Requirement Analysis Supply Chain Management
Revision Chart
Document Approvers
Name Signature
Distribution
Preface
The purpose of this document is to provide a blueprint of the Business Requirements for
University of Peshawar and confirm it with the relavant stakeholders. The basis of decisions
made in this document is the requirements and data gathered during the requirements phase
of the project.
CONTENTS
1 DOCUMENT OVERVIEW 7
2 ORGANIZATION OVERVIEW 8
1 Document Overview
1.1 Intended Audience
The intended audience for this document is the respective process owners, business users and the
team leads of the following departments:
Treasurer Office
Procurement Section Treasurer Office
Main Store Section Treasurer Office
Directorate of Works
University Departments
1.2 Assumptions
1. The document is prepared purely on the basis of meetings held with Stake Holders and data
gathered during the requirements phase of the project.
1.3 Source
Sr. No Document Name/Description
1.4 Terminologies
Element Definition
2 Organization Overview
The University of Peshawar is catering for the academic needs of Peshawar and also of the whole
province and Federally Administered Tribal Areas (FATA).
The University of Peshawar has three major units covering two core business areas i.e Academic &
Non Academic:-
Non Academic
o Administrative Unit
Academic
o Faculty Unit
o Unit of Research Labs, School & College
2.1.2 Academic Area / Faculty Unit & Unit of Research Labs, Schools / Colleges
Faculty Unit consists of six different faculties each having several departments within it. Each Faculty
has a Dean as Head of Faculty. A faculty comprises of different departments. In Academic area, there
are also Research Centres, Schools & Colleges. Detail of departments of all faculties is available on
University of Peshawar Official website
Faculty of Arts and Humanities
Faculty of Islamic and Oriental Sciences
Faculty of Management and Information Sciences
Faculty of Numerical and Physical Sciences
Faculty of Social Sciences
Research Centres
Research Labs
Others / Colleges
Affiliated Institutes
There are different methods for procurement of material / services from Vendors / Market. If
estimated cost of material / goods is less than PKR 25,000/-, (Twenty Five Thousand Only)
procurement is done through single quotation / vendor. If estimated cost is exceeding from
PKR.25,000/- (Twenty Five Thousand Only) but less than PKR.500,000/- (Five Lac Only) then authority
goes for three quotation process. More often, procurement for even below PKR.25,000/- (Twenty Five
Thousand Only) is done through three quotation approach. Tender is published in at least three
famous newspapers if estimated cost of material / services goes beyond PKR.500,000/- (Five Lac Only)
Purchasing Committees are established for procurement for all three approaches i.e Single
Quotations, Three Quotations, Tender for negotiation and recommendation of best supplier /
contractor. For Single & Three Quotation approach, one committee is established for each case where
as for Tender Process, one for entire year.
In order to meet daily expenses, departments are capable of making procurement up to PKR.25000/-
(Twenty Five Thousand Only) at their own.
Treasurer Office is responsible to procure specific area of goods / services types. Procurement for
remaining is done by Directorate of Works. DTE of Works is responsible to supply / provide Civil Works,
Electric, Sanitary and Telephone Exchange related material / services to all UoP departments /
residents whereas funds are allocated and payments are made by Treasurer Office. To execute
projects, funds can also be sponsored by HEC and NGOs etc. Sometimes Treasurer Office also procure
the Works related material for DTE of Works to meet daily demands from Users. DTE of Works has
same procurement mechanism as Treasurer Office.
Similarly, DTE of Works also has a store for Civil Works, Electric, Sanitary and Telephone Exchange
related material. Third type of stores is at Department level. Each department maintains its own store
to meet daily user requirements for their relevant type of goods like in case of laboratories they
maintain chemicals etc.
Senate
Chancellor
Syndicate
Vice Chancellor
Registrar
Treasurer Dean Faculty of Arts and Material Research Lab
Director Admission Humanities Centralized Resource Lab
Directorate of Dean Faculty of Islamic Nuclear Medicine and
Administration and Oriental Studies Research Lab
Dean Faculty of Life and Phyto-Pharmaceutical &
Controller of Environmental Sciences Neutraceutical Research
Examination Dean Faculty of Lab
Director (P&D) Management and University Model School
Provost Office Information Sciences University Public School
Dean Faculty of University Boys College
Directorate of Quality Numerical and Physical Jinnah College for Women
Enhancement Sciences
Central Library Dean Faculty of Social
Centre for Human Sciences
Resource & Career
Development
Directorate of Works
Directorate of Sports
Directorate of Distance
Education
Office of Research and
Innovation Centre
Following scenario illustrates how Treasurer Office makes the purchases through Single Supplier
/Quotation in order to fulfill the demand raised by any department, Treasurers Main Store/
Employee. Purchase Process is initiated in case material is not available in Treasurers Main Store.
Material/Service is purchased through single quotation Process if estimated cost is less than PKR.
