RAJASTHAN RAJVA VIDVUT PRASARAN NIGAM LIMITED

[Corporate Identity Number (CIN} : U40109RJ2000SGC016485]


OFFICE OF THE SUPERINTENDING ENGINEER( QC-Inspection & Monitoring}
Regd. Office: VidyutBhawan, Jyoti Nagar, Jaipur -302005
(AN ISO 9001: 2008 CERTIFIED COMPANY}
E-mail: se.qc.insp@rvpn.co.in; Website: www.rvpn.co.in

No.RV PN /SE(QC-Insp) XEN(PTCC)/JPR/ F. Railway/ D. .s- Dt. _/ ~c, _ I )

The Superintending Engineer (T&C),


RVPN,

Sub:- Procedure for Railway crossing cases & modification in EHV line(s) at crossing
of Railway track .

On the above cited subject, the procedure of crossing of Railway Track by


electric Power line & modification in EHV line(s} at crossing of railway Track along
with related documents, are hereby enclosed. It bears the approval of the Hon'ble
CMD, RVPN, Jaipur.

In view of above, it is requested that the field officers under your jurisdiction
be apprised about the aforesaid procedure & strict compliance should also be ensured
so that timely approval is obtained.

Encl:- As above

~upta}
Suptdg. Engineer (QC-Insp. & Mont.)

RVPN,Jaip~r--

Copy submitted /forwarded to the following for information and n/a please
1. The Zonal Chief Engineer (T&C), RVPN, Jaipur/ Ajmer/Jaipur.
2. The TA to CMD, RVPN for kind appraisal of Hon'ble CMD.
3. The TA to Director (Operations/Technical}, RVPN, Jaipur for kind appraisal of Director
(Op./Tech.}, RVPN, Jaipur. ~)\1-

Suptdg. Engineer (QC-Insp. & Mont.)

RVPN,Jaipur
.,

INDEX
~

S.NO DOCUMENTS Enclosed at page


no.
1. Technical Requirements for overhead line at railway 1-2
crossing
2. Snapshot of procedure of on line submission of application 3
for Railway crossing
3. Joint procedure order & timelines for various activities 4-6
issued by Railway Board
4. Procedure of crossing of railway track by Electrical power 7-8
line.
5. Forwarding letter addressed to Dy. Chief Engineer Electrical 9
& construction for approval of overhead railway crossing
6. Questionnaire 10-13
7. Three Blank Agreements duly signed by RVPN authorities on 14-25
I'
non judicial Stamp paper of Rs. 500 each
8. Rough sketch of Railway crossing 26

9. Joint Inspection Report 27-29

10. Demand note letter 30

11. Certificate of completion of work 31

12. Final Joint Inspection 32

13. Permission for energisation of EHV line by Railway 33


14. Procedure of modification in EHV lines at crossing of Railway 34
Track
15. Application from Railway Authority 35
16. Demand note for depositing file charges by RVPN 36
17. Confirmation letter of receipt of file charges by AO,RVPN 37
18. Technical estimate prepared by Railway authority 38-41
19. Tower schedule & Profile 42-43
20. Approval of Tower schedule & Profile 44
21. Administrative I Financial Approval & Technical sanction 45-47
letters
22. Demand note issued to Railway 48
23. Demand note deposited by Railway & receipt of Demand 49-50
note
24. Three Blank Agreements duly signed by RVPN authorities on 51-68
non judicial Stamp paper of Rs. 500 each
25. Letter of work execution permission 69
26. Letter of Way leave charges issued by Railway 70
27. Permission letter for starting the work 71
TECHNICAL REQUIREMENTS FOR OVERHEAD LINE RAILWAY CROSSING

1. ANGLE OF CROSSING'
The overhead line crossing shall ncrma!!y be at right angle to the railway track. In special case
a deviation up to 30 may be permitted by the Railway authorities.
2. LOCATION OF TOWER
Only "D" type tower on either side of the Railway track are permitted to be used. The towers
are to be located at minimum required distance from centre of the nearest railway track shall
not be less than the actual height of the tower in Meters above normal ground level plus 6
Meters.
3. CROSSING SPAN
The railway crossing span shall be restricted to 300 meters or 80% of the normal span for
which the structures are designed, whichever is less.
4. TYPE OF INSULATION
A double tension insulator string shall be used in crossing span in conjunction with a yoke
plate where necessary. Each tension insulator string shall have one insulator more than the
no. of units used in normal over head lines. The Factor of Safety of each string of insulators
under the worst conditions shall not be less than 2.
5. FOUNDATION OF RAILWAY CROSSING TOWERS
Foundation of Railway crossing towers should be in accordance with water table and soil
encountered at these locations. The classification of foundations for such towers should be
done cautiously keeping in view safety considerations.
6. EARTHING
(a) Each tower on either side of railway crossing span shall be earthed effectively by two
separate and distinct earthing and connections. At least one separate earth electrode shall be
provided for each earth connection.
(b) Where the earth resistance of the independent tower is higher than 10 ohms, the
counterpoise earthing shall be provided as per requirement of Railways. The method of
earthing the towers for crossing span shall also be approved by the Railways.
7. JOINTS IN CROSSING SPAN
No joints in conductors or earthwire (s) shall be permitted, in crossing span.
8. ANTI-CLIMBING DEVICES AND WARNING NOTICES
The supporting structures on railways land shall be provided with anti climbing devices.
Besides, suitable caution/warning notices shall be erected on all such structures in such
languages as may be prescribed for the purpose. The anti climbing devices and the
caution/warning notices shall be approved by the Railway.
9. NO INTERFERENCE WITH RAILWAY COMMUNICATION LINES
The crossing shall in no way interfere with or endanger railway communication lines and
approval given by the Railways to the placing of any crossing shall not be construed to
compromise or reduce in any way the requirements of Indian Posts & Telegraphs Department
for the protection of communication lines.
10. FACTOR OF SAFETY
The factor of safety of all structures, conductors, guards and ground wires used in the
crossing shall be as stipulated in the Indian Electricity Rules 1956 (as amended in November
1984) and the relevant code of practice.
MINIMUM CLEARANCE BETWEEN THE OVERHEAD LINE & RAILWAY TRACK & RAILWAY
STRUCTURES ETC.

1. Clearances Over the Track


(i) Minimum height above rail ievel of the lowest portion of any conductor of a crossing, including
guard wire, under, conditions of maximum sag shall be as follows:
i s. N~. T'- . --~~~Lv6it;lg-;j; -:--;- --+------.
' ----- ..... --C--1.. .......... - .
F sr~;d~Miit~r
.
8i.jli,.;;:;;w-g-;uges
. . ,.... ,., .......'....... .,.............. "" .,,........ .
--'----.,;:-~.::.._...__ - _::.;:;.(.,.,:.._, ____ _:._~ ----~-----"-

1. up to and including 11 kV Normally by Cable


2. 'Above 11 kV & up to 33kV 16.66 Meters
3. Above 33 kV & up to 66 kV 16.96 Meters

4. ,Above 66 kV & up to 132 kV 17.56 Meters

5. .Above 132 kV & upto 220 kV 18.46 Meters


6. :Above 220 kV & upto 400 kV 20.26 Meters
7. 'Above 400 kV & upto 800kV 23.86 Meters

(ii) No overhead line crossing shall be located over a booster transformer, traction switching station,
traction Substation or a track cabin location in an electrified area. structures, the height above the
rail level of the highest high tension line shall be taken into account for calculating the clearances.

2. Clearances From The Traction Mast or Structure


The distance between any of the crossing conductors and the nearest traction mast or structure
under the most adverse conditions shall not be less than 5 meters.

3. Minimum Vertical Clearance Between Power Line Crossings


The minimum vertical clearances to be maintained between any of the Railways power line
crossings at the same or at different voltages shall be as specified in Rule 37 of the Indian Electricity
Rules 1956 (As amended up to November 1984).

4. Minimum Clearance Between Highest Traction Conductor And Lowest Crossing Conductor
Minimum clearances between the highest traction conductor and the lowest crossing conductor
shall be maintained, as per details given in the following table :

l\l~l~~~,''.~'~~~''~:D1r:E =~;~C__, ~_,:;_~--~ __ _L~,f~~~l!t~1r_,~jiJ!j1x~-?~l:~(i~-M~~r~IJ


!up to & including llkV By Underground Cable
1! .. - - ' -.. ---- -- - ------ --- . -- --- ,_, - - ...
Above 11 kV & up to 33 kV 3.7 Meters
1
' -- - . --------- - --~------ --- ... -.------- .. ---
!Above 33 kV and up to and including 66 kV 4.00 Meters
I ---~---. ----- ---..--.,. . --..-.. ~------~- -------
(Above 66 kV & up to 132 kV 4.6 Meters

\Above 132 kV & up to 220 kV 5.5 Meters


r--- o ........ -----------~--------- - - -

!Above 220 kV & up to 400 kV 7 .3 Meters

iAbove 400 kV & up to 800 kV 10.9 Meters


l
l/5/2017 Wey Leave Facilities/Easement Rights

~. Application for Crossing Railway


-...
GOVERNMENT OF INDIA
Line
(Pipeline, Cables, etc.) MINISTRY OF
RAILWAYS 1

1-----------------~ ~----

; cI 11 Guidelines
Crossing Railway Line
) Click on the link ""Click here for Online application"'
(Pipeline, Cables, etc.)
+ Click here for Online Application ? Fill the particulars and submit the application.

+ Click here to view status of your ) Print the duly filled form, sign and submit to
DRM/Engg. enclosing a copy of rough sketch, draft
application
agreement signed on each page and Demand Draft/
+ Draft Agreement (PDF) MR in original.
'l Draft Agreement (Word) > Application fonn without rough sketch, draft
't Railway Board Policy Letter-1 ag"''ment duly signell by applicant on each page
+ Railway Board Polley Letter-2
and registration fee (Rs.2000/-) shall be
considered incomplete and be summarily rejected.
For Railway User
) The formal registration will be done after receipt of
+ Railway user has to login to Track
Management System (TMS) to view
duly signed application fonn.

reports l!r. update status of Crossing 't The Demand Draft should be prepared in favour of
Railway Line (Pipeline, cables, etc.) Senior Divisional Finance Manager (Sr. DFM) of the
Application. concerned Division payable at the divisional head-
+ Sr.DEN (SE land) of division is
authorised to update the status of
quarter station.

.. Click here to I in to "TMS".

Declgn"d & Developed by Centre for Railway Information Systems


,
l
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)

No. 2010/Elect(G)/148/6 New Delhi, dt: 30.01.17

General Managers
All Indian Railways

Su.b: Joint Procedure order for granting permission to Overhead Power Line
crossings over Railway track and Under Ground power Cable Crossings of
Railway Tracks on Indian Railways.
. .
Slates have been complaining on excess time being taken by Railways in
granting permission for Overhead Power line crossing (including that for Railway TSSs)
of Railway lines and Under Ground Power Cable Crossings of Railway Tracks. Ministry
of Powel' in this reference requested Ministry of Railways to issue guidelines with
definite tlmelines for issuance of the Railway clearance within one month.

2. To streamline the process and avoid delays of granting permission for Overhead
line electrical crossings (including that for Railway TSSs} over railway lines and
Under Ground Power Cable Crossings of Railway Tracks in a time bound manner,
Ministry of Railway, Railway Board has approved a joint procedure order along with
timelines for various activities as per Annexure I.

3. This must be followed as there have been number of complaints in this regard.

4. This issues with the approval of Board (MTR, ME, MT & FC).
....
Joi 111) IY
ni Agrawal)
Direc or Elect. Engg.(PS)
Railway Board

Copy to:
1.) Secretary, Ministry of Power, Government of India.
2.) Adv.IRE, Adv./Coaching, ED/L&A-1, EDF(X)ll.
3.) COMs, CEEs, FA&CAOs & PCE, All Indian Railways & PUs
4.) Deputy Comptroller and Auditor General of Indian Railways, Room No. 224, Rail
Btiawan, New Delhi.
5.) CPTMs, CESEs, CEGEs & CEDEs, All Indian Railways & PUs.
6.) Managing Director, All Railway PSUs.
SN Tlmenne/Dat
Activity
0
Sr.DEE/G of the concerned division will
be the Nodal Officer to
process the case for giving permission and the entire process will be
a sinale window_for the applicant. ------.-~--------
The application by the party be made at the Government of India
II website: http://ircep.gov.inNVLRMS and a hard copy so generated 0
should be submitted in the office of Sr.DEEIG with all details including
---1--=dc:.=ra::.!~ings, estimate, det.~j~ c~~~~_sheet.._sag cal~ul?.t_i9!1_etc;_.------- __ .. ___ ..
After scrutinizing the application, Sr.OEE/G will send the details to
Ill (0+3)
Sr.DEN/Coordination, for making the estimate for way leave
charges as per the guidelil)~~J~~Y.!ld by BoarQ_._ ________ ---i----------
Sr. DEN/C within Seven days should provide all inputs, failing which
IV Sr.DEE/G should work out way leave charges as per the Board's
ouidelines.
- ----v----~-.,.----c---.----------"'- .~ . , . ., ~-- ------------!
Simultaneously (when proposal is sent to Sr. DENiC), a parallel (0+10)
proposal should also be sent to Sr.OEE/Tr.O for his perusal and
v comments, if any. If no comments are received in Seven days, it
should be taken that Sr. OEE/Tr.D has no comments to offer and it
should be considered as NOC from Sr. DEE/Tr.D.
For Overhead power line crossing: ----------- .. -----------+------

Sr.DEE/G will make a consolidate estimate within next Three days


considering Lump sum charges of power and traffic block
including supervision by the relevant Railway departments
@Rs.5,00,0001- per hour and submit the same for Finance vetting.

For Under Ground power line crossing:


VI Lump sum amount of Rs. 5 lakhs in the form of Bank Guarantee (0+13)
(BG) shall be deposited by the party towards Security Deposit against
possible damage to OFC/Quard/Under ground power cable in
respect of all the under ground power cable track crossing cases
applied by a party in the Division. In case of damage to
OFC/Quard/Under ground power cable, the party will be asked to
deposit the penalty amount otherwise same may be recovered by
encashing the Ban.~-G~~e-d~Q5>sited bY. the party.
VII Divisional finance should vet the estimate in next Fiv.:-e~d-;-a_y_s_.----1---(-0_+_1_8)--
Sr.DEE/G will thereafter obtain sanction=-o=<t-A:a.~o=R;-;M;;;/O;;-;R;;.~M~(=--w-::it7"h:-in_o_n_e+-~-:.::!_ -
VIII week). (0+25)
-~-+-::::,.:;...:='-'~-::--.::=~;;;;----~--~~77.:-~-.:---~--;-,;-----1-------
Thereafter Sr.DEEIG will advise the party to deposit requisite money
IX with the Railways. (0+28}
The party has to deposit the above calculated amount within 15 days
x of issue of sanction. (0+43)
After deposition of the requisite money by the party a single standard
agreement betwee~ the party a~d. the Railway i.e., Engineering, Tr.D
XI & Elect. General. will be done within one week of deposit of money by (0+50)
the Railway.
c: :~~r ~gning of the agreement -ifiepermission tor power line crossing
Sr DEEnder .G~ound Cable Crossings should be issued by the
(0+64)
3 XII
z party. /G within Two weeks in consultation with Sr.DOM and the

Further for
.

regu 1ar ma!ntenance required for safe reliable upkeep
from Railway p om t o f view to ensure uninterrupted

0 f the crossint
' Rail. opera ti on due to ani
fault/breakdown of over head line crossings a fixed specified One hour block per y~a
~hall be granted (without levy of charges) b~ Railway to the State Utility/ Transmissior
lmeowner.
The State Utility/ Transmission line owner should ensure to produce EIG sanction beforE
charging of power line crossing and advise lhe d~te of charging of the power line to Sr.DEE/G.

~
~ o_ a.\-" ")
Dir. (L&A) ,
t
~.)
~
DF(X)-1
PROCEDURE OF CROSSING OF RAILWAY TRACK BY ELECTRICAL POWER LINE.

All the electrical Crossings of Railway Track by overhead transmission lines or cable are to be

processed and cairied out in accordance to the following:

1. The Superintending Engineer of RVPN shall submit all following documents initially:

S.No Document Required Sample


document
I placed at

1. Forwarding letter 9

2. Questionnaire 10-13

3. Blank Agreements duly signed by RVPN authorities on 14-25


non judicial Stamp paper of Rs. 500 each

i) Erection & Maintenance in English/Hindi


ii) Easement Rights trough Railway Land(Way Leave
charges) in English
4 Rough sketch of railway crossing 26

2. For online submission of Railway crossing case click on https://ircep.gov.in/WLRMS/Then


click on link "click here for online application". Fill all the particulars and submit the
application(at page no. 3)
3. Print the generated copy, sign and submit to Sr. DEE/G enclosing the above tabulated
documents with details including drawings , estimate, sag calculation and block time
required.
4. After checking of above documents Sr. DEE/G permits RVPN for depositing registration fee
amounting Rs. 2000 /-as DD or MR.
5. Feasibility survey to be conducted by Railway authority.
6. After checking, if the site is found in order, then a joint inspection of site shall be fixed by
Sr.DEE/G along with Sr. DEN and RVPN officers and a Joint Inspection report is prepared
and signed by representative of Railway and RVPN. (at page no.27-29)
7. Drawing of railway crossing plan is prepared by RVPN & duly signed by Superintending
Engineer, Sr.DEE/G, Sr.DEN and Sr.DSTE
8. Sr. DEE/G will send the details to following wings for making estimates
i) Sr. DEE/co ordination for Way leave charges
ii) Signal wing for laying of underground cables
iii) Operation wing for Block charges
iv) Electrical wing for Supervision charges.
9. After receiving the estimates from above wings, consolidated estimate for power line
track crossing shall be processed by Sr. DEE/G for vetting by Sr. DFM.

10. After Account 's vetting & sanctioning of estimate, demand note issued by Sr.
DEE/General to RVPN for depositing the estimated charges. (at page no.30)
11. Above mentioned three agreements will be filled & signed by Sr. DEE/G and Sr.
DEN/coordination.
12. The power line track crossing work eecution permission will be issued by Sr.DEE/G on
completion of all formalities i.e. receipt of demand charges, finalization of plan etc. &
intimation of the same shall be issued to all concerned of railway department.
13. The work will be executed by RVPN authorities under the supervision of SSE {P-way), SSE
(Electrical) and SSE {TRD) and SSE {PW) will arrange line block of the section as required.
14. On completion of work(at page no.31), a joint report by Railway and RVPN authorities will
be prepared and RVPN authorities will submit the same to Sr. DEE/G for final inspection
of site.
15. Sr.DEE will issue orders for final inspection of Track crossing with the Electrical and
Engineering Supervisors along with the representative of RVPN.
16. Final inspection shall be carried out in accordance with the Track Crossing Regulation
1987 and all measurements and clearances will be recorded. (at page no.32)
17. On receipt of final inspection report in Sr. DEE's office, if found as per regulation & as per
approved proposal, the permission for energisation will be given by Chief Electrical
Engineer & Electrical Inspector General. (at page no.33)
18. After energisation of railway crossing line by RVPN, the intimation of energisation of
crossing will be given to all concerned officials & date of energisation should be recorded
in track crossing register maintained by division in Electrical branch.
19. Maintenance of crossing:- The periodical inspection of all crossings shall be done in view
of safety as per the clause 9.2 of the regulation. The inspection shall be done by Sr.
DEE/AEE/Sr. Supervisor of the section along with the representative of RVPN at least
once in a year.
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
(An I SO 9001 : 2000 Certified Company)
OFFICE OF THE SUPERTENDING ENGINEER ( 400 KV GSS)
HEERAPURA A.JMER ROAD ,JAIPUR
No. RVPN/AEN-II/(C&M 400KV GSS)/HPR/ F. ID. I Date J--y /
I l( 63 10 I f.J

The Dy. Chief Engineer Electrical & Construction


NW Railways
Jaipur

Sub:- Approval of Overhead Railways Crossing of 220 KV D/C Jaipur (South-PG}


to Vatika Line in between Loe. no 140+6 &15 Spl. Across TP No.85/9 &
86/0between Chanani &Chaksu Railway Stations.
'

Please find enclosed herewith the complete case consisting of


'
following documents. for approval of overhead railway track crossing of 220 KV
D/C Jaipur (South-PG) to Vatika Line in between Loe. no 14D+6 &15 Spl. Across
TP No.85/9 & 86/gbetween Chanani &Chaksu Railway Stations:
1. Agreement on stamp paper in Hin.di & English -4 sets ( 1 set original+3 set
copy)/
2. Questionnaires -4 sets
3. Drawing of Railways Crossing case in tracing paper -1 No+3 copy

It is requested to get the case examined and arrange to convey


necessary permission to execute the work of above railway track crossing at
earliest possible. --,

~------~
Enclosed:- As above

Superintending Engineer (400KV GSS)


RVPN, Heerapura, Jaipur

Copy forwarded to the following for information& n/a:-


1. The Executive Engineer (PTCC) RVPN, Heerapura, Jaipur alongwith the complete
case of above railway crossing.
2. The Executive Engineer(C&M 400 KV GSS) RVPN, Heerapura Jaipur
~ssistant Engineer-ll(C&M 400KV GSS) RVPN, Hee~apura Jaipur

c.:=:s --- ~
Superintending Engineer (400KV GSS)
RVPN, Heerapura, Jaipur
E:\CTA POWER- I O\TRACKCl~OSINO\Trac~ Cru.<>..;in~ ! 1 .-,:" .,, '" " . , .. ".

ANNEXURE A 4.01
DATA, DESIGNS, CALCULATIONS AND DRAWINGS
CROSSING OF RAILWAY TRACK OVER HEAD TRANSMISSION LINE
(Form to be filled in_IJy th~_appi_icani} _ ------~---- _ _____ - -

a) Data and designs:- 11


1
1) Location of the crossing, ~ l?-.eM~:<'I -~'\l\""1 .. ~~.. I
1.
2) its distance from the nearest Railway station J~~~~~~~W
3) the distance from The telegraph posts on either sides of
the crossing, rnclud1ng number marked on the
~<m\o , "<J:-'0"t\f.---<l
r:-~. ~"'""'""i
si;.;.',t;,0~
.,,.:) ."' ,.,,m ~:ct?>-'~ 'bb I 0
6
1
<:>3-COM ,.,-~""' :-<:~ tJnro5 "I

T elegraph1c posts

l
(
a) System of supplies Voltage -AC-or DC- --- - -- ~~:Do~~-~ z. - -- ---- -.----11
b) frequency number of ph:.ises, _]} .50 \-l:z_ 13.-1'1'.,'t ;,

',
c )Size 0f conductor ~'<<A":'. ~-;;R ~ j
d) Weather neutral is earthed or not and 1f earthed. the ;s"'\~~~"""""Nll+\'.!.l'<4
type of earth. 1'\f:"':\-'<">~ ii; :so.D\d~~""*"
o....0 %\i:.'1,\<>.\-lflfl ~ ~
'---------1------------------------------'I-'~--e~~-TO~~~
3. Wind pressure adopted. l\s '4f. \ S<iYrr>
l-4-LT_e_n_1-pe_r_a-tu._r_e_d--a-ta_a_d_o_p-te-d-.---_-_-_-_---~-=--=---_---=--=-:-~::5':_-C....-L"""""_,_'_}'--1-"'-_0_,,__c__'!"-_'""_0_--
0
5. Particulars of ice/snow loading if any. Adopted. t--1 , "".

