1. Company : PT REKAYASA INDUSTRI
Project Location : Ulu Belu Unit 3 &4 Geothermal Power Plant 2 x 55 MW
Period Work : December 24, 2015 January 20, 2017
Classification : Pipe Support Supervisor
Reason of Leaving : Contract Completion

2. Company : PT PROMITS
Project Location : Phase VI Project PVC 4 Asahimas Chemical
Period Work : August 25, 2015 November 4, 2015
Classification : Supervisor Commissioning
Reason of Leaving : Job Completion

3. Company : PT. REKAYASA INDUSTRI


Period Work : EPCC Total Proyek Panas Bumi Kamojang 1x35 MW
Classification : March 19, 2015 June 30, 2015
Reason of Leaving : Supervisor Commissioning
Job Description : Job Completion

4. Company : PT. KPD/ JGC INDONESIA


Period Work : September 05, 2011 April 30, 2012
Classification : Piping Foreman
Reason of Leaving : Job Completion
Job Description : Line Cleaning ( Air Blowing, Water Flushing, Mechanical Cleaning )
Tightness Test and Inerting
Start Up BBoiler
Pipe Fabrication, Hydro Test and Erection

5. Company : PT. MESITECH MITRA PURNABANGUN


Period Work : Project Tangguh Operation 00.499
Classification : February 02, 2011 June 2011
Reason of Leaving : TAR Static technician
Job Description : Job Completion
: Assist Fro Process Operation
Check PHE and Repair Heat Plant Exchanger
Leak Test for PHE
Remove and Install PS V ( Presure safety valve )
:
6. Company : PT. EPCTO DIAN PERSADA
Project Location : Tangguh LNG Project anah Merah, kab. Teluk Bintuni, Idabar KJP -1135
Period Work : August 09, 2007 August 27, 2009
Classification : Commissioning Foreman
Reason of Leaving : Job Completion
: Fabrication Temporary Spool for Blowing and Flushing Check and
Cleaning Strainer
Pro Com and Commissioning Control valve
Check and repair valve
Leak Test foto Piping J pint
Pipe Join and Reinstallment and Torque Spoll, Gasket, Boltnut
Assist For Process Operation

:
7. Company : PT. PUSAKA JAYA PALU POWER
Project Location : Pryek PLTU 2x15 MW, PT. Pusaka Jaya Power, Ds. Talise Panu taweni
Tawei Palu Utara Sulawesi Tengah
Period Work : February 02, 2007 August 12, 2007
Classification : Supervisor Commissioning
Reason of Leaving : Job Completion

8. Company : PT. TRUBA JURONG ENGINEERING


Project Location : Cilacap 2x300 MW CFSPP project
Period Work : May 04, 2005 February 28, 2006
Classification : Pipe Fitter
Reason of Leaving : Job Completion

10. Company : PT. REKAYASA INDUSTRI


Project Location : Project PT. Pupouk Kalimantan Timur
Period Work : September 16, 1998 December 20, 2997
Classification : Pipe Fitter I
Reason of Leaving : Job Completion

11. Company : PT. REKAYASA INDUSTRI


Project Location : VCM Production Plant
Period Work : July 14, 1997 December 20, 1997
Classification : Pipe Fitter I
Reason of Leaving : Job Completion

12 Company : PT. SUKWON INDUSTRIAL CO.,LTD


Project Location : PT. Semen Nusantara Expansion Cilacap Siter
Period Work : December 21, 1996 June 26, 1997
Classification : Pipe Fitter
Reason of Leaving : Job Completion

I have by certificate that the above information is true and correct the best of may knowledge and
belief.
Yours Sincerely,

ROHMAT HIDAYAT