1. The document provides a cost breakdown and estimate for installing and maintaining telecommunication sites in two locations: Kappang, Southern Sulawesi and Jakarta.
2. For the Kappang site, the total estimated cost is $5,995, which includes costs for installation, logistics, materials, maintenance and site survey.
3. For the Jakarta site, the total estimated cost is $3,025, which also includes costs for installation, logistics, materials, maintenance and site survey.
1. The document provides a cost breakdown and estimate for installing and maintaining telecommunication sites in two locations: Kappang, Southern Sulawesi and Jakarta.
2. For the Kappang site, the total estimated cost is $5,995, which includes costs for installation, logistics, materials, maintenance and site survey.
3. For the Jakarta site, the total estimated cost is $3,025, which also includes costs for installation, logistics, materials, maintenance and site survey.
1. The document provides a cost breakdown and estimate for installing and maintaining telecommunication sites in two locations: Kappang, Southern Sulawesi and Jakarta.
2. For the Kappang site, the total estimated cost is $5,995, which includes costs for installation, logistics, materials, maintenance and site survey.
3. For the Jakarta site, the total estimated cost is $3,025, which also includes costs for installation, logistics, materials, maintenance and site survey.
4 unexpected costs Equipment handling If any reimburse
Cable running / work permit If any reimburse Building management permit If any reimburse Delay due to unexpected situation (delays due If any reimburse to the consumer or licensing issues and others) installation on site without prior survey 1 200 200
Grand Total 2310
Maintenance site location KAPPANG southern Sulawesi (incidental) 1 Corrective Tech Support 1 200 200 Maintenance Air Transportation 2 175 350 Ground / Sea Transportation 1 200 200 accommodation 3 60 180 Tech logistic + installation material 1 75 75 Total 1 1005 Preventive Maintenance + full year remote support, site location KAPPANG Southern Sulawesi 2 Preventive Tech Support 1 175 175 maintenance Air Transportation 2 175 350 Ground / Sea Transportation 1 200 200 accommodation 2 60 120 Tech logistic + installation material 1 75 75 Total 2 920 Site Survey site location KAPPANG (Southern Sulawesi) 1 Site survey Tech Support 1 150 150 Air Transportation 2 175 350 Ground / Sea Transportation 1 200 200 accommodation 2 60 120 Tech logistic 2 30 60 880 Total price no Item Breakdown unit Flag / price (USD) Installation for site location JAKARTA 1 Installation ( first Tech Support 1 400 400 setup) Co Tech support 1 250 250 Telco 1 50 50 Labor 2 50 100
4 unexpected costs Equipment handling If any reimburse
Cable running / work permit If any reimburse Building management permit If any reimburse Delay due to unexpected situation (delays due If any reimburse to the consumer or licensing issues and others) installation on site without prior survey 1 200 200
Grand Total 1280
Maintenance for site location JAKARTA (incidental) 1 Corrective Tech Support 1 200 200 Maintenance Air Transportation Ground / Sea Transportation 1 100 100 accommodation Tech logistic + installation material 1 75 75 Total 1 375 Preventive Maintenance + full year remote support, for site location JAKARTA 2 Preventive Tech Support 1 175 175 maintenance Air Transportation Ground / Sea Transportation 1 100 100 accommodation Tech logistic + installation material 1 75 75 Total 2 350 Site Survey site location JAKARTA 1 Site survey Tech Support 1 175 175 Air Transportation Ground / Sea Transportation 1 100 100 accommodation Tech logistic 2 30 60 325