Andrew H. Leavitt
Conco Services Corp.
Focusing On:
Equipment / Sample Set-up
2
Inspections / Methodology
3
Helium Mass Spec
4
Analyzer
5
Off-Gas Measurement
6
Rotometer
7
ACC / Maalaea
8
Pipeline
9
Pipeline
10
11
Debris
12
High Pressure Seal
13
Gland Seal Drain / Trap
14
Crossover Bellows Leak
15
Crack
16
Leakage Back Through Hogger
Exhaust when Isolated
17
Leak Under Insulation
18
Insulation Removed
19
WOW!
20
Bypass Leak
21
Circumferential Crack
22
Circumferential Crack
23
24
Base Weld Leaks
25
Top of Tube Leaks
26
First Tube Weld Leaks on Either Side
of Bundle Welds - Left
27
First Tube Weld Leaks on Either Side
of Bundle Welds - Right
28
Extensions
29
Extensions
30
Stress Cracking
After Temporary Repairs
31
Cut Outs
32
6 Weld Crack
33
Lots of Possibilities
34
Leak Location
35
Pinhole Leak
36
Fan Room Shooting
37
Tube Leak and Weld Leak
38
Duct Weld Leak
39
Rupture Disc Leak
40
Leak on Bundle where It Was
Welded to Exhaust Duct
41
Leak Directly on
Exhaust Duct Weld
42
Exhaust Bellows Leak
43
44
2 Dephleg Indications
45
Crack on Elbow
46
Crack on Elbow
47
Burst Tubes Due to Freezing
48
Creative Leak Repairs
49
Expanding Foam
50
Questions?
The leak is
up here!
51