Académique Documents
Professionnel Documents
Culture Documents
REGD. OFFICE NEYVELI HOUSE , 135, PERIYAR EVR HIGH ROAD, CHENNAI-600 010
CORPORATE OFFICE: BLOCK-1, NEYVELI 607 801, TAMIL NADU
VOLUME-III
TECHNICAL SPECIFICATIONS AND
DRAWINGS
****
1
VOLUME INDEX
NO OF
SL.NO TITLE
PAGES
2
CONTENTS
TECHNICAL SPECIFICATION
SL. PAGE
DESCRIPTION
NO. NO.
1 CIVIL WORKS 4
2 ELECTRIFICATION WORKS 85
3 DRAWINGS 263
A CIVIL-13 Nos
B ELECTRICAL- 1No
C BORELOG-4 Nos
3
INDEX
Scope of work
Description of Work
Scope of Work
Description of work
9 Drawings( SLD)
85
SECTION I
TECHNICAL SPECIFICATION for External Electrification system of NTPL
Town ship at Tuticorin
1.0
Scope of work
1.1 The Scope of work includes design, engineering,
manufacture/procurement, supply, testing and inspection at firms
work, packing, transit and its insurance, delivery to site, receipt,
unloading, handling, storage and preservation at site,
comprehensive insurance for storage-cum-erection and inplant
transportation at site, fabrication at site, supervision, erection, pre
commissioning, testing, commissioning, performance testing,
guarantee and warranty of complete electrical and associated civil
works of External Electrification of Township for 2 x 500 MW
Thermal Power Project of NTPL and handing over the system as
per specification and scope defined in the Tender Specification.
Power supply for the External Electrification for Township for the
Tuticorin Thermal (2x500MW) project shall be tapped off from the 22KV,2
86
pole structure ( with AB switch, fuse and one metering set TNEB type) to
be erected by TNEB. However supply of Metering set (TNEB type) for the
TNEB 2 pole structure shall be of bidders scope.
The successful bidder has to erect separate two pole (with AB switch,
lightning arrester, fuse arrangement) at a suitable distance from TNEB
two pole structure with suitable Cable / Conductor to receive the incoming
power supply.
2.2 GI Pipes:
Supply and providing of suitable GI pipes for road, drainage crossing &
Cable raising at Electrical panels /Transformer. The pipe shall be extended
up to full width of the road for all type of the cables as a protection.
87
2.3 Lighting Arrangement:
Pole Lighting :
Supply, erection and commissioning of street light poles, light fittings
,luminaire, lamps,and its accessories etc.
Suitable foundation with coping shall be provided for all the tubular poles.
Power supply for the above works shall be tapped from the nearest load
bank panel through a street light control panel located in /near the first
pole.
Each circuit from the load bank panel tapping shall not be connected to
more than 20 poles
Street light shall be provided with single swaged tubular pole with HPSV
lighting fittings.
Timer control panel shall be provided in the first pole of the lighting circuit.
From the nearest load bank panels 63 A, 3 phase MCCB ,supply shall be
tapped using 4Cx16 sqmm for street lighting arrangement and terminated
at the timer panel.
Loop-in & Loop-out box of suitable size & connectors shall be used for
terminating the cable at every pole at suitable height with suitable
clamping arrangement.
From the timer panel, 3 phase supply shall be tapped using 4Cx16 sqmm
and terminated at the incoming of the loop in & Loop-out box of the first
pole.
Single phase supply shall be tapped using 2.5 sqmm copper flexible PVC
cable from the loop-in & Loop-out box to the individual fittings.
Suitable size compression type cable gland anf lugs shall be used for
termination of cable. Necessary cable raising pipe with GI of thickness not
less than 2.5 mm shall be provided at every raising of cable.
The outgoing the loop-in & loop-out box shall be connected using 4Cx 16
sqmm cable to the incoming of the next loop-in & loop-out box and so on
up to the last pole.
88
2.4 Flood lighting :
From nearest load bank panels 63A,3 phase MCCB, supply shall be
tapped for each circuits using 4Cx 16sqmm cable and terminated at the
TPN MCB, which is to be located at the pole.
Single phase supplty shall be tapped using 3Cx 4sqmm,1.1 KV grade,
copper flexible PVC cable from the loop-in & Loop-out t the individual
fittings through a 16 A SPMCB.
Suitable size compression type cable gland and lugs shall be used for
termination of cable>Necessary cable raising pipe with GI of thickness not
less than 2.5 mm shall be provided at every raising of cable.
One earth pit shall be provided for every 5th pole for street lighting as per
specification and connected tyo the other polea through the armour of the
Loop-in 7 Loop-out cable.
Two earth pit shall be provided for Flood lighting as per specification.
2.6 General:
89
(iii) Setting and Name plate details of the kiosk VCB shall be painted
on the VCB chamber.
(iv) Name plate details of the transformers shall be written on the
plinth.
(v) Aluminum identification tags shall be provided on the coping and
the pole for a height of one meter.
(vi) Pole numbering shall be painted at the same level for all the
poles (Kiosk No./LBP No/Pole No.)
90
The detailed scope for both (a) & (b)
The O&M works shall be carried out by engaging qualified/experienced
employees in all the three shifts. For supervising the works, qualified
engineers with minimum diploma in electrical engineering shall be posted.
91
2.9 SPECIAL INSTRUCTIONS TO BIDDER
e) Concrete, earth work, brick work, fencing, gate etc., estimated for
civil works forming part of bidder's work.
Bidder shall have valid electrical bidder's license to execute the work in
Tamil Nadu.
92
The Bidder shall be responsible for storage and safety of the equipment at
site.
Unit rates / prices
2.10
Unit rates / prices shall be firm without any escalation till completion of job
assigned.
Unit rates shall cover all incidental charges and shall be for finished work
as per various clauses of complete purchase order document
Actual payment will be made for the quantity supplied and erected. Even
though the payment is on unit rate basis entire job shall be carried out on
turn key responsibility basis. All necessary foundations, supporting
brackets, pipes, cable tray, clamps, junction boxes, etc. which are
necessary for completing the job have to be considered by
the bidder and the rate for various items are to be worked out accordingly.
Flexible wires from junction boxes to the individual fittings are also
included in the scope
Bidder's Responsibilities
2.11
Bidder's License
2.11.1
The Bidder shall possess a valid and competent bidder's license issued by
the electrical licensing authorities of Govt. of Tamil Nadu or other states for
carrying out electrical installation work of the type and magnitude covered
in this document, in the state of Tamil Nadu.
Copy of the license shall be made available to the owner / consultant for
verification, during the execution of contract, if required.
93
satisfaction of Chief Electrical Inspector, CEA / Tamil Nadu state or any
other statutory body having jurisdiction in the area and also the owner /
consultant.
The responsibility for obtaining the Electrical Inspectorate's approval for
the installation to be carried out rests entirely with the bidder. It shall be
the responsibility of the bidder to prepare and submit all necessary
drawings, calculations, test certificates and relevant details (other than
those given by the owner / consultant) to the Electrical Inspector and
obtain prior approval for commencing the work and for the complete
installation work done. The necessary fees for inspection charged by
Electrical Inspectorate till the commissioning of all the equipment has to be
paid by the bidder.
2.11.3 Modifications
Modification required by the owner /statutory bodies to correct defective
workmanship, non-standard installation and non-compliance of statutory
regulation by the bidder, shall be carried out at free of cost by the bidder
without affecting the agreed milestone.
Although every required item of work may not be explicitly described in the
specification, the bidder shall furnish everything necessary to complete the
specified work.
94
time of the Bid without assigning any reason whatsoever.
Bidder shall complete the work within stipulated time to the satisfaction of
owner.
The bidder shall check and test all electrical equipment and systems
installed and supplied by him including equipment supplied by others in
conformity with the test procedures outlined by the manufacturer. In
addition, he shall test buried earth grids supplied and installed by him and
record values
Bidder shall ensure that no tests are applied which may stress equipment
above the limits for field testing recommended by the manufacturer. The
bidder shall be responsible for any damage to personnel or equipment
resulting from improper test procedures.
The bidder shall provide owner with complete test certificates on a format
approved by the owner . The certificates shall be signed by both the bidder
and owner and shall be completed under supervision of the owner .
All defective materials supplied by the bidder and defects due to poor
workmanship revealed through field testing, shall be corrected at the
bidders expenses without affecting the milestone agreed upon.
The bidder shall bring his own testing equipment for testing and
commissioning of equipment / items. List of such testing shall be furnished
along with the quotation. Valid calibration certificate shall be provided for
testing instruments on demand.
All tools, tackles, handling equipment etc., required to carry out the work
without causing any damage to the equipment / personnel shall be
arranged by the bidder himself.
95
The bidder may have to work along with other bidders / agencies for some
other job assigned by the owner at the same item and at the same place at
the site. Electrical bidder shall not object to this arrangement and extend
his full co-operation to other bidder to the satisfaction of owner .
96
bidder.
Similar equipment and components shall be of same make;
equipment of same type and rating shall be interchangeable.
The purchaser has the option of selecting the manufactures of
electrical equipment, instruments and controls and any other
specialized items in the interest of standardization and the
successful bidder shall have to supply equipment of particular make,
if so required.
2.11.9 Safety
All equipment shall be complete with approved safety devices
wherever a potential hazard exists and with provision for safe access
of personnel to and around equipment for operational and
maintenance functions.
The design shall include not only those usually furnished with
elements of machinery but also the additional covers, partitions, etc.
which are necessary for safe operation of the plant.
All danger and caution notice boards shall be in Hindi, English and
Tamil.
Contractor must take sufficient care in moving his construction plants
and equipment from one place to another so that those may not
cause any damage to the property of the Purchaser particularly to
the overhead and underground cables and other service lines.
When the work is carried out at night or in the obscure day light,
adequate arrangements for flood lighting in the working area shall be
made by the bidder at his own cost and got approved by the
purchaser.
97
2.11.10 Installation, Testing and Commissioning
98
2.11.13 Environmental Conditions
II. Frequency : 50 Hz +/ - 5 %
4 wire system
99
2- Pole structure shall be constructed using 90 LBS rails and standard
channels, angle etc. Typical arrangement is indicated in the drawing
no.MEC/TS/Q6G4/EI-PP/TB3/102. Pole shall be earthed properly.
Two Pole Structure shall be installed by the bidder for accommodating the
22 KV Air break switch with fuse. 22 KV cable from the purchasers 4-pole
structure shall be laid by the bidder and terminated on the 2 pole structure.
From the 2 pole structure, 22 KV cable shall be laid upto the VCBs and
from VCBs upto the transformer. Termination at ends shall be in the scope
of the bidder.
Minimum height of poles above ground shall be 8.0 mtr. and 1.5 mtr. length
shall be buried with PCC foundation. PCC work shall be upto 150 mm
above ground level.
Poles shall be painted with primer red oxide and finish with aluminium
paint from the bottom upto the height of 600 mm.
Bidder is advised to visit the site to apprise himself about the site
condition, location of tapping point of power at 22 KV level etc. A joint
route survey alongwith purchaser shall be done after placement of order to
finalize the cable route and other details. Unit rate furnished by the
tenderer shall be applicable for the actual quantity of materials used for
executing the job.
Size of the pole indicated above is typical value used for similar jobs.
However, it shall be the responsibility of the bidder to carry out the design
and get it approved by the purchaser/ purchasers consultant.
Each pole shall consists of pole top bracket, earthing set(with 3 mtr. long
50 mm dia GI pipe and other details as per IS 3043 with removable RCC
cover of size 45 x 450 x 75) ,clamp for earth wire.
All civil works associated with the above work are included in the scope of
the bidder. All supporting structures on poles to facilitate installation of
insulators ,LAs, isolators etc.also shall be under the scope of the tenderer.
100
The insulators shall be provided with clamps and fittings suitable for
conductor being used.
Bimetallic connectors shall be used to for connecting equipment terminals
made of copper or brass. Bolts, nuts and washers for conductors shall be
made of mild steel and shall be electrogalvanised and passivated to make
them corrosion resistant conforming to requirement of BS-1706.
22 KV Air Break Switch with drop out fuse shall be provided on the 2-pole
structure for isolating the incoming power. 22 KV cable shall be
terminated to the outgoing terminals of the Air break Isolator.