25,000/- (Twenty Five Thousand Only)
S. Process Name
No
1. N/A
None
Treasurer Office Treasurer Office Treasurer Office -
Start -Treas urer -Dealing Asst Dealing Asst
[Manual] Treasurer
(Procurem ent) (Procurem ent)
marks it to Store f or [Manual] Forwards it [Manual] Calls
Treasurer Office issuance or Dealing to Treasurer f or relev ant Supplier to
-Treas urer Asst (Procurement) to approv al. (4) prov ide quote. (7)
[Manual] A demand initiate Purchase
Process. In this > Supplier Quotation
f or Goods or repair is
receiv ed f rom any scenario, demand is
dept, Treasurer Main f orwarded to Dealing Treasurer Office
Store or any Asst (Procurement)
(2)
-Treas urer Treasurer Office
employ ee of
Treasurers Of f ice (1) [Manual] Forwards to -Dealing Asst
Vice Chancellor f or (Procurem ent)
> Demand f urther approv al. (5)
Treasurer Office [Manual] Forwards
-Dealing Asst quotation to
Treasurer along with
(Procurem ent) necessary
Vice Chancellor
[Manual] Prepares a documents. (8)
Purchase Requisition [Manual] Approv es
with estimated rates Requisition. (6)
to initiate Purchase
Process. (3) Treasurer Office
> Purchase
Treas urer
Requisition [Manual] Forwards to
Vice Chancellor f or
Sanction. (9)
SCM- Treasurer Office - Calls relevant Supplier to provide the Supplier Manual
BPI.1.7 Dealing Assistant quote. Quotation
(Procurement) (- A committee is established for each
case of Single & Three Quotation
Scenarios
- Which supplier to buy from: It is
decided by the mutual understating of
the committee.
- Rates may also be negotiated with
the supplier)
SCM- Treasurer Office - Forwards the quotation to Treasurer N/A Manual
BPI.1.8 Dealing Assistant along with necessary documents.
(Procurement)
SCM- Treasurer Office - Forwards to Vice Chancellor for N/A Manual
BPI.1.9 Treasurer Sanction.
Following process illustrates how Treasurer Office makes the purchases through three quotation
process in order to fulfill the demand raised by any department, Treasurers Main Store/ Employee.
Purchase Process is initiated in case material is not available in Treasurers Main Store.
Material/Service is purchased through three quotations Process if estimated cost is between PKR.
25,000/- (Twenty Five Thousand Only) and PKR. 500,000/- (Five Lac Only)
S. Process Name
No
1. N/A
None
Treasurer Office Treasurer Office - Treasurer Office -
Start Treas urer Dealing Asst Dealing Asst
[Manual] Treasurer
(Procurem ent) (Procurem ent)
marks it to Store f or [Manual] Forwards it [Manual] Calls
Treasurer Office issuance or Dealing to Treasurer f or relev ant Supplier to
Treas urer Asst (Procurement) to approv al. (4) prov ide their
[Manual] A demand initiate Purchase quotations. (7)
f or Goods or repair is Process. In this
scenario, demand is > Supplier Quotation
receiv ed f rom any
dept, Treasurer Main f orwarded to Dealing Treasurer Office -
Store or any Asst (Procurement)
(2)
Treasurer
employ ee of
Suppliers / Vendors
Treasurers Of f ice (1) [Manual] Forwards to
Vice Chancellor f or [Manual] Submit
> Demand f urther approv al. (5) their quotations on
Treasurer Office - scheduled date. (8)
Dealing Asst
(Procurem ent)
Vice Chancellor A
[Manual] Prepares a
Purchase Requisition [Manual] Approv es
with estimated rates Requisition. (6)
to initiate Purchase
Process. (3)
> Purchase
Requisition
SCM-BPI-6
Purchase Order
Receipt Process
SCM- Treasurer Office - Calls relevant Supplier to provide their Supplier Manual
BPI.2.7 Dealing Assistant quotations. Quotation
(Procurement) (- A committee is established for each
case of Single & Three Quotation
Scenarios
- Which supplier to buy from: It is
decided by the mutual understating of
the committee.
- Rates may also be negotiated with
the supplier)
SCM- Suppliers / Submit their quotations on scheduled N/A Manual
BPI.2.8 Vendors date.
Following scenario illustrates how Treasurer Office makes the purchases through Tender process in
order to fulfill the demand raised by any department, Treasurers Main Store/ Employee. Purchase
Process is initiated in case material is not available in Treasurers Main Store. Material/Service is
purchased through three quotations Process if estimated cost is greater than PKR. 500,000/- (Five Lac
Only). In this scenario Tender is published in at least 3 famous newspapers.
S. Process Name
No
1. N/A
None
Treasurer Office - Treasurer Office - Treasurer Office -
Start Treasurer Dealing Asst Treasurer
[Manual] Treasurer
(Procurem ent) [Manual] Writes a
marks it to Store f or [Manual] Forwards it letter to relev ant
Treasurer Office issuance or Dealing dept to publish
to Treasurer f or
Treas urer Asst (Procurement) to approv al. (4) Tender in newspaper
[Manual] A demand initiate Purchase So Tender is
f or Goods or repair is Process. In this published in at least
receiv ed f rom any scenario, demand is three newspapers. (7)
dept, Treasurer Main f orwarded to Dealing Treasurer Office - > Tender
Store or any Asst (Procurement)
(2)
Treasurer
employ ee of
Treasurers Of f ice (1) [Manual] Forwards to
Vice Chancellor f or Suppliers
> Demand f urther approv al. (5)
Treasurer Office - [Manual] Purchase
Dealing Asst Tender by depositing
(Procurem ent) Tender Fee (8)
Vice Chancellor
[Manual] Prepares a
Purchase Requisition [Manual] Approv es
with estimated rates Requisition. (6) Suppliers
to initiate Purchase
Process. (3) [Manual] Submit
quotations on
> Purchase scheduled date. (9)
Requisition
> Quotations
End
SCM-BPI-6
Purchase Order
Receipt Process
Following process illustrates how Treasurer Office makes the purchases through Two Envelop Tender
process in order to fulfill the demand raised by any department, Treasurers Main Store/ Employee.
