
Plant, IRAQ to 30/03/2014
Generators

Erection of Gas
Khor Al Zubar Power From 18/03/2013
2 turbines & Alstom Middle East KAZ Power Plant
Plant, IRAQ to 06/06/2013
Generators

PAKISTAN

Client and Project


Sl. No. Scope of Work Duration Client End User
Location

Holmore Power Ltd. From 24/05/2013 Holmore Power


1 Shutdown Job GE Oil & Gas
Punjab Pakistan to 06/06/2013 Generation Co.

Saif Power Ltd. From 21/01/2013


2 Shutdown Job GE Oil & Gas Saif Holding Ltd.
Punjab, Pakistan to 28/01/2013
NIGERIA

Client and
Sl. No. Scope of Work Duration Client End User
Project Location

Elvaton Project, Overhauling of From 09/10/2012 Elvaton Nigeria


1 Masood John Brown
Nigeria Gas turbines to 19/10/2012 Limited

SRI LANKA
Client and
Sl. No. Scope of Work Duration Client End User
Project Location

Kelanitissa CCPP, Overhauling of From 12/10/2009 Masood John


1 Kelanitissa CCPP
Colombo, Sri Lanka Gas turbines to 15/12/2009 Brown
List of Major Projects Executed
INDIA
Date of Contract
Sl. No Client and Project Location Scope of Work
award value INR
R & M Dismantling of exiting ESP Internal & other
components from BHEL/ customer storage to site of
work and carring out modification as required
Gujrat State Electricity
1 Erection, Testing & Commissioning and application of 03-11-16 3,99,00,000
Corporation Wanakbori, Gujrat Insulation / Cladding for the work Renovation &
Retrofitting of exiting ESP & Ducts for Unit #1
210Mw, Wanakbori, Gujarat.
Material handling&unloading,Erection, testing &
commissioning of completed boiler structures,
2 MahaGenco Maharashtra 23-01-10 48,94,40,923
pressure parts,ESP,fans,PCP,Coal mills& feeders
insulation &final painting of Unit 9,2x500MW
Erection, Testing, Commissioning, Trial operation
3 Lalitpur Power Generation
and handing over of steam turbine generator and its 16-12-13 13,67,49,997
Company Ltd Lalitpur, UP auxiliaries & piping etc. for package-B(Unit-2)
Erection, Testing, Commissioning, Piping and final
painting work
4 Krishak Bharati for 1x72MW unit and Application of Thermal 03-10-2012 11,35,00,000
Cooperative Ltd. Surat, Gujarat Insulation, Piping and
Painting for 1x190 TPH Heat Recovery Generator.
Erection, Testing, Commissioning & handing over of
NTECL Vallur Thermal Power Project complete Power Cycle piping supplied under SG&TG
5 Kuruvimedu Village ponneri Taluk, packages, Insulation work of Boiler, Esp. & Piping, 21-12-2012 113,500,000
Tamilnadu. accessories, associated equipments/systems, final
painting for Phase 2 , Unit-3 1 x 500 MW
Erection, Testing, commissioning and Handing over
Eleana Power & Infrastructure,
6 of Ducting, Rotating & Coal Piping of Unit 5, 30-10-2014 77,004,997
5x270MW, Amravati, Maharashtra.
5x270MW, Amravati, Maharashtra.
Erection, Testing, commissioning and
Eleana Power & Infrastructure, 5x270MW, Handing over of power cycle piping and final
7 24-09-2014 90,465,605
Amravati, Maharashtra. painting of Unit -5, 5x270MW Amravati,
Maharashtra.
Doosan Power Systems India Private
Critical Piping Erection, Testing and
Limited,2x685 MW Chhattisgarh Thermal
8 commissioning of complete and application
Power Project Near Raikheda Village, Raipur 23.07.2012 194,757,215
for Units 1 and 2 of 2x685 MW Set
District Chhattisgarh
Erection, Testing & Assistance for
Korba West Power Company Limited, 1X600 MW
commissioning, Trial Operation and Handing
9 KWPCL Avanta Raigarh Project, Near Bade over of Steam Turbine and Generator Set and 06.12.2011 69,400,000
its Auxiliaries, HP/LP Heater and Painting,
Bhandar Village, Raigarh District. Chhattisgarh. etc., of 1 X 600 MW
Erection, Testing, & Commissioning, Trial
Operation and Handing over of Boiler and its
Auxiliaries including ESP, Air Preheaters,
Dainik Bhaskar Power Limited Unit 1 of 2x600
10 Ducts and Dampers, Fans, Fuel Piping, Boiler 18.02.2011 571,297,500
MW DBPL, Janjgir, Champa District.
Integral Piping, Power cycle piping, Chemical
Chhattisgarh.
dozing system, Lining & Insulation, Final
painting, etc. of Unit 1 of 2 X 600 MW
Erection, Testing, Commissioning & handing
over of complete Power Cycle piping supplied
11 under SG&TG packages, accessories, 15.07.2010 216,864,000
NTECL Vallur Thermal Power Project
associated equipments/systems, final
Kuruvimedu Village Ponneri Taluk, Tamilnadu.
painting for Unit 1&2 of 2 x 500 MW
Erection, Testing, and commissioning of
complete Boiler Structures, pressure parts,
12 NTECL Vallur Thermal Power Project Non-Pressure parts , Rotating Machines
20.05.2009 313,974,140
Kuruvimedu Village Ponneri Taluk, Tamilnadu. including supply and Application of Final
Painting for Unit # 2 of 2x500 MW set
13 Gujarat State Energy Generation Ltd., Near Erection, Testing, Commissioning, Final
Painting and Handing over of 1 x 292 TPH 18.03.2009 82,034,029
Hazira, Village Mora, Dist. Surat , Gujarat . HRSG and its auxiliaries, Steel Stack,
Piping etc., for 1x350 MW combined
Power Plant at GSEG, Hazira ,Dist. Surat,
Gujarat
14 Erection, Testing, Commissioning and
handing over of complete Power cycle 05.01.2009 8,70,10,170
National Thermal Power Corporation / Korba
Piping including P-91 Material Piping etc.,
super Thermal Power Station Korba,
for Unit # 7 Stage III of 1 X 500 MW at
Chhattisgarh.
Korba Super Thermal Power Station, NTPC,
Korba ,Chhattisgarh.
15
Erection, Testing and Commissioning of
Kakatiya Thermal, Power Project, 02.06.2008 9,87,81,800
Power Cycle Piping of Unit 1x500 MW
Bhoopalapalli, Warrangal, Andhra Pradesh
Boiler