Factor of safety adopted in the designs


6. a).for conductors
b)structures, guard wires/cross wires if provide ~. '.2.., .o ..
earthwire, stay wire'
c)insulator-strings etc.

Design calculations of structures and foundations for


.......
pl''
the crossing span, communication lines or guarding if
7. any.
Note : If the structures and foundations are of
Standard type used for the transmission I

I distribution concerned, the detailed design


calculations shall be furnished.
Calculations leading to the minimum values under
worst conditions of the following.
i) Vertical clearance between the lowest crossing ~.\~".\6~.ct.\A-0. ....... ..
conductor, communication line and/ or guarding and ~.~.~!~~, ..... ..
different Railway tracks in the crossing span. '\\') . \..i,~ ,- ................ .
ii) Vertical clearance between the lowest crossing 0 ............................. .

Signature of Owner
---,

c::s------~
~ :~ - perintending Engineer
As<>tt, Engineer-Ii (C&M) _ (400 KV GSS) R.V.P.N.Ltd.
400 KV GSS (C) . - i-iue;ra;:;ura, Jaipur
RVPNL, Heerar.ma .... : .!!
/.
f --
conductor, commt,mication line and/ or guarding iii) No. ~~'!'M.>J>\:-1 S'M.<t<~
Railway's conductors of the traction sys tern or other A':<.~\9.~.e':f>~~.~
conductors if any. -.,9.1)~~ ~~~ ......... .
iii) Horizontal clearance to Railway mast I structure I
building, if any. \i)~(~~~1'~R.~~
iv) Lateral clearance to Railway mast I structure I ~ s-1.A\~ \2i:<:nm M~ ..+
building. if any. I'i' _,,.. ,.n. ,,.,.......,, ...c:::o,....., ,.....Q.
't\~.YtJ.')n..' I
-<'1.-. . , . . . . . . . . . . . . . . .

Note: Full particulars of the 11umber. size, m<Jteriai and @ -;:~ u,l_~ :"l-\1,, C:<""" S\e<,l_Q
dl<C\ \\o~\=="''fo"f'\'.'\.9<.
1
characteristics of various wires and co nductors be
~\J,,..-...,\]SW '.})~~
I furnished
----- -- -
S\ed

9. Particular of insulators, bridling of the cond


' -------
10 Details of guarding, size of guard and er
their characteristics. A detailed drawing
1
guarding arrangement, if provided. shall b

. 11

12
Size and characteristics of guy wire if p
the number of supports.
--------- - - - - -----
a) Details of earthing indicating the earth electrode,
b) size of earthing connection
c) method of connection to the support an d the method
of artifical soil treatment if proposed. Details of
counterpoise earthing, if coriiemplate d shall be
furnished.

13 Details of protection against moving-roa~ ehicles .


.

14 Particulars of anti-climbing devices. if p rovided and


warning and caution notices.
15 a) Detailed scheme of protection for the tr ansmission I
distribution line including particulars of rela ys operating
times etc
I b) Particulars of c1rcu1t br.;akers, 1f any.

16

17 Details of Adjoing span of the crossing l.bc,, 1.,.~ - \'-11>>,.(,, LCiftih'


33<)"1

i---,.-4~~-------- - - - - - - - - ---i-=Ub= I"'> S \>\-D((;~l>\~)- Lo\\cS


18 Normal span length of the power line
<.?>5 C) r<)

19 Crossing span of the power line

L~l_c_r_o_s_s_in_g_a_n_g_le-of the power line

Signature of Owner

~
~ ----- -f~-
kl.ltt. Engineeill (C&M} ' Superintending Engineer
400 KV GSS {C)
(400 KV GSS) R.V:P.N.Ltd.
R\/PNI., H~or~puno Heerapura, Jaipur
f \C I/\ POWER-10\TRACKCROSING\Trnck Cr,,~~ng
0
1 liANNF:\l IRf:: AL01 D;na Dr.:'.'ign~ OH

21 Height of the Tower (KMs. in Ascending Order

i) Right side
ii) Left side

22 Disiance from centre lineof~ \,,;ck to-structure-r------- -----i


(KMs in Ascending Order ) 1 I
ii) Left side
1) Rigl1-t-si-de-f--1_ _ _ _ _ _ _ _ _ _JI
l------1r-------~-------- ----
23 Insulator KN ~
\-:t.a>\L. ~ (_~'-eM;S{ CJ"S)_)
~~-~------

24 i) Type of Earthing , \ ', \\ \>e- ~'(._ ~"('M{-r-\s

ii) Value of earthing resistance p) ks J1., (}..el$'~~


c - - - - - t - - - - - - - - - - - - --- --- .
25 i) Type of circuit breaker --- -- --F\:i;, ch-o..,,\- fu""'\<-..;;.., - !
ii Tripping time of the power line -------
0 \D Sec..-
26 Deviation Angle of adjoining structure ~1> \ <. ~o '- \3.0 301(/.;T)
W.e.Nl \b ~ '.. <;.'-lo 25' (_It{_)

27 Sag at centre of the track

-u... \_\ 'b -'t"I


-1 '
I) Maximum at 75C

ii) Minimum at o0 c
'L- \Ob 'NI
--------
28 Height of the conductor from the fixed structure to
Ground level
( KMs. in Ascending Order)
i). Left side 2';1-' \D 'r<)

ii).Right side
29 The number , size & material
CDT>()i.\~ t>,cs:R...,_~
i) Conductor
S\~..:. 54\S\V>...,,....:, (\-C +
i) Earth Wire "'l-\ ~-\~"""" .,.~-~
:s)} ~"{\\-., U)~ '. r\'-\O T11W1'!.ja.Q
~~O\ \\o'~\ 'M"rn ~~"J/hf
(f.Jl~'I'\\~ s::iea9 ul~

c.;:;;::::::------..~ure of Owner
s u.. <Q t ::::::>
p~~n ending Engineer
~ ("fv:; h V GSS} R. 'Af>.N.Ltd.
~it. Engineer-Ii (C&M) Heerapura, Jaipur
400 KV GSS (C) .. '
RVPNL, Heerapura
E:\CTA POWER-! O\TRACKCl{O.'-' I NG\Trni;k Crn~~111g 1 lJ ANNEX\Jf\E r\11 .01 Dnta Designs OH
@
b) Drawings:-
Layout and site plan of the proposed crossing
I
f---1----
1. indicating Railways boundet1ies.
Longitudinal elevation of Irie crossing. The drawing I .
shall indicate fuli particulars of one span on either side 8'Jl.oul0) ~'vi ~<!!_..
2. I of the crossing span with various clearances with
1

respect to the Railway track(s). The drawing shall 1 ~L\.a)<'pcd> c\ ~UY~"-\;


show the crossing-section of the Railway formation
and tracks.

Drawing for warning and caution notices.


Note:-
I
i) All drawings shall be in standard sizes as
I ~w~"'t
prescribed in the !ates! edition of IS 696-1972
"Code of p1actice for general Engineering
i -t~l tw'l:r' 0
Drawings".

3. 'ii) All drawings are to be endorsed with a certificate as


given below:
"I hereby certify that the details of.the equipment
, providei::I are designed with the object of minimizing
danger in the event of breakage I fault and in
accordance with recognized modern Engineering
' _ _I _
Practice". And signed by the owner.
_J

******
~
f~tt. Enginer:r-11 \G&~'l)
400 l<V GSS (G)
RVPNL, Meerar1ura

-~

~ ._./

Superintending Engineer
(,tn;: !n/ '"'"'"')
"-'~,, .....
h~._.R \LL., N . Ltd .
.~r.

h"' .;; :_:;;:Jra, jsipur

Signature of Owner
)\
\ ~\
~ ""'' ...
tl. '"' ' l ' . I i; '
' '
......

,
Annexure A.4.02
AGREEMENT FOR ERECTING AND MAINTAINING AN
OVERHEAD POWER LINE CROSSING OVER AND ACROSS RAILWAY TRACKS.
AN AGREMENT made this ............... day ......................... of the Two
Thousand and Thirteen BETWEEN THE PRESIDENT OF INDIA acting through the
Chief Electrical Engineer/Divisional Railway Manag8r I Divisional Railway
Manager(Electrical) of the North Western Railway administration (hereafter called "the
Railway") of the one part and

..................................................................................................................,
(hereinafter referred to as "the owner" of the other part.WHEREAS the owner wishes to
erect an electric over head line and carry out .the works connected therewith for
transmission of distribution of electrical energy over ancf across the Railway tracks and/
1111Pr land at kilometrage KM No . .. . .. .. .. . .. .. . .. .. in the section .. . .. .. .. .. .. .
between.............................. .. .. .. .. . Railway station, cf the Railway, the said
overhead line where it crosses the Railway trac~s and I or land works connected
therewith hereinafter referred to as the "crossing." '
Now IT IS HEREBY AGREED AS follow:
1. General: The Railway will permit the owner as from the... days of
.. .. .. .. .. .. .. .. .. .. .. .. .. . .. .. .. .. . ... to lay the crossing as per Drg. No.
ORM/JP/ ................... approved by the Railway hereunto attached as Annexures and
in compliance with Regulation for Power line crossing of Railway tracks hereunto
attached as Annexures hereinafter referred to as the Regulations, for the purposes
hereinbefore mentioned subject to the terms and conditions hereinafter contained
ee

c:::'.5'---.~
Superintending Engineer
(400 KV GSS\ R.\..Lf>.N.Ud.
,

Permission to erect and maintain the crossing : The Railway will. subject to
, provis.ions ofclause 3 hereinafter contained. permit the owner to erect and maintain
accordance with the Regulations the crossing over and across the Railway tracks and
ir land at the place(s) shown on the said drawing and to execute all repairs in
nnection therewith when necessary from time to time and all such works shall be
ecuted at the cost oi the owner at such times as may be permitted and to the
tisfaction of the Railway in all respects Provided that if shifting of or modification to or
;mantling of the crossing is required for the proper functioning of the Railway and is
be carried out by the owner <JS desired by the Railway, the costs of such works
1all be borne by the Railway except in those cases where the need for such works
i account of Railway's anticipated development/requirements was foreseen in time
id the owner had agreed in writing prior to the construction of the crossing to meet the
>sts of such works.

Railway to carry out protection work!' . In the event of it being necessary in


1e opinion of the Rc.ilway to support or protect the Railway tracks and I or land or works
uring the erection of the crossing or the execution of any repairs thereto or any
~moval thereof the work of supporting of or protecting the Railway tracks or land and
~sorting the tracks and I or land to its original condition or such part of the said work as
1e Railway shall deem fit will be carried out by the Railway at the cost of the owner in
II respects. The amount of such costs will be determined by the Railway in its absolute
iscretion and will be paid by the owner to the Railway On demand. The owner will, if so
=quired, deposit with the Railway prior to the carrying out of the said work such sum of
ioney as may be' estimated by the Railway to be the cost of the work required to be
lone and the amount of the said deposit will be set off against the said cost to be
letermined as aforesaid and the balance paid as aforesaid.

k Cost of superv1s1on of works All works in connection with the matters


eferred to in clauses 2. 3 and will be subject to such supervision by the Railway as
nay be considered necessary by the Railway and the owner will pay to the Railway on
:lemand all cost of such supervision including the cost for the staff required to look after
:he safety of the Railway tracks and I or land while all or any of such works are I work is
.n progress. The costs of such supervision and other costs as aforesaid shall be
determined by the Railway in its C1bsolute discretion.

5. Access : Neither the owner nor his employees will at any time enter upon the
Railway land for any purpose whatsoever in connection with the crossing as aforesaid
without the consent in writing of the Railway.

c:s- -- -----,--~
Superintending Engineer
(400 l<V GSS) R.W'.N.Ltd.
Heerapura, Jaipur
I
I

l' M d.f. . h ft
0 , I f
o 1 1cat1on, s 1 mg or remova o crossing
. .lff ,
or convenience of operation,
@
nsat1sfactory maintenance or for any reason whatsoever the Railway desires special
aintenance, repairs, mod1f1cat1on, shifting or removal of the crossing the owner will
E ubject to the provisions of clause 3 hereof carry out such works or such portion thereof
ifrom the date of notice issued by ihe Railway and to the satisfaction of the Railway
within a reasonable period determined by the Railway in its absolute discretion as the
Railway shall not under provision of clause 3 hereof proposed to carry out the work. If
the owner so desires he may re-erect the same at this own expense but to the
satisfaction of the Railway in all respects on such other land or trcick of the Railway, as
it may in its absolute discretion consider suitable and available for the purp5se. In the
event of the crossing being so re-erected the land on which the same is re-erected will
be used and occupied upon the terms of the Agreement mutatis mutandis, as if the
same has originally been subject to this Agreemerit.

7. Termination of Agreement by the Railway: The Railway may be any time


(and from time to time) be at liberty in its absolute discretion to suspend temporarily and
I or termi;1ciie this Agreement and aii or any uf t!1e privileges hereby granted upon the
expiration of three month's notice in writing of its intention to do so being left at or sent
0
to the registered office of the owner I and not withstanding that the owner may have
executed any work of a permanent or temporary character and incurred expenses in the
execution thereof. The owner shall not be entitled to any damages or compensation by
~ the reason .of such termination or suspension

8. S'ame as otherwise provided in this contract, all notices to be given on behalf of


the president of India and all other actions to be taken on his behalf may be given or
taken on his behalf by the Chief Electrical Engineer/Divisional Railway Manager I
Divisional Railway Manager(Electrical) of the Railway.

9. Termination of Agreement by the owner : The owner may on giving to the


Railway one month's notice in writing terminate this Agreement and such notice shall be
sufficiently served if sent by registered post to the Chief Electrical Engineer/Divisional
Railway Managi;r I Divisional Railway Manager(Electrical) of the Railway or left at his
office.

10. Termination of Agreement for default : In the event of the Railway giving
notice under clause 7 hereof for special maintenance, repairs, modification, shifting or
removal of the crossing and the owner failing within the time stipulated to carry out the
._said works except such position thererif as the Railway may propose to carry out under
the provisions of clause 3 hereof or in the event of the owner committing any other
breach of this Agreement or any part thereof, the Railway shall be entitled in its absolute
discretion (notwithstanding the provisions. of clause 8 hereof) to terminate this
Agreement and all and any of the privileges hereby granted upon the expiration of six
month's notice in writing of its intentions to do so being given in the manner provided in
clause 7. ~

cs
Superintending Engineer
(400 KV GSS) R.V;P.N.Ltd.
Heerapura, Jaipur
.I i
Ir1.
!'
i~
t
Removal of crDssing: Prior to the termination of this Agreement ani:I subject to
ithe provisions of clause 3 hereof the owner will at his own cost remove tfle
.:>
crossing
'from the property of the Railw<:Jy and restore the land to its original condjtion to the
satisfaction of the Railway in all respects. In the event of the owner failing to femove the

.
said _crossing and restore the iand io i.is origin;ii condit.ion in the manner hef,e_ in before
provided the Railway will be .entitle at its option 11nmed1ately nfter .the termination of this
Agreement to carry out the work of removal of the crossing and restoration ;of the land
without being responsible for any loss or damage what so ever to the said :'crossing or
any part thereof. In such an event the owner will pay to the Railway on demajid all costs
incurred by the Railway in connection with such work including supervision charges, the
amount which will be determined by the Railway in its absolute discretioq The said
crossing and the materials usec1in connection there with and belonging to the owner will
be and rem<Jin the property of the owner but the Railway will be entitled t6 retain the ~

same but without any liability therefore until the amount of such costs as aforesaid have
been paid by the owner to the Railway. ;~
l
12. Indemnity: The said crossing w1il be used at the sole ri::;k and resp1:msibility of
the owner. If at any time Owing directly or indirectly to such use or to the E!xistence of
the said crossing or to the carrying Out of the work of erection and I or rep~ir and I or
removal of the said crossing and restoring The land to its original conditio;n or to the
exercise by the owner of any privileges hereby granted or to any other cause' arising out
~ of tha operation of the agreement any damage Will be caused to the Rail\V~Y or to the
permanent way and works, Rolling stock or any other Property of the Rail'ftay or if in
consequence of any of the matters aforesaid or of any default In fulfilling} any of the
conditions of this agreement or of any negligence on the part of the owner or any
person connected with him, any claim or damage or loss be substanti~ted by any
person or persons against the Railway the owner will upon derr>and pay fJrthwith and
make good the same and shall also make good to the Railway all costs an"d expenses
which It may incur in regard to any such claim or damage or loss as afor~said. In the
event of there being any dispute as to what specific loss and I or damage has been
caused by reason of any of the matters aforesaid such dispute will be refrred to the
Chief Electrical Engineer of the railway, whose decision thereon shall be final and
binding. f
13. Railway Accidents : The Railway sfiall not be responsible for an} damage to
the crossing and other property of the owner due to any accident in the wqrking of the
Railway due to any cause whatsoever. 1 ;
~ &
14 Sub-letting : The owner will not sub-let, transfer or assign this Agre~ment or
any of the privileges hereby Granted without the previous consent in writing of the
Rai~. ~
-;~.
e
15. Limitation of rights Nothing here in contained will be construed as conferring
upon the owner or his permitted assignee any rights over the property of the'.Railway .
. !
io

~ ~.
Sup_enntending Engineer
(400 KV GSS) R.1..P.
Heerapura, Ja .pur.N.Ltd
. ..: .
:'
'11
J.,_
_
'
);
j
--~-
~
16. Cost of Agreement : All costs and expenses incidental to the pr :fration and
completion of these presents including Stamp dut'/ will be borne and paid t the owner.
17. If at the instance of the Railway, the crossing is to be shifted c .riodified or
disr.1antled, the work shall be. carried out by the owner at. the cost of 1e Railway.
However, in those cases where the need for such works on accoun (:Railway's
anticipated developments I requirements was foreseen in time and U qwner had
agreed in writing prior to the construction of the crossing to meet the cost . >uch works.
Such works shall be carried out on a priority basis by the owner within a f. d. schedule,
as mutually agreed upon between the owner and the Railway and to the tisfaction of
the electrical inspector. The Railway shall have the right to claim camper lion for any
loss and/or inconvenience caused if there is avoidable delay in completin~: .e works.
In witness where of the parties have here unto set and su: ::[ibed their
respective hands and Seals the days, month and years respectively men n_ed against
their respective signatures.
<.:::= ..,-- ~~
' Superintending Eng Superinten 19 Engineer
fg~~~Yt~);R=~P.N'.~:;[r ('l~KM~ IRAAF.N.LtcJ . '
. eerapure, Jaipur .. 1 leerap: l, Jaipur
Signed at . .. . ... .. . .... ..... .. . .. . . ..... by Shri ..... . ... For and
behalt of the owner in the presence of:
'
1. .(Signalur~~j'. 1dess)
-i;
'
2. -Al
-'--
itness)
i
l
. ~-

Signed at . .... .............. ....... ..by Shri . {For and


behalf of the President of India in the presence of:
'

1. Name: .... (Signatur : of witness)


Address:

2. Name:
Address. (Signatu~ of witness)

Note. 1. In the case of Railway companies or Port commissioner':.


Railways, \he term Chief Electrical Engineer wherever o. ;urring
in this Agreement may be replaced by designation of tr officer
en whom the.duties of the Chief Electrical Engineer dev: ve.
2. The agreement should be signed on behalf of the presid nt of India
By an officer duly authorized under Article 299(1) of the \\
Constitution of India.

*****""**~*****
. ,--
f
I
l

,
..

3fPPl K- 4.02
l_(')_q~__ di_9U1QIT 3IB-::Yl<&Yfl f"!_;gq_~_Sl'llf~fi ct qftF1i:f101
it<T_::lii<~ cf;_ ~-'.!iIB_:-:
~ CF1R ~ 'C!<BCflr{ ct~ Ti "3CTR qf~i\11 'tC'J >mm"! ct :!&J f"1-si0l $-siifi''H I
fl'iUW m ~'<re!> (~) ct i:rrum ii ~ii '4ffil ct {1'?'1fct (fir;%'~ 3Wt
"w" ~ Tf1TI %) ~ sm 'q~ cf; ~
Ti ..................... :............................................................................................
...................................................................................... (flrB ~ 3Wt
. "Bnl1T" ~ Tf1TI %) cf;~ 3ITT! ~ .................................cFr fcfi'n Tf1TI I
~ 'tC'O ct .............................. :.............'t'C'O ~ en: <9US
............................Ti fcf;tjt ~ 'C!-i: ~m ~ I <TI ~"! ct d11R ~ &ITT- 'C!R ~
~ .'3"'1it BJt'1 '<>lfWr cnr i:ifi:f;p:f 10 I ~ ~ o;;if ct fl ...;i "-! 0 I '1T fci<i {I) I ct fui:r.
~ ~!Of(f cw:f CfiB liJIQdl %, TcRI ~ ~"l "ffiJ' ~aj ~ I <TI ~q(f ~
ct f.r:fruT CfiT<D c@ 111\ <f.'\ctt t '3B ~ aW\ 'hlffiI Cfi'ITT 1T1lJ %a:rci: q:ac;!,;lll

cs ::)9-.. B"i I'ifl-"-


Superintending Enginee!"f.i:i.~.
q, Qt<lll'J<:

(400 f<V GSS) R.\kP.N.Ltd. "


Heerapura, Jaipur
J!

