Vous êtes sur la page 1sur 2

UPPER TAMAKOSHI HYDROELECTRIC PROJECT

SURVEY DATA FOR PENSTOCK PIPE FROM LOWER BEND of LPS TO BF-6 THROUGH MSOV
S. N. Area Designed Value Measured Value Deviation
Distance and slope Distance and slope LB Distance and slope
Center Line Center Line Center Line
LB - MSOV - MSOV LB - MSOV
1 Lower Bend (LB)

Distance and slope Distance and slope Distance and slope


Center Line Center Line Center Line
MSOV-MP5 MSOV-MP5 MSOV-MP5
Main Shut off Valve
2
(MSOV)

Distance and slope Distance and slope Distance and slope


Center Line Center Line Center Line
MP5 to BF-1 MP5 to BF-1 MP5 to BF-1
3 Bifurcation 1 (BF-1)

Distance BF-1 to BF- Distance BF-1 to


Center Line Center Line Center Line
2 Distance BF-1 to BF-2 BF-2
4 Bifurcation 2 (BF-2)

Distance BF-2 to BF- Distance BF-2 to


Center Line Center Line Center Line
3 Distance BF-2 to BF-3 BF-3
5 Bifurcation 3 (BF-3)

Distance BF-3 to BF- Distance BF-3 to


Center Line Center Line Center Line
4 Distance BF-3 to BF-4 BF-4
6 Bifurcation 4 (BF-4)

Distance BF-4 to BF- Distance BF-4 to


Center Line Center Line Center Line
5 Distance BF-4 to BF-5 BF-5
7 Bifurcation 5 (BF-5)

Distance BF-5 to BF- Distance BF-5 to


Center Line Center Line Center Line
6 Distance BF-5 to BF-6 BF-6
8 Bifurcation 6 (BF-6)
UPPER TAMAKOSHI HYDROELECTRIC PROJECT
Lot-2 Hydro-Mechanical Works

Lower Bend to MSOV

MSOV TO MP-5

MP-5 TO BF-1