Phase 2
seabed-to-surface
Total OFON phase 2
Project Overview
OFON Phase 2 OFON Phase 2 Project's scope of work included the EPCI
Project (engineering, procurement, construction and installation) of:
Location Work also included the T&I (transport and installation) of:
Offshore West Africa
2 jackets Lifting bridge elements
Water depth 2 bridges
32 - 45m
The key objectives of the OFON Phase 2 Project consist in
stopping gas flaring on OFON and deliver gas to Bonny LNG plant
Project Type
via Amenam facilities, and in increasing the production from current
EPCI / T&I 50,000 barrels of oil per day (bopd) to about 100,000 bopd.
Date Awarded
15 September 2011
Date Completed
Q4 2014
Seven Borealis
Vessels Utilised
Seisranger
Seven Borealis
Rockwater 2
Simar Esperana
Rockwater 2
Simar Esperana 20
16
ril
Ap
www.subsea7.com
Subsea 7, 2016