'
,.r
1 ~:- w ~ cfit ~ ~ "3f~ >1'1'1"1rfl cf; fu11: <l1ftm ........ .
w W\T <llj'1/fc;a 'l:&1f'"1~ -B......................... -;;fl~ m~
ii
~m cfi ~it~ t cfi ~ m, w11m q;r ~ ~ Cfi1f.ri11 cfi rcifFl41
. .
~
.. .:... , ;,. .,
~ ffi<-i -31~jcl~TT ~ <:i11 11 ~ ('.
....... r"'
-:mt
~~, -"'-
l'll""D ~'t-1~ ~1~1Cl1"1lll1 CfiQT Tfm ~' ct>

31j41"H it~ 3-i!ir 31ctlcJQ f.:m~Rr 3ffi ~~l <f> :;:rtif.1 CFJfuri fc.mG CJi1 ~~IT
2. .'l'.ff41 CfiT qftf1i:f101 am~ ~~ ~ 4'1 3'!'.'@'T : w ~ 31P)
~ Tsl1T.5 3 <F ~m cf;- 31'tfr;r ~ ~ Cfit fcif+qi:Jr cfi ~ =mcrm
3ffi I '1:!1 'ifi1 cf> &=R 3ffi -31R- W <fcRI JTI't& it ~ ~ 11<: CFJfu'rJ CJiT
qf{f"JqfuJ ah ::iry:~ q;f.I 'd211 ~ -w:<i'tl it -Q:m ti'4t y{t:qtj' cn8 q,l -;;fl
"i:r:i W1<J 'P: 3:rlcf'~ m. ~ ?,-m ah itil ti'>ft q;p:f ~ cF1 ~ 'H am
itil W1<J Cl<: fcnQ. "'1Ti:ri'\ ~ . ~ fcni:n 0!111:. m ~ 'l(CliR it m Cfit '1'111~
Q11 it f-1 tJ:i I fc; i1 fcr.i:r. '.JfT1f.'T I

~ <rti; t-0 cf; Bi:tf'"1a i::i"'cc1"! cf; fu!J. 'f.Tfurl Cfit <"l'lHiaRn Cfk!J m ~
:~'CR~ <lT ~ m m
311Cl~l1Ch 3fR W ~ ~Oi91j<11{ ~ 'ChT<f ~WU
~ '3IRT mir 1l:B cwn q;r ~ "3"I ~ cfit ffisCf){ ~ 1l:B cwn qi'\
311 Cl~ ll cfi\11 QT , B W\T CfQ'l q;'r ;;nirft I
3. . 'w '1'T m~o1Cfl14fCfll fc:fl'l1Gl111 : Cfilfur1 CfiT q({f.111[01 ~ CJfR <lT
~ mum ~ ~ <lT ~ ~ ~ * ~ w qi'\ w:r it "ll'fu: w 'Ym' am
1'<1l ~ m ~ 'Ch1<if cfit ~. m m~ ~T 311Cl~"lCfi JITill ~ cfr ~ m
~ it 'We!~! m ~ Cfit ~ wITT m ~ m~ q;f.I m t?qtj\ m
m
'ifi1 cfit m ~ f.fl:lfor CfiT<f cf; il:B 'l1Tl1 cfit. ~ W\T cftq; ~ 0!111:; ~
~ W-Tfu it "0R ii ~ "Wf w
&m ~ >rCflR it ~ q,l ~ -q<:
fc1i<TT ~ m -zm
C"flrffi q;r TCl1i1 CJiT 21cl't:fRUT m im ~ "r1f fcfctq:; ii
fcflm ~ affi W CJiT i:rf1l 1ffiCITl1T W\T 6B'CfiT ~ fc!:;<:rT ~ I <rti; 'Q:m
3iG'a:n qi'\ ~ ~ ~ CfiT<f ~ it 'q:cl w cf; '4rn 'Q:m mit ~ aj:Trr ~
~ CJfR cf; f(;nz 3filf'imr f.:mfuT q;p:f CliT ~ \>1l it * m
f;Rl SllC!Cfif0a q,l ~
m ~ 31CI~ q;r CJff.t ~ TcKI .~ cfi ~'ti it TcKI f.l~ q;r til1li q;r
:pRr fcni:n ;;rrilTfr am m TCfit'I' CfiT i,:fzy:i ""Im ~iR'I mr ~ 1
I!) I!) - rcntj\ cf; ~a,n:

cs ... ~.'4."3.
Superintending Engineer
(-100 KV GSS) R.V.P.N.Ltd.
Heerapura, Jaipur
I

it~
'

/ . 1. - - ,. 'l'lil""' <it - ' - 2,3"1< 6 - ,.


1 -B<i"' ii 11'lft W!fur ~ Cj)j m &Trr ~ i;rcm 11"'fci?<l1Tf fcfi<lT ~ ~ m
' 311 Ci ~4Cfi ~ 3ffi ~ W -~HT l1frr fc!;i\ ~ -q<: -Q:i'l -q<:fcj!WJ! Cfit ~ ~
Cf,T dTT i'Jj! "B'l-ft ?:IT fc!ajt' f1l'lfur CF1'f ctr 1lTlfu ct ~ ~~ 3ffi ?:IT I ~ Cfit .

m<;n off ~~ "CFG c1; R1l!, ~l\l(l ~!n'~,1- Cf~ i3"fTRl Cj)j "11 ~ ~ 1

i'Jj! -q<:fcja_{U! CJi't cwIBt :im 'J9.ll 'l"fCR! 3Fl 0Tflrii cr;i :irq~mrri mbRT ~ irit o

f'Ci CJ Chi j {11 { fcl;orr ~ I

5. ~ : ~ "l:[f3"HCfl Ch i:f ..-ml fc!ajt 'ifr B1i7-l m 1Jfii -q<: m cFr f0 f@a
"BP1fu ci;" mi <r~ ~CK! cprfu'rr <t "B"Rl"< ii fcR:ft 'I-ft 9 l:Ji '1 '1 cf;- fuTl, ~ ~ o