General
i) The board shall be of outdoor Kiosk type and shall receive power
from the Two-pole structure through 22 KV cable. System shall be
22 kV, 3 phase, 50 HZ solidly earthed neutral system. Highest
system voltage will be 24 kV.
ii) Board shall have one incoming VCB feeder and two outgoing
feeders for feeding the 22KV/ 0.4 KV transformers. Board shall be
complete with CTs, PT, Protection relays etc.
101
iii) 22 KV Board shall have the following:
a) Cubicle with busbars, relay, instruments, earthing device etc.
b) Vacuum Circuit breaker.
c) Instrument transformer (PTs, CTs)
d) Panel lighting.
Control supply 110V AC shall be derived from 22KV Bus PT for the
following purpose.
a) ON, OFF & Auto trip LED Indications for 22 KV VCB.
b). ON, OFF & Auto trip LED Indications for 0.4 KV VCB
c) Working supply for 4 element relay meant for Transformer protection.
d) Capacitive Power pack to energise U/V release in case of failure
of 22KV supply.
e) PT signal to the Static Energy meter
22KV Bus PT burden shall be suitably designed to cater the above needs
also.
Construction
ii) Sheet steel shall be of minimum 2mm thickness for partition between
panels and 3 mm for hinged front and bolted rear doors.
iii) Electrical continuity between all metal parts not alive and the earth
terminals of the unit shall be ensured.
102
v) Hinged doors shall be provided for front side and bolted doors for rear
side. Three point locking arrangement with single operating handle
shall be provided for all hinged doors. Hinge locks, lock covers etc.,
shall be fabricated from anti-corrosive material. The hinges shall be
sturdy and robust. The doors shall be provided with additional
members for strengthening to avoid any warping (or) bending.
vi) Cubicles will be exposed to high winds, dust and rain. Neoprene
gaskets of high quality shall be used. The top cover of kiosk shall
have necessary slope to avoid stagnation of rainwater.
vii) Base frame shall be of sufficient thickness and tar painted to give
corrosion resistance even if water accumulation is there.
Both incoming and outgoing cables are with bottom entry. Cable
terminations shall be made with the sealing kits of specified type.
Blank G.I. plates gasketed and bolted to the cubicle for glanding and
terminating control and power cables shall be provided.
Components
Circuit Breaker
103
i) The circuit breaker shall be three pole vacuum circuit breaker with
spring charged operating mechanism. Plug in isolating contacts and
4NO+4NC auxiliary contacts all mounted on a withdrawable carriage.
ii) The air clearance between phases and between phase to earth at the
breaker incoming and outgoing terminals shall not be less than those
indicated in the IS/IEC/British standards, corresponding to the basic
insulation level of the circuit breaker as indicated in the criteria.
iii) The temperature rise of the breaker contacts / terminals while carrying
the rated current continuously or the rated short circuit current of rated
duration shall not exceed 40 deg0 C. over ambient of 50 deg C.
Further to minimise burning and pitting of contacts all parts exposed
to the arc created by current interruption shall be protected by special
arc resistance material.
iv) The circuit breaker shall be designed such that the peak short circuit
current (i.e. 2.5 times the RMS short circuit current) specified can be
interrupted without causing appreciable damage to 0main contacts.
Operating Mechanism
ii) Trip coil shall operate satisfactory between 70% and 110% of rated
voltage.
iii) The closing and tripping circuits shall be self opening on completion of
their respective functions irrespective of position of the breaker
ON/OFF switch.
104
v) In case of circuit breakers with more than one operating spring, they
shall be so interlocked such that the springs are charged to the same
extent and the breaker can be closed only if all the springs are
charged to the required values. Further in case of multiple pole /
phase breakers equal current sharing between poles shall be ensured
by means of current balance schemes.
vi) In order to ensure the reliability and long operating life for the
mechanism, the mechanism shall be light, with a high mechanical
strength and abrasion resistance to avoid high rate of wear and tear
and with few components. The number of components in the breaker
and operating mechanism shall be kept to a minimum and they shall
be designed to be free of undue stresses during normal or short
circuit operations. Further they shall ensure a high frequency of
operations indicated in technical particulars. All the moving parts of
the mechanism requiring inspection, maintenance and lubrication
shall be easily accessible.
ix) The life of the operating mechanism shall not be less than 30,000
operations.
xi) The circuit breaker carriage shall have three clear positions viz. the
servi0ce position where the control and power terminals of the circuit
breaker are engaged; the test position, where the power terminals of
the circuit breaker are isolated, while the control terminals remain
engaged; maintenance position where both power and control
terminals of the circuit breaker are isolated.
105
xii) The service and test position of the circuit breaker shall be within the
cubicle and it should be possible to keep the door closed, with the
breaker carriage in either test or service position. However the
maintenance position can be with door open.
xiii) In case of carriage provided for mounting the breaker, the same shall
move on steel balls, within the guide ways for friction less movement
of the carriage and for avoiding misalignment.
xiv) The movement of the carriage inside the cubicle shall not transmit any
vibration to the different compartments of the cubicle especially the
relay and metering compartment.
xv) The carriage shall be provided with locking arrangement for locking
them in either test or service position, to prevent movement due to
short circuit forces.
xvi) Spring loaded, sliding earth terminals shall be provided on both sides
of the carriage, making positive connection with the earth strip
provided in the cubicle to ensure that all non-conducting metal parts
are securely earthed before moving the breaker carriage to test and
service positions. The location of the earth terminal shall be such that
it should be first to make and last to break to ensure personal safety.
All the non conducting metal parts shall be bonded together and
connected to the earth terminal by means of a separate connection.
Bolted connections of the framework of the carriage shall not be used
as earth continuity conductors. Mechanical interlocks shall be
provided on each carriage to prevent mal operation and in particular
to ensure that :
a) The carriage cannot be moved in or out of its cubicle with the circuit
breaker closed. The carriage shall automatically get locked in service,
which can be unlocked, when breaker is open and racking operation
initiated.
b) The circuit breaker can only be closed when the carriage is in one of
the positions i.e. the service position, a definitely located test position
or fully out of the cubicle in the maintenance position. The necessary
contacts for the same shall be provided on the carriage at these
locations.
106
d) The carriage cannot be pushed to service position without making the
connections of control isolating contacts.
xvii) All circuit breaker carriages of same rating shall be identical in all
respects and shall be interchangeable.
107
Auxiliary Contacts
Drawing
108
a) Dimensional GA drawing of switchgear indicating foundation
details, cable gland plate location for each cable plan and
elevation of switchboard.
g) Bill of Materials
Specification
General
109
(iii) Transformers shall be designed for 50 Hz. + 5% unless specified
otherwise in data sheet.
(v) Transformers shall be suitable for over loading as per IS 6600, unless
specified otherwise. Off circuit tap switch, terminal bushings, other
auxiliary components / equipment shall be designed for maximum
permissible overloading. Short time over loading to the extent of 50%
shall be considered for this purpose, for all transformers unless
specified otherwise.
(ii) For this purpose, infinite supply system and solidly earthed systems
shall be considered.
Flux Density
(i) The maximum flux density in any part of the core and yokes at normal
voltage and frequency, shall be such that the flux density under over
voltage condition shall not exceed the maximum permissible values
for the type of laminations used and core construction adopted.
(ii) In case of transformers with variable flux, the voltage variation, which
would affect flux density at every tap, shall be kept in view while
designing the transformer.
110
Magnetic circuit
(i) The cores shall be constructed from high grade, low loss, high
permeability cold rolled non-ageing grain oriented silicon steel
laminations.
(iii) The insulation structure for the core to bolts and core to clamp plates
shall be such as to withstand a voltage of 2000V AC for one minute.
(iv) Wherever the CRGO sheets are punched or sheared into laminations,
laminations shall be annealed in a non-oxidising atmosphere to
relieve stresses and restore the original magnetic properties of CRGO
sheets. The laminations shall be free of all burrs and sharp
projections.
(vii) All steel sections used for supporting the core shall be shot or sand
blasted after fabrication.
(viii) The finally assembled core and coil assembly shall be rigidly fixed to
the tank to avoid shifting during transport, handling and short circuits.
Adequate provision shall be made for lifting the complete core and
coil assembly.
111
Windings
(ii) The coil clamping arrangement and the finished dimensions of any
ducts shall be such as to not impede the free circulation of cooling
media through the ducts.
(vii) Completed core and winding assembly shall be dried in full vacuum to
eliminate presence of moisture. After drying process, the full
assembly shall be impregnated immediately.
(viii) No strip conductor, wound on edge shall have a width exceeding six
times its thickness.
(x) Windings shall not have sharp bends, which might damage insulation
and/or produce high dielectric stresses.
(xii) All threaded connections shall be locked. Leads from the winding to
the terminal board and bushings shall be rigidly supported to prevent
injury during short circuits/vibration.
112
(xiii) Permanent current carrying joints in the windings and leads shall be
welded or brazed.
(xiv) Clamping bolts for current carrying parts inside the transformer shall
be compatible with liquid under all service conditions.
Off circuit tap switch shall be externally operated type. The tap switch
contacts shall be silver plated having adequate rating as applicable to
the transformer. The tap switch and contacts shall have spring action.
The switch shall not occupy any intermediate position. The operating
handle shall be easily accessible and can be locked in any position.
Tap numbers shall be engraved on non-corrodable metal sheet,
screwed to the tank. Tap switch indicator shall be permanently fixed
to the operating handle.
Transformer oil
All transformers shall be supplied along with first filling of Transformer oil
and 10% excess quantity in non-returnable drums and the liquid shall
comply with the latest issue of IS 335. All components, insulating materials
used in the transformer construction shall be compatible with the liquid
under all operating conditions.
Transformer cooling
Radiators
Tank
(i) Tank shall be made from high quality low carbon steel and shall have
oil tight welded construction.
113
(ii) The tanks of all transformers shall be complete with all accessories
and shall be designed so as to allow the complete transformer and
filled with liquid to be lifted by cranes or jacks, transported by road,
rail or water without over straining any joints and without causing
subsequent leakage of liquid.
(v) The base of each tank shall be so designed that it shall be possible to
move the complete transformer unit by skidding in any direction
without injury when using plates or rails.
(vi) Tank cover shall be of adequate strength and shall not distort when
lifted. Tank covers shall be slightly projecting outside to prevent
ingress of rainwater. Inspection openings shall be provided as
necessary to give easy access to bushings, testing earthing
connection without removing tank cover. Atleast two openings of
adequate size shall be provided at each end of the tank. Inspection
covers shall have lifting arrangement and weight shall not exceed 25
kg. The tank top cover shall be bridged with suitable size copper
clamp for earthing.
(vii) Tank covers shall have pockets for bulbs of liquid and winding
temperature indicators when specified. Wherever specified,
thermometer pockets shall have captive screwed top to prevent
ingress of water. The pockets shall be located in the position of
maximum liquid temperature and it shall be possible to remove the
instrument bulbs without lowering the liquid in the tank.
Lifting lugs shall be suitable for lifting the transformer with liquid.
114
Minimum of 4 jacking lugs, in accessible positions shall be provided to
raise or lower the complete transformer with liquid using hydraulic or screw
jacks. Minimum height of the lugs above base shall be 300 mm excluding
under base dimensions, for transformers upto 10T. Transformer shall be
provided with detachable, bi-directional rollers as specified. Means shall be
provided for locking the 90 deg. swivel movements in positions parallel to
and at right angles to the longitudinal axis of the tank.
Terminations
The Transformer shall be provided with Cable boxes with air insulated
disconnecting chamber. Bushings & bus bar metal parts shall be
suitable for the type and number of cables specified. The
Disconnecting chamber shall be suitably supported. The size of cable
box shall meet the minimum dimensional requirement of cable
termination. Double compression type brass cable glands and tinned
copper lugs shall be supplied. Cable boxes shall be air-insulated type
with clearances in air between phases and between phases and
ground as applicable for the impulse level specified as per CBIP/IS.
Further, air insulated disconnecting chamber shall be provided with
inspection opening. Transformer may thus be withdrawn from its
position without disturbing cable connection. The gland plate shall be
bolted type and shall be sufficiently big to remove the trifurcated cable
from the cable box, without damaging the termination.
Min. Clearances in air in mm
22 KV 415V
Between phases As per IS 25
Between phases and ground As per IS 20
(ii) Cable sealing kits of specified type along with associated accessories,
like stress relieving cones, insulating tapes, trifurcating boot, HT
insulating paste etc. shall be supplied along with transformer for HT
cable termination. Projecting lips shall be provided at the joints of
cable box disconnecting chamber etc. to prevent ingress of rainwater.