Erection, Testing & Commissioning of


National Thermal Power Corporation / Korba
Boiler and its auxiliaries, Rotating
16 super Thermal Power Station Korba,
Machines including Mills and Fans, Duct, 19.02.2007 17,24,93,240
Chhattisgarh
Fuel Piping etc., for Unit 7 of 1x 500 MW.
Erection, Testing and Commissioning of
complete Boiler Structure, Pressure Parts,
Kakatiya Thermal Power Project, Boiler Auxiliaries, Electrostatic
17 05.02.2007 22,94,63,960
Bhoopalapalli, Warrangal, Andhra Pradesh Precipitator, Rotating Equipments,
including supply and application of final
Painting for Unit 1x500 MW
Karnataka Power Corporation Limited /
Erection, Testing and Commissioning of
18 Bellary Super Thermal Power Project, 15.08.2006 3,91,54,140
Power Cycle Piping of 1x500 MW Boiler
Karnataka.

National Thermal Power Corporation / Erection, testing & commissioning and


19 Kahalgaon Super Thermal Power Project, handling over of Electrostatic Precipitator 22.12.2004 4,34,86,652
Bihar of 1 x 500 MW Unit No. 5

Erection, Testing and Commissioning of


Karnataka Power Corporation Limited /
Structures, Pressure Parts, Non-Pressure
20 Bellary Super Thermal Power Project , 04.09.2004 11,55,30,632
Parts, Air Pre-heaters, Ducts Boiler for
Karnataka
500MW
Erection, testing & commissioning and
National Thermal Power Corporation /
handling over of Boiler and its auxiliaries
21 Kahalgaon Super Thermal Power Project, 21.06.2004 21,18,15,100
including its Rotating machines, Ducts and
Bihar
Fans of 1x500 MW Unit No.6
Overhauling of Boiler pressure parts, high
National Thermal Power Corporation /
pressure valves in Boiler area Stage-I & II
22 Korba Super Thermal Power Station, 25.03.2004 55,09,786
& repair of Boiler tube failure and
Chhattisgarh
overhauling of soot Blowers of 3 x 500 MW
23 Tamilnadu Electricity Board / Kuttalam Erection, testing & commissioning, 03.01.2003 1,28,39,650
Mayiladuthurai Taluk, Tamilnadu application of insulation of Heat Recovery
Steam Generator and its auxiliaries,
Piping of 101 MW Combined Cycle
24 Aditya Cement / Shambhupura Dist. Erection, testing & Commissioning of 16.03.2002 1,36,18,098
Chittorgarh Rajasthan 1x105 TPH AFBC Boiler and its Auxiliaries
including Electrostatic Precipitator and
1x23 MW Steam Generator and its
Auxiliaries and Piping etc.
25 National Thermal Power Corporation / Erection, testing & commissioning of 06.08.2001 11,24,40,704
Talcher Super Thermal Power Project, Boiler for Stage II Unit V of 4 x 500 MW
Orissa
26 Hasdeo Thermal Power Station, CS Overhauling of coal mills, raw coal 16.06.2001 27,40,175
Electricity Board, Korba West feeders, coal bunkers, cleaning &
servicing of Mill lube oil system, servicing
of Mill gear box, Nitrogen Panels etc. of
2x210 MW boilers of unit no.3 & 4
27 Hasdeo Thermal Power Station, CS Overhauling of ID, FD & PA fans of 2x210 02.06.2001 4,58,640
Electricity Board, Korba West MW ABL make boilers of Unit 3 & 4
28 Korba Super Thermal Power Station, NTPC, Repair of boiler tubes and overhauling of 12.03.2001 10,34,550
Korba soot blowers
29 Korba Super Thermal Power Station, NTPC, Lowering of LTSH and other associated 12.06.2000 15,04,000
Korba jobs in Unit VI,500 MW boiler
30 Haryana State Electricity Board / Faridabad Erection, testing & commissioning, trail 15.04.1999 5,69,48,700
