Vous êtes sur la page 1sur 8

Name of Work : Reconstruction of Narrow Minor bridge at Km 17/6 of Bhuvnagiri -

Kurinjipady Road (MD 816) across the Kattuodai in lieu of existing piped causeway
Diversion Road

ABSTRACT ESTIMATE

Sl.
Description Quantity. Rate Amount
No
1
Filling behind Abutments and wings with
clean gritty gravel including cost and
conveyance of gravel toworksite, laying,
handling charges and filling in layers,tamping
under optimum moisture content to get the
maximum density including watering,with all
leads for water and all other incidental
charges etc,complete for filling behind the
abutment and wings as per MORTH No.

128.00 M3 425.09 /M3 54412


2 Providing and Laying Granular Sub-Base
Grade- V consisting of well graded Material
confirming to the grading given in Table
No.400-1, mixing in a mechanical mix plant
at OMC, carriage of mixed Material to work
site, spreading in uniform layers with motor
grader on prepared surface and compacting
with vibratory roller to achieve the desired
density, etc., complete as directed by the
Engineer. as per MORTH No. 111, 112, 401,
900.
70.00 M3 1585.84 /M3 111009
3

Provding and Laying Wet Mix Macadam


consisting of clean crushed aggregates
confirming to the grading given in Table
No.400-13, including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers with paver on well
prepared surface and compacting with
vibratory roller to achieve the desired density,
etc., complete as directed by the Engineer.
as per MORTH No. 111, 112, 406, 900.
57.50 M3 1716.55 /M3 98702

Supply of NP3 class RCC pipe with flush joint to a size of


1000mm inner diameter with wall thickness 115mm. to a
length of 2.5m in RCC M35 with reinforcement as per table
5 of IS :458:2003 to a ultimate load capacity of 71.58
KN/Linearmeter including cost of conveyance of all matrials
4
and steel including moulding charges, all labour charge,
hire charges for all T & P including conveyance and supply
of pipe to worksite and other incidental charges etc., as per
the specification IS : 458:2003 as per MORTH No. 111,
112, 2900, 900

7.50 Rm 2600.00 Rm 19500.00

Hoisting and fixing of 1000 mm dia NP3 pipes to proper


5 gradient including labour and all other incidental charges as
directed by the Engineer as per MORTH No.2900

7.50 Rm 66.55 Rm 499.13

Sub total = 284121

Assistant Divisonal Engineer, Assistant Engineer,


Highways, C&M Highways, C&M
Kuirnjipady. Portonovo.
Name of Work : Reconstruction of Narrow Minor bridge at Km 17/6 of Bhuvnagiri -
Kurinjipady Road (MD 816) across the Kattuodai in lieu of existing piped causeway
Diversion Road
Detailed Estimate

Sl. Measurement
Description No Qty Unit
No L B D
Filling behind Abutments and wings with clean gritty gravel including cost and
conveyance of gravel toworksite, laying, handling charges and filling in
1 layers,tamping under optimum moisture content to get the maximum density
including watering,with all leads for water and all other incidental charges
etc,complete for filling behind the abutment and wings as per MORTH No.

1 x 1 40.000 8.000 0.400 128.00


128.00 m3
Providing and Laying Granular Sub-Base Grade- V consisting of well graded
Material confirming to the grading given in Table No.400-1, mixing in a
mechanical mix plant at OMC, carriage of mixed Material to work site,
2
spreading in uniform layers with motor grader on prepared surface and
compacting with vibratory roller to achieve the desired density, etc., complete
as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.
(8+6)/2
1 x 1 40.000 7.000 0.250 70.00
70.00 m3
Provding and Laying Wet Mix Macadam consisting of clean crushed aggregates
confirming to the grading given in Table No.400-13, including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed Material
3
by tipper to site, laying in uniform layers with paver on well prepared surface
and compacting with vibratory roller to achieve the desired density, etc.,
complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900.
(6+5.5)/2
1 x 1 40.000 5.750 0.250 57.50
57.50 m3

Supply of NP3 class RCC pipe with flush joint to a size of 1000mm inner
diameter with wall thickness 115mm. to a length of 2.5m in RCC M35 with
reinforcement as per table 5 of IS :458:2003 to a ultimate load capacity of 71.58
4 KN/Linearmeter including cost of conveyance of all matrials and steel including
moulding charges, all labour charge, hire charges for all T & P including
conveyance and supply of pipe to worksite and other incidental charges etc., as
per the specification IS : 458:2003 as per MORTH No. 111, 112, 2900, 900
1 x 3 2.500 - 7.50
7.50 Rm
Hoisting and fixing of 1000 mm dia NP3 pipes to proper gradient including labour
5 and all other incidental charges as directed by the Engineer as per MORTH
No.2900
1 x 3 2.500 - 7.50
7.50 Rm

Assistant Divisonal Engineer, Assistant Engineer,


Highways, C&M Highways, C&M
Kuirnjipady. Portonovo.
BAR BENDING SCHEDULE - ( as per SD 109)
TOTAL UNIT
TYPE OF DIA IN SPACING LENGTH
Sl No SHAPE OF BARS Nos LENGTH (in WEIGHT ( in TOTAL WEIGHT ( in Kg)
BARS mm IN mm (in m) m) Kg/ m)
1 1 12 200 #REF! #REF! #REF! 0.888 #REF!
#REF! #REF!
#VALUE!
2 2 12 200 5.208 #REF! #REF! 0.888 #REF!

3.48

0.90
3 #VALUE! #VALUE! 3 12 130 #VALUE! #REF! #VALUE! 0.888 #VALUE!

#REF!
4
4 Bar not used

5 5 10 200 #REF! #REF! #REF! 0.617 #REF!

0.2 #REF!

#REF!
6 #VALUE! 6 12 180 #VALUE! #REF! #VALUE! 0.888 #VALUE!
0.20 0.2

7
7 Bar not used

8 #VALUE! 8 12 200 #REF! #REF! #REF! 0.888 #REF!


#REF! #REF!
9 0.2 9 10 250 1.222 #REF! #REF! 0.617 #REF!
0.862
0.2
10 0.2 10 12 250 1.242 #REF! #REF! 0.888 #REF!
0.89
0.2
11 #REF! 11 10 250 #REF! #VALUE! #REF! 0.617 #REF!
0.18 0.18

12 #REF! 12 10 250 #REF! #VALUE! #REF! 0.617 #REF!


0.18 0.18

13 #REF! 13 10 250 #REF! #REF! #REF! 0.617 #REF!


0.18 0.18

14 #REF! 14 10 250 #REF! 12 #REF! 0.617 #REF!


0.18 0.18

15 #REF! 15 10 250 #REF! #REF! #REF! 0.617 #REF!


0.18 0.18

16 #REF! 16 10 #REF! 12 #REF! 0.617 #REF!


0.16 0.16

17
17 Bar not used
18 0.15 18 10 150 1.092 #VALUE! #VALUE! 0.617 #VALUE!

0.45

19 0.16 0.16 19 10 - 2.860 4 11.44 0.617 7.058

2.60
20 1.30 20 10 150 4.207 #VALUE! #VALUE! 0.617 #VALUE!

1.1 1.556
0.20

21 0.2 0.2 21 12 - 2.928 20 58.56 0.888 52.001

2.60
#VALUE!

#VALUE!
(or) #VALUE!
BK at Km 3/4

Brigde 7574329

Diversion 258772

App Road 794223

R.Wall 567986

9195310

GST 1103437

10298747

L.S

10298747