115
Bushings
(ii) 22KV/0.4 kV and 1.1KV bushings shall be used for the HV and LV
sides & LV neutral respectively.
(iii) Clamps and fittings made of steel or malleable iron shall be hot dip
galvanised. Bushings rated more than 400A shall have non-magnetic
clamps and fittings only.
i) Where bushing CTs are specified, the same shall conform to the
specification indicated in data sheet. Hot spot temperature of CTs
shall be as specified for transformers.
ii) It shall be possible to remove the CTs at site, without opening the
transformer tank cover / active part.
Conservator
ii) Prismatic type oil level gauge with minimum and maximum levels
marked shall be provided. Taps or valves shall not be fitted to the oil
gauge.
iii) Drain valve shall drain the conservator oil completely. One end of
conservator shall be bolted into position so that it can be removed for
cleaning purposes. If the sump is formed by extending, the same
shall be for atleast 25 mm. Oil filling hole with cap shall be provided.
116
iv) A silica gel breather with inspection window and oil seal shall be
mounted at 1.4 m above transformer base and connected to the
conservator.
Buchholz relay
All transformers shall be provided with double float buchholz relay fitted in
the pipe connecting the transformer tank to the conservator. The diameter
of pipe shall be 25 mm. The pipe shall be arranged at a rising angle of 3
to 9 degrees to the horizontal, upto buchholz relay. Valves shall be
provided on either side of relay after providing necessary length of straight
pipes. The relay shall have pet cocks at the top and bottom, drain plug,
inspection window, calibrated scale to indicate gas present, built-in test
facility and terminal box with oil tight gland. The relay shall have
electrically separate, potential free self reset contacts for alarm and trip.
Contacts shall be rated to make, carry and break 5 A at 110 V AC. The
contacts shall be wired to marshalling box. The relay shall conform to IS-
3677.
All valves shall be of gun metal / cast steel, full way type with internal
screw and shall be opened by turning counter clockwise when facing the
hand wheel. All valves opening to atmosphere shall be fitted with blank
flanges. Means shall be provided for padlocking the bottom valves in open
and closed positions. All valves shall be provided with an indicator to
show clearly the position of the valve. Oil sampling device shall be
provided at top and bottom of the main tank and these shall not be fitted
on the filter valves. All transformers shall have bottom drain valve, top
and bottom filter valves suitable for connecting to oil filtration unit.
All gaskets used for making oil tight joints shall be of proven material such
as granulated cork bonded with synthetic rubber or synthetic rubber
gaskets for oil filled transformers. Gaskets used for liquid filled
transformers shall be compatible to the liquid used.
117
Explosion vent / pressure relief device
ii) The relief device shall be mounted on the main tank and if on the
cover, shall be fitted with skirt projecting 25 mm inside the tank and of
such a design to prevent gas accumulation.
Thermometers
i) 150mm dial type oil temperature indicator for measuring top oil
temperature, winding temperature indicator shall be provided.
ii) Each thermometer shall have potential free Normally Open Contacts
for alarm and trip contacts. Temperature setting of each contact shall
be independently adjustable at site. A manual reset type maximum
temperature indicator shall be provided for each thermometer.
iv) All contacts shall be rated to make 0.5 A (min.) and break 0.2 A (min.)
at 110 V AC. All contacts shall be wired to marshalling box.
Marshalling box
118
Internal earthing arrangements
All metal parts of the transformer with the exception of individual core
laminations core bolts and associated individual clamping plates
shall be earthed.
i) Routine tests
119
8. No load loss and no load current at rated frequency and 100%,
110% of rated voltage on HV side. Test shall be repeated with
415V, 3 phase supply connected to LV side (if the LV side rated
voltage is more than 415V). No Load & Load Losses shall be as
per CBIP/ IS with tolerance.
d) Acidity
Drawings
120
a) Dimensional GA drawing of transformer indicating maximum limiting
over all dimensions, location of fittings and accessories, weights,
shipping dimensions, accessories, dismantled for transportation,
dimensional drawing for cable box for HT & LT side, dimensions of
rollers, HV & LV flange details where busduct termination is specified,
clearances and insulation levels, bushing details etc.
General
ii) This shall be of outdoor Kiosk type suitable for use on 415V, 50 HZ, 3
phase, 4 wire solidly earthed neutral system.
iii) Each Board has ACB as incomer and MCCB as outgoing feeders.
Cubicle
Construction
121
ii) The incomer and the associated items shall be housed in a partitioned
panel, whereas the rest of the outgoing feeders shall be neatly
distributed and compartmentaly modular construction need not be
adopted. However, it shall be ensured that sufficient working
clearance and adequate space for cabling is provided.
iii) Hinged door shall be provided for the front and bolted door at the rear.
Three point locking arrangement shall be provided for the hinged
door. Hinged locks, lock covers etc shall be fabricated from anti-
corrosive material.
vi) Lifting lugs, foundation bolts of min. 20mm dia. with suitable washers
shall be provided. Lifting guides shall be provided at the top to
prevent touching of wire ropes with the body of kiosk while lifting.
vii) Both incoming and outgoing cables will have bottom entry. Blank G.I.
plates gasketed and bolted to the cubicle for glanding and terminating
power and control cables shall be provided.
ii) High tensile cadmium plated bolts with suitable spring washers shall
be used for busbar joints.
iii) Busbars shall be polyester sleeved with heat shrunk insulation. Wire
mesh shall be provided wherever necessary to prevent inadvertent
touching of busbars.
122
LT Air Circuit Breakers
i) The breaker shall be of triple pole, air break and of non-drawout type.
All current carrying contacts of the breaker shall be silver plated. The
main contacts shall have ample area and contact pressure for
carrying the rated current of the circuit breaker. Arc chute shall be
provided on each pole and so fitted that it can be easily removed for
inspection of the main contacts.
ii) The breaker shall have independent manual spring charged stored
energy mechanism.
iii) All breaker shall be provided with mechanical trip push button,
accessible from outside.
iv) All mechanism shall be designed to give trouble free service over
extended periods and shall not deteriorate with normal usage, require
attention more often than every 1000 operations or once a year
whichever is earlier. Each breaker shall be equipped with mechanical
ON OFF indications visible from the front of the panel.
v) Auxiliary Contacts
All contacts shall have adequate capacity to make, carry and interrupt
the currents in their circuits. Minimum rating shall be of 5A at 110V
AC. Each circuit breaker shall be provided with 6 NO + 6 NC auxiliary
contacts, out of these, 3 NO + 3 NC shall be spare auxiliary contacts.
The design of the contacts shall be such that they can be easily
converted from normally open to normally closed type and vice versa.
All the auxiliary contacts shall be wired internally upto the terminal
blocks in the fixed portion of the breaker cubicle. In case
multiplication of contacts is required, the same shall be done using
without any extra cost. (Latch in type with electrical reset feature).
123
vi) Interlocks
124
Specification for Load Bank panel :
125
5. Utilization category A
6. Rated frequency 50 Hz
9. Humidity Low
12. No of poles 3
126
Loop-in &Loop-out box of suitable size & connectors shall be used for
terminating the cable at every pole at suitable height with suitable clamping
arrangement.
From the timer panel 3 phase supply shall be tapped using 4Cx16sqmm
and terminated at the incoming of the loop-in & loop-out box of the first
pole.
Single phase supply shall be tapped using 3Cx 4 sqmm copper flexible
PVC cable from the loop-in & Loop-out box to the individual fittings.
Suitable size compression type gland and lugs shall be used for termination
of cable.necessary cable raising pipe with GI of thickness not less than 2.5
mm shall be provided at every raising of cable.
The out going of the loop-in & Loop-out shall be connected using 4C x
16sqmm cable to the incoming of the next loop-in & loop-out boxand so on
up to the last pole.
Flood lighting :
127
From nearest load bank panels 63A,3 phase MCCB, supply shall be
tapped for each circuits using 4Cx 16sqmm cable and terminated at the
TPN MCB, which is to be located at the pole.
Single phase supplty shall be tapped using 3Cx 4sqmm,1.1 KV grade,
copper flexible PVC cable from the loop-in & Loop-out t the individual
fittings through a 16 A SPMCB.
Suitable size compression type cable gland and lugs shall be used for
termination of cable and Necessary cable raising pipe with GI of thickness
not less than 2.5 mm shall be provided at every raising of cable.
All the earthing connections to the main equipments like Transformer, H.T
kiosk, L.T main panel, Load bank panel and Transformer neutral shall be
made up of 35X6 mm GI flat.In other areas 10 SWG GI wire shall be used.
Two Nos. earth pits shall be provided for each tranformers neutrals and
connected to the earthing terminals of the respective transformers neutrals.
Both earth pits shall be interconnected.
Two Nos. earth pits shall be provided for each L.T main panels and
connected to the earthing terminals of the respective L.T panels.. Both
earth pits shall be interconnected.
128
Testing and Commissioning
Routine tests as per relevant IS standards to be conducted at works
and
at site. Test certificates shall be provided.
Type test certificates for identical equipment shall be provided.
Drawings
f) List of inscriptions.
General
Specification
129
Type 1 : 22KVPVC cables suitable for 22KV, 3 phase , 50 Hz Solidly
ii)
earthed system.
vi) All cables shall be suitable for system particulars, site conditions and
environment conditions specified.
130
vii) The insulation of phase conductors shall be coloured red, yellow and
blue and the neutral black.
viii) For control cables, an easy means to identify the individual cores
shall be provided.
ix) HT, LT power and control cables shall be procured in suitable drum
lengths with continuous marking of lengths either embossed (or)
printed considering actual route length of cables, to avoid straight
through joints. Max, tolerance of -5% shall also be considered while
specifying drum lengths.
x) Cable drums will be stored in the open yard at site where it will be
subjected to rains and other climatic variations. The wooden drums
shall not deteriorate and collapse during storage for atleast 2 years.
Tests
ii) Type tests shall be conducted on one drum each size of cable
offered.
Safety charts
a) Charts are required for guiding the workmen, the methods of artificial
respiration, if any person is electrically injured, charts shall be
depicted with sketches showing different methods of resuscitation or
artificial respiration normally followed when a person gets electrical
injuries.
b) All instructions on the safety chart should be only on one side and
the same shall be in three languages namely English, Hindi and
Tamil.
131
Danger boards
b) Boards shall be in hub form and bordered and holes shall be drilled on
all four corners for nailing / screwing and shall be similar to the design
adopted by NLC and as approved by CEA.
a) First aid boxes shall be made from sheet metal with necessary
hinges, a hook, a handle with necessary padlocking facilities and
padlock with duplicate keys. It shall be painted with enamelled black
colour and a 'PLUS' mark in red colour on white round circles shall be
depicted on front and side covers of the box to indicate first aid, below
the 'PLUS' marks on the front cover, the work 'FIRST AID' shall be
written in English. The approximate size of the box shall be 350 x 350
x 150 mm.
a) Rubber insulating mats are required for used as floor covering in front
of electrical switchgear of 440 V and 11kV and 22KV. the mats shall
be made from vulcanised rubber compound free from fabric insertions
and fibrous materials. The lower surface shall be finished in cloth
imprints. The outside edges, except the butt edges, where a mat
consists of two or more sections may be bevelled.
132
b) Physical properties electrical properties, water absorption marking
and packing and other specifications of rubber mats shall be as per
IS-5424-1969 and other relevant standards for rubber mats suitable
for higher voltage.
c) The mats shall be free from blisters, pin holes, cracks, embedded
foreign matters and other defects which may impair its serviceability
c) The gloves shall have a smooth surface and shall be free on both
inner and outer surfaces from visual defects like patches, blisters,
porosity, embedded foreign matter or other physical defects. Gloves
shall be of curved fingers and hand comfortable working fit with
reduced hand fatigue.
Carbon dioxide type fire extinguisher shall consist of brand new, special
steel high-pressure cylinder, a suitable discharge valve with an internal
discharge tube, a high-pressure discharge hose or tube, a non-conducting
discharge horn and fully charged.
133
Fire buckets
5.1 General
All the electrical equipment shall be installed with proper care and as per
approved layout drawings. Minor modifications required at site shall be
made by the contractor with approval of purchaser representative /
consultant for installation of the equipment. Care shall be taken for proper
handling of equipment and undue vibrations shall be avoided particularly in
case sensitive (instrument mounted on panels) equipment. The contractor
shall have to refer installation manuals of respective equipment before
start of erection work.
