JOB HAZARD ANALYSIS

PNCP MEG PROJECT, EPCC - 10.

PROJECT PNCP MEG Project DATE 6/9/2008

COMPANY SECL EQUIPMENT INVOLVED


Helmet, shoe, Hand glove,Full boady
RESIDENT SITE MANAGER Mr. Y.H. OH PPE / SAFETY DEVICE REQUIRED harness,Mist mask, retractable Fall Arrestor, etc.
Painting crew, Scaffolder, Supervisor, HSE,
SITE ENGINEER / SUPERVISOR Naveen TEAM MEMBER Others.

HSE ENGINEER Sanjay KuMAR PERMIT REQUIRED Yes

ACTIVITY DESCRIPTION Painting Work JHA NO. 8

ACTIVITY HAZARD RISK CONTROL MEASURES RESPONSIBILITY


* Check safety condition for whole * If working for height / elevated place height work
work place. permit must be obtained.
1. Working condition and Work * Equipment and tools, etc. inspection must be
Permit. carried out.
ACTIVITY HAZARD RISK CONTROL MEASURES RESPONSIBILITY
* Fire and Explosion caused by * A storage building excusivly for paint, thiners etc.
flammable materials e.g. paint, shall be constructed preferably brick built and
thiners. maintained at a distance of 30m from job site and
other facilities.
* Storage building to be provided with good
ventilation
* Adequate fire exits to be provided. Such exits
must not be obstructed (inside and outside).
* Flammable materials shall be stored tidily with
gangways for access / egrees.
* Empty and full containers will be segregated from
each other.
2. Paint storage * Provide suitable locks etc. and spare keys to be
provided to the safety team for use during
emergency situation.
* Adequate numbers of the extinguishers to be
kept by exits in the storage building and in addition
extinguishers kept outside of building.
* Sign boar'Flammable Material; and 'No Smoking;
'No naked Light' etc displayed.
* Access and other roadwyas must be kept free
from obstruction due to emergency.

* Falling objects i.e. steel pipes / * Job supervisor and other related persons at the
hanger, scaffold fittings,planks,etc. work site.
* All other persons not associated with the scaffold
erection do not enter in erection area.
2. Scaffold erection.
ACTIVITY HAZARD RISK CONTROL MEASURES RESPONSIBILITY
* Falls of Person during scaffold * Scaffold area to be cordoned off with barrier, etc
erection. and warning sign provided i.e. "keep out".
* No scaffold shall be erected, moved eccept under
the supervision of competent scaffolder.
* Install specific ladder and other temporary
facilities in accordance with the work safety plan
and IOCL/EIL Safety rule & regulations.
* All material to be inspect prior to use. Every week
inspection required by competent person or job
supervisor and fill the green tag with remarks.
Follow SECL scaffolding tag system.
* Use right tools for erection and all tools should be
inspected prior to use.
* All scaffold work done by experienced and skilled
scaffold crew only.
* Do not put body force for tie up the structure, tie
in work by right tools only.
* During assembly of scaffold tie of seperate ledger
that are locked in to place.
* Secure hand tools in place with safety lanyards.
* If scaffold are sheeted / planking then calculation
will needed to ensure the safe working & wind
loading on the scaffold structure.
* Inspection made by competent scaffold
supervisor prior to use. If acceptable then use
Green Tag, during erection use Red and same in
dismentling.
* Scaffold must not be use until the Green Scaff
Tag has been issued and displayed on scaffold.
* Appropriate PPE to be worn at all the time i.e.
Helmet, safety shoe, Goggles, Full body
harness,etc. and aatached to a strong fixing poin.
* Falling object such as paint drums * Mechnical lifting device to be used to deliver paint
and other material lifted. etc. onto the scaffold working platforms.
* Paint containers etc. to be secured to prevent
movement during lifting.
* Fall of persons. * A loading platform to be consutructed in the
4. Mechnical & Mannual Handling scaffold and strong enough to take the load and
of Paint etc. other eqyuipment i.e. compressor for spraying etc.
* 'Close off' with barrication the area below the
lifting.
ACTIVITY HAZARD RISK CONTROL MEASURES RESPONSIBILITY
* Falling object such as paint drum * Supervisor shoild be stand by at site to drive the
and other material during painting. actvity in safe manner.
* Spray the paint spray gun or other painting tool
before work starting.