Purchase Process is initiated in case material is not available in Treasurers Main Store.
Material/Service is purchased through three quotations Process if estimated cost is greater than PKR.
500,000/- (Five Lac Only). In this scenario Tender is published in at least 3 famous newspapers.
S. Process Name
No
1. N/A
None
Treasurer Office Treasurer Office - Treasurer Office -
Start Treas urer Dealing Asst Treasurer
[Manual] Treasurer
(Procurem ent) [Manual] Writes a
marks it to Store f or [Manual] Forwards it letter to relev ant
Treasurer Office issuance or Dealing dept to publish
to Treasurer f or
Treas urer Asst (Procurement) to approv al. (4) Tender in newspaper
[Manual] A demand initiate Purchase So Tender is
f or Goods or repair is Process. In this published in at least
receiv ed f rom any scenario, demand is three newspapers. (7)
dept, Treasurer Main f orwarded to Dealing Treasurer Office - > Tender
Store or any Asst (Procurement)
(2)
Treasurer
employ ee of
Treasurers Of f ice (1) [Manual] Forwards to
Vice Chancellor f or Suppliers
> Demand f urther approv al. (5)
Treasurer Office - [Manual] Purchase
Dealing Asst Tender by depositing
(Procurem ent) Tender Fee (8)
Vice Chancellor
[Manual] Prepares a
Purchase Requisition [Manual] Approv es A
with estimated rates Requisition. (6)
to initiate Purchase
Process. (3)
> Purchase
Requisition
SCM- Treasurer Office - Forwards the case to Vice Chancellor N/A Manual
BPI.4.15 Treasurer for Sanction.
Following process illustrates how Treasurer Office purchases / hires services like repair of toner or
replacement of drum etc. in order to fulfill the demand raised by any department, Treasurers Main
Store/ Employee. Just like goods, hiring of services approach is same depending on estimated cost but
mostly Three Quotation approach is used for below PKR. 500,000/- (Five Lac Only) otherwise tender
is published in newspapers.
S. Process Name
No
1. N/A
None
Treasurer Office Instrum ent Vice Chancellor
Start Treas urer M echanic [Manual] Approv es
[Manual] Treasurer [Manual] Puts his sanction request.
marks it to Store f or remarks on abov e Purchase Committee
Treasurer Office issuance or Dealing noting as Technical is also f inalized f or
Treas urer Asst (Procurement) to Report. (4) this particular
initiate Purchase purchase (7)
[Manual] A demand > Technical Report
f or repair / Process. In this
replacement is scenario, demand is
receiv ed f rom any f orwarded to
dept, Treasurer Main Treasurer Of f ice Treasurer Office -
Main Store Treasurer Treasurer Office -
Store or any Dealing Asst
Of f ice - Dealing Asst Dy. Treasurer
employ ee of (Procurem ent)
Treasurers Of f ice. (Procurement) (2)
[Manual] Report
Take example f or [Manual] Calls
goes to Dy . Treasurer
repair of Ky ocera relev ant Supplier to
through
225 KM, Drums out prov ide their
Superintendent & he
of order. (1) Treasurer Office - quotations. (8)
approv es it. (5)
Dealing Asst > Supplier Quotation
> Demand
[Manual] Puts up
noting to Instrument
Mechanic or relev ant Treasurer Office -
dept like IT Dept, Treasurer Suppliers / Vendors
Science Dept. etc. [Manual] Submit
[Manual] Case is sent
through their quotations on
to Vice Chancellor
Superintendent. (3) scheduled date. (9)
f or sanction &
> Note Sheet decision of Purchase
Committee. (6)
A
SCM- Treasurer Office - Report goes to Dy. Treasurer through N/A Manual
BPI.5.5 Dy. Treasurer Superintendent and he approves it.
SCM- Treasurer Office - Case is sent to Vice Chancellor for N/A Manual
BPI.5.6 Treasurer sanction and decision of Purchase
Committee.
SCM- Vice Chancellor Approves the sanction request. N/A Manual
BPI.5.7 Purchase Committee is also finalized
for this particular purchase
SCM- Treasurer Office - Calls relevant Supplier to provide their Supplier Manual
BPI.5.8 Dealing Assistant quotations. Quotation
(Procurement) (- A committee is established for each
case of Single & Three Quotation
Scenarios
- Which supplier to buy from: It is
decided by the mutual understating of
the committee.