The contractor shall have valid electrical contractor's licence valid for state
of Tamilnadu and as well supervisory licence. He shall have in his
employment sufficient number of electricians and supervisors holding valid
licences for HV and LV installations. It will be the responsibility of the
contractor to get the installation cleared and relevant drawings, certified /
approved by electrical inspectors. Factory inspectors, insurance agencies
and other statutory authorities.
The base frames of all panels, Kiosks, posts etc., shall be welded to
structures or to the civil inserts provided on the floor/walls. Fabrication of
supports/frames wherever required, shall be done by the contractor.
134
In the case of panels, the shipping section shall be placed in position
before removing the protective covering to eliminate scratch/ damage. The
shipping skids shall be moved by using rollers under the shipping skids
wherever lifting cranes are not available. The contractor shall do the
assembly at site as per manufacturer's general arrangement drawings and
installation instruction. The panels shall be properly levelled prior to
grouting the holding down bolts or welding the panels to the inserts. All
interconnection of busbars and wiring between the panels shall be done as
per manufacturer's instruction and drawings. Welding work on the panels
shall only be carried out after consultation with the purchaser. Damage to
the plant due to welding shall be rectified by the contractor.
5.3 Transformers
The oil conservator and the pipes shall be erected as shown in the
manufacturer's drawings. All radiator tubes shall be cleaned before
installation.
135
The contractor shall also test the oil from each transformer to determine its
suitability for use. If required the contractor shall carry out drying and
filtering operations as per IS code of practice to ensure that moisture is
completely removed and the oil is free from impurities. This may be carried
by using oil filtering equipment to be provided by the contractor having
vacuum as well as heating arrangement. Only after the dielectric strength
of oil and other parameters are checked and approved, the external
connections shall be made to the transformers.
Naked light and flame shall never be used near the transformer.
Cables installations
If the cables are crossing the road / rail track, cables shall be laid in, G.I
pipes. 25% spare conduits / pipes shall be provided.
136
The trench excavation shall include removal of all materials including the
conveyance of excess material to disposal area. Soil conditions inclusive
of rock may be encountered. In excavation where both ordinary soil and
hard rock are involved, the ordinary soil shall first be completely stripped
off and levels of the hard rock surface shall be taken to enable
measurements and further work in hard rock will be resumed after
clearance from owner /engineer.
All cables shall be tested for proper insulation before start of laying work.
While laying cables, care shall be taken that kinks twists or mechanical
damage do not occur to the cable.
All bends in cables shall be made with due consideration to the minimum
permissible bending radius of the cables. On being pulled the cable shall
not be allowed to drag drawing along the ground or on another cable
already laid.. Special care shall be taken while pulling through an opening
where other cables have already been laid. Only approved cable pulling
devices shall be used.
137
All cables shall be neatly dressed without interlocking or cross overs.
While laying the cable vertically, these shall be clamped at suitable
intervals. Horizontal runs shall be rigidly secured to trays or racks/ hangers
in all the places where the direction of the route changes as well as at
cable terminations or joints. The clamps shall not be done up so tight that
the insulation is damaged or deformed.
Where cables are required to cross surface drains and water, oil, gas or
other pipelines, they shall be taken through GI Pipes/hume pipes.
All cable entry openings in the equipment shall be sealed. All cable
openings in wall and floors shall be sealed after laying of cable.
All cables shall be provided with identification tag indicating the cable
number in accordance with cable list. Tags shall be fixed at both ends of
the cable and at 30 m spacing for straight runs as well as on both sides
wherever cables are crossing walls/ floors. The tag shall be of aluminium /
PVC with numbers punched/painted on them and securely attached to the
cables by non-corrosive wires. The shape of tags shall be round, triangular
and rectangular for control, medium voltage and high voltage cables
respectively.
Glanding shall be done for direct entry of both power and control cables
into the panels by the contractor. Double compression type brass cable
glands shall be used.
138
Control cables entering switch boards, control panels control desks etc.
shall be neatly bunched and strapped with PVC perforated straps and
suitably supported to keep it in position at the terminal blocks. All spare
cores of each cable shall be segregated, marked spare, neatly dressed
and suitably taped at both ends.
When the cores of two or more multicore cables take a common route,
cores of each cable shall be separately bound and the separate bundles
neatly bound together. Individual cores of control cables shall have plastic
interlocked type coloured ferrules with engraved numbers at both ends of
the circuit for identification.
Lighting :
5.5
4Nos 100W MV lamp shall be provided on 4 corners of the substation.
Lighting supply shall be tapped from nearby LT skid. Suitable Timer switch
shall be provided in the ckt. to switch on and off the lighting Automatically.
A switch shall be provided to bypass the timer if required. A 15A/5A plug
point shall be provided.
It shall have necessary antitracking tapes. The sealing / jointing kits shall
have the capacity to withstand maximum thermal and dynamic stresses
caused due to short circuit in the system.
5.7 Conduits
139
Cables shall occupy not more than 60 % of the conduit size.
Jointing of conduits shall be done only in straight portion and not in bend
portion.
The contractor shall have available at site bending facilities for conduits as
well as dies for threading conduits of diameters and threads corresponding
to the standards. The threaded ends of conduits shall be painted with
anticorrosive paint. The outer ends shall be smoothened free of burrs and
sharp edges. Bushing shall be fitted at both ends of conduits.
5.8 Earthing
Earthing protection
140
The principal requirement of the grounding are as follows :
(a) Resistance of earthing network shall not exceed 1 ohms under all
operating conditions.
(c) Uniform and near uniform ground potential at all structural metal work,
on all metal enclosure and/or supports of equipment and apparatus.
In case of HT system, E/F current will be made to flow through copper screen
tape provided over inner sheathing. Screen will be connected to earth bus at
both ends. In case of LT system the following system will be followed.
141
The LV side neutrals of the power distribution transformer shall be connected
to two separate earthing electrodes. They shall also be connected with the
neutral bus of the corresponding switchgear. Connection from switchgear
earth bus to Distribution boards shall be through armouring of cables.
Metal supports and metallic fittings thereon of the supporting structures should
be earthed permanently and efficiently. Whenever burying of earthing
conductors are carried out, the same shall be done as per IS and approval of
Owner/Consultant.
Whenever earth conductor/cable crosses road, it shall be taken through GI
pipes.
The distance between two pits shall not be less than 6 meters. All accessories
required for the earth pits such as electrodes, charcoal, salt, clamps, clips,
bolt/nuts/washers, GI pipes, GI funnel and also the masonry works of the pits
including supply of necessary materials, bricks, cement and excavation of
earth for providing earth pit shall come under the scope of the Contractor.
142
The electrode shall be well packed with earth, charcoal and salt mix upto the
level of connections.
Masonry work of the earth pit shall be carried out only after well ramming of
riddled soil and complete settling of loose soil. As such electrodes shall be
fixed in the ground before commencing of any other work of the installation of
masonry work shall be taken only at the end after completion of all other
works in the installation.
The termination of strips to the equipment shall be done by bolting and the
wires shall be terminated by compression lugs. Bolt connected contact
surfaces shall be tinned. Jointing of strips shall be done by welding for proper
continuity. All contact surfaces shall be thoroughly cleaned of dust and oil and
after jointing, the joints shall be given bitumen paint.
Earthing conductors laid directly in ground, shall be coated with one coat of
bituminised paints, be wrapped with one layer of bitumatic tape laid on half
lapped and shall have a final coat of bituminised paint to prevent corrosion.
All joints of bare GI earth strips shall be welded so as to form rigid earth ring.
All such welded joints shall be given necessary coatings of suitable bitumen
compound to prevent corrosion. Welded joints shall form part of laying earth
conductors.
In the case of joints of PVC insulated earth conductors appropriate joints shall
be made by using suitable connectors and the entire joints shall be fully
sealed by suitable compound so that no metallic part is exposed. The
contractor shall make his own arrangement for necessary crimping tools,
soldering equipment, drilling machines and other tools and tackles which are
necessary for completing the installation. The Contractor shall provide
adequate number of earth electrodes and equipment earthing conductor as
per site requirements based on unit rates indicated.
143
Any modifications suggested by the Electrical Inspector of CEA/ Government
of Tamil Nadu on the work done by the contractor shall be done by the
contractor at no extra cost.
5.11 Illumination :
Substation premises shall be provided with illumination facilities to achieve
and maintain specified illumination levels.
All substation shall be properly illumination by bidder. The following details
are given below.
Outdoor transformers foundations, Oil pits & complete related works like
elevated platform & its Brick skirting/ peripheral walls, floor finishes, plinth
filling etc, Hand railing if required around transformers platform
Foundations/ pedestals for mounting electrical panels/ boards/ equipments &
HT/ LT Sub station Board (LTSB / LT load Bnk panel ).
Chain link fencing with Gate at the periphery covering all outdoor installations.
144
Scope shall include all works / structures not specifically mentioned herein but
are required for construction, operation, maintenance & completeness of this
package
Soil & water samples of this area indicates high concentration of sulphate and
hence adequate measures to take care of this aspect as per IS:456 is to be
considered in the design of concrete structure.
Tuticorins environment may be considered as very severe for the design of
structure.
Dense & Homogeneous RCC of grade M-35 shall be used with minimum
cement content not less than 400 kg/m^3 . Corrosion inhibitors of approved
make shall be used in Concrete for all RCC work as per standards and
manufacturers specification. Grade of PCC for block foundations &
pedestals could be M-20, Grade of concrete for mudmat shall be M7.5 &
145
grade for screed concrete shall be M-15.
OPC with C3A Content from 5 % to 8% shall be used for all concrete sub
structures and structure in contact with soil.
Two coats of hot bitumen paint over a coating of primer shall be provided
to all under ground concrete in contact with soil / ground water & top
surface of mudmat for these structures shall have two coats of hot
bituminous painting of grade 85/25 conforming to IS : 702 @ 1.7 kg / sqm
(minimum) .
Grouting below machine/ equipment bases and pockets shall be with non
shrinking grout of adequate thickness and strength.
ii) Embedded inserts shall be provided in cable trench for fixing of cable
racks.
iii) Cable trenches shall be covered with precast RCC/ chequered plate
cover as required.
iv) Screed in Cable Trench shall be of PCC M-15 and shall be laid in slope
as required over structural concrete floor with minimum thickeness being
25mm. Cable trenches shall have provisions for drainage sump.
Chain link fencing shall be 75mm square mesh size of 4mm nominal dia
galvanized steel wire conforming to IS:2721. The barbed fencing wire shall
consist of 2 ply, 12 gauge galvanized wires with 4 point thick set barbs at
75mm centers.
Wire shall be fully stretched and specify tied to the post. The fixing shall be
done in a workmanlike manner without leaving any kinds etc. The wire shall
146
be held tight in a position by eye bolts etc.
All steelwork shall receive one coat of zinc chromate paint conforming to
IS:2074 over a coat of primer. Concrete posts shall be painted with two coats
of cement wash.
All service and utility lines crossing under roadways shall be taken through
Concrete pipes and designed for imposed loading.
Foundations for poles shall be designed taking into consideration all loads
like windload self weight of Poles, its overhangs and fittings, erection and
maintenance load etc. and shall have minimum anchorage of 2.5m in virgins
oil
- Poles/ pole structures shall be encased with concrete M-10 grade for
a ht up to 1000mm above FGL.
Handrails shall be of steel tubes for posts, top and middle rail and plates /
sheets for toe plates. The vertical height of the hand railings shall be
minimum 1000 mmm above floor level. The vertical post shall be of 40 mm
nominal bore MS Pipe ( medium class). The top rail shall be of 32 mm
nominal bore MS pipe ( medium class) while the middle rail shall be of 25 mm
nominal bore MS pipe ( medium class). All pipes shall be as per IS:1239. All
the hand railings shall be provided with 150 mm high x 3.15 mm thick sheet
toe guard.
147
5.14 TESTING
General
Test of all equipment shall be conducted as per latest IS. Tests shall also
confirm to International standards IEC / VDE / DIN / BS.
General
All the equipment shall be tested at site to know their condition and to
prove suitability for required performance.
