Vous êtes sur la page 1sur 1

GRID LOCATION

MP-B1 Bb-Bc/3'-2"
6 No BEAM REQUIRED AS DRAWN MKD' MP-B1
PHASE NAME
Phase 1

RD 1327 2214

S38-34

S38-92

S38-34

HI300-5-10*200 x 2214

RD
40 2174 40
S38-92 A
75

75
75

75
75

75
3 * D 18
3 * D 18 S38-34 BS A

150 150

S38-92

3 * D 18
75
75

S38-34
75

3 * D 18

S38-34
FOR FABRICATION
SECTION A - A
REV. DESCRIPTION DATE DRWN. BY CHK'D BY APRV'D BY

McDonald Forge Ahead

McDONALD STEEL BUILDING PRODUCTS LTD.


"Santa Western Tower" (Level-11th) 186, Biruttam Mir Sawkar Ali Sharak.
Tejgaon Industrial Area, Dhaka-1208
STEELWORK: ASSEMBLY DRAWING
CLIENT MAGNUS POWER PRIVATE LIMITED
PROJECT 110.4 MW MAN HFO ENGINE POWER PLANT
IF FOUND ANY DISCREPANCY IN THIS DRAWING
PLEASE CALL BEFORE FABRICATION 1. FOR DETAIL INFORMATION REF. SINGLE PART DWG. LISTED BELOW. STRUCTURE POWER PLANT BUILDING
NOTES: SITE ADDRESS BOSILA, MOHAMMADPUR, DHAKA.
NOTES DRG TITLE Beam Details
MATERIAL LIST FOR ONE ASSEMBLY MK'D MP-B1 6 No. Required
MP-B1 JOB NO. 1612 REV
1. ALL DIMENSIONS ARE IN MILLIMETERS (mm) U.N.O.
2. ALL HOLES AT MAIN SHAFT ARE 22 DIA U.N.O. DRAWING No.
3. ALL WELDS ARE ALL AROUND SEALED TO BE 6mm SIZE U.N.O.
4. ALL PG SECTION TO BE READ AS PG-DEPTH*WIDTH*WEB THK.*FLG. THK.
Mark Size Grade No. Length Area Weight-Kg
5. ALL ELECTRODES TO BE E60xx
6. ALL HOLES TO BE DRILLED OPEN HOLES SHOWN S38-34 PL8*187.5 50 2 279 102670.11 5.99 SIGNATURE:
Tekla structures

7. ALL FITTINGS PREFIXED W/"F" TO BE FULLY WELDED UNO


8. ALL NOTCHES TO BE ROUND SHAPED (R-15) UNO
9. ALL SHARP EDGES TO BE REMOVED
S38-92 HI300-5-10*200 50 1 2214 3088260.00 93.85 DRAWN BY: Jobaidul CHK'D BY: Fuad APV'D BY: Mosharaf
01.02.2017
10. ALL MARKS TO BE HARDSTAMPED AT SIDE INDICATED W/ WHERE NOTED.
ENDS AND FACES THAT ARE PREPARED FOR FULL CONTACT BEARING TO BE Total 3190930.1 99.84 DATE: 01.02.2017 DATE: DATE: 01.02.2017
IN ACCORDANCE WITH BS 5950 CL 723

Vous aimerez peut-être aussi