Code | Description unit | Quantity | Ratez | Amount 2 MACHINERY 0024 | Hire and running charges of hydraulic piling rig with power unit etc. including complete accessories and shifting at site day 0.70 | 3400.00] 2380.00 (0025 | Hire and running charges of light crane. day 0.08 | 2500.00] 150.00 0026 | Hire and running charges of bentonite pump. day 0.75 | 4200.00} 3150.00 0018 | Hire and running charges of loader day 0.30 | 6000.00] 1800.00 0017 | Hire and running charges of tipper day 0.30 | 1800.00] 540.00 LABOUR Work supervisor o1s0 | Mistry day ota 487.00 68.18 o1t4 | Beldar day 3.50 368.00] 1288.00 TOTAL 74629.31 ‘Add 1 % Water charges _on all except (A) i.e. on (74629.31 - 42675,50) = 31953.81 319.54 TOTAL 74948.85, Add 15 % Contractor's profit and overheads ‘on all except (A) i.e. on (7448.85 - 42675.50) = $2273.35 4841.00, Gost of 15 metre pile 79789.85, Cost of 1 metre pile 5319.32 Say 5319.30 20.2A.3 1000 mm dia piles Code | Deseri unit | Quantity | Ratez | Amount & Details of cost for 10 m length of pile MATERIAL, Concrete 3.14/4x1.00%10 = 7.85 cum 5.33.1 | Rate as per item no 5.33.1 of SH: RCC Work | cum 7.85 | 6446.45|50604.63(A) 7183 | Bentonite tonne 0.35 | 3100.00] 1085.00 9999 | Sundries LS. 175.89 173] 30429 MACHINERY 0024 | Hire and running charges of hydraulic piling rig with power unit etc, including complete accessories and shilling at site day 0.69 | 3400.00) 28460.00 0025 | Hire and running charges of light crane. day 0.08 | 2500.00] 150.00 0026 | Hire and running charges of bentonite purnp. day 075 | 4200.00] 3150.00 0018 | Hire and running charges of loader day 0.40 | 6000.00) 2400.00 0017 | Hire and running charges of tipper day 0.40 | 1800.00] 720.00 LABOUR, Work supervisor o1g0 | Mistry day o16 487.00 7.92 o1t4 | Beldar day 4.00 368.00] 1472.00 TOTAL 83423.84 ‘Add 1 % Water charges on all except (A) ive. on (83423.84 - §0604.63) = $2819.21 328.19 TOTAL 83752.03 Add 15 % Contractor's profit and overheads ‘on all except (A) i.e. on (83752.03 - 50604,63) = $3147.40 4972.11 Cost of 10 metre pile 88724.14 Gost of 1 metre pile 8872.41 Say 8872.40 ‘SUB HEAD : 20- PILE WORK 1494 20.2A.4 1200 mm dia piles Code | Description unit | quantity [ Ratez | Amount & Details of cost for 9 m length of pile MATERIAL, Concrete 3.14/4x1.20%9 = 10.17 cum 5.33.1 | Rate as per item no 5.33.1 of SH: REC Work| cum 10.17 | 6446.45 |e5560.40(A) 7183 | Bentonite tonne 0.385 | 3100.00) 1193.50 9999 | Sundries LS. 290.79 1,73] $03.07 MACHINERY 0024 | Hire and running charges of hydraulic piling rig with power unit etc. including complete accessories and shifting at site day 0.67 | 3400.00) 22780.00 0025 | Hire and running charges of light crane. day 0.08 | 2500.00] 150.00 0028 | Hire and running charges of bentonite pump. day 075 | 4200.00] 3150.00 0018 | Hire and running charges of loader. day 0.50 | 6000.00] 3000.00 0017 | Hire and running charges of tipper day 0.50 | 1800.00] 00.00 LABOUR, Work supervisor o1g0 | Mistry day 018 487.00 87.66 o1t4 | Beldar day 4.50 368,00] 1656.00 TOTAL 98980.63 ‘Add 1 % Water charges on all except (A) i.e. on (98980.69 - 65560.40) = $3420.23 334.20 TOTAL, 99314.83 ‘Add 15 % Contractor's profit and overheads fon all except (A) i.e. on (99314.83, = 88560.40) = 33754.43 5063.16 Gost of 8 mete pile 104377.99 Cost of 1 mete pile 1597.55 Say 11597.55 20.2A.5 1500 mm dia piles Code | Description unit | Quantity | Rateg | Amount & Details of cost for 9 m length of pile MATERIAL, Concrete 3.14/4x1.50%x9 = 15.90 cum 5.33.1 | Rate as per item no 5.93.1 of SH : RCC Work | cum 15.90 | 6446.45 |102498.56(A) 7183 | Bentonite tonne 0.45 | 3100.00] — 1395.00 9999 | Sundries LS. 593.48 173) 1026.72 MACHINERY 0024 | Hire and running charges of hydraulic piling rig with power unit etc. including complete accessories and shifting at site day 0.77 |34000.00] 26180.00 (0025 | Hire and running charges of light crane. day 0.10 | 2500.00 250.00 0026 | Hire and running charges of bentonite purnp. day 096 | 4200.00} 4032.00 0018 | Hire and running charges of loader day 0.75 | 6000.00] 4500.00 0017 | Hire and running charges of tipper day 0.75 | 1800.00] — 1380.00 LABOUR Work supervisor o1s0 | Mistry day 0.25 | 487.00 121.75 ‘SUB HEAD : 20- PILE WORK 1495

Vous aimerez peut-être aussi