148
All checks and tests shall be conducted in the presence of clients
representative and test results shall be submitted in six copies to client and
one copy to Electrical Inspector. Test results shall be filled in proper
proforma.
Based on the test results clear cut observation shall be indicated by testing
engineer with regard to suitability for charging of the equipment or reasons
for not charging are to be brought by the Contractor.
After the successful test of each equipment as per standard test procedure
the entire control system shall be put on trial run test on actual site
conditions and operation of the system.
Acceptance test
The acceptance test on the system shall be carried out by supplier as per
mutually agreed test procedures to establish satisfactorily functioning of
the system as a whole and each equipment as part of the system.
Site tests
Transformer
(e) IR, wiring and operational tests on all control devices in control
cabinet, oil level indicator, winding and oil temperature indicators
etc.
149
(g) Testing of buchholz relay for alarm and trip conditions.
(j) Checking for oil leakage and arresting of leakages (if there).
(l) Checking for open position of all the valves (except drain and filter
valves).
(m) Filtration of oil by using line filter, vacuum pump, and heater set.
(o) Checking of oil for acidity, water content, tan delta, as per IS 335.
Current Transformer
150
(g) Checking of continuity and IR values for cables from CT to
Marshalling Box.
Potential Transformer
HT / LT Bus
(b) HV test.
(e) Check for clearances between phase to phase and phase to earth.
(f) Check for minor damages and cracks in supporting insulators and
bushing after cleaning.
151
(g) Checking for inspection openings and accessibility for replacement
of insulator etc.
b) HV test .
c) Operational test .
HT switch Gear
a) IR test.
152
i) IR and voltage ratio test for PTs.
b) HV test by HV megger.
Earthing
153
6.0 TECHNICAL PARTICULARS OF ELECTRICAL EQUIPMENT
6.1 22 kV SWITCHGEAR
Cubicle
i) Type : Fully
compartmentalised,
metal clad, horizontal,
draw out, sheet,
enclosed outdoor Kiosk
conforming to IP 55.
Fully type tested as per
IEC 60298 / IS 3427.
ii) Thickness of sheet steel :
vi) Busbars
154
d) Busbar joints : 1. Cadmium plated bolts
and tinned surfaces.
2. Flexible connection if
required.
155
e) Termination accessories : HT cable sealing kit,
double compression type,
brass cable glands and
tinned copper lugs for HT
power, LT power and
control cables to be
terminated in the panels.
f) Name plates, inscription : As specified
plates for components,
switches, feeder
identification
g) Flexible copper connections : To be provided
between hinged doors and
cubicle for earthing
h) Breaker accessories visible : - Mechanical breaker
and accessible from outside positi
on
- Breaker ON/OFF
- Mechanical trip push
button accessible
from outside with
panel door close.
- Mechanical close
push button
i) Removable welded wire : To be provided wherever
mesh behind the panel necessary
j) Danger notice boards and : To be provided
instruction plates
k) Operation counter : To be provided
156
m) Termination of incomer : As per
panel SLD
( For 3 phase PVCarmoured
cable)
6.2 Breaker
22 kV, 50 Hz,
i) System : .
three phase
system neutral
earthed.
157
viii) Operating duty : 0-3 min-co-3 min-co
158
xxii) Breaker fully type tested as : IEC 56 and IS 2516
per
xxiii) There should be provision for shunt trip and series trip.
Series trip should be done through a summation current
transformer and a series coil suitable for it. Shunt coil
should be rated for 110 V DC.
6.3 Current Transformer
v) Insulation level
159
iii) Connection : Three single phase PT
with suitable power pack
for DC shunt trip
iv) Rated burden : 20VA / phase, class 1.0
viii) Protection :
iii) Size : 96 X 96 mm
160
iv) Dial finish : White painted dial with
pointer type needle
v) Mounting : Flush mounting
b) System earthing
161
- Secondary side (LV) : Solidly earthed
v) Transformer type
- HV winding : 22 kV
- LV winding : 0.433 kV
x) Cooling
162
xiii) Max. temp. rise at rated kVA and
principle tap
a) Top oil by thermometer method : 50deg C
over design ambient temp of 50
deg C
b) Any winding (HV & LV) by 55deg C
resistance method over design
ambient temp. of 50 deg C
xiv) a) Percentage impedance 4.5%
voltage at rated current,
frequency, principle tap and 75
deg C
b) Frequency variation +3%, - 5% of 50 Hz
xv) Tappings
163
b) 1.2 x 50 micro second impulse
withstand voltage level
HV winding 75 kV Peak
LV winding kV (RMS) - do -
c) Winding connection
- HV winding Delta
Type CRGO
Thickness, mm 0.3
164
xxi) Noise level in dB scale when As indicated in write up
measured 4 ft. from the
transformer edge at a height of
5 ft. above the floor at rated
voltage and load
xxii) Bushing current transformer
(only for LV neutral)
a) Location On the tank cover and
accessible without
removing neutral
bushing, tank cover or
active parts. Two nos.
neutral bushings, one
in the LV cable end box
and the other on the
tank cover shall be
provided after branch
off from the neutral CT.
b) No. of cores on the CT One
- Type Window
- Ratio 1600/5
- Taps --
HV LV HV LV
Number 3 3 -- 2
165
Current rating in Amps A 2500A -- 250
0A
a) 150 mm dial type oil temp. Indicator and winding temp. Indicator with
max. reading pointer and with 2 sets of independently adjustable
potential free NO contacts for alarm and tripping.
b) Double float buchholz relay with potential free alarm and trip contacts.
e) Radiators with top and bottom stop valves and drain and air release
plugs.
f) Conservator with sump and drain valve with cover plate and oil filling
hole with cover plate and oil level indicator.
g) Marshalling box.
166
i) Top and bottom sampling valves
ii) Top and bottom filter valves
k) Lifting lugs
q) Mounting channels-4
167
f) 1 sec. short time rating of : 20 kA
switchboard with min.
busbars, feeder busbars, kA
(RMS)
o) Bus Bar
168
(b) Bus connections to : As per rated currents of
circuit breakers breakers
Breakers
169
(x) (a) Short circuit release range : 2-4/3-6kA
(b) Number : 6 NO + 6 NC
Current Transformers
(iv) Burden : 15 VA
(iii) Size 96 x 96 96 x 96
170
(i) System voltage : a) 22 kV, 3 ph. Solidly
earthed neutral
b) 415V, 3 phase, solidly
earthed neutral.
171
(b) Frequency variation +3%, -5%
1.1 DOCUMENTS
i. Control Schemes
172
TECHNICAL DATA SHEET
1.1 HT SWITCHGEAR
ii) Type :
173
xvi) Hinged doors on front and rear :
Construction
i) Draw-out feature provided for :
b. Voltage Transformer :
c. Protective relays :
b. Rear mm :
:
Bus Bar
i) Make :
174
vii) Short time current for 3 sec kA rms :
Reactance ohm/m/ph :
a) Phase to phase mm ::
b) Phase to ground mm :
a) Insulating sleeve :
b) Phase barriers :
a) Silver plated :
a) Make :
b) Type / Material :
c) Reference standard :
d) Voltage class kV :
g) Net weight kg :
Circuit Breaker
175
i) Make :
ii) Type :
b) Asymmetrical kA peak :
a) Unloaded transformer :
b) Loaded transformer :
c) Unloaded lines :
176
d) Induction motor :
i) Running at No-load :
a) At tripping m / sec :
b) At closing m / sec :
177
a) Main :
b) Arcing :
a) Main :
b) Arcing :
a) Between poles :
a) Type :
178
g) Whether slow closing / opening :
is feasible for maintenance
testing
a) Voltage V :
a) Auxiliary relay :
f) Operation counter :
179
h) Cell switch with required :
contacts
b) Contact rating at :
180
xxxv) Impact load for foundation design (to :
include dead load plus impact values
on opening at maximum interrupting
rating kg
1.5
Control& Indications
i) Push Buttons
a) Make :
ii) Lamps
a) Make :
c) Watts / Voltage :
a) Make :
1.6
Current Transformer
181
i) Make
ii) Type
v) Rated frequency :
a) Metering C.T :
b) Relaying C.T :
c) CT magnetisation curve :
furnished
Voltage Transformer
i) Make :
ii) Type :
v) Rated frequency :
vii) VA burden :
182
viii) Over voltage factor
a) Continuous :
b) 30 seconds :
a) Primary :
b) Secondary :
x) Fuses
Relays
i) Draw-out type with built in test :
facilities
183
d) Auxiliary relay :
Meters
i) Make :
ii) Type :
iv) Size :
v) Scale :
a) Make :
b) Type :
Secondary wiring
i) Type and insulation :
a) Potential circuit :
i) Make :
ii) Type :
Cable Termination
i) Cable termination & connection :
arrangement furnished as specified
184
a) Make :
b) Type :
a) Type :
b) Material :
v) Cable entry
a) Power cable :
b) Control cable :
Ground Bus
i) Ground bus furnished :
ii) Material :
iii) Size :
Name Plate
i) Material :
ii) Thickness :
a) Panel :
185
b) Equipment / devices :
a) Make :
b) Thermostat controlled ? :
c) Wattage :
d) Voltage :
a) Make :
b) Type :
c) Rating :
iv) Lamp :
a) Type :
b) Watts :
A C Supply
i) Isolating switches fuse unit for :
incoming supply
a) Type :
b) Rating :
a) Type :
b) Rating :
Tropical Protection
186
a) Any special treatment for tropical :
protection ?
Painting
Finish of switchgear
a) Inside :
b) Out side :
Accessories
List of accessories furnished :
Tests
i) Routine tests to be performed on :
switchgear
a) :
b) :
c) :
d) :
a) :
b) :
c) :
b) Breaking capacity :
xii) Mounting :
187
xv) Max. panel dimensions (LxBxH) :
1. Rating
i. Oil by thermometer, oC :
3.
b at 75% load :
c at 50 % load :
a at u.p.f % :
8 Clearance
188
Min clearance in mm
a. Between phases :
i. In air
ii In oil
a Length :
b Breadth :
c Height :
11 Guaranteed weights kg
c Oil :
d Total weight :
B General Details :
1 Name of manufacturer :
3 Reference standard :
4 Type of cooling :
5 Rating :
a Rated KVA :
189
b Rated current , amp (rms)
HV :
LV :
c Rated voltage KV
HV :
LV :
d Number of phases :
7 a Windings
ii Insulation class :
b Connections :
i High voltage :
ii Low voltage :
c Terminal arrangement :
190
i HV :
ii LV :
i HV :
ii LV :
9 Taps :
a Capacity :
10 Losses
g Knee-point voltage :
191
12 Efficiency at 75 deg.C and 08 p.f lag %
a at 100% load :
b at 75% load :
c at 50% load :
b Maximum efficiency :
192
a Maximum flux density :
b Temperature rise :
a H.V winding :
b L.V.winding :
18 Clearance :
Maximum clearance in mm :
a Between phases :
i In air :
ii In oil :
i In air :
ii In oil :
20 Insulation strength
i H.V :
ii L.V :
193
iii L.V. Neutral :
21 Tap-changer
b Provide with :
ii Operation counter :
22 Details of tank :
i Material :
ii Thickness of side, mm :
iv Thickness of tube, mm :
v Thickness of bottom , mm :
23 Details of conservator :
a Volume of conservator :
194
24 Explosion vent :
a Material :
b Thickness , mm :
b Thickness at lamination mm :
c Insulation of lamination :
26 Insulation material
a Turn insulation HV :
b Turn insulation LV :
c Insulation core to LV :
d Insulation, HV to LV :
27 Details of bushings
a Make :
b Type :
c Voltage class KV :
d Creepage distance mm :
f Weight of bushing kg :
g Applicable standard :
195
i Phase to phase ,mm :
ii Phase to earth, mm :
28 Insulation oil
29 Marshalling box
b Degree of protection :
30 Terminal blocks
a Make :
31 Wiring
a Cable type :
c Conductor size :
196
a Bucholz relay :
33 a Material of gaskets :
34 a Type of valve :
35 Tests
i Pressure kg/cm2 :
ii Duration hour :
i Vacuum mm of Hg :
ii Duration , hour :
36 Accessories
a Length :
b Breadth :
c Height :
197
d Crane lift for untanking core and coil assembly :
(including sling)
38 Approximate weights, kg
c Oil :
d Total weight :
39 Shipping data :
40 Rollers :
a Quantity :
b Whether bi-directional :
c Gauge :
3
etc
42 Termination arrangement
198
b Details of LV cable termination arrangement :
furnished
i. Make :
ii. Type :
a. Front
b. Back
c. Side
199
d. Bottom / Top
xvii) Painting :
a. Colour
b. Finish
c. Details of painting
d. Procedure furnished?