- Rates may also be negotiated with
the supplier)
This process illustrates how the material is received against Purchase Order at Treasurers Main Store
or any department. Supplier delivers the material to following locations:-
Treasurers Main Store: if material is purchased to maintain the stock in Store
Requesting department: if material is purchased to fulfil the demand
In second case, Treasurers Main Store Keeper puts the entry on Stock Register (Receipt and then
Issue) at the time of receiving and makes the balance as Nil.
S. Process Name
No
1. SCM-BPI-01 Purchase through Single Supplier / Quotation
2. SCM-BPI-02 Three Quotation Purchase Process
3. SCM-BPI-03 Purchase through Tender Process
4. SCM-BPI-04 Purchase through Two Envelop Tender Process
SCM-BPI-01
Purchase through Inspection Relevant Store Relevant Store
Single Supplier / Com m ittee Store Keeper Store Keeper
Quotation
[Manual] carries out [Manual] Puts [Manual] Signs
inspection of receiv ing entry on Deliv ery Challan &
SCM-BPI-02 Three material (2) Stock Register. In retain one copy as
Quotation case material is Goods Receipt Note
Purchase Process deliv ered directly to (GRN) (6)
dept then Store
> Goods Receiv ed
SCM-BPI-03 Inspection Keeper puts entry
Note (GRN)
Purchase through Com m ittee (receipt & then issue)
Tender Process on Stock Register &
[Manual] Inspection makes balance as
report is prepared & Nil. (4)
SCM-BPI-04 signed by Inspection Relevant Store
Purchase through Committee (3) Store Keeper
Two Env elop
[Manual] Bills
Tender Process Supplier f orwarded to
[Manual] submits all Treasurer Of f ice
Start relev ant bills (5) Accounts Section f or
Pay ment Process (7)
> Deliv ery Challan /
Supplier Inv oice / Sales Tax
End
[Manual] deliv ers
material at
Treasurers Main FIN-BPI-xx
Store or requesting Relev ant
dept (1) Financials
Document
SCM- Relevant Store Puts the receiving entry on Stock Stock Register Manual
BPI.6.4 Store Keeper Register. In case material is delivered
directly to department then Store
Keeper puts the entry (receipt and
then issue) on Stock Register and
makes the balance as Nil.
(Before entry he verifies the signature
of the respective Recipient on
Delivery Challan)
SCM- Supplier submits all relevant bills Delivery Manual
BPI.6.5 Challan /
Invoice / Sales
Tax
SCM- Relevant Store Signs Delivery Challan and retain one GRN Manual
BPI.6.6 Store Keeper copy as Goods Receipt Note (GRN)
SCM- Relevant Store Bills are forwarded to Treasurer Office N/A Manual
BPI.6.7 Store Keeper Accounts Section for Payment Process
This process illustrates how the work completion is confirmed against Purchase Order at Treasurers
Main Store or any department. In case of replacement, Supplier delivers the material to following
locations:-
Show the material to Treasurer Office Main Store first and then to concerned department for
fixing / replacement and repair
Directly goes to relevant department / user for work completion
Treasurer Office Main Store Keeper puts the entry on Stock Register (Receipt and then Issue) and
makes the balance as Nil.
S. No Process Name
1. SCM-BPI-05 Purchase / Hiring of Services
SCM-BPI-04
Purchase / Hiring Supplier Treasurer Office
of Serv ices M ain Store
[Manual] Submits
Deliv ery all relev ant Dealing Asst
Start bills. (3) [Manual] Satisf actory
> Deliv ery Challan / Report is also
Supplier Inv oice / Sales Tax obtained f rom
concerned user /
[Manual] completes requestor (5)
work (serv ices /
> Satisf actory Report
replacement / f ixing) Treasurer Office
(1)
M ain Store
Dealing Asst
Treasurer Office
[Manual] Technical
Relevant Store Report is obtained
M ain Store
Store Keeper f rom relev ant Dealing Asst
technical person [Manual] Bills
[Manual] In case of against work
replacement Store f orwarded to
completed (4) Treasurer Of f ice
Keeper puts entry
(receipt & then issue) > Technical Report Accounts Section f or
of utilized item on pay ment (6)
Stock Register &
makes balance as
Nil. (2) End
FIN-BPI-xx
Relev ant
Financials
Document
An advance of One Lac Rupees is given to nominated employee and he is allowed to purchase the
material from this fund as and when required. This is for demands received from internal Offices only
and not from other departments. If expense is more than PKR.1000/- then approval is taken from
Treasurer. This process belongs to different departments but in this document we are taking the
example of Store Keeper of Treasurers Main Store. Other depts. can purchase up to PKR. 25,000/- on
petty cash.