cR'Tl I
6. ifilffl.'I ir omIT'tT"I, : 7:!fc; w YR'910'1 er,-'\
~1'1HH 0 1 "Cfi"{'11 ?:IT ~J'ZRT
tffer~.rf cf;- fr:>,1!,_ 3n:f1'11~ 3'f1{P.fU! cf; Chl{Ol'~l fcR:fr '!ft 3-J-r;::q CFRlJf B ~
cpifurr cf; ~ ~P.fUT ~, TJ~, ""1Rl:mui ?:TT "3B ~ C!iT ~.JT cma1.
t <fr BW11 ~ ~ 3 cf; "311C!m cf; &1tit'1 ~ ~ f.r:ITUT CF1'f ?:TT ~ 'lWT CfiT
~ &Trr ~ ~ CJi't cnfus! -B Ru:rR:l ~ .am m NU -.mcF irit
rci~Cfiljfll{ 3ic!~ ~ B-i::r<! ot ~ m q;r "B"G"T~ ~it f1DLJ1r<a ~.
~- ~ ~ 3 cf; "d'f"Cim ct 31tjj-;, ."<lQ CfiT<f 'h'> ~ ."'1Eft fcf;orr "1T'1T %I 7:!fc;
BW1T il:Bt ~ cmaT t ci\ CfQ w il:Bt 3Fl 'irf4 ?:TT m TJ9-J fui'! w 31i:f.'! 1rif
rci~Cfiljfll{ ,.,,cig:Ckl ~ am -;;fr dCk1 >11:Ji"1114" ~ mTl<: :wR ~ i'!
"3BOfil "Tf: qfl:f14fo! qi{ m %~ -~ i;rcr;r.: B m c@ "fl'TI'tWi"ll"G: ~ it
~ CfiT ~ m :rr: qf{f14fo1 Cfi"{Ji\, ""1"R ctr W<cft ir CfQ ~ f;m -q<: ~
:ff: qfl:f14fo1 Cfi\f4T -rr:rr t, ~~cf; fuiiBT cf; 31tjj-;, ~ <r~ qf1:<fo1.T
~ -Q:i\ d41:Jl 11 am &lf'tT'4P"f it "0T7:ft ~' iiFl1 CfQ ~ Ql1 B ~ cf;
&! vrtjj-;, uft mI
7. mmu <RR qif q<fq fl 11 : mc@ M mB-i::r<! cJfll: <.=!li4 <.=!li4 Tl<: )
-311B ~ ~ -B ~ OTIB off !a ~a1 mrft qi\ % w CfiU"1: am ~ &Trr ~
"B"'lfl ?:IT M fci~lq1f'tTCfiTl Cfir ~ Ql1 B l'"ltif<ild cnG m I ?:!T q4cifoa cnG
ct &li:R ~1<1- 'ciit <ft;i 1im CJi't f0Psk1 "f['9"'1f BW1T ct lf"l'.lct;>a Cfil4f04 ir
01scti< ?:!T ~ ~ off &!Cff'tT off fl41M cf;- CIR B1. OTIB cf; ma ~ '!ft fcn"
~ "'1 ~ G!T ~ ~ cnr m m
f.r:ITDT CfiT4 fcfi<lT % -mcf> fuTl. 1Sfi'.f
fcf;orr t
~------<2=-.
~~~erlntending Engifi.l!!Wcf; QWfW.
\'C10 KV GSS) R.\AP.N.Ltd.
Heerapura, Jaipur Cf.Tl :z.
. I
f1 <.+iFi cf; " , fcf;;efl
. . ..
j <'f'fll f+<H <!! >!fem CfiT ~ ~ mm I
n-IT='

I
;
8.
---'-
~
-
"'."5-f?i qf0T
0 @
~
1l
. it -31-'ll'.!T <ll'.!T ~'<.IB
. ., '
'8-:l'i!IJ
~ _.;...,.
,)1R ,j'1'1I! 'j-jl(
Cfft 'l.Jifu,
'
'B
'111!
-A ........:. --::+
-
cf;- <:I Qqfa Cfft 3ffi i;
".;+ . ' ,> ~
ctd '.Jll1 CfiC'?! TI~1 ~ Cf)lll~1$lll
cit
t l "" ' .
TICfit di1: {p cf.~ ~ ~:Jflf.PH .rr:f'JW TB >!Ci~ I "I~ tc~ >fCii;jq.,
(~ ) <:.
ilITT CJft ~ I
cit
l'
IBr .:!' ~'!i!... q<fq {ll'j : ~ ~ cFr ~ ci:;m ci;r q>fcrn l'1 cn8

:'\l-F.,,f0"'"f@=a ~ ~ ~ qi:li'lfA\"1 Cfi<: ~ an iJ,-Bt ~ 1Plfi:a

~ i'l <lf!1l cfi't rrm ~ ~ <iR "3i'l m cfi- ~ ~ ~ ,,n r14{ / ~
~ >fq'~ ~ 'IB ~~ C ~ ) O!i'r <:F"1+<;;1ctict srci; f;TU ~ fu'1T 'SfrctT '&
<rT ~ C: ~ i\ Ws. R<:rr ~ t- I
0

~ .
10. cx:rfc... ;ir_<f. f'lq; Cfi_'(i{ 'fiT ~tf<Hilj : B zyJ CFTfurT cf; ~ ~~,
.~
~' -311 {", 'f."-1T'!l"ct<'Jf<!T<ro'..........O.'fc ' - -&,.,
0.01'1 Cf; C:O\O)>+ief> 19DS 7 q:; ilFTR ~ 1<...'1:

"1f.i cFt ft: i ii\ 3ITT ~ STU dcRl f.ii:ituT cwif oR d'1Cf; -Q:B 'llfTI ciit ~<:,
firil TB "3' ~t<9Us 3 cf; ~ii! cf; 3!$1 f1aofc;a ~ Cf>T mJCI Cfi't, ~
~

'111ll ~ m f1i:q1fc;ct Cfif.t i\ ~"Wt 'lit W-lfu i\' <!!~STU~ Cfi\11: <TT
~ fcfim ~ ciit 'lf1! Cfif.t cii't W-lfu it m O!i'r ~ ~ fcrc!cn il c~ ~ a
i
cf;~!f{. 1ci '1< ) ~ <!IB CfiT QCfi .~ fcn ~ ~ Clim .:im ~ s:ro ~
1fci~I 41 f'tRil<: ciit q<fcifi.:;a cnf.\ cf; ,-.,m 1'ITTT"l 'lit T9US 7 i\ ~~
Bifi <IT fcn ~ .
tlfu il cit c ti6 l1R'f Cfft fufuR! "lJ"rl'ff Cfft +i41Ni i::n: ~ Cfim ciit 44<'lfBct Cf;{~
t ' --
~
11. q;if: iq;) *
~ = ~ Cfi\11: 44ciB11 i'l ~ an~ <9US 3 ct ~m
cf; 3!$1 T- :ft a:rRt ~ i::n: m 'lit fl Aj fro i'l C\il p.j' I C!ii QGI ll>' II I m ~ ~
qi\ .~tjt ~ :iT i; ( 'i;-
m
cfil '141~ ~ it ~ <[cfcrct W-lfu i\ >R'<lfcffifu Cfi'trTT I
~ ~ i?r ~ i\ (i~ ~ "!fi1 ciit ~ ~ ~'tI ftfu i'l ~ ~

...
W-lfu it',. t i Cfif.t i\ a-r<:rq1~ wi CJit ~it' m ciit ~ ~T 41aflcfi wrr
WT. cfil ct ~ C!Tffi fcf;Bt mR <!! jCfiB 1'11 cf;- ft;>Q, dm F; 141 SQ: ~ mqijq:; il ~
Cfim ct 'q<: BR ct ~ ~ <Jil ffi' I C!ii QGR .:ifR 11fi=! Cfl'!k41 Cld'i CfiT CfiT4 cnG
J ----

CfiT Qefi~ I' ~


e e ' c:::::, . ~~
BWiT #~PJ<:-
" Superintending Engineer
(400 f<V GSS) FtV:P.N.Ltd. <12""4 ~
.,_
~
Heerapura, Jaipur
l
-Q:fi1 W1Tir if ~, 'ifrT ~ "lR m ~ ~ ~ C!1fllT cfi ~!i if 't0- &m "3111IB
.,m cwIBI q;i nm 'q<fcr8;1UJ 'J'lf!ii ~ ""11 w &m ~ 1r1f ~ it
f.lmfur qiT ~, CfOT Ui'W'J ~ I ToK! ~ ~ ~ ~'t"f i\ il'llfi'I qiT
~ 6i1': ~ CfiT ~ ~ CfiT BUffCT"l WTI ~.~ ~ ~ f;ro ~ cR
_, '"-~~
-q:cI/cf\l i:tm C'J1m1 cn1 \cti"I
. ~-="' ' f\ .........,_;,._.
Olll <=lCJli 1c;o~. "ll'i GCfi B ~ f!Pi CT1 Olll do1;1c;o fuv.
3 C'<1 l?.,l':i) ". fiFfT >rfumftl fcn'r( ~ qiT ~ mrIT I
12. ~fa'"Jf<i' : dCFl g:;rfurj Cf;!~~ cf; Q,Cf>L\I~ i'if@q 0 .3fn: 3\i"W";/fi~itj
m ~~ 1 ~ ~ B1i<l 1Tc".!IW!: <:n 31J;[NIW!: iti:\ ~cf; Cf>RUT 1~1
"3CR! ~ qiT c Rm-liRill "3Cffi Cf.Tft:irr cf; q Rf"i q fur ~ I <fl q {4/ ("j ~ <fl
~ ~cR cf; Clir4 CfiT l'1"'1i<;'1 cnG ~ ~ cR ~ ~ W1fc1 i\ \F"l/IClfcf'ri
CR"~ <TI~ f;ro ~&RT ~0t! fci:/141f'ITcFP: q;] ~<i'tTT cnf.\ cf; 'Cf>RU] .:;f~
~ ~ cf; ~ it <Sc;'!'@ fcR:ft 31rl.1 Cf>RUT it tr> <it <:n Wi:1~ crm f.n:ITur cwl,
CJi'r ~0RJCF: <TI 't\3 qi'! fcR:ft ~ 1.'rPTim ciil ~ :rmr-" ~ m7-fT ~
fcR:ft '>ft fclw:i <TI cFr ~ q;] 1ffi'J.1 cnf.\ if fcR:ft Cl~ fCk1 '*' q <TI ~ qiT
B'I. CfKR
<im i'l .:;f~ ~ ~!i(l fc!im O':!fcRl cii't 3ffi i'l fol:; 7T'ft oo ~an cfi qf1011Y
~ fcnm 02:/fcm <TI C2J fCR14l f;ro B cf; 11l'<l!i if cRi zyn <TI jCflB I'1 <TI mf.l
ff'lf; m~ %ci'T BWft l1'r1 fcn'r( "lR m ("lfi'hl0 ~ ~ cn{rn ~ 3B
TfliTQ:'TT 3ffi w
cfi Yl "l'i'>i't ~ ,1ffi ~ cF.\ m1<t>1q:11 -;;fr ~ <:!m
cr.cifCR! fcR:ft ~ zy'1 <TI jCf>fl l'1 '-lT mf.l cR <TTC\rl ~ Cfi't I ~ ~.-!O! if fol:;
~CR! fcR:ft '>ft~ cf; CFRUT ciiT"1 m fClf"lR!'<'. QrR ~I 7:ri jCfifli'1l ~ %,cR{
~ m qi't Wffel if di'! ~ cf; 1J&l fcrq\l $'"11 f+'H 'li't itm ~ ~
fcif1~i'i'1 ~~!ii\ ~ 3:ffi: 31/<JOJ;if>< ~ I
13. 'B s;eic:'i 1Q: : ~, w m +i i'i 10'1 cf,- ~ fcR:ft mCfiRUT it cRi ~
m -fr ifdf1~ 1 / cFl ~ ~ Cfi\ -3P1 <;:p:qfrn c@ ~~ fcFm jCfiB\'1l cf; WQ.
3\'\"Hc;11jl ~ WlT I
14. ~"G'Gl'll\~: ~wciitf0f&a '{clBw:iRicfifor-n~cnm~<n
~l>RT IRCTf fcFm f<F041f!T<m c@ 3qqc:'2: m ~ ~. "3f'rCf>1 ;o,~ <TI
BY'.J>~~l'1 ~ cR<rr I --
""=--~ .f==-~<f;~P,TI
S~perintending Engineer <'li".'1.<;.
(-,oo KV GSS) R\kP.N.Ltd. <

Heerapura, Jaipur
/ '

./
~. 15.
~ fcF % ~ <rr ~ ~ fP:J>1~fi11<il cfir 'IB ciil" fll11fm 'l( ~
31f~ >RR Cflit %I .,

I' 16. _<{id< c;;r (WT?, : -~ 1"2\8@ cf.r t<in: q:;f.1am1rlf q:;f.1 q:;r "B'lfr ~
f
' :;.fn: 31Tj<lfTrcli" c<:fll Cfil "Rl"l11 ~ ~, ~ WU ~ m ~ fcf;<rr ~
i '
..' 17. tu 9. s : <Tfu t&c1 oi1 ~"l '11: SfilfurT cf.r ~ 11 iafta <iT ~ qft ci ct'i cg;i-r
l
f
<l1 f--Fhl 0'11 ~ -al ~ m 'tifc! cf;- ~ '11: ~ WT M "lTifrrr 1 (lmfQ "3"! ~
ii z j 'tifc! WU Ji1R Jfrll Ifill(! fcr.f;rn I -W'l P;1T31'f of;- g:;iyur -Q:fl Cfil<TI Cfil" i>i ICl~ l! CJi aI
Cf.I ~ ii 3=fTITT ('5TTT fu"lJl 1TlJ"T \>.ll am "fClr:fl "21 SflTfuTr cf; f.rrJfur ii ~ f0f@a

(>"11 ii -Q:B q;riif q:;r "0PTi! ~ CF.8 cJ;- IB<) fCl1 CJ2i1l ~ <it tj't -m ~ ~ m ~ am

'tf>;:j cl;-~ ~ 41<<-qficn oi;rn: of;- -31Jf!R ~ WU m~F1Clia1 cf;- 31Tm< 'l( fc!w.
flft?.;1Cl1 cfir <:llil~ <"l ii "QClO f1f~i'l\1 3'fC!flcl of;- "lffin: fcF;i\ ~ I Cfil<TI c@ ~
Cf>G ii~ qfh;14 fCJ0kl of;- cfi!{Uf ~ fcnm ~ I 3nffe;'t.IT cf;- full,~ cf.r ~
Cf.l ~ "Cf.8 CfiT 31f~ ~ I
~BT~ - "fCW! ~ 11a:rcnm ~ 'f>lrn: 6'G1: af~fa a1~l&'i cfir 3i1R m:m~

. ~ ~ i ~ 13i;T ('5TTT <it% 1


- Su~ntending Engineer
Su~t~~roEngineer (400 K~S):~.\lcf>.N.Ltd.
(400 KV GSS) R.\kP.N.Ltd. Heerapura, Jaipur
Heerapura, ~:~ur
f11C1f0fl:SIB Clit u :.m'ct ii ~r of;-~ am "d"f!Cf,J 3Tif ii
m................................."21 Cflffi 1R ~a:TI: fcm. :~
\.;. f ~ M Mc.f\--1?.._

1. : ::::::::.~~'.~(/::~:~'.:~::.:;.:~.~:~~~~-!~'.:::: (BTtjt cf;~)


t11:.7~~rri~}Uia
2. 1"Ti:r
.
...'l:\11w....P.-.'f.<:':r..::rtl:-"'I.............
.
~
. - 0 .,::_;!-
:qc-rr -~~~.1\; ..~-i:\?:"'..''.]i:\\?.9\1:1!.~~(Wtjt cf;- ~831 )
R ~'f'e>.\ ..- \-\~ R-~{\>v.-v . --~.

~-- ~
Sup~9l:ldimgEnglrieer
(400 KV GSS) R.\kP.N.Ltd.
Heerapura, Jaipur
,

F1"1F0r@C! ~~it 'l1mf ~ {1"?4fi1 cfi ~am~ J:ITT: it


11 ............................ :'\ q:;m ;n 'Q@.?Jl: fcm. l
1. '1Tl1 ............................................... .
'4(ff .. ".. . ....... : ................................ (wan ~ ~m )

2. 'fl1i ................................................ .
'4(ff ................................................ (wan ~ ~e.-n: )

fu:qufr : 1. w CfilXf f1 <il 7:[j ~ 1ffil'l~'iRIT ~ W!fu ir "n;i com 'l:{t ~ ci;m ii
lJ&! fcrqc! ~ "11 r1 lj { crc:: "41: ~ -m ~ '3B ~ cfi -qeyftRR b:RT
~ Cf;<: f<;<iT ~ f;ii\ lJ&! ~ ~'1ll<: cf;~~
~%1 .
2.~ CfiITT <fi'I 'l'fTl '$ U"?4fo f;Rl am~ 3'ffi it 'lfml '$ ~'<lR cf;
ai:-r"Oc; 299{1} cfi 3-1!W! ~~it mf~ efi~ ~ ~m
fcflri~~ I

(9 ****** (9
. - -.. - r vrv"~ \U 0. Ut1l1Z.eci Jor the C\'l:J$Si'h_s hQV beeh
r-e.ct Jactor of SQ:fefy Cls spec1fiec:L in ihe re_gtJlq-tions .:JOr elec.+r-icaf crossi'J)_g of Rfy.
dftions.
\I
-1
'.)SSin3 Provided. cJeqrcmc.es siipuloted in fhe scheclule o;f dimensions of Jndiqn
( .Sa;fe +he .Sf'r\Jc.f1Jres hqye been cle._si.gned QS per th.e !.S. Code of practice.
_St\'uc.+ur~s are. propos4'!.cl. to be ere.ct~ is ql{ite .suitable j)r these -f:tpe of
s1s-tc:t11c::e 1.U1U 'f'iot ~cee.cl -6 dnms. the .scdefy of ~l\Q s-tructures will be ff-ie cJ;.rner.s
,druc-l:ure. Wil\ be eqrthed ih dependen~ty .
\ore thaYl
-- ---- -
---
_Bo[. af:_J_he. . 'rl or.mal .CD.an f,.,y ... 1i..: A,, J.J.. - _.1. ___ - . - --- ..... - l . -- ~ -,~-~--- --
-

- '
""
~- WEST RA\LWA'Y J'AJPIJR...
O.FFf,CE OFTHf SUPER.INTENDJt.JGENGINEEl{(4ook.Y~.HR)
RJ.~. R.AJYA VID'iUT PRASARAN NIGAM LTD, ::JA IPU'-

'220KV D/C :JAIPU!t-SOUTH PG. VATIK.A TR.ANSMISSIOHUNf


f4i.. , E../_ .JP!l.
''
OVERJiEAD RLy. CROS.SI ~.G BETWE.1'-l RL'f.SF!t11DJIS
.
CHRAlilAf.lJ.2-CHAK.SU AIJD 8E.1WE.N T.~ N!8S/3&86f o
Stc_t3PR.. \i'- OUT SIDE THE RAILWAY STATJOf..l LIMIT" .
?
PllAWf.l.BJ CHECl(E.D f>Y RE~BY- APPRoVE.J2:- .
. c. r --cu~ b .
XEN-(~4~
C 1
1
!\ ~:'Y'-/ AEIJ-L[ ( C21'1400kV SE. (4ookli {EfS.S)
GS:>HPR RVP N; HEE RA PV~JI- RV pt-.1 HE.E.RAP() R.A
I~ 'f!Jlt!t:~
,i> :" ~-='~; /c/IPR. R.VP1'1 a..
:r.o.1p~
-, ,.,.~.

DRG. Ni! SE )4ooKvGZ/ 2013


. ..
I DATE.

. J ,:rp A.. ALL OJtllE'.NSIONS ARE IN MTR.E.5 J1'/LSS or k'E.R. WISE

,~r ~~i.
.'- ...'.;' '
.STATEJ> HE.RE//\! . @
-- .. . ,
-

... - .. - -
-------- - - .. --- -------. - - .. -- ..
r2 71
~R.

NORTH WESTEORN RAILWAY

Divlsioha! Office
Jaipur
Date 20.11.2013
No. EL/253/634/W6
..
Superintending Engineer F{400kV GSS)
Heerapura,Jaipur

Sub:-220KV Double circuit Overhead Track Crossing between CHNN-CKS Railway


Station at KM No 85/9-86/0

Ref: Letter of SE/ RVPN/AEN-11/C&M (400KV


--_ GSS) HPR/F /1463 dated 24.10.2013
)

In reference to above, you are permitted for completion of Joint Site


Inspection up to 05.12.2013.For the purpose of Joint Inspection you should meet
SSE/Electric/JP and SSE/P-WAY/BNLW and Fix proper time for Inspection. After
completion of Joint Inspection please submit duly signed Joint Inspection report
and Safety Certificate With Rough Sketch of Site Plan along with Signatures of
SSE/ Electric /JP and SSE/P-WAY/BNLW as per Enclosed Format.

o. ;;.._ c \...'.
1 >-ti"" ~"
ORM (Electrical)Jaipur

Copy:
SSE/P/JP: for Information and necessary action.
SSE/P-WAY/BNLW: For Information and necessary action.
DEN (5) JP: For Information and further action.
ADEN (Line) JP: For Information and further action.
E:\l1A t-'0WER-10\TRACKCROS1NG\Track .Crossing 11/Joint inspection report OH

(Joint [nspectio11 Report for OH Track Crossing)


R-li'P ,,,,,,,,,,,,,,
cp !11\ci ~, Wl'.J' I
' ,9Si~\0\0 \
fu<m:-~ ?,~\\:::\\) ..'111 ,.;;i;\~.~\')..~\<:<:"f........ fctg<l ~ f.'rrq Fflfi12;s ct~
~fulf2!Q .k.-:b.O.. ct.<11. ~/;s4i<lfifc/~ ~Tc'!T;r-1 <Ji\ fi/i~.~'"":::?dl0:'l:"flK<~<tif ct
'lU/)fil>.!\1.~~~C'M,#~'f....... '.3.5\'\=2'.q.a Cf< f.'r~ <Fi fm; .mf; <1'T f.'rZT!!fJf
~ ;:rhi~ (10:[
>i'liR)i J
~t. :~' .......:1c::1.. 1s.~j ..6.?"'1..\ ..1<J.(g, ..... D:r.?.co..~\\:.Y~... ~.~.J)..R,~ ..LE.~~~.(A.,Q_}.::'31:\.ipY\"
Fcas1bil1ty Report <r <GJ 1<'TR kx ~ it f.'r"i f.r:;;w <1'T ~T-1 m 1 '!'I w,'\ <!ilc'fl1 WT rm:
iI
11;:-J
"!Tc : ~ ~ <!> '1Ff lf'1"f f?l;C11'1'lc~
<i<>dS fil>dl'1lc< ~Iii I ~ G2TI ~< 1
~ ~ ~ -<ift;; W!R ~~I('. <rffc-u'fc ffl Cf< PW! 3T<R 6ffililH <ITT I

1. ('!>) ~ 0n' q"; lJUJ 'C1$1 x"f <;'Rr'3i't< ~ '11\3){1 Wr ~ (<m!'S'I fil>01)>\'\e< 'It <mh'll) ;,

~ iWP Wr ~ :1?:o. ~J.L0..~..........'ll<1'l cm; WI ~ . J.f?!.'..~.t.'.L .... .... I


2. ('!I) ~OJir \;'!> cf; 'lt1! ~ x"f cfrii 3iT< fctg\1 C1'R Wr ~ I(~ fiO~ it ~ 1)

<:flft i'R'li <t\'t ~ ....\\2:::.'0.'.L ............'ll<1'l men WI~ ...... 6.\..~ .............. 1
3. ~ ~ <Fi l1UI mrf<r 3 lfrC< "lX ~ Wror x"r "lf't Wr "ffif6', ~ '31R ~tj' illX<i'l'llfi
GiP Wffi tM'R G'<Jhrr \ilTil I

4. ~ 'C1$1 w'rfWT <1'T ~ L.......... ~'b.c\<=V ..................................... .


I / -
j
l .

fJER-10\TRACKCROSiNG\Track Crossing 11/Joint inspection report OH

I
i ifcR ~ ~ ':)GfT 'li'r ~ (Fuli width of Arm in case of overhead track crnss!n~)
~rn ~~rq, ii x'r ;:;IT 'l.fr ~'l t'T) \O..?.:-P f.:Yl . . ..................... .
r. t1 c'f<Fol (~'ii -;:~ ;i,iqq, ~"' 1<'l~ 'i'<) -1) K'"i<T'l <'ITT q,"f '3"r>i, :ofl<r-x~ </; ~-{ ~
inimumVcrtical clearance from Rail level to lowest crossing conductor)

vay Track

:iNo. I
Minimum Vertical clearance from r<ail level to lowest crossing conducto1
75 c after max. sag minas.
\Ch, i <O 'M R~-bv"-\~ls-~
l
__
er i

reNo.2
1
_in_e_N_o._3_--r------~--------------------~J
----,-~-~ -..,.---c--c----,c---c---c-~-=---=--~---------~~
12. ~<Fl~ ~'1 (0.20/0.10 ~) ..............l'.:>..'..\0. ...-:t>~.~--- '
13. iiiTftilr x<it'f ........ftJ.?..:-9..C>.r.J. .......................... .
~"WT o c......~:~~-----c.J.........:..-- c ......:.S.'..\1..'.Q..~-----~-;;------;, ...-i
6.
0
14. 75 f'.:')tlrt7 COEi/o
15. 3i1Q'!~"5 wTfurr ~ fu;rft'r <fl~ I'!> fqC'lit qi't ft~ 1..63..:0.2 ...~ ......... ,.<3-).,..... .
16. llR11fc1a ~ cnr R<1>c:a'1 m ... :g~\55:1'14-~------- ffif~----~l0.'.l.q;:~-- ...... .

~.....\.n.}.-:-1..~~------ ...."'-"l...... :.;;)..\\.n.~.\.ir:::.. I ~ :0\-


17. '!Rf GRT <ft ~ ~ iiff'fil; ~ ....:S:D.. 6...@.. '(.... 1-..'iJ:s;:j ..............c;;.' ......'!... ~ i\

lifMrt11/~/C11f4lcq/@i1bH/fC'll~ I (>~x 0J; wlftM x"fC'I" *t qlfOI"~ <:< ;c't--iJ


~I)
It' 1a. lP1lfUm ftl,<rr iilT<IT t fol; iitt11fi:1a ~"' <r.11'fi1 ~ ~ izct tofcr ?:ITT! ~ 'lfr -~ o.:rr
mtc: ~ izci f4> fG1 ~<ii t I

tf<itT.'I ll 11 fc1a 0J> ;ii1furr <nT '<Yi '<'11 '1 I(1) q'fG I f4<l x"fC'I" </; XYi m i\ ~ q'; '1T'1
iMT xIB>:!T ~ f<p_lj't_<f2JT GT1fl 3tfx f f ~ 3llf<;: ~ "1Tif I
(2). ~'"~q;11 GTC1'r. Wl'lTX :o~ x'r ~ <!> fWI/~/~ Tl$r ~ crr<R <f;f;i'"
<tit qlttJfc1q, ft~ '(CJ) '<'!Fl, ~ ui-$ 'r -~ if f,] I
~~. ~~~~--~~~~~~~-~~~~-~--~ ~--
.... .
t
-

(/Track Crossing/Correspondance 14
0

NORTH WESTERN RAILWAY

Divisio-! Office
Jaipur
Date 15.04.2014
No. EL/253/634/W6

Superintending Engineer (400KV GSS)


Heerapura, RRVPNL, Jaipur

Sub : Depositing track crossing charges.

Ref: SE(400KV GSS)RRVPNL, Jaipur Letetr No/SE/ RVPN /AEN III/400 KV


GSS HPR/F 1463 dt 24.10.2013

<<>>
In above cited subject details of track crossing charges are as under-

lsr.No Particulars ,#\mount in R11pees


~~.......
i 1. Electrical Estimate i.-~.- '" 118152.00 .
12. Way Leave Charges (for 10 Years) 247868.00
I
~3. Operating Estimate 340584.00
14. Engg. Estimate 67661.00
I Total '774265.00
-

Please arrange to deposit track crossing charges of Rs.774265/- within one


month otherwise above Track crossing proposal will be rejected without any
information. Cheque /DD may be issued in favourofSr.DFM/NWB/l:P.

f i-D-' 167'1
6J-. '-:
ORM (Elect) Jaipur

'
CERTIFICATE OF COMPLIANCE,

It is hereby certified that the Electrical ").~.KV undero/6und / flt:.' ;\';;;d c.illle eras.sing No .

. EL/253/.l,3.!:i,/W6.at Km .. 0.? l.'\::::.'!?.~/.();on the section ":l8:-~~. ,~.;la' <'11 ..,,~\'b'f the Division
>
of the North Western Railway has been constructed in compliance vvitii li1dir1n EleLl1icily Act, 2003

and Indian RailWays Act, 1989, and the rules i:nade there under and as ainended from time to time

and the Regulations for power line crossings of Railway Tracks, 1987_ The crossing has also been

constructed in r.iccqrclance vJith the drawings approved by the ORM/ JP North \/\/es tern .Hallway and

the Electrical Inspector of the North Western .Raih:1a_y, the reference of \vhici1 are given below:

Ref~;nce u~~-Approving
JS. N. --rnDra;,,,ing No_.__ Title of Drawing . ALotcKamti/Tonpof
! Crossing vv'hich rlrilv.ring ic:; ,: Authority

h-k Approved
11

,0
I.~
i .
! ~~~-~-~-...--+-!r.-..&l-
...-.~.~~-~k.f."-~--- ] i?.13 :::: __
!"~~ .. (:)/)\j~'-;1':,-, .. . ... 'bbl c
i i;.,rg_~~.\T O\l~\i1\l)
EL/253/@~W6
I Sr.DSTE
i Sr DEE/JP
: Sr.DEN(Co.)JP
-1
I
l c.
t'..,Ro~l.i:-:l<>i ...oERl't\h!"~ DRM/JP
~.RM\~.. E>.Erw.f.al
~ s. :::-. ~;J:! .~!'I R11-1 t.. "I f.(
S-rt1~1~ 1\-r \<-'("('\
HQ Level I
'bSJ"'l-'2>~1 o Permission Given I
."2. * If is also hereby certified that the overhead line crossing specially released as per clause 22.4
by CEE/EIG I
of the Regillations for power line crossing of Railway Tracks, 1987 would be modified by the owner,

On an approved desi$11 whenever Railway will require to modify such crossing duf= to introduction of

electric traction on the section ofth2 Railway.

Along with areproducible print eight copies of the drawings showing the completed poweLline
crossing is I are enc~osed.. C:::::::S .$
Superintending Enginesr
(400 KV GSl.'l,lff.V.P.N.Ltd
I Jj1t,<ilr~l?MH!w.l8lpu!h se~;l
Date

Place .......... : ............ .


~~q,1~f=7

1. ~ ~' q"r ~ ~ 7fT't <WT! ET cit il"ffii. 3P::m j;<n ' <e.<-;<K! ii\'t ;,;~) 01f'r<liC'l
~ .<Maximum Sag) alt f.'i<'lili'\; <!> ilR
................................),Q.., ..=...:o:..~
zyn
9-*' ::?.~ ....
........
WR/ '11of '1'I <it 3l>f WIT ~ m ~ Cf'!TI :ll.\ <fu!:iftfi. q,"; 1\c"j fiRRl ~
!;,-... .. ....
2.
1.....:1:~.9......... 2 .........::r~.............. 3 ...... 0.,.:0...b.... 4.. P'.:!....JY ... .
3. ti\o! '1'I ~ <lm 'll1R i'j ~ ~ <-il m offl I t
......>.l..h: ... .
4 <ITTW'f o'lt. <i<Eh1011~fol1 ~ ""'! ~ m '!ill 1 't<'!>
5 <rl'i; iITTfWT <i;'l'R oil 'ITT'. qft ~ CIT *""' ~. ~ <ti ~ ~ <'! 'i5<:G $] "lfCl (f"l] 0'<0!
iP!fWT '.</; ~ llziM' ii fum 'fllT ~ i ... ~ -.~.
llo\!Wr 'l'Rlt ii F<:u Tit ~w <i\ 311".m 1' m ~ 1
6.
7 zy.n cr;n:p * W01 t<P *
................ \.9.'.?>:.. .So..
q 'lm'l1'f
m.~.....................
'H
-n 3i0f'T~ <;Yr
..~ ........ S4c\J..Q.m~ ..
B. 'IBit VfRt f<t;m T('lf <'l!;M
GRT '<'!n> W,iq;_,,,:I,.~,.'\'. .. \\,.\ .
oil .. . . .. ...............""'"''''' .... - .

J ------------ ............. -- ....... .


'
"'1~;; ~ :;;;i'-;j;)~;::= ~9.~.=:::: ~ m . . .\'.'.'l:;...~'r~..::;~,~q::;,;;;. =~19~~
;
' 3.
(] 10. ~ ~ .i!i'(furr f<1f.'l1lll )987 <l<ITT JR Rule 2005 <f ~ '1Wr YIOR ~ ~ .~ '5T ;pp\
'
i'
!_.;
f4>'lT Tim<n't f<l;- ~~ .g CP..n 4JiR ~ qi\ '.'Fi\lb'"' (Energisation) q;z.'t <F ~'lilt
< ;;mfti '1t'i j\ I .
11. ~ ~'l<i\ ~ w.rr ~ ...\'b.'.\,(;,~Y,.

'
12. i 11 ...4q14'{ ~ cpu.g)~j"i m--~nH~O~O;b..~ . . Om ... --onH'O

~-
t: 13. OIB'l 'lJ01Tf ~ ~ i'j tl6T qft ~ *t ft<lftl .........O.'.~' ................
~'
14.

a., ..
. 15 . ~ q\1- ~..~.... - ............... 0.!.:~'- ..
16. ~ titoi oil m-..rr 'ffil!> '(('<! tffi.or1= \fl 3!f2llT <t) fufilit J;:o\.\.'&2:'.::.:~1.~ hctJ \)a e...,\
<lr<i;~ ~ ~-l1<1iot1~'1fl\'1; ~~<i llii ~ .Etfu')........~."-Q~.~'..
I
17. 1ITJ __
) 18. Q'<! ~/Cll'R w mR ~<ti <ti fy.mr.. ...... F(\:\0.~.... 9..:::.

19. fm;pj * '11'2{ ~ ~ f.'r~ ~ ~.......................~t.;>..: ..................................

Jllllfilm f<tm Well i f<l; <Nd ~ ~ ~ '<'!Pf <.i;


2003, 'lmfu:r ~ 3JlUf.'r'I'! 1989 '1"i ~ lb'(fWr ~ 1987
~.

As:;tt. Engincir:f:{c&~ rhL


P.~~rH~~ta _qo~ (~t.~.)
-Sr.SectionEnglneer(P.Wa~1 "F; .,,:.::". 'i ..
'3otio~oiJO~ 4aftl:;V\l~,., lP""'~"''-i :.,._-_::;';r)
:'\l.W.Rlv.Ban~s~~t~ f\n~1

.. - ;,"'" ' -~--


-
' ,,

NORTH WESTERN RAILWAY
Divisional Office
Jaipur
Date 21.0420 j5
No. EL/253/634/W6

Superintending Engineer (400~V GSS)


Heerapura, RRVPNL, Jaipur

Sub : Permission for energization of 220 KV OH Railway track crossing at Km no.


8519-8610 between CHNN-CKS Railway stations.
Ref:- HQ letter no. EL/I 71/2(EIG)/JP dated 20.04.20 I 5
<<<>>>
In reference to above, perm1ss1on of Energization has been given by
CEE/EIGfNWR/Jaipur for 220 KV OH Railway track crossing at Krn no. 8519-8610 between
CHNN-CKS Jl.ailway stations. "It should be ensured that All safety precaution are observed
before energization of power line as per T~e Electricity Rules,2005 ,Electricity Act 2003 and
p0wer line track crossing regulation I 987 etc:'.
. . Ql\,!e .of:-eiiei;gizatlon should be intfmated to this office and maintenance of over head
line shol.114\~,~i'ed-0ut as per agreemeni with Railways and It should be emlured that line
should be always be !n good condition so prevent any human losses .
.Owner will carry one inspection in the du ration of 12 months if Railway found any
deficiency thap owner will rectify as earliest.
.-----~------------

Copy- .------- - -.. --..---------- ..


Sr.DOM/JP- For kind information please.
DEN/.S/JP- For kind information please.
SSE/P-Way/BNLW - For kind information please.
SSEIP/JP- For information and necessary action please.
PROCEDURE OF MODIFICATION IN EHV LINE AT CROSSING OF RAILWAY TRACK

For any modification/ alteration of track crossing to be carried by the Railways department during
the gauge conversion, the Railway authority shall apply wrt to the modification of existing
transmission line crossing the railway track.

1. Railway authority shall apply to concerning Superintending Engineer of RVPN. (at page
no.35)
2. Initially, the Railway department is required to deposit file charges with RVPN. (at page
no.36) The Superintending Engineer according to voltage level will intimate the file charges
to be deposited by Railway department which is to be adjusted into final demand note.
Amount of file charges as approved by RVPN is as under:

S.No Voltage level File ch ages to be deposited by Railway


1. 132 KV Rs. 50,000 per case
2. 220 KV Rs. 1,00,000 per case
3. 400KV Rs. 2,00,000 per case

3. After depositing the file charges by Railway authority, concerned Accounts Officer of RVPN
will issue confirmation letter having receipt number of File charges. (at page no.37)
4. Concerning Superintending Engineer/ Executive Engineer will check the feasibility of
modification and prepare cost estimate for the above said work including estimated shut
down charges and railway crossing permission charges. (at page no.38-41)
5. Meanwhile Tower schedule & profile will be approved by competent authority of RVPN. (at
page no.42-44)

6. After finalization of cost estimate.Administrative approval is accorded by Chief Engineer


(PPD) as per DOP and Technical Sanction is accorded by Chief Engineer (T&C). (at page
no.45 & 47)
7. After Technical Sanction, demand note is issued to Railways. (at page no.48)
8. Demand Note is deposited by Railway and receipt issued. (at page no.49-50)
9. RVPN will apply for permission for railway track crossing considering the work of
modification as a new work.

10. The procedure indicated under head "PROCEDURE OF CROSSING OF RAILWAY TRACK "
which ever applicable needs to be followed & new agreements are required to be executed
also. (at page no.51-68)
11. Work Breakdown Structure Element code is generated by SE(P&P)/CE(PP&D) for the project
in SAP Module & accordingly all entries/payments are to be made under this code by
concerning officers of T&C circle.

12. Permission will be taken by the concerning Superintending from ORM, Railway for execution
of work. (at page no.69)

13. Letter will be issued by the ORM, Railway for depositing Way leave charges. (at page no.70)
14. Railway authority will issue letter of approval for the modification work of EHV line crossing
the railway track and grant permission to start work. (at page no. 71)
15. The final account of the deposit work of Railway needs to be settled for closing the project.
( NORTH WESTERN RAILWAY

f
!

Office of the, !
Dy. Chief Electrical i

>. fl/C/JP/track crossing /JP-SIKR/l/OU


Engineer,NWR-Jaipur.
Dated: 23.04.2012
I
:(TCC-1)
/PNL- Joipur

S~b :- Modification of 132/220 kV power line crossings between Jalpur-Sikar Railway line
, section. / ,
I <<<<>>>~ I

In the 'above m?ntioned subject it is mentioned tr.at gJuce conver~ion work of Jaipur -Sikar ,,
.<ortion is und~r progrefs, following two power line. track crossin_ g in the Jaipur-Sikar section is crossing
1

~-'!way line, not ~s!per track crossing regulation 1987 Act. '
am
!

(!} Single
.
circuitI 132 kV- between Govindgarh Malikpur. -ningas Rly. Stn. se'ctions. Tower No.
112-113
,
of. the crossing
I
and Railway TP No. 145/8-9 .
(II) Double circuit Z2U k'.' between Nindhar Benar-Chomonun Samod Rly. Stn. sections. Tower
No. 311-312 ofthecrossing
:
and Railway. TP No.- 158/6-7 ,,,_;)
";,,..,,

As per track crossing regulation 1987 following parameters are to be strictly followed .
1. . Horizontal clearance of towers from centre of the track should be minimum H+6 (i.e. His height
~jt~~,t~we~a~o~~ g:ou~d ie~el) 1 ;; . :
2. Vertical clearance of lowest conductor from the proposed new track level should be minimum I
I
15m for l3ZkV and 16.Sm for 220kV power line. The new proposed track will be raised
approximate on' meter from the existing MG track and therefore, the clearance from existing
tract should be n1inimum lG1n for 132 kV and 17.Sm for 220kV power line. l
I .
Power line should cross the track at 90 degree and maximum deviation permitted only up to 30 I I

degree.

As the BG conversion of the said section i~ under fast ;.regress and without modification of these
power lines crossin~, the section can not be opened ;or .traliic. Therefore, above power lines are
required to be modified urgently. _ /
-~ You are therefore, requested to send t~e 'f'ecessary Demand Note immediately for carry out the
n1~dification work. / l.,rl 07b/_
. o/ / ' 1'~ (2::'1-" !

wp ,-~~~))
'' ~ 1
l____ - -- "-.. --- :. - -~' 1-{._,- ~~
!RA.JASTHAN RA.iYA VJDYUT P~ASARAN
NIGAM LIMITED
. 400 KV <;ss: llf:ERAl'llH;\: .J;\fl'llR.
No. RVPNUSE/400 KV/(jSS/Hl'l\/.ll'R-SKR /(!\\iay./2011-12/D !J_8) llt <t:>)J;i) '!J-t> /'1-----

To.

The Dy. Chief Electrical En~inccr.


North Western Railway -.Jaipur.

Sub: Dem~nd Note for modification of 132 KV I 220 KV powL'r line crossing.>
between Jaipur- Sikar Railway line section.
Hef.: Your letter no. EL/C/.Jl'/trnck crossing I .JP-SI l<IVl/102 elated 23.0~. I 2

Dear Sir(s),

Jn reference to your Jetter no. EL/C/.IP/track crossing I JP-SIKR/1/102 dated ::'.1.04.12


vide Vhich you have required the dcn1and note for carrying out the n1odificrition ,,prk l)r
132KV/220 KV power line ciossings between Jaipur- <;ikar Railway line section. The XI N (220
KV GSS) I leerapura with railway rcpresentati,c have made a joint visit on dated 1.8.1:: and 11,
has submitted th3t the follo\\ing t\\O lines ,ro"ings are under this circle:
------------ 1 ~--------
S.--TLJile Name Location betv. ~:en I ~ocation bet\veen Fik~i1;111~e::. to h~ j
1
,. I
: ,. .;o. ' raihvay section no. EHV -ro\vt.:~r no. deposito..:d h> Rtiih'<i>
1 i. ! 220 KV Heerapura - Khetri-1 line 14517 - 145/8 403-404 Rs. 1.00.llO!i.OO

--~- _j 22o__i::_v Hccr~pura --~hetri-11 i '_''"~ --~4_')_-/6 :-_ 1.i~~---_-_--_- siii-584 I[{-,, I j)f) l)ll!J.t)()

You ;are therefore advised lo please deposit the lile charL?es n1nnuntinu to l1ll;tl I{:-.,
2,00,000.00: (Rs. One lacs l'or each line) for tht' ahovc mentioned \\~irk tn the ;\,~n1111h t Jllic,r
rrcc:.J), RVPNI., i-iecrarura throutdl /)c111ancl l"J1an in his favor p;1y;1hlc ~ll th . .~ cnr!il''-I '-.(\ 1h:11
further needful action 111~1: hL t<1kc11 11ccordingl:. It j.., also i11~i111atLd 1h:11 till' l!I: ch<1r:-"' .111h1u111

is adjustable in the final hill.

Copy submitted to the following for inflirmation and necessary action.


l. The Chief Engineer (T&C), RVPNL, Heerapura, Jaipur.
2. The Executive Engineer (220 KV GSS) RVPNL, Heerapura with instruction to submit the
estimate as per the requiremC'nt of thr Ri!ilw~1s.
3. The Accounts Officer (TCC-1), RVPNL, Hcerapura.

SlJPERINTF.NIJING ENGINFJ:ll
(400 f(V GSS) 1-IEl~llA.l'llIL\

~(,~

i.J:;' '
~