Combined Power Plant, Haryana operation & handling over of 2x230 TPH
HRSGs
Haryana State Electricity Board / Panipat Erection, testing, commissioning of 1 x
31 24.08.1998 6,96,16,020
Thermal power station, Haryana 210 MW Unit VI Boiler

Uttar Pradesh Electricity Board / Feroze


Erection, testing, commissioning & trail
32 Gandhi Thermal Power Station Unchahar, 21.01.1997 3,19,20,000
run of 2 x 210 MW boiler
Rai-barelley, U.P.

Hindustan Newsprints Limited / Kottayam, Erection, testing & commissioning of


33 04.11.1996 78,02,020
Kerala. 1x140 TPD chemical recovery boiler

Erection, testing & commissioning of


Gujarat Electricity Board / Wanakbori
34 Boiler, Electrostatic Precipitator and 17.06.1996 6,38,55,700
Thermal Power Station, Gujarat
their auxiliaries 1 x 210 MW boiler

Erection, Testing and commissioning of


35 Madras Refineries Ltd., Manli, Madras 02.09.1993 37,50,000
2x20 MW TG Sets and Auxiliaries

Fabrication & Erection of Piping &


36 Cochin Refineries Ltd., Cochin, Kerala Equipments for Capacity Expansion 06.04.1993 1,36,00,000
Projects at CRL, Kerala.

Erection, testing, commissioning &


Dahanu Thermal Power Project, completion of trial operation of
37 17.04.1992 2,49,31,800
Maharashtra, BSES, Mumbai Ltd. Electrostatic Precipitators for 2 x 250 MW
Boiler

Erection, testing, commissioning &


completion of trial operation of complete
Talcher Super Thermal Power Project, non-pressure parts like external
38 10.04.1992 1,36,62,500
Kaniha, NTPC structures, flue gas ducts, dampers,
expansion joints in Unit I & II of 2 x 500
MW Boiler
Handling at Site Stories / Storage Yard, Transportation to
Talchar Super Thermal
Site of Work, pre-assembly, erection, testing,
39 Power Project, Kaniha, 10.02.1992 47,63,920
commissioning & completion of trial operation of rotating
NTPC
machines and its auxiliaries for Unit I of 2x500 MW Boiler.
Erection, testing, commissioning and completion of trial
National Aluminum
40 operation of Electrostatic Precipitator, Rotating machines 04.10.1991 38,67,500
Company / Angul, Orissa
etc.
Tamil Nadu Electricity Erection, testing and completion of trial operation of
Board / North Madras Electrostatic Precipitators and its auxiliaries, Rotating
41 06.03.1991 1,15,78,500
Thermal Power Project, Machines, ducts, dampers for the first two units of 2 x 210
Tamil Nadu MW
Engineers India Limited / Erection, testing & commissioning of 1 x 60 T/H Heat
42 Cochin Refineries Ltd. Recovery Steam Generator including insulation of Cochin 14.03.1990 39,07,750
Kerala. Refineries Ltd.
National Thermal Power
Corporation / Korba Super Erection, testing & commissioning of mills, fans & other
43 09.03.1988 34,76,295
Thermal Power Project, auxiliaries & fuel piping of Unit VI of 3 x 500 MW.
Chhattisgarh
National Thermal Power
Corporation /
Erection, testing & commissioning of Electrostatics
44 Ramagundam Super 20.11.1987 48,65,000
Precipitator galleries & stairways of Unit VI of 3 x 500 MW
Thermal Power Station,
Andhra Pradesh
Sathavahena ISPAT Ltd.
Unloading, stacking, transportation, erection, testing &
45 Haresamudram Village, 20.09.1987 53,44,400
commissioning of 1 x15 TPH BF gas fired boiler.
Anantapur, A.P.