CONSTRUCTION
200
b) Cubicle door can be closed with breaker :
in isolated position
xii. Buses
Bus Conductor
a. Make :
c. Reference standard :
e. Shape :
i. DC Resistant of bus :
i) at 20 deg.C. Micro-ohm/m/ph :
201
j. Losses (middle phase), w/m/ph :
l. Support spacing, m :
i) insulating sleeve :
n. Current ratings :
a. Main busbar :
b. Vertical droppers :
c. ACB connections :
a. Silver plated :
202
xvi. Minimum clearance of bus bars and
connections
i. Phase to phase, mm :
a. Make :
c. Voltage class :
CIRCUIT BREAKER
i. Make :
203
v. Maximum continuous voltage at which breaker :
can operate
a. Type :
b. Material :
e. Contact resistance :
a. Type :
204
b. Material :
a. Rate of rise KV / ms :
b. Peak voltage KV :
a. Between phases :
205
xxviii. Details of anti-pumping features provided? :
a. At no-load :
a. Normally open :
b. Normally closed :
i. AC 110V :
i. At 110 V AC :
206
xxxvi. Breaker cubicle Accessories :
f. Operation counter :
207
HRC FUSES
i. Make :
ii. Type :
CURRENT TRANSFORMERS
i. Make :
ii. Type :
iv. Ratio :
v. Accuracy class :
208
a. Protection :
b. Metering :
x. Type of insulation :
xiii. Mounting :
i. Make :
ii. Type :
v. Case size :
209
viii Catalogue furnished :
PUSH BUTTONS
i. Make :
ii. Type :
INDICATING LAMPS
i. Make :
ii. Type :
i. Make :
ii. Type :
v. Voltage rating :
AUXILIARY CONTACTOR
i. Make :
210
iv. No. of NO & NC contacts :
WIRING
i. Power wiring
a. Voltage grade :
b. Insulation :
c. Conductor material :
d. Size of conductors :
a. Voltage grade :
b. Insulation :
c. Conductor material :
d. Size of conductors :
211
a. Make :
b. Voltage grade :
c. Type of terminal :
CABLE TERMINATION
a. Make :
b. Type :
a. Make :
b. Type :
c. Material :
212
a. Type
b. Material
GROUND BUS
ii. Material :
iii. Size :
NAME PLATE
i. Material :
ii. Thickness :
a. Panel :
b. Equipment / Device :
i. Cubicle Heater
a. Make :
b. Thermostat controlled ? :
c. Wattage :
d. Voltage :
a. Type :
b. Rating :
a. Type :
b. Rating :
213
iv. Cubicle heater, and plug socket circuit :
provided with individual switch fuse unit?
PAINTING
i. Inside :
ii. Outside :
1.4 CABLES
The Bidder shall indicate the following for each type and size of cables:
i. Inner ( min) :
214
ii. Outer (min) :
i. Insulation (Type-C) :
i. Insulation :
B- TECHNICAL DATA
The Bidder shall indicate the following for each type and size of cables:
1. Make :
2. Type :
3. Applicable Standard :
4. Voltage Grade :
a) Service voltage :
b) Neutral earthing :
215
6. Maximum Conductor
Temperature
a) Continuous, oC :
b) Short time, oC :
7. Conductor
a) Material :
b) Size, mm2
a) Material :
b) Type :
c) Thickness, mm :
d) Whether extruded :
9. Insulation
a) Material :
b) Type :
c) Thickness, mm :
main / neutral
a) Material :
b) Type :
c) Thickness, mm :
a) Material :
216
b) Type :
c) Thickness, mm (min) :
d) Extruded :
12. Armouring
a) Material :
c) DC Resistance at 20oC,
Ohm / km
a) Material :
b) Type :
c) Thickness, mm :
Colour
a) In Ground :
b) In Duct :
c) In Air :
217
b) Conductor temperature :
allowed for the short circuit
duty
a) Conductor resistance, :
ohm/km at 20 deg C
b) Insulation resistance, :
ohm/km
c) Reactance at 50 C/s, :
ohm/km
d) Impedance, ohm/km :
a) At 30oC :
b) At 35oC :
c) At 40oC :
d) At 45oC :
e) At 50oC :
Multicore cable :
a) 3 Nos. :
b) 4 Nos. :
218
c) 5 Nos. :
d) 6 Nos. :
1 Make :
2 Type :
B CABLE STRAIGHT-THROUGH
JOINTING KIT
1 Make :
219
2 Type :
220
Schedule of Quantities for External Electrification of
NTPL Township
221
5 1250KVA,22/ 0.415 KV, 3 phase, two winding ONAN Nos 2
,DYn11 Transformers suitable for out door installation with
+/- 5 % off circuit tap charge in steps of 2.5% as per tech
spec and IS 2026 with all fittings and accessories and
ternimation facilities including suitable sealing kits and
glands and air insulated cable end booxes for HT and LT
termination with 10 % extra oil.All accessories including
C.Ts,marshalling box,bushings etc. are inclueded. Bushing
CTs to be provided for E/F protection(REF & SEF) and with
necessary earthing and all civil works.
6 2500 A,415 V outdoor type TP& N LT switchboard with 2 No 1
incomer & 1 bus coupler ACB with independently adjustable
thermal and short circuit release and auxiliary contact
block,out going MCCB(63A) shall have one no.voltmeter
with selector switch,3 nos.CTs,ammeters,eart bus etc. as
per SLD and necesary earthing and all civil works
7 Out door type Load Bank panel with an incomer MCCB of Nos 6
rating of 400A and 10 nos O/G MCCBs ( withexteranl
neutral link) of rating 63A including earthing and necessary
earthing and all Civil works
8 1.1KV grade heavy duty stranded Aluminium
conductor,PVC insulated,GI steel round wire/flat
armoured,with inner and outer PVC sheath confirmimg to
IS:1554, cable markers and GI pipies for road crossing shall
be provided as per specification.
a). Same as above 6R,3.5 C 120 Sqmm cu conductor. lot 1
222
10 Illumination fittings,lamp(100 W MVL) with all acessories in set 4
the Sub Station (HT & LT KIOSK ) premises &
perphery.Item shall include all erection accessories,GI
pipes,supporting brackets,control gears and necessary
cables /wrires etc for power supply
11 PERIPHERAL STREET LIGHTS
I Supply and erection of 9 mtr height above ground level set 145
swaged steel tubular poles with single arm including 150 W
HPSV lamp & fittings and its acessories,base plate,sheet
steel JB, earthing etc including wiring upto fixtures and civil
works as per the specification .
II set 30
Supply and erection of 11 mtr height above ground level
swaged steel tubular poles with single arm including 150 W
HPSV lamp & fittings and its acessories,base plate,sheet
steel JB, earthing etc including wiring upto fixtures and civil
works as per the specification .
12 Earth pit consisting of 3 mts,40 dia,medium class GI pipe Nos 50
electrode including supply of charoal,salt etc
13 Nos 10
Supply and erection of pre wired street light control switch
with timer,230 V, 50Hz Double dial time switch anologue 24
Hrs suitable for DIN rail mounting and surface mounting
with manual override switch. Hands /Strips for easy setting
of time with fuse contronl and contactor suitable for 3 phase
63A, 1NO+1NC system.The whole arrangement shall been
enclosed in sheet steel with industrial locking arrangement
Total
Note:
* Supply (including design & Engg.) of all Technological equipment incl. technological
structure,complete in all respect with all accessories, Initial fill of iol,consumables etc. for
successful commissioning & performance tests and as per Technical specification / as
above.
223
**Erection /installation charges of plant & equipment (as per T.S),testing &
commissioning, and performance tests etc. including civil works whereever
required including all statutory /contingency insurance coverage,e.g third
party liability,ESI,workmen compensation etc.
1.The equipment indicated in the schedule of Quantities are inclusive of all
the internal wiring,inter equipment wiring respective earthing materials
(flats,hard wares etc) other components required as per best engineering
practice /statutary requirement etc though not specifically mentioned
without any additional cost implication to the purchaser.
2.All civil work required for the respective equipment /structures including
foundation are inclusive in the respective equipments though not
specifically mentioned without any additional cost implication to the
purchaser.
3. Details given in the schedule of quantities is only indicative. Successful
Bidder shall provide all the required accessories materials required for the
installation such as earthing items, concealed wiring items, Switch Board,
hardware etc though not specifically mentioned without any additional cost
implication to the purchaser.
4. It is the responsibility of the successful bidder to supply and install all
the items of material required for satisfactory and safe operation without
any additional cost implication.
224
SECTION -II
1.1 GENERAL:
The scope involves tapping of incoming supply from the load Bank panel
for providing power supply for non residential buildings and internal
electrification of non residential buildings including provision of DTH as per
specification
Scope of work covered under the specification in general, comprises of
the following.
1.1.1 Internal electrification is to be carried out for the following non residential
buildings.
1.Shopping complex
2.Reading Room
3.RCC over Head tank / Pump House
4.Store room for Maintenance office
5.Recreation club
6. Security cabin
7.Community centre
8.Dining hall
9.Canteen building
225
10.Dispensary
11. Maintenance office
12.Sewage treatment plant
Providing DTH system to non residential building
3 phase,125 A Switch fuse unit shall be supplied and provided for non-
residential buildings.
Sump pump house power supply shall be tapped from the nearest load
bank panel,using suitable size of PVC insulated aluminium cable.
The distribution board and the switch fuse units shall be mounted on
suitable angle steel frame work grouted to wall.
An earth shall be formed near the angle steel frame work usi g copper bus
suitable holes for tappings.
Earth pits for NRBs shall be provided interconnected and connected to the
respective earthing arrangement in the distribution board.
The 3 phase switch fuse unit, the distribution board and the angle steel
frame work shall be earthed properly using GI wire of No.8 SWG
226
From the main distribution board circuits with earth wire arrangement shall
be formed and each circuit shall be terminated at in coming of the cut box
as per specification near the distribution board.
From the energy meter location circuits shall be run in concealed system
of wiring, using PVC insulated 6mm2 flexible copper wire for each circuit
and shall be terminated in the 3 phase MCB distribution board as per
specification, in respective non residential building with 2 runs of 4 mm2
insulated flexible copper for each circuit for earthing.
From the main 3 phase MCB distribution board, circuits with of PVC
insulated 6mm2 flexible copper wires and with 4mm2 PVC insulated,
flexible copper wire for earthing arrangement, shall be provided on both
sides of the energy meters through cut out at the incoming to the energy
meter.
An earth shall be formed near the angle steel frame work usi g copper bus
suitable holes for tappings.
Earth pits for NRBs shall be provided interconnected and connected to the
respective earthing arrangement in the distribution board.
The 3 phase switch fuse unit, the distribution board and the angle steel
frame work shall be earthed properly using GI wire of No.8 SWG
From the energy meter location circuits shall be run in concealed system
of wiring, using PVC insulated 6mm2 flexible copper wire for each circuit
227
and shall be terminated in the 3 phase MCB distribution board as per
specification, in respective non residential building with 2 runs of 4 mm2
insulated flexible copper for each circuit for earthing.
From the main 3 phase MCB distribution board, circuits with of PVC
insulated 6mm2 flexible copper wires and with 4mm2 PVC insulated,
flexible copper wire for earthing arrangement, shall be provided on both
sides of the energy meters through cut out at the incoming to the energy
meter.
Point Wiring:
Point wiring as per the specification for Lights,fan,5A plug,exhaust
fan,buzzer,telephone ,DTH cable point,stair case light,scooter shed light,
etc. inconcealed system of wiring including switch board with laminated
sheet of not less than 3 mm thick Each point shall consist of the
following.However actual number of points for NRB and STP Control room
shall be as per work schedule.
i.) 2 runs of 2.5 sqmm PVC insulated copper multistrand and 1 run of 1.5
sqmm copper cable for earthing in PVC conduit of 2 mm thick with
Bends,elbow etc.
ii.)Three pole PVC Ceiling rose /PVC straight,angle batten holders-1No
iii.) 5A flush type switch
iv.) 5A bell switch including Bell /Buzzer
v.) 5A / 15 A plug and socket
vi) Telephone socket RJ 11
vii.) TV socket
228
2.11 Telephone wiring
2 GI pipe shall be laid under ground from telephone DP near MCB at
staircase to the front side of the building up to the fencing so as to avoid
recutting of the flooring while laying the telephone cable. 17 SWG GI wire
shall be kept inside the pipe from end to end with suitable excess lengths at
the ends to draw the cable through the pipe at a later date. The ends shall
be covered with bituminous compound.