RAJASTHAN RAJY A V1DYUT PRASARAN NIGAM Lil\UTED


{JSO 900J :2000 Certified ('omp2ny)
OFI'JCE OF THE ACCOlJNTS OFFICER (TCC-1)
NEW BUILDING, A.Th1ER ROAD, NEAR 400 KV GSS,
HEERAPURA, JAIPUR-302024. ,
Tele:- 0141-2250094 Enrnil:-ao_tcc_i_jpr@rvpn.co,in

No/RRVPNLiAO/TCC-I/ Cash/D. ,;}fiii:s'D

Dy.Chief Electrical Enginecr(Const.)


Norlh-Western,Railway,Jaipur.
0

Sub:-Confirmation of receipt

Ref:-Your letter No.El/C/JP/Track crossisng/SKIR-LUH/8/12 Dt.26.12.2012

In the above cited subject we confirm that this office received Rs.200000/-
(Rs.Two Lacs only) through RTGS on dt.17.09.2012 against demand note
No.RVPN/SE/400KV/GSS/HRf/JPR-SKR R/Way/2011-2012 D.1281 dt.03.08.2012 of
SE(400 KV GSS),RVPN, Heerapura by the FA & COA,NWR, Jaipur.

fLtolor
Accounts Officer (TCC I)
R.R.V.P,N.L., Jaipur
Copy to the Superintending Engineer (400 KV GSS), RVPN, Jaipur for information &
necessary action:

""'""L (TCC I)
R.R.V.P.N.L. 1 Jaipur
'-'Oii "i - r;

.----------------
Technic31
. ------
E;::~:,nate
--------~ ~
-~
: C/0 THE AEN-IJJ(C&M, 400 Ky GSS RVPi'JL, HEERAPUR:... ~.:.:;:-u'ft-

jl RP--g.Ji~n1~~nt -~; 220 KV SIC H~erapu~:-Khe:~ine- CX1. l 1or Raising the ~eight at Rail\vay
Crossing between TP No. 145/ 7- 8 & Loe. No. 402(A+D)405(A+O) Railway Deposit Work.
I
I S.N:. as 1 - - - - - p -_ ----------_-\-
1 articular :
- -.-~~al Qty.] Latest S.l. Rate: A
1Jrnt I I 01.01.2013 ' .s.,.
, 'f! ,I
1
j Sifl i I Used
fT!C'J;l.,

,----A1-'"22()~VSJC-SUPe;5tr~;;jih~~tub
(1)Towertype "A"
I---=-F-
:::r NO.~
--=--i--i _____, ______
1 . 194315.co:~ 194315.00 (
A 9iin 6 Mtr. Ext for220 KV S/C Tov1er I
1\Towert""e "A" . NO. 1 61146.00 v 61146.00 (
L AB 220 KV D/C super structure with stub_-li-----11-----+------+-----~
f------l'L!HJ..CTower type "D" .. -J.1-"'N_,,Oc.-\.--"2--lf---- 641030.00 < 1282060.00 <
A9 lviil 3 Mtr. Ext for220 KV DIC Tower -,.,-,---f--c--+---oc===+-~==~,.j
>-----c(l~)L!T~o~w~e~r_,,,ty~D" NO. 1 112795.00 112795.00 <
A9 lviiil 6 Mir. Ext for220 KV D/C Tower
1)Tower type "D" ~-......:1---'N"'O"'.'----i----''-'--\.--1'-7:..:9:..:7.:::0.::9:.:.0:.::0.i.-_ 179709.00 <"
e--~C~s_ _...,H_a_r~d_V11are for ACSR Zebra Conductor
livl (1) Double Tension H/W Set 6 3174.00 19044.00 <
L_iiii) 1(2) Single Tension H/W Set 6 1510.00 9060.00 (
;-,---,;c-~"~n__~(.3"')~>.ouble suspension H/W Set
Ii\ (4) Single Susoension HNI Set 6 592.00 4152.001(
___?,UL~-+,(7
1
5,_)~P~.A.=-;.R:.:o:.:d:.:s'-~-----------+-~S~e~t-+--~6'--l----'1.:::0.::09=.:.::0.::0J--~6=.:0~5~4~.0~0~,
1111 6) MS Compression Joint Set 6 539.00 3234.00 ,.
(iii' (7) Repair Sleeves No. 3 171.00 513.00V
. fiv) 8) Vibration Damper No. 24 540.00 1 W60.00 ,.
C12 Hardware for E/Wire for 713.4 mm
r-~i:.:ili"----Jc.11"'11''s="1rain Assemblv No. 4 652.00 2608.00'
r--;;v;.,',._-H(;;2l!-S;';u;;;s~p:<'e'c'n:':s":io=.:n~As
07 se=.:m=b'-'ly'-----+-;;N.::o:....--1---'2~-+----=6;;3:;3::;.o;.o:ci-- 1266.00 ~
r--~'i~iil,_~3)~M~S_c.~o-m~p=.J_o~i:.:n~t_ _ _ _ _._ _ _..J-......:NN~o=.:.-+---~2,,__+---~1~1~1.~o~o+-__~-
Ii) 4) Vibration Damper 8
2~.-2,~~
~~.ooo,.:.,
321.00 25 6 3 0
livl 5) Repair Sleeves No.
CS ACSR Zebra Conductor KM 3.5 225183.00 1ss140.so r
D7 Earth Wire 7/4 mm KM 1.17 49629.00 58065.93 .r
Clii" 120 KN Disc lnsu1ator NO. 270 530.00 1431 00.00 <
--'-"""--+-~s~s~-1>------3=2=.:a~.o~o=+--~2""1sao.00
Clll ~ 70 KN Disc Insulator
Pine tu.u.. earthinn set SET 4 1044.00 4176.00 ...
01 iii\ Phase Plate SET 3 59.00 177.00 y
D ii Number Plate NO. 3 64.00 192.00 <
Di Danner Plate NO. 3 162.00 486.00 y
DI GI Nut Bolt
111635 MT 0.25 71471.00 1 17867.75 <
211s40 MT 0.17 71471.00 12150.07 ~
3116.45 MT 0.10 71471.00 7147.10 Y
4'16so MT o.os 71471.00 3573.55 r
s 1555 MT 0.10 11411.00 7141.10 r
f--'OD~4'--+'9=S,,,:n~rl.,.n"'-'nW=a"'sh'"e"'r---------+---"M",T'--+--"'0.;;04c;.5:;i..._ _:..~6:;:2,;.13::;9~.;;00;;i_ 2796.26 <'
r-~0"'3'--!'-1.,,0)S!ep Bolt MT 0.10 68618.00, 6861.80 .....
r--:--+-=====.,---~--~------l-----+-----l------\"-'2~971467.06 <,.
A Cost of' Electrical ecuipment 2971467.06 '_,......
B Cost of civil works@ 10% on A . 297145.71 <
TotallA+B) 326BGi3.76 _,,..,.
c l.abourchar<1es@10%on CA+B) 326861.38 /
Total(A+B+C) 3595475.141.(
D Over head charoes@40%on (A+B+C) 1438190.05 <
TOTAL(A+B+C+D) . ~033665.19 ("
-+.--------- L Say Rs.I 503'3665.19 i
Certificate. J_ ___ _J__ I . __J ____ _
r-----l~l>O!i}''T='h:.:ec.estomate prepared as per rate list issued by CE(MM) D.818 Dote 21/0)/2013
{ii) Overhead charges as per CCOA order no.D.455 Dt 22-203 =='-'-"-----;

...bi.
,~~~I). \.
,.:-l'" '"
v ~-,t-)
R.V.P.i~ . Heerapura~ Jaipur
r=!
' I i7 Cost of dismantled material
-----i
010 THE AEN-lll(C&M, 400 KV GSS RVPNL, HEERAPURA JAIPUR !
Re-alignment of 220 KV S/C Heerapura-Khetri Line Ckt. I for Raising the t1eight at Railway Crossing between T? No. 145/ 7- B &
Loe. No. 402(A+0)-405(A+O} Railway Deposit Work.
ACTUAL
S.No. Particular of Material" UNIT RATE AMOUNT REMARKS
OTY
1 220 _KV S/C super structure
--
(l)Tower type "A" (Loe.No. 402) Nos. 1 194315.00 194315.00 <'
(2)Tower1ype "C" (Loe.No. 403 & 404) Nos. 2 537630.00 1075260.00 le
2
3
ACSR Zebra Conductor
120 KN Oise Insulator
KM
Nos.
3.486 225183.00
84 530.00
784987.94
44520.00
...
70 KN Disc Insulator Nos. 39 328.00 12792.00
A Cost of Electrical equipm:ent 2111874.94
B SOlo of A 1055937.47
c 422374.99 .'

,.
Over head charaes@40o/oon B
Total(B+C) 1478312.46 ..
--
Say Rs 1478312.46
Certificate
. I'
(i) The estimate orepared as per rate list issued bv CE(MM) D.818 Dt. 21/112013 l:
(ii) Overhead charges as per CCOA orc'er no.D.455 Dt 22-2-08

\
k__
A.O. {TCC-1)
R. V.P.N., Heerapura, Jaipur
..,.-'I I "

ANNEXUR~
010 THE AEN-llHC&M. 400 KV GSS RVPNL HEERAPURA JAIPUR
Shut-down charges for Re-alignment of 220 KV S/C HeerapurawKhetri Line Ckt. I for Raising the height at Rail1o-va~ Crossing
I
between TP Mo. 145/ 7- 8 & Loe. No. 402{A+0)-405{A+Ol Railwa~ De~osit Work.
Variable Charges !

S.No Name of Feeder


Total Day of
shut down
Fixed charges
(Rs.)
Rate per 15
Duration Hrs.
15 r.1inuits
Amount (Rs.)
Total Charges (Rs.) I
min. Blocks
1 2 3 4 5 6 7 B 9; 4+6

i
Re-alignment Of 220 KV
S/C Hecrapura-Khetri.Line
Ckt. I for Raising the
heigh~ at R~ilway
1 11 24500.00 3420.00 264.00 1056.00 3611520.00 3636020.00
Crossing between TP No.
14517-8 & Loe. No. .

402(A+0)-405(A+O)
Railway Deposit Work.

' G.Total 3636020.00

AJ?.ki)
R. V.P.N., Heerapura. Jatpur
' .
ABSTRACT OF WORK FOR Re-alignment of 220 KV SIC Heerapura-Khetri Line Ckt. I for Raising
the height at Railway Crossing between TP No. 14517- 8 & Loe. No. 402(A+0)-405(A+O) Railway
Deposit Work.
S.No. Particular of work Amount (Rs.)
A COST OF NEY,/ MATERIAL 5033665.19
B COST OF DISMANTLING MATERIAL 1478312.00
c COST OF SHUT DOWN CHARGES 3636020.00
Net Amount Rs. 10147997.19

0
A.O. b,-
R. V.P.N., Heerapura f
J.. 'ur
'-l'r"
,I ,I
i \i 11 ,II ~
! ...
11
.I
'
I
I
I I
!

. !

I , . :i II ,
OFF1Cf OJ THE EXECt:'j~vlE ENGJNEER

I
220 KV GSS, RVPN, llLERAPURA
, I ' ' '
"AN !SO 9001-2000 Certified Company"

.\o. RVPN I XEN I 220KV/ GSS/ HPR / Estt. ID- ('] r. D1!'cd: ?-,/-,j) 3 ..
.._....,./ The Superintending Engineer,
400KV GSS. RVP\'.
Heccapura(J ai purl.

,- Sub:-TC."/Cr schcd1ilc & profile for 220KV SIC I kcrnpurn KJ:ctoi II line for rais11Ho the
' height at Railway crossing.

Ref:-Lettcr :\o. R VI'.'\ I AL\'-lll I C&M-400 kV GSS/ Hl'R I Tech.! D- 274 D1 2 I/02/2111 3

L: :"'1pliancc to the :\'igam administrative order issued by SE (400K\ ~'''> .RVP:\,


lleerapura preliminary survey for the afqresaid work has been carried out.
Tower schedule & profile for 220KV SIC Hcerap11rn Krctri Il line f, 1 '"""t' tlic
height at RailwJy cro>sing is prepared& appended for apprcn:d.

Encl:-A:. Above

221tKV(:SSH\'P."11.lli"Vl{i\l'l .. '>

Copy forwarded to The AEn-III (C&M- 400 KV CSS) l<Vl':\, lfrcrrip11rr1. rrn
information.

EXE<:t 1 Jl'E E\Gl.''1:EH


220 K v c;ss RVP.~L JIF.El-:.APt:I{.\
i

I ------;-;
.. ,,~: f_ __
Name of llno 220 KV S/C Hccrapura~Khctrl Line Ckt.11 lor R;iislng the height at Railway Crossing between TP No. 147/ G-7 B Loe. No. sa2(D+0)-5BS(A ... Q) Railway ~~eoi!f . '----
.~.
work
... :.:~:;_~~fi ,,.--:--

TOWER SCHEDULE Loe No. 220 KV SIC (402) 10 (406) SECTION AP NO TO AP. NO PROGRESSIVE LENGTH
--~l~~~it~i~.
'' .-
Sum of ~Hol Weight Span
..

Cold Weight Span Section Type of


Loe Type of Tower LOc. Span Jn Angle of RemarkS/Crou1ng;;;'.-
.:S:-No. Adj.Spa - Length Insulator
.No. No. Mtrs. Oeviatoin Details :_ :.:__:_
n 1.c O/G Total l/C OIG Total . (Mtrs.) Strir.g
-'
_J.
I 1 582 O+O SIC Existiny I ~68 0 168 170 50 120 ~r
----
-.,--
I 160 160
2 582 x DD6 D1C
;30
290 'I

I
150 18 208 210. 40 250
130
[l
. STIOT
RailwaY Line--
""-=-""'-
..

a 583 00+6 DIC 440 82 172 254 90 190 280 55::-30' RT DT/ST .. :;:
....
- 310 I i ----.-.-- - -

-~--
t 56~
\'4
.. ..
A,6 SIC _J'
I
i 350
660 138 0 138 120 0 120
I-
i
SS
~--
..--- ..

_J_
-
.: -~:.. 585
---
A SIC
I Existing i -
:::!e'~':.. :
~- -
~--
SURVEYED BY CHECKED BY

~,.
.. ...
_.... - :-
;__..-.~--'
.:-

Super1n , ng Engineer
{400 le' .. i'.':;,r) R .
. ---"-='-'-' - .\ltP.N.Lto,-
Ht;erapura, Jaipur
Rl}JASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
~
; (An I SO 9001 : 2000 Certified Cohipany )
OFFICE OF THE SUPERINTENDING ENGINEER{400KV GSS) HEE RAP A
Tele:-0141-2 2504.l j , Cr na ii:-se_ 400_kv _h~ef.J purJ@ rvpn.co.ln

No. RVPN/SE/(400KV GSS}/HPR/ F.Jpr-Skr cross. /D. 9-9,i t, l /Date:- !'.2 1) 9 \ '-I '.>

Th2 Executive Engineer (220 KV GSS),


RV P N Lt.d, Heerapura, Jaipur.

Sub: Ap 1 ;;~.'al of profile and Tower Schedule for 220 KV S/C Heerapura-Khetri-11
Line for rais:,ig the heigh~ at Railway crc..:.sing
Ref.: Your letter no. 535 dated 21.2.13.

In context to above the Profile ;,nd Tower Schedule for 220 KV S/C Heuapura-

Khetri-11 Line for ra;sing 'he heic;ht at Raiiwoy cros,;ing is hereby approved as

recornr .. ended by you for further needful action.


Encl.: Approved ?rofile of above mentioned line
with tower scher1...1le.

Superintending EnginPer
400 KV GSS ,RVPN, HEERAPUR/\

Copy submin~d to the Chief Engineer (T&C) RVPN Jaipm for kind inl'nr111;1ti<'n
-,
/.::; -~

{__ ' ,, \
Superintending En:~ineer
".10 KV GSS ,RVPN, HEERAPURA
o/v
rr. __
/
~ ;;:;:,-~~;----.: ."G ...... "'
. L .
; ':: B~:,~.-;,4:f.:..~u STHAN RAJYA VIDYUT PP.ASARAN NIGAM LiMITED
R. '~jl.f\/B'~-~~~~. "2... (An:S09001-2000CertlfledCompany)

I
/. 1L:;:... \ 7/1
. ,,.,'.:. .
i 1 ,; ;
!i\~;,_:,~.:.:;:_.\<);.~h_~.
'<-.'~~'.f/t.:~e:
__;_ .-(f'c(~.-,,~~!...~
FFICE OF CHIEF ENGINEER ('r&C. JPZ), JAIPUR
RASARAN BHAWAN, AJMER ROAD, JAIPUR .302020
(Tel fo Fax: 0141-2250992 & 0141-2250087)

[._... No. RVPN / C.E.(T&C) /Sec. 5/ F. /JPR/D. f ') Dated 0 \), \ o i--J) Q..o/3
Chief Engineer (PPM)
Rajasthan Rajya Vir.lyut Prasaran Nigam Ltd .
.Jaipur.

Sub: Administrative and financial approval for modification of 220


KV Power line crossing between .Jaipur-Sikar section :
realignment of existing 220 KV S/C Heerapura-Khetri-1 line
by raising the height at railway crossing ( Railway Deposit
a 1
\ /ork).

In reference to the subject cited above, the Superintending


Engineer (400 KV GSS), RVPN, Heerapura has submitted the subject
case.

The total cost of estimate is Rs. 1,01,47,997 /- (Rs. One Crore One Lac
Forty Seven Thousand Nine Hundred Ninety Seven Only).

The file charges Rs. 1,00,000/- has been deposited through R.T.G.S on
dated 17.9.2012.(Copy Encl.)

In this context, Please find enclosed herewith detailed cost


estimates for according administrative and financial approval.

Encl: l. Copy of Estimate.


2.Letter of Railway

(D.P~
CHIEF ENGINEER (T&C)
RVPN, ..JAIPUR.
Copy to:
--? 1. The Superintending Engineer(400 KV GSS)RVPN, Heerapura.

CHIEF EN~
RVPN, .JAIPUR.
\.

RAJASTHAN RAJYA VIDYUT PRASARAN


[Corporate lden"IY Number (CIN):U40109RJ2000SGC016485}
NIGAM~~ED.
(Regd. Office: Vidyut Bhawan, Jan Path. Jyoti Nagar, Jaipur - 302 005)
OFFICE OF THE SUPERINTENDING ENGINEER (P&P)
,r, .;.g i-14 +-274UO:d:.;,rax:+::;1-141-.c 1;u1:.:1.:;,
IJ8.WLJDCK'J e-mail se_p&.:-J@rvpn co in, website 'N\~_/\1,,1 rvpn co in
Ar. ISO 9001:2000
CertlMed Company

.Vo. RVP1VSE!P&PJXEN (/'mj.!AE-l' F .JoifJUr. D1 lf.r-0:3 -..2.o/6


The Zonal Chief Engineer (T&C).
RVPN. Jaipur

between Jaipur-Sikar section by realignment of existing 220 kV SIC Heerapura-


Khetri-1 line & 220 kV S/C Heerapura-Kotputli line by raising the height at
railway crossing (Deposit work of Railway).
Ref.: - (i) This office letter no. 555 dated 18.04.2013.
(ii) Your letter no. 4289 dated 19.01.2016.
(ii) This office letter no. 2986 dated 08.02.2016.
(iii) Your letter no. 4689 dated 24.02.2016.

On the above subject and reference, revised administrative approval of WTD's of RVPN
under DOP item No.2 (b) is hereby conveyed for modification of 220 kV Power line crossing
between "Jaipur-Sikar section by realignment of existing 220 kV S/C Heerapura-Khetri-1 line & 220
kV S/C Heerapura-Kotputli line by raising the height at railway crossing under deposit work of NW
Railv-..1ay, having total estimated cost of Rs. 4,21,80,674/ as per the estimates enclosed a!ong 11ith 1

your letter and following breakup

~~-1
Name nf the work Estimated Scheme Code-
r cost (In Rs.)" 150300
Project Code
1. Modification I realignment of existing 220kV SIC 2,30,54,717/- 150331
Heerapura-Khetri-1 line by raising the height at railway
crossina
2. Mod1f1cat1on I realignment of ex1st111g 220kV S/C 1,91,25,957/- 150332
Heerapura-Khetri-11 line by raising the height at railway
crossing
--
Total 4,21,80,674/-

Any charges on account of TDS, Income Tax and Work Contract tax, if applicable, will be
extra on party's account. Service tax@14.5 % is included 1n tne esnmares, nowever, me"''"""~;,.,;;
be charged as per actual charges in vogue.

This administrative approval is issued subject to the technical sanction to be issued at


your end and it is in supersession to the earlier approval issued vi de this office letter no. 555
dated 18.04.2013.
.. -.~-~_.,.
. -.>::
-.,,
~\
.~,
~v-
j { (A. K. Shrama)
I Ch~nvr (PPM)
...... I '
i
, ,_, .. " L,io.~ -r f~
I
l
:i''~
o "
ifi11-it;.:.;t). :;:.
.{(;>;,;;;:;., ....--~1'> r?H'
N .RAJYA VI YUT P
D RASARAN NIGAM LIMITED
\ ;:~ , 1(~~~,~~;\ : {. J/.\.1 ..J (An ISO 9001-2000 Certified Cornpany)
~ ' -. . . flft-- ~L:;~1-~ ----
L - -..y~;'.~,~,;~> OFF'ICE OF CHIEF ENGINEER (T&C - JPZ), JAIPUR
PRASARAN BHAWAN, AJMER ROAD, JAIPUR -302020
(Tel & Fax: 0141-2250992 & 0141-2250087)

No. RVPN / C.E.(T&Cj /Sec. 5/ F. /JPR/D. 4 {0 Dated / :;,/0 :sJ 1::f


The Superintending Engineer (400 KV GSS),
Rajasthan Rajya Vidyut Prasaran Nigam Ltd.,
Heerapura.

Sub: Technical Sanction of technical estimate for modification of 220 KV


Power line crossing between Jaipur-Sikar section : realignment of
existing 220 KV S/C Heerapura-Khetri-1 line by raising the height
. at railway crossing (Railway Deposit Work).

Ref: Administrative Approval No. 555 dated 18.04.2013

Technical sanction of Zonal Chief Engineer (T&C) , RVPN, Jaipur under DOP
item No. l(a) is hereby accorded for modification of 220 KV Power line crossing
between Jaipur-Sikar section : realignment of existing 220 KV S/C Heerapura-
Khetri-1 line by raising the height at railway crossing (Railway Deposit Work).

The total cost of estimate is Rs. 1,01,47,997 /- (Rs. One Crore One Lac Forty
Seven Thousand Nine Hundred Ninety Seven Only).

Any charges on account of Service tax, TDS Income Tax and work Contract
tax, if applicable will be extra on party's account.

II!; Detailed cost estimates are being enclosed along with above referred letter.

Encl: As above.
(,122r-
'b)t'JJ-:,
Exe cu tive Engineer
T.A. to Chief Engineer (T&C)
RVPN, Jaipur.
Copy to:
1. Sr. Accounts Officer (T&C), RVPN, Jaipur.
~fl/~ rSJn
T.A. to Cfuef ifrigmeer(T&C)
RVPN, Jaipur.
If
RA.IA rfHAN R\.JYA YlllYUT PRASARAN NIGA~~Tll
400 KV GSS: HEERAPURA: .JAIPUR.
I
No. RVPNL/SE/400 V/CiSS/lll'IUr. M"dificntion work/ 2013-1~/I). l, [ (- 1)1
To /:
- riie 0y:chlef electrlcd 'Engineer
1
North western Railwc ., Jaipur

Sub: Demand
1
i~ote
for modification of 220 KV Power line crossing between JaiJ)ur. Sika
section: realig 'menc of Exiting 220 KV S/C Heerapura- Ketri-1 line & 220 KV S/C Heerapura
' Ketr!-11 line by ~aising the height at railway crossing. (Railway deposit work)

.,, Dear Sir,


In reference ~your letter No ElC/Jp/track crossing/Jp-Sikar/1/102 dated 23/04/2012 rcgording

...
modification of 220 K Power line crossing between Jaipur- Sikar section: realignn1ent of Exiting 220 KV
Sic;. Heerap4f,a- . !<etri-1 'ine & 220 KV S/C Her;ipura-Ketri-11 line by raising the height at railway crossing. 1t
-. is intimated that the_t nt<1tivc (",t11n;llc!d co~t for followinp, line cro<:.sing work-i~ ,15 uncit'r

~----;--- ----------,---_ ----------------, --


5 No Line 'Name I Locflt1onbetwcen Loc;it1onbet.,.,,,L'(!n ; Tvn1.11ivv f''..ti111,1t
/ railway section No EHV Tower no l ru~t

-----~L"-=-~~~:~~:~:~:~:~~:~:::::;::~::;::: ~ :.:.:;.: ;:. : : :.~n":.:~_..._ jL. .:~ .:.4~ - ~:. .:-.:~ ~: ;.;.j-_-_..-____--'-+- '" -s: :4~: :~ =- ~-: ; ;.~:;.f.,~_--_
i..:1 ;.:: :.:c 7-=1 ': 7;-:)~ ~17"/-:- -
_ __.Jf.,,R:...R::.:-:-\o,;-7;;-,'. - . . .. _.. - - ...
Total:- Rs. 179>19,73i/-

... You are ther ore requested to please arrange to deposit the amount Rs. 179,19.731/-(Rupees
One/Crore Seventy t ne Lacs Nineteen Thousand Seven Hundred thirty s>ne only) for above mentioned
v!ork to the Account' iOfficer (TCC-1), RVPNL, Heerapura, Jaipur through RTGS or D.D. (payable at Jaipur)
Jith\n :thirty_ days o ;issuing of this notice, so that the modification work may be taken up in hand
accdrdingly. The ban :account details of A.O.(TCC-1), RVPN Jaipur for RTGS, is as under:-
Bank Name: SB BJ
Branch Nam ' Collectorate, Jaipur Branch (code 010026)
A/C No.: 51093320727
IFSC code of ank: SBBJ0010026

,. Please note 1 e aforesaid amount is tentative and you have to deposit the additionCll nn10Lint as
deman_ded by RVPN mmediately in case of the amount exhausted before completing of work. Plea~e
n~te also ihat,work ill only be started after depositing additional amount if demanded by RVPN.
Further, it i !also informed that any charges on account of Service Tax , TOS ~ncon1e Tax and
1

Work contract Tax, applicable, \t1ill be extra on your part. .. --)


I , - .) - - --
-. :)
(K:\nrn\ ,Jain)
SUPERINTENDING ENGINEER
(400 KV G5S) HEERAPURA.
Copy submitted /fo f,varded to the following for information and necessary action.
1- The Chief E gineer (T&C). RVPNL, Heerapura, Jaipur.
2. The Execut' .e Enginee1 {220 KV GSS). RVPN, Heerapura, Jaipur with advise to st1bn1it the
material re uircment of <1fores.1id work.
3. The Accou1 s Officer (TCCI), RVPNL, Hecrapura with advise to ple<tse inti111Jtc ID thi" 0ffic-t.
immediate ' after depositing the aforesaid amount by firn1.
i
:
' I
SU PERIN rENOIN(l f.NCilN[l f\
1 (400 KV GSS) HEEHAPUH.~

I
iI
I
'
~V.
N.w.e
' WESTERN RAILWAY
NORTH

Office of the
Dy. CEE/C/Jaipur
Case No. EL/C/SIKR-LHU/GC/1 Dt. 26.09.2015

(1) Superintending Engineer


400kV GSS, Heerapura
RRVPNL, Jaipur

(2) Superintending Engineer (TCC-1)


RRVPNL, Jaipur

Sub:- Deman.ct note for modification ofEHT lines in Jaipur-Sikar and Sikar-Churu
. .
section.
-I a
Ref:- 41) SE/TCC-I's demand note no. RVPNL/SE/TCC-l/Cell-2/F./2013/D. 1709
jaipur <ltd. 05.9.13 for Rs. 4,41,07,676/- .
V SE/400KV GSS's. demand note No. RVPNL/SE/400KV/GSS/HPR/F.
Modification work/2013-l 4D. 879 dtd. 9.7.13 for amount Rs. 179,19,731/-
<<>>
Dear sir.

In reference to above cited subject and reference N.W. Railway Jaipur has deposited a
sum Rs. 62027407/, (Rs. 4,41,07,676/- +Rs. 179,19,731/-) Rs. Six crore Twenty lacs Twenty .
Seven thousand Four hundred Seven only against aforesaid demand notes through RTGSfNEFT
/UTR No. S13IN 115240006785 dtd. 28.8 2015 in your SBBJ A/Cl No. 51093320727 ..

Now you are requested to provide the acknowledgement of ihc same and also provide
.._;.. demand note for remaining amount due to escalation of price and any taxes if applicable at the
earlier possible, so that the balance amount can be deposited immediately.

Office c :.\J:GSS)
~,,
R . ...
1,.
;\ 2-2\--2.'8- ..... .
Dar<.
Sec. ~.::::::::
r~.v
. ,-.. .. ~::.iPUR
s . "- .
''!'
-~--- .
~ . (\./
I.
{
. j
(I::. -
' '
OFFICE OF THE ACCOUNTS OFFICER TCC-
RAJASTHAN RAJA Y VIDYUT PRASARAN NIGAM IMfTED
Jlnd Floor Prasaran Bhawan,near Surana Farm House Hee apura Jaipur

Ncfl1RVPNL/AO!fCC-I/CASH./F. ID. ~ ~ ~ Date : 16.05.2016

f
I Certificate

I
9 ..... This is certified that amount of RS. 5,90,45,927.00(in wor s Five
Crore Ninty Lac Fo1iy Five Thousand Nine Hundred Twe ty Seven
only) has been received in our Account NO 51093320727 on dated
08.04.2016 through RTGS(online Transfer) from FA AND AO/JP.

~ '""""~
\ I.. \
ACCOUNTSiOFFICE (TCC-I)
-s\ \(,,
RRVPNL JAIP H
Accol.II\tS Office (TCC I)
R.R. V.P.N.L., J lpur
~ RAJASTl;IAN AF 795126
"'
I '~ ;>,
! _ . \fa NORTH\VESTERNRAIL\VAY

\ lli L~Ad:ki1b\ii:m:Fbk GRANTING OF WAY LEAVE FACILITIES.FOR THE WORK


" U
I',) . ~
Oli' OVERHEAD TRACK CROSSING FOR LAYING ELECTRIC LINES.
,.

'
.,, An ~~ecieil't'mllde this . . . . . . . . . . day of . . . . . . two thousand . . . . . . . . . . . . and between
President of the Union of India acting through Divisional Railway Manager (Works), Jaipur
I Division, North Western Railway hereinafter called this " Railway administration" which
expression shall unless the context does not so include his successors and assigns, of the one
B part and ... Rajasthan Rajya Vidyut Prasaran Nigam Limited............... Hereinafter
referred to as "Applicant" which expression shall, where the context admits, include his/ heir
B successors and assigns, qf the applicant is the sole owner and proprietor of certain land or
ground situate at ................ :......................... .
.. . . .. . .. . .. .. .. .. . . . . .. . . .. .. .. .. .. .. . . . .. .. .. Registration sub-district of ..................... .
District........... as shown in plan No. DRM'/JAIPUR/..... , ........................... AND
R WHE.REAS the applicant is desirous having a... .. . . .. . .. . .. .. .. .. .. .. .. . . . .. .. .... laid
across the .. . Railway Track .................................... between the point marked A
I and B in the said plan for the purpose of...... Transmission of electric
Power. ............................................. And has applied to the Administration to lay and
I to pem:Ut him to use such a aforesaid which administration have agreed to do upon the terms
and conditions hereinafter appearing NOW IT IS HEREBY AGREED BY & between the said
g parties here to as following :

}~,
B. V.P.N.Lj Heorapyra

-
~--

~--
~ .. .,,,,__ .. ~--.,_~ ..
--.~,,._...., .~.,
- -------
'
......... __ _____
.-~-----""''' .-~--.-_
-~------ ~ -- ---- ..__ _
_

The Administration shall lay a................................................ on


eel strncturcs (hereinofler referred to as the line) across the Railway track at Km
bctvveen Raih.vay
ation bet\veen the points iHrk(;d 1\. and Bin the saiJ plan and distance of KnL
from Raihvay stsrien .. ............. ............... and \vhich portion of
:the said points A and 1l is situated at the ...................................................... .
<registration sub-district of ................... .District.
'2. The line when laid a' aforesaid shall be vested in and shall become the property of the
Administration and shall be under their sole control and the applicant shall have no right or
interest in or claim to the pipe whatsoever subject to the provision of clause thereof

3. At the instance of the application, the Railway administration have agreed to grant
way leave facilities/cas~ment right for the specified purpose of the track crossing for laying
of OVERHEAD TRACK CROSSING FOR LA YING ELECTRIC LINES at above Km's and
drawing No. as approved by the Railway and conditions stated therein.

4. It is agreed that way leave facilities/easement right is allowed and that the Railway
land/way leave facility is not licensed but only permission granted for a limited use as
specified in detail the applicant will carry out all repairs and maintain in good order the way
'leave premises and no construction (where pennanent, quasi- permanent or temporary) is
permitted on Railway land. In case of any construction coming up subsequently, it should be
removed immediately and the way leave facility will be discontinued with. In case of
crossing of Railway tracks rules, terms and conditions for crossing Railway tracks should be
complied with by the applicant.

5. The applicant will deposit as way leave charges a sum of Rs. 1,00,000/- with the
Railway which are calculated as per .Railway Boards letter No. 2001/LML/24/20 dt.
18.10.200!. These charges will be taken for lO years in advance subject to revision of
charges from time to time by Railway. The other charges which include departmental charges
etc aie as per demand note advised by Railway vide No ............................................ .
6. In the event of the way leave facilities being discontinued with, The Railway will not
be liable to pay any comp~nsation or reimburse any amount to the applicant, not to provide

/
6'..
any alternative arrangement for access etc. In such cases, any underground installations etc.
put up by the applicant are liable 1o removed /shifted by the applicant to have the existing
open drainage and surface /overhead pipelines etc. replaced by underground installations at
his cost.

7. Whenever the party intends to carry out any repairs to their cables within the Railway
premises, they will obtain personal approval of AEN concerned before carrying out the
satisfaction of authorized Railway representative.

8. Railway will have underfeed right on the land and in case damage is caused by the
Railway to the cable during inspection/maintenance repairs or due to any reason whatsoever
Railway well not pay any damages.

9. The way leave feasibility will not involve any Railway asset and would not in any
way obstruct free use of the land I bridge /culve11s by the Railway.
10. Railway interest and maintainability for the structure track will not be affected in any
way whatever because of this cable.

8.E~=.;?;S)
..v.r.11.li.; 8eerapura
T]ie way leave facility will not affect Railway's future interesi in any ways.

:it!. 'fhe party is to subrcit annual safety icport certit~ving the good condition to the GI
)ipe line cros.sing belo;v the RnihvJy.
'
'J 3. The applic:mt shall pay all the legal expenses, stamp Juty and registration charges and
all other cost ch<iX6~S and incurred in connection \Vith these presents.
;

J4. In case Railway desire to shift relocate or remover the cable from the existing
locations on account of Railway's requirement, the party will promptly remove.
i Renovate/shift to the new location at their own expense within 60 days of intimation from the
! Railway side.
I
Subject as otherwise provide in this Agreement all notices to be given on behalf of the
president of the Union oflndia and all other actions to be taken on this behalf may be given
to or taken on hb behalf by the Divisional Railway Manager (Works)/Jaipur of the North
Western.Railway Kota.

IN WTINESS WHEREOF ............................................................................. .


i
!
the Sr. Divisional Engineer ( ) of the North Western Railway,
Jaipur for and on behaifof the president of Union ofindia and .................................... .
Have herein to set their respective hands the day and year first above written.

Licensee's signature & Address

Sr. Div. Engineer ( ) I Jaipur

Sup~
('80 KV:GSS), R.V.P.N. Ltd.
Engineer
North Western Railway, Jaipur
for and on behalf of the president
of the Union oflndia
Sjgned by abt1'61W 0 B.iAaiP.PJlresence

, 1.'. ............. (_::>~-)


I
~~~g~~eer
v "], ~;.. .......RRVPNt H 'I
eernpura (Jaipur)
~J
~~".i\SSi5tant Engineer-III (C&M)
c
z.....................
;:l/<.. .8.1 /k.. ~) 400 KV GSS, RVPNL, Heerapura
D4'?.
i,...-. _, 1)--- -
b:5 .