* Falls of persons from scaffold or * Confirm specially scaffolding , ladder, and other
other elevated place. temporary facilities in accordance with the Project
HSE Plan.
* Confirm safety net, guard rail system including
toe board, life line, safety sign and other safety
facilities in accordance with project HSE Plan.
* Only working creew persons enter the painting
area, unauthorized not allowed.
* Fire * Flammable material shall be isolated and kept
* Explosion away from other substances / materials.
* Remove combustible substance from the work
area and maintain tidy housekeeping.
5. Painting * Control the iginition sources i.e. no smoking, no
naked lights.
* Provide adequate ventilation.
* Fire extinguishers to be kept on stand by in the
working areas.
* Toxic Vapours * Wear Personal Protective Equipmentn: safety
helmet, safety shoe, safety full boady harness,for
elevation work, eye protection, hand protection and
as required respiratory protection.
* All paints and thinkers etc. to be used
accordance with the MSDS sheets specifying the
hazards associated in using the substances.
ACTIVITY HAZARD RISK CONTROL MEASURES RESPONSIBILITY
* Falling workers during scaffold * Scaffold area to be cordoned off with barrier ,etc
dismentling and warning sign provided i.e. "keep out".
* Falling objects like steel pipes, * No scaffold shall be dismantled, or altered except
clamps,tools and other materials under the supervision of competent
* Struck by flying materials person.erected, moved ecept under the
supervision of competent scaffolder.
* Install specific ladder and other temporary
facilities in accordance with the work safety plan
and IOCL/EIL Safety rule & regulations.
* All scaffold material to be lowered to the ground
by rope only, not thrown down.
* Dismentle the scaffold don't demolish it.material
to be inspect prior to use. Every week inspection
required by competent person or job supervisor
and fill the green tag with remarks.
* Use right tools for erection and all tools should be
inspected prior to use.
3. Scaffold Dismentling * During dismentling tie of to seprate and secured
ledger that are locked in place.
* All scaffold work done by experience and skilled
scaffolder only.
* Do not put body force for tie up the structure , tie
in work by right tools only.
* During assebly of scaffold tie of to separate and
secured ledger that are locked in to place.
* Secure hand tools in place with safety lanyards.
* If scaffold is to are sheeted / planking, calculation
will need to be made the safe working & wind
loading on the scaffold structure.
* Inspection made prior to use by competent
scaffold. If acceptable then use Green Tag, during
erection use Red and same in dismentling.
* Scaffold must not be use until the Green Scaff
Tag has been issued and displayed on scaffold.
* Appropriate PPE to be worn at all the time i.e.
Helmet, safety shoe, Goggles, Full body
* Rest Shelter, Drinking Water, *harness,etc.
Provide restand
shelter, Drinking
aatached to awater,
strongToilet
fixing at near
poin.
Toilets, etc by area, etc.
4. Welfare / Medical Facility Job supervisor / HSE
* Injury, Etc. * First aid box

* Supervisor should know the emergency contact


numbers, assembly point and IOCL First aid
5. Emergency Response * Incident / Accident, etc. center. Supervisor / HSE
* Standby vehicle required during working time.
ACTIVITY HAZARD RISK CONTROL MEASURES RESPONSIBILITY
Checked / Reviewed By:
ZARD ANALYSIS
G PROJECT, EPCC - 10.

6/9/2008

Helmet, shoe, Hand glove,Full boady


harness,Mist mask, retractable Fall Arrestor, etc.
Painting crew, Scaffolder, Supervisor, HSE,
Others.

Yes

RESPONSIBILITY
RESPONSIBILITY
RESPONSIBILITY
RESPONSIBILITY
RESPONSIBILITY

Job supervisor / HSE

Supervisor / HSE
RESPONSIBILITY

Vous aimerez peut-être aussi