2.11.1 i).10 P/20 P krone DPs shall be made available by each NRB.
ii) Where number of connections required is less than four,twin flat wiring
shall be done from theDP to respective phone points.
iii).Whever number of connection required are four and above,one number
of 5 P switchboard cable shall be laid from the main DP of the building for
every four connection and the 5P cable shall be terminated on a 10 P krone
at suitable centre location. A maximum of 4 twin flat shall be run from the
DP to the respective telephone location.
iv). Wiring on the exterior side of the building shall be done using 1 PVC
pipes and the wiring in the interior side by using casing & capping for
twin flat wiring and 1 casing & capping for switch board cable wiring.
v). Twin flats shall be terminated on RJ11 rosettes fixing onto a suitable
PVC box, which shall be fixed properly on the wall.
Telephone points:
1.Shopping complex18 Nos
2.Reading Room:- 1 no
3.RCCover Head tank : 1no
4.Store room for Maintenance office: 1No
5.Recreation club: 4 No
6. Security cabin:1 no
7.Community centre-2 Nos
9.Canteen building:1 no
10.Dispensary: 4 Nos
11. Maintenance office: 4 Nos
229
12. Sewage treatment plant : 1 No
a.) Supply and fixing of DTH antenna in the necessary plinth of the rooftop.
c.) Laying of Coaxial cable for TV socket from the respective DTH dish
antenna located at the roof to the non residential building.
2.15 General:
For internal electrification the circuit wiring shall be horizontal or vertical in
the wall (cross laying is not allowed). No joints in the wire shall be made at
any place. Neutral wire shall be terminated in a copper bar using bolts and
nuts. Neutral copper bar shall be provided in all the switch boxes. Junction
boxes shall be provided in the tapping points and no wire joints are allowed
230
in the junction box. The power wiring, and communication wiring cabling
shall be independent. PVC Protection pipes shall be provided in all the
cable raising location at the incoming.
i.) 2 runs of 2.5 sqmm PVC insulated copper multistrand and 1 run of 1.5
sqmm copper cable for earthing in PVC conduit of 2 mm thick with
Bends,elbow etc.
ii.)Three pole PVC Ceiling rose /PVC straight,angle batten holders-1No
iii.) 5A flush type switch
iv.) 5A bell switch including Bell /Buzzer
v.) 5A / 15 A plug and socket
vi) Telephone socket RJ 11
vii.) TV socket
231
aluminium cable and terminating the cable in the loop-in loop out box.
Supply and providing loop-in-loop-out boxes made out MS sheet steel with
locking arrangement .
Supply and erection of LT Lighting Distribution panel as per the
specification.
Supply and providing automatic lighting control with timer arrangement as
per specification.Suitable capacitor bank shall be provided for power factor
correction to 0.95 and connected to suitable rating of SFU with proper
cabling.
3 Phase, 415 V, 125 A, metal clad switch fuse units shall have single
break isolation and quick make break mechanism independent of the
speed of operation of the handle
The Switch shall be provided with a positive ON- OFF indication even
when the switch door is closed
The switches shall be provided with door interlock to ensure that the switch
cannot be opened in ON condition
The enclosure shall be fitted with removable top and bottom end plates
with adequately sized knockouts for cable entry and exit.
232
Electrical contacts shall be made of electrolytic grade copper, silver plated
for better contact and greater resistance to corrosion
50 mm dia.GI pipes shall be supplied and provided along with pulling wire
by the bidder from the battery limit of the building of the building pavement
up to each of the incoming switch fuse unit located at ground floor for
laying the incoming cables.
The enclosure shall be fitted with removable top and bottom end plates
with adequately sized knockouts for cable entry and exit.
The DB shall be fixed to the top of the SFU with suitable adopter box
Adequate sized plated terminals, suitable for 35mm2 aluminium wire shall
be provided with terminal cover shrouds to prevent any accidental contact
with live parts.
233
3.4 Energy Meters:
MCB DB shall be of double door with locking provision. Perfex View class
for outer door shall be provided.
234
3.7 Colour Code:
For single phase circuits RED and BLACK shall be used for phase and
neutral respectively and GREEN shall be used for earth wire
For three phase circuits RED, YELLOW, BLUE and BLACK shall be used
for R, Y, B phases and neutral respectively and GREEN shall be used for
earth wire.
3.8 WIRING
The distribution board shall be wired in such a way that total load of the
consuming devices shall be divided, as far as possible, evenly between the
number of ways of the board leaving the spare circuit for future extension.
All connections between the pieces of apparatus or between apparatus
and terminals on the board shall be neatly arranged in a definite sequence,
following the arrangements of apparatus mounted thereon avoiding
unnecessary crossings.
Point wiring shall be carried out with 2x2.5 .mm2 PVC insulated copper
wire in PVC rigid 2mm thick conduit for lights and fans complete with piano
key type switch in a M.S. box of 16 SWG thick and suitable size covered
with hylem sheet (thickness 3 mm) cover with brass screws and cup
washers. Ceiling rose with suitable flexible wire leads for all points shall be
erected.
235
3.10 Point wiring for 5A plug socket :
Point wiring shall be carried out with 2 x 2.5 mm2 copper wire PVC
insulated unsheathed wire in metallic rigid steel conduit with 1.5mm2
copper earth wire The 5A 5 pin plug shall be mounted on laminated sheet
thickness not less than 3 mm and erected on switch board.
All other relevant provisions and specifications for point wiring for lighting
shall be applicable.
Power Point wiring with 2 runs of 4 mm2 copper wire with 1 run of 2.5 mm2
PVC insulated copper wire for earth continuity and terminated at 15A flush
type 3 pin socket outlet.
The PVC conduit pipe of suitable size with 2mm wall thickness conform to
IS shall be used. All conduit accessories shall be of grip type or clamp
type.
All outgoing ends of point wiring shall be terminated in 3 pole ceiling roses
erected on Nylon junction box. The ceiling rose shall not embody fuse
terminal as an integral part. Only PVC insulated flexible cords of adequate
length shall be connected to each rose
Fluorescent fittings.
All single /twin fluorescent fitting shall be box type fittings. The channel
shall be of CRCA sheet steel, rust proof treated and stove enameled grey
236
on box and white on reflecting strip. The end plates shall be secured to
channel by knurled screws. The fluorescent fittings shall be suitable for
direct mounting on wall. Each unit shall be pre-wired with polyester filled
heavy-duty choke, starter switch lamp holder and rapid start 40W
single/twin fluorescent tube.
Double suspension pipe with ball and socket arrangements for hanging
the fitting shall be provided if necessary.
BULK HEADS:
The industrial bulk head shall be cast aluminium alloy body finished in
stove enameled silver grey outside and white on inside and supplied
complete with prismatic glass bowl and wire guard. The bulk header shall
be weather proof with synthetic rubber gasket. The fitting shall be complete
with BC porecelain lamp holder for use with CFL 23 W.
Air Conditioner:
1.5 TR capacity window type room air conditioner fitted with hermetically
sealed compressor suitable for operation on 230 V,50 cycles /second,
single phase AC supply conforming to IS:1391/Part-1/92 and covered
under DGS & D rate contract including stabilizer and power card.
237
and river sand around the e electrode of 150mm dia, back filling the earth
pit and construction of masonry trough by 300x300mm and provided with
RCC top cover. Suitable lifting arrangement shall be provided. Except for
equipment provided with double insulation all non- current carrying metal
parts of electric installations are to be earthed properly, metallic parts of
light fitting to be earthed. All metal conduits switch fuse unit, distribution
boards and all other parts made metal shall be bounded together and
connected by means of two separate and distinct connection with earth.
Earth continuity conductor specified in the wiring section for switchgear,
DBs, and plug sockets, light fittings, fans and other metallic parts shall be
connected to main earth continuity conductor. Where equipment is
connected by flexible lead all exposed metal parts of the equipments shall
be earthed by means of earthing conductor. Paint enamel corrosion and
other non- conducting material shall be removed from the metal section to
which earth continuity conductor is attached.
Separate copper earth flat with holes for tapping provision shall be
provided near the SFU at the stair case location .
238
Cable armouring shall be of galvanized steel.
The inner and outer sheaths shall have fire resistant low smoke(FRLS)
characteristics and shall not propagate flame.The cables shall meet the
requirements of additional tests specified for the purpose.
The power cables for field equipments shall be 1100 Volts grade,85 C
rating.heavy duty power cables with stranded aluminium conductors,PVC
insulated,extruded FRLS PVC inner sheath,galvanized steet armour and
extruded FRLS PVC overall sheath.
The core of the cables shall be identified by suitable colours as per
relevant IS. Power cable shall be as below:
i) Grade :1100V
ii) Conductor material :Aluminium
iii) Core insulation: PVC
iv) Inner sheath :PVC
v) Armour :GI
vi) Outer sheath:PVC
vii) Size: Required size and number of runs:3.5 Cx35 sqmm /4Cx16
sqmm cable for NRB
239
insulated,extruded FRLS PVC inner sheath,galvanized steet armour and
extruded FRLS PVC overall sheath.
The core of the cables shall be identified by suitable colours as per
relevant IS. Power cable shall be as below:
viii)Grade :1100V
ix) Conductor material :Aluminium
x) Core insulation: PVC
xi) Inner sheath :PVC
xii) Armour :GI
xiii)Outer sheath:PVC
xiv) Size: suitable size
xv) No. of core :3.5 cores
Construction
It shall be made out of M.S. sheet of at least 2.5mm thickness for outdoor
installation.
The top of the panel shall be fitted with a suitable sloping canopy such that
rainwater shall not accumulate on the top and also it shall not drip into the
box.
It shall have a set of double doors at the front. The door shall be so fitted
as to provide the interior with maximum protection from atmosphere
conditions. The hinges shall be of such construction that the doors can be
swung open by to less than 75 deg.C. In addition the hinged design shall
permit doors being completely removed when necessary. The hinges shall
240
be robust for the duty meant for. The door shall be provided with
necessary stiffeners to prevent warping etc.,
The doors shall be provided with a suitable locking arrangement.
Adequate ventilation shall be given by providing ventilation louvers for the
inlet and exhaust of air.
The DB shall be suitably protected against corrosion. A primary coat of
anti-corrosive red oxide paint shall be given and the inside the box shall be
given two coats of white enamel paint. The external surface shall be
painted with two coats of enamel paint of shade 632 of IS5.
Each circuit way shall be provided with link type HRC fuses complete with
bases.
A 15A three-pin plug and socket with necessary fuses shall be provided.
Removable gland plates shall be provided at the bottom.
The DB shall be fixed to MS channel and mounted on masonry plinth of
500mm. Height, by grouting of foundation bolts.
Bus bar
The bus bars (3 phase and neutral) shall be of copper and of adequate
size from electrical and mechanical angled.
The bus bars shall be supported by suitable SMC insulations.
The exposed portion of bus bars shall be covered by Hylam/M.S. Sheets.
Earthing
Two earthing terminals of adequate size shall be provided. Lables shall be
provided. The designation of the outgoing feeders as required by the
purchaser and the current rating of each outgoing and incoming
circuits/fuses shall be abeled.
241
YARD LIGHTING
Poles
Poles shall be of GI/tubular of suitable size and height shall supplied and
erected.
Light fittings
Suitable light fixtures shall be provided at the pole for yard illumination.
Necessary control boxes for controlling the lights along with timer circuit,
fuses, switches, control gears etc., shall be provided in the yard at suitable
location to enable easy operation. Floodlights shall be fixed at suitable
height. The earthign arrangement shall be as per the specification. The
incoming supply to the lighting control and distribution panel in the yard
shall be tapped off from the LT main panel inside the control room with
suitable cable and cable terminations.
Construction
It shall be made out of MS sheet of at least 2.5 mm thickness.
The enclosure shall be dust, vermin, and weather proof suitable for indoor
installation.