S. Process Name
No
1. SCM-BPI-10 Material Issuance within Treasurer Office (demand is raised)
SCM-BPI- Material
Issuance within Treasurer Office - Treasurer Office - Treasurer Office -
Treasurer Of f ice Store Keeper Store Keeper Store Keeper
(demand is raised
[Manual] In case of [Manual] Purchases [Manual] Updates
written demand, material f rom market petty cash register (7)
Start Treasurer marks it to or requestor
> Petty Cash Register
Store f or issuance or purchases himself &
Dealing Asst prov ides bill to Store
Treasurer Office - (Procurement) to Keeper. (4)
Treasurer initiate Purchase
Process. In this Treasurer Office -
[Manual] A demand
scenario, demand is Store Keeper
f or Goods or repair is
receiv ed f rom any f orwarded to Store Treasurer Office - [Manual] Once
employ ee of Keeper. (2) Store Keeper av ailable f unds
Treasurers Of f ice. (1) reach its ceiling,
[Manual] One, two,
> Demand detail of all bills is
or three bills together
prepared & sent to
Treasurer Office - sent to Treasurer f or
Vice Chancellor
Store Keeper approv al (5)
routing through Dy .
> Bill Treasurer &
[Manual] obtains
Treasurer f or
Treasurers approv al
approv al. (8)
f or purchase if
expense is more than
PKR.1000/- Treasurer Office -
otherwise purchases Treasurer
directly (3) Vice Chancellor
[Manual] Sanction
approv ed by [Manual] Approv es
Treasurer (6) sanction request. (9)
SCM- Treasurer Office - Updates petty cash register Petty Cash Manual
BPI.8.7 Store Keeper Register
SCM- Treasurer Office - Once available funds reach its ceiling, N/A Manual
BPI.8.8 Store Keeper detail of all bills is prepared and sent
to Vice Chancellor routing through Dy.
Treasurer and Treasurer for approval.
SCM- Treasurer Office - sends approved case sanction case N/A Manual
BPI.8.10 Store Keeper along with all bills to Accounts Section
(Advance Assistant)
SCM- Treasurer Office - process the adjustment and issues Transfer Manual
BPI.8.13 Cheque Writer Transfer Voucher to concerned Voucher
employee (Store Keeper) as evidence
of adjustment
SCM- Treasurer Office - Petty Cash advance sanction is taken N/A Manual
BPI.8.14 Store Keeper from Vice Chancellor through Dy.
Treasurer and Treasurer.
SCM- Treasurer Office - looks into budget available and N/A Manual
BPI.8.16 Ledger Keeper mentions on document how much
budget is available
SCM- Treasurer Office - Issues the cheque to concerned Cheque Manual
BPI.8.17 Cheque Writer employee (Store Keeper)
This process illustrates how the material is issued from Treasurers Main Store against Demand. If cost
of material is within PKR.1000/- then Store Keeper directly issues the material otherwise takes the
approval from Treasurer. Treasurers Main Store issues the material to the following:-
University Departments
Entitled Employee Houses
Hostels
Treasurer Offices Employees
S. No Process Name
1. SCM-BPI-06 Purchase Order Receipt Process
SCM-BPI-06
Purchase Order Treasurer Office - Treasurer Office
Receipt Process Treasurer M ain Store Store
[Manual] Treasurer
Keeper
Start marks it to Store f or [Manual] Puts
issuance or Dealing Issuance entry on
Asst (Procurement) to Stock Register (4)
Treasurer Office - initiate Purchase
Treasurer Process. In this > Stock Register
[Manual] A demand scenario, demand is
f or Goods or repair is f orwarded to Store
receiv ed f rom any Keeper (2)
Relevant Dept.
dept, Treasurer Main
Store or any Store Keeper
employ ee of [Manual] In case,
Treasurers Of f ice. Treasurer Office
material is issued to
(Verbal / Telephonic M ain Store Store store of any other
/ Written) (1) Keeper dept, concerned
> Demand Store Keeper puts
[Manual] Issues
receiv ing entry on
material to
Stock Register (5)
Requestor & takes his
signature on demand > Stock Register
(3)
> Demand Entry End
Register
SCM-BPI-15
Material Issuance
within Depts. (All
Departments)
This process illustrates how the material is issued from Treasurers Main Store against Demand within
Treasurer Office. If cost of material is within PKR.1000/- then Store Keeper directly issues the material
otherwise takes the approval from Treasurer.
S. No Process Name
1. SCM-BPI-06 Purchase Order Receipt Process
2. SCM-BPI-08 Purchase through Petty Cash
SCM-BPI-06
Purchase Order Treasurer Office Treasurer Office
Receipt Process M ain Store Store M ain Store Store
Keeper Keeper
SCM-BPI-08
Purchase through [Manual] Issues [Manual] Puts
Petty Cash material to Issuance entry on
Requestor & takes his Stock Register (4)
signature on demand
> Stock Register
Start (2)
> Demand Entry
Register End
Treasurer Office
M ain Store Store
Keeper None
[Manual] A demand
Treasurer Office
f or Goods or repair is M ain Store Store
receiv ed f rom any Keeper
employ ee of
Treasurer Of f ice. (1) [Manual] In case of
cost more than PKR.
> Demand 1000/- then approv al
is taken f rom
Treasurer (3)
This process describes how unserviceable material is returned from departments to Treasurer Offices
authorized location.
S. No Process Name
1. SCM-BPI-9 Material Issuance to Depts. from Treasurer Office Main Store
SCM-BPI-9
Material Issuance Treasurer Office Treasurer Office Treasurer Office
to Depts. f rom M ain Store Store M ain Store Store Dealing Asst.