Tamil Nadu Electricity


Erection, testing & commissioning of Electrostatics
Board / Mettur Thermal
46 Precipitator, Rotating machines, ducts & dampers of Unit I, 12.09.1984 1,09,32,916
Power Project, Mettur,
II & IV of 2 x 210 MW
Tamil Nadu
U.A.E
Contract value
S.No Client and Project Location Scope of Work
(AED)
1 Larsen & Toubro Limited, E&C Division,
Fabrication & Erection of Carbon Steel and Stainless Steel
Borouge III, P3B Plant at Ruwais, Abu
Piping at P3B Plant at Ruwais, Abu Dhabi 3,384,000
Dhabi

L&T/Naphtha Hydro Theater Plant/ Erection of Structures for of Compressor shed 08


2 500,000.00
U.A.E &10 and associated Sheeting.
Supply, Fabrication and Erection of Demister
3 Dewa / U.A.E 150,000.00
Structure For L2 Power Station.

4 Jan De Nul /U.A.E Supply, Fabrication and Erection of Dredging Pipes 200,000.00

L&T / Naphtha Hydro Treater Plant/ Fabrication & Erection of SS and CS Piping For
5 250,000.00
U.A.E Naphtha Hydro Theater Plant At Enoc Refinery

L&T / Naphtha Hydro Theater Plant/ Erection and alignment of E.O.T Cranes for Enoc
6 100,000.00
U.A.E Refinery

Emaar/ District cooling plant 03 Burj Fabrication & Erection of Chilled water piping for
7 200,000.00
Dubai/U.A.E Cooling Plant 03.
Modification and Rectification of Existing Pipe Rack
8 L & T/ Enoc Refinery Expansion 200,000.00
Structures and replacement with new structure.
Al Ghurair Iron and Steel Plant / Abu
9 Erection Of Equipments for acid regeneration plant. 230,000.00
Dhabi

10 Voltas Limited/Abu Dhabi Erection Of Equipments- Generators 92,000.00

11 Mubadala Development /Abu Dhabi Erection of steel structure 260,000.00


Fabrication and Erection of GRP Pipes for
12 SEWA /CH2MHILL 550,000.00
Desalination plant.
OMAN
Sl. Contract value
Client and Project Location Scope of Work
No. (AED)
1 Vale/steel plant/ OMAN Erection of Structures for of Steel plant . 800,000.00
Fabrication & Erection of oil piping for PDO.
2. PDO/OGS plant/OMAN 300,000.00

Fabrication & Erection of utility piping for vale.


3. Vale/steel plant/ OMAN 1,200,000.00
Financial Turnover
90
82.29
77.86
80
74.06
66.31
70
60.88
60

50
AMOUNT IN CRORES

37.07 38.11
40

30

20

10

Financial Year
List of Clients
Aditya Cement Andhra Pradesh Power Bharat Heavy Chhattisgarh State Chennai Petroleum Gujarat State Cochin Refineries
Generation Corp Ltd Electricals Limited Electricity Board Corporation Limited Electricity Board Limited

Dainik Bhaskar Larson & Toubro (L&T) Gujarat State Haryana Electricity Hindustan Sharjah Electricity Petroleum
Power Limited Energy Generation Board Newsprint Limited & Water Authority development of
Ltd oman

Jindal Power Karnataka Power National Aluminium National Thermal NTPC TamilNadu Masood John Dubai Electricity &
Limited Corporation Ltd Company Power Corporation Energy Company Brown Water Authority
Ltd Ltd

Tamil Nadu Thiru Arooran Sugars Uttar Pradesh Fisia Italimpianti. Gasco Jindal Strips Neyveli Lignite
Electricity Board Limited Electricity Board Gruppo Impregilo Limited Corporation Limited

Maharashtra State Reliance Energy VISA Power Avanta Power Doosan Power Lalitpur Power KC Cottrell
Power Corp. Ltd Limited Systems India Pvt Ltd Generation
Company Limited

Sintex Infra
Project Ltd
Awards and Accolades
Performance Awards
Safety Awards
Work Completion certificates

Vous aimerez peut-être aussi