The lighting control box shall be suitably protected against corrosion. A
primary coat of anti-corrosive red oxide paint shall be given and the inside
of the box shall be given two coats of white enamel paint. The external
surface shall be painted with two coats of enamel paint of shade 632 of
IS.5.
Bus bar
The bus bar (3 phase and neutral) shall be of copper adequate size from
electrical and mechanical angle.
The bus bar shall be supported by suitable epoxy insulation.
Earthing
Two earthing terminals of adequate size shall be provided.
242
Drawings
Detailed drawings shall be furnished to NLC and got approve before
supply. Relevant tests as per IS shall be conducted and test certificates
furnished for scrutiny and approval.
243
DATA TO BE FILLEDUP BY BIDDER:
1. Type
2. Applicable standard
3. Voltage grade
a) Continuous
b) Short time
5. Conductor
a) Material
b) Size in mm2
6. Insulation:
a) Material
b) Thickness (mm)
7. Inner sheath
a) Material
b) Thickness (mm)
8. Armouring
a) Material
b) Size
9. Overall sheath
a) Material
244
b) Size
a) Resistance
b) Reactance at 50c/s.
c) Capacitance at 50 c/s.
d) Impedance at 50 c/s
1. Make
2. Type
3. Reference Standard
4. Enclosure
5. Bus bars
a) Material
b) Size
6. Bus rating
b) 1 Sec. current
7. Finish
245
a) Colour
9. Incomer switch
a) Make
b) Type
c) Rating
d) Ref. Standard
10. MCB
a) Make
b) Type
c) Ref. Standard
d) Rated Voltage
e) No. of poles
f) Current rating
Continuous
11. Switch
a) Make
b) Type
c) Ref. Standard
a) Make
b) Type
246
c) Ref. Standard
d) Rated voltage
a) Make
b) Setting Range
c) Fuse rate
d) Contactor rating
a) Main member
b) Doors
1. Type
2. Reference Standard
3. Enclosure
4. Bus bars
a) Material
b) Size
5. Bus rating
b) 1 Sec. current
6. Finish
a) Colour
247
b) Shade (as per IS 5)
8. Incomer switch
a) Make
b) Type
c) Rating
d) Ref. Standard
9. MCB
a) Make
b) Type
c) Ref. Standard
d) Rated Voltage
e) No. of poles
f) Current rating
Continuous
10. Switch
a) Make
b) Type
c) Ref. Standard
a) Make
b) Type
c) Ref. Standard
248
d) Rated voltage
c) Main member
d) Doors
1 75 mm Medium Se 1 1 1 1 1 1 1 1 1 1 1 1 12
class GI pipe t
for incoming
power cable of
SFU
3 SPN MCD DB No 0 1 0 0 1 0 1 0 1 0 0 0 4
having 20A 1 s
no MCB for
incoming and
SP MCB-10
nos out going
along with SFU
(32A)
249
4 MCB DB, 3 set 0 0 0 1 0 0 0 0 0 1 0 0 2
phase, 4 s
way,consisting
of incominfg of
40A,4 pole
isolator-1 No,
O/G of 20 A
SP MCB-5Nos,
10 A SP MCB-
7 Nos.
6 Electronics Se 4 0 1 1 0 1 0 1 0 1 1 1 11
Energy t
meter,3phase
,10 -40A,with
cutout
fuse,wiring etc.
6A Electronics Se 0 1 0 0 1 0 1 0 0 0 0 0 4
Energy meter, t
Single phase
,10 -20A,with
cutout
fuse,wiring etc.
7 Main circuits 2 Se 4 1 1 1 1 5 1 3 0 0 1 3 21
run of 6 sqmm t
Cu wire &1 run
of 4sqmm earth
wire (Meter
board to MCB
DB)
250
8 Sub MCB DB, No 4 0 0 0 0 5 0 3 0 0 0 3 15
3 phase ,4 way, s
consisting of
40A,4 pole
isolator -1
no,20ASPMCB-
5Nos,Single
phase 10A
SPMCB-7 Nos
9 Light circuit 2 Se 12 3 1 9 4 8 2 15 12 12 2 15 96
run of 4 sqmm t
Cu wire & 1 run
of 2.5 sqmm Cu
wire for earth
(MCB DB to
switch board)
12 5A plug point Se 12 6 1 10 8 16 2 20 15 13 1 12
t 116
13 15 A plug point Se 12 3 1 10 2 16 1 8 5 6 1 12
t 89
14 AC point Se 8 0 0 0 0 4 0 0 0 0 0 0 12
including MCB t
as per spec.
15 Telephone Se 4 1 1 8 0 6 1 2 0 1 1 5 30
point t
16 15 A power Se 20 2 1 10 0 16 1 8 5 6 1 12 82
circuit with 2 t
run of 4sqmm
Cu wire & 1 run
of 2.5 sqmm Cu
for earth.
251
18 Exhaust fan No 4 0 0 3 4 4 1 2 1 1 0 4 24
300 mm dia s
with gravity
louvers
22 Light fittings No 0 1 0 0 4 3 0 2 1 1 0 0 12
&lamp and its s
accessories etc
suitable for CFL
23 150 W metal No 3 0 3 4 0 5 0 6 1 0 4 4 30
halide s
fitting,lamp and
all accessories
with suitable
bent pipe.
24 Street light No 10 1 0 4 2 0 0 0 0 17
fittings s
&Lamp(sigle
tube light) with
accessories
and suitable
bend pipe for
installation .
25 Independent No 3 1 1 3 1 4 1 4 1 1 1 3 24
earthing s
arrangement(tr
eated) with 3
mtr long gI
pipes and all
accessories.
252
26 Telephone No 1 1 1 1 0 1 1 1 0 1 0 1 9
Distribution s
panel and
wiring up to
Telephone
points
27 DTH system No 0 0 0 0 0 1 0 1 0 0 0 0 2
including s
supply erection
of dish antenna
on the roof of
each block with
set of box and
necessary
cable system
(concealed
wiring ) to cable
socket at
respective
room.
Note:
1. Details given in the schedule of quantities is only indicative. Successful Bidder shall provide all the
required accessories materials required for the installation such as earthing items, concealed wiring
items, Switch Board, hardware etc though not specifically mentioned without any additional cost
implication.
2. It is the responsibility of the successful bidder to supply and install all the items of material required
for satisfactory and safe operation without any additional cost implication.
253
SPECIAL CONDITIONS
The description and items of work given in the schedule of work is only
indicative and comprehensive. Being turn key work, it is the responsibility
of the bidder to supply and install all the items of materials required for
254
satisfactory and safe operation and for meeting statutory regulation.
The bidder shall post well qualified and experienced engineers in each
shift to look after the works, workmen, materials and register for logging
maintained at site to record the progress of work and also to coordinate
with NLC/NTPL engineers during the work at site.
The bidder shall arrange for the transport, cranes and other tools and
tackles for carrying out the work.
7.0 Inspection :
The bidder shall allow NLC/NTPL engineers for stage inspection at firms
works at any time and also to witness the tests wherever needed. At least
15 days advance intimation shall be given for inspection of equipments.
The equipments shall be despatched only after getting clearance from
NLC/NTPL
The bidder shall insure his personnel against accidents while at work as
required by the relevant rules and it shall be the obligation of the bidder to
pay compensation as per the Act is required. Any enquiry by the
competent authority authorized by the NLC/NTPL will be ordered into any
accidents occurring at site in course of execution of the works and the
255
bidder shall render all possible help to trace out the cause and avert such
accidents in future.
All bidders labour and staff will be issued a temporary permit of entry by
the security officer in charge of Tuticorin Thermal Power Project (TTPP)
and none without a pass will be admitted. Each labour or staff of the
bidder must carefully present the pass and produce it whenever required
by any officer of the NTPL/NLC.
The bidders are required to furnish the list of persons employed by them
everyday before they commence their work. They should furnish the list
relating to any day on such day before they actually commence their
work. No persons other than those mentioned in list shall be allowed or
required to work in the respective work spots.
Whenever the materials are to be taken inside , the bidder should submit
a list of such items like tools, plants and materials in duplicate to the
Security Officer of which one copy will be the Security retained by the
Security Officer and the other copy will be authenticated and will be
passed on to the NLC/NTPL site engineer.
Every house wiring shall be tested and a certificate to that effect shall be
produced to NLC/NTPL
The bidder shall collect and remove the scraps and debris generated
during site work then and there. The same shall be stored / disposed in
respective location indicated by NLC/NTPL
Water, electricity and open space for storing materials at site will be
provided free of cost.
All the required consumables, tools and materials shall be brought by the
bidder for all the works
256
grade or higher system licence issued by any other state Government
duly endorsed by Tamilnadu Electrical Licensing Board. A copy of the
same shall be enclosed.
a.) If the bidder does not possess the valid licence on their own, he shall
engage a sub-bidder who possesses a valid licence as specified in
Sl.No.8.2.1. and having experience in any electrical works.
b. The successful bidder shall furnish the copy of the sub-bidders licence
and other credentials to the purchaser and shall get approval of the
purchaser before commencement of the work.
c. The bidder shall furnish an undertaking along with the bid to engage
sub-bidder as specified above.
257
modifications/changes if necessary in the design/drawing to suit the site
condition. The approval given to the detailed drawings by the purchaser
shall not relive the bidder of the responsibilities of the correctness of the
design and in the execution of the work in accordance of the terms of
specification.
The successful bidder shall submit the following drawings and get the
purchaser approval during details Engineering.
i.) Single Line Diagram for lighting circuits for building.
ii.) Internal electrification drawings for residential quarters.
iii.) Necessary General Arrangement drawings and leaflets
describe the details of the equipment and components.
iv.) SLD for Incoming and distribution arrangement for the
residential building.
The successful bidder shall furnish the following soft and hard copies of
drawings / documents / test certificate at the time of supply.
i.) 6 copies of test certificates mentioned.
b.) The bidder shall work in co-ordination and close co-operation with
other Bidders/ workers working in the area.
258
men while handling and erecting the same due to negligence and
carelessness. The actual cost of damage together with the overheads
shall be recovered from the bidders bill. The decision of the concerned
authorities of NLC/NTPL regarding the cause as well as the extent and
cost of damage shall be final.
a.) All safety rules and codes as applicable to work shall be followed
without exception.
c.)The bidder shall provide guards and prominent display caution notices
if access to any equipment/area is considered unsafe and hazardous.
16.0 STAFF:
The entire work shall be carried out with bidders staff, qualified and
specially trained for such works, so as to ensure workmanship of high
standard. Engineers from bidders side shall be stationed at Tuticorin
throughout the period of work covered by this work order. He shall be in
overall in charge of the work and co-ordinate the work suitably, keeping a
close liaison with our Engineer in charge.
b.) Storage and safe custody of materials supplied for the work is the
sole responsibility of the bidder till erection, testing, commissioning and
handing over of installation
259
4.0 LIST OF SUBVENDORS FOR ELECRICAL ITEMS:
Bidder to note that the list of sub-vendors are furnished below. In case of
the contractor desire to deviate from the list furnished he shall get prior
approval from purchaser. The approval of additional sub vendor will be
based on various details regarding capacity, capability, experience etc of
the sub vendor proposed by bidder. It is the responsibility of the bidder to
get the details of such sub vendor which is to be proposed by bidder for
additional approval.
260
Sl.no Description Proposed VENDORS
3. HT cable /LT Cable /control M/s CCI, M/s Universal Cables, M/s Industrial
Cable Cables, M/s Central Cables Ltd, M/s NICCO,
M/s Radiant , M/s GEM, M/s RPG cable Ltd,
M/s Fort Gloster, ASIAN CABLES, POLYCAB
WIRES Pvt Ltd.
5. Cable Jointing kits M/s Denson, M/s Raychem, M/s CCI, M/s M-
seal
6. Oil type transformer M/s BHEL, M/s TELK, M/s KEL, M/s Indotech,
M/s Bharath Bijlee, M/s Alsthom, M/s ABB,
M/s CGL
M/s ABB.
261
13 CTs PTs M/s Kappa, M/s Kalpa, M/s SILKAANS, M/s
Pragathi
14 Ceiling fans /Exhaust fans M/Cropton Greaves, M/s Usha, M/s Alsthom,
M/s Khaitan, M/s Almonard
19 Street Light Timer M/s L&T,M/s MDS Legrand, M/s MAXI, M/s
REX,M/s QUIT,M/s SEMS
262