Treasurer Of f ice
Main Store Keeper Keeper [Manual] List of
[Manual] A rep of [Manual] Material is Unserv iceable Items
Main Store v isits site transf erred to is attached in
Start Auction File
in order to count decided location
items as per list (Treasurers Of f ice maintained by
giv en by dept & get Premises) (4) Dealing Asst (6)
Relevant Dept.
idea on what kind of
Head of Dept. v ehicle is required to
> Auction File
This process illustrates how the material is written off in case of theft, unserviceable material not
auction able and fire case etc.
S. Process Name
No
1. SCM-BPI-11 Return of Unserviceable Items from Depts.
SCM-BPI-11
Return of Treasurer Office
Unserv iceable M ain Store Store
Items f rom Depts.
Keeper
[Manual] Af ter VC
Start
approv al, Stock
Register is updated
Treasurer Office with Issue entry (3)
Treasurer > Stock Register
[Manual] Writes a
letter to Vice
Chancellor f or
Treasurer Office
approv al of Write Of f
material. (1) M ain Store Store
Keeper
> Letter
[Manual] Write Of f
register is also
updated. (4)
Vice Chancellor > Write Of f Register
[Manual] Sends a
person to v isit stores
f or v erif ication. End
Inquiry is held in
case of thef t. (2) None
Auction process is initiated by analyzing Auction file maintained by Store Keeper. Auction File contains
the lists of unserviceable items returned from different departments. Unserviceable material is
stocked on different locations under custody of Treasurer Office Main Store.
S. Process Name
No
1. SCM-BPI-11 Return of Unserviceable Items from Depts.
SCM-BPI-11
Return of Treasurer Office Bidders Winning Bidder (s)
Unserv iceable M ain Store Store
Items f rom Depts. [Manual] Security [Manual] Remaining
Keeper (Ref undable) is amount is deposited
[Manual] Writes a deposited by all by winning bidders
Start participant Bidders later on decided
letter to Media
Protocol Of f icer to on same day (5) date. (8)
Treasurer Office publish Auction
detail in at least
Treasurer three f amous
[Manual] Writes a newspapers. Details Auction Com m ittee Treasurer Office
letter to Vice like Auction date, [Manual One or
Treasurer
Chancellor along terms & conditions & more Bidders
material details, [Manual] Prov ides
Auction File f or selected by
auction location etc. Authority Letter /
approv al to conduct committee based on
(3) Gate Pass f or
Auction. (1) their calls. (6) collection of material
> Letter f orm specif ic
location. (9)
Treasurer Office Winning Bidder (s) > Authority Letter/
Vice Chancellor M ain Store Store Gate Pass
Keeper [Manual] Fixed
[Manual] Approv es amount is deposited
[Manual] Auction is A
case. Committee & by winning bidders at
date of auction is held in presence of time of auction. (7)
also decided in this Committee &
approv al (2) bidders. (4)
End
FIN-BPI-xx
Relev ant
Financials
Document
SCM- Vice Chancellor Approves the case. Committee and N/A Manual
BPI.13.2 date of auction is also decided in this
approval
SCM- Treasurer Office Writes a letter to Media Protocol N/A Manual
BPI.13.3 Main Store Store Officer to publish Auction detail in at
Keeper least three famous newspapers.
Details are like Auction date, terms &
conditions and material details,
auction location etc.
SCM- Treasurer Office Auction is held in the presence of N/A Manual
BPI.13.4 Main Store Store Committee and bidders.
Keeper
SCM- Winning Bidder (s) Fixed amount is deposited by winning N/A Manual
BPI.13.7 bidders at the time of auction.
For detail payment, please refer FIN-
BPI-05 Tender Sales
SCM- Winning Bidder (s) Remaining amount is deposited by N/A Manual
BPI.13.8 winning bidders later on decided date.
SCM- Treasurer Office Provides Authority Letter / Gate Pass Authority Manual
BPI.13.9 Treasurer for collection of material form specific Letter/
location. Gate Pass
SCM- Winning Bidder (s) Collects the material in the presence N/A Manual
BPI.13.10 of Treasurers Office Representative.
(In case bidder does not collect the
material, his deposits are retained.)
For collection of payments detail,
please refer FIN-BPI-05 Tender Sales
This process describes how under warranty material is repaired or replaced by relevant vendors. There
is no documentation maintained for these activities.
S. No Process Name
1. SCM-BPI-6 Purchase Order Receipt Process
SCM-BPI-6
Purchase Order Relevant Firm
Receipt Process
[Manual] Visits site &
repairs instrument if
Start repairable otherwise
take it to their
workshop f or repair.
Treasurer Office (3)
Store Keeper
[Manual] Receiv es a
complaint. (1)
Relevant Firm
> Complaint
[Manual] If still
instrument is not
repairable,
Treasurer Office instrument is
replaced by f irm (4)
Store Keeper
[Manual]
Communicates to End
concerned Firm (2)
None
SCM- Relevant Firm Visits the site and repairs the N/A Manual
BPI.14.3 instrument if repairable otherwise
take it to their workshop for repair.