.
00 .

AF 795127
Annexure -4.02
AiREEMENT FOR ERECTING AND MAINTAINING AN OVERHEAD POWER LINE,
CROSSING OVER AND _ACROSS RAILWAY T~CKS
ll
ANAGREEMENT made this day of two thousand
an~ BETWEEN THE PRESISDENT OF INDIA acting through the Chief
Electrical Engineer/Divisional Railway Manager /Divisional Railway Manager
(Eltct]ical) of the _ __ Railway administration (hereafter called" the Railway")
of the one part and __ (hereinafter refetred to as "the o..-ner" of the other part.
WJiEREAS the owner wishes to erect an electric overhead line and carry out the works
con"nected there with for transmission of distribution of electrical energy over and
across the Railway 1racks and /or land at kilometrage_.___ in the section
_1_ at ____ Railway station., of the Railway, the said over
head line where it crosses the Railway tracks and /or land works connected therewith
hetf'inafter referred to as the "crossing" Now IT IS HEREBY AGREED AS Follows:

1. General: The Railway will permit the owner as from the _ day of 20 , to lay
s the crossings as per Drg. No. approved by the Railway
hereunto attached as annexures and in compliance with Regulations for Power
line crossing of Raili.\ray tracks llereunto attached as Annexures hereinafter
~ referred to as the Regulations, for the pJlrposcs hereinbefore mentioned subject
to the terms and conditions hereinafter contained.
I!
2. Permission to erect and maintain the crossing:- The Railway will, subject to
~ the provisions of clause 3 hereinafter contained, permit the owner to erect and
maintain in accordance with the Regulations the crossing over and across the
~ Railway tracks and ior land at the place(s) shown on the said drawing and to
,:,. execute all repair8 in t:";o11r1ectio11 therewith when necessar~y from ti11~e t6 time
and all such works shall be exec'lted at the cost of the owner at suc.h times as
f~
~:'i:'
~ may be permitted and to the satisfaction of the Railway in all respects.
~-
-~: !.
._j
-~---~,...,;~_-""~-~----~ - - -_-.:
...
~ t:. (400 i(\' (;;;,/
~~''-f'.N.!.f !~cc,:-:!p;.~;-,:_

.
lr ._, , , , , ,_,; ""'"'
.e
m"' "'"""''"'nfla&-wm,;,,,@,,,.,_s_m_g__'_,_____
is required for the proper functioning of the Railway and to be carried out by
the owner as desired by the Railway. the cost of, such works shall be born by
the Railway except in those cases where the need for such works on account

I/ "
of RaiJ\\..ays anticipatd developn1ent/ requirement ~as foreseen in tirne a11d
tl1e o\1rner had agreed iI1 \Vriting prior nto the construction of th~ crossing to
rr.:.eet the cost of Sl!Ch tvorks.

Railway to carry out protection works: - In the event of it being necessary


in the opinion of the Railway to support or protect the Railway tracks and
/or land or w>rks during the erection of the crossing or the execution of any
!J' repairs thereto or any removal thereof the works supporting of or protecting
the Railway tracks or land and resorting the tracks and /or land to its
original condition or such part of the said works as the Railway shall deem
fit will be carried out by the Railway at the cost of the owner in ali respects.
The amount of such costs will be determined by the Railway in its absolute
discretion and v..ill be paid by the owner to the Rly. on demand. The owner
will, if so required, deposit with the Railway prior to the carrying out of the
said works such sum of money as may be estimated by the Railway to be the
cost the work required to be done and the amount of the said deposit will be
set off against the said cost to be determined as aforesaid and' the balance
paid as aforesaid.

4. Cost of Supervision of works


All works in connection with the matters referred to in clauses 2,3 and 6 will
be subject to such supervision by the Railway as may be considered
necessary by the Railway and the owner will pay to the Railway on demand
all costs of such supe1vision including the cost for the staff required to look
after the safety of the Railway tracks and/ or land while all or any of such
works are/work is in progress. The costs of such supervision and other costs
as aforesaid shall be determined by the Railway in its absolute discretion.
5. Acces:::,;:-Neither the o\\~ner r1or his ernployees will at any time enter upon the
Railway land for any purpose whatsoever in connection with the crossing as
aforesaid without the consent in writing of the Railway.
6. Modification, shifting or removal of crossing
If for convenience of operation, unsatisfactory maintenance or for any reason
whatsoever the Railway desired special maintenance, repairs, modification,
shifting or removal of the crossing the owner will, subject to the provisions of
clause 3 hereof carry out such works or such portion thereof from the date
of notice issued by the Railway and to the satisfaction of the Railway within
a reasonable period determined by the Railway in its absolute discretion as
the Railway shall not under provision of clause 3 hereof proposed to carry
out the works. If the owner so desired he may re erect the same at this own
expense but to the satisfaction of the Railway in all respect on such other
land or track oi the Railway, as it may in its absolute discretion consider
suitable and available for the purpose. In the event of the crossing being so
re erected the land on which the came is re erected will be used and
occupied upon the terms of the agreement mutatis mutandis, as if the same
has originally been subject to this agreement.
7. Termination of agreement by the Railway
The Railway may be any time (and from time to time) be at liberty in its
absolute discretion to suspended temporarily and/or terminate this
agreement and all or any of the privileges hereby granted upon the
expiration of three months notice in writing of its intention to c)o so being left
at or sent to the registered office of the owner/and not withstanding that the
owner may have executed any work of a permanent or temporary character
2

s.e~~ssi
G.V.l'.N.Lt fle&tapur~
~
,
il
L,_,_ ,,,,_,,,m-m.~
or suspension.
... ,,,.. ~,~@----.-~-----
entitled to ~ny da1nages or compensation by t11e reason of such termination

p,. Same as otherwise provided in this contract, all notices to be given on behalf
of the }Jresident or India and all other a.::tii:ons to be taken on this behalf 111ay
be giveri ur taken 011 his bei1alf Ly lhc Chief Electrical Engineer/Divisional
Raih..vay Manage~/Divisional Railway !Y1ai-::ager (Electrical) of the Railway.
~l. Ter:lninatioll of l\greeme-nfb}r the- oWn-er- - - -
The owner 1nay on given to the Railway one mo.nth's notice in writing
terminate this agreeme_nt and such notice sha!! be sufficiently served if sent
by registered post to the Chief Electrical Engineer /Divisional Railway
j Manager/Divisional Railway Manager (Electrical) of the Railway or left at this
office.
i 10. Termination of Agreernent for default.
I In the event of the Railway giving notice under clause 7 hereof for special
maintenance, repairs, modification , shifting or removal of the crossing and
the owner failing within the time stipulated to carry out the said works
>
~
except such posit10n thereof as the Railway may propose to carry out under
the provisions of clause 3 hereof or in the event of the owner committing any
'
' other breach of this agreement or any part thereof, the Railway shall be
I entitled in its absolute discretion( notwithstanding the provisions of clause 8
hereof) to terminate this agreement and all and any of tl1e privileges hereby
'

I
granted upon the expiration of six month' notice in writing of its intentions
to do so being given in the manner provided in clause 7.
11. Removal of crossing.
Prior to the. termination of this agreement and subject to the provisions of

I clause 3 hereof the owner will at his own cost remove the crossing from the
property of the Railway and restore the land to its original condition to the
satisfaction of the Railway in all respects. In the event of the owner failing to
remove the said crossing and restore the land to its original condition in the
manner herein before provided the Railway will be entitled at its option
immediately after the termination of this agreement to carry out the work of
removal of the crossing or any part thereof. In such an event the owner will
pay to the Railway on demand all costs incurred by the Railway in
connection with such work including supervision charges, the amount which
)

will be determined by the Railway in its absolute discretion. The said


crossing and the materials used in connection therewith and belonging to
the own.er will be and remain the property of the owner but the Railway will
be entitled to retain the same but without any liability therefore until the
amount. of such costs as aforesaid have been paid by the Railway.

