M th d P
Method Productivity
d ti it Delay
D l Model
M d l (MPDM) P
Processing
i ShSheett
Total
Number of Mean Cycle Sum [(Cycle time) - (Mean
Units Production
Cycle (n) Time Non-delay time)] / n
Time
A) Non-
delayed 900+750+750 [|900-800|+|750-800|+|750-
3 800
production = 2400 800|]/3 = 200/3 = 66.67
cycle
Production Unit:
1. Productivity Equation:
Overall productivity = (Ideal Productivity) * (1 - Een - Eeq - Ela - Emt - Emn) These rate tell the contractors what
productivity they need to
Ideal Productivity = (60 min/hour) (60 sec/min) / (800 sec / units) achieve and what area of
= 3,600/800 = 4.5 units/hour improvement.
B. Delay Information
Env Delay Equip Delay Lab Delay Mat Delay Mangt Delay
Probability of occurance 0 0.333 0.167 0.000 0.167
Relative severity 0 0.15 0.1 0 0.8
Expected Percent Delay 0 5% 1.7% 0% 13.3%