SCM- Relevant Firm If still instrument is not repairable, N/A Manual
BPI.14.4 instrument is replaced by the firm
This process illustrates how the material is issued from departments store within departments against
demand.
S. No Process Name
1. SCM-BPI-08 Purchase through Petty Cash
2. SCM-BPI-09 Material Issuance to Depts. from Treasurer Office Main Store
SCM-BPI-09
Material Issuance Relevant Dept.
to Depts. f rom Store Keeper
Treasurer Of f ice
Main Store [Manual] Issues
material to
Requestor & takes his
SCM-BPI-08 signature on demand
Purchase through (2)
Petty Cash
> Indent Book Copy
Start
Relevant Dept.
Relevant Dept.
Store Keeper
Store Keeper
[Manual] Puts
[Manual] A demand Issuance entry on
f or Goods is receiv ed Stock Register (3)
f rom any employ ee
of dept. (1) > Stock Register
> Indent Book
End
None
Following scenario comes into picture when demand is raised by any department or resident. Demand
is forwarded to Treasurer Office. It depends on the type of goods that who will issue the material to
the requestor (Treasurer Office or DTE of Works). Examples of some items which are to be demanded
from Treasurer Office are:-
Geysers
Electric Water Coolers
Ceiling Fans
Air Conditioners
Generators
Stabilizers
S. No Process Name
1. SCM-BPI-1 Purchase through Single Supplier / Quotation
2. SCM-BPI-2 Three Quotations Purchase Process
3. SCM-BPI-3 Purchase through Tender Process
4. SCM-BPI-4 Purchase through Two Envelop Tender Process
SCM-BPI-1
Purchase through Start Civil Works/Electric/ Treasurer Office
Single Supplier / Sanitary/PBX Store Keeper
Quotation
Dir of Works Dir Exchange Section [Manual] Gets
Superintendent approv al / signature
SCM-BPI-2 Three [Manual] A demand f rom Treasurer f or
Quotations f or Goods or repair is [Manual] prepares a
report accordingly & issuance. (6)
Purchase Process receiv ed f rom any
dept or Resident in put up to Dir of Works
Dir of Works Of f ice. along with User
SCM-BPI-3 (1) Demand (3)
Purchase through Treasurer Office
> Requisition / > Site Report
Tender Process Store Keeper
Demand
[Manual] Issues
SCM-BPI-2 Three material to User /
Quotations Directorate of Benef iciary & takes
Purchase Process Civil Works/Electric/ Works Dir signature of
Sanitary/PBX benef iciary on
[Manual] Puts up demand. (7)
Exchange Section case to Treasurer f or
Superintendent approv al (4) > Benef iciary Report
[Manual] Instructs
relev ant person to A
v isit site in order to
prepare a report
Treasurer Office -
either item is Treasurer
repairable or to be [Manual] Marks it to
requested f rom main Procurement Asst or
Store (Treasurer Store Keeper
Of f ice) (2) accordingly . (5)
Treasurer Office
Store Keeper
[Manual] puts entry
in Stock Issue/
Receipt Register. (8)
> Stock Register
End
None
SCM- Treasurer Office Issues the material to the User / Beneficiary Manual
BPI.16.7 Store Keeper Beneficiary and takes the signature of Report
beneficiary on demand.
SCM- Treasurer Office Puts the entry in Stock Issue/Receipt Stock Register Manual
BPI.16.8 Store Keeper Register.
Following information regarding
Receiver is maintained in Stock Issue
/ Receipt Register:-
Department Name
House Name
Employee Name
Office Name in case of
issuance to Offices
Hostels Name in case of
issuance to hostels
S. Process Name
No
1. N/A
None
Relevant Section DTE of Works Relevant Section
Start Superintendent Store Keeper Supvr
[Manual] prepares a [Manual] Issues [Manual] obtains
report accordingly & material to Supv r of signature of
DTE of Works Dir put up to Dir of Works concerned section & benef iciary on
[Manual] A demand along with User retains Slip giv en by benef iciary report (8)
is receiv ed f rom any Demand. (3) Dir. (5)
> Benef iciary Report
dept or Resident in > Site Report
Dir of Works Of f ice
like Floor Repair etc.
(1) DTE of Works DTE of Works
> Demand DTE of Works - Dir Store Keeper Store Keeper
[Manual] Rev iews [Manual] puts entry
[Manual] Prepares
report & demand & in Stock Issue/
an Issue Voucher
issues a slip to store Receipt Register. (6)
Relevant Section monthly or bi-
Keeper f or issuance > Stock Register monthly & sends to
Superintendent of material. (4) all 4 sections Works,
[Manual] Instructs > Issue Slip Electric, Sanitary ,
relev ant person to PBX Exchange. (9)
v isit site in order to Relevant Section > Issue Voucher
prepare a report. (2) Supvr
[Manual] Fixes / A
utilizes material &
completes work (7)
Civil Works/Electric/
DTE of Works
Sanitary/PBX
Store Keeper
Exchange Section
Supvr [Manual] enters it on
Credit Voucher &
[Manual] One copy then Stock Register
of Indent is giv en to (13)
Store Keeper f or
record purpose (11) > Credit Voucher &
Stock Register
End
None
SCM- Relevant Section Prepares a report accordingly and put Site Report Manual
BPI.17.3 Superintendent up to Director of Works along with
User Demand.