12. Indemnity.
The said crossing will be used at the sole risk and responsibility of the
owner. If at any time owing directly or indirectly to such use or to the
existence of the said crossing or to the carrying out of the work of erection
and/or repair and/or removal of the said crossing and restoring the land to
its original condition or to the exercise by the owner of any privileges hereby
granted or to nay other cause arising out of the operation of the agreement
any damage will be caused to the Railway or to the permanent way and
works, rolling stock or nay other property oi the Railway or if in consequence
of any of the matters aforesaid or of any default in fulfilling any of the
conditions of this agreement or of any negligence on the part of the owner or
any person connected with him, any claim or damage or loss be
3
~~-
8.E. (400 KV GSS)
L V.I" .lll.l.iPloerapur11
....-"S'l!bmnttateLl bY ctil)' pet son. u~ pet :o;ons""'!1.ga.irrnttrr-e---Rcftlway-thc-C'Wlle!'Wtll,_:--~---
upon demand pay fGrth ..vith and make good the same and shall also make
good tc tl1e Railvvay aii costs and expenses \Vhich it may incur in regard to
any such claim or damage or loss as aforesaid. In the event of three being
any di::.pute as to what specific loss and/or dan1age has been cal1sed by
reason of aay of th~ matters afo1 csciid stich dispute will be referred to ihe
Cl1ief E.lectrical E:igir..ef'r of the Raih.vay, \Vhose decislo11 tltereo11 3hall be
,-' final and binding.
~ -
1 1 3. -Ritilway ai:diient
#'
;
The Railway shall not be responsible for any ,damage to the crossing and
other property of the owner due to any accldent in the working of the
Railway d11e to any cause whatsoever.
14. Sub- ietting
The o~J.1er 'vill not sub let, transfer or assign this agree1ner1t or any of the
privileges hr.reby gnu1ted without the previous co1-.sent in wriilng of the
Railway.

15. Limitation of rlghts


Northing herein contained \v:ill b~ constfficd as conferring upon the o\vner or
his permitted assignee any rights over the property of the Railway.

I 16. Cost of Agreement.


Al! costs and expenses incidental to the preparation and completion of these
presents including stamp duty will be borne and paid by the owner.

I
i
'
17. Contents of Para 9.5 of regulations for power line crossing of railway
track- 1987.
"If at the instance of the railway, the crossing is to be shifted or modified or.
dismantled, the work shall be carried out by the owner. at the cost of the
Railway. However, in those cases where the need for such works on account
of Railway's anticipated developments/requirements was foreseen in time
and the owner had agreed -in writing prior to the construction of the crossing
to meet the cost of such works. Such works shall be carried out on a priority
basis by the owner within a fixed schedule, as mutually agreed upon
between the owner and the railway and to the satisfaction of the electrical
inspector. The railways shall have the right to claim compensation for any
loss and/or inconveniences caused if there is avoidable delay in completing
the works."
In witness whereof the parties have hereunto set and subscribed their
respective hands and seals the day, month and years respectively mentioned
again.st their respective signatures.

(~di-~~WOO?~ ~
11.V.P.N.UHeernpuril (Signature)
Signed at .; .................................. by Shri .................................. .

For and On behalf of tz:owner in the presence of:


v p ])/t.ke.-.--J
1. Name
Address
Ex utive Engineer
(C&M-400 KV GSS)
RRVPNt., Hee~ra (Jaipur)
(Sign~~ness)
2. Name c~ P., I 11< A.A,) \i\.JJ...-
Address Assistant ~ngineer-111 (C&M) (Signatur of witness)
400 '(JI GSS, RVPNL, Heerapura
(Seal of the Rly aun10nty)
(Signature)
Signed at _ _ _ _ _ _ _ _ _ by Shri_ _ _ _ _ _ _ _~
4
For and on behalf of President ol lndia in the presence

1. Name
Address (Signature of witnessj

2. Name
~ Address {Signature of \vitness)

I
P NOTE: -1. In the case of Railway Companies or Port Commissioners
Railway, the term Chiei 1lectrical Engineer wherever occurring
in this agreement may be replaced by the designation of the
Officer on whom the du ties of Chief Electrical Engineer devolve.
2. The agreement should be signed on behalf of the president of
India by an officer duly authorized under Article 299(1) of the
Constitution of India.

. d-
S.E. (400 KV GSS)
R. V.r.N.l1 Heerapura
0

5
AF 795128

--~ --"~-----~------=~"""""%'='?.,.,., 49-.-.,------ r;-~-


s.e. (400 KV G S0)
-.-,..Ji."1~~;'11~.'r~-~,
'11~<:1ur ~cpf~ VfFlT w1ffiiT <ITT ilr~~ fit,'? \ij::i c!T~{ii?;Y ~;;;;;-- -
-uiR m ~ 1'CT11 viR <ii ~ ~ <J\) mi T'i 'lfu tor ~- 311'/<rr '!!~ m
_ - q;1'if <PT 3!R'fR! m meJlrr ~ 3lml1'fi TI VlTill t ill BXT !Wfa ii t0 ,.,,rr <rr
'-;~ <PT 3!1W'I wrr-l, ZIT BWITT 'i'RIW'J <fR'l 3i'R ti;rq"<i ZIT 'lfi'J ZIT ,'3w. f.1'!fu'r q;flf
o/ ~ '>IT'f <Pl, 'ijf "'!_ Fl<T i)q; '111ffi vm;, "'.;qi] ,,~q\~ fr".rR\ '1 ?.A ~ ,-,"f1d
-ird m rRT 0 qy,i~ \i ~~n-Vir ~ (>IT~ ~ ft<lr \J11~Tr .3ftx i;fffi 1_:;1prc=if q:5t --<qi>r en1
3J<ITTR"f ~ &Ki 0r,cf; ,-r\ lit'<P-fi -fl fon41 '-"f\!'IT "1R Tc1 <Pi lfilr 'H iPTI ;;m
;3'-m ~ 1iPzrr '"ITT''ll I 'lfii ~ 3f!Tarr ctr VITT; ill 'f<IPl1 \-l<ICI '1>14 m x'! 'l,'f
~ <f; tfIB ~ '1'fu V!~T ~ ui't ~ V!rit <ii ~ 31~ f.1+Jfur <l>f1l <J\) <'IT'l<l <!>
~ ii ~ &m 1111/ifaa ctr um; 3fR ~ =ifu <Ft \ifR c;R'ft \J<ld' <'Wm m
* Wi1' if >\J<l(1' f.'reT<r q\) \$11 ~ :fif'T q\) ~fi ;,jj-{
fipzrr ~ I
m-
Xi/i1f <Ff *1<l <!"-TT ~

f.l1lfur <Wit ~ ~q4""il""'111=01 q\) l'!Tlfff


wo;s 2,3 ;i/lx s lf f.lftrc -.wrc# <ii Wi:f ii <'f'fi f.'r'ffur <wit 'Pf tor ElX! '<ff ~
~IW'l 1iPzrr ~ ~ tor w<ml'f- m
3i'R 'f<IPl1 ~ IDXT Wr <ti vrR TJ'I ~
~ q\) m
C1T'IB <ITT 3tR ~ ~ <rr f<!>ffl f.l1lfur <l>f1l q\) J;fTffff
TJ2lT 3i'R m/'lflt ctr marr Q\'r ~wi-rc'I ~ <i> ~ 3f!TT'am i!ih11R<JY <tr C1T'IB 'f>T
t<'! * <:m.r
'1't <R1'I ~ I ~ ~0,'U'[ <tr '-'lJlTiit 3iTI ~ 'KJrcrn 31""1 <ilIW <ITT 31"Jt,'R"T t<'!
&RT ~ 'l"f f<liliiilj'til{ !iP<rr V!Tl(l'fT I

'5. ~:
~ <IT \TI'!~ iii ifil I;() f<ITTft 1fi Wl<l ~ 'lflt ~ <J\) fufuCT '1Hlf<r fol"lT '12:/T
~
~I
WifWr cf; ~<i'..r if f<!>ffl >ft
'CJ{

~ * fc:rq-
<f;
-mi- '18t
6. WJftiir if aot)IEM, ~1'1i'tl~"I l!>Rf 'llT ~ 6CRT I
<lftt ~ qRiJ1<+1 q\'\ ~m <ii~- 3~ ~ <t <nRur m f<ITTft >ll 31""1
<ITTXur ~ ~ wrfurr <i> f<lm- 3fT'IW'l. lW'f<l. qRqcf'1, "'111'1hH 0 r m ~ 1>cR q\'\
llmT ~ t en ~ ~ wo;s 3 <ii ~ * 31'fi'1' ~ ~ ~ mtur <fiT't m
~ 'WT <PT B in'f "fRt 'J,if'll <tr crRffir ~ ~ <fitl'fT 3i'R tC1 m<r ~ 'l"f
F~il<tilj'!IR 3f<f'<llfur ~ ~ <ii 'lfl<R ~ <PT ~ ~ i'i ~a ~ <ttiT
fin ~ ~ "lu;s 3 <i> -~ cf; 31'fi'1' 'ffi' <fiTlf B &m '18t 1iPzrr \ifRf t I
<lftt ~ ~ qiur ~ t en
~ ~ ~ 31""1 'lflt m m
1'.f'!T fu<f ~ m T'f
Riil<ti1j'l11~ ~ ~ 31\< \i1T \J<l(1' 114hH1>f ~ TI 'CJ{ ~ ~ \N1'f-Tm
'!fl 4Rf.'1>1f1 '<tiX Wlifil t I ~ 1R m ~ ~ <PT ~ >'l i'i wrfurr <1>1
~ m Tf "IRf.'r'Jfor <Im\' V!R q\'\ M:f<r i'i ~ 'j_ll!r ftra 'CJ{ "'11ITT Tl' 4Rf.'1'1f1
'PXf4T lf4T t, ~ '<tiXR <i> ~ <!> 31'fi'1' \'!"!~ <1~ qRq<f'1Y '1fITTr Zff ~
3i'R ~ >I OTll ~- llRr ~ 'i'" ~ ~ ~ '<tiXR <i> ~ ~ TI I
1. m mxr '<tiXR 1l>f 44<1~1"1.
~ q;)- f<ITTfl 'lft Wl<l (;i/lx Wl<l Wl<l 'CJ{ ) 3!'f'l T'f
~ ~ ~ 'ITTT ctr 'fCI< i "'1 aI
lWfi fin ~ ~ <!>~ 3i'R ~<i> m<r 11<:m '1"'ft m f<!>ffl ~ '<tiT ~l<ift Bl
~ Pl <1 fi'<la <ITT"~ 3tR Im 4<fq fft a m
<i> 3l1R 3ITTl<l' q\'\ cfr"! lfIB <f.T ~ WAT
'ffi1ll <ii ~IG1ttlifia <til<if<'lll if ~ m '>!-ul<ITT' WAT q\'\ ~ <tr wn~ <i> '1R'
~ '1R' <i> mtt' ~ 'lft fin lT'ft ~ ~llfi 1IT 3R"lTllfi ~ q;r ~ q;flf fil>m t atR
~ ~ <g9' finm t ~ '<tiXR q;)- ~ '"'f ~ Pi<'lfi'<la atR qifq~d '<tiX -e; I
~ ~ qlfq'IJH m Pl<ii><H <t; <ITTXur ~ ffe~tf.llll m ~ <ITT mr< 'ltt
Til'fT I
a, ~ ~ if ~ <1v.r ~ q\'\ 'llfcr, '1R<f <ii ~ "~ 4 RI q\'\ 31R ~ <ft \jj']'il <fl<'fi
<flfi ~ 3i'R ~ 31R ~
~ :;'GJ'lf.l<N/~
V!R qrc;ft 'li'i't 3Rr <tiflfqf~l!i ~ 31R ~-~
q\)
~~I lf1l;s(1' t<'! ~ ~) aixr Gt ;illx q\'\ ~
*
I

~~ 7
8.E. (400 KV GSS)
a..P.11.~-fleerapura
-;;."!1Tl-~-mR,~ qiflj<Ti!tfM~~---~--.
;
~ ~ q;'r 1'\-f W<" <f,T q,;q,j!'i 'PB ~ \['Ii 'IRf Q\T fc1fu<j ~ B<l
ti4qffi<1 q,-{ ~ ,>fR ~ ~ ~ wi <f rrfltrc;r <ITT -~ "ff'f.'!fi vmrft I llft
i3<'i tM <!; ~ ~~ /'T"<;ct tM ~ / ~ ti'! ~ (filw'!) q;'r
~"N)cr =
~r >hr ftm VlIBT it <n "fl q', <JJT>i!c:rr if ~ fit<lr "1ffiT I t
10. oqf4'trn1 ~ ~ lf,iff <liT 441<Mi'1
fc! m lITTffi>T <!> filWr ~. lffl"!CT. ~ 'R!RR!<ur m B<l Rril <i> ~
~~ "'";s 1 ci; 3!'\R ~ iil'i i.ifR <ITT ~ if 3lT< ~-itft &RT i><ft! f.i1lfuT <wit
<ITT
m
~ ~ 'WT <it \J) <; oo{ ftRt tM iRPli &u;s 3 *
"1T<r.Jl 3!EfR f.wnf<;n *
<ITT Jffiffq 'f>t. 3!J'l& Tflill <f> -.ftm f.'itijlfci<J <f>T-1 if 3!"'! ~ 1 ~<!!ft'r if
'IT ~.j\ liHT 'Pi <P.ffx 'IT ~ ~ 'Wf <ITT >in 'fiR <ITT fuift'r if tci cnl. 3111*, 'J_uf
f.'t;R; \'[ (~'11 wr,; 8 * ~~ * <lT<f') ~ <mi q;r t:'l> 6Trrr ft); % .. ff <J;<R
~ ~ m 1l~001 "fl"fr <n ~ ~ <nT 'l<fciftrc! G>R <t ;i,<r*. ~lf <ITT
~ 7 if ~ m<l <l <!'I ~ 6 'lfff <ITT f2.fffif ~ <ITT WlJ1i<l 'R ~ <fi'(f'( ,
'l~ 'I>'{ ~I

SP1lWT q;)- W'1T


11.
~ ~
'R
*qll<"l'\11'1 <t 'rt 3t1< ~~ ~ 3 *
\31fil~ <!> 3JfR <GT>lT 3!'At <WIB
ti'! <ITT W"lfm 'ff wrfWr <ITT 5~ 3ITT 'Rf ~ <ITT "fl"fr ~ '8 ti'! 'fiT
'1llT'!RllG <'l'l if ~ ~ ~ llC'<Mfd<J ~ I \3<R! i'!i1futT 'fiT ;;cri\ if Gm
\:Pf ~x-rif ~ ~ ilfcr '8 ~ ~ ~ if 11i41qRfa 'fiR if
1!fi'r <Pl
3ffi'l>Ol <ITT Gm if ti'! <Pl '1<Rr wTfWT m 'ffi<i> P.Rlt 1W1" 'fiT ~ 'l'Tofi ~
w*.
~Tf.t 1JT jif>tll'"f <!> ~ \ii'H<:l<Jlt ~ f.AT t<lfci~if> '8 ~ <IRR <!> qifqflf'1 <!> W'U
~. wITWT 'fiT ;;cri\ 3iR 1!fi'r <!> llC41ildI 'fiT <!iT4 <!>~ 'fiT ~ iMJ I ~
rnlfct ii <GT>Tt +rf1r ~ iJfR tn ti'! <ITT ~ <ITT<i! <!> ~ if tc'f m iJ'l1TCT "fl"fr
cwm'f <PT <Im qiftjeiu1 W1ffi 1ffi '1j;lf ti'! &RT \RPli ~ ~ <f ~ 1
vrritift. <PT <'i<:f1l' ~ I \3'lU WTfulT 3ITT \RPli <fiiq ii BtnWr qi\ ~ 3iR ~
qi\ '1J1f!fr 'RTiTt <ITT 'Wilm mift 3ITT ~ ~ ~l'll &RT ~~ <Pl ~ l[<fi
<'!T'Tffi 'Iii Z<V'I q;; ~'<" ~ w-t <!<Ii" t<'I '3<ffi ~ <nr ~ ~ mu<GJ<fi ~
f.AT~~~<ITT~M I

.,
~-'-
12- ~
\3<Rf wrfWr 'liJ \31TllPT ~ <!> \['Ii 11B1 ~ 3iR \'I rn ~<;I ft!c-q 'R f<!RIT '1ff<PTI I
<lflt P.Rlt Wf'! ~llIB: m 3!!1C'<lllIB: ~ ~ <!> 'fiRl'T m \3<Rf WTfulT 'Iii "6i
fi\u<H'id I \3<Rf wfu <!> q~f.'i '1\01 . 3iR / m lR"'lCT 3iR m B<l ;;cA <!> q;r4 'fiJ
f.\iqw1q;B3fl'{1!fi'r <ITT""~~~ it 11C41qfifo ~ m ~ m ~
&RT ~ ~ q;r ~ ~ * 'fiR1JJ 3!'4<lT ~ Q>ffi' *
~ 3R1. 'fiRl'T 'ff ti'! 'fiT m t<'I ~ ~ f.r'1for <liT4. <nT "!<'! ~ m ti'! 'Iii ~
~ '8 ~

3R1 '1"lftU 'fiT ~ j<'l>fll'1 lfS'lill N m ~ ~ >n ~ m ~ <!RR 'Iii m


'fiT 'lIB'1 ~ it ~ <"2l firrfrl>l'I m ~ 'Iii 3lR 'ff 3T"Fll ~ ~<ifmr f<ITTft C<Jfut
<ITT 3lR 'ff qi\ ~ f<ITTft \3l'!arr q'; ~ f<);-<fi ~ <IT <"ll i<ta <TI &RT t<'I <i>
~ if ~ Wll m j<'lifll'l m mf.'I fu& m w<fi t m ~ +rf1r f<l,q \ifR 'R
mq;m \ffi'fiJ ~ ~ 3fl'{ \3'8 14>iq11 3iR ti'! * \l'! "fl"fr r i ~ <'fT'lill 'fiT
>n og<'!>1q11 urr erg 1f41Ct_<ififfi ftl;<lT ~ GT<t m j<'lifll'"f m mfq <i\t orrom \i4"liftf CIR
I ~tr '<Ml it f<);- \34oil ift1 ~ 'lfi 1!fliR <!> 'fiR1JJ ~ fc1 f.\ fi!: m 3ft< / m
j<'lifl14l ~ t. ~ f<l<lrG rr.t <ITT ft<!!ft'r it ~ ~
\ilTIPTT fGrnq;r f<J PIN 'l ~ mm if aif<rl $. 3ITilil'R m-in I
* ~~ Fctwr ~Vl~f.\<ix <nt .>tm

~~
S.E. (400 KV GSS) g
B.V .f' .111.t.i f!eerapura
'.- ~- !);Eic'ii ( -~ ~-~-- ~--- - .._ - . -
: ~. -& 'T' ~l'"'1 <t <:'RR ftRfr <fl <JITTUT <'i q;J-~ ~ rn x'r wrfurr ifit 311'
<---wil qi] 3t"'X! 'ff"ltfn <Pl s~ ]q,,f, j<t><il'll </'; ~~ \ffil'RT<fi '!'~ ir1TT I
iN~21R ~
-,,;r-qr & q;"\ tMffi! 'J:'T "fl"rTm
7$ cfl 'RX! <tiT 'IT ~Tit Gm l!Grn fu;xt ITTl~P
r::;T 1-j~ ~::~ ~~ ~. %~ ~I.--.:1~'-'f m -~=Pij~~fq ;,fr 'i>~- 1 11 i
;i,'fQ-<lm'! qf\ q I~ rt) 'I I
$<i ;1 3Rlf'lZ fiITTft .ft <ml 'i>1 ~ .310, 'l<ft <'fl'lT'..JT ~ fcl> % x-<o"T'lt 'Tl \ffi',~
3IJ'lCf fl'.J~~~l<fi <Pl ~ qi] ~ 'l< <f,)-'1 ~ l<Gl'l <ITT"ctr I t
'Im< qft <'IT'Rl
"'1 fcl<t"-'l q;l rPIT-! ""'1' ;;ITT 11'.'f ~ <ti W'!Uf <'fJ'lfil 3t1' 3Jjqif<'lifi "l<I ifiT <CTUf
'{l'"'o<ri 'ffi%rr , ~ ID<T '16'1 31~ ~ fil><rr ~ I ~ flTe<! ~ ]fff'<fi
<Rfil>f{f ~ ~;: BlR \r"'1'ffii'1 ~ ifiT 3rTi\ 3f'l~ 'ITTID<N " " fu/ t 3fR f

wn<flt1 ~~
~ Gss; (ITT'<'ITarx)
l'Jtr.,.~&.i)":ff~erapura
~qi]~ ii~* Poi~ 3ITT \!""~ 3ITT <'; .,jt ...................................... ___ .. ..
~..........................................'R ~al' ~ :-

1. ~ ... -~i~:~.... 4~ .
<rctT ...... AAJ~M::4.00.K1/.-GS.S} ....... ~ <!> -
2
:
.
::AS.~r.~i1'ij?e[;.;~:~~~p&,M)u.,, <i>~,'f1>--
400 KV GSS, Rvrn , neeoa U~ljll~I
~fum qft ~<!Tfu ii '1RG <!'; '<l'l";4Ri <!'; ~ 3ITT \ffl'il\T 3ITT ~ ..,ft ........................... ..
.................. A....... , ..............................lR ~ ~ I
1. ~

I . ':"
i:mr. .. ..... ... ....... ................... .................. (<m1" <!'; lffi!RR)

'fd . . .. ......................................... " . ... ... (~rclt <!'; ITT<rraN)

{C;
' . ~ :- 1. ~ ifikff.i<li 'l'T ~ ~ qi] ~ ii vrITT q;-61 >ft ~ q>'{N ii
~
~ ;t'Jftf.1!l'< lf<:' 3!T1I '1'ff ~ ~ am ~ <R ~ m
'"1Z'TT ftffi ~ ~ ;j'Jft f.'l<H </'; ~ mq '\i!Rl t I
*
2.~ <ITTR lR "Tffil <!'; "~4Rt &m 3ltx ~ 3Ji< ~ '1RG <!'; ~ <!>
~ 299 (I) </'; ~ ~ Xiitf ~ ~ ~ &Rf ITT<l'mR ~
;:;wf ~ I

9
.,

.;....---------------------=- -------- ----~~---------------------~ ,.,,.,.------


Gei:eral: The Railway will permit the owner as from the _day of 19, to lay
he crossings as per Drg. No. __ approved by the Railway hereunto
attached _.,..; aru1ex11res, a.nd i11 CO?P.. pJia11ce \'\rith Regulations for Power li.J.1e crossh1g
l)f H.aflv,'.:1:. tracks here11nto attacb2d as /\.ruu:x--u.res ller~inafter referred to as tit~
Regulatio.,, for the purpos<'.s her,cinbdor~ mentioned subject to the terms and
- -conditions hereiI1after- contained. - -

2. Pen!lission to erect and maintain the crossing:- The Railway will, subject to
the prmisions of clause 3 hereinafter contained, permit the owner to erect and
maintain in accordance with the Regulations the crossing over and across the
Railway tracks and i or land at the place(s) shown on the said drawing and to
,.
,, .. -,
execute all repairs in connection therewith when necessa1y from time lo time and all :)

such works shall be executed at the cost of the owner at such times as may be
permitted and to the satisfaction of the Railway in all respects.

