CARBN EN COLOMBIA
RESUMEN
ABSTRACT
A cargo distribution system is designed, for a company that exports coal from
Colombia, in order to find minimum cost routes from the Boyac and Cesar
production centers to the ports of Barranquilla and Santa Marta, in addition, the
Pgina 1
transport of cargo to the ports of Amsterdam and Philadelphia. The methodology
developed focuses on finding a solution to the problem of minimum cost flow,
which considers the capacity of production centers; the storage capacity of each
rail and river port; the costs of road, river, railway arcs; operating costs of
production centers; export costs and transshipment costs. Finally, with the help of
the Trans Cad tool, confirm the productivity of the network.
Pgina 2
produced in the center of the country, 2. METHODOLOGY
as for the moment by aspects such as
the infrastructure in road roads, In order to implement an optimal route
fluvial, rails and operational logistics, that reduces the operational costs of
this mineral cannot be exploited to a transporting coal to be exported, an
greater extent. These are one of the optimization model is performed,
reasons why, the cost of coal in the which provides consistent results of a
center of the country is greater than transportation network that goes from
that of the Atlantic coast. two major coal production centers in
Colombia ( Boyac-Cesar) to two of
Therefore, creating alliances between the country's main seaports
important national operations centers (Barranquilla-Santa Marta), bound for
is a great help to meet the demand Amsterdam and Philadelphia.
challenges in terms of cargo planning,
transport and the costs of such Taking into account the exploitation
operations. It is necessary to find a capacity of each reservoir and the
viable strategy that minimizes the storage capacity of each transfer
costs of cargo transportation as much center, the routes and modes used for
as possible, and ensures that the this purpose are identified, evaluating
quantity demanded is the same in the which of the results is the best in
capacity to offer. To achieve this terms of cost. To begin, it is
objective, it is necessary to use necessary to recognize each activity
optimization methods by estimating center, within the system and identify
significant decision variables, with its role, and what specifically
strong information from the collection contributes to the network studied.
centers, their production capacity, For example, if it is a production
storage capacity, possible transfer center, it is important to know the tons
centers, loading mode. of coal it has available to offer, and to
establish what capacity of reception
According to the above, the following (demand) has each port, in order to
article will develop a model that will prevent inconveniences of imbalance
optimize transport costs and load in the market.
transfer, based on a multimodal
transportation network, on a particular In case of not having the previous
problem of a coal company in information of each node, it is strictly
Colombia that exports coal to necessary to carry out a market
international ports. evaluation between supply and
demand, to establish the existing
relationship in both scenarios and to
Pgina 3
know exactly the quantity produced month, which refers to the large
and required in each case. amount of reception they have.
For the case study, there are two The following table characterizes the
nodes of origin that depart from the arcs used in the modeled transport
departments of Boyac or Cesar, and structure, adding specific attributes
two ports of destination are such as the serial, the production
Barranquilla and Santa Marta, and schedule, the mode of transport used,
then exported to Amsterdam and among others.
Philadelphia. Table 1 illustrates the
capacity of supply and demand of Table 2.Transportation network of
each one of them. coal.
Pgina 4
The transport modes used for each
node are shown below.
Pgina 5
Fig.4 Rout since Boyac, with
transfer ferrous.
Fig 7. Route since Cesar with transfer
It also represents the routes that are
fluvial
carried out to transport the cargo
coming from the department of Cesar, In the images it is possible to
to the seaports. observe, which are the routes that are
taken and the mode with which they
are crossed, likewise, each
transshipment carried out to change
the load of mode, generates an
additional node of transfer, called
transfer node.
Pgina 6
function is formulated with minimum of the route. The illustration __ shows
height constraints and flow the results obtained by the program.
conservation.
3. FORMULATION OF THE
In order to verify the result obtained in PROBLEM
Excel, the graph was also developed
in Matlab 6.1. In this program the data Understanding the whole system as a
are entered in the form of vectors, set of nodes and arcs that work in
and the node-arc incidence matrix, common, and share a transport
some of the vectors that are infrastructure with limited capacity. An
introduced are the cost and capacity optimization problem was formulated
vector. that takes into account the most
important attributes of the nodes and
When everything is ready for arcs that comprise it, in order to
development, the lingprog function maximize the capacity of the network
was used, this function solves and reduce its costs.
problems of linear programming,
which consists in optimizing a linear OBJECTIVE FUNCTION
equation subject to a series of (1)
constraints conformed by linear
inequalities, and from this function we
obtain the value of the route of
minimum cost flow and is compared MINIMUM QUOTATION
to that obtained in Excel. RESTRICTION
( ) (2)
In Transcad we draw the graph taking
into account the nodes, arcs and (3)
flows raised in Excel, then we
introduce the costs of each arc, the
costs of nodes of producers and
attractors. It is checked that the nodes RESTRICTION ON FLOW
carry the same order as the one that CONSERVATION
had been raised in the graph. In the = 0 (4)
end a logical network is created (it
depends on capacity capacity, Where:
producing nodes and attractors), we
$
run the program that gives us the = ( )
minimum cost flow path and the cost
=
Pgina 7
= ,
= ,
4. RESULTS
Pgina 8
place where each district and port that Philadelphia and Amsterdam, and
are part of the solution of the problem nodes 1, 3, 5 and 6 are the supply
will be found. nodes and storage respectively.
Pgina 9
5. CONCLUSIONS towards the port of Barranquilla, the
amount of coal that arrives is very
For the optimal solution to a problem small compared to Santa Marta,
of flow of minimum cost, three modes which has a large influx of
of transport are considered, which are merchandise transported. Which
rail, road and fluvial. With a respective indicates that it is more profitable to
participation in each case of: 30% rail, transfer most of the merchandise to
46% truck and 24% of fluvial mode. the maritime port of Santa Marta, from
These will carry a total of 670000 tons where it is going to be distributed to
in the month of study, and that will Amsterdam and Philadelphia.
have a cost of 27545000 dollars.
In order to address this problem, the
The mode of transport that gained the distance between districts and ports
most participation was the load that could also be taken into account. As
was taken through the truck, for which this can significantly influence costs,
it is vital to have the best road because they can have higher costs,
infrastructure. This so that the cargo and it would be inherent to give
can be transported with greater meaning to the travel time taken by
efficiency, with better conditions of each route. This is because in many
comfort and security for both the cases, it is a factor with which to
plaintiffs and the bidders of said make the greatest decision-making.
merchandise.
REFERENCES
The conditions of demand and supply
fulfilled the conditions of equilibrium. [1]Colombia. Unidad de Planeacin
Therefore, it was not necessary to Minero Energetica, UPME.
apply any kind of penalty to the Indicadores de la mineria en
exporting companies, since the export Colombia. Bogota: Ministerio de
quantities were optimal. Minas y Energia, 2014.127p.
Pgina 10