(Report contains the information on
how much material and how many
labor is required.)
SCM- DTE of Works Reviews the report & demand and Issue Slip Manual
BPI.17.4 Director issues a slip to the store Keeper for
issuance of material.
SCM- Relevant Section Fixes / utilizes the material and N/A Manual
BPI.17.7 Supervisor completes the work
SCM- DTE of Works Prepares an Issue Voucher monthly or Issue Voucher Manual
BPI.17.9 Store Keeper bi-monthly and sends to all 4 sections
Civil Works, Electric, Sanitary, and
Telephone Exchange.
SCM- Relevant Section Puts entry on Indent Book by cross Indent Book Manual
BPI.17.10 Supervisor verifying with Issue Voucher and
Beneficiary Report
SCM- Relevant Section One copy of Indent is given to the N/A Manual
BPI.17.11 Supervisor Store Keeper for record purpose
Following scenario illustrates how major repair / work is done for Directorate of Works related tasks.
Note: Assessment Report used in this process is prepared based on Site Report and MRC of current
year like MRS-2016.
MRS is a website where Civil Works related Composite Rates are published year wise.
Estimate Report has two types of rates i.e Schedule Items & Non Schedule Items
Schedule items are those which are published on MRC Website
Non Schedule Items are those which are not published on MRS Website. In this case
rates are prepared & analyzed by the engineer.
S. Process Name
No
1. N/A
None
Directorate of Directorate of Treasurer Office -
Start Works Sub Works Sub Treasurer
Engineer Engineer [Manual] by checking
[Manual] prepares a [Manual] Prepares rates with MRS &
Dir of Works Dir based on av ailable
report accordingly & an Estimate Report &
[Manual] A demand put up to Dir of Works puts up to Dir of budget, approv es /
f or Goods or repair is along with User Works (5) Rejects sanction
receiv ed f rom any Demand (3) request. (7)
> Estimate Report
dept or Resident in > Analy sis Report
> Site Report
Dir of Works Of f ice.
For Example A
bath room
construction is Directorate of
Directorate of Works Dir Vice Chancellor
required by a dept /
resident (1) Works Dir Approv es case. (8)
[Manual] Puts up
> Demand [Manual] Asks Sub- case to Treasure f or
Engineer to prov ide Budget approv al. (6)
estimate. (4)
Directorate of
Directorate of Works Dir
Works Sub [Manual] writes a
Engineer letter to relev ant
dept to publish
[Manual] Visits site to
Tender in
get requirement &
newspaper. (9)
dimensions etc. (2)
> Tender
Directorate of Directorate of
Works Sub Works Sub
Engineer Engineer
[Manual] prepares [Manual] prepares
bill according to v oucher / bill & send
Contractors to Treasurer through
application & Dir of Works f or
completion of work at pay ment process (23)
site. (21)
> Bill End
SCM- DTE of Works prepares a report accordingly and put Site Report Manual
BPI.18.3 Sub Engineer up to Director of Works along with
User Demand
SCM- DTE of Works Asks the Sub-Engineer to provide the N/A Manual
BPI.18.4 Director estimate.
SCM- DTE of Works Prepares an Estimate Report and puts Estimate Manual
BPI.18.5 Sub Engineer up to Director of Works Report
Note: Assessment Report is prepared
based on Site Report and MRC of
current year like MRS-2015.
SCM- DTE of Works Puts up the case to Treasure for N/A Manual
BPI.18.6 Director Budget approval.
SCM- Treasurer Office By checking the rates with MRS and Analysis Manual
BPI.18.7 Treasurer based on available budget, approves Report
sanction request.
(In case of Non Schedule items,
Analysis Report is required by
Treasurer like Bill of Materials, Cost of
Labor, Taxes, and Carriage etc.)
Puts up the case to Vice Chancellor for
further approval
SCM- Vice Chancellor Approves the case. N/A Manual
BPI.18.8
SCM- DTE of Works Forwards the case to Treasurer and N/A Manual
BPI.18.15 Director Treasurer forwards it further to Vice
Chancellor for Sanction.
SCM- Vice Chancellor Approves the Sanction Request. N/A Manual
BPI.18.16
SCM- DTE of Works Issues the Work Order to Winning Work Order Manual
BPI.18.19 Director Bidder.
SCM- Contractors submit the application with detail, on Application for Manual
BPI.18.20 completion of complete or partial payment (Full
work / Partial)
SCM- DTE of Works Prepares the bill according to Bill Manual
BPI.18.21 Sub Engineer Contractors application and
completion of work at site.
(Assistant Director Works also verifies
it.)
SCM- DTE of Works prepares voucher / bill and send to Vouchers / Manual
BPI.18.23 Sub Engineer Treasurer Office through Director of Bills
Works for payment process
(Note: 2% earnest money and 8%
from all bills so total 10% is kept as
retention money that is paid after
specific duration from the day of work
completion like three months etc.)
For payment process, please refer FIN-
BPI-03 Payment to Suppliers
Closed Issues
ID Issue Resolution Responsibility Target Date Impact
Date