"Provided that if shifting of or modifications to or dismantling of the crossing is


required for the proper functioning of the Railway and to be carried out by the owner as
desired by the Railway.the cost of, such works shall be born by the Railway except in those
cases where the need for such works on account of Railways anticipatd
development/requirement was foreseen in time and the owner had agreed in writing prior nto
the construction of the crossing to meet the cost of such works.

3. Railway to carry out protection works: - In the event of it being necessary in


the opinion of the Railway to support or protect the Railway tracks and i or land or
works during the erection of the crossing or the execution of any repairs thereto or
any removal thereof the works supporting of or protecting the Railway fracks or
land and resorting the tracks and i or land to its or; ginal condition or such part of the
8aid works as the Railway shall deem fit will be carried out by the Railway at the
cost of the owner'in all respects. The amount of such costs will be determined by the
Railway in its absolute discretion and will be paid by the owner to the Railway on
demand. The owner will, if so required, deposit with.

~~Engineer'
5upef!ntend1 ~\f.P.N- uct.

Ex~1ne11r
(C&M-400 KV GSS)
(48QK'J:~ JaiPUf
tleef3pur3
.

RRVPN!., H!!!!rapura (Jaipur1

CXo.VU9 .
Assistan; fn:\n;?r:lli (C&M)
400 KV GSS, RVPNL, Heerapura

~~
..,_.-.
c
.
.

10
'

, ____ _,__ - --z-----=--___.._ ---~------

ANNEXURE A- 4.01
DATA, DESIGNS, CALCULATIONS AND DHAWIXGS
osSING OF RAILWAY TRACK OVER HEAD TP-ANSMISSION LINE
{Form to be filled in by the applicantJ_ _______ _
----1
_; nd designs:~ i 220 lt.."V Sic Heerapura - Kotputli
a ~ Transmission Line

' :- Between Nindar Denad & Chomu raihvay


distance from the nearest Raihvay station

e distance from the telegraph posts on eithei'" sjdes


stations

: - 3 Kms (apprx.) from Nindnr & 13 Kn1s f1om


II
e crossing including number marked on the Chomu .
.graphic po~ts. ,

'
~
~System of supplies Voltage AC Or DC
<frequency number of phases,
.i
ft

!
Kin stone No: - 145i6 &145/7 Distance fron1
Km stone No; 145/6 44 Mtrs. & 145/7 ~56
Mtrs.

220 KV AC, Single Circuit


50 Hz,3 phase
~Whether neutral is earthed or not and if earthed e Neutral is solidly earthed at substation by
,,, of earth. i; earth electrode connected to earth rnesh.

45 Kg/sq m
75 o Maxm
erature data ado ted. -2.so Minm
:o.~:articulars of ice/snow loading if any Adopted NA

5'-actor of safety adopted in the designs


e) For conductors :- 4.0
f) :J Structures guard wires/ cross wires if provide
eartl) wire ,stay v.ire :- LS
gJ Insulator -strings etc. :-2.0
h) Foundation :- 2.5
Design calculations of structures and foundations fOr The structures & foundations are of standard
The crossing span, communication lines or guarding if type being used in all the lines in R\'PN &
any PGCIL transmission lines successfully &
Note : if the structures and foundations are of safely.
Standard type used for the transmission
/distribution concerned, the detailed des!gn
calculations shall be furnished 1

" - Calculations leading to the minimum values under 1


worst conditions of the following.
1) Vertical clearance between the lowest crossing :-18.2 Mtrs.
8. conductor, communication line and /or
guarding and different Raiiway tracks in thti
crossing span. :-NA
2) Vertical clearance bct-,,veen tlte lowest crossing
conductor communication line system and
other conductors if any. :-No railway mast/ structure/building exists
3) Horizontal clearance of Railway mast/ near the railway crossing
Structure/building, if any.
Note: full particulars of the number size :- ACSR Zebra conductor (54/3.18 mm Al
material and characteristics of various wires and &7/3.18 mm steel wire),l Nos earth wire of
"----'-=co=n=d_,,u,,,c=to"r,~s'--b"e~fu=n~11"s~h"e~d~-------------'--'-7~3".1"5"-"m'-'m=,,G::=al.Yanized Steel Stranded

'L
. S.E. (400 KV
lt.t.1t.11.t.;-s Gss)
Gerapura 4
- r(s) ___ .__
,-,&M,nsatat.ors-,.&Pidling.Gi-th.&"'8&flffilt.:{;~~.;;.,;;~==:::i:f~l~5'~~~Disc--'t-tstt-latttr,-B&S-~~J>..,~ _..,.

I
_
~
aracteristics. A detailed drav. ing shO\ving the
ll" arran<Tement ifproviJe, shall be given.
0 a
- - --

""It.:Co;f'-gu-a-::rd"m;::.-:g:-,-:s:;izc::::-.-::o-:rfgu;;;-;;a-:r:;:rl,-&:::nd cross
1
'.Vire and I
I
phase~&; lx2 I additional per phase)

Guarding not rr.quircd


l
-

~~d characteristic~ of guy \Vire. if provided-and t~ Guy\\~; not requ :red as ~tnH~ure- nn_ self I
~~:i:of 8upports. ----- .. , suppo,tmg tye. 1-
~.- tails of protection against moving road vehicles. No road exists near the crossing strui:tures.801
no requirement of protection against moving
road.
'culars of ;nti-climbing devices if pro!itled and Spik~ type ACD & ::;tanda.rd warning notice
J:ning and caution notices. provided on shucture(Drawing enclosed)
'
-'=--.,,.-.-~c::-:::-:c-:-<::-::-:::-::-:::;:=-~----------+-~----------------~-~~
_Detailed scheme of protection for th{".
-~ -.. -,ft-~missiun/distribution line including particulars of The system is protected by means of quick and
'.HiQYs operating times etc. fast acting relays & circuit breakers which
Particulars of circuit breaker if any ensures -instantaneous isolation. Tripping time
= 0.1 sec

~ ;~tio's separate and distinct independent earth on each Yes provided as per dra\ving.
;crossing stn1cture
.i-:;!~ .
. ~"~
~:Details of Adjoing span of the crossing Adj. Span to the structure 583, DD+6 is 322
'f,
Mtrs & Adj. span to 582 'X' DD+6 is 144 Mtrs.

:Normal span length of the power line 350 Mtrs

Height of the Towe"(KMs in Ascending Order)

I )Right side 41.35 Mtrs

2.) Left side 41.35 Mtr

Distance from cer,i.tre line of the track_ to structure (KMs


in Ascending Order)

!)Right side 74Mtrs

2.) Left side 56Mtrs

23.. Insulator KN 120 KN

24. l)Type of Earthing :- Pipe Type


2) Value of Earthing resistance :- Will be measured after work completion at
the time of final ins ection
25. l}Type of circuit breaker :- SF-6

2 Tripping time of the poWer line :- 0.1 sec


26. Deviations Angle of adjoining structure 583( 43"40' 00" LT) & 582 'X' (00" 00' 00")

27. Sag at center of the track l)Maximum at 75C :-2.78Mtr


2)Minimum at-2.5c :-1.38 Mtr

"- 5
S.E. (400 KV GSS)
LV.I'Jll.~- Beerapura-
@
l)Lcft side I) :- 27 .85 ,.,_1trs
,_;;,..;.- 0 ------~ioht.
side . :- 27.85 ~1trs____________

-li~)tumber, stze l~ material I


i) Conductor I :-54/3.18 1nn1 (Alun1inum} l

ii) Earth Vlire


:
i :- 7/:3.i.$
i
nun (USS~ I
I
I

-~i
i;l!J"i11gs:- I
_'iout and site plan of the p~posed crossing I Sho\\fl 1n t.l--ie enclosed draw1ng
ri'dicating Ra1l~ays boundanes. r-
____l ______ - - - - - - - - - - - -
ng1tud1nal elevation of the crossing. The drawing Shall I
~~Jdi~te full par~icular~ of one span on e!thc::r side of the \ I
.'" Ss1ng span '-''Ith various clearances with respect to
_ "erailway track(s). The drawing shall show the
IShovn1 in the -'?nclosed dra\\ing

:! Fossin -SP.ct.ion of the Railway formation and tJ:acks.

mr~wing: for v:aming and caution notices.


.,_ate;-
iiiJ All drawings shall be in standard sizes as
prescribed ir. the latest edition of 18: 696-
1972 code of practice for general
Engineering Dra~..ngs.
iv) All dra\\ ings are to be endorsed with a
1

certificate as given below.


"I hereby certify that the details of the
equipment provided are designed with the Drawing enclosed
object of n1iriimizing danger in the event cf
breakage / fault and in accordance wiLl-i
recognized modem Engineering Practice".
And si ed. b the owner.

~gineer
(C&M-400 KV GSS)
RRVPNL, Heerapura (Jaipur;

Assistant ~~M)
400 KV c;;ss, RVPNL. Heerapura

6
..~"'''1-i<><-Jp..:i~.Cet-KM 1'5/o >od 145/7 f<-2J~v, ..
Existin Heera ura-Kotputli Line.
Between Loe. No. 582X D+6 and 583 D+6 at 75C
::/f~t' DISTANCE OF RAILWAY TRACK FR0iv1~~:.:..0:.:.._::5.::_83'-'("'M'"'-)----1f--56_ _,
.--;;-
...-0 R.L. of Loe. No. 583 11
Rl" _lc_'f'v_,1)_ _ _ _ _ _ _ _+_9_6__
.2_1-l
UL---~R;;'_':'L.:.co~f~L=:oc':'".';:~-;:lo:-.-;5;;82~X;--;;..-;P '~~-- _i r>'J_ _ _ _ _ _ _-t-_9~ .80
R.l. of Railway Track "R:____(r 1) 95.95
7
,~.~c.~~-~-.--. ro=:r:r::::O~-M-GROSS.ARM-R.L~OF LOC. 1:!!"J. 533 (27.85) (M)- -H4.06
BOTTOM CROSS ARM R.l. OF LOC. rJO. 582X (27.85) (M) 122.65
TENSION "T" AT 75 deg ( (KG) 1547.00
(~1_1)____
CROSSIN SPAN "L" _ _ 130.00
CONDUCTOR WEIGHT "W" FOH ACSR ZEBRA (KG/M) 1.621
H.T DIFFERENCE OF BOTTOM CROSS ARM IN BETWEEN LOC. NO. 583 AND
582X "H" 'Ml 1.41
NULL POINT ( TH/WL) +L/2 "I" (M) 75.35
21 ~-~)_ _ _ _ _ _ _ _,._1_5_0_.7_0--i
11 11
Ll ==
"----M:-,-A-:-:X-.S:::-A:-G:::-A-:-:T::-:cN-:-:U:-:-L:-L::-PO=/N:::T:-:":::S-:-:1,:--, ~ W L1 2/BT ( M) 2. 97
- F NULL POINT "R4" =BOTTOM CROSS RL OF LOC. NO. 583 -MAX. SAG AT
NULL POINT OF BOTTOM CONDUCTOR (M) 121.09
DISTANCE OF RAILWAY TRACK FROM NULL POINT "J" (M) 19.35
"L2" = 2*J (M) 38.70
.'$,4.~ LEVEL ABOVE NULL POINT AT RA/WAY TRACK "S2" = WL2 2 /BT (M) 0.20
MAX. SAG ON RAILWAY TRACK =Sl - S2 (M) 2.78
.l. OF BOTTOM CONDUCTOR AT RAILWAY TRACK "RS"= R4+S2 (M) 121.28

, LEARANCE BETWEEN BOTTOM CONDUCTOR TO RAILWAY TRACK (AFTER


:. AX. SAG MINUS) (CONSIDERING 0.94945580 AS PRACTICAL WORKING
FACTOR)= R5*0.94945580 - R3 (M)
18.20
0TE: HEIGHT OF LOWEST CONDUCTOR IS 27.85 MAT LOC. NO. 583 AND 27.85 M l\T
' 1.0C. NO. 582X FROM GROUND & AS MOVE TOWARDS RLY. TRACK. THERE JS SAG & BY
~LCULATING ALL VALUES BY ABOVE PROCEDURE WE REACH AT THE CLEARANCE= 18.20
M

~ngineer
(C&M-400 KV GSS) "-~ . --r
RRVPNL, Hee~pura (Ja.1pu() . . nding En9'"""'
S~GSS), R.V.P.N. Ltd.
~~.
(4ll01<V- ..,..,. Ja\our
Heet'lo.,u-

Assistant Engineer-III (C&M)


400 ~ GSS, RVPNL, Heerapura
, - -- ..
.
j .
.. .-
@alw!atioo Cbact foLJp,SlKAfl..Tr;id..be.twprn Kl\LUS;'.6 arui.i45/7 fcr.220.K\I-
' -.~;
';~.
Existin2 Heeranura-,:otnutli Line.
Between Loe. No. 582X D+6 and 583 D+6

at() 2.5'C
I
.


.----
:f
, -------
DISTANCE OF RAILWAY TRACK FROM LOC. NO. 583 (M)
R.L. of Loe. No. 583
R.L. of Loe. tJD. S82X
---------
"RJ"
''E2;'
(M)
( ~.1)
56
96.21
91.80
l
I

R.L. of Railway Track "R3" (M) 95.95 I'


-
, "-:--- _BQTIQMJ:ROSSARM R.L. OE LOC. NO. 583 (27.85) (M) .124:051
BOTTOM CROSS ARM R.l. OF LOC. NO. 582X (27.85) (M) 122.65

- TENSION "T" AT 75 deg C (KG) 4351.50
' CROSSIN SPAN "L" (M) 130.00
' '-- - --
CONDUCTOR WEIGHT "W" FOR ACSR ZEBRA (KG/M) 1.621
EIGHT DIFFERENCE OF BOTTOM CROSS ARM IN BETWEEN LOC. NO. 583 AND
! 1.41
582X "H" (M) .

NULL POINT ( TH/WL) +L/2 n /" (M) 94.12

' . nlln
MAX. SAG AT NULL POINT
= 2 * I
"Sl" -
(M)
WL1'/8T (M)
188.23
1.65
~
R.L. OF NULL POINT "R4" =BOTTOM CROSS RL OF LOC. NO. 583 -MAX. SAG AT
NULL POINT OF BOTTOM CONDUCTOR (M) 122.41
;
DISTANCE OF RAILWAY TRACK FROM NULL POINT "j" (M) 38.12
11
L2 11 = 2*J (M) 76.23
-
SAG LEVFL ABOVE NULL POINT AT RAIWAY TRACK "S2" = WL2 2 /BT (M) 0.27
' MAX. SAG ON RAILWAY TRACK =Sl - S2 \M) 1.38
' R.L. OF BOTTOM CONDUCTOR AT RAILWAY TRACK "RS"= R4+S2 (M) 122.68

CLEARANCE BETWEEN BOTTOM CONDUCTOR TO RAILWAY TR.ACK (AFTER

,I
MAX. SAG MINUS) (CONSIDERING 0.94945580 AS PRACTICAL WORKING
FACfOR) = R5*0.94945580 - R3 (M) 19.53

NOTE;- HEIGHT OF LOWEST CONDUCTOR !S 27.85 MAT LOC. NO. 583 AND 27.8S MAT
LOC. NO. S82X FROM GROUND & AS MOVE TOWARDS RLY. TRACK. THERE IS SAG & BY
CALCULATING ALL VALUES BY ABOVE PROCEDURE WE REACH AT THE CLEARANCE= 19.53
M

EDc~gineer
(C&M-400 KV GSS)
RRVPNL, Heerapura (Jaipur1

Q~.\A.,J .
Assistant Efgmeef-nf(c&M)
400 'l:'./ GSS, RVPNL, Heerapura
------ -
RJ\JASTll1\N tAJY.\ VIDYUT Plt1\SJ\ltAN NIGAM LIMITED
OFFICE OF TllE .UPUUNTENOING 1:NGINEElt(T&C-Jaipur City)
(ISO 'J.10l:!IJOB Certified Company)
[Corpurat ,, 11 ,11u t .,. Nu mbcr[ Cl NI I I Hll O'J l{jZOOOSGCO 16485)
l(egd Cl!licl' \'1cl;"t llhawa11, )yI' ''agar, jaipur-302005
TeJ,., _,.q 111-z2:;012:i,Fa" 'Jl-141-2250440
Ln1aiJ ,r il l.!!q:: (,1)1vpn.cn in \\'t'l>-;ite: \VWW.rvpn.co.in

No. RVPNL/SE/l .'><C/JPR-Cliv/Tl'cl1/ ,...

!The Divisional ttailway Manager


North Wester ILdway, Jaipur.

Sub.:- Itaising h11ght of existing LLO h '-;/1. Ilccrapur.1-l<l1ttri ;:nd LLO l<V S/C l-lcerapur;1-
l<otputli line (Deposite work).
lief::- (1.) No. RVl'NL/SE/400 KV c;SS/l'M/I /ll.1336 Ill. 2'J.O:l.2016
(2.) No.fl.:! ./C/j P/track crossi nv 'JP-SI kar/1 /16 Dated: 12.0C,.2016
(3.) RVPN l./SE/40.0 l\V /GSS/ 111 i~/Tcd1./F./20 I (>/ll.11(,7 Dated: lfl.o:uo l(,

llear Sir,

ln referenc to the subject cited .1bov, it is int111at d !hat the complete proposal (or
HJilway crossnllg cases for Lhc ro!lcJ\\ .:;g .'.l'((inn und1'.r j<11pur Division for Haising height of
existing 220 KV ;;c Heerapura-Khd1 .1111: .:w KV S/C: "'"'"1pura-Kotputli l;nc h<is already
submitted to your good office vidc let .. 1- 11<' ~cir, d;.icd "J.ll:l.201 (,,but the pcrn1isson fo1
0xecn!"i ::n of the <:1foresaid \vork is
1 c.1w;11L(~d ti:I t.oday.
It is therLfore you arc requcst._d ti) convey nccc~.-.,;1ry pcr1nissionof above r;1ilway
crossing at the t~<1rliest. As Uuc to th1> \~1c .111.' nol in ..i po-,ition to issue the work order for

llaising height ol above lines. Any de!,,' in 1l11s part is to ytntr ;1ccou11l.

This may please be treated as M J}iT JJl.ll!.1_,NT.


?.:,s? -r
I ICC. Shivgan)
1lil'EIUNTENiJINC ENGINEER (T&C: J;iipur City)
HVl'N, I IEERAPURA, jAil'UR.
Copy submitted I forwarded to the ro1;.1wi11:: 1'01 infor111illidll ilnd 11cccssary action:-
1. The Chicl Engineer (T&C), RVl''J, Jaipur.
2. The Executive Engineer (T&C, J .ipu1 i:ity), RVl'N, llf'c1'i1puro1, Jaipur.
:l. The Assi't ant Engineer -ll (T& . J;11 p1o1 City), I! V l'N. Ilccrapura Jaipur.

'"'~
SlJl'l'l<INTl.NlllNG ENGINEER (T&C Jaipur City)
I(\! l'N, 11 l"mAPURA. ]/\I I'll R.

IJil'.Ccll/SrJCity/21
NORTI-I WESTERN RAIL\VAY
Divisional Office
Jaipur
Dated 26.08.!6
No. DY. CEE/C/GC/JP-SIKR/02

SE (400 kV GSS)
RVPNL, Hcerapura
Jaipur

Sub:- Modification of 220 kV overhead railway track crossing between Chomu-


NDH railway station at KM no. 1~s/7-7.
Ref: - Way leave facility for track crossing by Railway

<<>>

Jn above cited subject, please arrange to deposit way leave charges of Rs.
12800/- with signed way leave agreement on Its ..100 Non judicial Stamp paper in
reference with power line track crossing within one month. The charge of 12800/- is
taken for proyioeway leave facility to RVPNL. Cheque /DD may be issued in favour
ofSr.DFM/NWRJJP.
Modification work of power line track crossing should not be started without
written pennission of undersigned.

Encl.- Way leave agreement copy

D~~~' ?P~
(ELECRICAL)
rs)~
-~ U, NWR/Jaipur
,
'----'
Copy to-
Dy. CEE/C/JP : For kind information and chase up with crossing owner please

:::~~r1ntrP):i!J :,1~i:
fL \l. r~. i :
' 'lf.R.

Office of the,
Dy. Chief E.2ctrical
Engineer,/\JVVR-Jaipur_

No. EL/L/JP/JP-SIKR/GC/EHT/1/2015 Dated: 03.11.2016

SE(T&C Jaipur City)


RVPN- Heerapura, Jaipur

Suh:- Permission for starting the modification work of 220kV S/C between
Nidarbanar-Chomu Samod Railway station at km 145/6-7.
Ref:- RVPNL/SE/T&C/JPR-CT/Tech/No. /2016/D. 1368 Jaipur, dtd. 26.07.16
<<>>
Vide above subject and reierence, t_lle. proposal for modification work of 220kV S/C
EHT track crossing line between'Nidarbanar~Chomu Samod Railway station at km
/" ~.~ . ., _ ~'.; ~~:.o:,: :;,."
l45/6-7 submitted by SE{T&C J.alpl.u::Ci~y}He.rap_ura, Jairur has been approved and
; ~ --,, 1.:, . :-:..... '-~ -~-'.~ ': . ~.
granted permission to start the/modification work. - ..
Tl1is is fo, your kind fn~h(fW~t~oh al1d 'furthdr nE)~essary action please.
~ t~:. .-;,-\.0f,. _::' ~-~- ' -- - ,-< '---~-
,), C"}.r-
~\_\;,.: ; : \
).J)\'0./
~~Encl:- Photocopy of drawing.
, n..1 -:\., ~L:
" '-<-"'
Dy. CEE/C/Jif5' \
. I 1/1.i.

~.
77,l -io !;;d-::- : ; -~~incer(T &C-Ja1purar1)
R V. P. N. JAIPUR